    Earth Work

    1). Earth work in excavation over areas exceeding 30cm in depth, 1.5m in width as

    well as 10sq.m on plan including disposal of excavated earth lead up to 50m. and lift

    up to 1.5m. disposed Earth to be leveled and neatly dressed.

    a).Ordinary Soil.

    b).Hard Soil.

    c). Hard shale and Dhunda soil.

    2). Earth work in rough excavation banking excavated earth in layers not exceeding

    20cm. in depth, breaking clods, watering, rolling each layer with 1/2ton roller or

    wooden or Steel hammers and rolling every 3rd and topmost layer with power roller

    of minimum 8 ton and dressing up in embankment for roads flood banks marginal

    bund and guide banks or filling up ground depressions lead up to 50m. and lift to

    1.5m.

    a).Ordinary Soil.

    b).Hard Soil.

    c). Hard shale and Dhunda soil.

    3). Earth work in surface excavation not exceeding 30cm in depth, but exceeding1.5m in width as well as 10sq.m. on plan including disposal of excavated earth lead

    up to 50m. and lift up to 1.5m. disposed soil to be leveled and neatly dressed.

    a).Ordinary Soil.

    b).Hard Soil.

    4). Surface dressing of the ground including removing vegetation and inequalities

    not exceeding 15cm.deep and disposal of rubbish, lead up to 50m and lift up to 1.5m.

    a).Ordinary Soil.

    b).Hard Soil.

    5). Earthwork in excavation in foundation trenches not exceeding 1.5mtr. in width or10 Sqm. on plan or drains not exceeding 1.5mtr.in width or 10 sqm. on plan

    including dressing of sides and ramming of bottoms lift up to 1.5m. Including getting

    out the excavated soil and disposal of surplus excavated soil as directed, with in a

    lead of 50m.

    a).Ordinary Soil.

    b).Hard Soil.

    6).Filling available excavated earth (excluding rock)in trenches,plinth,sides of

    foundations,etc.in layers not exceeding 20cm in depth, consolidating each deposited

    layer by ramming and watering lead up to 50mtr.and lift up to 1.5m.

    7).Filling in plinth with local sand under floors including watering, ramming,

    consolidating and dressing complete

    1

  • 7/30/2019 RD Scheduled

    2/30

    1). Providing and laying in foundations and plinth cement concrete1:5:10 (1 cement:

    5 river sand: 10 jhama brick aggregate 40 mm nominal size) excluding the cost of

    centering and shuttering.

    2).Providing and laying in foundations and plinth cement concrete1:4:8 (1 cement: 4

    river sand: 8 jhama brick aggregate 40 mm nominal size) excluding the cost of

    centering and shuttering.

    3).Providing and laying in foundations and plinth cement concrete1:3:6 (1 cement: 3

    river sand: 6 jhama brick aggregate 40 mm nominal size) excluding the cost of

    centering and shuttering.

    A) Foundations and plinth.

    b).Independent piers columns and pillars up to first floor level.

    4).Providing and laying cement concrete1:2:4 (1 cement: 2 river sand: 4 jhama brick

    aggregate 20 mm nominal size) excluding the cost of centering and shuttering.

    A) Foundations and plinth.

    b).Independent piers columns and pillars up to first floor level.

    5).Providing and laying cement concrete1:1.5:3 (1 cement: 1.5 river sand: 3 jhama

    brick aggregate 20 mm nominal size) excluding the cost of centering and shuttering.

    A) Foundations and plinth.

    b).Independent piers columns and pillars up to first floor level.

    6).Providing and laying cement concrete1:3:6 (1 cement: 3 river sand: 6 jhama brickaggregate 20 mm nominal size) excluding the cost of centering and shuttering.

    a) Foundations and plinth.

    b).Walls including attached buttresses pilasters and their caps

    and bases and string courses etc. up to first floor level.

    c).Independent piers columns and pillars up to first floor level.

    7). Providing and laying cement concrete1:1:2 (1 cement: 1 river sand: 2 jhama brick

    aggregate 20 mm nominal size) excluding the cost of centering and shuttering.

    a) Foundations and plinth.

    8).Providing and laying damp proof course 50mm thick with cement concrete 1:2:4(1cement :2 river sand:4 jhama brick aggregate 20mm.nominal size).

    9).Providing and laying damp proof course 38 mm. thick with cement concrete

    1:2:4(1 cement: 2 river sand: 4 jhama brick aggregate 20mm.nominal size).

    10).Providing and laying damp proof course 25 mm. thick with cement concrete

    1:2:4(1cement: 2 river sand: 4 jhama brick aggregate 20mm.nominal size).

    2

  • 7/30/2019 RD Scheduled

    3/30

    11).Extra for providing and mixing water proofing materials in cement concrete

    work in the proportion recommended by the manufacturers.

    12).Extra for laying concrete in or under water in foul position.

    13). Extra for laying concrete in or under water or liquid mud including cost of

    pumping or bailing out water and removing of slush etc.complete.

    RCC WORK

    1). Reinforced cement concrete work 1:2:4 (1 cement: 2 river sand: 4 brick

    aggregate 20 mm. nominal gauge) in suspended floors, roofs, landing shelves and

    their supports and balconies up to floor two level including finishing and plastering

    the ceiling with cement mortar 1:3 (1 cement: 3 river sand) of thickness not

    exceeding 6 mm. to give a smooth and over surface but excluding the cost of

    centering, shuttering and reinforcement.

    2). Reinforced cement concrete work 1:2:4 (1 cement: 2 river sand: 4 brick

    aggregate 20 mm. nominal gauge) including finishing and plastering the exposed

    surface with cement mortar 1:3 (1 cement: 3 river sand) of thickness not exceeding 6

    mm. to give a smooth and over surface but excluding the cost of centering, shutteringand reinforcement in.

    a).Foundations and plinth.

    b).Lintels, beams, girders, bresummers and cantilevers up to floor two level.

    c). Columns pillars, posts, and struts up to floor two level.

    d).Stairs case (except spiral cases) excluding landings but including preparing of

    the top surface.

    e). In chajja.

    3).Reinforced cement concrete work 1:1.5:3 (1 cement: 1.5 river sand:3 brick

    aggregate 20 mm. nominal gauge) including finishing and plastering the exposedsurface with cement mortar 1:3 (1 cement:3 river sand) of thickness not exceeding 6

    mm. to give a smooth and over surface but excluding the cost of centering, shuttering

    and reinforcement in.

    a).Foundations,footings,bases of column etc.and mass concrete.

    b).Lintels, beams, girders, bresummers and cantilevers up to floor two level.

    c). Columns pillars, posts, and struts up to floor two level.

    3

  • 7/30/2019 RD Scheduled

    4/30

  • 7/30/2019 RD Scheduled

    5/30

    1).First class brick work in foundations and plinth in cement mortar 1:4(1cement: 4

    river sand).

    2).First class brick work in foundations and plinth in cement mortar 1:6(1cement: 6

    river sand).

    3).Extra for brickwork in superstructure above plinth level up to floor two level.

    4). Extra for brickwork in 1st. floor superstructure above plinth level up to floor two

    level.

    5). Extra for brick work in square or rectangular pillar.

    6). Extra for brick work in circular pillar.

    7). Extra for making tapered surface of brick masonry.

    8).Extra for 1st. class brick work curved on plan up to a mean radius not exceeding 6

    metres.

