new hospital presentation

26
Changing the way West M ichigan experiences health care The Metro Health Village The Metro Health Village

Upload: tina-gilson

Post on 16-Jul-2015

73 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: New Hospital Presentation

Chang ing the way We st Michig an e xpe rie nce s he alth care

The Metro Health VillageThe Metro Health Village

Page 2: New Hospital Presentation

Reinventing the Health Care Reinventing the Health Care ExperienceExperience

• One-of-a-kind Health Village

• Change the experience of health care

• Design a hospital to delight patients/visitors and inspire employees and physicians

• Create the hospital of tomorrow through community engagement and technology

• Create a sustainable, environmentally friendly campus for our employees, partners, and customers.

Page 3: New Hospital Presentation

The bene fits to We st Michig an

The Metro Health VillageThe Metro Health Village

Page 4: New Hospital Presentation

Benefits to the CommunityBenefits to the Community

• Quality improvements

• More efficient (reduced costs)

• More convenient and better access

• Economic impact

• Improved collaboration

• Environmentally responsible

Page 5: New Hospital Presentation

Quality ImprovementsQuality Improvements

• Larger patient rooms and surgery suites

• Technology advancements

• Lower length of stay

• Lower infection rates

• Reduced errors

• Less movement of patients

Page 6: New Hospital Presentation

More EfficientMore Efficient

• More efficient use of staff

• Improved technology (paperless)

• Reduced utility costs

• 5% reduction in operating expenses

Page 7: New Hospital Presentation

Convenience and AccessConvenience and Access

% PopulationGrowth

-3.97 - -.01

.00 - 2.99

3.00 - 5.99

6.00 - 8.99

9.00 - 12.71

Source: 2000 Census data

Page 8: New Hospital Presentation

Convenience and AccessConvenience and Access

30 community drive time analysis(Caledonia, Cascade, Cedar Springs, Comstock Park, Jenison, Kentwood, Lowell, Alpine, Rockford, Wyoming, Wayland, Coopersville, Marne, Allendale, Standale, Walker, and more...)

• Shorter drive times from over 90% of the locations

• Significant decrease for most current patients

Page 9: New Hospital Presentation

Economic ImpactEconomic Impact

• 130,000 total Metro patients annually

• 2,200 Metro employees

• 397 physicians (D.O.s and M.D.s)

• 147,600 outpatient visitsannually

• 29,000 cars per day projected at Village

Page 10: New Hospital Presentation

CollaborationCollaboration

An invitation to other organizations:

• Spectrum Health

• St. Mary’s Mercy Medical Center

• Pine Rest

• Muskegon Mercy

• Aquinas College

Page 11: New Hospital Presentation

Environmental InitiativesEnvironmental Initiatives

• Green buildings (LEED certified) throughout

• Ongoing use of only green materials

• AESC Center and Educational Partnership

• Minimize waste and storm-water run off

• Preserve existing wetlands and green space

• Purchase or self-generate renewable energy

• Implement an environmentally preferred purchasing program

Page 12: New Hospital Presentation

The Triple Bottom LineThe Triple Bottom Line

Page 13: New Hospital Presentation

A lo o k into theMetro He alth Villag e

Page 14: New Hospital Presentation

A 10,000-foot ViewA 10,000-foot View

Gezon Pkwy

Byron C

enter

M6 South Beltline

Page 15: New Hospital Presentation

A 1,000-foot ViewA 1,000-foot View

Proposed Retail & Commercial

Hospital

Health Related

Page 16: New Hospital Presentation

A Ground-level ViewA Ground-level View

Page 17: New Hospital Presentation

Construction ProgressConstruction Progress

Page 18: New Hospital Presentation

Construction ProgressConstruction Progress

Page 19: New Hospital Presentation

The New HospitalThe New Hospital

• $150 million• 448,000 square-foot building• 208 licensed beds• 25 unlicensed short stay beds • Private rooms - twice the size• Bedside internet access• Patient control of temperature & lights• Attention to visitor needs• Curved corridors

Page 20: New Hospital Presentation

The VillageThe Village

Page 21: New Hospital Presentation

The Time LineThe Time Line

CON Approval

DEC‘02

Design Phase

APRIL‘03

Break Ground

AUG‘03

Begin MajorConstruction

2004

Name and Site Plan Introduced

MAR‘03

Occupy

AUG‘06

Community InvolvementCommunity Involvement

Redevelop old campus

2007

Page 22: New Hospital Presentation

Why We Need to MoveWhy We Need to Move

+ 73% Outpatient visits

+ 75% Emergency visits

+ 42% Births

+ 61% Lab tests

+ 29% Surgery procedures

+ 10% Inpatient admissions

+ 83% Radiology procedures

Page 23: New Hospital Presentation

The Metro DifferenceThe Metro Difference

• Personalized care

• Complementary not competitive

• Commitment to the underserved

• Osteopathic medical education

• 45% of patients are from rural areas

Page 24: New Hospital Presentation

Our Presence in West MichiganOur Presence in West Michigan

Page 25: New Hospital Presentation

“ I found the staff to be highly professional, motivated, and friendly… The staff is the facility. And this is an outstanding facility.”

Preserving the Metro DifferencePreserving the Metro Difference

Page 26: New Hospital Presentation

The Metro Health VillageThe Metro Health Village Que stio ns?Que stio ns?