![Page 1: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/1.jpg)
Rt 29 Solutions Project Delivery Advisory Panel
January 19, 2017
![Page 2: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/2.jpg)
Rt 29 Solutions
2
Introductions: Project Delivery Advisory Panel VDOT Technical Team
Agenda item 1: Charlie Kilpatrick, Commissioner of Highways
Agenda Item 2: Aubrey Layne, Secretary of Transportation
![Page 3: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/3.jpg)
Rt 29 Solutions
3
Agenda item 3: Interaction and Feedback
Live Streaming Dec 15, 2016 Dec 1, 2016
• Unique Viewers: 17 18
• Streams: 18 36
• Average Minutes per stream: 21 23
![Page 4: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/4.jpg)
Rt 29 Solutions
Agenda item 3: Interaction and Feedback (continued)
For the period Dec 13, 2016 - Jan 17, 2017
Inbox email and phone calls: 12 emails and phone calls
• 1 commented that signals on Rt 29 at Timberwood and at Hollymead intersections are not well timed. (Signals will be adjusted after construction)
• 1 noted Rio - Rt 29 intersection is dramatically better. • 1 commented about a blind spot at Ashwood. (The sight distance is greater
than required by design standards) • 1 asked about location of crosswalk on Rt 29 Widening project. (Crosswalk
will be at N. Hollymead intersection; connects sidewalk to shared use path) • 1 thanked the contractor and project communications team. • 1 asked if Rio Mills Road will be paved and whether there will be access to
Berkmar Drive from Rio Mills Road. (No current plans to pave. But project to connect Rio Mills to Berkmar was submitted for Smart Scale scoring.)
4
![Page 5: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/5.jpg)
Rt 29 Solutions
Agenda item 3: Interaction and Feedback (continued)
For the period Dec 13, 2016 - Jan 17, 2017 (continued)
• 1 asked when Berkmar Extension will open. (July 1 completion scheduled) • 1 said the signal at Ashwood does not change frequently enough. (Field
check indicates light is working properly) • 1 resident near Rt 29/250 asked about opening in the sound wall near the
Barracks Road exit ramp. (Opening is chained but VDOT reviewing security) • 1 requested additional stone on the driveway from Route 29 to the parking
area of Ridgewood apartments. (Stone added and graded) • 1 suggested a “3-way Stop” be added on each approach to Berkmar Drive
and Hilton Heights intersection. (Roundabout will be in place by summer) • 1 said the new pavement markings are not easy to decipher on SB Rio Road
at the GSI. (There are no plans to change or add markings) • 1 noted the mast arm for the traffic signal on northbound Route 29 at Rio
Road appears to be bouncing in the wind. (Some sway is appropriate. Dampers were added in the fall to reduce excessive swaying.)
5
![Page 6: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/6.jpg)
Rt 29 Solutions
Agenda item 3: Interaction and Feedback (continued)
For the period Dec 13, 2016 - Jan 17, 2017 (continued)
Web Provide Input: No new postings
Project Hotline 844-220-5540: 7 emails and calls
• 4 communications with property managers at Forest Lakes and Hollymead for construction updates
• 2 communications with other property managers for construction updates • 1 requested information about responsibility for maintaining temporary
access and gravel on entrances during construction.
