migrating to meditech 6.x- alder hey's journey

16
Migrating to Meditech 6.X- A Hospital’s Journey MUSE EU 2015

Upload: summit-healthcare

Post on 14-Apr-2017

507 views

Category:

Healthcare


3 download

TRANSCRIPT

Page 1: Migrating to Meditech 6.x- Alder Hey's Journey

Migrating to Meditech 6.X- A Hospital’s Journey

MUSE EU 2015

Page 2: Migrating to Meditech 6.x- Alder Hey's Journey

Todays Agenda

• Introductions

• Alder Hey Children’s Migration Philosophy

• Critical Success Factors

• An Integration Roadmap

• Interfaces, Integration & Automation: Where do they fit in?

• Maximizing your MEDITECH 6.x migration

• Case Studies

• Questions & Discussion

Page 3: Migrating to Meditech 6.x- Alder Hey's Journey

Barry Njoes

Regional Sales Manager

• 15 Years at MEDITECH• Integration Analyst background• 5.5 years at Summit Healthcare

Summit Healthcare

• Established in 1999, Privately Held• Headquarters in Braintree, MA.• Singular focus on Healthcare• Automation and Integration Technology:

• Products, Solutions and Services• Support all HCIS markets

• Over 1,000 clients using Summit software across United States, Canada & U.K.

Page 4: Migrating to Meditech 6.x- Alder Hey's Journey

Alder Hey’s 6.x Success FactorsSummit Healthcare

Training

Workflow and

Process Improvements

Interfaces / Integration

Conversions / Data Archiving

Executive / Leadership Buy-in and Support

Right Team that Can Commit Time

Clinician/Physician Engagement

Infrastructure

Alder Hey Children’s Hospital

Page 5: Migrating to Meditech 6.x- Alder Hey's Journey

Alder Hey’s Need to Streamline IntegrationSummit Healthcare

• Create “current state” diagram of all interfaces (custom interfaces)

• Create “future state” diagram with new project interfaces included. Monthly Status Reports keeping track of current and future interface projects

• Eliminating and recouping unnecessary interface costs (no need to buy duplicate feeds or pay maintenance)

• New Departments with interfacing expectations? (ex: Bedside Monitors data to PCS/EDM)

• Identify interfaces required as part of future projects looking 12-24 months post 6.X Live for future ROI

• Driving need to integrate real-time, longitudinal health information from a wide variety of electronic health record systems at different hospitals, physicians and ancillary care providers.

• End result – Better more informed patient care and stronger patient outcomes

Page 6: Migrating to Meditech 6.x- Alder Hey's Journey

Alder Hey’s Comprehensive Plan:Summit Healthcare Pulls the Pieces Together

• Dedicated Project Manager & Engineer

• Planning & preparing for “gotchyas” including what the REAL costs are especially regarding interfacing

• Learning from Proven Integration Strategies with MEDITECH

• Detailed Project Plan to ensure Milestones are met and Implementation stays on track

• Keeping long term strategic goals in mind: • Integrating with community physician offices• Patient portals• Sharing data with other Trusts

Page 7: Migrating to Meditech 6.x- Alder Hey's Journey

Legacy Data Archiving• What data do you need as discrete data in MEDITECH? • What data can be stored in an archive and referenced

on “as needed” basis? • Need to be able to get the data you need off legacy

systems to keep from paying support on those systems for too long.

Data Migration/Conversions• What dictionary data is MEDITECH not

migrating/converting? • What data to your clinicians need access to and for

how long? • What administrative/financial data needs to be kept

and for how long?

Alder Hey’s Dictionary StrategySummit Healthcare

Page 8: Migrating to Meditech 6.x- Alder Hey's Journey

Alder Hey Children’s Hospital

Liverpool, England

Part of NHS Foundation Trust

Total inpatient beds 304

Data Migrations

The Project at a glance:

• Accurately migrated over 30 dictionaries from various modules in under 4 weeks!

- included 65,000+ dictionary entries

Modules Migrated:

Additional Facts:

• If a person manually did this at a rate of 3 per minute, it would have taken them over 9 weeks to do it.

