CELPImember of Romelectro group

60 years1953 2013

1, Bercenarului Road , 041116, county 4 , Bucharest, ROMANIA Register of Commerce: J40/290/1991, VAT: RO 382482 T : +40 (21) 450.20.11, F: +40 (31) 816.54.40 Email: [email protected];[email protected] http://www.celpi.ro

S.C. CELPI S.A.

BUCHAREST

ROMANIA

Company Profile2013

• OHTL STEEL TOWERS up to 750 Kv

• CLAMPS AND FITTINGS (OHTL & substations)

• SUBSTATION STRUCTURES up to 750 kV

• STEEL STRUCTURES FOR CIVIL AND INDUSTRIAL WORKS

• STEEL STRUCTURES FOR RAILWAY AND TELECOMMUNICATIONS

• ENGINEERING

• TOWER TESTING

• HOT DIP GALVANISING

• Design

• Detailing

• Prototyping

• Towers and steel structures testing 1:1

• Manufacturing

• Supply

c e l p i

member of Romelectro group

1953 - 60 years of activity - 2013

Power transmission and distribution

Civil and industrial works

Telecommunication

Railway installations

Other industrial fields

Business Areas

CLAMPS AND FITTINGS OHTL & substations

STEEL STRUCTURES FOR CIVIL & INDUSTRIAL WORKS

ENGINEERING

HOT DIP GALVANISING

SUBSTATION STRUCTURES up to 750 kV

STEEL STRUCTURES FOR TELECOMMUNICATIONS

TOWER TESTING scale 1:1

OHTL STEEL TOWERS up to 750 Kv

STEEL STRUCTURES FOR RAILWAY

Design

Detailing

Manufacturing

Prototyping

Supply

Key figures

2009 2010 2011 2012 2013

Employees, average number 171 147 166 155 148

Turnover (Mil. €) 4,10

4,38

5,03

4,16

6,06

Our Mision

To provide high quality fabricated steel structures at competitive prices.

Our Vision

To supply steel towers, clamps & fittings for OHTL in Europe, Middle East and Africa

Our Core Values

Quality through continous improvementRespect and trust for all employeesHonesty – ethical and moral behavior Practice environmentally responsible behavior.

Quality Management System ISO 9001:2008

Steel towers for OHTL

Rating voltage (kV) 20, 33, 66, 110, 132, 220, 400, 750

Number of electrical circuits With a single circuit, with two or more circuits

Structure type Beam with lattice

Geometrical configurationFir type, Y type, RODELTA type, spatial frame type, anchored portal type, guyed

type

Functional type Suspension, tension, terminal, crossing

Joint manner Bolted, welded, welded - bolted

Materials

Angle profiles SR EN 10056:1,2;

sheet SR EN 10029; SR EN 10063:1, 2, 3;

steel SR EN 10025 – S235, S275, S355,

class JR, JO, J2

Fasteners Bolts STI-03, DIN 7990, ISO 898, grade 5.6, 5.8, 6.6, 10.9, nuts, plate and Grower

washers

Anticorrosive protectionHot Dip Galvanizing - SR EN ISO 1461

Painting

Testing

Mechanical testing for OHTL towers and further structures under natural

conditions according CEI IEC 60652 -" Loading tests on overhead line towers"

On test samples of component materials

Delivery Steel angles bars in yokes linked with metal strips; plates, fasteners and small

elements in metal or wooden boxes

Steel towers for OHTL

Steel towers for OHTL

Clamps and Fittings OHTL

Catalog CELPI - Clamps and Fittings - http://www.celpi.ro/images/Catalog_CELPI_CLEME_ARMATURI.pdf

Clamps and Fittings OHTL

Galvanising and PackingZinc Kettle Dimensions 11,0 x 1,4 x 1,6 [m] 9,0 x 1,4 x 1,6 [m]

Equipments

CNC cutting, punching and marking machine 16 -34NT, from FICEP-Italy, for processing of angles 40-160 mm, holes max. Φ32 mm (purchased in 1998)

Drilling and sawing system Voortman V630/1000T for processing of I, U, H profiles up to 1000 x 15000 mm, holes max. Φ 42 mm (purchased in 2007);

CNC machine PG 116 from Vernet-France for processing of plates 750x1200x20 mm, holes max. Φ 32mm (purchased in 1999);

MIG-MAG welding equipment from Air Liquide

CNC cutting, punching and marking machine 20 - 34, from FICEP-Italy for processing of angles 50-200 mm, holes max. Φ 32 mm (purchased in 2000)

List of EquipmentsItem Description of the equipments Type

A. PUNCHING, DRILLING, CUTTING SYSTEMS

1 FICEP Automatic CNC system for the processing of angles (punching, drilling, notching & shearing system) L45 – L100

A 20.36 NT

2 FICEP Automatic CNC system for the processing of angles (punching, drilling, notching & shearing system) L100 – L200

A 16.34 NT

3 FICEP Automatic CNC system for the processing of plates ( punching & drilling system)

P 803 PN

4 VERNET Automatic CNC system for the processing of plates ( punching & drilling system)

PG 116S

5 VOORTMAN CNC drilling and sawing system for the processing of Europrofiles HEA, HEB, HE, IPE, UPE, HEM, angles, pipes

V630/1000T

6 Angle grinder GWS 24-180

7 Hydraulic Shearing machine # 16x2500

B. WELDING SYSTEMS

1 CNC Thermal cutting system OTC-12000

2 Electric welding equipments TWIN 3S-350

3 AIR Liquide MIG-MAG welding equipments Filcord 4000TS

4 CNC Plasma/Oxi – gaz cutting system Torchmate USA

C. MECHANICAL PROCESSING

1 Cutting and milling system AF-85-015

2 Universal milling machine FU-36x160

3 Eccentric press PAI-63 tf

4 Hydraulic press brake PD-250 tf

5 Hydraulic press brake PYE-250 tf

6 Drilling machine GR-616

Item Client Description Q’ty [mt] ]Year

CNTEE TRANSELECTRICA SA

ELECTRICA SA

110 Kv-400 kV O.H.T.L.

Steel towers950 2000

NEPCO – JORDAN500 kV O.H.T.L.