6
![Page 7: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/7.jpg)
Agenda item 4: Report on Panel Feedback
No new items
7
Rt 29 Solutions
![Page 8: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/8.jpg)
Rt 29 Solutions
8
Agenda item 5: Panel Feedback and Suggestions for Future Agenda Items
Open Discussion
![Page 9: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/9.jpg)
Rt 29 Solutions
9
Agenda item 6: Construction Milestones
As of 2016 20171/17/17 November December January February March April May June July August September October
29 Widening
Waterline Relocation (30%) 50% Construction CompletePhase 4 Grading, Drainage, and Paving (25%) 40%
Phase 6 and 7 Grading, Drainage, and Paving (30%) 35%
Berkmar
Roadway Construction South of River (85%) 85%
Roadway Construction North of River (90%) 90% Construction CompleteDeck Construction 100%
Parapets, Abutment Slabs, and Railing (0%) 20%
Hillsdale
Partial Building Demolition 100% Greenbriar Signal Infra 0% Grading, Drainage, and Paving North of Greenbriar Drive (5%) 10%
Construction Complete
Bridge Substructure (60%) 90% Bridge Superstructure
Retaining Wall-Pepsi (35%) 40% Grading, Drainage, and Paving between Greenbriar Drive and Seminole Ct. (10%) 40%
Roundabout and Roadwork between Zan Rd. and Whole Foods (20%) 30%
Grading, Drainage, and Paving in Seminole Ct. 5%
Seminole Court Signal
�1
9
![Page 10: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/10.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening Work this week • Erosion control • Excavation at Ridgewood Hotel and Ruben Lane • Ditch grading and stabilization • Stone grading for northbound and shared use path • Pond 3 drainage installation • Guardrail removal • Landscaping • Storm sewer installation • Water main relocation • Water main phase 1 testing • Jack and bore 9-2 and 11-1 • Underdrain installation
10
![Page 11: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/11.jpg)
11
Rt 29 Widening North End Grading
11
![Page 12: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/12.jpg)
12
Rt 29 Widening New NB Lane
12
![Page 13: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/13.jpg)
13
Rt 29 Widening Stormwater Basin - Ashwood
13
![Page 14: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/14.jpg)
14
Rt 29 Widening Waterline Relocation
14
![Page 15: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/15.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Significant lane closures this week (nighttime)
• Access at Ridgewood and Ruben Lane coordinated with residents
15
![Page 16: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/16.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Work next two weeks • Erosion control • Ruben Lane excavation • Pond 3 finalization • Fine grading northbound lane and shared use path • Curb backup material installation • Storm sewer installation • Asphalt demolition south of Hollymead Drive • Landscaping • Phase 3 water main installation • Phase 2 water main testing • Jack and bore structure 9-2, demobilization of 11-1 • Underdrain installation
16
![Page 17: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/17.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Anticipated significant upcoming lane closures (nighttime) • Access at Ruben Lane coordinated with residents
• Nighttime closure of Ashwood with detour along Hollymead for water main crossing
17
![Page 18: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/18.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Berkmar Extended
Work this week • Erosion control maintenance • Fine grading and stone placement on shared use path and sidewalk • Cut to fill abutment A, push to fill abutment B • Build and set bridge form liners • Install tooth joints • Pour sleeper pads • MSE coping installation • Base and intermediate paving (weather dependent)
18
![Page 19: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/19.jpg)
19
Berkmar Extension Roundabout
19
![Page 20: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/20.jpg)
20
Berkmar Extension North End
20
![Page 21: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/21.jpg)
21
Berkmar Bridge Looking South
21
![Page 22: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/22.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued)
Significant lane closures this week • Phase 1 MOT at Berkmar and Hilton Heights (re-configured stop vs
through)
22
![Page 23: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/23.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued) Work next two weeks • Grading shared use path and sidewalk • Cut to fill abutment B • Build and set bridge form liners • Abutment A tooth joint installation • Base and intermediate paving (weather dependent) • Landscaping • Storm sewer installation • Water main installation (betterment) • Tie steel for approach slab and parapet tie-in
23
![Page 24: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/24.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued)
