mud mixing plant installed onboard trinity supporter for niko
TRANSCRIPT
![Page 1: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/1.jpg)
Mud Mixing Plant from start of fabrication to installation onboard MV Trinity Supporter
(Singapore) End client NIKO IndonesiaThis was a capital sale project not a rental project
2250 bbl Tank capacity with separate 250 bbl Brine mixing tank 2 x 585Kw Generators1 x air conditioned Circuit Breaker Module12 x mud guns20 x 11Kw Agitators3 x 8 x 6 x 14 Centrifugal Pumps2 x Big Bag Mixer2 x Hi - Ride Mixers1 x CD 500 Centrifuge2 x 9.2Kw Conveyors1 x Mud Lab1 x Storage Container
![Page 2: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/2.jpg)
MV Trinity Supporter Deck during survey
![Page 3: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/3.jpg)
Start of Fabrication after design acceptance
![Page 4: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/4.jpg)
Day 1 start of installation at Loyang Offshore Base Singapore
![Page 5: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/5.jpg)
Installation
![Page 6: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/6.jpg)
Installation of CD 500 Centrifuge
![Page 7: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/7.jpg)
Installed mixer pumps / Pipe work / Lighting / Electrics prior to commissioning phase
![Page 8: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/8.jpg)
Utilities: Brine / Sea water / drill water / mixing pump transfer lines and equalization upper and lower manifolds, conveyor for centrifuge solids
transfer to future cuttings box lay down area.
![Page 9: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/9.jpg)
The top of tanks were designed to have a modular grated deck eliminating trip hazards for the operators all valves shafts were extended so the operators had easy access during
operation, all agitator starters were mounted on easy reach stands directly next to each agitator,
The centrifuge could take suction from any tank and discharge to any tank
![Page 10: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/10.jpg)
Looking Forward to Aft with access stairs to Port and Starboard side of tanks and Starboard Aft view of the Centrifuge package / mixing and equalization manifolds
pictures taken prior to commissioning and hand over to client the final commissioning was carried out at Anchorage East Coast Bay Singapore.
![Page 11: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/11.jpg)
![Page 12: Mud Mixing plant installed onboard Trinity Supporter for NIKO](https://reader035.vdocuments.site/reader035/viewer/2022062821/5886dcdb1a28ab776a8b6f01/html5/thumbnails/12.jpg)