Project Precinct Description Type Status Project Manager Contact Number Arkansas Bend Park Group Bldg Gerald Daugherty (Pct 3) Community meeting building with event space for approximately 300 people, including restrooms, catering prep kitchen and storage. Park Design Odette Tan, P.E. 512-854-7587 Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY EXECUTIVE 700 Lavaca Street P.O. BOX 1748 AUSTIN, TEXAS 78767 (512)854-9418 David Greear, P.E., Assistant Public Works Director Capital Improvement Projects Capital Improvement Projects (CIP) include the cost of buildings and other structures, infrastructure and capital-related additions, alterations, reconstruction, and installations that have a value of $5,000.00 or more and an estimated useful life greater than one year. The Transportation and Natural Resources Department (TNR) works primarily with infrastructures, which are long-lived capital assets that normally are stationary in nature and can be preserved for a significantly greater number of years than most capital assets. These include the construction of new or reconstruction or improvements of existing facilities that may fall under one of the following: · New parks development · Major drainage improvements · Roads · Bicycle lanes · Sidewalk and other pedestrian facilities · Expansion of the County’s bridge system 1 Monday, June 15, 2020

Upload: others

Post on 13-Jun-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Arkansas Bend Park Group Bldg Gerald Daugherty (Pct 3) Community meeting building with event space for approximately 300 people, including restrooms, catering prep kitchen and storage.

Park Design Odette Tan, P.E. 512-854-7587

Public Works Improvement Projects (CIP) Summary Table

TRANSPORTATION AND NATURAL RESOURCES DEPARTMENTCYNTHIA McDONALD, COUNTY EXECUTIVE700 Lavaca StreetP.O. BOX 1748AUSTIN, TEXAS  78767(512)854-9418

David Greear, P.E., Assistant Public Works Director

Capital Improvement ProjectsCapital Improvement Projects (CIP) include the cost of buildings and other structures, infrastructure and capital-related additions, alterations, reconstruction, and installations that have a value of $5,000.00 or more and an estimated useful life greater than one year.  The Transportation and Natural Resources Department (TNR) works primarily with infrastructures, which are long-lived capital assets that normally are stationary in nature and can be preserved for a significantly greater number of years than most capital assets.These include the construction of new or reconstruction or improvements of existing facilities that may fall under one of the following: ·        New parks development ·        Major drainage improvements·        Roads ·        Bicycle lanes ·        Sidewalk and other pedestrian facilities·        Expansion of the County’s bridge system

1

Monday, June 15, 2020

Page 2: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Arkansas Bend Park Phase I Gerald Daugherty (Pct 3) Design and construction to improve beach, picnic areas, playgrounds, boat ramp, other amenities, and associated infrastructure for the day-use area and new campground and to restore disturbed land to natural conditions.

Park Completed Odette Tan, P.E. 512-854-7587

Arkansas Bend Park Phase II Gerald Daugherty (Pct 3) Complete overnight facilties with infrastructure and associated amenities

Park Pre-Construction

Odette Tan, P.E. 512-854-7587

Arroyo Doble / Twin Creeks Drainage Gerald Daugherty (Pct 3) Design and construct subdivision drainage improvements and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road.

Drainage Design Tony Valdez, P.E. 512-854-7567

Arterial A (Engineering and ROW) Jeff Travillion (Pct 1) New MAD 4 arterial between US 290 East and Parmer Lane Roadway Design Mo Mortazavi, P.E. 512-854-7589

Bee Creek Road at Bee Creek Low Water Crossing- project supended

Gerald Daugherty (Pct 3) Improve existing low water crossing to all-weather crossing Bridge Completed Tony Valdez, P.E. 512-854-7567

Bee Creek Road Improvements Gerald Daugherty (Pct 3) Widen existing 2-lane road to 4-lane arterial from SH 71 to Highland Boulevard

Roadway Completed Tony Valdez, P.E. 512-854-7567

Bee Creek Sports Complex Gerald Daugherty (Pct 3) The Bee Creek Sports Complex will have soccer, baseball, and football fields, parking, restrooms, team meeting facility, trail head and primitive trail, playground area, maintenance building, and other amenities and associated infrastructure.

