Rt 29 Solutions Project Delivery Advisory Panel
November 17, 2016
Rt 29 Solutions
2
Agenda item 1: Introductions
Project Delivery Advisory Panel
Technical Team
Rt 29 Solutions
3
Agenda item 2: Interaction and Feedback
Live Streaming Nov 3, 2016 Oct 6, 2016
• Unique Viewers: 34 7
• Streams: 42 10
• Average Minutes per stream: 26 19
Rt 29 Solutions
Agenda item 2: Interaction and Feedback (continued)
For the period Oct 31, 2016 - Nov 14, 2016
Inbox email and phone calls: 5 emails and phone calls
• 1 asked why Berkmar and Hillsdale are 2-lane roads instead of 4-lane • SPCA asked for permission to trim trees before vacating former bypass RW • 1 noted that traffic signal mast arm at Rio GSI sways excessively • 1 noted that there is a bump on Rt 29 NB south of Hollymead and requested
a “Bump” sign • 1 commented about lane shifts as vehicles approach the Rio GSI and asked
for additional signing
4
Rt 29 Solutions
Agenda item 2: Interaction and Feedback (continued)
For the period Oct 31, 2016 - Nov 14, 2016 (continued)
Web Provide Input: No new postings
Project Hotline 844-220-5540: No calls
Call directly to Lane-Corman • 1 called about dust blowing onto their property from Berkmar
5
Rt 29 Solutions
Agenda item 3: Report on Panel Feedback
Landscaping plant list • Agenda item 8
Accident update • Agenda item 10
6
Rt 29 Solutions
7
Agenda item 4: Panel Feedback and Suggestions for Future Agenda Items
Open Discussion
Rt 29 Solutions
Agenda item 5: Construction Milestones
88
118
Status as of Nov 14, 2016
2016 2017July August September October November December January February March April May June
Rio Road GSI Dec 2, 2016
Lighting (95%) 100% Wall Staining (80%) 100% Complete
Landscape & Hardscape (85%) 95%
Temp Crossover Removal (60%) 100%
Final Paving (40%) 100% Punchlist (95%) 98%
Rt. 29 Widening
Oct 31, 2017
Temporary Signals 100% Waterline Relocation (15%) 15%
Jack & Bore 90% Phase 4 Grading, Drainage, and Paving (0%) 5%
Gas Relo 100% Phase 7 Grading, Drainage and Paving (20%) 20% (continues through Sep 2017)
Phase 1 paving 100% Start Phase 6
Phase 2 Grading, Drainage and Paving (98%) 100%
Phases 3 and 5 Grading, Drainage and Paving (65%) 80%
Berkmar Oct 31, 2017
Roadway Construction South of River (70%) 75% (continues through Jul 2017)
Roadway Construction North of River (85%) 85%
Pier Construction (95%) 100% Deck Construction (25%) 50%
Steel Girder Erection (33%) 100% Parapets, Abutment Slabs, and Railing 0%
Sanitary Sewer Relocation 100%
Hillsdale Oct 31, 2017
Utility Relocation (90%) 100% Seminole Court Signal 0%
Partial Building Demolition (70%) 100% Greenbrier Signal Infra 0%
Bridge Substructure (20%) 30% Bridge Superstructure
Retaining Wall at Pepsi (10%) 20%
Roundabout 0%
Under way
Complete
Late
( % ) %complete prior reporting period
�1
8
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rio Grade-Separated Intersection
Work this week • General punchlist items • Rio landscaping • Rio/Berkmar curb cut ramps • Final signal inspection
Significant lane closures this week • Nighttime lane closures along Route 29 at Rio intersection between 9:00
pm and 6:00 am
9
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rio Grade-Separated Intersection (continued)
Work next two weeks • Outstanding punchlist items • Complete Rio/Berkmar curb cut ramps
Anticipated significant upcoming lane closures (nighttime) • Nighttime lane closures along Route 29 at Rio intersection between 9:00
pm and 6:00 am
10
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening
Work this week • Excavate and place stone at Ridgewood Drive • Set impact attenuators for phase 4 • Phase 4 entrance preparations Backfill curb • Fine grade stone on phase 3 north end • Rubin Lane demolition • Permanent seeding • Phase 3 turn lane construction and through lane asphalt build-up • Jack and bore 9-2 and 11-1 • Electrical connections at Hollymead • Ground-mounted sign installations Southbound • Phase 4 traffic shift
11
12
Rt 29 Widening Grade
12
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Significant lane closures this week (nighttime)
• Route 29 left or right lane closure NB and SB as necessary
13
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Work next two weeks • Pond 3 excavation and embankment • Phase 4 asphalt demolition • Curb and gutter installation • Finalize structure 8-1 • Phase 4 drainage structures • Jack and bore structures 9-2 and 11-1
14
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Rt 29 Widening (continued)