    9).Half brick masonry (1st. class) in cement mortar 1:4 (1cement:4 river sand) in

    foundations and plinth.

    10).Extra for half brick work masonry in superstructure above plinth level up tofloor two levels.

    11). Half brick masonry (1st. class) in cement mortar 1:3 (1cement:3 river sand) in

    foundations and plinth.

    12). Half brick masonry (1st. class) in cement mortar 1:6 (1cement:6 river sand) in

    foundations and plinth.

    13).1st. class honey comb half brick work in cement mortar 1:4 (1 cement: 4 river

    sand).

    14).Extra for cutting or chamfering of bricks to required shape in masonry work.

    15).Joining old brick work with new work.

    16). Rounding of corner of bricks to required shape by cutting edges.

    17).1st. class brick work 75mm thick in cement mortar 1:3 (1 cement: 3river sand) in

    superstructure.

    5

  • 7/30/2019 RD Scheduled

    6/30

    18).Moulding and cornices in 1st class brick work in cement mortar 1:4 (1 cement: 4

    river sand) girth to be measured in cm. and length in running metres.

    19).Extra for laying brick work in or under water and / or liquid mud including cost

    of pumping and bailing out water and removing slush etc. complete.

    FINISHING WORK

    1).12 mm. cement plaster 1:4 (1 cement: 4 river sand)

    2). 12 mm. cement plaster 1:6 (1 cement: 6 river sand)

    3).15 mm. cement plaster 1:4 (1 cement: 4 river sand) on the rough side of brick wall.

    4).15 mm. cement plaster 1:6 (1 cement: 6 river sand) on the rough side of brick wall.

    5).12 mm. cement plaster 1:3 (1 cement: 3 river sand)

    6). 6 mm. cement plaster to ceilling1:3 (1 cement: 3 river sand

    7). Neat cement punning.

    8). 20 mm. cement plaster 1:4 (1 cement: 4 river sand)

    9). 20 mm. cement plaster 1:6 (1 cement: 6 river sand)

    10).Extra for plastering on circular not exceeding 6m. in radius.

    11).Extra for providing and mixing water proofing materials in proportion

    recommended by the manufactures.

    12).Pointing on brick work with cement mortar 1:2 (1 cement: 2 river sand)

    a).Flush pointing.

    b).Ruled pointing.

    c).Cut or weather struck pointing.

    d).raised and cut pointing.

    13).Pointing on brick work with cement mortar 1:3 (1 cement: 3 river sand)

    a).Flush pointing.

    b).Ruled pointing.c).Cut or weather struck pointing.

    d).raised and cut pointing.

    14). Pointing on brick flooring with cement mortar 1:2 (1 cement: 2 river sand)

    a). Flush pointing.

    b). Ruled pointing.

    15). Pointing on brick flooring with cement mortar 1:4 (1 cement: 4 river sand)

    a). Flush pointing.

    6

  • 7/30/2019 RD Scheduled

    7/30

    b). Ruled pointing

    16). Removing white wash or co lour wash by scraping sand papering and preparing

    the surface smooth including necessary repairs to surfaces etc. complete.

    17).White washing with lime on new work (three or more coats) to give an even

    shade.

    18).White washing with lime on old work to give an even shade.a).In two or more coats

    b). In one or more coats.

    19).Co lour washing such as green, blue or buff on new work (two to more coats)

    including a base coat of white washing with lime to give an even shade.

    20). Colour washing such as green, blue or buff with lime on old work to give an even

    shade.

    a).In two or more coats.

    b).In one or more coats.

    21).Distempering with dry distemper of approved quality (one or more coats) and ofrequired shade on new work including priming coat of whiting to give an even shade.

    22). Distempering with dry distemper of approved quality (one or more coats) and of

    required shade on old work to give an even shade.

    23). Applying one coat of distemper primer of approved quality on wall surface.

    24). Applying one coat of cement primer of approved quality on wall surface

    25). Finishing walls with water proofing cement paint of approved quality and of

    required shade on new work (three or more coats) to give an even shade.

    26). Finishing walls with water proofing cement paint of approved quality and of

    required shade on old work (one or more coats) to give an even shade

    27).Removing dry or oil bound distemper by scraping sand papering and preparing

    the surface smooth including necessary repairs to scratches etc. complete.

    28).Painting two coats with oil bound wood preservative of approved quality on new

    work.

    29). Painting one coats with oil bound wood preservative of approved quality on oldwork.

    30). Applying priming coats with ready mixed primer of approved quality on

    woodwork.

    31). Applying priming coats with ready mixed primer of approved quality on steel

    work.

    7

  • 7/30/2019 RD Scheduled

    8/30

    32). Applying priming coats with ready mixed genuine red lead paint of approved

    quality on steel work.

    33).Painting two or more coats (excluding priming coats) with superior ready mixed

    paint for wood, of approved quality in all shades, on new work to give an even shade.

    34). Painting one or more coats with superior ready mixed paint for woodwork, of

    approved quality in all shades, on old work to give an even shade.

    35). Painting two or more coats (excluding priming coats) with superior ready mixed

    paint for steel, of approved quality in all shades, on new work to give an even shade.

    36). Painting two or more coats on G.I. sheets with ready mixed superior paint of

    approved quality, on new work to give an even shade.

    37). Painting one or more coats on G.I. sheets with red superior ready mixed paint of

    approved quality, on old work to give an even shade.

    38). Painting two or more coats with synthetic enamel paint of approved quality in

    all shades on new work to give an even shade.

    39). Painting one or more coats with synthetic enamel paint of approved quality in

    all shades on old work to give an even shade.

    40).Wall painting two or more coats with plastic emulsion paint of approved quality

    on new work to give an even shade.

    41). Wall painting one or more coats with plastic emulsion paint of approved quality

    on new work to give an even shade.

    42). Varnishing (two or more coats) with superior quality spar varnish of approvedbrand and manufacture, on new work including an under coat of varnish with glue

    sizing.

    43). Varnishing (one or more coats) with superior quality spar varnish of approved

    brand and manufacture, on old work.

    44).Distempering (two or more coats) with oil bound washable distemper of

    approved quality and of required shade on new work over including a priming coat

    with distemper primer of approved quality to give an even shade.

    45). Distempering (one coat) with oil bound washable distemper of approved quality

    and of required shade on old work to give an even shade.

    8

  • 7/30/2019 RD Scheduled

    9/30

    FLOORING WORK

    1).First class brick on edge flooring in cement mortar 1:4 (1 cement: 4 river sand).

    2). Flat brick flooring with first class bricks in cement mortar 1:4 (1 cement: 4 river

    sand).

    3).Dry flat brick flooring with first class bricks and filling, joints with river sand.

    4).25 mm thick cement concrete flooring 1:2:4 (1 cement: 2 river sand: 4 jhama

    brick aggregate 12.5mm nominal size) finishing with a floating coat of neat cement.

    5). Cement concrete to flooring 1:2:4 (1 cement: 2 river sand: 4 jhama brickaggregate 20 mm nominal size) finishing with a floating coat of neat cement.

    a).40 mm thick.

    b).50 mm thick.

    6). Cement concrete to flooring 1:2:4 (1 cement: 2 river sand: 4 stone aggregate 20

    mm nominal size) finishing with a floating coat of neat cement.

    a).40 mm thick.

    b).50 mm thick.