Park Design Odette Tan, P.E. 512-854-7587

Big Sandy Drive at Long Hollow Creek Low Water Crossing

Gerald Daugherty (Pct 3) Improve existing low water crossing to all-weather crossing Roadway Completed Mo Mortazavi, P.E. 512-854-7589

Bitting School Road at unnamed tributary to Wilbarger Creek

Jeff Travillion (Pct 1) Construct drainage structure to replace undersized existing culverts under Bitting School Road at unnamed tributary to Wilbarger Creek

Drainage Design Mo Mortazavi, P.E. 512-854-7589

Blake Manor Road Improvements Jeff Travillion (Pct 1) Widen Blake Manor Rd from 2-lane to 4-lane from East Metro Park to the proposed Wildhorse Connector (close to the Manor City Limits)

Roadway Design Miguel Villarreal, P.E. 512-854-7586

Blake Manor Shared Use Path Jeff Travillion (Pct 1) Shared use path along Blake Manor Rd from East Metro Park to the proposed Wildhorse Connector (near the Manor city limits)

Roadway Design Miguel Villarreal, P.E. 512-854-7586

Braker Lane I, Phase I Jeff Travillion (Pct 1) Realign Decker Lane from US 290 to Lindell Lane Roadway Completed Tony Valdez, P.E. 512-854-7567

Braker Lane I, Phases 2, 3, 4, 5 (Public-Private-Public)

Jeff Travillion (Pct 1) Extend Braker Lane from realigned Decker Lane to Parmer Lane at SH 130

Roadway Not Started Tony Valdez, P.E. 512-854-7567

2

Monday, June 15, 2020

Page 3: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Braker Lane II, Phase 1 (Public-Private) Jeff Travillion (Pct 1) Extend Braker Lane from FM 973 to one mile east Roadway Completed Tony Valdez, P.E. 512-854-7567

Braker Lane II, Phase 2 (Public-Private) Jeff Travillion (Pct 1) Extend Braker Lane from one mile east of FM 973 to Taylor Lane

Roadway Completed Tony Valdez, P.E. 512-854-7567

Braker Lane North Extension (design only) Jeff Travillion (Pct 1) Extend Braker Lane form Samsung Blvd to Harris Branch Park as a 4-lane arterial. Dormant. COA participation required to complete design.

Roadway Started Mo Mortazavi, P.E. 512-854-7589

Bridge #109; Boyce Lane Jeff Travillion (Pct 1) Replace or rehabilitate bridge by TxDOT Bridge Design Mo Mortazavi, P.E. 512-854-7589

Bridge #113; Old Manor Road Jeff Travillion (Pct 1) Build new parallel bridge and rehab existing bridge. Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Bridge #126 on Lund Carlson Jeff Travillion (Pct 1) Replace existing Bridge 126 on Lund Carlson with a new bridge.

Bridge Design Mo Mortazavi, P.E. 512-854-7589

Bridge #136; Lund Carlson Road Jeff Travillion (Pct 1) Replace or Rehabilitate bridge by TxDOT Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Bridge #154; Old Highway 20 Jeff Travillion (Pct 1) Replace existing bridge with a new 2-lane bridge Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Bridge #155; Old Highway 20 Jeff Travillion (Pct 1) Replace existing bridge with a new 2-lane bridge. Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Bridge #229; Weiss Lane Brigid Shea (Pct 2) Bridge replaced by Pflugerville. Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Bridge #302; Old San Antonio Road Gerald Daugherty (Pct 3) New parallel 2-lane bridge. Bridge Design Mo Mortazavi, P.E. 512-854-7589

Bullick Hollow @ FM2769 Gerald Daugherty (Pct 3) Add Left Turn Lane on westbound Bullick Hollow at The Intersection of FM2769.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Bullick Hollow Road Safety Improvements Brigid Shea (Pct 2) From Oasis Bluff Dr to FM2769, spot shoulder improvements for bike\safety.

Roadway Construction Miguel Villarreal, P.E. 512-854-7586

Bullick Hollow Road Safety Improvements Gerald Daugherty (Pct 3) From Oasis Bluff Dr to FM2769, spot shoulder improvements for bike\safety.