Anticipated significant upcoming lane closures (nighttime) • Route 29 left or right lane closure NB and SB as necessary
15
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued) Berkmar Extended Work this week • Erosion control maintenance • Grade and backfill curb • Place base stone • Backfill and rip rap at abutment B • Backfill and MSE wall panels at abutment A • Abutment A and B drainage • Tie deck steel • Complete stay-in-place forms • Bulkhead installation • Underdrain installations • Complete deck studs • Electrical service at Hilton Heights
16
17
Berkmar Bridge Deck
17
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued)
Significant lane closures this week • Flagging operation along Rio Mills Road as necessary
18
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued) Work next two weeks • Erosion control maintenance • Stone placement on north end • Abutment A and B drainage installation • Install bulkheads and Bid-Well paving machine • Abutment A MSE panel installation • Tie deck steel • Weekly seeding
19
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Berkmar Extended (continued)
Anticipated upcoming significant lane closures • Flagging operation along Rio Mills Road as necessary
20
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Hillsdale Extended
Work this week
• Fill placement at Greenbrier and Hillsdale • Continue fill between Pepsi and USPS • Modular wall excavation/undercut between Pepsi and USPS • Underdrain and subbase in Homewood Suites area • Building subcontractor continues working on building reconstruction • Grading at intersection of India and Line Drive • Abutment B pile driving
Significant lane closures this week
• None21
22
Hillsdale Abutment A
22
23
Hillsdale at Homewood Suites
23
24
Hillsdale Building Reconstruction
24
Rt 29 Solutions
Agenda item 6: Rt 29 Solutions Project Updates (continued)
Hillsdale Extended (continued)
Work next two weeks
• Modular wall excavation/undercut between Pepsi and USPS • Fill placement at Greenbrier and Hillsdale • Underdrain and subbase stone in Homewood Suites area • Building subcontractor continues working on building reconstruction • Grading at intersection of India and Line Drive
Anticipated upcoming significant lane closures • None
25
Rt 29 Solutions
Agenda item 7: Construction Budget Update
26
Route 29 Solutions Budget Update as of November 17, 2016
Construction Contracts
Original Construction
Contract ValueExpended (Invoiced)
Approved Change Orders
Exposure (Anticipated COs) Remaining CV
Total Anticipated Construction
Expenditures at Completion
Total SYIP Allocations for Construction
Rt. 29 Solutions Design-Build (1) $116,746,000 $98,731,970 $10,067,180 $1,300,000 $28,081,210 $128,113,180 $155,775,000
Change from Oct $11,942,942 $0 $0 ($11,942,942) $0 $0Rt. 29/250 Interchange (2) $11,121,078 $12,117,184 $168,283 $800,320 ($827,823) $12,117,184 $14,632,000
Change from Oct $0 $0 $0 $0 $27,503 $0Adaptive Signals
$3,720,000 $2,349,605 $125,000 $50,000 $1,495,395 $3,895,000 $3,420,000
Change from Oct $0 $0 $0 $0 $0 $0Hillsdale Extended
$11,451,492 $984,561 $0 $573,000 $10,466,931 $12,024,492 $11,198,000
Change from Oct $668,646 $0 $0 ($668,646) $0 $0Totals $143,038,570 $114,183,320 $10,360,463 $2,723,320 $39,215,713 $156,149,856 $185,025,000
Change from Oct $12,611,588 $0 $0 ($12,611,588) $27,503 $01. Rt. 29 Solutions Design-Build Exposure includes $1,300,000 potential incentive for overall DB program on-time completion.2. Rt. 29/250 Interchange Exposure includes anticipated final payment.
�1
26
Rt 29 Solutions Rio GSI Plant List
Agenda item 8: Rio GSI Plant List and Rt 29/250 Landscaping
27
28
0.9595 Ac.D.B. 1078 PG. 681
PARCEL ID: 400004D00
1.6227 Ac.D.B. 939 PG. 102
PARCEL ID: 400004000
1.3140 Ac.INSTR. 2011003693
PARCEL ID: 400002700
INSTR. 2010002380PARCEL ID: 400001400
NO ACREAGE PROVIDEDINSTR. 2008005310
PARCEL ID: 400001300
0.3897 Ac.INSTR. 2012001247
PARCEL ID: 400001200
9.0 +/- Ac.D.B. 431 PG. 735
PARCEL ID: 400001100
INSTR. 2010002380PARCEL ID: 400001400
0.2205 Ac.D.B. 503 PG. 810
PARCEL ID: 400004F00
0.9595 Ac.D.B. 1078 PG. 681
PARCEL ID: 400004D00
4 Red Maple
Emmet St. (Route 29)
Metal Sig
nBollard Posts
Metal Sig
n
Metal Sign
Guar
drail
Grass
Grass
Metal Sign
Inv.
Out
= Blind
Con
nection
In Pl. 15"
RCP
Inv.
Out
= 437.2
0’
Rim
= 441.4
2’
In Pl. C
DI
Inv.
Out
= Blind
Con
nection
In Pl. 15"
RCP
Inv.
Out
= 438.0
3’
Rim
= 440.8
4’
In Pl. DI
In Pl. 15"
RCP
Inv.
