R t f N l PRoutes for Nuclear Power Development:
Turbine
p
IAEA’s View BuildingIAEA s View
P. Vincze,Section Head,
Division of Nuclear [email protected]
IAEAInternational Atomic Energy Agency
@ g
Three “Pillars” of the IAEA
IAEA 2
Focus: Nuclear Energy SystemsTo accelerate and enlarge contributionof atomic energy to peace…
SUPPORT: Sharing best practices/experience
CATALYZE: International cooperation,advanced and innovative technologies, long term visionlong term vision
BUILD: Knowledge and experience in developing countries, capacity for
Disposal
g yinformed decision making
With due regard to safety, security,
IAEA 3
safeguard worldwide
Our Functions
• Technical cooperation (TC)
• Coordinated research projects• Focussed efforts: new countries, safety, security• Review missions: INIR, OSART• Publications: Safety Standards, Nuclear Energy y gy
Series• Conferences, WS, networks • Information: INIS, Library, databases• Training
IAEA 4
g
Content
• World challenges and nuclear powerWorld challenges and nuclear power• Nuclear power programs
• operating fleet• operating fleet• expansion of nuclear programs• new countries nuclear infrastructure• new countries - nuclear infrastructure• human resourceC l i• Conclusions
IAEA 5
World Challenges and Nuclear PowerWorld Challenges and Nuclear Power
IAEAInternational Atomic Energy Agency
Status of Nuclear Power in 2009
• About 13 900 reactor years of experience
• 437 power reactors in operation (installed capacity about 370 GWe)
• Average plant load factor: about 80%
• Contributions to global electricity: ~16%Contributions to global electricity: 16%
• Low electricity cost, good safety records
• 56 reactors under construction
• 37 constructions in Asia
IAEA 7
World Challenges - Nuclear Opportunities
• Climate change• Climate change• Energy security• Improved operations,
performance record• Fossil price rise
• Economic crisis
IAEA 8
Increasing Number of Countries Considering a Nuclear Power Programme
29 With Operating NPPs60 Consider Nuclear Power in energy mix12 Prepare NP programmes20 New countries consider a Nuclear Power
29 With Operating NPPs60 Consider Nuclear Power in energy mix12 Prepare NP programmes20 New countries consider a Nuclear Power
IAEA 9
Programme in operation by 2030Programme in operation by 2030Operating
Considering
Low and High Projections
HighLow800 800
600 600
800
748 GWe in operation, 6-21 new countries
400W(e
)
400W(e
)
473 GWe in operation, 2-6 new countries
200
GW
200
GW
0 0
IAEA 10
1960 1970 1980 1990 2000 2010 2020 2030 1960 1970 1980 1990 2000 2010 2020 2030
history 2003 2004 2005 2006 2007 2008 2009
Nuclear SafetyUnplanned scrams per year
Industrial accidentsper 1 mln man-hoursp
S WANO
IAEA 11
Source: WANO
Regulatory Framework
IAEA Safety StandardsIAEA Safety Standards and Legal Instrumentsand Legal Instruments
Safety FundamentalsSafety Fundamentals
RequirementsRequirements
Safety FundamentalsSafety Fundamentals
Safety GuidesSafety Guides
RequirementsRequirements
Safety GuidesSafety Guides
IAEA 12
Nuclear Power ProgramsNuclear Power Programs
Support for Operating Nuclear Power Plants
IAEAInternational Atomic Energy Agency
Important issues on Operating NPPs
• High performance: maximize safe and reliable, and economic operationp• Ageing effects and mechanisms• Advanced technology development for condition monitoring of
systems, structures and componentsM d i ti f Di it l I&C t• Modernization of Digital I&C systems
• Heavy components replacement
Considering life extension 95% of Operating NPPs• Considering life extension: 95% of Operating NPPs • Develop ageing management program • Established plant life management program for long term
operationoperation • Start to think about NPP operation beyond 60 years
IAEA 14
IAEA Approaches to support MS for excellence for operating NPPs
• Services to assist Member States through Technical Cooperation
• Development of series of tech. guidelines & reports
• Plant life management Technical Cooperation projects
• Training courses
• Plant life management• Life extension approaches• Ageing Management
• Competitiveness of • Training courses• Workshops• Expert Missions• Equipment procurement
• Competitiveness of operation
• Optimization of Maintenance/ ISI/ NDE Equipment procurement
• Engineering review services
/ ISI/ NDE• Outage management • Reactor Pressure Vessel
Integrity• Advanced technical
application• Digital I&C application
IAEA 15