Roadway Construction Miguel Villarreal, P.E. 512-854-7586

Caldwell Lane at River Timber Jeff Travillion (Pct 1) This project consists of the installation of cross culverts at the low point of the road at the bend, and a drainage easement with a drainage channel from the ROW to the high bank of the Colorado River.

Drainage Design Miguel Villarreal, P.E. 512-854-7586

Caldwell Lane Drainage Margaret Gomez (Pct 4) Construct erosion protection dike for Caldwell Lane at Lower Colorado River

Drainage Completed Tony Valdez, P.E. 512-854-7567

Cameron Road Improvements Brigid Shea (Pct 2) Widen and realign existing 2-lane road to 4-lane divided arterial with bike lanes and sidewalk from Gregg Lane to SH 130

Roadway Pre-Construction

Chiddi N’Jie, P.E. (512) 854-7585

3

Monday, June 15, 2020

Page 4: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Cameron Road Improvements Jeff Travillion (Pct 1) Widen and realign existing 2-lane road to 4-lane divided arterial with bike lanes and sidewalk from Gregg Lane to SH 130

Roadway Pre-Construction

Chiddi N’Jie, P.E. (512) 854-7585

Circle Drive Safety Improvements Gerald Daugherty (Pct 3) Bike/shoulder safety improvements, at spot locations, From HWY 290 to Thomas Springs Rd

Roadway Construction Miguel Villarreal, P.E. 512-854-7586

Circle Drive/US 290W Intersection Improvements

Gerald Daugherty (Pct 3) Realign Spring Valley Drive at Circle Drive and US 290W Roadway Completed Tony Valdez, P.E. 512-854-7567

Citation Avenue Drainage retrofit Margaret Gomez (Pct 4) Improve drainage of current areas in Thoroughbred Farms neighborhood

Drainage Design Tony Valdez, P.E. 512-854-7567

County Line Road at Elm Creek Jeff Travillion (Pct 1) Replace undersized bridge and adjacent structure on County Line Road where Elm Creek crosses.

Bridge Not Started Miguel Villarreal, P.E. 512-854-7586

Decker Lake Road (Public-Private-Public) Jeff Travillion (Pct 1) Extend Decker Lake Road from FM 973 to SH 130 SB Frontage Road

Roadway Completed Tony Valdez, P.E. 512-854-7567

Decker Lane / Hog Eye Sidewalk Jeff Travillion (Pct 1) Construct sidewalk on Hog Eye Road from Decker Lane to Community First Village.

Pedestrian Completed Odette Tan, P.E. 512-854-7587

Decker Lane Sidewalk Jeff Travillion (Pct 1) Construct a five foot wide by 1.63 mile concrete sidewalk within existing right-of-way along the west side of Decker Lane (FM 3177) from Loyola Lane to Daffan Lane.

Pedestrian Completed Odette Tan, P.E. 512-854-7587

Deer Creek Substandard Roads (Lake Park, Lake Beach & Lake Shore)

Gerald Daugherty (Pct 3) Improve Lake Park Dr, Lake Beach Dr and Lake Shore Dr in Deer Creek Subdivision to meet County Substandard Road standards.

Roadway Completed Katharine Hardin, P.E. (512) 854-7598

East Metro Park Community Pavilion Foundation Repair

Jeff Travillion (Pct 1) Structural evaluation of Community Pavilion building and design for structural foundation repair

Park Design Odette Tan, P.E. 512-854-7587

Ed Acklin Rd @ unnamed tributary Jeff Travillion (Pct 1) Drainage structures to replace undersized culverts Drainage Construction Miguel Villarreal, P.E. 512-854-7586

El Rey Boulevard Sidewalk Gerald Daugherty (Pct 3) Construct sidewalk along El Rey Blvd. from US 290W to Espanola Trail

Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598

Elroy Road at FM 812 Margaret Gomez (Pct 4) Design and construction of one additional southbound lane on Elroy Road at the intersection of FM 812

Roadway Completed Odette Tan, P.E. 512-854-7587

Elroy Road widening Margaret Gomez (Pct 4) Reconstruction of Elroy Road between McAngus Rd and Kellam Rd from 2 lanes to 4 lanes divided, with shoulders and sidewalks.