    7).Cement plaster skirting (upto 30 cm height) with cement mortar 1:3 (1 cement:3

    river sand)finished with a floating coat of neat cement including rounding ofjunctions with floor.

    a).18 mm. thick.

    b).21 mm thick.

    8).40 mm thick marble chips flooring, rubbed polishing to granolithic finish, under

    layer 34mm thick cement concrete 1: 2:4(1cement:2river sand:4 graded jhama

    brick aggregate 12.5mm,nominal size)and top layer 6mm thick with white, black or

    white and black marble chips of sizes from 1 mm to 4mm nominal size laid in cement

    marble powder mix 3:1(3 cement:1 marble powder) by weight in proportion of 4:7 (4

    cement marble powder mix:7 marble chips) by volume.a) Dark shade pigment with ordinary cement.

    b).Light shade pigment with white cement.

    c) Medium shade pigment with approximately 50 percent white cement and 50

    percent ordinary cement.

    d).White cement with out any pigment.

    e). Light shade pigment with ordinary cement.

    9

  • 7/30/2019 RD Scheduled

    10/30

    9). 40 mm thick marble chips flooring, rubbed polishing to granolithic finish, under

    layer 31mm thick cement concrete 1: 2:4(1cement:2river sand:4 graded jhamabrick aggregate 12.5mm,nominal size)and top layer 9mm thick with white, black or

    white and black marble chips of sizes from 4 mm to 7mm nominal size laid in cement

    marble powder mix 3:1(3 cement:1 marble powder) by weight in proportion of 4:7 (4

    cement marble powder mix:7 marble chips) by volume.

    a) Dark shade pigment with ordinary cement.

    b).Light shade pigment with white cement.

    c) Medium shade pigment with approximately 50 percent white cement and 50

    percent ordinary cement.

    d).White cement with out any pigment.

    e). Light shade pigment with ordinary cement.

    10).Marble chips skirting (upto 30 cm.height) rubbed and polished to granolithic

    finish top layer 6 mm thick with white, black or white and black marble chips of

    sizes from smallest to 4mm nominal size laid in cement marble powder mix 3:1 (3

    cement: 1 marble powder) by weight by weight in proportion of 4:7 (4 cement

    marble powder mix: 7 marble chips) by volume.

    A).18 mm. thick with under layer 12 mm. thick in cement plaster 1:3 (1cement: 3

    river sand).

    a).Dark shade pigment with ordinary cement.

    b).Light shade pigment with or white cement.

    c).Medium shade pigment with approximately 50% white cement and 50%

    ordinary cement.d).White cement without any pigment.

    e). Light shade pigment with ordinary cement.

    B).21 mm. thick with under layer 15 mm. thick in cement plaster 1:3 (1cement: 3

    river sand).

    a).Dark shade pigment with ordinary cement.

    b).Light shade pigment with or white cement.

    c).Medium shade pigment with approximately 50% white cement and 50%

    ordinary cement.

    d).White cement without any pigment.

    e). Light shade pigment with ordinary cement.

    11).Precast terrazzo tiles 20mm. thick with white, black or white and black marble

    chips of sizes upto 6 mm. laid in floor, treads of steps and landings on 25 mm.thick

    bed of cement mortar 1:3 (1 cement: 3 river sand) joined with neat cement slurry

    mixed with pigment to match the shade of the tiles including rubbing and polishing

    complete with precast tiles of:

    a). Light shades using white cement.

    10

  • 7/30/2019 RD Scheduled

    11/30

    b). Medium shade using approximately 50% white cement and 50%

    ordinary cement.

    c).Dark shades using white cement.

    12). White glazed tiles 6 mm. thick in flooring, skirting and dado in 12 mm.thick

    cement plaster 1:3 (1 cement:3 river sand )in base and joined with whitecement(Indian make of approved quality) slurry in joins excluding cost of angles

    covers, bending and cornices.

    13).40 mm. thick red oxide flooring, under layer of 30 mm, thick cement concrete

    1:2:4 (1 cement: 2 river sand:4 jhama brick aggregate n20 mm nominal size)&top

    layer of 10mm thick plaster of cement red oxide mix (using 3.5 kgs.of red oxide of

    iron per 50 kgs of cement) 1:3 (1 cement :3 river sand )finished with a floating coat

    of red oxide mix of same proportion.

    14). Red oxide plaster skirting 9 upto 30 cm.height ) with top layer of 6 mm.thick

    plaster of cement and red oxide mix ( using 3.5 Kgs, of red oxide of iron per 50Kgs.of cement ) in mortar 1:3 (1 cement :3 river sand) finished with floating coat of

    cement red oxide mix of same proportion.

    a).18 mm.thick with under layer 12 mm.thick cement plaster 1:3 (1

    cement: 3 river sand)

    b). 21 mm.thick with under layer 15 mm.thick cement plaster 1:3 (1

    cement: 3 river sand).

    15). Extra for providing and fixing aluminum strips 40 mm.wide and 1.6 mm, thick

    in joints of terrazzo floor.

    16). Extra for providing and fixing glass strips 40 mm.wide and 1.6 mm, thick injoints of terrazzo floor.

    a). 40 mm. wide and 4 mm. thick.

    b). 40 mm. wide and 6 mm. thick.

    17). Precast terrazzo tiles 20mm. thick with marble chips of sizes upto 6 mm. in

    skirting and risers of steps not exceeding 30 cm. in height on 12 mm. thick cement

    plaster 1:3 (1 cement : 3 river sand ) jointed with neat cement slurry including

    rubbing and polishing complete with tiles of.

    a).Light shade pigment.

    b). Medium shade using approximately 50% white cement and 50%

    ordinary cement.c).Dark shades using ordinary cement.

    18). Precast terrazzo tiles 20mm. thick with marble chips of sizes upto 6 mm. fixed

    on wall on 12 mm. thick cement mortar 1:3 (1 cement : 3 river sand ) jointed with

    neat cement slurry including rubbing and polishing complete with tiles of.

    a).Light shades using white cement.

    b). Medium shade using approximately 50% white cement and 50%

    ordinary cement.

    c).Dark shades using ordinary cement

    11

  • 7/30/2019 RD Scheduled

    12/30

    19).Chequered terrazzo tiles 22 mm. thick with marble chips of sizes upto 6 mm. in

    floors on 25 mm.thick bed mortar 1:3 (1 cement : 3 River sand)joined with neatcement slurry mixed with pigment to match the shades of the tiles including rubbing

    and polishing complete.

    a).Light shades using white cement.

    b). Medium shade using approximately 50% white cement and 50%

    ordinary cement.

    c).Dark shades using ordinary cement

    20). Extra, for terrazzo tiles are laid in treads of steps not exceeding 30 cm. in width.

    21). Extra, if cut tiles other than half tiles are used in risers of steps skirting and

    dado.

    22). Providing and fixing 38 mm. glazed internal and external angles.

    23).Providing and fitting, fixing of marble stone in flooring over 20 mm. thick 1:6

    cement sand mortar with white cement in joints.

    12

  • 7/30/2019 RD Scheduled

    13/30

    WOOD WORK

    1).Providing wood work in frames of doors, windows and clerastory windows and

    their frames, wrought framed and fixed in position.

    a).Gamair wood.

    b).Soft wood (Chamal wood).

