Page 2: Romelectro general presentation

Mission Standing for the Group’s ethical principles, our services’ quality and promoting the highest professional standards generate our clients’ appreciation. What makes us different in the energy and environment market are: our unique technological solutions already implemented, the integrated approach and our experts’ specializations and skills diversity. Flexibility and adaptation to current challenges represent our strengths. A group of powerful companies united by a common purpose “turning objectives into results”

Vision

Our Group members’ experience and tradition have gathered common valences:

Creativity, determination, cooperation, transparency; Trust, solidarity, honesty, integrity; Responsibility in inter-human relations and partnerships; Respect for the environment and the community

Values

Page 3: Romelectro general presentation

1971 Romelectro is set up as the foreign trade company of the Ministry of Energy

1974-1978 First export works for dams and

OHTLs in Iran and Algeria

1980 Complex T&D contracts in Egypt, Iraq, Jordan, Lebanon, Malaysia

1982–1984 Turnkey works of Vafregan Dam in Iran

1990 Power T&D works in the Philippines and Thailand

1993 Romelectro is present in 19 countries

1994 Romelectro becomes a 100% private company

2004 Starting of the turnkey execution works for the Complex Hydro-development of Jiu Canyon, Bumbești–Livezeni Stretch

44 years at a Glance (1)

discover the business power

Page 4: Romelectro general presentation

2005 Romelectro becomes major

shareholder in ISPE, CELPI and Electromontaj Carpaţi Sibiu, setting up Romelectro Group

2008 Romelectro becomes investor of Ecogen Energy Buzau and starts the Construction of a Combined Heat and Power Plant in Buzău

2009 Romelectro becomes investor of Voineasa Micro Hydro Power Plant

2007-2014 Romelectro develops environmental protection competencies (low Nox burners, Dense Slurry Systems, Flue Gas Desulphurisation)

2014 Romelectro signs the contract with Timisoara Municipality for first representative Waste to

Energy contract in Romania2014 Romelectro signed the contract for

Bradu 400/220/110/20 kV substation Refurbishing

2015 Romelectro signed the contract for Stejaru HPP Refurbishment

44 years at a Glance (2)

discover the business power

Page 5: Romelectro general presentation

EPC Contractor, Project Developer and Investor in the fields of power and heat generation, power transmission & distribution, environmental protection and industry

Leader as consulting and engineering company in the field of power generation, power T&D, environmental protection and industry

Contractor for design, construction and testing for steel structures in the field of power T&D and telecommunication.

Contractor for construction and installation works for power Transmission and Distribution projects.

Romelectro Group structure

Page 6: Romelectro general presentation

Roles on the market

• EPC Contractor • Investor • Project Developer • Strategic Partner• Electricity trader

About Romelectro

MARKET AREAS

Power Generation -Thermal

Environmental Protection

IndustryPower Generation - Hydro

Power Transmission and Distribution

Page 7: Romelectro general presentation

About Romelectro

Romelectro offer

• Turn-key contracting• Studies, research and development• Technical consultancy• Commercial and institutional consultancy• FEED, Basic and detailed engineering• Equipment supplier• Installation and assembling services • Civil works• Site supervision and project management• Commissioning• Rehabilitation and modernisation programs

Page 8: Romelectro general presentation

As Romelectro’s expertise over the years extends to most of the heat and power plants in Romania, we have the necessary competences, technologies, resources and know-how to answer to our clients’ needs for both green field projects and existing power plants.As investor and project developer, Romelectro transformed the existing power plant of Buzău into a modern Combined Heat and Power Plant, using high efficiency technology. References:• Complex rehabilitation, retrofitting and upgrading programs in the field of thermal power plants and cogeneration plants developed for more than 3,000 MW.• Engineering and design for more than 15,000 MW in conventional & nuclear power plants, representing 90% of the total installed capacity of Romania. • Projects for new facilities using both conventional fuels and renewable energy sources (biomass, biofuel, waste).

IndustryPower Generation Hydro

Environmental Protection

Power Trasmisson & Distrbution

Power Generation - Thermal

Page 9: Romelectro general presentation

• As EPC Contractor, Romelectro is leading the complex development of the Jiu River on Bumbeşti–Livezeni stretch and the construction of two hydropower plants with an installed power of more than 60 MW.

• As investor and general contractor, Romelectro developed 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW.

• Romelectro carried out the feasibility studies for the Ramdane Djamel and Zaouia Dams (Algeria); detailed technical design for the Bougous and Bouhalloufa Dams (Algeria); turnkey execution of the Vafreghan Dam (Iran); execution of the El – Fakia (Algeria) and turnkey heightening of the Ksob Dam (Algeria).

• Recently Romelectro signed for the rehabilitation of Stejaru HPP 210 MW.

Power Generation - Hydro

Power Generation Thermal

Environmental Protection

Power Trasmisson & Distrbution

Industry

Power Generation - Hydro

Page 10: Romelectro general presentation

Romelectro’s capabilities in the Power Transmission and Distribution field have been proved through the 45 years long hystory of domestic and international projects:

• Engineering for more than 22,000 km of OHTLs in Romania and about 10,000 km OHTLs (750 kV, 400 kV, 220 kV, 110 kV) km in countries like Iran, Iraq, Philippines, Jordan, Syria, Algeria or Malaysia

• Design, engineering, construction for more than 150 high voltage substations

• Grid connection studies for more than 30,000 MW of wind energy farms

• Strategies and forecasting studies for the National Power System

Power Generation Thermal

IndustryPower Generation Hydro

Environmental Protection

Power Transmission & Distribution

Page 11: Romelectro general presentation

Power Generation Thermal

IndustryPower Generation Hydro

Power Trasmisson & Distrbution

Environmental Protection

In line with the environmental protection related goals set by the EU Energy 2020 Strategy and the EU Energy 2050 Roadmap, Romelectro promotes and implements the most advanced tehnologies: • Ash and slag removal and storage in dense slurry system: projects for 12

coal-fired boilers at Oltenia Energy Complex.

• Flue gas desulphurization at Ișalnița TPP.

• NOx emission reduction: projects for 14 gas-fired boilers at Galați CHPP, Iernut TPP, Progresu CHPP, București Vest CHPP and București Sud CHPP.