Out
= 441.8
2’
Rim
= 443.8
4’
In Pl. DI
In Pl. 2
4"
RCP
Inv.
Out
= 439.9
1’In
v. In S
W
= 440.2
2’
Inv. In
NE
= 440.11’
Rim
= 445.5
3’
In Pl. C
DI
In Pl. 2
4" RCP
Inv. Out = 444.73’
Inv. In = 444.92’
Rim = 450.14’
In Pl. CD
I
Inv. In = 446.70’
In Pl. 2
4" RCP
In Pl. 2
4"
RCP
Inv.
Out
= 443.7
3’
Inv. In =
443.7
7’
Rim
= 448.9
5’
In Pl. C
DI
Mulch
Block W
all
Metal Sig
n
4’ Wood Fence
Conc. Sidewalk
Mulch
Sig
n
Rim
= 437.18’
In Pl. DI
Ra
mp
Metal Sig
n
Ra
mp
Ste
ps
Metal Sign Wood Sign
Metal Sign
15" Oak
Shrub
Shrub
6" Dogwood
4’ Hollys
Conc. Sidewalk
Sig
nMetal Post
6" Tree
Metal Post
15" Tre
e
20" Tr
ee8" B
rick W
all
Ste
ps
8" Tree
12" Tree 6"
Holl
y
Sign
Mulch
Conc. Sidewalk
Appro
x. Loc
ation
"Subway"
1 Sty. Stucco
"Batteries Plus"1 Sty. Brick
"Cavalier Diner"1 Sty. Brick
(a)
(b)
Inv.
Out(b) = 424.12’
Inv.
Out(a) = 424.12’
Inv. In(b) = 426.2
1’
Inv. In(a) = 426.69’
w/
Con
c. End
walls
Dou
ble
Box Cul
vert
In Pl. 258LF- 6’x
6’
(a)
(b)
Monitorin
g
Well
Sig
nMetal
In Pl. 4
8LF-
Drain
age
Pip
e (D
AT
R)
Inv.
Out
= 433.4
7’ Per Pla
nRim
= 439.3
4’
In Pl. DI
(31.0
0’)
(N84 01’3
0"W)
(32.88’)(N38 48’17"E)
(N61 14’08"E 95.56’)
(R=1659.02’ L=63.54’)
(L=3
0.0
0’)
(R=2
6.72’)
(L=3
8.9
6’)
(R=6
8.0
5’)
(R=18
4.4
2’ L=7
7.4
4’)
(31.4
6’)
(S84 01’0
0"E)
(N54 3
2’0
0"W 43.19’)
(37.4
7’)
(N33 4
3’0
0"W)
(6.89’)
(14.5
3’)
(N45 3
5’2
0"W 75.6
5’)
(N31 2
6’10"W 61.6
0’)
(N25 0
2’0
0"W 91.2
8’)
12.00’)
(N60 56’00"E)
(L=48.88’)
(R=3
2.00’)(R
=128.9
7’ L
=73.9
5’)
(R=13
0.0
0’ L
=124.7
9’)
Existing R/W (Hwy. Plans 7250-104-101, RW-201)
Existing
R/
W (H
wy. Pla
ns 7250-104-101,
RW-2
01)
Existing
R/
W (H
wy. Pla
ns 7250-104-101,
RW-2
01)
Existing R/W
Existin
g R/
W
Existing R
/W
44.71’)(N1
2 22’0
0"E
(N41 19’20"E 54.83’)76.94’)(N36 42’00"E
Existing R/W
(D.B. 483 PG. 607)Ex. 12’ San. Sewer Esmt.
Approx. Location
(N53 3
6’W 10
0.0
0’)
(N79
59’W 70.04’)
(D.B. 271 P
G. 3
89)
Ex. S
an. Sew
er Esmt.
Appr
ox. Location C/L
(S79
58’E 70.04’)
(S53 3
5’E 10
0.0
0’)(N08
51’0
0"W 22
2.33’)
(S39 33’00"W 91.07’) (S36 01’38"W 84.93’)
(S08
51’E 22
2.3’)
In Pl. 3
4LF
- Drainage
Pipe
DAT
R
Inv.
Out = 427.68’
Inv. In = 427.68’
Rim
= 438.2
0’
In Pl. DI
In Pl. 6
0LF-
Drain
age
Pip
e (D
AT
R)
Inv.
Out
= 432.0
4’
Inv. In =
432.0
4’
Rim
= 437.3
5’
In Pl. DI
VD
H
Mon.
VD
H
Mon.
IRF
PL
PL
PL
PL
PL
Mulch
Shru
bs
Meta
l Sig
n
36" Poplar
Ram
p
Conc. Sidewalk
Con
c.
6" D
ogwood
Shrub
Flow
er Bed
L. Tim
ber
Shrub
18" Maple
W. S
ign
Brick/Conc. 2 Story
OV
HD
Traffic Pole
Electric Cabinet
w/ GuyPP #BK95
Telephone M
H
Traffic B
oxTraffic B
oxes
Traffic Box
TC
T
EOI (QLD)
(DUCT)TC
TC
TCE
Future Use (Fiberlight)Empty Conduits For
EOI
0.5"
(DUCT)
System, Wires Cut.