    2). Providing wood work in frames of false ceiling, partitions etc. sawn and put in

    position.

    a). Karai wood.

    b). Soft wood (Chamal).

    3).Providing and fixing 38 mm. thick paneled, glazed or paneled and glazed shuttersfor doors, windows and clerastory windows including anodized aluminum butt

    hinges with necessary screws.

    a).Gamair wood.

    4). Providing and fixing 35 mm. thick paneled glazed or paneled and glazed shutters

    for doors, windows and clerastory windows including anodized aluminum butt

    hinges with necessary screws.

    a).Gamair wood.

    5). Providing and fixing 35 mm. thick paneled glazed or paneled and glazed shuttersfor doors, windows and clerastory windows including black enameled M.S.butt

    hinges with necessary screws.

    a).Gamair wood.

    6).Providing and fixing 19 mm. thick battened door and window shutters with

    necessary ledges braces (25 mm.) including bright finished or/and black enameled

    M.S butt hinges with necessary screws.

    a).Second class Indian teak wood.

    b). Gamair wood.

    7). Extra for additional lobour for circular work such as in frames of light.

    8). Providing and fixing 25 mm. thick paneled glazed or paneled and glazed shutters

    for cup-board etc.i/c anodized aluminum butt hinges with necessary screws.

    9). Providing and fixing flush door decorative type core of block board construction

    with frame of 1st class Indian teak wood ply veneering with vertical grains or cross

    bands and face veneers on both faces of shutters.

    13

  • 7/30/2019 RD Scheduled

    14/30

    a). 40 mm. thick including anodized aluminum butt hinges with necessary

    screws.

    b). 35mm. thick including anodized aluminum butt hinges with necessary

    screws.

    c). 30mm. thick including anodized aluminum butt hinges with necessary

    screws.

    d). 25mm. thick including anodized aluminum butt hinges with necessary

    screws.

    10). Providing and fixing 38mm. thick battened and framed door shutters i/c. bright

    finished or/and black enameled M.S.butt hinges with necessary screws.

    a). Gamair wood.

    b). Soft wood.

    11). Providing and fixing 38mm. thick louvered shutters with fixed Venetians per 12

    mm. thick for windows including bright finished or/and black enameled M.S. butt

    hinges with necessary screws.

    12). 25mm. thick wooden shelves supported on 40x40x6mm.T and L iron brackets

    fixed at suitable distances but not exceeding 75 mm. apart in 7.5x7.5x15 cm. blocksof cement concrete mix 1:3:6 (1 cement :3 river sand: 6 jhama brick aggregate 20

    mm. nominal size) with:-

    a). Gamair wood.

    b).Chamal wood.

    13). 38 mm. thick wooden shelves supported on 40x40x6mm.T and L iron brackets

    fixed at suitable distances but not exceeding 75 mm. apart in 7.5x7.5x15 cm. blocks

    of cement concrete mix 1:3:6 (1 cement :3 river sand: 6 jhama brick aggregate 20

    mm. nominal size) with:-

    a). Gamair wood.

    b).Chamal wood.

    14). Providing and fixing 1st class Indian teak wood staircase hollow post made of

    10m. thick planks i/c. mouldings.

    15). Providing and fixing 12 mm. thick and 150 mm. wide pelmet with 25 mm. dia.

    Wooden curtain rod and brackets including fixing with 25x3 mm. M.S flat 10 cm

    long and plugs etc. complete.

    `16).Providing and fixing 12 mm. thick 150 mm. wide pelmet with 25 mm. dia.

    Wooden curtain rod and brackets including fixing with 25x3 mm. M.S. flat 10 cm.

    long and plugs etc. complete.

    17). Providing and fixing 38 mm. paneled glazed or panel glazed partitions fixed to

    frames with iron screws etc. complete.

    18). Providing and fixing plain asbestos cement sheet 6 mm. thick in partitions i/c.

    fixing to frames with brass screws etc. complete with 50x12 mm. soft wood (chamal)

    beading (frames to be paid separately).

    14

  • 7/30/2019 RD Scheduled

    15/30

    19). Providing and fixing in partitions 4 mm. thick hard board of approved quality

    i/c. fixing in frames with brass screws etc. complete with 150x12 mm. wooden

    beading.

    20). Providing and fixing bright finished brass Furniture handle.

    21). Providing and fixing 50 mm. bright finished brass cupboard wardrobe knob

    with necessary screws.

    22). Providing and fixing 65x35 mm.special quality bright finished brass cup-board

    or wardrobe locks with 6 levers including necessary screws etc. complete.

    23). Providing and fixing M.S. round or square bars at required spacing in wooden

    frames of windows and clerestory windows.

    24). Providing and fixing M.S Grills of required pattern in wooden frames of

    windows etc. with M.S. flats square or round bars with rounded bolts and nuts or by

    screws.

    a). Plain grill.

    25). Providing and fixing expended metal 20x60 mm. strands 8.20 mm. wide and 1.6

    mm. thick for windows etc. including 62x19 mm. beading of Gamair wood.

    26). Providing and fixing hard drawn steel wire fabric 75x25 mm. mesh of weight not

    less than 7.75 kg per sqm. to windows frames including 62x19 mm. beading of

    Gamair wood.

    27). Providing and fixing fly proof galvanized M.S. wire gauge of I.S. gauge

    designation 140 G with wire of dia. 0.71 mm. to windows clerestory windows and

    including 62x19 mm. beading of Gamair wood.

    28). Providing 40x3 mm. flat iron hold fast 40 cm. long including fixing to frames

    with 10 mm. diameter bolts, nuts and wooden plugs and embedding in cement

    concrete block 30x10x15 cm. beading of Gamair wood.

    29). Providing and fixing sal ballies in posts,purlins,rafters posts plates etc including

    cost of iron nails and spikes required and applying wood preservative on all exposed

    surface.

    30). Providing and fixing M.S.sliding door bolts bright finished or/and black

    enameled with necessary nuts and screws etc. complete.

    31). Providing and fixing M.S. handles with necessary screws etc. complete.

    32). Providing and fixing M.S.Hooks and eyes.

    33). Providing and fixing M.S. fan light pivots with necessary screws etc. complete.

    34). Providing and fixing M.S.fan light catch with necessary screws etc. complete.

    35). Providing and fixing M.S. safety hasp and staple with necessary screws etc.

    complete.

    15

  • 7/30/2019 RD Scheduled

    16/30

    36). Providing and fixing M.S. tower bolts (barrel type) with necessary screws etc.

    complete.

    a).250x10 mm.

    b).200x10 mm.

    c). 150x10 mm.

    ROOFING WORK

    1). Providing G.C. sheet roofing fixed with galvanized iron J or L hocks bolts nuts8mm.dia. with bitumen and G.I. limpet washers complete, excluding the cost of

    purlins, rafters and trusses.

    a). 0.5 mm. thick.

    2).Providing ridges or hips 60 mm. overall in plain G.I. sheet fixed with galvanized

    iron J or L hooks and bolts and nuts 8 mm. dia. G.I. limpet and bitumen washers

    complete.

    a). 0.5 mm. thick.

    3). Lobour wages for providing and making holes, cutting hoisting and placing MS

    flat.

    4). Providing and fixing 3 mm. thick hard board sheet ceiling of approved quality

    with necessary nails etc. Complete. (Frame work to be paid separately).

