other florida airport project experience (excl. goaa)...melbourne airport runway 5-23 repaving &...

2
CENTRAL FLORIDA AIRPORTS Daytona Beach International Airport Taxiway November Rehabilitation Inverness Airport Rehabilitation Services Kissimmee Gateway Airport Airfield Electrical Improvements Kissimmee Gateway Airport Runway 24 Melbourne Airport Runway 5-23 Repaving & Relighting Melbourne Airport Runway 9L-27R & Taxiway B Rehabilitation Merritt Island Airport Runway 11-29 Safety Improvements New Smyrna Beach Airport Runway 7-25 & Taxiway DNew Smyrna Airport Runway 11-29 New Smyrna Beach Airport Taxiway E Orlando-Sanford International Airport Parking Lot F Orlando Sanford International Airport Terminal Expansion Sanford International Airport Boarding Bridge Replace BP1 Sanford International Airport Boarding Bridge Replace BP2 Sanford International Airport Runway 18-36 Rehabilitation Sanford International Airport Runway Improvements Space Coast Taxiway B Airport Project Space Coast Titusville Airport Runway 9 Rehabilitation Valkaria Airport SOUTH FLORIDA AIRPORTS St. Lucie Airport Taxiways A & B Survey St. Lucie Airport Apron Improvements Vero Beach Municipal Airport Taxiway E Extension Other Florida Airport Project Experience (Excl. GOAA) Over the years, we have provided surveying services for more than 30 airports throughout Florida. We have extensive experience with aviation projects ranging from taxiway rehabilitation to terminal construction. Our experience includes control, as-builts, boundary, design, wetland, topographic, utility, and quantity surveys, construction layout, and monument installation. 925 S. Denning Drive, Winter Park, Florida 32789 Phone: 407-622-9322 | Fax: 407-622-9325 [email protected]

Upload: others

Post on 15-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Other Florida Airport Project Experience (Excl. GOAA)...Melbourne Airport Runway 5-23 Repaving & Relighting Melbourne Airport Runway 9L-27R & Taxiway B Rehabilitation Merritt Island

CENTRAL FLORIDA AIRPORTS

Daytona Beach International Airport Taxiway November Rehabilitation

Inverness Airport Rehabilitation Services

Kissimmee Gateway Airport Airfield Electrical Improvements

Kissimmee Gateway Airport Runway 24

Melbourne Airport Runway 5-23 Repaving & Relighting

Melbourne Airport Runway 9L-27R & Taxiway B Rehabilitation

Merritt Island Airport Runway 11-29 Safety Improvements

New Smyrna Beach Airport Runway 7-25 & Taxiway “D”

New Smyrna Airport Runway 11-29

New Smyrna Beach Airport Taxiway E

Orlando-Sanford International Airport Parking Lot F

Orlando Sanford International Airport Terminal Expansion

Sanford International Airport Boarding Bridge Replace BP1

Sanford International Airport Boarding Bridge Replace BP2

Sanford International Airport Runway 18-36 Rehabilitation

Sanford International Airport Runway Improvements

Space Coast Taxiway B Airport Project

Space Coast Titusville Airport Runway 9 Rehabilitation

Valkaria Airport

SOUTH FLORIDA AIRPORTS

St. Lucie Airport Taxiways A & B Survey

St. Lucie Airport Apron Improvements

Vero Beach Municipal Airport Taxiway E Extension

Other Florida Airport Project Experience (Excl. GOAA)

Over the years, we have provided surveying services for more than 30 airports throughout Florida. We have extensive experience with aviation projects ranging

from taxiway rehabilitation to terminal construction. Our experience includes control, as-builts, boundary, design, wetland, topographic, utility, and quantity

surveys, construction layout, and monument installation.

925 S. Denning Drive, Winter Park, Florida 32789

Phone: 407-622-9322 | Fax: 407-622-9325

[email protected]

Page 2: Other Florida Airport Project Experience (Excl. GOAA)...Melbourne Airport Runway 5-23 Repaving & Relighting Melbourne Airport Runway 9L-27R & Taxiway B Rehabilitation Merritt Island

NORTH FLORIDA AIRPORTS

Cecil Airport Rehab Runway 9L-27R Cecil Airport Taxiway "E" Improvements C-782 Flagler County Airport Taxiways C & D Flagler County Airport Parallel Taxiway H Gainesville Regional Airport Taxiway “E” Rehabilitation Herlong Airport Rehabilitate Northeast Apron & Taxiway Inverness Airport Jacksonville International Airport Terminal Access Road Northeast Florida Regional Airport - Terminal Apron Rehabilitation Ormond Beach Airport Runway 8-26 Rehabilitation & Heliport Site Improvements Ormond Beach Airport Taxiway “G” Palatka Airport As-Builts North Apron Expansion Palatka Airport As-Builts Taxiway C St. Augustine/St. Johns Airport - Taxi A Rehabilitation

GREATER TAMPA AREA AIRPORTS

Albert Whitted Airport Taxiway C Rehabilitation Bartow Municipal Airport Project: Airfield Drainage Improvements Ph. II Lakeland Linder Regional Airport New 10-Unit T-Hanger Lakeland Linder Regional Airport Rehab Terminal Apron and Customs Apron Lakeland Linder Regional Airport Aviation Drive Lakeland Linder Regional Airport Intermodal Center Lakeland Linder Regional Airport Runway 9-27 Rehabilitation Lakeland Linder Regional Airport Southeast Apron Rehabilitation Lakeland Linder Regional Airport Taxiway E1 Construction Lakeland Linder Regional Airport Taxiway H Rehabilitation St. Pete Airport Runway 7-25 and S. Connector Taxiway Rehabilitation Tampa International Airport SkyCenter Site Development, Atrium & Pedestrian Bridge Winter Haven Airport Gilbert Field New Entrance Road

To see more information regarding

our GOAA project experience, please see

our GOAA Project Experience flyer.