Control Loop
Aband. Traffic
Drop
On
Utility P
ole.
Unable T
o Is
olate C
atv
To Second Water Meter.
Locate Water Service Unable To Electronically
Gas Str
aig
ht T
o Main.
Ser
vice. R
ecor
d Sho
ws
Bey
ond Turn In
Water
Loc
ate G
as Ser
vice
Unable T
o Electr
onic
ally
ControllerTC Signal
Traffic Box
EOI
Pole
Traffic S
ignalOverhead
Traffic Signal Pole
Overhead
OVHD
w/
Lig
htP
P #BJ58
LP
w/
Guy
PP #B
K60
PP #T
A1111
WV
Water MH
FO
Handhole
Water MH
w/ LightPP #BK75
PP #B
K83
Rim = 437.55’In Pl. Sanitary MH
Traffic Box
Traffic Pole
Traffic Box
WV
FH
w/
Guy
PP #BJ89
Traffic Box
Rim = 440.09’In Pl. Sanitary MH
Traffic Box
Traffic P
ole
Gas Str
ucture
Traffic B
ox
OV
HD
OVHD
OVHD
(DAT
UR)
(DAT
UR)
(DA
TU
R)
FL =
426.7
7’ Per Pla
nRim
= 438.2
7’
In Pl. S
anitary
MH
FL
= 425.63’ Per Pla
n
Rim
= 438.73’
In Pl. S
anitary M
H
FL
= 423.75’ P
er Plan
Rim = 436.65’
In Pl. S
anitar
y M
H
W
W
S
S
S
TC
TC
TC
TC
S
S
TC
TC
TC
Traffic Box
Traffic B
ox
(Abandoned)
EOI E
OI
T
0.5"
0.5"
EOI
Pos
sibly A
bandon
ed
Gas Ser
vice
Telep
hone
MH
EOI
EOI
Ser
vice
Unk. Siz
e
FH
WV
EOI
(FBL)
T
FH
WV
Unk. U
tility
LP
(4)
WM’s
(QL
D)
0.5"
FOR MY GIRLS CORP.
OMD, LLC.
COOKOUT CHARLOTTESVILLE, INC.
GLORIA K. RENNOLDS, TRS.JOHN D. BALLAS, TRS.
UNITED STATES OF AMERICA
PROPERTIES, LLCSHILSHOLE
GLORIA K. RENNOLDS, TRS.
LAURA MALONE ELLIOTTKATHLEEN ELLIOTT WHATLEYHUMPHREY JOHN ELLIOTT, JR.
FOR MY GIRLS CORP.
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
l10908903.dgn
Plotted By: thomas.aigner9:17:43 AM
5/20/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
0029-104-295
0
SCALE
25’ 50’
29
NXL 804-644-4600
LANDSCAPE ARCHITECTRichmond, Virginia
VDOT Location & Design
Dale Huff, CLA 540-643-2514
Dale Huff, CLA 540-643-2514
DAVID CUBBAGE, LS 540-727-7129
Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 101+50.0
0 See S
heet 4
0029-104-295, L801 3
3
Dominion Virginia Power - DistributionMr. Daniel Bateman, Supervisor Customer Solutions1719 Hydraulic RoadCharlottesville, Virginia 22901O: (434) 972-6734C: (434) 996-5514
Dominion Technical Solutions701 East Cary Street
O: (804) 771-4262C: (804) 624-0986
CenturyLink
127 East Church Street
O: (276) 666-4247C: (276) 340-9726
12379A Sunrise Valley Drive
O: (703) 391-5782C: (703) 350-8463
Fiberlight
O: (571) 323-7666C: (540) 522-3776
Lumos Networks
O: (540) 946-3179C: (540) 292-9916
Comcast
324 West Main Street
O: (434) 951-3725C: (434) 531-1830
Department of Public Works
O: (434) 970-3908
City of Charlottesville Public Utilities DivisionDepartment of Public Works
O: (434) 970-3811
Rivanna Water & Sewer Authority
695 Moores Creek LaneCharlottesville, Virginia 22902
Albemarle County Service Authority
168 Spotnap RoadCharlottesville, Virginia 22911
Dominion Virginia Power - Transmission
E: jacob g [email protected]
305 4th Street, NWCharlottesville, Virginia 22903
Mr. Phil Garber, Chief Gas Engineer305 4th Street, NWCharlottesville, Virginia 22903
O: (434) 977-2970, Ext. 104
Ms. Jennifer Whitaker, P. E. Chief Engineer
Mr. Peter Gorham, P. E. Director of Engineering
O: (434) 977-4511, Ext. 115
Charlottesville, Virginia 22903
Mr. Cary R. Bowman, Outside Plant Engineer524 West Broad Street, 2nd FloorWaynesboro, Virginia 22980
Herndon, Virginia 20170950 Herndon Parkway, Suite 250Mr. Wayne Haithcox, Project Manager
Verizon Business (Formerly MCI)Mr. David Fisher, Project Manager
Reston, Virginia 20191
Mr. Jerry Burge, Network Engineer II
Martinsville, Virginia 24112
Mr. Jacob G. Keisey, Transmission Line Engineer
Richmond, Virginia 23219
UTILITY OWNERSHIP LIST
Construction ManagerMr. Wesley W. Parker,
Utilities DivisionCity of Charlottesville Public
Utilities Engineer (Water & Sanitary Sewer)Mr. E. W. "Trip" Stakem, III, P. E.