Steel towers2450 2000

NEPCO – JORDAN132 kV O.H.T.L.

Steel towers2000 2000

NEPCO – JORDAN132 kV O.H.T.L.

Steel towers2200 2001

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110 kV-400 kV O.H.T.L.

Steel towers1250 2001

KHUZESTAN WATER POWER AUTHORITY –400 kV O.H.T.L

Steel towers1350 2001

CARAZ – HUARAZ 66 kV Steel towers 215 2001

ORANGE, CONNEX RomaniaTelecomunication steel

towers560 2001

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110Kv -400 kV O.H.T.L.

Steel towers1200 2002

NMTC – KuwaitTelecomunication towers

H = 40m and 60 m550 2002

COSMOROM RomaniaTelecomunication steel

towers1386 2002

ELECTRICITY SUPPLY BOARD IRELAND38 kV O.H.T.L.

Steel towers600 2003

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110 kV-400 kV O.H.T.L.

Steel towers2340 2003

CHROME CONSORTIUM ENERGY330 kV O.H.T.L.

Steel towers135 2003

ELECTRICITY SUPPLY BOARD IRELAND400. kV O.H.T.L.

401. Steel towers165 2003

NMTC – KuwaitTelecomunication towers

H = 60 m525 2003

TRYLON RomaniaTelecomunication towers

H = 25 m145 2003

CHROME CONSORTIUM ENERGY330 kV O.H.T.L.

Steel towers332 2004

ELECTRICITY SUPPLY BOARD IRELAND38-110 kV O.H.T.L.

Steel towers1250 2004

Ref

eren

ce L

ist

20

00

-20

13

(1

/7)

Item Client Description Q’ty [mt] ]Year

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110-400 kv O.H.T.L.

Steel towers1700 2004

NMTC – KuwaitTelecomunication towers :

H = 83m, H=70 m1340 2004

ORANGE, CONNEX RomaniaTelecomunication steel

towers650 2004

ELECTRICITY SUPPLY BOARD IRELAND38/110 kv O.H.T.L

Steel towers1176 2005

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110-400 kV O.H.T.L.

Steel towers1860 2005

DEXTRON LTD330 kV O.H.T.L.

Steel towers1300 2005

ELECTRICITY SUPPLY BOARD IRELAND38/110 kV OHTL

Steel towers1176 2005

CNTEE TRANSELECTRICA SA

SC ELECTRICA SA

110-400 kV OHTL

Steel towers1860 2005

DEXTRON LTD 330 kV OHTL Steel towers 1300 2005

ELECTROMONTAJ CARPATI SIBIUSteel structures for 400/220

kV substation80 2005

ENERGOMONTAJ IEASteel structures for 110 kV

substation125 2005

TELELINK RomaniaTelecomunication towers

H= 30 m650 2005

SC EGNATIA-ROM RomaniaTelecomunication towers

H50-6(9) m; 55-15 m500 2005-2006

SC EGNATIA-ROM RomaniaMetallic steel structures for

sites100 2005-2006

TELELINK RomaniaTelecomunication towers

H=50-6 m; 189 2006

SVF MANAGEMENT Romania Metallic tower H=60 m 20 2006

ISRAEL ELECTRICITY CORPORATION 161 Kv Steel towes 50 2006

ELECTRICITY SUPPLY BOARD IRELAND 38/110 kV OHTL Steel towers 350 2006

AHWAZ FANOOS 330 kV OHTL Steel towes 15 2006

Ref

eren

ce L

ist

20

00

-20

13

(2

/7)

Item Client Description Q’ty [mt] ]Year

LENKER GMBHSteel structures for

substations32 2006

ELECTROMONTAJ CARPATI SIBIUSteel structures for

110/220/400 kV substations360 2006

ELECTRICITY SUPPLY BOARD IRELAND 38/110 kV OHTL Steel towers 150 2007

ABB POWER TECHNOLOGYSteel structures for 220 kV

substations410 2007

SC ELECTRICA SASteel structures for 110 kV

substations60 2007

SC ROMELECTRO SA400 kV OHTL Steel towers

Oradea-Nadab-Bekescsaba1400 2007

ELECTROMONTAJ CARPATI

SIBIU

Steel structures for

110/220/400 kV substations250 2007

SC EGNATIA-ROM RomaniaTelecomunication towers

H= 50-9 m; H=50-6 m;466 2007

TELELINK RomaniaTelecomunication towers

H=50-6 m70 2007

INTRAKAT RomaniaTelecomunication towers

H= 50-9 m; H=50-15 m;85 2007

SC EGNATIA-ROM Romania Steel structures for sites 80 2008

ELECTRICITY SUPPLY BOARD IRELAND Steel towers 38/110 kV OHTL 450 2008

ABB SWEDENSteel structures for 110/20 kV

substation Bulgary100 2008

SC ROMELECTRO SASteel structures for 110/220

kV substations150 2008

SC ROMELECTRO SA 110 Kv OHTL Steel towers 250 2008

SC VULCAN SASteel structures for oil

industry150 2008

BALFOUR BEATTY RAIL GMBh Steel structures for railway 180 2008

IMSAT GROUP SNEFGalvanising steel structures

for railway1056 2008

SEMI SPAIN Steel structures for railway 250 2008

Ref

eren

ce L

ist

20

00

-20

13

(3

/7)