• If done manually, this project would have an error rate of about 3% that would be 1,950 errors that would have to be corrected manually.

• MIS• PHA• ABS• LAB

• PCI

• OM• CWS• Etc…

Page 9: Migrating to Meditech 6.x- Alder Hey's Journey

Benefits of a Downtime Solution• Patient Safety – Access to ALL critical data 100% of the time • Eliminate the costs associated with downtime perils• Allow staff to be proactive instead of reactive. Alleviate the

impact on patients• Your IT mind at ease!

Summit HealthcareThe Inevitable: Downtime

The Summit Downtime Reporting Solution• Identify and use existing key critical reports• Encrypt using 512 bit encryption, flexible distribution options • Protection of data, flexible delivery, authenticated retrieval• EHR and Network downtime – no problem!

Page 10: Migrating to Meditech 6.x- Alder Hey's Journey

Alder Hey Children’s Hospital

Liverpool, England

Part of NHS Foundation Trust

Total inpatient beds 304

Alder Hey’s Plan for Downtime

At a glance:• Currently has 8 centralized downtime workstations throughout their

facility. When they move to their new facility on October 3, 2015 this number will increase.

• Live in 5 months• 8 – 9 users • Daily distribution of 105 reports from one server

Reports being pushed:

At a glance:• De-centralized Downtime Workstations including Wards and ER staff

• Nursing Ward Census - Every 35 mins• Operating List - Daily• Tracker Report - Every 35 mins• Blood Bank Transfusion History - Daily• Outpatients Downtime - Twice a day

• Downtime Report for Wards *- Every 105 mins

• Downtime Report for ED *- Every 35 mins• MAR Report - Every 35 minutes

*Custom NPR MEDITECH reports

Page 11: Migrating to Meditech 6.x- Alder Hey's Journey

Boulder Community Hospital

Boulder, Colorado

265 licensed beds across mutiple facilities

Express Connect Interface Engine:• Migration of 3 interface engines into 1 interface engine• Developed project plan and migration path for 60 interfaces• Leverage Summit Scripting Toolkit for non HL7 integration

Additional Projects:• Integrating with 7 physician clinics bi-directionally • Laboratory results, Radiology reports and Orders (bi-directional)

Integration Case StudySummit Express Connect

Page 12: Migrating to Meditech 6.x- Alder Hey's Journey

BeforeBoulder Community Hospital

Integration Landscape ComparisonBoulder Community Hospital – Before & After

AfterBoulder Community Hospital

Page 13: Migrating to Meditech 6.x- Alder Hey's Journey

MEDITECH UK – Summit Healthcare CustomersSummit Healthcare

Page 14: Migrating to Meditech 6.x- Alder Hey's Journey

14

Summit InSync

Summit Downtime

Reporting System

Summit Scripting Toolkit

Summit Provider

Alert

Provides hospitals with bi-directional

physician EMR integration.

The Summit Healthcare Product Suite

A robust, powerful

interface engine with inherent mapping and

filter capabilities.

Integration & Automation

Powerful and efficient

dictionary extraction,

analysis and update tool

Summit Provider Exchange

Summit Care

Exchange

Summit Express Connect

A web based application that

delivers real-time patient-specific Hospital Event data such as Admission,

Discharge, and Summary of Care events to primary

care providers.

Supports CCD integration:

Discharge/Push, Query/Respond,

Direct Messaging.

A proven scripting

environment to automate workflow.

Ensures continuous

access to critical patient data in

the event of HCIS or network downtime.

Page 15: Migrating to Meditech 6.x- Alder Hey's Journey

Questions?

Summit Healthcare

Page 16: Migrating to Meditech 6.x- Alder Hey's Journey

Contact UsSummit Healthcare

Barry Njoes 781-519-4840 ext.124 [email protected]

Summit Healthcare is recognized as an expert of Integration and Automation Technologies. To learn more about Summit InSync or our other Healthcare products, solutions, and services please contact us: