5/26/2018 PvCheckList-slidepdf.com http://slidepdf.com/reader/full/pv-check-list 1/3 PRESSURE VESSELS CHECK LIST Q.C. INSP. REPORT NO. Srl No. List of Check Points Inspected by Vendor Verified by DRIPL Remarks A DRAWINGS:- 1 Verification of Drawings – approvals by DRI/Client in Code 1 2 Inspection shall be carried out as per approved drawings and ITP only. B WPS, PQR AND WPQ REPORTS 1 Review of Welding Procedure & Qualification Records as per weld-Map and approved drawings. 2 Witnessed for New Procedure Qualification. C WELDING CONSUMBLES 1 Review of Test Certificates for Welding Consumables. D NDE – PROCEDURE FOR RT, LPT & HYDRO TESTS. 1 Review of all Test Procedure as per Drawings requirement. E MATERIAL IDENTIFICATION OF PRESSURE PARTS. 1 Review of Material as per approved drawings and applicable specification and approved ITP. 2 Review of Material Test Certificates / Check tests Reports and NDT – Reportsas applicable. 3 Check visual inspection 4 Check for Vendor approved list if applicable. F DISHED END INSPECTION 1 Check Dimensions as per drawing. 2 Check for SF, KR & CR as per template. 3 Check –Min. Thickness by THK –Gauge as per drawing 4 Check visual & LPT –Tests on SF, KR & Edge portion. 5 Check for Heat Treatments as per Drawings if applicable. 6 Review of Heat Treatment Chat. 7 Witness / Review of Coupon plate testing as per ITP. G FIT UP FOR LONG SEAM AND NOZZLE CONS. 1 Check Fit up as per drawings, verify weld joint. 2 Check for proper alignment tolerance of Shel long seam, Dish to shell and Nozzle cons as per drawings & Code. 3 Check visual inspection for weld grooves and bevels. JOB NO. : INSPECTION BY : VENDOR : DR PO NO. : ITEM : DR JOB NO : CLIENT : INSPECTED BY:- FOR VENDOR VERIFIED BY:- Page 1 of 2 Rev - 00 Prepared by-Pravin Modh

Upload: bapug98

Post on 16-Oct-2015

29 views

Category:

Documents


0 download

DESCRIPTION

pressure vessel check list

TRANSCRIPT

  • PRESSURE VESSELS CHECK LIST

    Q.C. INSP. REPORT NO.

    Srl No. List of Check PointsInspected by

    VendorVerified by

    DRIPLRemarks

    A DRAWINGS:-

    1 Verification of Drawings approvals by DRI/Client in Code 1

    2 Inspection shall be carried out as per approved drawings and ITP only.

    B WPS, PQR AND WPQ REPORTS

    1 Review of Welding Procedure & Qualification Records as per weld-Map andapproved drawings.

    2 Witnessed for New Procedure Qualification.

    C WELDING CONSUMBLES

    1 Review of Test Certificates for Welding Consumables.

    D NDE PROCEDURE FOR RT, LPT & HYDRO TESTS.

    1 Review of all Test Procedure as per Drawings requirement.

    E MATERIAL IDENTIFICATION OF PRESSURE PARTS.

    1 Review of Material as per approved drawings and applicable specification and approved ITP.

    2 Review of Material Test Certificates / Check tests Reports and NDT Reports asapplicable.

    3 Check visual inspection

    4 Check for Vendor approved list if applicable.

    F DISHED END INSPECTION

    1 Check Dimensions as per drawing.

    2 Check for SF, KR & CR as per template.

    3 Check Min. Thickness by THK Gauge as per drawing

    4 Check visual & LPT Tests on SF, KR & Edge portion.

    5 Check for Heat Treatments as per Drawings if applicable.

    6 Review of Heat Treatment Chat.

    7 Witness / Review of Coupon plate testing as per ITP.

    G FIT UP FOR LONG SEAM AND NOZZLE CONS.

    1 Check Fit up as per drawings, verify weld joint.

    2 Check for proper alignment tolerance of Shell long seam, Dish to shell andNozzle cons as per drawings & Code.

    3 Check visual inspection for weld grooves and bevels.

    JOB NO. :INSPECTION BY :

    VENDOR :DR PO NO. :ITEM :

    DR JOB NO :CLIENT :

    INSPECTED BY:-FOR VENDOR VERIFIED BY:-

    Page 1 of 2Rev - 00

    Prepared by-Pravin Modh

  • PRESSURE VESSELS CHECK LIST

    Q.C. INSP. REPORT NO.

    H FLANGES AND COUPLING

    1 Verify flanges size as per Drawing.

    2 Verify Coupling size as per Drawing.

    3 Check flanges face for damage and Finish requirements.

    4 Check rotation and till of Nozzles as per drawing/Code Tolerances.

    5 Check for threaded cons. for threads damage.

    6 If Vessels is to be mounted to two or more cylinder, Ensure proper Jig/ Templateis used for clearance requirements.

    I WELDING CONFORMANCE

    1 Check for correct weld fillet size

    2 Inspect for weld Quality.

    3 Inspect for full penetration welds for FPW Joints.

    J INTERNAL INSPECTION BEFORE CLOSING.

    1 Check internal surface cleaning.

    2 Check for full penetration welding of Nozzle cons. as per drawing.

    3 Check Nozzle cons / Inside Flush LPT Tests.

    4 Check for internal fit up if any for chock tube / orifice plate & support.

    5 Witness of pneumatic leak tests of RF Pads if required.

    6 Inspect for internal painting if required, check for coating & DFT. . .

    K NDT -INSPECTION

    1 Check for Radiography Tests review of films as per drawing & ITP.

    2 Check for UT, LPT, MT requirements as per drawing & ITP.

    L FINAL VISUAL & DIMENSIONS INSPECTION.

    1 Check for dimensions as per Drawings / tolerances.

    2 Check for external attachment, Lifting Lug, Pipe Support & Support pad Ifapplicable as per drawing.

    3 Check dimensions before PWHT if applicable as per drawing.

    4 Review of Post Weld Heat Treatment / Charts if applicable as per drawing.

    5 Check for hardness requirements after PWHT is applicable.

    6 Inspect for overall workmanship, Weld spatters, under cuts, weld Arc strikes andweld reinforcement as per code.

    M FINAL HYDRO TEST INSPECTION.

    1 Inspect / witness Final hydro testing as per required tests pressure as perdrawings.

    2 Check for Pressure Gauges calibration and requirements.

    3 Review results or witness Hydro Tests pressure tests.

    N INTERNAL CLEANING AFTER HYDO TESTS.

    1 CHECK for water draining, drying and internal cleaning.

    2 Final visual check for Nozzle cons. Flanges Raised face serration.

    O FINAL EXTERNAL INSPECTION AFTER PAINTING.

    1 Check for external painting as per drawings / painting schemes.

    2 Inspect external painting for quality and verify paint DFT.

    3 Check for visual for proper coating, Paint damage / pill out .

    4 Check for proper Flanges Enclosures / steel covers with required gaskets.

    5 Check for Fasteners / Studs projection length on Blind Flanges / covers.

    P FINAL DOCUMENTS / DOSSIERS.

    1 Review of Inspection reports / MTC and Documents

    2 Review Dossiers as per INDEX and if any client requirements.

    INSPECTED BY:-FOR VENDOR VERIFIED BY:-