Project 0029-104-248, C501 (UPC 85708) for utility adjustments.See proposed utility plans of completed construction Note:
AINI
GRI
V FO HTLAEWN
OM
MO
C
TC
E
TIHCRA EPACSD
NA
L
WINFRED DALE HUFF, JR.Lic. No. 000681
Rt 29 Solutions Rt. 29/250 Landscape Plan
Rt 29 Solutions Rt. 29/250 Landscape Plan
29
Inv. O
ut =
450.2
1’
Inv. I
n = 4
51.54’
w/ C
onc. E
ndwalls
In Pl. 2
4" R
CP
4.500 AcreDB. 996 PG. 556
PARCEL ID: 40B001000
4.500 AcreDB. 996 PG. 556
PARCEL ID: 40B001000001
1 Red Maple
5 REDBUD
3 SWAMP WHITE OAK
Route 2
50
Bypa
ss
Emmet St. (Route 29)
10" D
ogwood
s
24" G
um
Asphalt
6" Orn
amental
3’ Shr
ubs
RT
E. 2
50
ON
RA
MP
Gra
ss
Shru
bs
Asphalt
Shrubs
Grass
Grass
Grass
(S34 09’18"W 142.95’)
(S70 33’18"W 140.03’)
(S70 33’18"W 68.61’)
(N63 4
5’10
"W 110.8
1’)N67 42’51"E
S66 3
5’3
7"E
250 OF
F RAMP250 ON RAMP
RTE. 250 ON RAMP
U.S. R
OUT
E 250
BYP
ASS
RTE. 250 ON RAM
P
RTE. 250
OFF
RAM
P
SBL U.S. ROUTE 29 - NORTH EMMET STREET
NBL U.S. ROUTE 29 - NORTH EMMET STREET
24" - 12
" Pines (T
yp.)
Asphalt
6" Orna
mental
Asphalt
Limited Access Line
Existing R/W &
Limited Access Line
Begin Existing
(N61 14’08"E 95.56’)
(N84 37’40"E 74.27’)
24" Maple
Electric
Handhole
Electric Cabin
etElectric S
witche
s
Sprin
klers
Sprin
kler
WV
FH
S
LP
Elec.
Vault
Traffic B
oxElec. V
ault
Telep
hone
MH
WMW
V’s
WV’s
S
TC
TC
TC
Inv. O
ut = 4
61.68’
Inv. In =
461.70’
Rim =
477.58’
In Pl. Sa
nitary
MH
LP
LP LP
Vault
Elec.
Inv.
Out
= 466.5
6’
Inv. In =
466.6
7’
Rim
= 475.8
0’
In Pl. S
anitary
MH
(QLD)(QLD)
(QLD) EOIEOI
(DUCT)(DUCT) (DUCT) (DUCT)
Sign
Elec T
o
SignElec To
(IRR)
(IRR)
(IRR)
Sign
Elec To
W
TC
E
E
E
E
E
E
E
T
T
Future Use (Fiberlight)Empty Conduits For
EOIEOI
EOI
EOIEOI
EOI
EOI
EOI
Bridge.
Conduit On Side Of
Junction Box With
Above Ground Elec
SignTo
(Fiberlight)For Future UseEmpty FO HBFuture Use (Fiberlight)
Empty Conduits For
Traffic Sig
nal Pole
Overhe
ad
LP
Records. Not Shown OnConfigurationNew Water
BEST BUY STORES, LP
BEST BUY STORES, LP
FOR MY GIRLS CORP.
