PAVEMENT DESIGN EXAMINATION REPORT
MODUL 7
GROUP 1A
Daniel Wibisana 1306437076
Sabrina Nurul Hidayah 1306437145
Raihan Alisha Nabila 1306437126
Rafitya Rahisa 1306437063
Jean-baptiste a!ies 15067"65#0
ate $f %&peri'ent ( N$!e'ber 1) 2015
Na'e $f Assistant ( Alfisahr *erdian
ate $f Appr$!al (
S+$re (
Assistant Si,nature (
LAORATORIUM O! STRU"TURE AND MATERIAL
DEPARTMENT O! "IVIL ENGINEERING
ENGINEERING !A"ULT#
UNIVERSITAS INDONESIA
DEPO$ %01&
-
7/23/2019 Pavement Design Report (Modul 7)
2/6
'(07 SPE"I!I" GRAVIT# O! )ARD ITUMEN AND TAR
*PA ( 0307(76+
*AAS)TO T ( %%,(7-+
*ASTM D ( 70(03+
I. Ob/ei2ehis e&a'inati$n is intended t$ deter'ine the spe+ifi+ ,ra!ity $f hard bitu'en and tar by
py+n$'eter. /itu'en $r tar density is the rati$ beteen ei,ht $f hard bitu'en $r tar and
distilled ater ith the sa'e +$ntent at a spe+ifi+ te'perature.
II. Aaa5s
a. he 'arinade bath euipped ith a te'perature +$ntr$l a++ura+y $f 0.1 .
b. y+n$'eter) a++$rdin, pi+ture 13
+. her'$'eter) a++$rdin, t$ the pi+ture 14
d. istilled ater 1)000 +'3
e. lass !essel
III. Maeial
Heat e&a'ple hard bitu'en $r tar a'$unt $f 50 ,ra's until it be+$'es liuid and stir t$
pre!ent l$+al ar'in,.
IV. Pe5e
a. n preparati$n day) +lean and dry the py+n$'eter) then 'easure the ei,ht ith the
+$!er $n A8b. After that) fill the py+n$'eter ith distilled ater and 'easure the ei,ht $f the
py+n$'eter ith the ater and +$!er /8+. %'pty and +lean the py+n$'eter) 'a9e sure it is dry and n$ ater is in the
py+n$'eter.
d. hen p$ur the tar sa'ple that has been heated:'elted $n a st$!e int$ the dry
py+n$'eter) fill ; $f the py+n$'eter ith the tar.
e.
-
7/23/2019 Pavement Design Report (Modul 7)
3/6
SG=(CA)
(BA)(DC)
=here( A > ei,ht $f py+n$'eter ith +$!er8 ,ra'8
/ > ei,ht $f py+n$'eter filled ith ater ,ra'8 > ei,ht $f py+n$'eter +$ntains asphalt ,ra'8 > ei,ht $f py+n$'eter +$ntainin, bitu'en and ater ,ra'8
Result( A > 24.0#3 ,
/ > 46.#26 ,
> 3".046 ,
> 47.314 ,
SG= (39.04624.083 )(46.82624.083 )(47.31439.046 )
=1.0337
VI. Anal8sis
i. E9ei:en Anal8sis
he purp$se $f this e&peri'ent is t$ find the spe+ifi+ ,ra!ity $f tar by usin, a
py+n$'eter. ?n $ther $rds) it is the rati$ beteen the density $f asphalt and ater. ?t
is si'ply deter'inin, the rati$ beteen ei,ht $f tar and the ei,ht $f distilled ater
ith the sa'e +$ntent at a spe+ifi+ te'perature. /ef$re the e&peri'ent be,ins)
preparati$n has t$ be d$ne $n the pre!i$us day. he 'aterial used in this e&peri'ent
is tar $r asphalt and distilled ater. Asphalt is heated $n a st$!e until it is 'elted and
ta9es $n a liuid f$r'. he reas$n this is d$ne is s$ that tar +an be shaped easily and
p$ured int$ the py+n$'eter. =hen heatin, the asphalt sa'ple) 'a9e sure t$ stir the
sa'ple s$ that air is n$t trapped ithin the heated sa'ple. he sa'ple +ann$t +$ntain
air !$ids be+ause it ill affe+t the +al+ulati$n $f the tar spe+ifi+ ,ra!ity. he ei,ht $f
the py+n$'eter is first 'easured and re+$rded. After that) the py+n$'eter is filled
ith ater until it is full and the ei,ht $f py+n$'eter is 'easured as the ei,ht $f