Item Client Description Q’ty [mt] ]Year

ENERGOMONTAJ IEASteel structures for substation

400/110 kV80 2009

GENERAL ELECTRIC 110 Kv OHTL Steel towers 90 2009

ELECTRICITY AUTHORITY OF CYPRUSGalvanised materials for low

and medium voltage370 2009

ICCO 110 Kv OHTL Steel towers 30 2009

OMV PETROM 400 Kv OHTL Steel towers 250 2009

PRELCHIM RM VALCEA 110 Kv OHTL Steel towers 100 2009

PROMPSERVIT 110 Kv OHTL Steel towers 90 2009

ELECTROMONTAJ CARPATI SIBIUSteel structures for substation

220/110 kV60 2009

SEMI SPAIN Steel structures for railway 50 2009

SC EGNATIA-ROM RomaniaMeteo tower H = 82m,

H=102m99 2009

TELELINK RomaniaTelecomunication towers

ESQ8.6 2009

ORION SloboziaTelecomunication towers

CT1501C88 2009

ORION SloboziaTelecomunication towers

CT1501C33 2010

EMON ELECTRIC CAMPINA 400 kV OHTL Steel towers 140 2010

SEMI SPAIN Steel structures for railway 150 2010

BLACK SEA POWER DUBAI EAU132 kV steel structures and

clamps for substation15 2010

ELECTRICITY AUTHORITY OF CYPRUSSteel structures for Medium

Voltage lines30 2010

ELECTRIC TOTAL 110 kV OHTL steel towers 45 2010

ELEMO CONSTANTA 110 kV OHTL steel towers 100 2010

EMPOWER FINLAND 400 kV OHTL steel towers 30 2010

ELVANI PLOIESTI 110 kV OHTL steel towers 38 2010

INABENSA SPAIN 132 kV OHTL steel towers 50 2010

Ref

eren

ce L

ist

20

00

-20

13

(4

/7)

Item Client Description Q’ty [mt] ]Year

ELECTRICITY SUPPLY BOARD IRELAND38 kV & 110 kV OHTL

steel towers221 2010

AWHAZ FANOOS IRAN 230/63 kV OHTL steel towers 31 2010

PROMATCOM DIVERS 110 kV OHTL steel towers 120 2010

ELECTROMONTAJ CARPATI SIBIU220/110 kV steel structures

for substation650 2010

ELECTROMONTAJ “CARPATI” SIBIU 400 kV OHTL steel towers 32 2010

UTI INSTALL Steel tower for GSM system 10 2010

ROMELECTRO SAMetallic structures for

termoplant850 2010

OMV PETROM SA 400 kV OHTL steel towers 127 2010

TIAB SA PLOIESTI 110 kV OHTL steel towers 21 2010

PRELCHIM RM VALCEA 110 kV OHTL Steel towers 75 2010

ENERGOTECH BUCHAREST Clamps and fittings 50 2010

IMSAT SNEF Steel structures for railway 250 2010

FORTAN B.V. Combined Gas Coolers 40 2010

ENERGOMONTAJ

SAEM

Slurry installation - Metallic

structure for thickeners130 2010

SC ROMELECTRO SAMetallic structure between

thickeners630 2010

ELCO110 kV steel structures for

substation20 2011

INABENSA SPAIN 220 kV steel towers 60 2011

PET COMMUNICATION 110 kV steel towers 120 2011

ENERGOTECH 110 kV Clamps and fittings 20 2011

ELECTROMONTAJ CARPATI SIBIU400/110 kV steel structures

for substation320 2012

ELECTROMONTAJ CARPATI SIBIU220/110 kV steel structures

for substation540 2012

Ref

eren

ce L

ist

20

00

-20

13

(5

/7)

Item Client Description Q’ty [mt] ]Year

BACME 750 kV steel towers 16 2012

CELPI 110 kV steel towers 25 2012

CONS ELECTRIFICAREA INSTAL 110 kV steel towers 92 2012

EL MONT 110 kV steel towers 80.5 2012

ELECTRICA SERV- GALATI 110 kV steel towers 2.5 2012

ELECTRO_CONSTRUCT 20 kV & 35 kV steel towers 12 2012

Electroconstruct Sildac 110 kV steel towers 14.5 2012

ELECTROMONTAJ CARPATI SIBIU110 kV steel structures for

substation12 2012

ELECTROMONTAJ CARPATI SIBIU 220 kV steel towers 94 2012

ELECTROMONTAJ CARPATI SIBIU400/220/110 kV steel

structures for substation127.5 2012

ELEMO CONSTANTA 110 kV steel towers 160 2012

ELEMO CONSTANTA 400 kV steel towers 50 2012

ELEMO CONSTANTA 750 kV steel towers 2.5 2012

IMSAT Railway steel structures 8.5 2012

MONTAJ ELECTRIC110 kV steel structures for

substation57 2012

PET COMMUNICATIONS110 kV steel structures for

substation23 2012

PROMAT COM DIVERS SRL 110 kV steel towers 29 2012

ROMELECTROFlue gas desulphuration

installation unit 8.Absorber1870 2012-2013

SEKFAB AB Sweden110 kV Steel structures for

substations66 2012

CELPI - SIMSteel structures for towers

tested in CTTS66 2012

EEI RESITA 110 kV steel towers 26 2013

Ref

eren

ce L

ist

20

00

-20

13

(6

/7)