Roadway Construction Chiddi N’Jie, P.E. (512) 854-7585

Fitzhugh Road Gerald Daugherty (Pct 3) Add shoulders on both sides of Fitzhugh Road from US290 to 2.9 miles west to Travis County Line

Roadway Design Chiddi N’Jie, P.E. (512) 854-7585

4

Monday, June 15, 2020

Page 5: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Flint Rock Road Gerald Daugherty (Pct 3) Widen/Safety Improvements on Flint Rock Road from RM620 to Serene Hills Drive

Roadway Completed Tony Valdez, P.E. 512-854-7567

FM 1626 Improvements Gerald Daugherty (Pct 3) Improve FM 1626 to 4-lane arterial with center turn lane, paved shoulders/bike lane and sidewalk from west of Bear Creek Bridge to FM 2304

Roadway Pre-Construction

Tony Valdez, P.E. 512-854-7567

FM 969 Improvements (TxDOT Pass-Through Toll Finance), Phase I

Jeff Travillion (Pct 1) Improve FM 969 to 4-lane arterial with center turn lane, paved shoulders and sidewalk from FM 3177 to FM 973

Roadway Construction Miguel Villarreal, P.E. 512-854-7586

FM 969 Improvements (TxDOT Pass-Through Toll Finance), Phase II

Jeff Travillion (Pct 1) Improve FM 969 to 4-lane arterial with center turn lane, paved shoulders and sidewalk from FM 973 to Hunters Bend Road

Roadway Design Miguel Villarreal, P.E. 512-854-7586

FM 973 to Blake Manor Road Connector Jeff Travillion (Pct 1) New 4-lane arterial from FM973 to Blake Manor Road Roadway Design David Greear, P.E. (512) 854-7650

Fort Smith Trail Substandard Road Gerald Daugherty (Pct 3) Improve Fort Smith Trail off Debba Drive for acceptance into County maintained roadway system

Roadway Completed Miguel Villarreal, P.E. 512-854-7586

Frate-Barker Road Gerald Daugherty (Pct 3) Reconstruction of two lane road to a four lane divided roadway section from Brodie Lane to Manchaca Road with bike lanes and sidewalks.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Frate-Barker Road Margaret Gomez (Pct 4) Reconstruction of two lane road to a four lane divided roadway section from Brodie Lane to Manchaca Road with bike lanes and sidewalks.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Gilbert Road Extension Jeff Travillion (Pct 1) Extend Gilbert Road from FM 969 to Austin's Colony Roadway Completed Miguel Villarreal, P.E. 512-854-7586

Grand Avenue Parkway - GAP Brigid Shea (Pct 2) Construct four lane roadway with bike lanes and sidewalks from Bratton Lane westward toward existing 4 lane section of Grand Avenue Parkway at Crissom Lane

Roadway Design David Greear, P.E. (512) 854-7650

Great Divide @ Little Barton Creek (evaluation only)

Gerald Daugherty (Pct 3) Study only. Conceptual evaluations of preliminary design alternatives and receive community feedback.

Drainage Completed Miguel Villarreal, P.E. 512-854-7586

Great Divide bridge Gerald Daugherty (Pct 3) Bridge structure to replace undersized culverts at low water crossing

Bridge Not Started Mo Mortazavi, P.E. 512-854-7589

Gregg Ln at Wilbarger Creek Jeff Travillion (Pct 1) Replace undersized culvert Drainage Design Katharine Hardin, P.E. (512) 854-7598

Hamilton Pool Road Safety Improvements 1 Gerald Daugherty (Pct 3) Phase I of Safety Improvements along Hamilton Pool Road; replacement of the Bridge over Hamilton Creek and addition of Turn Lanes at the Entrance to the Hamilton Pool Preserve and Stage Coach Rd.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

5

Monday, June 15, 2020

Page 6: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Hamilton Pool Road Safety Improvements, Phase II

Gerald Daugherty (Pct 3) Various identified safety improvements from RR 12 to the top of the East bank of the Pedernales River

Roadway Not Started Chiddi N’Jie, P.E. (512) 854-7585

Harold Green Extension Jeff Travillion (Pct 1) Extend Harold Green Road from SH130 eastward to Austin's Colony as a 2 lane arterial with bike lanes and sidewalks