py+n$'eter ith ater. =hen the tar is 'elted) it is then p$ured int$ the py+n$'eter
until ; the hei,ht $f the py+n$'eter and then the ei,ht is then 'easured a,ain. his
ei,ht is re+$rded as the ei,ht $f py+n$'eter +$ntainin, asphalt. he asphalt is
-
7/23/2019 Pavement Design Report (Modul 7)
4/6
9ept in the py+n$'eter ith$ut +l$sin, the lid:+$!er. he e&peri'ent is +$ntinued $n
the ne&t day s$ that there is en$u,h ti'e f$r the asphalt in the py+n$'eter t$ +$$l. n
the ne&t day) distilled ater is p$ured int$ the py+n$'eter +$ntainin, asphalt until it
is full. he ei,ht is re+$rded a,ain as the ei,ht $f py+n$'eter +$ntainin, asphalt
and ater. @a9e sure that there is n$ ater $n the surfa+e $f the py+n$'eter be+ause
it ill affe+t the ei,ht 'easure'ent. After all the data are +$lle+ted) the +al+ulati$n
$f spe+ifi+ ,ra!ity $f asphalt +an be deter'ined usin, the f$r'ula 'enti$ned ab$!e.
ii. Res5l Anal8sis
sin, the f$r'ula 'enti$ned earlier) the spe+ifi+ ,ra!ity $f tar based $n this
e&peri'ent is deter'ined t$ be 1.0337. Spe+ifi+ ,ra!ity !aries ith te'perature) s$ it
is i'p$rtant t$ 9eep the distilled ater and asphalt at the sa'e te'perature. ?n this
e&peri'ent) the te'perature used is the r$$' te'perature) hi+h is 25B elsius.he typi+al !alue $f asphalt spe+ifi+ ,ra!ity is 1.03) s$ +$'pared t$ $ur result) this
e&peri'ent is ab$ut a++urate.
iii. E Anal8sis
urin, this test) there +$uld be s$'e err$rs that happened durin, the pr$+edure $f the
test and 'easure'ents. here +$uld be err$rs +aused by the t$$ls $r euip'ent and
students in lab$rat$ry. An e&a'ple $f err$r +aused by the students +$uld be ina++urate
readin,s $f the ei,ht s+ale) hi+h $uld then affe+t the +al+ulati$n. An$ther
p$ssible hu'an err$r +$uld happen hen heatin, the asphalt sa'ple. he sa'ple
'i,ht n$t be heat) stirred and pla+e in the py+n$'eter pr$perly) s$ the asphalt sa'ple
+$ntains air !$ids. here +$uld als$ be a paralla& err$r durin, this test that resulted
fr$' a sudden +han,e in the r$$' te'perature. $ deter'ine the rati$ beteen the
ei,ht $f asphalt and ater) the te'perature $f b$th substan+es 'ust re'ain the
sa'e. ne last p$ssible err$r +$uld $++ur t$ the euip'ent in the lab$rat$ry. he
ei,ht s+ale +$uld +ause an err$r t$ the +al+ulati$n if it is n$t a++urate.
VII. "nl5sin
@aterials $r substan+es ith a spe+ifi+ ,ra!ity $f 1 are neutrally bu$yant in ater. his
e&peri'ent sh$ that the spe+ifi+ ,ra!ity $f asphalt is '$re than $ne) hi+h 'eans that
asphalt) is denser that the referen+e substan+e) distilled ater. /e+ause asphalt is denser than
ater) it ill sin9 in it re,ardless $f the surfa+e. /e+ause the spe+ifi+ ,ra!ity $f asphalt
-
7/23/2019 Pavement Design Report (Modul 7)
5/6
binders +han,e ith te'perature) spe+ifi+ ,ra!ity tests are useful in 'a9in, !$lu'e
+$rre+ti$ns based $n te'perature.
VIII. Re;eene
http(::.pa!e'entintera+ti!e.$r,:arti+le:the$reti+al-'a&i'u'-spe+ifi+-,ra!ity:
Buku Panduan Praktikum, e'eri9saan /ahan er9erasan Jalan
-
7/23/2019 Pavement Design Report (Modul 7)
6/6
IX. Aa