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
l10908904.dgn
Plotted By: thomas.aigner9:18:50 AM
5/20/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
0029-104-295
0
SCALE
25’ 50’
29
NXL 804-644-4600
LIMITED ACCESS HIGHWAY
Dated July 9, 1952
By Resolution of City Council
LANDSCAPE ARCHITECTRichmond, Virginia
VDOT Location & Design
Dale Huff, CLA 540-643-2514
Dale Huff, CLA 540-643-2514
DAVID CUBBAGE, LS 540-727-7129
40029-104-295, L801
4
Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 108+5
0.0
0 See S
heet 5
Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 101+50.0
0 See S
heet 3
Project 0029-104-248, C501 (UPC 85708) for utility adjustments.See proposed utility plans of completed construction Note:
AINI
GRI
V FO HTLAEWN
OM
MO
C
TC
E
TIHCRA EPACSD
NA
L
WINFRED DALE HUFF, JR.Lic. No. 000681
30
No Recorded AcreageDB. 414 PG. 93
PARCEL ID: 40C005100
0.614 AcreDB. 2011 PG. 2610
PARCEL ID: 40C006000
3.397 AcreDB. 1006 PG. 306
PARCEL ID: 40C001000
No Acreage RecordedDB. 360 PG. 502
PARCEL ID: 40C002000
4.500 AcreDB. 996 PG. 556
PARCEL ID: 40B001000
001
9 SWEETGUM
Emmet St. (Route 29)
Mulch
6"
Orna
mental
AsphaltAsphalt
12" Tre
e
15" Tree 2
4" Tree
15" Pin
es
3’ Shrubs
Con
c. Sid
ewalk
Landscape Timbers
18"
Crabapple
HO
LID
AY
DRIV
E
Conc. SidewalkConc. Sidewalk
Asphalt Drive
Asphalt Drive
Asphalt Drive
Conc. Sidewalk
Asphalt Drive
Asphalt Drive
Conc. Apron Conc. Apron
Grass
Grass
Grass
(S36 00’00"W 159.90’)
PL
(S49 11’38"E 316.9
8’)
PL
PL
PL
(S45 4
0’0
0"E 13
5.0
0’)
45.00’)(S34 09’18"W
Existing R/W
Existing
R/
W
Existing
R/
W
Existing R/W
N31 35’05"E
N32 18’24"EN31 18’51"E N33 13’51"E12.14’)(S37 58’00"W
152.8
0’
VD
H
Mon. +26.3
9
145.86’)(S39 53’00"W
7250-104-101 RW-201)(Hwy. Plans
Existing R/W
PLPL
PL
AN
GUS
RO
AD
Gravel
SBL U.S. ROUTE 29 - NORTH EMMET STREET
NBL U.S. ROUTE 29 - NORTH EMMET STREET
27" Gum
10" Oak
10" Oak
10" Gum
10" Gum
12" Dogwood
Limited Access Line
Begin Existing
Sprin
kler
WV
FH
w/
Guy
PP
No
#
LP #D
M03
Gas
MH
Gas
MH
Electric
Handhole
Electric
Handhole
WM
Spig
ot
Electric
Handhole
PP #D
M04
Traffic Pole
WM
LP OV
HD
LP
w/
Guy
PP
No
#
Telep
hone
MH
Tele.
Handhole
Gas
MH
Traffic Box
Gas MH
Traffic Box
G
SS
S S
TC
S1
S2
S3
S3
S2
S1
Inv. Out = 464.43’Inv. In = 464.47’Rim = 470.83’In Pl. Sanitary MH
Inv. Out = 462.50’Inv. In = 462.58’Rim = 468.76’In Pl. Sanitary MH
Inv. Out = 460.11’Inv. In = 460.15’Rim = 467.72’In Pl. Sanitary MH
OV
HD
OV
HD
PP #DM33
(Per Plans)Water Line
Pole
Sig
nal
Traffic
Overhe
ad
EE
GG
E
S
Inv.
Out
= 468.15
’In
v. In =
468.19’
Rim
= 473.19’
In Pl. S
anitary
MH
Inv.
Out
= 466.5
6’
Inv. In =
466.6
7’
Rim
= 475.8
0’
In Pl. S
anitary
MH
Find ConnectionUnable to
EOI
EOI (OLD)
(DUCT)
Sign
Elec T
o
Sign
Elec T
o
Light
Ground
Sign PostsElec To
LOOPTO
W
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
E
G
T
(QLD)
EOI
EOI
(DUCT)
(DU
CT)
(DUCT)
(APLOC)
(AP
LO
C)
(APLOC)
(QL
D)
0.5"G
0.5"
(AP
LO
C)
EOI
EOIEOI
EOI
LOOP
TO
EOI
EOIEOI
EOI
EOI
TO
LO
OP
TO
LO
OP
EOI
(AP
LO
C)
(QL
D)
Using History Paint.Locations. Approximate Location Placed Marker Balls At SelectNo Trace Wire Found. City Has 2" Plastic Gas Is Not Locatable,
ConduitsExposed
Future Use (Fiberlight)Empty Conduits For
ConduitsExposed
ElectricWith Post
LOOPTO
(Fiberlight).For Future UseEmpty Conduits
Designating.Under Construction At Time Of Future Use (Fiberlight)Empty Conduits For
Detail On Records.Area, Not Shown InRegulator In ThisOf Underground GasApproximate Location
Shown On Records.
Configuration NotElectronically.WVMH To MainUnable To Connect
Traffic Ca
mer
aOverhe
ad
Traffic Sig
nal Pole
Overhe
ad
Traffic Sig
nal Pole
Overhe
ad
Inv.
Out
= 451.2
0’
Inv. In =
451.2
5’
Rim
= 459.8
0’
In Pl. S
anitary
MH
ControllerTC Signal
Ground Light
Pole BaseAband. Light
KF
C Sign
Elec T
o
JRN CHICKEN STORES INC.