Roadway Design Miguel Villarreal, P.E. 512-854-7586

Highland Boulevard (Public-Private) Gerald Daugherty (Pct 3) Extend Highland Boulevard from Rough Hollow Drive to Bee Creek Road

Roadway Completed Tony Valdez, P.E. 512-854-7567

Hodde Lane Roadway Realignment Jeff Travillion (Pct 1) Realign roadway Roadway Design Mo Mortazavi, P.E. 512-854-7589

Hog Eye Rd @ Harris Branch Creek Jeff Travillion (Pct 1) Drainage Structure to replace undersized culverts. Drainage Design Katharine Hardin, P.E. (512) 854-7598

Hog Eye Rd @ Trib to Harris Branch Crk Jeff Travillion (Pct 1) Drainage structure to replace undersized culvert Drainage Design Katharine Hardin, P.E. (512) 854-7598

Howard Lane I Brigid Shea (Pct 2) Reconstruction of a two-lane road to a four-lane divided curb and gutter road with sidewalks and bicycle lanes from Dessau Road to Cameron Road

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Howard Lane II (Public-Private-Public) Jeff Travillion (Pct 1) Extend Howard Lane from Cameron Road to SH 130 Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Hunters Bend sidewalk Jeff Travillion (Pct 1) A new sidewalk along Hunters Bend Road between Austin's Colony Boulevard and Red Tail Trail

Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598

Jesse Bohls (Design and ROW only) for Realignment and improvements

Jeff Travillion (Pct 1) Engineering and ROW for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane roadway with shoulders from Weiss to approximately 1 mile east then continue with added shoulders to Cameron

Roadway Started Chiddi N’Jie, P.E. (512) 854-7585

Jesse Bohls Road Bridge (#231) Brigid Shea (Pct 2) Replace bridge and realign approaching roadway Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Kellam Road Margaret Gomez (Pct 4) Two lane divided road being 1st phase of a planned four lane divided road with sidewalk and associated bridges and water quality ponds.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Kimbro Road/Parsons Road Bridge (#164) Jeff Travillion (Pct 1) Replace bridge and realign approaching roadway Bridge Completed Mo Mortazavi, P.E. 512-854-7589

Lake Oak Estates (CDBG) Gerald Daugherty (Pct 3) Reconstruct substandard roads - Cavalier Canyon Drive, Bowling Lane, Holly Lane

Roadway Completed Katharine Hardin, P.E. (512) 854-7598

Ledgestone Terrace at Pen Creek Trib Gerald Daugherty (Pct 3) Drainage Structure to replace undersized culvert Drainage Design Miguel Villarreal, P.E. 512-854-7586

Linden Rd at Maha Creek Margaret Gomez (Pct 4) Replace and raise undersized bridge and culverts Drainage Design Mo Mortazavi, P.E. 512-854-7589

Littig Road Bridge #161 Jeff Travillion (Pct 1) replace functionally obsolete bridge structure that is load posted with new bridge.

Bridge Design Mo Mortazavi, P.E. 512-854-7589

6

Monday, June 15, 2020

Page 7: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Lost Creek Sidewalk Gerald Daugherty (Pct 3) Construct sidewalks within Lost Creek MUD (public-public partnership)

Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598

Manda Carlson Road Bridge #134 Jeff Travillion (Pct 1) Replace functionally obsolete bridge with new bridge Bridge Design Mo Mortazavi, P.E. 512-854-7589

McKinney Falls Parkway Extension Margaret Gomez (Pct 4) Construct 4-lane divided road from William Cannon Drive to Thaxton Lane with bike lanes and sidewalks, plus a 48" waterline (for City of Austin), and reconstruction of Thaxton Lane..