Item Client Description Q’ty [mt] ]Year

ELCO-IASI 110 kV steel towers 20 2013

ELECTROMONTAJ CARPATI SIBIU 110 kV steel towers 14.5 2013

ELECTROMONTAJ CARPATI SIBIU220/110 kV steel structures

for substation122 2013

ELECTROMONTAJ ELM CLUJ 400 kV steel towers 380 2013

ELEMO CONSTANTA 110 kV steel towers 21 2013

EXIMPROD GALATI 110 kV steel towers 313 2013

IRLANDA138 kV steel structures for

substation2.5 2013

PET COMMUNICATIONS110 kV steel structures for

substation35 2013

PROMAT COM DIVERS SRL 110 kV steel towers 487 2013

ROMELECTROFlue gas desulphuration

installation unit 8. Suports86 2013

CELPI - SIMSteel structures for towers

tested in CTTS12 2013

SMART CONSTANTA 750 kV steel towers 11.5 2013

ELECTROMONTAJ CARPATI SIBIU220 kV Steel structures for

substations Barbosi146 2013

SEKFAB AB SWEDEN

110 kV Steel structures for

substations for EOn &

Siemens

148 2013

ALSTOM Transport Romania Steel structures for railway 30 2013

CONS ELECTRIFICARE 110 kV steel towers 38 2013

EEI Resita 110 kV steel towers 29 2013

ELCO Iasi110 kV Steel structures for

substations23 2013

DEXTRON NIGERIA330 kV D/C & Q/C towers

type OHTL1650 ongoing

Ref

eren

ce L

ist

20

00

-20

13

(7

/7)

Steel towers for OHTL

SC CELPI SA

Tower Testing Station

Bucharest – ROMANIADrumul Bercenarului, nr. 1, sector 4, 041116, Bucuresti, ROMANIA;

T: +40 (21) 450.20.11; F: +40 (31) 816.54.40; E-mail: [email protected]; [email protected]

Web: http//www.celpi.ro

Celpi Towers Testing Station

Steel towers for OHTL

Celpi Towers Testing Station – general view

Steel towers for OHTLCTTS - technical characteristics -

The maximum size of tower foundation - foundation I- foundation II

21.5 x 25.0 m9.0 x 9.0 m

The maximum distance between peak of same horizontal cross arms

37 m

The maximum weight of tower 120 ton

Maximum load for one point 50 ton

Maximum compression force per leg 560 ton

Maximum uplift force per leg 500 ton

Transversal loads(20 loads )

Longitudinal loads(14 loads)

Vertical loads(12 loads )

3 x 50 ton 3 x 40 ton 3 x 25 ton

6 x 25 ton 6 x 20 ton 6 x 20 ton

4 x 20 ton 3x15 ton 3x15 ton

4x15 ton 2x10 ton

3x10 ton

Celpi Towers Testing Station

Location And FacilitiesCELPI Tower Testing Station (CTTS) is located in Bucharest-Romania, close to the

CELPI’s factory and head office.CTTS is capable to testing towers up to 750 kV Transmission LineThe testing facilities consists of two testing pads: one for towers having a base

width up to 25 meters and the other up to 15 meters.CTTS is part of CELPI SA who built towers and accessories, clamps and fittings for

major transmission lines in Romania .That testing station serve the objective of satisfying customers about design

parameters of tower by subjecting prototype tower to various test loads.The tests shall be performed in accordance with CEI IEC 60652:2002 “ Loading

tests on overhead line towers“.Testing Station CapacityA maximum of 45 loads can be simultaneously exerted.Vertical, longitudinal, transversal and wind loads are applied by steel ropes

pulled by electrical winches .The loads are applied to the prototype independently and are managed and

monitores from the Control Room.The load measurement apparatus consists of electronic compensated load-

cells connected to a PC base monitoring system located in the Control Room.The longitudinal loads exceeding 60 ton will be applied by pulling on the

resultant direction.The tower testing starts after application of 25 – 40 % of the loads (lay-out and

pre- tensioning of cables).According to CEI IEC 60652 the loads is applied in increments to 50 %; 75 %; 90

%; 95; 100 %, of the specified lods for 1 minute each step

Steel towers for OHTL

Celpi Towers Testing Station

Measurements and material checkThe calibration of the load-cells is performed before and after tests in the laboratory annexed to theTesting Station.Transversal and longitudinal displacements are measured at each load step, by means of stadias. Afterthe test is completed, a visual inspection is carried out to ascertain the status of the various members.Eight samples are cut from the members at Consultant/Client chois and prepared and tested tomeasure yield and tensile strenth and elongation.Test SpecificationThe Client prepare and transmit to CTTS, at an agreed time prior to the delivery of the tower, thefollowing appropiate information:●workshop and/or erection drawings of the tower● The mass of each section of the tower● Requirements for the tower assembly of disassembly, including if necessary details for lifting thetower from the horizontal● Bolt tightening requirements● The tensions for any guys● Nominal force to be applied during slip-joining of sections and/or slip-joint length and theirrespective tolerances● Foundation setting tolerances and verticaly tolerances of the tower● The exact position of the load application points for each loading case● The design loads to be applied on the tower for eachloading case● The location of the deflection measuring points for each loading case● If the tower is to be realigned between individual tets● Calibration records●Deflection measurements● Photographs, video film (if required by the client)● Local meteorological data during the test● The engineering properties of component samples taken from the tower