    5). Providing and fixing plain, square edged wooden beading 38mmx12mm section

    with screws approved quality for ceiling.

    a). Gamair wood.

    6). Extra for making chamfered edges of beading.

    7). Providing and fixing 600 mm. long 100 mm. diameter stone ware pipe in cement

    mortar 1:4 (1 cement: 4 river sand).

    8). Providing and fixing 600 mm. long 100 mm. diameter cement pipe in cement

    mortar 1:4 (1 cement: 4 river sand).

    9). Providing and fixing M.S. holder bat clamps of approved design to C.I. or S.C.I

    pipes including cement concrete block 10cm x 10cmx 10cm. of 1:2:4 mix (1 cement :2

    river sand :4 jhama brick aggregate 20 mm. nominal size ) including cost of cutting

    holes and making good the wall etc.

    a). 75 mm. diameter.

    b).100mm. diameter.

    c). 150mm. diameter.

    10). Providing and fixing on wall face C.I. rain water pipes including filling the joints

    with spun yarn soaked in neat cement slurry and cement mortar 1:2 (1 cement :2

    river sand).

    a). 75 mm. diameter pipes.

    b).100mm. diameter pipes.

    c). 150mm. diameter pipes.

    16

  • 7/30/2019 RD Scheduled

    17/30

    11). Providing and fixing 25 mm. to 40 mm. dia. muli bamboo roof frame at 15 cm.

    c/c including G.I. wire tied complete with one layer dhari mat lining on roof frame.

    12). Providing and fixing 25 mm. to 40 mm. dia. muli bamboo roof frame at 22.5 cm.

    c/c including G.I. wire tied complete with one layer dhari mat lining on roof frame.

    13). Providing Champa Kampa tarja ceiling with split bamboo battens and tied with

    G.I. wire i/c. fitting and fixing complete.

    14). Thatch roofing with superior quality sun grass on bamboo roof frame tied with

    G.I. wire complete (roof frame paid to be separately).

    a). 22.5 cm. thick thatching.

    b). 15 cm. thick thatching.

    c). 10 cm. thick thatching.

    d).7.5 cm. thick thatching.

    15). Ridge and hips with double dhari and layer of tarja.

    16). Ridge and hips with Sun grass (new).

    17). Providing and fixing 20 mm. thick wooden planks ceiling (frame work for base

    to be paid separately) with MS screws.

    a). Gamair wood.

    b). Soft wood.

    17

  • 7/30/2019 RD Scheduled

    18/30

    ROAD WORK

    1). Preparation of sub grade excavating earth to an average of 22.5 cm. depthdressing to camber and consolidating with road roller including making good the

    undulation etc. and disposal of surplus earth lead up to 50 meters.

    a). Ordinary soil.

    b). Hard soil.

    c). Hard shale & Dhunda Soil.

    2). Laying flat brick soling and consolidation with road roller including spreading

    and consolidation of binding materials moorum or earth etc. ( payment to be made

    of only brick soling used excluding blinding materials).

    3). First class brick edging laid lengthwise with half brick depth includingexcavation, refilling and disposal of surplus earth lead up to 50 m.

    4). Labour for departmental jhama bats or jhama brick ( including bigger lumps up

    to 2 bricks size ) into metal or chips and stacking the same properly as per direction

    of the Engineer-in-charge within a lead of 50 m.

    a). Jhama chips 50 mm. size.

    b). Jhama chips 40 mm. size.

    c). Jhama chips 20 to 12.5 mm size.

    5). Cutting road side drains 30 cm x20 cm. to 30 cm x 30 cm. including grading &

    disposal excavated earth lead up to 50 m. and lift up to 1.5 m. disposed soil to beleveled and neatly dressed.

    a). Ordinary soil.

    b). Hard soil.

    c). Hard shale & Dhunda Soil.

    6). Construction of road side drain 30 cm wide, 20 cm Deep and 10 cm thick side

    walls and bed with cement concrete 1:2:4 ( 1 cement : 2 river sand :4 jhama brickaggregate 20 mm. nominal gauge) finished with 6 mm. thick cement plaster 1:3 ( 1

    cement : 3 river sand) with a floating coat of neat cement finish complete as per

    standard design ( Earth work to be paid separately).

    18

  • 7/30/2019 RD Scheduled

    19/30

    S.P.T AND TEMPORARY BRIDGES AND CULVERTS

    1). Applying coal tarring two coats on new wood work.

    2). Labour wages for wooden beams, decking, track way, collars wheel guard, struts,

    ralling bracings of piles, battens for abutments and wing walls etc. including hosting

    fitting, fixing in position with necessary spikes and nails and carrying to the site of

    work, applying coal tarring two coats on new wood work, complete as per direction

    of the Engineer- in-Charge (rate excluding the cost of bolts & nuts etc. but cost of

    spikes & nails, labour for fitting & fixing included.)

    a). Sal wood.

    3). Labour charges for wood plank for walling, track way etc. including fitting, fixingin position with necessary spikes and names and applying coal tarring two coats on

    new wood work complete as per direction of the Engineer-in-Charge.

    4). Labour charges for driving and handling sal or nageswar piles with 3/4T monkey

    including marking length in metre and part of metre run from the bottom of the

    piles and including the cost of applying two coats of coal tarring complete as per

    direction of the Engineer- in-Charge.

    a). Below river/cherra bed level up to 5.0m.

    i). 250 mm. to 300 mm.

    ii).200 mm. to 250 mm.

    b). Extra for driving piles.i). 250 mm. to 300 mm.

    5). Labour charges for 38 mm. thick karai wood plank for walling, track way etc.

    including fitting, fixing in position with necessary spikes and nails and applying coal

    tarring two coats on new wood work complete as per direction of the Engineer-in-

    Charge.

    6).Labour charges for dressing and tapering of sal/local piles including making shoe

    with end tapering up to 0.175m.from bottom of piles.

    19

  • 7/30/2019 RD Scheduled

    20/30

    RIVER TRAINIG WORK

    1). Labour charges for Barak bamboos 75 mm. to 100 mm. dia. And making shoe

    with end tapered upto 0.75 m. from the bottom of the bamboo including carriage to

    the site of work complete as per direction of the Engineer-in-Charge.

    2). Labour charge for driving Barak bamboo 75 mm. to 100 mm. dia. upto the length

    required by heavy hammer or monkey including marking length in metre and part

    of a metre complete as per direction of the Engineer-in-Charge.

    3). Labour charge for fitting, fixing stout barak bamboo of 75 mm. to 100 mm. dia.

    for horizontal diagonal bracings, struts etc. including carriage to the site of work andfitting, fixing complete with nails,spikes,stout wire etc. as per direction of the

    Engineer-in-Charge.

    4). Labour charge for double layer split bamboo tatti lining including fitting, fixing

    in position complete as per the direction of the Engineer-in-charge.

    5). Labour charge for ballies 100 mm. dia. well dresses and making shoe with end

    tapered as per direction of the Engineer-in-Charge, including carriage of ballies to

    the site of work.

    a). Sal ballie.

    6). Labour charge for driving sal ballie and/or 3rd. class local wood ballie 100 mm.

    dia. up to the length required by heavy hammer or monkey including marking

    length in metre and part of a metre as per direction of the Engineer-in-Charge.

    a). 250 mm to 300 mm.

