PRESSURE VESSELS CHECK LIST
Q.C. INSP. REPORT NO.
Srl No. List of Check PointsInspected by
VendorVerified by
DRIPLRemarks
A DRAWINGS:-
1 Verification of Drawings approvals by DRI/Client in Code 1
2 Inspection shall be carried out as per approved drawings and ITP only.
B WPS, PQR AND WPQ REPORTS
1 Review of Welding Procedure & Qualification Records as per weld-Map andapproved drawings.
2 Witnessed for New Procedure Qualification.
C WELDING CONSUMBLES
1 Review of Test Certificates for Welding Consumables.
D NDE PROCEDURE FOR RT, LPT & HYDRO TESTS.
1 Review of all Test Procedure as per Drawings requirement.
E MATERIAL IDENTIFICATION OF PRESSURE PARTS.
1 Review of Material as per approved drawings and applicable specification and approved ITP.
2 Review of Material Test Certificates / Check tests Reports and NDT Reports asapplicable.
3 Check visual inspection
4 Check for Vendor approved list if applicable.
F DISHED END INSPECTION
1 Check Dimensions as per drawing.
2 Check for SF, KR & CR as per template.
3 Check Min. Thickness by THK Gauge as per drawing
4 Check visual & LPT Tests on SF, KR & Edge portion.
5 Check for Heat Treatments as per Drawings if applicable.
6 Review of Heat Treatment Chat.
7 Witness / Review of Coupon plate testing as per ITP.
G FIT UP FOR LONG SEAM AND NOZZLE CONS.
1 Check Fit up as per drawings, verify weld joint.
2 Check for proper alignment tolerance of Shell long seam, Dish to shell andNozzle cons as per drawings & Code.
3 Check visual inspection for weld grooves and bevels.
JOB NO. :INSPECTION BY :
VENDOR :DR PO NO. :ITEM :
DR JOB NO :CLIENT :
INSPECTED BY:-FOR VENDOR VERIFIED BY:-
Page 1 of 2Rev - 00
Prepared by-Pravin Modh
-
PRESSURE VESSELS CHECK LIST
Q.C. INSP. REPORT NO.
H FLANGES AND COUPLING
1 Verify flanges size as per Drawing.
2 Verify Coupling size as per Drawing.
3 Check flanges face for damage and Finish requirements.
4 Check rotation and till of Nozzles as per drawing/Code Tolerances.
5 Check for threaded cons. for threads damage.
6 If Vessels is to be mounted to two or more cylinder, Ensure proper Jig/ Templateis used for clearance requirements.
I WELDING CONFORMANCE
1 Check for correct weld fillet size
2 Inspect for weld Quality.
3 Inspect for full penetration welds for FPW Joints.
J INTERNAL INSPECTION BEFORE CLOSING.
1 Check internal surface cleaning.
2 Check for full penetration welding of Nozzle cons. as per drawing.
3 Check Nozzle cons / Inside Flush LPT Tests.
4 Check for internal fit up if any for chock tube / orifice plate & support.
5 Witness of pneumatic leak tests of RF Pads if required.
6 Inspect for internal painting if required, check for coating & DFT. . .
K NDT -INSPECTION
1 Check for Radiography Tests review of films as per drawing & ITP.
2 Check for UT, LPT, MT requirements as per drawing & ITP.
L FINAL VISUAL & DIMENSIONS INSPECTION.
1 Check for dimensions as per Drawings / tolerances.
2 Check for external attachment, Lifting Lug, Pipe Support & Support pad Ifapplicable as per drawing.
3 Check dimensions before PWHT if applicable as per drawing.
4 Review of Post Weld Heat Treatment / Charts if applicable as per drawing.
5 Check for hardness requirements after PWHT is applicable.
6 Inspect for overall workmanship, Weld spatters, under cuts, weld Arc strikes andweld reinforcement as per code.
M FINAL HYDRO TEST INSPECTION.
1 Inspect / witness Final hydro testing as per required tests pressure as perdrawings.
2 Check for Pressure Gauges calibration and requirements.
3 Review results or witness Hydro Tests pressure tests.
N INTERNAL CLEANING AFTER HYDO TESTS.
1 CHECK for water draining, drying and internal cleaning.
2 Final visual check for Nozzle cons. Flanges Raised face serration.
O FINAL EXTERNAL INSPECTION AFTER PAINTING.
1 Check for external painting as per drawings / painting schemes.
2 Inspect external painting for quality and verify paint DFT.
3 Check for visual for proper coating, Paint damage / pill out .
4 Check for proper Flanges Enclosures / steel covers with required gaskets.
5 Check for Fasteners / Studs projection length on Blind Flanges / covers.
P FINAL DOCUMENTS / DOSSIERS.
1 Review of Inspection reports / MTC and Documents
2 Review Dossiers as per INDEX and if any client requirements.
INSPECTED BY:-FOR VENDOR VERIFIED BY:-
Page 2 of 2Rev - 00
Prepared by-Pravin Modh