Page 12: Romelectro general presentation

Energy efficiency in Industry

Romelectro takes over the whole chain from technical general audit to implementation, going through: Technical audit (thermal, electrical, utilities), Projects technical-economic analysis – opportunity, prefeasibility and feasibility studies, cost – benefit analysis, Business plan, Identifying financing/co-financing sources for investment, financial model, social, economic and environmental impact assessment, turn-key contracts.

We cover all energetic issuesFactory energy dispatcher • Energy management system• New power generation resources• Specific thermal, mechanical and electrical solutions• Electrical distribution system SCADA systems (electric/thermal power, water, natural

gas, heavy fuel oil etc) • DCS or PLC systems for process management• Process simulation systems • Security systems, Video - data - voice networks

Power Generation Thermal

Power Generation Hydro

Environmental Protection

Power Trasmisson & Distrbution

Industry

Page 13: Romelectro general presentation

V

PROJECTS

Page 14: Romelectro general presentation

FACTS AND FIGURES • 2 x 315 MW power units• 3317 ÷ 5543 mg/Nm³ rated

sulphur dioxide emission, estimated in the current operation

• 200 mg/Nm³ maximum SO₂ concentration after project implementation

• Wet desulphurization plant using limestone slurry

• 96% desulphurization efficiency

Ișalnița TPP - Flue gas desulphurisation systemPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Scope of the project: reducing the sulphur dioxide (SO₂) emissions, discharged together with the flue gas resulting from power units no. 7 and no. 8 at Ișalniţa TPP – SE Craiova – Oltenia Energy Complex.

The two plants are being executed identically, with the same type of equipment, delivered by the same suppliers.

Starting year: 2012Commissioning year: 2014Client: Oltenia Energy Complex – SE Craiova

Babcock Noell GmbH – Consortium Leader Romelectro – Consortium Partner Ispe – Engineering

Page 15: Romelectro general presentation

Dense Slurry System at Turceni TPP

Turceni TPP is the largest coal fired producer, supplying more than 10% of the energy consumed in Romania.

Scope of the project: Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology. The new investment consists mainly of:

• two dense slurry preparation stations• bagger pumps replacement• dry ash transport installation• air compressor station• one wastewater treatment plant

Starting year: 2009Commissioning year: 2012Client: Turceni TPP

Romelectro: EPC Contractor

FACTS AND FIGURES• 4 × 330 MW units

• 4 × 155 t/h of dry solids (30 t/h bottom ash + 105 t/h fly ash + 20 t/h FGD gypsum)

• 5 × 450 kW + 1 × 250 kW

Atlascopco compressors

• 8 sets of Metso Mineral centrifugal pump grups

• CIRCUMIX continuous mixing technology

• 4900 m transport distance

• 24 m geodetic level difference.

PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Turceni TPP - Dense Slurry System

Page 16: Romelectro general presentation

Dense Slurry System at Craiova II CHPP

Part of Oltenia Energy Complex, Craiova II CHPP

(2 × 150 MW) has a significant importance both for the Romanian power sector and for the city of Craiova, being the only heat producer both for population and strategic industrial consumers such as Ford automotive factory and other plants on the industrial platform. Scope of the project: Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening.

Starting year: 2008Commissioning year: 2010Client: Craiova II CHPP

Romelectro: EPC Contractor

FACTS AND FIGURES

• 2 × 150 MW power units (+8 district heating boilers)

• 2 × 86 t/h of dry solids• (6 t/h bottom ash + 60 t/h

fly ash + 20 t/h dry gypsum)• 1:1 water to solid ratio • CIRCUMIX continuous

mixing technology• 2 × 140 m3/h + 1 × 110

m3/h transport slurry lines • 3 sets of Feluwa hose

diaphragm slurry pumps for distance transport

• 9400 m transport distance• 90 m geodetic level

difference

PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Craiova II CHPP - Dense Slurry System

Page 17: Romelectro general presentation

Ișalnița TPP - Dense Slurry System

Part of Oltenia Energy Complex, Ișalnița TPP (2 × 315 MW) has a significant importance for the Romanian power sector being one of the largest power generation capacities operation in Romania.

Scope of the project: Increasing the stability of the slag and ash storage of SE Ișalnița, on the right and left banks of Jiu river, using dense fluid technology. The solution is designed to transform the existing heavily polluting ash handling system to match the eco-friendly dense slurry technology.

Starting year: 2008Commissioning year: 2010Client: Ișalnița TPP

Romelectro: EPC Contractor

FACTS AND FIGURES

• 2 × 315 MW power units, 4 × 510 t/h boilers

• 4 × 77 t/h of dry solids (5 t/h bottom ash + 52 t/h fly ash + 20 t/h dry gypsum)

• CIRCUMIX continuous mixing technology

• 3 × 120 m3/h transport slurry lines – 1 ash field

• 4 sets of Warman centrifugal pump groups

• 3 pumps/group for distance transport

• 4600 m transport distance• 45 m geodetic level

difference.

PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Page 18: Romelectro general presentation

Rovinari TPP - Dense Slurry System

The second largest coal fired producer in Romania, with an installed power of 1320 MW (4 x 330 MW), Rovinari TPP supplies about 9% of the total electricity generated on the local market.

Scope of the project: New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW)

Starting year: 2008Commissioning year: 2010Client: Rovinari TPP

Romelectro: EPC Contractor

FACTS AND FIGURES

• 4 x 330 MW units

• 4 x 190 t/h at dry solids (30 t/h fly bottom ash + 127 t/h fly ash + 33 t/h dry gypsum)

• CIRCUMIX continuous mixing technology

• 4 x 270 m3/h transport slurry lines

• 4 sets of Warman centrifugal pump groups

• 7000 m transport distance• 32 m geodetic level

difference.

PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Page 19: Romelectro general presentation

Galați CHPP Low NOx (1)

Scope of the project: : Modernization and retrofitting of firing systems of 4 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS.