    7). Labour charge for fixing ballie 100mm. dia. for horizontal and diagonal bracings,

    and struts etc.including fitting, fixing complete with nails,spikes,stout wire etc.as per

    direction of the Engineer-in-Charge.

    a). Sal ballie 100 mm. dia.

    8). Labour charge for the providing and laying light duty non NP2 pressure classR.C.C. pipes with collars and jointing with stiff mixture of cement mortar in the

    proportion of 1:2 ( 1 cement:2 river sand) including joints etc. complete.

    a). 600 mm. dia. R.C.C. pipe(NP2).

    b). 900 mm. dia. RCC pipe (NP2).

    c). 1200 mm. dia. RCC spun pipe (NP2).

    20

  • 7/30/2019 RD Scheduled

    21/30

    REPAIRS OF BUILDING

    1). Repairs to plaster in patches of 2.5 sqm. and under i/c. cutting the patch to propershape and preparing and plastering the surface of the walls complete i/c. disposal of

    rubbish to the dumping ground within 50 m. lead with cement mortar.

    2). Providing and fixing wooden cleats to doors and windows with approved doors

    and windows with approved fittings i/c. painting polishing or bees waxing to match

    the existing shade thick iron screws.

    a). Gamair wood cleats with iron hinges and screws.

    b). Soft wood cleats with iron hinges and screws.

    3). Supplying and fixing glass panes with putty and nails i/c. removal of broken glass

    panes where necessary.a). Glass panes 2 mm. thick.

    b). Glass panes 3 mm thick.

    c). Frosted glass panes 2 mm. thick.

    4). Removal of old putty of glass panes.

    5). Re-fixing old glass panes with putty and nails.

    6). Dismantling old plaster or skirting out joints and cleaning the surface for plaster

    i/c. disposal of rubbish to the dumping ground within 50 m. lead.

    7). Raking out joints in lime or cement mortar and preparing the surface for

    repairing for repainting or replastering i/c. disposal of rubbish to the ground within

    50 mtrs. Lead.

    8). Providing and fixing MS fan clamp of standard shape and size in existing RCC

    slab i/c. cutting chase and making good and painting exposed portion of the clamps

    complete.

    21

  • 7/30/2019 RD Scheduled

    22/30

    DISMANTLING AND DEMOLISHING

    1). Demolishing cement concrete work 1:3:6 or richer mix i/c. disposal of materialswithin 50 m. lead.

    2). Demolishing cement concrete work 1:4:8 or leaner mix i/c. disposal of materials

    within 50 m. lead.

    3). Demolishing RCC work including stacking of steel bars and disposal of

    unserviceable materials within 50 m. lead.

    4).Extra for cutting reinforcement bars RCC or RB work.

    5). Extra for scraping cleaning and straightening reinforcement from RCC or RBwork.

    6). Demolishing brick work in cement mortar including stacking of serviceable

    materials and disposal of unserviceable materials within 50 mtr. Lead.

    7). Removing mortar from and cleaning brick.

    8). Dismantling wood work of sectional area 40 sq.cm. and above wrought, farmed

    and fixed in frames or and trusses i/c. stacking the materials within 50 mtr. Lead.

    9). Dismantling doors, windows and clerestory windows (steel or wood) shutters i/cchowkhats, holdfast etc. complete and stacking within 50 mtr. Lead.

    a). Of area 3 sqm. and below.

    b). Of area beyond 3 sqm.

    10). Dismantling steel work in single sections in channels,angles,tees and flats i/c

    dismembering and stacking within 50 mtr. Lead.

    11). Dismantling steel work in built up sections in angles, tees, flats and channels i/c.

    all gusset plates, bolts, nuts, cutting rivets, welding etc. i/c. dismembering and

    stacking within 50 mtr. Lead.

    12). Dismantling G.I. sheet roofing including ridges hips, valleys and gutters etc. and

    stacking the materials within 50 m. lead.

    13). Demolishing thatch roofing bamboo single roofing etc. including mats, bamboo,

    jafri etc. complete including stacking of serviceable materials and disposal of

    unserviceable materials within 50 m. lead.

    14). Dismantling wooden boarding in lining of walls and partitions excluding

    supporting members but including stacking within 50 m lead.

    22

  • 7/30/2019 RD Scheduled

    23/30

    a). Up to 10 mm. thick.

    b). Thickness above 10 mm and up to 25 mm.

    c). Thickness above 25 mm. and up to 40 mm.

    15). Dismantling precast concrete slabs in wall, partition walls etc. including stacking

    within 50 m. lead.

    a). Thickness up to 40 mm.

    b). Thickness above 40 mm. and up to 75 mm.

    16). Dismantling cement asbestos or other ceiling or partition hard board wall

    including stacking of serviceable materials and disposal of unserviceable materials

    within 50 m. lead.

    17). Dismantling ballies in posts, purlins or rafters including stacking within 50 mtrs.

    lead.

    18). Dismantling barbed wire or flexible wire rope fencing including making rolls

    and stacking within 50 m. lead.

    19). Dismantling asbestos sheet roofing including ridges, hips, valleys and gutters

    stacking the materials within 50 m. lead.

    20). Demolishing dry brick pitching in floors, drains etc. including stacking of

    serviceable materials and disposal of unserviceable materials within 50 m lead.

    21). Dismantling the tiles work in floors and roof laid in cement including stacking of

    serviceable and disposal of unserviceable materials within 50 m lead.

    a). For thickness of tiles 10 mm. to 25 mm.

    b). Thickness of tiles above 25 mm. and up to 40 mm.

    22). Extra for dismantling trusses, rafters, purlins etc. of steel work for every

    additional span of one metre or part there of and beyond 10 mtrs.

    23). Dismantling steel work in single sections in R.S. joints including dismantling and

    stacking within 50 m. lead.

    24). Taking out doors, windows, and clerestory windows shutters (steel or wood)

    including stacking within 50 m lead.

    a). Of area 3 sqm and below.

    b). Of area beyond 3 sqm.

    25). Dismantling woodwork of sectional area below 40 sqm. and above wrought,

    framed and fixed in frames, or frames and trusses including stacking the material

    within 50 m. lead.

    26). Dismantling R.B. work including stacking of steel bars and disposal of

    unserviceable materials within 50 m. lead.

    23

  • 7/30/2019 RD Scheduled

    24/30

    MISCELLANEOUS

    1). Making plinth protection 50 mm. thick of cement concrete 1:3:6 (1 cement : 3

    river sand : 6 jhama brick aggt. 20 mm nominal size) over 75 mm bed of dry brickballast 40 mm nominal size , well rammed and consolidated and grouted with river

    sand including finishing the top smooth.

    2). Brick edging 7.5 cm. wide and 12.5 cm deep to plinth protection with 2nd class

    bricks including grouting with cement mortar 1:4 ( 1cement : 4 river sand)

    3). Making plinth protection with 2nd.Class bricks on edge in cement mortar 1:6

    ( 1cement : 6 river sand) over 7.5 cm. bed of dry bricks aggregate 40 mm. nominal

    size over 75 mm. bed of dry brick ballast 40 mm. nominal size rammed consolidated

    and grouted with river sand and top of bricks pointed with cement mortar 1:2 ( 1

    cement ; 2 river sand).

    4). Providing and fixing one layer of champa kampa tarja wall with split bamboo 75

    mm. wide and bamboo battens of 40 mm. wide including tying with G.I. wire

    complete as per drawing and as directed by the Engineer -in -Charge.