ANGUS INVESTORS LLC
THE CITIZENS CORPORATIONPROPERTIES LLCGMT MANAGEMENT
BEST BUY STORES, LP
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
l10908905.dgn
Plotted By: thomas.aigner9:19:50 AM
5/20/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
0
SCALE
25’ 50’
0029-104-295
29
NXL 804-644-4600
LANDSCAPE ARCHITECTRichmond, Virginia
VDOT Location & Design
Dale Huff, CLA 540-643-2514
Dale Huff, CLA 540-643-2514
DAVID CUBBAGE, LS 540-727-7129Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 108+5
0.0
0 See S
heet 4
Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 115
+25.0
0 See S
heet 6
0029-104-295, L801 5
5Project 0029-104-248, C501 (UPC 85708) for utility adjustments.See proposed utility plans of completed construction Note:
AINI
GRI
V FO HTLAEWN
OM
MO
C
TC
E
TIHCRA EPACSD
NA
L
WINFRED DALE HUFF, JR.Lic. No. 000681
Rt 29 Solutions Rt. 29/250 Landscape Plan
31
1.6
03
Acr
e
DB. 5
48 P
G. 400
PA
RCE
L ID: 4
0C00910
0
0.552
Acr
e
D.B. 68
5 P
G. 89
PAR
CE
L ID: 40C0092
00
0.527 AcreDB. 2010 PG. 798
PARCEL ID: 40C009000
0.578 AcreDB. 960 PG. 562
PARCEL ID: 40C011000
0.682 AcreDB. 840 PG. 620
PARCEL ID: 40C010000
0.614 AcreDB. 2011 PG. 2610
PARCEL ID: 40C006000
3.990 AcreDB. 650 PG. 644
PARCEL ID: 40C012000
002
3 REDBUD5 RED MAPLE
5 REDBUD 5 SWAMP WHITE OAK
Emmet St. (Route 29)
18"
Crabapple
4’ Shr
ubs
12" Tree
Mulch
24"
Maple
15"
Maple
15"
Maple
6’ Shr
ubs
15" Stump 8" Tree3’ Shrub
Mulc
h
Grass
PL
PL
PL
Z
Z
PL
PL
PL
PL
P
Mulch
Myrtles3" Crepe
PL
PL
8" Oak4" Maple12" Gum12" Gum8" Oak
12" Oak
12" Dogwood27" Gum
8" Maple27" Gum
BedFlower
Sprin
klers
LP
No
#
WM
S
S
S
Inv. Out = 434.71’Inv. In NW = 434.79’Inv. In SW = 448.71’Inv. In SE = 443.47’Rim = 456.29’In Pl. Sanitary MH
Con
c. B
ase
LP on
EOI EOI (QLD)
(QLD)
(QLD)
Light
Ground
LightGround Light
Ground
SignElec To
SignElec To
Sig
n
Elec To
EOI
EOI
E
E
E
T
T
T
(DUCT) (DUCT)
FO HB
0.5"
EOI
EOI
EOI
(APLOC)
EOI
EOI
EOI
Future Use (Fiberlight).
Empty Conduits For
Future Use (Fiberlight).Empty Conduits For
By
Rec
ord.
Tap, C
annot Prov
e Tie I
n
In
Vaults. P
ossible R
ever
se
Two
6"
Water Lin
es
Visible
Valves
Irrigation
(Fiberlight)For Future UseEmpty FO HB
Inv. Out = 434.51’Inv. In = 434.51’Rim = 453.81’In Pl. Sanitary MH
Inv.
Out
= 447.9
2’
Inv. In =
447.9
4’
Rim
= 454.12
’In Pl. S
anitary
MH
Con
c. B
ase
LP on
GAT
EW
AY
LIMIT
ED P
AR
TNE
RS
HIP IX
OZ
ONE
LLC
CARLYLE PROPERTIES LLC
EMMET STREET LLC
ZANNIS LC
PROPERTIES LLCGMT MANAGEMENT
LIMITED PARTNERSHIPSQUAM ASSOCIATES
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
l10908906.dgn
Plotted By: thomas.aigner9:21:23 AM
5/20/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
0
SCALE
25’ 50’
0029-104-295
29
NXL 804-644-4600
Dale Huff, CLA 540-643-2514
Dale Huff, CLA 540-643-2514
DAVID CUBBAGE, LS 540-727-7129
LANDSCAPE ARCHITECTRichmond, Virginia
VDOT Location & Design
Matc
h Lin
e (R
oute 2
9
Baselin
e) Sta. 115
+25.0
0 See S
heet 5
6
6
0029-104-295, L801
Project 0029-104-248, C501 (UPC 85708) for utility adjustments.See proposed utility plans of completed construction Note:
AINI
GRI
V FO HTLAEWN
OM
MO
C
TC
E
TIHCRA EPACSD
NA
L
WINFRED DALE HUFF, JR.Lic. No. 000681
Rt 29 Solutions Rt. 29/250 Landscape Plan
32
Inv.