For each of the C6, C7 and C8 steam boilers , the new installation consists of:

• 6 low NOx mixed burners for heavy fuel oil and natural gas• a new modern system for heavy fuel oil and natural gas supply• a new BMS (Burner Management System) unit• a new DCS (Distributed Control System) unit• emission monitoring system• methane leakage monitoring system

PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

FACTS AND FIGURES

• 4 x 420 t/h steam boilers

• 6 x 53 MW mixed heavy fuel oil – natural gas low NOx burners/boiler body (for C6, C7 and C8)

• 6 x 53 MW natural gas low NOx burners/boiler body (for C5)

Page 20: Romelectro general presentation

Galați CHPP Low NOx (2)

For C5 steam boiler, the new installation consists of:

• 6 low NOx burners for natural gas• 8 low NOx burners for blast furnace gas• a new modern system for natural gas supply• a new modern system for blast furnace gas supply• a new BMS (Burner Management System) unit• a new DCS (Distributed Control System) unit• emission monitoring system• methane leakage monitoring system

Starting year: 2008Commissioning year: 2013Client: Electrocentrale Galați

Romelectro: EPC Contractor

PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

FACTS AND FIGURES

• 8 x 21 MW blast furnace gas low NOx burners /boiler body

• BMS type SIL3, failsafe, double redundant /boiler body

• DCS type Ovation /boiler body

Page 21: Romelectro general presentation

Iernut TPP - Low NOx

Scope of the project: modernization and retrofitting of firing systems of 4 x 320 t/h natural gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS. For each boiler, the new installation consists of:

• 10 low NOx burners • a new modern system for natural gas supply• a new BMS (Burner Management System) unit• upgrading and extension of existing DCS for integration of new BMS• emission monitoring system• methane leakage monitoring system

Starting year: 2009Commissioning year: 2011Client: ELCEN București

Romelectro: EPC Contractor

PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

FACTS AND FIGURES

• 2 x 215 MW units

• 2 x 640 t/h (4 x 320 t/h) steam boilers type PK-47-2

• 10 x 30 MW low NOx burners / boiler body

• BMS type SIL3, failsafe, triple redundant / boiler body

Page 22: Romelectro general presentation

FACTS AND FIGURES • 2 x 420 t/h steam boilers• 4 ESP casings are to be

fitted with new inner instalation components

• 400 mm collecting electrodes spacing optimised design

• 24 new high-performance 120 kW power transformers with high-frequency technology to supply high voltage to the retrofitted ESP’s

• 2 new improved ESP monitoring and control systems

• 48 mg/Nm³ maximum dust emissions at ESP’s outlet, after project completion

Govora CHPP - Electrostatic precipitators modernization PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION

Govora CHPP is the only thermal energy producer for Râmnicu-Vâlcea area in Romania. It is also the only steam supplier for Râmnicu Vâlcea industrial platform and it can deliver power to the national power grid.

Scope of the project: Modernization of the electrostatic precipitators for boilers no. 5 and no. 6 at Govora CHPP, aiming to reduce the level of dust emissions at maximum 48 mg/Nm3 at ESP’s outlet.

Starting year: 2012Commissioning year: 2013Client: Govora CHPP

Romelectro – EPC ContractorTechno Montaj – Mechanical erectionIcpet Eco – Engineering and design

Page 23: Romelectro general presentation

FACTS AND FIGURES

• 4 x 420 t/h steam boilers

• min 121% power efficiency calculated according to the “Waste Directive”

• min 5.64 Mwe installed electric power

• min. 86% boiler efficiency

• Noxious emissions at the stack - according to Directive 2008/98/EC

• 87000 tons/year - estimated quantity of fuel to be processed

Timișoara TPP - Waste-to-Energy PROJECTS > THERMAL POWER

It is the first major project in Romania in the field of Waste-to-Energy, according to the National Waste Management Strategy, included in the Waste Management Plan

This project proposes the execution of an alternative fuel incineration plant, fuel resulting from the sorting process of municipal waste and generation of electricity and heat.

Objectives: - Discarding the sorted waste by conversion of the resulting alternative fuel into energy, by means of a high efficiency cogeneration plant; - Reducing the methane gas consumption by replacing it with this alternative fuel, the result being approximately 16 million m3/year.

Starting year: 2013Commissioning year: 2016Client: International Recycling Energy Romelectro – Consortium Leader Baumgarte Boylers Systems GmgH – Consortium PartnerISPE – General Designer

Page 24: Romelectro general presentation

PROJECTS > THERMAL POWER

Rovinari TPP unit 4 Modernization of Electric and Automation Installations

• The executed works provided an efficient operation of Power Unit No. 4, in safe and highly reliable conditions. Moreover, the requirements related to the environmental legislation shall also be achieved in operation.

• Full replacement of the 6 and 0.4 kV substations, the DC substations, rectifiers, inverters, and 24 and 220 V DC stationary batteries, digital protections for the power unit, static excitation, substation and IT aggregates for the electrostatic precipitators, DCS – Distributed Control System, firing control system, measurement loops in the boiler and machinery halls, Governor control system of the steam turbine and boiler feed pump turbine.

• ROMELECTRO, acting as Consortium Leader had to identify the best technical solutions and harmonization of the delivered equipment with the existing or refurbished installations.

Starting year: 2013Commissioning year: 2014Client: Complexul Energetic Oltenia – Rovinari TPP Co

PARTNERSHIPRomelectro – Consortium LeaderSAEM Energomontaj IEA – Consortium Partner ISPE – Engineering and Design

Page 25: Romelectro general presentation

Investment for Combined Heat and Power Plant in BuzăuPROJECTS › CONGENERATION

As investor and general contractor, Romelectro developed the project transforming the existing power plant of Buzău into a modern combined heat and power plant, using high efficiency technology. 

The new generation capacity is operated by the Special Purpose Vehicle (SPV) created on the basis of private–public joint venture.

Starting year: 2008Commissioning year: 2009Client: Ecogen Buzău (IPP)

Romelectro: Investor, EPC Contractor

FACTS AND FIGURES

• Inhabitants of Buzău City: ~150,000

• Length of primary district heating system: ~26 km

• Length of secondary district heating system: ~56 km

• Total number of apartments: ~35,000

• Number of apartments supplied: ~21,000

Buzău CHPP - Investment for Combined Heat and Power PlantPROJECTS > THERMAL POWER

Page 26: Romelectro general presentation

Complex Hydro-Development of Jiu ValleyPROJECTS › HYDROPOWER

As EPC Contractor, Romelectro executes the complex development of the Jiu River on Bumbești–Livezeni stretch and the construction of two hydropower plants (Dumitra and Bumbesti) with an installed power of approximately 60 MW and Livezeni dam. This project represent the most important investment in Romania in hydropower field after 1990.