    5). Providing and fixing one layer of champa kampa tarja wall with split bamboo

    ( tarja) 75 mm. wide and bamboo battens of 40 mm. wide including one layer of

    dhari lining and tying with G.I. wire complete as per drawing and as directed by the

    Engineer -in -Charge.

    6). Providing and fixing muli bamboo tarja walling plain woven with split bamboo( tarja) 75 mm. wide and bamboo battens of 40 mm. wide including tying with G.I.

    wire complete as per drawing and as directed by the Engineer-in-Charge.

    7). Providing and fixing double layer dhari mat walling strengthen with split bamboo

    battens 40 mm. wide including tying with G.I. wire complete as per drawing and as

    directed by the Engineer-in- Charge.

    8). Providing and fixing muli bamboo jafri including tying with G.I. complete as per

    drawing and as directed by the Engineer-in- Charge.

    9). Providing and fixing muli bamboo compound fencing plain woven with splitbamboo ( tarja) 75 mm. wide and bamboo battens of 40 mm. wide including tying

    with G.I. wire complete as directed by the Engineer-in-Charge.

    10). Providing and fixing whole muli bamboo walling with muli bamboo 40 mm. dia.

    placed closely including bamboo battens tied with G.I. wire complete as per drawing

    and as directed by the Engineer-in-Charge.

    11). Providing and fixing jhap door ( 1.80 m x 0.90 m) for compound fencing or for

    house with double layer dhari and jafri including split bamboo frames fitted and

    24

  • 7/30/2019 RD Scheduled

    25/30

    fixed with G.I. wire complete as per drawing and as directed by the Engineer-in-

    Charge.

    12). Providing and fixing jhap window ( 0.90 m x 0.75 m) with double layer dhari

    and jafri including split bamboo frames fitted and fixed with G.I. wire complete as

    per drawing and as directed by the Engineer-in-Charge.

    13). Providing and fixing whole muli bamboo machan with barak bamboo 75 mm

    dia. to 100 mm. dia. posts and runners tide with coir rope complete with one layer ofchampa kampa tarja matting as per drawing and as directed by the Engineer-in-

    Charge.

    14).Providing and fixing barak bamboo 75 mm. to 100mm. dia. posts etc. tied with

    coir rope.

    15).Renewing muli bamboo battens 40 mm. wide for tarja wall, compound fencing,

    jafri etc. including removal of old battens as directed by the Engineer-in-Charge.

    16).Renewing muli bamboo roof frame with new muli bamboo including removal of

    old sun grass or single dhari lining etc. including tying with G.I. wire wherenecessary.

    17). Repair to thatching with new sun grass (superior quality) tying with G.I. wire

    complete as directed.

    18). Proving and fixing karai wood railing 0.75 m. high with 7.5 cm. x 5 cm. x top

    and bottom rails, 7.5 cm. x 5 cm. sides and 5 x 5 cm. intermediate vertical bars

    placed at 22.5 cm. centre to centre including painting two or more coats complete as

    directed.

    19). Proving and fixing soft wood ( chamal`) eve board 25 mm. thick and 22.5 mm.

    wide including painting two coats complete as directed.

    20).Labour for providing and fixing prefabricated MS steel door including frame in

    cement concrete block (15 x 10 x 10 cm.) 1:3:6 mix of jhama aggtt. 20 mm. nominal

    size as per direction of Engineer-in-Charge.

    21). Labour for providing and fixing prefabricated MS steel window including frame

    in cement concrete block (15 x 10 x 10 cm.) 1:3:6 mix of jhama aggtt. 20 mm.

    nominal size as per direction of Engineer-in-Charge.

    22). Labour charge for fitting fixing of tubular truss up to 9 M span including filling

    fixing of all related members as per direction of Engineer-in-Charge. Two-gavel wallwill be considered as one bay.

    23). Providing and laying mud wall with puddle earth mixed with jute fibre and cow

    dung and placing in blocks not more than 45 x 30 x 30 cm. size and not more than 30

    cm. height at a time and rested for drying for a day or two as per direction.

    24). 18 mm. thick mud plaster in two coats , 12 mm. under layer and 6 mm. top layer

    including cow dung lapping mixed with mud not less than 3 mm. thick.

    25

  • 7/30/2019 RD Scheduled

    26/30

    25). Diluting 7 injecting chemical emulsion ( to be supplied free of cost at site of

    work) for PRECONSTRUCTIONAL ANTI-termite treatment and creating a

    continuous chemical barrier under and around the column pits , wall trenches,

    basement excavation, top surface of plinth filling, junction of wall & floor, along the

    external perimeter of building, expansion joints, over the top surface of consolidated

    earth on which apron is to be laid, surroundings of pipes & conduits etc. complete as

    per specifications.( plinth area of the building at ground floor only shall be measured

    for payment)

    Chloropyriphos Emulsifiable concentrate 20% with 15 concentration.

    26). Supplying fitting & fixing mortice lock with latch, operating handle and key 6

    labours connecting rod with complete set of approved quality as per direction of the

    engineer in charge.

    27). Supplying fitting & fixing of hydraulic door Closer of approved quality with ISI

    mark ( heavy type ISI sizes) as per direction of engineer-in- charge.

    28). 2 mm thick PVC sheet flooring & skirting plain coloured or mosaic mottled

    finish laid with approved adhesive conforming to relevant IS code on floor/wall

    including stretching cutting & fitting complete.

    29). Providing & fixing PVC solid plastic door/window frames made of low density

    free formed sheet 9 PVC solid plastic sheet) of overall dimensions 50 mm x 75 mm

    with a maximum wall thickness of 3 mm duly reinforced with PVC solid plastic sheet

    of 12 mm. thickness joints mitred & welded & fitted to CB/CC/RCC work/pillar with

    flat iron hold fast 25 mm x 3 mm x 250 mm ( 4 hold fast on each side ) embedded in

    1:2:4 CC block ( 1 cement :2 river sand: 4 jhama brick aggregate 20 mm. nominal

    size)12.50 cm x 7.50 cm x 15.00 cm. complete as per direction of the Engineer- in

    -Charge.

    30).Providing & fixing PVC solid plastic door/ window shutter consisting of in fill

    PVC plastic section (SASH) in the dimension of 50 x 50 mm and PVC plastic bead inthe dimension 12 x 12 with overall thickness of 8 mm. solid PVC plastic sheet with

    arrangement for locking system analyzed aluminum hinges ( 3 hinges on each side)

    complete as per direction of the Engineer-in-Charge.

    31).Providing and fixing 1 mm. thick MS Steel door with frame of 40 x 40 x6 mm

    angel iron and 3 mm MS Gusset Plates at the junctions and corners all necessary

    fittings complete, including applying a priming coat of approved steel primer.

    a).Using MS angles 40 x 40 x 6 mm for diagonal braces.

    b).Using flats 30 x 6 mm for diagonal braces & central cross piece.

    26

  • 7/30/2019 RD Scheduled

    27/30

    M-II/M-III HAND PUMP

    Sl.

    No

    Activity (Description) Unit Materials Labour

    1. Drilling & boring of 40 mm.

    dia. pilot hole by any suitablemethod and withdrawing the

    same after selecting the

    aquifer (staging should not

    be dismantled if aquifer is

    found suitable)

    Mtr. HS=0.07 Nos.

    SK=0.193Nos.S/SK=0.426Nos.

