qa / qc welding engineer

Upload: hany-nabil

Post on 05-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 QA / QC WELDING ENGINEER

    1/6

     1

     

    Education:

      B.SC. of Engineering from Cairo University, Mechanical Design and

    Production Dept. 

    - Quali f icat ions: 

    - : Level II Non Destruc t ive Test ing  

    1) Ultrasonic testing. Level II

    2) Radiographic testing. Level II

    3) Penetration testing. Level II

    4) Magnetic testing. Level II

    5) Attend CWI Preparation course and wait Exam

      6) Attend ASME-IX and ASME B31.3

      7) Attend API 1104

     -:I was training in Companies of Petroleum  - Cairo Oil Refining. ( from 15 / 7 / 2004 to 14 / 8 / 2004 ) (Egypt)

      - East Zeit Petroleum ( from 27 / 8 / 2005 to 10 / 9 / 2005 ) (Egypt)

    - Belayem Petroleum ( from 28 / 7 / 2005 to 13 / 8 / 2005 ) (Egypt)

      - Belayem Petroleum ( from 3 / 7 / 2003 to 18 / 7 / 2003 ) (Egypt)

    (Egypt)- Qarun Petroleum ( from 7 / 9 / 2003 to 18 / 9 / 2003 )

      All Training in Department ( Welding & Inspection )

     

    HANY NABIL ABDEL TAWAB

     

    NAME :

    AddressPersonal Data

     

    Mobile Number :

     Egypt ( 002 ) 01225622022  – ( 002 ) 01005027677 Iraq: (00964) 7814480797  Email :[email protected]

     

    Nationality : Egyptian

     Date of Birth:6 /12 /1981 Social Status : Single Language : Arabic , English ( Excellent )

  • 8/16/2019 QA / QC WELDING ENGINEER

    2/6

     2

     

    DUTIES

    During the employment; quality positions was held, these

    positions varies in role and duties. Here listed below the mainresponsibilities of these positions:

      Prepared WPS and apply PQR and WQT

      Visual inspection for welding

    * Before welding (check fit up)* During welding (check process for welding)  * After welding (check V.T for welding joint)

      Welder qualification test.

      Check the type for material & limited type of electrode using according to

    (WPS)

      Check calibration certificate for (Welding machines, portable oven for

    electrode before using )  Supervision of radiographic test and making film interpretation and making a

    report.

      Performing of Ultrasonic Testing and making a report.

      Performing of Magnetic Particle testing and making a report.

      Performing of Hardness Testing on several materials and making a report.

      Liquid Penetrant Testing and making a report  Thickness Gauging testing and making a report.

    P P R R O O F F E E S S S S I I O O N N AA LL  E E X X P P E E R R I I E E N N C C E E : : 

    y y e e a a r r s s ’ ’  e e x x p p e e r r i i e e n n c c e e  i i n n  d d o o m m a a i i n n  w w e e l l d d i i n n g g  i i n n s s p p e e c c t t i i o o n n M M o o r r e e  t t h h a a n n  9 9 

    1- Pressure Vessels. 2- Tanks inspection. 3- Pipe line Inspection.4  – Heat Exchanger. 5 – Piping Inspection. 6 – Steel construction.

  • 8/16/2019 QA / QC WELDING ENGINEER

    3/6

     3

     

    AS FOLLOWING: - 

     

     ) IRAQ (  –ALSHALAL ALAZRAQ WITHO Tel now T Nov.2014 

     Position: QA / QC Manager 

    Client: ROO - BP – EXXON MOBIL – PETROFAC - SOC

     ructionPipeline under const Projects:

    Piping system

    (IRAQ)  –SEENOPEX OIL SERVESES WITH2014 .O Oct March 2012 T 

    Posi t ion:  QA / QC Welding Inspector

    (Before, During, After) welding Process

    Client: SOUTH OIL COMPANY (SOC) – IRAQ

      BP –

     EXXON MOBIL –

     PETRONAS - ENI

    Project :  SPHERICAL PRESSURE VESSEL & PIPING

      PIPELINE UNDER CONSTRUCTION

      STORAGE TANKS

    Site: Baghdad  – Hella – BASRAH

     

  • 8/16/2019 QA / QC WELDING ENGINEER

    4/6

     4

     

    )(EGYPT –PANYCOMOPCOWITH2012.2011 TO Feb.Oct 

    Posi t ion:  QC Welding Inspector Make

    and QC ( Before , During , After ) welding Process and

    NDT ( UT- RT- VT- PT- MT )

     Client: NEVERSEL COMPANY  – EGYPT

    Project :  SPHERICAL PRESSURE VESSEL & PIPING

    Site: BORT SAEED

    Third Party:  Lioyds Register 

    ( EGYPT ) –RICO COMPANY2011 WITH.2011 TO Sep.Jun 

    Posi t ion: NDT Inspector (UT - RT) 

    Client: ENPC 

    Project :   AMMONIA UREA ENPC PROJECT

    Third Party:  Lioyds Register  

    JOB Descr ip t ion:

    ( piping & reformer tube & boiler piping )

     

    ( EGYPT ) –RICO COMPANYWITH. 2011TOJun. 2011May 

    Posi t ion: QC Welding Inspector Make WPS , PQR , WQT ) 

    and QC ( Before , During , After ) welding Process, and

    and NDT Inspector ( UT –

     RT –

     PT –

     MT - VT )

    Client:  GASCO COMPANY 

  • 8/16/2019 QA / QC WELDING ENGINEER

    5/6

     5

     Project : PIPE LINE Contractor :  RICO COMPANY 

    ( EGYPT ) –COMPANYOPCOWITH2011.Apr TOMarch. 2011 

    Posi t ion:  NDT Inspector ( UT  – RT  – PT  – MT-VT ) 

    Client: Abou Zaabal Fertilizer and Chemical 

    Project: PIPING & STORGE TANK 

    Contractor: OPCO COMPANY 

    ( EGYPT ) –IDKU COMPANYWITH2011.FebTODes. 2010 

    Posi t ion:  QC Welding Inspector Make ( WPS , PQR , WQT ) 

    and NDT Inspector ( UT – RT  – PT  – MT - VT ) 

    and QC ( Before , During , After ) welding Process

    Client :  AGIBA PETROLUIM COMPANY 

     

    Project : TANKS & PIPNG 

    Contractor: PETROMAINT COMPANY 

    ( EGYPT ) –

    COMPANYIDKUWITH2010.sep. 2010 TO Nov 

    Posi t ion:   NDT Inspector ( UT – RT  – PT  – MT )

    Client: M IDOR COMPANY

    Project :   PIPING & STORGE TANK 

    Contractor: PETROMAINT COMPANY 

  • 8/16/2019 QA / QC WELDING ENGINEER

    6/6

     6

     

    CAIROFUCULITY OF ENGINEERHWITMay. 2010 TO Aug. 2010

    ( EGYPT ) –

    UNIVRSITY 

    Posi t ion:  NDT Inspector ( UT  – RT  – PT  – MT - VT ) 

    Client:  ORASCOM COMPANY 

    Project :  STRUCTURAL STEEL 

    ( EGYPT ) –NTROL COMPANYQUALITY COWITH006 TO March. 2010l.2Ju 

    Posi t ion:  QC Weldding Inspector Make ( WPS , PQR , WQT ) 

    and QC ( Before , During , After ) welding Process 

    and NDT Inspector ( UT –

    RT –

     PT –

     MT –

     VT ) 

    Client:   Belayem Petroleum  ( PETROPEL)

    Project : 

     ( Pipe Lin e , Tanks , Pressu re Vessel , Heat Exch anger , Piping )