Starting year: 2004Commissioning year: 2013 (Dumitra HPP), 2014 (Bumbești HPP) Client: Hidroelectrica

Romelectro: EPC Contractor, Consortium Leader Hidroelectrica and ISPH: Consortium Partners

Jiu Canyon - Complex Hydro-Development PROJECTS > HYDROPOWER

Page 27: Romelectro general presentation

Rehabilitation of Voineasa Micro Hydro Power PlantPROJECTS › HYDROPOWER

Romelectro became the owner of the hydro power capacity on Mănăileasa River in 2006. As investor and EPC Contractor, in 2009 Romelectro started the works for the complete rehabilitation of Voineasa MHPP, creating a new and efficient capacity for harvesting the renewable potential of Mănăileasa River.

Scope of the project: developing the 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW by replacing the old generation capacities with new hydro-mechanical and electrical equipment.  

Starting year: 2009Commissioning year: 2011

Romelectro: Investor and EPC Contractor

Voineasa Micro Hydro Power Plant RehabilitationPROJECTS > HYDROPOWER

Page 28: Romelectro general presentation

Complex Hydro-Development of Jiu Valley

Scope of the project: Romelectro is leading for 6 years in a row the turn key project CHE Stejaru Rehabilitation - “Hydropower Romanian School”.

Starting year: 2015Commissioning year: 2021

Romelectro: EPC ContractorThe Hydropower, the central point of the Complex Landscaping of the Bistrita River, with an installed capacity of 210 MW and over 50 years of functioning, summing up over 1.000.000 working hours, is preparing for the implementing of some state-of-the-art solutions, that will assure a high level of availability and security for at least the following 30 years.

Client: HidroelectricaRomelectro: General Contractor, Consortium LeaderLitostroj Power Slovenia: Consortium Partner

Stejaru HPP RehabiliationPROJECTS > HYDROPOWER

Page 29: Romelectro general presentation

Refurbishment of the 400/110 kV Brașov Substation

The 400/110 kV electrical substation in Brașov has a particular importance for the National Power System and for the local grid. It represents a junction for power lines connecting Muntenia, South Transylvania and the poorly covered Moldovian area. The substation supplies the local consumption area (around 167 MW) being also the connecting point for Brașov TPP.

Scope of the project: upgrading of the primary and secondary circuits in the 400/110kV substation, by full refurbishing. The purpose is to complete a new 400 kV outdoor electrical substation, equipped with the modern high-performance conventional installations, as well as a new indoor 110 kV electrical substation, equipped with SF6 insulated installations (GIS cells).

Starting year: 2010Commissioning year: 2013Client: Transelectrica

Romelectro: EPC Contractor, Consortium LeaderCG Holdings Belgium NV: Consortium PartnerISPE: Engineering and designElectromontaj Carpați Sibiu: Erection and commissioning works

PROJECTS › POWER TRANSMISSION & DISTRIBUTION

400/110 kV Brașov Substation Refurbishment PROJECTS > POWER TRANSMISSION & DISTRIBUTION

Page 30: Romelectro general presentation

PROJECTS › POWER TRANSPORT & DISTRIBUTION

Scope of the project:

• replacing the existing primary switch gear • replacing the AT 400 MVA• modernising the internal services • introducing the numerical and SCADA protections and control systems - it is now possible for the substation to be fully remote-controlled by means of the (territorial and national) dispatch • retrofitting works on the drainage and sewage system • modernising the heating, climatising, security as well as the fire extinction system.

Starting year: 2004Commissioning year: 2006Client: Transelectrica – Cluj Subsidiary

JACOBSEN Elektro As (Norway): Consortium Leader Romelectro: Local Partner

400/220 kV Roşiori Electrical Substation RetrofittingPROJECTS > POWER TRANSMISSION & DISTRIBUTION

Page 31: Romelectro general presentation

PROJECTS › POWER TRANSPORT & DISTRIBUTION

Modernization of Electrical Substations PROJECTS > POWER TRANSMISSION & DISTRIBUTION

• Refurbishment of the 220/110 kV Barboși Substation

• Refurbishment and modernization of 110 kV and 220 kV bays in FAI Substation

• Extension and modernization of the 110/20 kV Dumbrava - Sibiu Substation

• Primary equipment upgrade in the 110/20 kV Petrila Substation • Refurbishment of the 220/110/20 kV Turnu Măgurele Substation• Upgrade of the 110 kV bays in HPP Ciunget Substation• Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP

• Modernization of the 110 kV Electrical Substation of Govora HPP

• Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation • Modernization of the 220/110 kV Vetiş Electrical Substation

Page 32: Romelectro general presentation

PROJECTS › POWER TRANSPORT & DISTRIBUTION

BARBOSI ELECTRICAL SUBSTATION 220/110kVPROJECTS > POWER TRANSMISSION & DISTRIBUTION

In 2013, Romelectro began the works for refurbishing the Barbosi substation, consisting of:•Replacing the existing primary equipment in the substation due to their old age (over 30 years of operation);•Replacing the existing protections with modern digital protections;•Introducing the central control system (SCADA) so that the substation will operate with no personnel;•Increasing the safety in operation of the substation for both the electricity supply of the 0 (zero) degree consumer - Arcelor Mittal Galati and the wind electricity transit in the Dobrogea area towards the Moldova area through 220kV Lacul Sarat-Filesti OHTL in the 220kV Barbosi Substation - 220kV Focsani Vest OHTL.

CLIENT: Transelectrica – ST Constanta

PROJECT STARTING YEAR: 2013PROJECT COMPLETION YEAR: 2014

PARTNERSHIP:Romelectro: EPC Contractor, Consortium LeaderElectromontaj Carpati Sibiu: Consortium Partner

Page 33: Romelectro general presentation

PROJECTS › POWER TRANSMISSION & DISTRIBUTION

Scope of the project: to connect the Dumeşti and Românești Wind Farms to the National Power Grid through a new 110 kV line cell executed in the 220/110 kV FAI Substation

The characteristics of this projects are:• mounting of new 110 kV cell in the FAI substation, required to connect the new user;• mounting the control and protection equipment in the FAI substation for the new 110

kV cell in Dumeşti Wind Farm;• providing a measurement group in the 110 kV FAI transformer station to meter the

electricity consumed /generated by the user;• providing the equipment to monitor the quality of the electricity for the new 110 kV

cell in Dumeşti Wind Farm.

Starting year: 2013Commissioning year: 2014Client: Transelectrica

Romelectro: EPC Contractor

Connection of 99 MW Dumești and 30 MW Românești Wind Power Plants to the National Power Grid

Page 34: Romelectro general presentation

Refurbishment of the 400/110 kV Brașov Substation

The 400/220/110 kV Bradu Substation is of special importance for the National Power Grid and also for Pitești and Rîmnicu Vâlcea areas. It represents an important connection point of the Muntenia and Oltenia networks with the one in Transylvania.