Steel towers for OHTL

Celpi Towers Testing Station

Test ReportThe test report include the following data:● indication of the applicable standard for testing towers (IEC 60652)● designation, type and description of the tower●Name of the tower manufacturer, designer, client●Dates and location of testing●Names of the persons present during the tests● List of workshop and/or erection drawings of the test tower, including any modifications●Rigging drawing used to apply the test loads●Methods and measurements of the joint assembly●Brief description of the test facility● Loads required at the varoius points on the tower and at each load level●Holding period for the final level● Calibration records●Deflection measurements● Photographs, video film (if required by the client)● Local meteorological data during the test● The engineering properties of component samples taken from the tower

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(1

/9)

No. Tower type Client Weight(mt) Testing date Year

1 2S+6 Abu Dhabi Water and Electricity Authority 12,50 14.06.2001 2001

2 2BAT+6Abu Dhabi Water and Electricity Authority

19,50 31.07.2001 2001

3 4S+9Abu Dhabi Water and Electricity Authority

22,70 27.09.2001 2001

4 4BAT+6Abu Dhabi Water and Electricity Authority

35,35 15.01.2002 2002

5 4BAT DE(A)+6Abu Dhabi Water and Electricity Authority

26,09 20.03.2002 2002

6 54C Electricity Supply Board Ireland 1,50 02.04.2003 2003

7 408 Electricity Supply Board Ireland 40,00 25.02.2003 2003

8 54D Electricity Supply Board Ireland 1,50 16.08.2003 2003

9 139 Electricity Supply Board Ireland 12,00 30.09.2003 2003

10 101C Electricity Supply Board Ireland 1,50 10.06.2003 2003

11 130DE Electricity Supply Board Ireland 6,50 16.10.2003 2003

12 63C Electricity Supply Board Ireland 3,60 14.05.2004 2004

13 102C Electricity Supply Board Ireland 2,70 18.05.2004 2004

14 136DE Electricity Supply Board Ireland 10,30 06.04.2004 2004

15 S+6Abu Dhabi Water and Electricity Authority

17,50 31.03.2005 2005

16 AT+6Abu Dhabi Water and Electricity Authority

23,12 28.04.2005 2005

17 BAT+6Abu Dhabi Water and Electricity Authority

25,24 17.05.2005 2005

18 BAT DE(T)+6Abu Dhabi Water and Electricity Authority

25,55 23.08.2005 2005

19 1DT6 – E6 BANGLADESH 21,66 02.10.2006 2006

20 QL+9m NEPCO 12,00 22.03.2006 2006

No. Tower type Client Weight(mt) Testing date Year

21 SS-3 IRAN 10,90 04.12.2006 2006

22 TMC2+6B ISRAEL 13,20 26.04.2006 2006

23 SnR 400150 – 5.3B TRANSELECTRICA 18,00 05.06.2006 2006

24 TMC2+6D ISRAEL 18,40 22.05.2006 2006

25Beam concrete

R1700TRANSELECTRICA 21.06.2006 2006

26 SnR 400250 – 5.3B ELECTROMONTAJ Romania 21,80 17.07.2006 2006

27 TMC2+6G ISRAEL 16,40 08.05.2006 2006

28 2T2+6 MITAS, TURKEY 15,00 19.10.2006 2006

29 2E2+6 MITAS, TURKEY 19,00 31.10.2006 2006

30 2S2+6 OZDIL, TURKEY 10,00 23.11.2006 2006

31 SM2-8000 TRANSELECTRICA Romania 1,80 12.05.2006 2006

32 2T2+6 OZDIL, TURKEY 15,66 24.01.2007 2007

33 2S2(H)+6 OZDIL, TURKEY 8,74 28.02.2007 2007

34 HEB 260 IMSAT 1,10 23.03.2007 2007

35 2E2+6 OZDIL, TURKEY 19,16 04.04.2007 2007

36 LS-03 FANOOS, IRAN 12,57 04.07.2007 2007

37 T1T2 SAG, BULGARIA 15,70 05.06.2007 2007

38 A SA-RA, TURKEY 4,60 22.05.2007 2007

39 DCB-2T MITAS, TURKEY 15,56 18.06.2007 2007

40 C SA-RA, TURKEY 10,50 07.05.2007 2007

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(2

/9)

CTTS Reference List 2001-2013 (3/9)

