Page 1: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 1

Proton Plan StatusProton Plan Status June June

Eric Prebys

Page 2: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 2

• Shutdown Schedule – Mau• Operations - Prebys• Technical Progress – Prebys

Focus on shutdown preparation

• Cost/Schedule Report – Baller

AgendaAgenda

Page 3: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 3

Operations

Page 4: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 4

Operational HighlightsOperational Highlights

• NuMI Great until 2nd horn problem knocked them off the

air

• MiniBooNE/SciBooNE Will ~hit design goal for the fiscal year in spite of

three month down time!

Page 5: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 5

NuMINuMI

Dotted lines are 2.4 second rep rate

Now this is a coincidence

Oops!

Page 6: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 6

MiniBooNE/SciBooNEMiniBooNE/SciBooNE

• Good running plus delayed shutdown => both beamlines ~hit their design goals for the fiscal year in spite of mistakes, unforeseen problems, etc.

No sense letting all the NuMI protons just sit there

Page 7: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 7

Total Booster Output Total Booster Output

Operations smoothly switches NuMI’s protons to BNB

Page 8: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 8

Technical Status

Page 9: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 9

Significant Activity Since Last PMGSignificant Activity Since Last PMG

• (1.1) Linac (1.2.2) Quad Power Supply Upgrade

• Continues adiabatically

(1.2.4) Linac LLRF Upgrade• Prototype FPGA board working and being used for tests• Unlikely to finish job during shutdown

– Goal: Complete at least station 5 and all prep work (VXI crates, etc) for other stations.

– Adiabatically upgrade remaining stations as hardware appears.

• (1.2) Booster Magnets, magnets, magnets

Page 10: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 10

Magnet Production (as of yesterday)Magnet Production (as of yesterday)

completebottleneck

Page 11: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 11

Latest Delivery ScheduleLatest Delivery Schedule

• Will not delay installation• Does not free up technicians until well into the shutdown

Date Magnets Available

August 3 10

August 10 11

August 17 13

August 24 15

August 31 19

September 7 23

September 14 26

Page 12: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 12

Prototype InstallationPrototype Installation

• All power supplies and water connected• Pulsing (hard) on beam off cycles• Proceeding with beam tests

Page 13: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 13

Main Injector ActivityMain Injector Activity

• (1.3) Main Injector (1.3.2) MI Collimation Systems

• Ring:– All collimators assembled in MI-65– Motion control tested– Ready for shutdown

Page 14: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 14

Assembled CollimatorAssembled Collimator

Page 15: Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys

Proton Plan PMG 7/26/07 E Prebys 15

Cooldown?Cooldown?

• Current Estimate: 530 mRem/person!• Propose turning MiniBooNE/SciBooNE off one week

before shutdown

Average Normalized Dose vs Cool Down

0.0

0.2

0.4

0.6

0.8

1.0

1.2

0 10 20 30 40 50 60

Days since Beam

Data Single Exponential Double Exponential

One week