The main refurbishing works shall consist in:• refurbishment of the 400 kV Substation, 220 kV Substation, 110 kV Substation and

of 20 kV Substation • procurement and mounting of 2 x 400/400/80 MVA, 400/231/22 kV autotransformers • procurement and mounting of 2 x 200/200/60 MVA, 231/121/10,5 kV

autotransformers• procurement and mounting of 2 x 16 MVA, 110/20 kV transformers• control – protection (SCPA) and metering system• remote protection and telecommunication systems• refurbishing the DC and AC internal services installation • constructions and architecture works • achieving the 400 kV Țânțăreni OHTL connection

Starting year: 2014Commissioning year: 2018Client: Transelectrica

Romelectro: EPC Contractor

PROJECTS › POWER TRANSMISSION & DISTRIBUTION

Refurbishment of the 400/220/110 kV Bradu Substation PROJECTS > POWER TRANSMISSION & DISTRIBUTION

Page 35: Romelectro general presentation

Grid Connection of the Green Field 800 MW CCGT BraziPROJECTS › POWER TRANSMISSION & DISTRIBUTION

Scope of the project: the (400)/220/110 kV Banca Substation was conceived to evacuate in National Power Grid a power of approximately 406 MW generated by Ivesti, Falciu 1 and Falciu 2 Wind Farms.

The characteristics of this projects are:• execution of a (400)/220/110 kV transformer substation• connection of the transformer substation in 220 kV DC Gutinaș-FAI and Gutinaș-

Munteni OHTL (belonging to Transelectrica-ST Bacău) by means of an approximately 0.3 km 220 kV DC OHTL

• regulating the coexistence of the 110 kV Bârlad- Roșiești OHTL (belonging to EoN Moldova) to the 220 kV OHTL in the Banca Substation;

Starting year: 2012Commissioning year: 2013Client: Transelectrica

Romelectro: EPC Contractor

Connection of 300 MW Ivești, 88 MW Falciu 1 and 18 MW Falciu 2 Wind Power Plants to the National Power System through the new (400)/220/110 kV Banca Substation

Page 36: Romelectro general presentation

Grid Connection of the Green Field 800 MW CCGT BraziPROJECTS › POWER TRANSMISSION & DISTRIBUTION

Scope of the project: supplying and installing two new Overhead Transmission Lines in order to connect the Green Field 860 MW CCGT (Combined Cycle Gas Turbine) Brazi to the National Power System.

 Starting year: 2008Commissioning year: 2010Client: OMV Petrom

Romelectro: EPC Contractor

FACTS AND FIGURES

Connection point: 400/220/110 kV Brazi West Substation

Length: 3 km Voltage level:

• 400 kV for the double circuit DONAU type towers

• 220 kV for the simple circuit RODELTA type towers

 Distance between the axes: 80 m

Grid Connection of the Green Field 860 MW CCGT Brazi PROJECTS > POWER TRANSMISSION & DISTRIBUTION

Page 37: Romelectro general presentation

44 Years of Sustainable Development on Domestic and International Markets

Page 38: Romelectro general presentation

Project Client Contract performance period

Execution of a Waste-to-Energy Plant and incorporating it within Timișoara Sud TPP

International Recycling Timișoara (IRE)

2014 – 2016

Rehabilitation and modernization of 330 MW Power Unit No. 4 operating on lignite in SE Rovinari; Modernization of the electric power and automation plants

Oltenia Energy Complex –SE Rovinari

2014 – 2014

Process water supply installation for the desulphurization plants related to power units no. 4 and 5

Oltenia Energy Complex – SE Rovinari

2014 – 2014

Execution of works for taking over the gypsum slurry from the flue gas desulphurization plant of unit no. 4 to the dense slurry plant related to unit no. 3

Oltenia Energy Complex – SE Rovinari

2014 – 2014

Automation Works - Interconnection of the dense slurry plant to the dry ash collecting and taking over plant of Cenextra related to the project: "Ash collecting, transport and automatic loading plant, unit no. 3

Oltenia Energy Complex – SE Turceni

2014 – 2014

Rehabilitation / Modernization of the electrostatic precipitator in power unit no. 7, execution and connection of the gas circuit between power unit no. 7 and desulphurization plant no. 6

Oltenia Energy Complex – SE Turceni

2014 – 2014

Interface execution between the dense slurry plant and the desulphurization plant

Oltenia Energy Complex –SE Turceni

2012 – 2014

Flue gas desulphurization plants for power units no. 7 and no. 8 at Ișalniţa TPP

Oltenia Energy Complex –SE Craiova

2012 – 2014

Modernization of the excitation system and protections of Unit 7 generator in Ișalnița TPP

Oltenia Energy Complex – SE Craiova

2012 - 2014

Electrostatic precipitators modernization at Govora CHPP Govora CHPP 2012 – 2013

Projects in Romania THERMAL POWER PROJECTS

Page 39: Romelectro general presentation

Projects in Romania

Proiect Client Contract performance period

Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology

Oltenia Energy Complex –SE Turceni

2009 – 2012

Modernization and retrofitting of firing systems of4 x 320 t/h gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS

ELCEN BucureștiIernut TPP

2009 – 2011

Modernization and retrofitting of firing systems of 5 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS

Electrocentrale GalațiGalați CHPP

2008 – 2013

Investement for Combined Heat and Power Plant of 6 MWe and 80 Gcal in Buzău

Ecogen Buzău (IPP) 2008 – 2009

Increasing the stability of the slag and ash storage of Ișalnița (2 x 315 MW), on the right and left banks of Jiu river, using dense fluid technology

SE CraiovaIșalnița TPP

2008 – 2010

Refurbishment and upgrade of electrical and automation installation for 330 MW unit no. 6 at TPP Rovinari

SE Rovinari 2008 – 2010

New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW)

SE Rovinari 2008 – 2010

Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening

SE CraiovaCraiova II CHPP

2008 – 2010

Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP - boiler 2

ELCEN București Progresu CHPP

2007 – 2007

THERMAL POWER PROJECTS

Projects in Romania

Page 40: Romelectro general presentation

Projects in Romania

Project Client Contract performance period

Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP, boilers 3 and 4

ELCEN București Progresu CHPP

2006 – 2007

Rehabilitation and modernizing of 315 MW unit no. 7 in Işalniţa TPP SE CraiovaIșalnița TPP

2005 - 2006

Rehabilitation of the firing installations for 525 t/h steam boiler no.2 in Bucureşti Vest CHPP and no. 5 and 6 in Bucureşti Sud CHPP, by replacing with modern low NOx burners

ELCEN București 2004 – 2006

Refurbishment of 330 MW units no. 4 and 5 in Turceni TPP (Program A3)

Turceni TPP 1995 – 2003

Refurbishment of 330 MW units no. 3 and 7 in Turceni TPPand no. 5 and 6 in Rovinari TPP (Program A2)

Turceni TPPRovinari TPP

1994 – 1998

Refurbishment of 330 MW units no. 2 and 6 in Turceni TPPand no. 3 and 4 in Rovinari TPP (Program A1)

Turceni TPPRovinari TPP

1991 - 1994

Projects in Romania

HIDRO POWER PROJECTS

Project Client Contract performance period

Hydropower development of the Jiu River on the Livezeni – Bumbeşti strech, with the execution of 2 hydropowerplants with an installed power of 60 MW

Hidroelectrica 2004 – 2014

Rehabilitation of Voineasa Micro Hydro Power Plant, Voineasa I, II, III

Romelectro 2009 – 2011

THERMAL POWER PROJECTS

Page 41: Romelectro general presentation

Projects in Romania

Proiect Client Contract performance period

Rehabilitation of the 400/220/110/20 kV Bradu Substation Transelectrica 2014 - 2018

Switching to a 400 kV voltage of the Porțile de Fier – Reșița – Timișoara – Sacalaz – Arad axis/Stage I: Extension of the 400 kV Porțile de Fier Substation

TranselectricaCraiova Subsidiary

2013 - 2015

Rehabilitation of the 220/110 kV Barboși Substation Transelectrica 2012 - 2014

Turnkey (400)/220/110 kV Banca Substation Transelectrica 2012 - 2013

Refurbishment of the 400/110 kV Braşov Substation Transelectrica 2010 – 2013

Refurbishment and modernization of the 110 kV and 220 kV bays in FAI Substation

TranselectricaBacău Subsidiary

2007 - 2011

Extension and modernization aiming to increase the safety in operation of the 110/20 kV Dumbrava Sibiu Substation

Electrica TransilvaniaSud

2007 – 2009

Primary equipment upgrade in the 110/20 kV Petrila Substation

Transelectrica 2007 – 2007

Refurbishment of the 220/110/20 kV Turnu Măgurele Substation

Transelectrica 2006 - 2011

Modernization of the protection systems of 250 MVA transformer and 110 kV PDB in 400/110 kV Braşov, Dârste, Domneşti, Medgidia Sud, Pelicanu, Tulcea Vest, Smârdan, Drăgăneşti Olt Substations

Transelectrica 2006 – 2009

Upgrade of the 110 kV bays in HPP Ciunget Substation HidroelectricaRâmnicu Vâlcea Subsidiary

2006 – 2008

Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP

HidroelectricaRâmnicu Vâlcea Subsidiary

2006 - 2007

ELECTRICAL SUBSTATIONS

Projects in Romania

Page 42: Romelectro general presentation

Projects in Romania

Proiect Client Contract performance period

Modernization of the 110kV Electrical Substation of Govora HPP HidroelectricaRâmnicu Vâlcea Subsidiary

2006 – 2007

Turnkey refurbishment of the 110/10 (20) kV Bucureşti Centru Substation

Electrica Muntenia Sud

2005 – 2007

Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation

Transelectrica 2005 – 2005

Refurbishment of the 400/220 kV Roşiori Electrical Substation TranselectricaCluj Subsidiary

2004 – 2006

Modernizing works at the 220/110 kV Vetiş Electrical Substation TranselectricaCluj Subsidiary

2004 – 2006

Turnkey modernization of the 110/20 kV Electrical Substation Borsec

Electrica Transilvania Sud 2003 – 2005

Turnkey modernization of the 110/10 kV Cluj Centru Electrical Substation

Electrica Transilvania Nord 2003 - 2004

Turnkey refurbishment of the 6(20) kV Fileşti – Galaţi connection Substation

Electrica Muntenia Nord 2002 – 2003

ELECTRICAL SUBSTATIONS

Projects in Romania

Page 43: Romelectro general presentation

Projects in Romania

Proiect Client Contract performance period

Connection to the Electricity Transmission Network of 99 MW Dumești Wind Farm and 30 MW Românești Wind Farm, by executing a 110 kV line cell in the 220/110 kV Fai Substation

TranselectricaBacau Subsidiary

2013 - 2014

Coexistence conditions between the existing 110 kV Bârlad – Roșiori OHTL and new 220 kV OHTL connections for the (400)/220/110 kV  Banca Substation for connecting 300 MW Ivești, 88 MW Falciu and 18 MW Falciu 2 Wind Farms to the electric grid

Transelectrica 2012 - 2013

Top overhaul of 400 kV Mintia-Sibiu OHTL Transelectrica 2011 - 2014

Rehabilitation of the 220 kV OHTL Lotru - Sibiu Transelectrica 2007 – 2010

400 kV OHTL Oradea – Nadab – Békéscsaba, new interconnexion line with Hungary

Transelectrica 2006 – 2008

Rehabilitation of the 400 kV Bucureşti South – Gura Ialomiţei OHTL

Transelectrica 2006 - 2007

Execution of 220kV and 400 kV connections of Iernut Substations

Transelectrica 2005 – 2006

Emergency works of the Sibiu – Țânțăreni 400 kV OHTL Transelectrica 2005 – 2005

Rehabilitation of 220 kV Brazi Vest – Târgovişte OHTL Transelectrica 2004 - 2005

Improving the dispatcher transmission system by executing the interconnecting of the data transmission system between the National Dispatch Centers in Romania and Bulgaria

Transelectrica 2003 – 2004

Rehabilitation of 220 kV Borzeşti – Gutinaş OHTL Transelectrica 2003 – 2003

Projects in Romania OVERHEAD TRANSMISSION LINES

Page 44: Romelectro general presentation

Projects in RomaniaMajor Projects in AsiaPHILIPPINES

THAILAND

Project Client Contract performanceperiod

138 kV Compostela - Banilad OHTL Technical specification: Foundation pads and chimneys, double triangle hot zinc plated poles, active 2xACSR 400 mm2 Condor conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors.