No. Tower type Client Weight(mt) Testing date Year

41 DCD-2T MITAS, TURKEY 24,16 18.07.2007 2007

42 DCC-2T MITAS, TURKEY 20,06 27.08.2007 2007

43 2M2+6 OZDIL, TURKEY 13,92 09.01.2007 2007

44 AAH NIGERIA (DEXTRON) 24,30 31.10.2007 2007

45 2Hx30 EMPOWER, FINLAND 9,60 19.11.2007 2007

46 2LA DALEKOVOD, CROATIA 16,00 18.02.2008 2008

47 1MA DALEKOVOD, CROATIA 25,00 16.04.2008 2008

48 T-30 FANOOS, IRAN 20,00 06.02.2008 2008

49 CL-34 MITAS, TURKEY 7,00 06.11.2008 2008

50 Cylinder poles IMSAT 5,00 20.06.2008 2008

51 1LA DALEKOVOD, CROATIA 16,20 19.08.2008 2008

52 1HS DALEKOVOD, CROATIA 16,80 16.09.2008 2008

53 T-60 YASAN, IRAN 30,00 10.03.2008 2008

54 2H20 FINLAND 8,00 12.05.2008 2008

55 2HX32 EMPOWER, Finland 4,00 02.10.2009 2009

56 DCDP-2T MITAS, TURKEY 27,85 03.12.2009 2009

57 DCR-2T MITAS, TURKEY 32,00 27.03.2009 2009

58 DCAP-2T MITAS, TURKEY 9,30 04.11.2009 2009

59 DR MITAS, TURKEY 10,72 05.06.2009 2009

60 A/1U D1 ELECTROMONTAJ, Romania 5,45 05.08.2009 2009

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(3

/9)

No. Tower type Client Weight(mt) Testing date Year

61 DA MITAS, TURKEY 14,00 21.05.2009 2009

62 1HX36 EMPOWER,Finland 6,00 24.09.2009 2009

63 AA+0 MITAS, TURKEY 3,87 11.12.2009 2009

64 DCCP-2T MITAS, TURKEY 22,30 19.11.2009 2009

65 A/3U D1 ELECTROMONTAJ, Romania 11,33 12.08.2009 2009

66 A+6 MITAS (Turkey)– NIGERIA 4,4 10.04.2010 2010

67 B+6 MITAS (Turkey)– NIGERIA 4,73 15.04.2010 2010

68 D+6 MITAS (Turkey)– NIGERIA 6,5 07.05.2010 2010

69 DDH CE 2000 (ITALY) - NIGERIA 50 29.05.2010 2010

70 H2N MITAS (TURKEY) 2,3 07.06.2010 2010

71 EEH CE 2000 (ITALY) - NIGERIA 60 20.06.2010 2010

72 ERS 10 AHWAZ FANOOS – IRAN 4,7 26.06.2010 2010

73 ERS 45 AHWAZ FANOOS – IRAN 1,85 27.06.2010 2010

74 S2 MITAS (TURKEY) - PERU 11,86 07.07.2010 2010

75 A35 MITAS (TURKEY) - PERU 14,69 15.07.2010 2010

76 4Y36 EMPOWER, FINLAND 26,88 29.07.2010 2010

77 1Hx27,5 ELTEL, FINLAND 6,7 09.08.2010 2010

78 2H ELTEL, FINLAND 6,32 16.08.2010 2010

79 DAL3P OZDIL (TURKEY) - IRAK 1,573 24.08.2010 2010

80 DBL3P OZDIL (TURKEY) - IRAK 2.8916 26.08.2010 2010

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(4

/9)

No. Tower type Client Weight(mt) Testing date Year

81 DCL3P OZDIL (TURKEY) - IRAK 5,6799 27.08.2010 2010

82 DDL1P OZDIL (TURKEY) - IRAK 6,96 01.09.2010 2010

83 A70 MITAS (TURKEY) - PERU 16,137 06.09.2010 2010

84 N INABENSA (SPAIN) – SERBIA 8,7 11.09.2010 2010

85 UZ 30 INABENSA (SPAIN) – SERBIA 18,21 29.09.2010 2010

86 AA1 DEXTRON (ROMANIA)-NIGERIA 6.53 11.10.2010 2010

87 EE1/FF1 DEXTRON (ROMANIA)-NIGERIA 7.415 16.10.2010 2010

88 BB1 DEXTRON (ROMANIA)-NIGERIA 15.971 22.10.2010 2010

89 AA15 MITAS (TURKEY) – DOMINICAN REPUBLIC 24.7 04.11.2010 2010

90 D1+9 NEPCo (JORDAN) 10 13.11.2010 2010

91 D3+9 NEPCo (JORDAN) 12,35 22.11.2010 2010

92 DDL1P OZDIL (TURKEY) - IRAK 6,96 27.11.2010 2010

93 BM4S3 MOSHANIR (IRAN) 12.667 18.12.2010 2010

94 BM4T10 MOSHANIR (IRAN) 17.739 06.01.2011 2011

95 AA15 MITAS (TURKEY) – DOMINICAN REPUBLIC 27,03 16.01.2011 2011

96 DC-SINABENSA (SPAIN) – UNITED ARAB

EMIRATES22,169 09.02.2011 2011

97 DC-ATINABENSA (SPAIN) – UNITED ARAB

EMIRATES31,476 25.02.2011 2011

98 AS MITAS (TURKEY) - PERU 20,385 12.03.2011 2011

99 LSD-3P YASAN, IRAN 27 24.03.2011 2011

100 A TRECSA, GUATEMALA 12,658 03.04.2011 2011

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(5

/9)

CTTS Reference List 2001-2013 (6/9)

