method of chaining on sloping ground
DESCRIPTION
TRANSCRIPT
METHOD OF CHAINING ON METHOD OF CHAINING ON SLOPING GROUNDSSLOPING GROUNDS
There are two methods of chaining on There are two methods of chaining on
sloping groundssloping grounds
Direct method Direct method
Indirect methodIndirect method
Direct methodDirect method
In this method the sloping ground is divided into a number of horizontal and vertical strips
The lengths of horizontal portions are measured and added to get the total horizontal distance
Indirect method
There are further three types of indirect method By using clinometerBy applying hypotenusal allowanceBy knowing the difference of level between the points
By using clinometerA clinometer is a graduated semicircular protractorWe measure the slope of the ground by using clinometerWe resolve the sloping distance into its horizontal component by using the formula
Horizontal component =(magnitude of sloping distance )(cosα)
Horizontal component is the required distance
By applying hypotenusal allowance
In this method the slope of the ground is found by clinometer Hypotenusal allowance is made for each stepThen hypotenusal allowance is applied on each step until the end of line is reached
A
C
Knowing the difference of level In this method the difference of level of
two points on the slope is measured by a levelling instrument
Then the sloping distances are measured
A triangle will form then by applying pathagorous theorem the horizontal distance is measured