PLiM-SALTO Review Services
Support to establish PLiM Programme under TC project
• Argentina - PLiM programme for Embalse NPPArgentina PLiM programme for Embalse NPP• China - Ageing management of Critical Components • Hungary - License Renewal of Paks Nuclear Power Plant Operation• Mexico - Life Management programme for Laguna Verde NPPsg p g g• Ukraine - Action Plans for Nuclear Power Plant Lifetime Management• Pakistan - Development of Capabilities in Automatic UT and Material
Corrosion testing for Assessment of Structural Integrity
Review missions (SALTO peer review services) implemented:• South Ukraine NPP (Mar 2007)
K i 1 NPP (K J l 2007)• Kori 1 NPP – (Korea – July 2007) • Dukovany NPP – (Czech Rep – April 2008)• Paks NPP – (Hungary – Sep 2008)
IAEA 1616
• Borssele NPP – (Netherlands – Nov 2009)
Operation Experience Feedback – Power Reactor Information System (PRIS)
RDS N 2A l
Operating E i
RDS-No.2
PRISPRISAnnual
publications
Experiencewith NPP in MS ( 1100 pages)
WEBWEDASOn-line access
www.iaea.org/programmes/a2WEBSITE
PRIS- PCOn-line access
PRIS Statistics
IAEA 17
PRIS Statistics
PRIS : Power Reactor Information SystemRDS : Reference Data Series
Planned Activities• Program Aspects
• Development of PLiM Models• Development of spare parts supply optimization modelsDevelopment of spare parts supply optimization models
• Technical Aspects• Analysis of operational feedback and possible update of International
GALL reportp• Fatigue analysis procedures• Concrete ageing with special emphasis to unlined pre-stressed
structures,O G• Operation Guidelines
• International Coordinated Research Project• Review and benchmark of calculation methods on piping wall thinning
d t i i i NPPdue to erosion-corrosion in NPPs • Approaches for the continued operations beyond 60 years in NPPs
• Knowledge management
IAEA 18
• 3rd International PLiM Symposium in 2012 (USA)
Nuclear Power ProgramsNuclear Power Programs
Expansion of Nuclear Programs
IAEAInternational Atomic Energy Agency
Expanding Programs Need
• Solid energy planningSolid energy planning• Strategic plans – long term thinking• Effective implementation plans construction• Effective implementation plans - construction
IAEA 20
Nuclear Programme in Perspective
INPRO objectives:To ensure that NES contributes to sustainable energyTo ensure that NES contributes to sustainable energy needs of the 21st century; Technology holders and users consider jointly desired innovations in nuclear reactors and fuel cyclesy
IAEA 21
Number of New Construction Initiation
GW(e) No
10
15
5
10
01 2 3 4 5 62004 2005 2006 2007 2008 2009
GW(e) 1.03 3.4 3.3 7.6 10.5 12.9
No 2 4 4 7 10 13
008 2009
IAEA 22Rapidly increase of number of construction unit
Available Advanced Water Cooled Reactor TechnologiesTechnologies
IAEAInternational Atomic Energy Agency
Competition with Operating NPPs Life Extension
APR 1000/1400APR-1000/1400
AP-1000
ATMEA
APWR/ABWR
EPR
LIFE EXTENSIONPROGRAMME
ATMEA
EPRNEW/EXPANDING
PROGRAMME ESBWR
WWER-1000/1200WWER 1000/1200
ACR-700/ 1000
IAEA 24
Challenges in construction• Limited Manufacturing Capabilities
• Main Components - Long lead components• Number of fabricators with the capabilities to build nuclearNumber of fabricators with the capabilities to build nuclear
modules
• Lack of Construction technologies and management • Specialized equipment (Very High Life Crane)• Specialized equipment (Very High Life Crane)• Modularization and piping
• Limited Human resources• Labor/Resource Availability• Labor union Agreements• Licensing personal capabilities
• Competition between newcomer /expanding Npp programme and life extension programme for operating Npps
IAEA 25
p g pp
Change of Main Suppliers20081980s 1990s 2000s
B&W (U.S)
Framatome (France)
Framatome ANP
AREVA-NP
MitsubishiUSPWR
EPRSiemens (Germany)
Framatome (France)
Siemens (Germany)
Mitsubishi (Japan)
Business collaboration
PWR business cooperation
System 80 +ABB-CE
Korea nuclear industry
OPR-1000 APR-1400Combustion Engineering
ASEA (Sweden)
Brown Boveri
F d ti f i ti
AP1000
Westinghouse (USA)
BWR business ll b ti
AP 600
Toshiba (Japan)
Westinghouse (USA)
G E (USA)
Westinghouse (USA)
Toshiba (Japan)
G.E (USA)Foundation of an association corporation
WWER- 1200
collaboration G.E (USA)ESBWR
AEP (Russia)
Hitachi (Japan)ABWR
ACR 1000ECR - CANDU
AEP (Russia)
Hitachi (Japan)
A C (C )
IAEA 26
ACR 1000ECR - CANDUAECL (Canada) AECL (Canada)
How can we solve these challenges ?
• Early preparation of expanding NPP programme to reserve the long lead material and specialto reserve the long lead material and special equipment
• More regional cooperation and makeMore regional cooperation and make International partnership to minimize the overlap of construction
• Develop the supply chain and the human resource management programme
• Maximize the exchange of the operating experiences for new NPP programme.
IAEA 27
IAEA Activities in Construction Area
• Existing documents• TRS-279, Nuclear Project Management – A guide book, j g g• TECDOC-1390 : Construction and Commissioning Experience
of Evolutionary Water Cooled Nuclear Power Plants (2004)
• Under Preparation• Safety Guide - Construction Activities at Nuclear Installations
issued• Project management during construction of NPPs• Advanced Construction Methods for NPPs • Safety Report Series - Safety Culture during Pre-operation y p y g p
Phase
IAEA 28
Nuclear Power Programsg
Supporting Infrastructure Development for NewCountriesCountries
IAEAInternational Atomic Energy Agency
Increasing Number of Countries Considering a Nuclear Power Programme
9
20 20
NationalRegional11
60 Consider Nuclear Power (NP) in energy mix12 Prepare NP programmes20 New countries consider a Nuclear Power
60 Consider Nuclear Power (NP) in energy mix12 Prepare NP programmes20 New countries consider a Nuclear Power Operating N
o. o
f CO
UN
TRIE
S
IAEA 30
Programme in operation by 2030Programme in operation by 2030 Operating
Considering
What are newcomers’ top issues?
• Do I have the people?Do I have the people?• Can I find the money?• Will I have public/government support for the• Will I have public/government support for the
entire life of the project??• What about the waste?
• Will someone sell me a suitable reactor? And can I get fuel and spare parts?
• Is this going to create local jobs?IAEA 31
g g j
Understanding the nuclear power option
• Long-term national commitmentg5-10 years to prepare5-7 years to construct30-60 years to operate100+ years to manage waste
• Long-term international commitmentI t ti l bli tiInternational obligations
IAEA 32
IAEA Position• Considerations before a decision is taken• Nuclear infrastructure - (Milestones)• Nuclear infrastructure - (Milestones)• Self-assessment of national readiness• Integrated Nuclear Infrastructure Review• Integrated Nuclear Infrastructure Review (INIR) Mission
• Coordination of international effortsCoordination of international efforts
Comprehensive approach!
Comprehensive approach!