No. Tower type Client Weight(mt) Testing date Year

101 AA TRECSA, GUATEMALA 13,088 09.04.2011 2011

102 B TRECSA, GUATEMALA 16,820 21.04.2011 2011

103 C TRECSA, GUATEMALA 19,117 30.04.2011 2011

104 AA TRECSA, GUATEMALA 14,143 09.05.2011 2011

105 A TRECSA, GUATEMALA 12,919 18.05.2011 2011

106 1T30 FINGRID 7,78 24.05.2011 2011

107 D TRECSA, GUATEMALA 26,777 08.06.2011 2011

108 D TRECSA, GUATEMALA 26,777 21.06.2011 2011

109 1Ax33 FINGRID 14 02.07.2011 2011

110 D3+9 NEPCo(Electromontaj) 11,791 11.07.2011 2011

111 S1+9 NEPCo(Electromontaj) 7,91 18.07.2011 2011

112 2xHEA300+2 IMSAT 3,565 20.07.2011 2011

113 DC BAT 60 INABENSA 36,738 23.08.2011 2011

114 S3+9 NEPCo(Electromontaj) 8,563 28.09.2011 2011

115 DC BAT 90 INABENSA 39,709 08.10.2011 2011

116 D TRECSA, GUATEMALA 26,447 07.11.2011 2011

117 1L MITAS (Fingrid) 7,89 10.11.2011 2011

118 1Ax33 FINGRID 14,54 19.11.2011 2011

119 4L MITAS (Fingrid) 16,59 26.11.2011 2011

120 MMSL2+9 I.E.C. 13,857 03.12.2011 2011

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(6

/9)

CTTS Reference List 2001-2013 (7/9)

No. Tower type Client Weight(mt) Testing date Year

121 TML2+6T I.E.C. 22,649 12.12.2011 2011

122 TMH2+12G I.E.C. 16.538 20.12.2011 2011

123 BLT H.R.E.Co.(Iran) 15,556 17.01.2012 2012

124 SS+3 ELECTRICITY COMPANY OF GHANA (ECG.) 2,066 31.01.2012 2012

125 AC+3 ELECTRICITY COMPANY OF GHANA (ECG.) 2,398 09.02.2012 2012

126 DE ELECTRICITY COMPANY OF GHANA (ECG.) 2,695 17.02.2012 2012

127 BMS K.R.E.Co.(Iran) 9,096 24.02.2012 2012

128 2PA(testat 6 cazuri) SA-RA 23,518 23.03.2012 2012

129 14G24, SC TIM EUROSEI 03.04.2012 2012

130 2PA(retestat caz 6) SA-RA 24,959 12.04.2012 2012

131 2S2 MITAS 5,544 20.04.2012 2012

132 BBH DEXTRON 27,458 07.05.2012 2012

133 2PB SA-RA 29,870 23.05.2012 2012

134 Pole Tower N 29M PETIT JEAN 8 09.06.2012 2012

135 2PD SA-RA 55,95 19.07.2012 2012

136 BT 60 B.P.M.I.C.(Iran) 9,475 03.08.2012 2012

138 1F FINGRID 5 20.08.2012 2012

139 2FG FINGRID 5,1 23.08.2012 2012

140 BT 30 B.P.M.I.C.(Iran) 10,684 04.09.2012 2012

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(7

/9

)

No. Tower type Client Weight(mt) Testing date Year

141 EEH DEXTRON 53,605 26.09.2012 2012

142 2DDLSU TRANSPOWER 29,816 31.10.2012 2012

143 Pole Tower UZ 60 PETIT JEAN 19,186 13.11.2012 2012

144 2PE SA-RA 68,561 30.01.2013 2013

145 2PF SA-RA 75,598 28.02.2013 2013

146 EEH (ultimele 4 cazuri) DEXTRON 54,531 18.03.2013 2013

147 D3+9 ELECTROMONTAJ 11,265 29.03.2013 2013

148 4D1+9 (2 cazuri) ELECTROMONTAJ 26,669 08.04.2013 2013

149 AA3 MITAS 16,427 22.04.2013 2013

150A16M, I16M, J16M,

P16MFUNTAM 2,680 21.05.2013 2013

151 4D1+9 (5 cazuri) ELECTROMONTAJ 26,669 01.06.2013 2013

152 2S2+6 SA-RA 12,080 22.06.2013 2013

153 2M2+6 SA-RA 13,670 17.07.2013 2013

154 2T2+6 SA-RA 17,717 12.08.2013 2013

155 CC1+9 DEXTRON 9,172 17.08.2013 2013

156 N+0 Av400 EGEM 19,447 18.09.2013 2013

157 Rv 150+2 EGEM 37,924 09.10.2013 2013

158 2E2+6 SA-RA 23,010 22.10.2013 2013

159 E18 ON 160 ELFEKO S.A. 2,575 26.10.2013 2013

CT

TS

Ref

eren

ce L

ist

20

01

-20

13

(8

/9)

CTTS Reference List 2001-2013 (9/9) No. Tower type Client Weight(mt) Testing date Year

160 E 18 P ELFEKO S.A. 1,796 29.10.2013 2013

161 A+30 MITENG (MITAS) 41,624 28.11.2013 2013

iI

I1tI

ROMANIAMINISTERUL TRANSPORTURILOR $1 INFRASTRUCTURII

AUTORITATEAFEROVIARAROMANA- AFER

AUTORIZA TIE•de furnlzor feroviarSeria AF Nr.5486

in conformitate cu prevederile Hotararll Guvernului nr. 626/1998modlflcata ~i completata cu Hotararea Guvernului nr. 1561/2006 ~i in bazaraportului nr. 2072 din data de 28.06.2012 al comisiei de evaluare, se atesta capersoanajurldlca:

SCCELPISA

cu sediul in localitatea BUCURE$TI, Drumul Bercenarului, nr. 1, sector 4,inregistrata la Oficiul National al Registrului Comeftului sub nr. J40/290/1991,are dreptul sa furnizeze, in calitate de furnizor feroviar, urmatoarele categoriide produse ~i/sau servicii feroviare critice:

• Fabricare ~i montare constructil metalice ~i pafti componente alestructurllor metallce, confectli metallce, bulonate sau sudate;

• Lucrarl de acoperire ~i tratare a metalelor prin vopsire sau zincaretermlca:

• lncercarl de rezlstenta rnecanlcaa constructillor metalice,

in condltllle in care face dovada ca detlne un certificat de omologare tehnicaferoviara sau, dupa .caz, un agrement tehnic feroviar pentru fiecare produs~i/sau serviciu feroviar critic furnizat.