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

McKinney Falls Parkway Pedestrian Way Margaret Gomez (Pct 4) Construct pedestrian way on west side from William Cannon Drive to McKinney Falls State Park

Pedestrian Completed Mo Mortazavi, P.E. 512-854-7589

McNeil Road Drainage Improvements Brigid Shea (Pct 2) Drainage improvements to relieve McNeil Drive between Howard Lane and Ashton Wood Dr from flooding

Drainage Design Miguel Villarreal, P.E. 512-854-7586

Moya Park - Moore's Crossing Bridge Repair Margaret Gomez (Pct 4) Repair Moore's Bridge Crossing that was damaged during the October 2015 floods

Park Completed Odette Tan, P.E. 512-854-7587

Northeast Metro Park BMX Site Improvements

Brigid Shea (Pct 2) Parking, restroom, utilities & misc. improvements for BMX track site

Park Completed Odette Tan, P.E. 512-854-7587

Northeast Metro Park Soccer Field Improvements

Brigid Shea (Pct 2) Convert 4 soccer fields to synthetic turf, install sports lighting, and build associated improvements

Park Construction Odette Tan, P.E. 512-854-7587

Northeast Metro Park South Entrance Road Brigid Shea (Pct 2) Construction of new park entrance road from Wells Branch Parkway to the park including hike and bike trail, Bridge, and parking facilities.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Northeast Metro Phase III Amenity Center Brigid Shea (Pct 2) Construct an amenity center with playscape, shed, restroom, parking, etc.

Park Completed Miguel Villarreal, P.E. 512-854-7586

Northeast Metro Phase III Skate Park Brigid Shea (Pct 2) Construct a skate park Park Completed Miguel Villarreal, P.E. 512-854-7586

Old Lockhart Road Shoulders Margaret Gomez (Pct 4) Add shoulders on both sides of Old Lockhart Road from Slaughter Lane to Thaxton Road

Roadway Started Katharine Hardin, P.E. (512) 854-7598

Old Manor Road Safety Improvements Jeff Travillion (Pct 1) Improve the existing 2 lane roadway and add shoulders from Ferguson cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections

Roadway Design Chiddi N’Jie, P.E. (512) 854-7585

Old San Antonio Road shoulders Gerald Daugherty (Pct 3) Add shoulders on both sides of Old San Antonio Road from FM1626 to Hays County Line

Roadway Started Katharine Hardin, P.E. (512) 854-7598

7

Monday, June 15, 2020

Page 8: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Onion Creek Greenway II Margaret Gomez (Pct 4) Design and construction of a major shared–use trail, recreational facilities and support infrastructure on Travis County-owned land from Satellite 4 Office to the confluence of Onion Creek with the Colorado River.

Park Design Odette Tan, P.E. 512-854-7587

Onion Creek Greenway Phase III Margaret Gomez (Pct 4) Design and construction of a concrete hike and bike trail from Richard Moya Park to Barkley Meadows Park.

Park Design Odette Tan, P.E. 512-854-7587

Onion Creek Greenway, Phase 1A Margaret Gomez (Pct 4) Hike and Bike Trail from FM 973 to SH 71 Park Completed Miguel Villarreal, P.E. 512-854-7586

Pace Bend Park Boat Ramp Gerald Daugherty (Pct 3) Construction of a new boat ramp Park Completed Miguel Villarreal, P.E. 512-854-7586

Park Boat Ramp Renovations Margaret Gomez (Pct 4) Reconstruction of two (2) boat ramps located at Webberville and Little Webberville Parks.

Park Completed Odette Tan, P.E. 512-854-7587

Park West Drainage Improvements Gerald Daugherty (Pct 3) Drainage improvements at the Parks West Office in Precinct 3

Drainage Completed Odette Tan, P.E. 512-854-7587

Parmer Lane Extension Phase IIB (Public-Private-Public)

Jeff Travillion (Pct 1) Extend Parmer Lane from Cap Metro Railroad ROW to Braker Lane Extension

Roadway Completed Tony Valdez, P.E. 512-854-7567

Pearce Lane Widening Margaret Gomez (Pct 4) Widen Pearce Lane from Kellam Road to the Bastrop County Line at Wolf Lane. Also add left turn lanes on Pearce at approaches to intersection with Kellam Road

Roadway Design Tony Valdez, P.E. 512-854-7567

Pedernales Canyon Trail @ Lick Creek Gerald Daugherty (Pct 3) Drainage structure to replace undersized culverts Bridge Not Started Katharine Hardin, P.E. (512) 854-7598

Quinlan Park Road Improvements Brigid Shea (Pct 2) Construct center turn lane from Bella Mar Trail to Tierra Grande Trail

Roadway Completed Miguel Villarreal, P.E. 512-854-7586

Rancho Alto Road Substandard Road Gerald Daugherty (Pct 3) Improve 500' of Rancho Alto Rd north of FM 1626 to meet County standards for acceptance into County maintained road system