National Electric Power Corporation (NPC)

1994 – 1999

230 kV Talisay - Compostela OHTL Technical specifications:Foundation pads and chimneys, double triangle hot zinc-plated poles, active ACSR 772 mm2 MARTIN conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors.

National Electric Power Corporation (NPC)

1994 – 1999

Project Client Contract performanceperiod

230 kV OHTL Phuket Junction - Phuket 2Technical specifications:Foundation pads and chimneys, double triangle hot zinc plated poles, active 795 MCM ACSR/AW phase conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors.

Electricity Generating Authority of Thailand (EGAT)

1998 – 2002

230 kV OHTL Phangnga - Phuket 2 Technical specifications:Foundation pads and chimneys, double triangle hot zinc plated poles, active 2x1272 MCM ACSR/AW PHEASANT conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors.

Electricity Generating Authority of Thailand (EGAT)

1998 – 2000

Page 45: Romelectro general presentation

Projects in RomaniaMajor Projects in Middle EastJORDANProject Client Project

completion date

D.C Bayader - Amman - Quatrana - Ghar Safi - Ma’an 132 kV OHTL (310 km)

Jordan Electric Authority

1982

D.C. Ma’an - Aqaba and Amman – Sahab 132 kV OHTL (210 km)

Jordan Electric Authority

1984

D.C. Irbid - Yarmouk University 33 kV OHTL (12 km) Yarmouk University 1984

D.C. Subeihi - 33kV OHTL King Talal dam (11 km) Yarmouk University 1986

D.C. Irbid - Wadi Arab 33 kV OHTL (25 km) Jordan Electric Authority

1986

846A JEPCO – Bringing electricity to 14 villages Jordan Electric Power Company

1986

Zarqa – Sabha 132 kV OHTL (40 km) National Electric Power Corporation

1995

25 / 84 – 33 kV and 11kV Medium Voltage OHTL (160 km) Jordan Electric Authority

1987

D.C. Ma’an - Esheidiyeh - Kharrana - Azraq - Rishah 132kV OHTL (327 km)

Jordan Electric Authority

1988

Queen Alia International Airport – Sweima 132 kV OHTL (38 km)

National Electric Power Corporation

2000

Subeihi - Waqqas 132 kV OHTL National Electric Power Corporation

2005

Page 46: Romelectro general presentation

Projects in RomaniaMajor Projects in Middle EastIRAQProject Client Project

completion date

33 kV S.C. OHTL (Northern Area – 210 km; Central Area – 220 km; Western Area – 400 km)

General Rural Electricity Department

1984

33 kV S.C. OHTL (Baghdad Area – 90 km) Baghdad Electrical Distribution

1986

400 kV D.C. OHTL Musaiyb - Baghdad South Musaiyb – Babylon (87.5 km)

Major Electrical Projects Implementation Department

1988

400 kV D.C. OHTL Babylon – Qadisiya (101.5 km) Major Electrical Projects Implementation Department

1988

D.C. Tuba – 6.9 km; Hammar – 7.5 km; 132 kV OHTL; Ramadi – 11.1km Samadiya – 1.8 km; Mashtel – 0.4 km; Annah – 2.4 km

Major Electrical Projects Implementation Department

1989

D.C. Arbil – Dokan 132 kV OHTL (83.8 km) Major Electrical Projects Implementation Department

1989

132 kV D.C. OHTL Darbandikhan - Sulaimaniya 111.5 km (Kirkuk Industries – 5 km; Tarmia - 14.8 km, Musaiyb - 42.2 km)

Major Electrical Projects Implementation Department

1989

Page 47: Romelectro general presentation

Projects in RomaniaMajor Projects in Middle EastELECTRIC TRANSFORMERS & DISTRIBUTION SUBSTATION

TECHNICAL ASSISTANCE, CONSULTING & EQUIPMENT SUPPLY

Project Country Client Contract performanceperiod

Sheich Said -(Aleppo) Syria Sheich Said – Aleppo Cement Factory

1975 - 1977

Al Quaim Cement Plant 2X34 MVA; 33/6.6 kV Iraq Ministry of Industry and Minerals

1982– 1985

Sinjar Cement Plant S/S Iraq Ministry of Industry and Minerals

1982 – 1985

AL Quaim Limestone Quarry S/S Iraq Ministry of Industry and Minerals

1994 – 1999

Project Country Client Contract performanceperiod

Technical assistance and consulting on operating and repairing equipment

Kuwait Ministry of Energy and Water 1991 - 1999

Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company

1998– 1998

Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company

1999 – 1999

Technical assistance and consulting on operating and repairing equipment

United Arab Emirates (Abu Dhabi)

Technical assistance and consulting on operating and repairing equipment

1999 – 2001

Page 48: Romelectro general presentation

Projects in RomaniaMajor Projects in Middle EastIRAN

Turnkey execution of the Vafregan damShort description of the objectiveArch-shaped concrete dam, having an accumulation volume of 230 million cubic meters, which has been built with a view to ensuring water supply for the city of Saveh and also, to providing irrigation to an area of nearly 60.000 ha. At the same time, a hydroelectric plant has been built, having an overall installed capacity of 11 MW.

ClientTeheran Regional Water Board (TRWB)

LocationIran, 200 km south of Teheran

Project completion date1992

PartnershipRAH VA SAHTEMAN (MOLAVI) Teheran - associate partner

Page 49: Romelectro general presentation

Projects in RomaniaMajor Projects in North AfricaALGERIA

Feasibility studies for the RAMDANE DJAMEL and ZAOUIA dams. Expertise of the Technical Project for the dams BOUGOUS and BouhalloufaDescriptionThe core business of the contract consisted of Romelectro conducting the projects for the Ramdane Djamel and Zaouia dams in the Feasibility Study stage.

According to the Special Prescription Book, the services were provided in the following 5 stages:Stage 1: Defining the options and the reconaissance programStage 2: Hydrological studyStage 3: Geological and geo-technical studyStage 4: Solution studyStage 5: Feasibility study and bid documents

Also, for the same client, Agence Nationale des Barrages et Transfert (ANBT), the expertise of the technical project for Bouhalloufa and Bougous was conducted. The core business of the contract was for the APD study expertise to be conducted APD according to the Special Prescription Book.