    USK=0.186 Nos.

    2. Reaming the borehole of 40

    mm. dia. to an enlarge

    borehole of 80 mm. dia. by

    any suitable method.

    Mtr. HS=0.04 Nos.

    SK=0.124 Nos.

    S/SK=0.271 Nos.

    USK=0.116 Nos.

    3. Reaming the borehole of 80mm. dia. to an enlarge

    borehole of 150 mm. dia. by

    any suitable method.

    Mtr. HS=0.081 Nos.SK=0.324 Nos.

    S/SK=0.833 Nos.

    USK=0.269 Nos.

    4. Lowering and handling of 40

    mm dia. (GI) nominal bore

    (medium) quality pipe

    including 40 mm. dia. Brass

    Strainer with suitable steel

    cutter/ threading/jointing

    complete as directed.

    Mtr. Blind pipe =1

    No/Job. Brass

    Strainer =3

    Nos/Job. Pipe

    =0.16 Nos./Mtr.

    HS=0.023 Nos.

    SK=0.07 Nos.

    S/SK=0.145 Nos.

    USK=0.041 Nos.

    5. Lowering and handling 100mm. dia. nominal bore (GI

    pipe) with suitable steel

    cutter/threading/jointing

    complete as directed.

    Mtr. Pipe=0.16nos./Mtr. HS=0.043 Nos.SK=0.129 Nos.

    S/SK=0.27 Nos.

    USK=0.075 Nos.

    6. Fitting fixing of India Mark-

    III hand pump (Leg shall be

    embedded in CC base)

    including handling &

    lowering of 65 mm.dia. GI

    pipe connected with cylinder

    at one end and water tank inother end including fitting

    fixing of connecting rod with

    cylinder also with chain

    coupling etc. complete as per

    direction of Engineer -in-

    charge.

    1job M-II/M-III = 1

    No.

    HS=0.40 nos.

    SK=1.20 nos.

    S/SK=2.5 nos.

    U/SK=0.7 nos.

    7. Development of tube

    well by pumping out the tur-

    bid water till clean sand free

    1job. SK=2 Nos. U/SK=2

    Nos.

    27

  • 7/30/2019 RD Scheduled

    28/30

    water is obtain as per

    direction of Engineer-in-

    Charge.

    STEEL WORTK

    1. Labour charges for fitting

    fixing collapsible steel

    shutters with vertical

    channels 20x10x2 mm. bracedwith flat iron diagonals 20x5x

    mm.size top and bottom rails

    of iron 40x40x6 mm. with 38

    mm. dia. steel pulleys

    ,complete with

    bolts,nuts,locking

    arrangements,stoppers,handle

    s,including applying a

    priming coat of red lead paint.

    sqm HS=1.00 nos.

    USK=2.00 nos.

    2. Supplying and fixing rolling

    shutters of approved makemade of 80x1.35 mm MS laths

    interlocked together through

    their entire length and jointed

    together at the end by end

    locks mounted on specially

    designed pipe shaft with

    brackets, side guides and

    arrangements for inside and

    outside locking with push and

    pull operation complete but

    including the fixing of the topcover, ball bearings and

    spring.

    sqm Rolling shutter

    =1 Sqm.

    HS=0.667 nos.

    S/SK=0.943 nos.

    3. Providing and fixing MS

    round holding down bolts

    with nuts and washer plates

    complete.

    Qtl. H.D bolts (60

    mm.dia. @ 1.58

    kg/mt.)

    Plate (100x100x6

    mm. @ 47

    kg/mt.)

    SK=0.597 Nos.

    4. Steel work in single section

    including cutting, hoisting,

    fixing in position andapplying a priming coat of red

    lead point.

    a). In R.S. Joists.

    Qtl.

    HS=0.14 NOS.

    SK=0.08 NOS.

    USK=0.23 NOS.

    28

  • 7/30/2019 RD Scheduled

    29/30

    b).In tees angles & channels. Qtl. HS=0.2 nos. SK=0.12

    nos. USK=0.4 nos.

    c). In flats. Qtl. HS=0.14 NOS.

    SK=0.08 NOS.

    USK=0.23 NOS.

    5. Welding by gas plant. Cm.

    Leng

    th

    Welding

    Rod=0.01 nos.

    Cost of Gas

    L.S.=24.00

    SK=0.015 nos. USK=

    0.004 nos.

    6. Welding by electric Plant. Cm.

    Leng

    th

    Welding

    Rod=0.01 nos.

    ElectricityCharge =0.08

    unit.

    SK=0.006 nos.

    USK=0.002 nos.

    ROOF TREATMENT

    1. Removing all existing

    treatment including tar felt /

    plaster / lime concrete etc.

    and clearing the roof surface

    by clear water and lifting the

    same within 50 mtr.lead asper direction of Engineer-in-

    Charge.

    Sqm. Nil HS=0.054 No.

    SK=0.079 No.

    S/SK=0.15 No.

    USK=0.54 No.

    2. Applying bond coat

    consisting requisite quantity

    of water proofing compound

    by weight with cement slurry

    (2.75 kg)/sqm. (as

    recommended by Engineer-

    in-Charge).

    Sqm. Latex=250 ml

    Cement=1 kg

    HS=0.03 No.

    U/SK=0.03 No.

    3. Providing and applying

    specialized chemical waterproofing treatment using

    requisite quantity of water

    proofing compound two

    coats (as recommended by

    Engineer-in-Charge). By

    brush 2 kg to 2.5 kg.

    Sqm. Water proofing

    materials =2 to2.5 kg.

    HS=0.11 No.

    USK=0.11 No.

    4. Cement concrete 1:2:4 (1

    cement: 2 river sand: 4

    jhama brick aggregate 10

    Sqm. Cement=0.26

    bag. Sand=0.025

    Cum. Brick

    HS=0.035 Nos.

    SK=0.03 Nos.

    S/SK=0.105 Nos

    29

  • 7/30/2019 RD Scheduled

    30/30

    mm. size) 40 mm. thick using

    water proofing admixture IS-

    9103 @ ratio 100 ml/50 kg.

    bag of cement and curing the

    complete as directed.

    aggregate =0.035

    Cum.

    Admixture= 100

    ml/50 kg. bag of

    cement.

    USK=0.248 Nos.

    5. Applying polymer modified

    cement based compound

    repair mortar for repairing

    the cracks of wall and beam,channel, edged etc. after

    making V shaped grove

    and cleaning the loose

    particle by brushing and

    saturated the surface by

    clean water and filled the

    groove by Euco Damit

    Hydroplug with a ratio of

    1.4 kg. per mtr. And

    saturated the surface for 2

    days with clean water.

    Mtr. Euco Demit=1.4

    kg

    HS=0.15 Nos.

    USK=0.596 Nos.

    6. Mix latex: Water: Cement @

    (250 ml: 500ml: 1 kg.) and

    apply by brush on the walls

    as prime coat.

    Sqm. Latex =250

    ml. Cement=1kg.

    HS=0.03 Nos.

    U/SK=0.03 Nos.

    7. Applying one coat of

    Eucoseal after mixing 1 part

    Eucoseal with 300 ml. of

    water over the prime coast

    when the prime coat is dry.

    Using 1 kg of Eucoseal

    Sqm. Eucoseal=1 kg. HS= 0.057 Nos.

    U/SK=0.09 Nos.