prioritizing stormwater capital improvement program (cip)...

29
1 PRIORITIZING STORMWATER CAPITAL  IMPROVEMENT PROGRAM (CIP) PROJECTS APWA Fall Joint Conference| Kearney, NE | November 6 th , 2013 Presented by Lalit Jha, PE, D.WRE, CFM Miles Simmons, EIT, M.S.

Upload: others

Post on 10-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

1

PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) 

PROJECTSAPWA Fall Joint Conference| Kearney, NE | November 6th , 2013 Presented by

Lalit Jha, PE, D.WRE, CFMMiles Simmons, EIT, M.S.

Page 2: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

2

Agenda

• Urban Drainage Issues

• CIP Prioritization

• Study Methodology

• Project Benefits

• Conclusion

Page 3: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

3

Urban Drainage Issues

• Flooding Problems

• Structural Condition of the System

• System Upgrades and Master Planning

• Operation and Maintenance

• Stormwater Program Financing 

Page 4: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

4

63rd and Fletcher Ave.

50th and R St.

Localized Flooding

Page 5: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

5

27th and Highway 2

33rd and Highway 2

Stormwater System Deficiencies

Page 6: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

6

14th and Holdrege St.

11th and Oak St.

Structural Condition

Page 7: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

7

Urban Drainage Issues

“How can drainage problems be identified?”

“Which problems should be addressed first?”

“What are the financing needs?”

“Most bang for the buck”

Page 8: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

8

Background – Lincoln, Nebraska

• State Capital, second largest City in NE• Population 260,000• 82 square miles within City limits• 500 miles of public storm drain system• 230 miles of open channel system• 31,000 ancillary items

Page 9: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

9

Background – CIP Prioritization

• Previous methodology developed in 1966• Based on out‐dated standards• Reactive approach

“Squeaky wheel gets the grease”

Page 10: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

10

Project Objective

• Develop an updated prioritization methodology and a proactive CIP

• Identify  stormwater CIP projects

• Enhance the City’s stormwater database

“Reduce Flooding and Drainage Issues”

Page 11: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

11

Prioritization Approach• Written Scoring

• Written Policy

• Engineering Judgment / Committee Review

Page 12: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

12

Prioritization Methodology

• Prioritization Categories• Structural Flooding • Non‐Structural Flooding• Existing Infrastructure Condition• Miscellaneous Factors 

health and safety  critical locations  downstream impacts community development  links to other utility projects

Page 13: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

13

Prioritization Methodology

Example Prioritization Worksheet

Page 14: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

14

Previous Study Process

• Data Preparation / Data Collection

• Identify Deficiencies – MicroStation GeoPak Drainage– 1‐D, Rational Method, steady flow

• Propose Drainage Improvements

• Prioritize Projects

• GIS Coverage and Database– Imported from MicroStation

Page 15: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

15

Application

• Studied 10,000 acres of watershed• 135 miles of pipe, 20,000 LF of open channel, 

5,000 ancillary items• Identified 150 CIP stormwater projects

– Dozens of projects proceeded to design/construction through funding from 2005‐2012 Stormwater bonds

Page 16: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

16

Current Urban

Drainage Study

Page 17: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

17

Current Study Process• Phase 1‐ Screening Level Analysis

– 1‐D, Rational Method, steady flow– Identify Storm System Deficiencies

• Pipe Capacity, Inlet Ponding Depths, Ponding Limits, Structural Flooding

– Update GIS Database

• Phase 2‐ Detailed Analysis and CIP Development– Optional 2‐D, unsteady flow– Develop CIP stormwater projects

• Evaluate conceptual alternatives

Page 18: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

18

Hydrology and Hydraulics

Screenshot of DGN map ArcGISXP SWMM

Page 19: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

19

Drainage system deficiencies based on design storm as defined in City design criteria manual.

Pipes(Discharge Relative to Capacity)

Inlets (Ponded Depth at Inlet)

Ponding Areas(Structural Flood Frequency)

Street Flooding

Stormwater System Deficiencies

Page 20: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

20

1-D/2-D Analysis

1-D Pipes/Open Channels

2-D Overland Flow/Flooding

Page 21: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

21

Flooding Animations

Page 22: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

22

CIP Project Development

• Structural Flooding

• Location

• City Design Standards

• Cost-Effectiveness

Page 23: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

23

CIP Project Development

Page 24: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

24

CIP Project Prioritization

Page 25: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

25

GIS Database Management

Page 26: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

26

GIS Database Management

Page 27: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

27

Model Validation

Page 28: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

28

Conclusion

• Cost‐effective approach to prepare a proactive stormwater CIP

• Ensures taxpayers’ dollars spent on most needed projects 

• Helpful in justifying stormwater program financing needs to elected officials and public

Page 29: PRIORITIZING STORMWATER CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECTSnebraska.apwa.net/content/chapters/nebraska.apwa.net/file... · 2013-11-06 · IMPROVEMENT PROGRAM (CIP) PROJECTS

29

Thank You!Questions?