Anticipated upcoming significant lane closures • Phase 1 MOT at Berkmar and Hilton Heights (re-configured stop vs
through)
24
![Page 25: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/25.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Hillsdale Extended
Work this week
• Retaining wall excavation and undercut between Pepsi and USPS • Retaining wall leveling pad, panel placement, and backfill • Place curb south of India Road & Pepsi parking lot • Place storm water pipe by Hampton Inn • Construct Abutment A wing walls, form and pour architectural treatment
Significant lane closures this week
• None
25
![Page 26: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/26.jpg)
26
Hillsdale North Abutment Retaining Wall
26
![Page 27: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/27.jpg)
27
Hillsdale at Homewood Suites
27
![Page 28: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/28.jpg)
28
Hillsdale Seminole Square Reconstruction
28
![Page 29: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/29.jpg)
Rt 29 Solutions
Agenda item 7: Rt 29 Solutions Project Updates (continued)
Hillsdale Extended (continued)
Work next two weeks
• Retaining wall excavation and undercut between Pepsi and USPS • Retaining wall panel placement and backfill • Excavation at India and Hillsdale Drive intersection • Place storm water pipe/structures between roundabout & India Road • Construct Abutment A wing walls, form and pour architectural treatment • Undercut and fill at SWM pond
Anticipated upcoming significant lane closures
• Flagging operation at India and Hillsdale
29
![Page 30: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/30.jpg)
Rt 29 Solutions
30
Agenda item 8: Budget Update
8
Route 29 Solutions Budget Update as of January 19, 2017
Construction Contracts
Original Construction
Contract ValueExpended (Invoiced)
Approved Change Orders
Exposure (Anticipated COs) Remaining CV
Total Anticipated Construction
Expenditures at Completion
Total SYIP Allocations for Construction
Rt. 29 Solutions Design-Build (1) $116,746,000 $106,381,583 $10,067,180 $1,300,000 $20,431,597 $128,113,180 $155,775,000
Change from Dec $3,133,320 $0 $0 ($3,133,320) $0 $0Rt. 29/250 Interchange (2) $11,121,078 $12,117,184 $168,283 $800,320 ($827,823) $12,117,184 $14,632,000
Change from Dec $0 $0 $0 $0 $0 $0Adaptive Signals
$3,720,000 $2,349,605 $125,000 $50,000 $1,495,395 $3,895,000 $3,420,000
Change from Dec $0 $0 $0 $0 $0 $0Hillsdale Extended
$11,451,492 $2,690,459 $0 $573,000 $8,761,033 $12,024,492 $11,198,000
Change from Dec $638,780 $0 $0 ($638,780) $0 $0Totals $143,038,570 $123,538,831 $10,360,463 $2,723,320 $29,860,202 $156,149,856 $185,025,000
Change from Dec $3,772,100 $0 $0 ($3,772,100) $0 $01. Rt. 29 Solutions Design-Build Exposure includes $1,300,000 potential incentive for overall DB program on-time completion.2. Rt. 29/250 Interchange Exposure includes anticipated final payment.
�1
30
![Page 31: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/31.jpg)
Rt 29 Solutions
Agenda item 9: Accident Report Update (Post-Rio GSI opening period)
Joel DeNunzio
Number of crashes, isolated period, Jul 19 - Oct 31, 5-year history
• Jul 19 - Oct 31, 2012 22 • Jul 19 - Oct 31, 2013 38 • Jul 19 - Oct 31, 2014 25 • Jul 19 - Oct 31, 2015 32 • Jul 19 - Oct 31, 2016 16
31
![Page 32: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/32.jpg)
32
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Rio Crashes July 19 - October 31, 2012
Collision Type
!( Rear End
!( Deer
!( Angle
!( Sideswipe - Same Direction
!( Sideswipe - Opposite Direction
22 Crashes
![Page 33: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/33.jpg)
33!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
Rio Crashes July 19 - October 31, 2013
Collision Type
!( Rear End
!( Ped
!( Angle
!( Sideswipe - Same Direction
!( Non-Collision
38 Crashes
![Page 34: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/34.jpg)
34
!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
Rio Crashes July 19 - October 31, 2014
Collision Type
!( Rear End
!( Deer
!( Other
!( Angle
!( Head On
!( Sideswipe - Same Direction
!( Fixed Object - Off Road
25 Crashes
![Page 35: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/35.jpg)
35
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
Rio Crashes July 19 - October 31, 2015
Collision Type
!( Rear End
!( Angle
!( Sideswipe - Same Direction
32 Crashes
![Page 36: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/36.jpg)
36
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Rio Crashes July 19 - October 31, 2016
Collision Type
!( Rear End
!( Angle
!( Sideswipe - Same Direction
16 Crashes
![Page 37: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/37.jpg)
Rt 29 Solutions
Agenda item 10: New Business and Wrap Up
Agenda item 11: Adjourn
37
![Page 38: Rt 29 Solutions Project Delivery Advisory Panel...Rt 29 Solutions Agenda item 3: Interaction and Feedback (continued) For the period Dec 13, 2016 - Jan 17, 2017 (continued) • 1 asked](https://reader033.vdocuments.site/reader033/viewer/2022042419/5f35ec0d9e112a652260d49b/html5/thumbnails/38.jpg)