Roadway Completed Tony Valdez, P.E. 512-854-7567

Road Reconstruction/ Recycle Jeff Travillion (Pct 1) Recycle in place various roads in Pct 1 & Pct 4, Burleson-Manor, Rodriguez, Laws, Eiler and Maha Loop Roads

Roadway Completed Katharine Hardin, P.E. (512) 854-7598

Road Reconstruction/ Recycle Margaret Gomez (Pct 4) Recycle in place various roads in Pct 1 & Pct 4, Burleson-Manor, Rodriguez, Laws, Eiler and Maha Loop Roads

Roadway Completed Katharine Hardin, P.E. (512) 854-7598

Ross Road North Auxiliary Lane Margaret Gomez (Pct 4) Add Pedestrian Signal & Auxiliary Ln from St. Thomas Dr to the northernmost driveway of Del Valle High School SEE DRONE VIDEO of completed project at: https://www.dropbox.com/s/8qupxv419be5q0r/Ross%20rd%20final%20video.MOV?dl=0

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

8

Monday, June 15, 2020

Page 9: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Ross Road South Margaret Gomez (Pct 4) Widen the existing 2 lane roadway to a 3 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Road

Roadway Design Chiddi N’Jie, P.E. (512) 854-7585

Rowe Lane Safety Improvements Jeff Travillion (Pct 1) Safety improvements from SH 130 to Martin Lane Roadway Completed Mo Mortazavi, P.E. 512-854-7589

Sandy Beach Road Substandard Road Gerald Daugherty (Pct 3) Improve 1300' of Sandy Beach Road between Deer Creek Skyview and Lake Shore Dr to meet County standards

Roadway Completed Miguel Villarreal, P.E. 512-854-7586

Slaughter Lane East Extension Margaret Gomez (Pct 4) Extend Slaughter from Goodnight Ranch to Thaxton Road Roadway Construction Mo Mortazavi, P.E. 512-854-7589

Slaughter Lane Extension - Goodnight Margaret Gomez (Pct 4) Extend Slaughter from Bluff Springs thru Goodnight Ranch Roadway Completed Mo Mortazavi, P.E. 512-854-7589

Slaughter Lane-Goodnight Phase II Margaret Gomez (Pct 4) Design of W. Bound lanes of Slaughter Lane between Old Lockhardt and Vertex Blvd. Construction By Developer

Roadway Started Mo Mortazavi, P.E. 512-854-7589

South Pleasant Valley Road Margaret Gomez (Pct 4) Construct a new 4-lane divided roadway with bike lanes and sidewalks from FM1327 to Bradshaw Road approximately 1,000 feet south of River Plantation Drive

Roadway Design Tony Valdez, P.E. 512-854-7567

Spicewood Springs Low Water Crossing #1 Gerald Daugherty (Pct 3) Replace low water crossing with new bridge at the location of low water crossing #1

Bridge Design Mo Mortazavi, P.E. 512-854-7589

Springdale Road Sidewalk Jeff Travillion (Pct 1) Add sidewalk along the west side of Springdale Road from Ferguson Lane to US290

Pedestrian Design Odette Tan, P.E. 512-854-7587

Steiner Ranch Area Evacuation Brigid Shea (Pct 2) The Steiner Ranch Area Evacuation project is identified as a critical safety project. This project will address a needed evacuation route out of the Steiner Ranch area, located in Precinct 2.

Roadway Design Katharine Hardin, P.E. (512) 854-7598

Steiner Ranch Blvd/FM 620 Intersection Study

Brigid Shea (Pct 2) Preliminary engineering study for Steiner Ranch/FM 620 intersection improvements

Roadway Completed Miguel Villarreal, P.E. 512-854-7586

Tandem Blvd Improvements Brigid Shea (Pct 2) Improve Tandem Blvd between Mopac Expy and Well Branch Pkwy to meet County Substandard Road standards.