Out
= 450.2
1’In
v. In =
451.5
4’
w/
Con
c. E
nd
walls
In Pl. 2
4" R
CP
470
460
464
454
2:1
458456
456
458
462
460462
464
453
3:1
464466468
454
460
458
460
460
3:1
x454.25SWM Basin #1Proposed
3:1
465
455
455
462460458456
456
458
462
460
FC
FC
FC
FC
FC
0.5’ Curb0.5’ Curb
Wood
Sig
n
Wood
Sign
Guardrail
Guardrail
Guardrail
Guard
rail
Guardrail
Asphalt
Grass
Woods
Woods
Ditch
10" Dogwood 10" Dogwood
28" Pine
28" Pine
2.5’ C & G
Guardrail
Conc. Ditch
Guardrail
Guardrail
10" Dogwoods
24" Gum
Guardrail
Guardrail
0.5’ Curb
Asphalt
0.5’ Curb
Asphalt
Woo
d Sig
n
Grass
Inv.
Out = 473.2
3’
w/
Con
c. End
wall
In Pl. 4
3LF
- 15" R
CP
Inv.
Out = 474.5
0’
Rim
= 478.75’
In Pl. DI
GuardrailG
uardrail
Con
c.
Ditch
Conc. Ditc
h
EBL U.S. ROUTE 29 - U.S. ROUTE 250 BYPASS
WBL U.S. ROUTE 29 - U.S. ROUTE 250 BYPASS
Conc. Island0.5’ Curb
0.5’ Curb
Sign
Asphalt
Woo
d Sig
n
Grass
Metal Sign
= 23.0’
Bridge Clear
ance
101
102
100+00.00 R
oute
29 S
urvey
Baseline
Start Statio
n
RTE. 250 OFF RAMP
U.S. ROUTE 250 BYPASS
RTE. 250
ON RAMP
SB
L U.S. R
OUTE 29 -
NOR
TH
EM
ME
T ST
RE
ET
NB
L U.S. R
OUTE 29 -
NOR
TH
EM
ME
T ST
RE
ET
RTE. 250 ON RAMP
Inv. Out = 456.28’In Pl. 15" RCP
Inv. Out = 456.47’Inv. In = 456.67’
Rim = 461.28’In Pl. CDI
Inv.
Out
= 450.2
1’In
v. In =
451.5
4’
w/
Con
c. E
nd
walls
In Pl. 2
4" R
CP
E
Electric
Handh
ole
Electric Handhole
LP #B
173
Electric Handhole
LP #B180LP
Traffic BoxElec. Vault
WV’s
TCE
E
(QLD)
(DU
CT)
(QLD)
(QLD)
SignElec To
E
E
E
E
E
EOI
(QL
D)
EOI
450
455
455
460
460
460
465
465
465
470
470
470
475
475
475
480
480
480
485
485
485
490
490
490
13 Eastern Red CedarRTE. 250 OFF RAMP
RTE. 250 ON RAMP
RTE. 250
ON RAMP
SB
L U.S. R
OUTE 29 -
NOR
TH
EM
ME
T ST
RE
ET
EBL U.S. ROUTE 29 - U.S. ROUTE 250 BYPASS
U.S. ROUTE 250 BYPASS
SWM BASIN
(see Sheet 2B)Reforestation Area
SWM BASIN
ACCESS ROAD
Conc. Ditch
Conc. Ditc
h
SWM BASIN ACCESS ROAD
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
l10908907.dgn
Plotted By: thomas.aigner11:24:05 AM
5/20/2016
PROJECT MANAGER
SURVEYED BY
DESIGN SUPERVISED BY
DESIGNED BY
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
NXL 804-644-4600
29
0
SCALE
20’ 40’
Dale Huff, CLA 540-643-2514
Dale Huff, CLA 540-643-2514
DAVID CUBBAGE, LS 540-727-7129
0029-104-295, L801 7
0029-104-295 7
Project 0029-104-248, C501 (UPC 85708) for utility adjustments.See proposed utility plans of completed construction Note:
LANDSCAPE ARCHITECTRichmond, Virginia
VDOT Location & Design
AINI
GRI
V FO HTLAEWN
OM
MO
C
TC
E
TIHCRA EPACSD
NA
L
WINFRED DALE HUFF, JR.Lic. No. 000681
Rt 29 Solutions Rt. 29/250 Landscape Plan
Evergreen and deciduous trees
Rt 29 Solutions
Agenda item 8: Rio GSI Plant List and Rt 29/250 Landscaping (continued)
Rt 29/250 Landscaping plans • Project was rebid week of Nov 7 • Bids due Dec 1, 2016
33
Rt 29 Solutions
Agenda item 9: Signal Timing Adjustments Since Nov 3 PDAP
Joel Denunzio
34
Rt 29 Solutions
Agenda item 10: Accident Report Update
Joel DeNunzio
35
36
05/23/2015 – 07/18/2015
Agenda item 10: Accident Report Update (continued)
37
05/23/2016 – 07/18/2016
Agenda item 10: Accident Report Update (continued)
Rt 29 Solutions
Agenda item 11: New Business and Wrap Up
Agenda item 12: Adjourn