IAEA 33
Milestones in the Development of a National Infrastructure for Nuclear Power (NG-G-3.1)
Nuclear power option included within the
national energy strategy
MILESTONE 1Ready to make a
knowledgeable commitment to a nuclear programme
MILESTONE 2Ready to invite bids
for the first NPP
MILESTONE 3Ready to commission and
operate the first NPPNuclear power option
included within the national energy strategy
Nuclear power option included within the
national energy strategy
MILESTONE 1Ready to make a
knowledgeable commitment to a nuclear programme
MILESTONE 2Ready to invite bids
for the first NPP
MILESTONE 3Ready to commission and
operate the first NPP
t pro
gram
PHASE 3
Activities to implement a first NPP
Maintenance and continuous infrastructure improvement
t pro
gram
PHASE 3
Activities to implement a first NPP
Maintenance and continuous infrastructure improvement
re d
evel
opm
ent
PHASE 2
Preparatory work for the construction of a NPP after a policy decision has been taken
a s
re d
evel
opm
ent
PHASE 2
Preparatory work for the construction of a NPP after a policy decision has been taken
Preparatory work for the construction of a NPP after a policy decision has been taken
a s
Preparing for assuming commitments & obligations
Infr
astr
uctu
r
PHASE 1
Considerations before a decision to launch a nuclear power programme is taken
been taken
Preparing for assuming commitments & obligations
Infr
astr
uctu
r
PHASE 1
Considerations before a decision to launch a nuclear power programme is taken
Considerations before a decision to launch a nuclear power programme is taken
been takenbeen taken
NPP
Pro
ject
Commissioning
Operation / decommissioning
Feasibility study Bidding process
Pre project Project decision making Construction
NPP
Pro
ject
Commissioning
Operation / decommissioning
Feasibility study Bidding process
Pre project Project decision making Construction
IAEA 34
1st. N
10 – 15 years
INFRASTRUCTURE DEVELOPMENT PROGRAMME
1st. N
10 – 15 years
INFRASTRUCTURE DEVELOPMENT PROGRAMME
Milestones in the Development of a National Infrastructure for Nuclear Power (NG-G-3.1)
• National position • Stakeholder involvement• Nuclear safety• Management• Funding and financing
• Site and supporting facilities
• Environmental protection• Funding and financing• Legislative framework• Safeguards
Environmental protection• Emergency planning• Security and physical
t ti• Regulatory framework• Radiation protection• Electrical grid
protection• Nuclear fuel cycle• Radioactive waste• Electrical grid
• Human resources development
Radioactive waste• Industrial involvement• Procurement
IAEA 35
Human Resources for Nuclear Programs
Nuclear facilities(including NPPs,
Government agencies(ministries, etc.)
Owners,operating
organizations,
Human Resources
fuel cycle, radwaste)
R&D
g ,corporations
(e.g. headquarters)
Human Resourcesfor a Nuclear Power
Programme
Regulators(including nuclear)
R&Dorganizations
gOrganizations involved in
radioactive waste activitiesPeople are likely to be the worst bottleneck
Educationalinstitutions
People are likely to be the worst bottleneck
IAEA 36
institutions
IAEA 37
37
International Conference on HRD for Introducing/Expanding Nuclear Power Programs
Abu Dhabi, United Arab Emirates14 – 18 March 2010
IAEA 38
Integrated Nuclear Infrastructure ReviewINIR Missions
• Self-evaluations prior to INIR
• Review of all 19 issues• Based on the Evaluation
th d l dmethodology and Milestones Guide
• Takes into account prior• Takes into account prior mission reports
• Assists member states inAssists member states in identifying gaps, action plans to fill the gaps
IAEA 39
Effectiveness of Support: Coordination
• International initiatives in support of newcomers• AFNI, EC, GNEP, WANO, WNA, bilateral arrangementsAFNI, EC, GNEP, WANO, WNA, bilateral arrangements• Players in the market (suppliers, consultants)
• IAEA’s support has limitation
C di ti• Coordination may • Address gaps in the international efforts• Support effective use of resourcesSupport effective use of resources• Avoid overlap & speak in one voice• Help international confidence building on the country’s
IAEA 40
nuclear power programme
Agency’s Activities For Newcomers in 2010
• Workshops, Technical Meetings
• 4-5 INIR Missions
• Finalize Reports: Workforce Planning, Bid p g,Specification and Evaluation , Managing Siting
• Continue efforts: Alternative Contracting &Continue efforts: Alternative Contracting & Ownership, NPP-Electrical Grid interface, Industrial Capacity, Financing Issues
• Launch new efforts: Nuclear Law (vol. 3), environmental issues, strategies and
IAEA 41
gknowledgeable decision-making
IAEA’s role in support for newcomers
• Provide comprehensive, unbiased and impartiald iadvice
• Provide guidance, conduct reviews, and supportof capacity buildingp y g
• Encourage transparency• Build international confidence in a country’s
ti lnational programme
What IAEA cannot do:What IAEA cannot do:• Make and implement decisions
IAEA 42
Infrastructure publication WEB site
• http://www-pub.iaea.org/MTCD/publications/ninfrastructure.asp
• http://www.iaea.org/OurWork/ST/NE/NESeries/ClickableMap/
IAEA 43
Conclusions
• Growing expectations for Nuclear Power
• Increasing number of new countries
B l d d t k l d bl• Balanced, prudent, knowledgeable, transparent decision-making is needed
• Agency promotes comprehensive approach to assistance and internationalapproach to assistance and international cooperation
IAEA 44
…Thank you for your attention