Roadway Completed Odette Tan, P.E. 512-854-7587

Taylor Lane Jeff Travillion (Pct 1) Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road

Roadway Design Tony Valdez, P.E. 512-854-7567

Thaxton Road Margaret Gomez (Pct 4) Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from McKinney Falls Pkwy to Sassman Rd

Roadway Design Chiddi N’Jie, P.E. (512) 854-7585

Thomas Springs Rd at Circle Drive LTL Gerald Daugherty (Pct 3) Add left turn lane on eastbound Circle Drive at Thomas Springs Road

Roadway Pre-Construction

Chiddi N’Jie, P.E. (512) 854-7585

9

Monday, June 15, 2020

Page 10: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Thomas Springs road widening Gerald Daugherty (Pct 3) Add 6' shoulders on Thomas Springs from Circle Drive to SH71

Bike Design Tony Valdez, P.E. 512-854-7567

Tom Sassman Rd at Maha Creek Margaret Gomez (Pct 4) Construct Bridge to replace existing culverts Bridge Design Mo Mortazavi, P.E. 512-854-7589

Tumbleweed Trail @ Trib to Lake Austin Gerald Daugherty (Pct 3) Replace the existing 36" concrete pipe with a larger structure in order to reduce roadway overtopping during storm events.

Drainage Design Chiddi N’Jie, P.E. (512) 854-7585

Tuscany South-Springdale Jeff Travillion (Pct 1) Extend Tuscany Way as a four lane divided curb and gutter road from US290 E to Springdale Road

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Webberville Park Maintenance Facility Jeff Travillion (Pct 1) New maintenance facility at Webberville Park Park Construction Odette Tan, P.E. 512-854-7587

Weiss Lane Improvements Jeff Travillion (Pct 1) Safety improvements from Pecan Street to Cele Road Roadway Construction Mo Mortazavi, P.E. 512-854-7589

Wells Branch Parkway Comprehensive Study Brigid Shea (Pct 2) Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Branch Parkway from IH35 to Loop 1

Roadway Design David Greear, P.E. (512) 854-7650

Wells Branch Parkway Extension I & II Brigid Shea (Pct 2) Widen Wells Branch Parkway to four lanes between Immanuel Rd and its terminus at killingsworth Ln (West) , and extend new four lane divided road approximately 1 mile to it intersection with Killingsworth Lane (East), all with bike lanes and sidewalks.

Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585

Wells Branch Parkway Extension III Brigid Shea (Pct 2) Extension of 4-lane divided roadway with bike lanes and sidewalk from Killingsworth Lane to Cameron Road.

Roadway Design Chiddi N’Jie, P.E. (512) 854-7585

Wells Branch Pkwy @ Howard Lane Brigid Shea (Pct 2) Improve/extend left turn lanes on Wells Branch Parkway between Mopac and Howard Lane intersections.

Roadway Construction Miguel Villarreal, P.E. 512-854-7586

Wells Branch W-2A Substandard Roads Brigid Shea (Pct 2) Improve substandard roads - Rick Whinery Dr, Quiet Pond Ct, Emmett Pkwy

Roadway Completed Katharine Hardin, P.E. (512) 854-7598

Westminster Glen Sidewalk Brigid Shea (Pct 2) Install sidewalk on one side of Westminster Glen Avenue from City Park Road to Narrow Ridge Drive.

Pedestrian Construction Odette Tan, P.E. 512-854-7587

Wildhorse Connector Jeff Travillion (Pct 1) New 4-lane Divided Arterial Road from Parmer Lane to FM 973

Roadway Not Started Chiddi N’Jie, P.E. (512) 854-7585

William Cannon Drive Phase 2 Margaret Gomez (Pct 4) New 4-lane arterial from McKinney Falls Parkway to US 183

Roadway Design Tony Valdez, P.E. 512-854-7567

10

Monday, June 15, 2020

Page 11: Public Works Improvement Projects (CIP) Summary Table · Public Works Improvement Projects (CIP) Summary Table TRANSPORTATION AND NATURAL RESOURCES DEPARTMENT CYNTHIA McDONALD, COUNTY

Project Precinct Description Type Status Project Manager Contact Number

Wyldwood Rd at Slaughter Creek Gerald Daugherty (Pct 3) In the procurement process for design phase services. The study has been completed, including evaluating conceptual culvert replacement designs and gathering community feedback.

Drainage Not Started Miguel Villarreal, P.E. 512-854-7586