resume(nazeerahmed0000)

5
Page 1 of 5 Engr.Nazeer Ahmed Narejo Address: Karachi, Pakistan. [email protected] +92-313-3023389 Skype I.D: engr_nan09 Objective : Seeking for a challenging Electrical Engineer position in a progressive and forward thinking company that enables me to gain and develop my growing experience and where my skills and knowledge along with my enthusiasm can be utilized and make a difference. Educational Qualification: B.E (Electrical Engineering) having 1 ST Division (Jan 2009-to-Dec 2012) from Quaid-e-Awam University of Engineering, Science & Technology Nawabshah, Pakistan. Computer Skills: MS-Windows, MS-Office & MS-Project. PLC, Mat-Lab & AutoCAD. Professional Experience: 2. Currently Working as Electrical Site Engineer (Buildings) Date : March 2014 -to- Present Company : Arcika Electrical Contractors Karachi. Client/Projects : 1. Dr. Altamash Dental Institute & Hospital Clifton Karachi. 2. Main Office Building at Soorty Enterprises (PVT) LTD. Nooriabad, Pakistan. 3. Mosque, Canteen and Dispensary area Buildings at Soorty Enterprises (PVT) LTD. Nooriabad, Pakistan.

Upload: nazeer-ahmed

Post on 15-Apr-2017

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: resume(NazeerAhmed0000)

Page 1 of 3

Engr.Nazeer Ahmed Narejo

Address: Karachi, Pakistan. [email protected] +92-313-3023389Skype I.D: engr_nan09

Objective : Seeking for a challenging Electrical Engineer position in a progressive and forward thinking company that enables me to gain and develop my growing experience and where my skills and knowledge along with my enthusiasm can be utilized and make a difference.

Educational Qualification:B.E (Electrical Engineering) having 1ST Division (Jan 2009-to-Dec 2012) from Quaid-e-Awam University of Engineering, Science & Technology Nawabshah, Pakistan.

Computer Skills: MS-Windows, MS-Office & MS-Project. PLC, Mat-Lab & AutoCAD.

Professional Experience:

2. Currently Working as Electrical Site Engineer (Buildings)

Date : March 2014 -to- Present Company : Arcika Electrical Contractors Karachi. Client/Projects :1. Dr. Altamash Dental Institute & Hospital Clifton Karachi.2. Main Office Building at Soorty Enterprises (PVT) LTD. Nooriabad, Pakistan.3. Mosque, Canteen and Dispensary area Buildings at Soorty Enterprises (PVT)

LTD. Nooriabad, Pakistan.4. Lab Offices, R.D House and Single/Double bed room Residential Buildings at

Soorty Enterprises (PVT) LTD. Nooriabad, Pakistan.

Job Responsibilities:

Supervising electrical jobs based on Electrical shop drawings and specifications. Single Line Diagram (SLD) and Bill of Quantity (BOQ) skills. Checking all installations in preliminary stage as per drawing. Coordinate with Client, Consultant and others. MV and LV Substations. Transformer 1500kVA capacity.  Standby Diesel Generator Sets with 1500 KVA capacity. Installation of building services like LV Electrical Power System, Lighting System,

Electrical H.T and L.T Panels, DB’s and Control System. Internal and External Lighting System. Exit sign light System.  UPS and Emergency Light System. BTD, Sub Panels and Tap off Box.

Page 2: resume(NazeerAhmed0000)

Page 2 of 3

Earthing & Lightning Protection System. Load Calculation. MV/LV Power Cable routing, Cable termination, Cable Trench and Cable Tray. MV and LV switchgear. PFI Plant and ATS Panels. Testing & Commissioning. Low Current systems (CCTV System, Public Address Systems/BGM, Telephone & Data

Systems, Building Management and Fire Alarm Systems). Air Conditioning System.

1. Jr. Electrical Engineer

Date : Feb 2013 -to- Jan 2014 Industry : Rohri (Zeal Pak) Cement Factory Private Ltd. Rohri. Project : 66KV Power Gird Station & 440Volts Power Substations,

Cement Plant 700 TPD, Construction of 132KV (GIS) Grid Station for 5000 TPD new cement plant and Erection of 5000 TPD New Cement plant.

Job Responsibilities:

66/3.3KV Power Grid Station. 66KV Oil Insulated Oil Circuit Breaker, Switchgear, Surge Arresters, Instrument

Transformer (C.T & P.T), Disconnector Switches & Protective Relays/Devices. 7.5MVA Step-down Power Transformer. 3.3KV Oil Insulated Switchgear. Maintenance of Station Battery and Battery Charger. Electrical Protective Relays, Protection Schemes, Emergency Equipment’s & HT/LT

Motors. AC Motors, DC Motors & Slip Ring Motors. Monitoring the RPM, Vibration & Temperature of HT/LT Motors. Electrical troubleshooting of MV/LV Circuits and HT/LT Motors. PFI Plant, MCC Panels, MCB/MCCB Circuit Breaker, HV/LV panels, Contactors,

Overhead Cranes and Utility. Lying of Underground Cables with minimum joints and maintaining required curve area

while crossing roads and L-turns. Installation & Maintenance for all Electrical Services for Plant, Residential Buildings,

Offices etc. Review of single line diagrams, layout drawings, Power/Control Schemes, load panel

schedule & Cable schedules etc. Check feasibility location for transformer and generators, circuit breaker, ring main

units, MV/LV (66/3.3KV) Switchgears. Maintenance & Installation HT/LT panels, Transformers Systems, Solar power

generation, DG sets, cabling etc. Site Execution on Installation & Commissioning of Electrical Machinery and

Equipment. Supervise the construction work of 132 KV Power Grid Station. Inspection, Supervision & Control of all on-site electrical Installations & Constructional

activities of 5000 TPD plant.

Achievements: One-day seminar on “Smart communication system environment” at Quest Nawabshah. One-day seminar on “Save the water secure the life” at Quest Nawabshah.

Page 3: resume(NazeerAhmed0000)

Page 3 of 3

Final year thesis/project: Thesis on “Testing commissioning of measuring transformers of power system”.

Personal Information: Nationality: Pakistani Date of Birth: 4th March 1991 C.N.I.C: 45202-2882374-3 Gender: Male Material Status: Single Languages: English, Urdu & Sindhi Member: Pakistan Engineering Council Driving License: Pakistan Passport No: KZ1163741

Reference: References are Available on Request.

Note: All relevant documents, citations and credentials will be made available upon request.