Education:
B.SC. of Engineering from Cairo University, Mechanical Design and
Production Dept.
- Quali f icat ions:
- : Level II Non Destruc t ive Test ing
1) Ultrasonic testing. Level II
2) Radiographic testing. Level II
3) Penetration testing. Level II
4) Magnetic testing. Level II
5) Attend CWI Preparation course and wait Exam
6) Attend ASME-IX and ASME B31.3
7) Attend API 1104
-:I was training in Companies of Petroleum - Cairo Oil Refining. ( from 15 / 7 / 2004 to 14 / 8 / 2004 ) (Egypt)
- East Zeit Petroleum ( from 27 / 8 / 2005 to 10 / 9 / 2005 ) (Egypt)
- Belayem Petroleum ( from 28 / 7 / 2005 to 13 / 8 / 2005 ) (Egypt)
- Belayem Petroleum ( from 3 / 7 / 2003 to 18 / 7 / 2003 ) (Egypt)
(Egypt)- Qarun Petroleum ( from 7 / 9 / 2003 to 18 / 9 / 2003 )
All Training in Department ( Welding & Inspection )
HANY NABIL ABDEL TAWAB
NAME :
AddressPersonal Data
Mobile Number :
Egypt ( 002 ) 01225622022 – ( 002 ) 01005027677 Iraq: (00964) 7814480797 Email :[email protected]
Nationality : Egyptian
Date of Birth:6 /12 /1981 Social Status : Single Language : Arabic , English ( Excellent )
-
8/16/2019 QA / QC WELDING ENGINEER
2/6
2
DUTIES
During the employment; quality positions was held, these
positions varies in role and duties. Here listed below the mainresponsibilities of these positions:
Prepared WPS and apply PQR and WQT
Visual inspection for welding
* Before welding (check fit up)* During welding (check process for welding) * After welding (check V.T for welding joint)
Welder qualification test.
Check the type for material & limited type of electrode using according to
(WPS)
Check calibration certificate for (Welding machines, portable oven for
electrode before using ) Supervision of radiographic test and making film interpretation and making a
report.
Performing of Ultrasonic Testing and making a report.
Performing of Magnetic Particle testing and making a report.
Performing of Hardness Testing on several materials and making a report.
Liquid Penetrant Testing and making a report Thickness Gauging testing and making a report.
P P R R O O F F E E S S S S I I O O N N AA LL E E X X P P E E R R I I E E N N C C E E : :
y y e e a a r r s s ’ ’ e e x x p p e e r r i i e e n n c c e e i i n n d d o o m m a a i i n n w w e e l l d d i i n n g g i i n n s s p p e e c c t t i i o o n n M M o o r r e e t t h h a a n n 9 9
1- Pressure Vessels. 2- Tanks inspection. 3- Pipe line Inspection.4 – Heat Exchanger. 5 – Piping Inspection. 6 – Steel construction.
-
8/16/2019 QA / QC WELDING ENGINEER
3/6
3
AS FOLLOWING: -
) IRAQ ( –ALSHALAL ALAZRAQ WITHO Tel now T Nov.2014
Position: QA / QC Manager
Client: ROO - BP – EXXON MOBIL – PETROFAC - SOC
ructionPipeline under const Projects:
Piping system
(IRAQ) –SEENOPEX OIL SERVESES WITH2014 .O Oct March 2012 T
Posi t ion: QA / QC Welding Inspector
(Before, During, After) welding Process
Client: SOUTH OIL COMPANY (SOC) – IRAQ
BP –
EXXON MOBIL –
PETRONAS - ENI
Project : SPHERICAL PRESSURE VESSEL & PIPING
PIPELINE UNDER CONSTRUCTION
STORAGE TANKS
Site: Baghdad – Hella – BASRAH
-
8/16/2019 QA / QC WELDING ENGINEER
4/6
4
)(EGYPT –PANYCOMOPCOWITH2012.2011 TO Feb.Oct
Posi t ion: QC Welding Inspector Make
and QC ( Before , During , After ) welding Process and
NDT ( UT- RT- VT- PT- MT )
Client: NEVERSEL COMPANY – EGYPT
Project : SPHERICAL PRESSURE VESSEL & PIPING
Site: BORT SAEED
Third Party: Lioyds Register
( EGYPT ) –RICO COMPANY2011 WITH.2011 TO Sep.Jun
Posi t ion: NDT Inspector (UT - RT)
Client: ENPC
Project : AMMONIA UREA ENPC PROJECT
Third Party: Lioyds Register
JOB Descr ip t ion:
( piping & reformer tube & boiler piping )
( EGYPT ) –RICO COMPANYWITH. 2011TOJun. 2011May
Posi t ion: QC Welding Inspector Make WPS , PQR , WQT )
and QC ( Before , During , After ) welding Process, and
and NDT Inspector ( UT –
RT –
PT –
MT - VT )
Client: GASCO COMPANY
-
8/16/2019 QA / QC WELDING ENGINEER
5/6
5
Project : PIPE LINE Contractor : RICO COMPANY
( EGYPT ) –COMPANYOPCOWITH2011.Apr TOMarch. 2011
Posi t ion: NDT Inspector ( UT – RT – PT – MT-VT )
Client: Abou Zaabal Fertilizer and Chemical
Project: PIPING & STORGE TANK
Contractor: OPCO COMPANY
( EGYPT ) –IDKU COMPANYWITH2011.FebTODes. 2010
Posi t ion: QC Welding Inspector Make ( WPS , PQR , WQT )
and NDT Inspector ( UT – RT – PT – MT - VT )
and QC ( Before , During , After ) welding Process
Client : AGIBA PETROLUIM COMPANY
Project : TANKS & PIPNG
Contractor: PETROMAINT COMPANY
( EGYPT ) –
COMPANYIDKUWITH2010.sep. 2010 TO Nov
Posi t ion: NDT Inspector ( UT – RT – PT – MT )
Client: M IDOR COMPANY
Project : PIPING & STORGE TANK
Contractor: PETROMAINT COMPANY
-
8/16/2019 QA / QC WELDING ENGINEER
6/6
6
CAIROFUCULITY OF ENGINEERHWITMay. 2010 TO Aug. 2010
( EGYPT ) –
UNIVRSITY
Posi t ion: NDT Inspector ( UT – RT – PT – MT - VT )
Client: ORASCOM COMPANY
Project : STRUCTURAL STEEL
( EGYPT ) –NTROL COMPANYQUALITY COWITH006 TO March. 2010l.2Ju
Posi t ion: QC Weldding Inspector Make ( WPS , PQR , WQT )
and QC ( Before , During , After ) welding Process
and NDT Inspector ( UT –
RT –
PT –
MT –
VT )
Client: Belayem Petroleum ( PETROPEL)
Project :
( Pipe Lin e , Tanks , Pressu re Vessel , Heat Exch anger , Piping )