Prezentaautorlzatle este valabila pana la data de 27.06.2017, in condltltlevizarii sale anuale.

Obligatiile ~i drepturile posesorului autorlzatlel sunt specificate peverso.

Data eltberarll: 28.06.2012

ROMANIAMINISTERUL TRANSPORTURILOR

AUTORITATEAFEROVIARAROMANA- AFER

AUTORIZA TIE•Seria AL Nr. 321 I 2008 - R

LABORATORDEiNCERCARI MECANICE"STATIE DEiNCERCARI MECANICECELPI"

detlnut de catre persoana juridica:

SC CELPI SA

cu sediul in localitatea BUCURE$TI, Drumul Bercenarului, nr. 1, sector 4,inregistrata la Oficiul National al Registrului Comertului sub nr. J40/290/1991,

este autorizat pentru efectuarea categoriilor de lncercarl ~i verlficari, specificeproduselor feroviare mentlonate in anexa.

Prezenta autorlzatie este valablla pana la data de 31.03.2018,cu conditiavizarli sale periodice, la intervale de doi ani.

Data ellberarll: 09.03.2009

.....................,

Valabil pana laValabil Rana la3/: /1.~ '..~.t?!.4...

Valabil pana lawoiso~WQ.

WNs

DIRECTORGENERAL

DIRECTORGENERAL

Anexa la AutorizatiaSeria AL Nr. 321 /2008 - R

LlSTA iNCERCARILOR AUTORIZATE

STATIA DE iNCERCARI MECANICELAB'ORATOR iNCERCARI MECANICE

1. Incercarl mecanice structuri metalice:1.1 incercare la tractlune ~i compresiune.

2. Incercari mecanice uzuale:2.1 incercare la tractiune la temperatura ambianta;2.2 incercare la lndoire;2.3 incercare la incovoiere prin see pe epruvete Charpy;2.4 incercare la duritate Brinell;2.5 Incercarl mecanice pentru accesorii, cleme ~i armaturi

(incercare la tractiune);2.6 Incercari mecani~e pentru organe de asamblare (incercare

la tractiune),

DIRECTOR GENERALDinu DRAGAN

ROMANIAMINISTERUL TRANSPORTURILOR

AUTORITATEA FEROVIARA ROMANA - AFER

AGREMENT TEHNIC FEROVIARSeria AT nr.715/2013

in baza Raportului nr. 703 din data de 16.07.2013 al comisiei de evaluare seatesti ca serviciul feroviar critic:

PROTECIIA ANTICOROZIV A PRIN ZINCARE TERMICAA PRODUSELOR DIN OIEL PENTRU INSTALAIIILE DE ELECTRIFICARE

furnizat de catre persoana juridica:

S.C. CELPI S.A.

cu sediul in localitatea BUCURE~TI, Drumul BERCENARULUI, Nr. 1, Sector 4,inregistrata la Oficiul National al Registrului Comertulul cu nr. J40/290/1991,

iNDEPLlNE~TE CONDIIIILE PENTRU UTILIZAREiN DOMENIUL TRANSPORTULUI FEROVIAR

Descrierea serviciului feroviar critic, principalele performante §icaracteristici tehnice, conditille §i domeniul de utilizare sunt specificate in anexala prezentul agrement tehnic.

Serviciul feroviar critic se incadreaza in clasa de risc 1A.Prezentul agrement 'tehnlc este valabil pana la data de 15.07.2015 in

urmatoarele conditll: respectarea prevederilor din OMT nr. 290 I 2000 §i anexa laprezentul agrement tehnic.

Data ellberarl; 16.07.2013

DIRECTOR GENERAL

Florin Dan ROPOT

Valabilitatea prezentului agrement tehnic se prelungeste pana la data de .in urmatoarele conditii:

Data:DIRECTOR GENERAL

1, Bercenarului Road , county 4, 041116, Bucharest, ROMANIA; Phone: +40 (21) 450.20.11; Fax: +40 (31) 816.54.40E-mail: [email protected]; [email protected]; Web: http://www.celpi.ro

Lucrari de referinta Parteners and Suppliers

c e l p iT R A D E M A R K

MANAGEMENT team

GHEORGHE UTUREANU GENERAL MANAGER +40 (0728) 777.910 [email protected]

VALENTIN POPA COMMERCIAL MANAGER +40 (0731) 808.200 [email protected]

VASILICA FILIP FINANCIAL MANAGER +40 (0728) 777.912 [email protected]

CONSTANTIN IONESCU QUALITY MANAGER +40 (0728) 777.921 [email protected]

1 1953 - 2013

SC CELPI SA

1, Drumul Bercenarului, county 4041116, Bucharest, ROMANIA

VAT RO 382482Romanian Trade Registration J40/1990/291

T: +40 (021) 450.2011

F: +40 (031) 816.5440

E: [email protected], [email protected]

W: http//www.celpi.ro

We can grow together!

`Thank you for attention!