Project starting dateNovember 2002 (Ramdane and Zaouia)May 2001 (Bougous)April 2002 (Bouhalloufa)Project completion dateNovember 2003 (Ramdane and Zaouia)April 2002 (Bougous)September 2002 (Bouhalloufa)

Page 50: Romelectro general presentation

Projects in RomaniaMajor Projects in North AfricaALGERIA

EL-Fakia dam executionShort description of the objectiveDam made of rock blocks piles endowed with a clay core, 49 m high and a 390m crown, which has been built with a view to ensuring water supply for the city of M’Sila and also, to irrigating80.000 ha of farm land.

Client: Directorate for Hydraulic Projects and Works (DHPW)Location: Algeria, 30 km from M’SilaProject completion date: 1985

SONAGHTER - associate local partnerTurnkey heightening of the Ksob damShort description of the objectiveRomelectro has conducted the works aimed at heightening the existing dam by 10m by means of a turnkey contract. It is a complex project which has called for rock excavations of over 37.000 cm,casings of over 100.000 mp and nearly 2.500 tones of metallic partners.

Client: Directorate for Hydraulic Projects (DHP)Location: Algeria, Pre-Sahara area, 30 km from the city of M’SilaProject completion date: 1976

SONAGHTER -associate local partner

Page 51: Romelectro general presentation

1. Performance of studies, designs and technical assistance

Morocco Sidi - Benour SubstationKenya Kinogoni Mining Complex SubstationChina Sini - Veni TPPPeru various locations

2. Turnkey projects:Bangladesh 21 sets of 33/11 kV 2.5 and 5 MWA transformer substations

25 sets of 11/0.4 kV 100-200 kVA transformer substationsPakistan The Lasbella 132/63 kV 2x25 MWA transformer substationIraq The Al Qaim 33/6.6 kV 2x34 MWA + 132/6.6 10 MWA transformer substation

The Sinjar 33/6.6 kV 3x34 MWA transformer substation

Transformers and Distributions Substations

Other projects abroad

Page 52: Romelectro general presentation

Client Country Project Type Scope of supply Consulting Engineer

Year

JEPCO Jordan Turnkey GLST - 132 kV T/L NEPA 2000

NAPOCOR Philippines Turnkey GLST, assembling elements - 500 kV

Edwin Ladingnon

2000

Intracom SA Greece, Intrarom SA Romania

Romania Supply Hot dip galvanised tubular steel antenna towers - 30, 50 m high

Intrarom SA

2000

NMTC Kuwait Turnkey Lattice steel antenna towers - 70 m high

NMTC 2000

Hayat Kuwait Supply Lattice steel antenna towers - 64 m high

NMTC 2000

NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae- 40, 75, 100 m high

MTCo 2000

NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae- 25, 30, 40, 75 m high

MTCo 1999

MEM Peru Design,Testing,Supply

GLST - 220 kV MEM 1999

JEPCO Jordan Turnkey GLST, assembling elements - 132 kV

NEPA 1998

Other projects abroad

Page 53: Romelectro general presentation

Major Export ProjectsClient Country Project Type Scope of Supply Consulting

EngineerYear

MEM Peru Design,Testing,Supply

GLST - 138 kV MEM 1998

ONUR CIVATA Turkey Supply Fittings 1998

JEPCO Jordan Supply,Erection

GLST - 132 kV NEPCO 1998

Consorcio GyM Cosapi Peru Supply GLST - 220 kV MEM 1998

Consorcio Cosapi-Abengoa

Peru Supply GLST - 220 kV MEM 1998

Consorcio Cosapi-Balarezo

Peru Supply GLST - 138 kV MEM 1998

EGAT Thailand Design,Testing,Supply

GLST, assembling elements - 115, 230 kV

EGAT 1997

MEM Peru Design,Testing,Supply

GLST, assemblingelements - 60-138 kV

MEM 1997

Mobifon Romania Supply Hot dip galvanized lattice steel towers fortelecommunications- 40 m high

MOBIFON 1997

Other projects abroad

Page 54: Romelectro general presentation

Client Country Project Type

Scope of Supply Consulting Engineer

Year

National Mobile Telecommunication Co. (NMTC)

Kuwait Supply Steel lattice towers for antennae - 70 m high

MTCo 1997

TREC Iran Design,Testing,Supply

GLST, assembling elements - 230 kV

Moshanir 1997

EEA Egypt Supply Fittings EEA 1997

NAPOCOR Philippines Turnkey GLST - 138, 230 kV Sweed Power & EEDD-NPC

1997

Public Establishment for Distribution and Exploitationof Electric Energy

Syria Supply Gantry towers for transformer station,clamps & fittings - 66/20 kV

PEDEEE 1996

National Electric Power Authority

Nigeria Supply GLST, lighting poles, gantry towers for132/33 kV substation

NEPA 1996

Avangan Iran Design,Testing

GLST - 230 kV Moshanir 1996

Ministry of Energy and Mines (MEM)

Peru Supply GLST - 60 kV MEM 1995, 1996

National Power Corporation (NAPOCOR)

Philippines Turnkey GLST, clamps, fittings, composite insulator strings, power conductors, OHGW, OPGW - 132, 230 kV

Sweed Power 1995

Major Export ProjectsOther projects abroad

Page 55: Romelectro general presentation

Client Country Project Type

Scope of Supply Consulting Engineer

Year

Power Generation and Transmission Co. - Ramin

Iran Design, Testing, Supply

GLST, assembling elements - 230 kV

Ghods Niroo 1995

K.E.SH. - Tirana Albania Supply Clamps & fittings - 132 kV

K.E.SH. 1995

Moshanir P.E. Co. Iran Design,Testing

GLST - 230 kV Moshanir 1995

Tavanir Iran Design,Testing

GLST - 63 kV MATN 1995

TREC Iran Design, Testing, Supply

GLST - 400 kV Moshanir 1993

TREC Iran Design, Testing, Supply

GLST, assembling elements - 230 kV

Moshanir 1993

AREC Iran Design, Testing, Supply

Clamps & fittings - 154, 132, 230 kV

Moshanir 1993

KWPA Iran Supply AAAC conductor Moshanir 1993

National Iranian Copper Industry Co. - Sirjan

Iran Design, Testing, Supply

GLST, clamps, OHGW –230 kV

Moshanir 1993

Major Export ProjectsOther projects abroad

Page 56: Romelectro general presentation

Major Export ProjectsClient Country Project

TypeScope of Supply Consulting

EngineerYear

Ministry of Energy and Water

Kuwait Supply Steelworks, assembling elements

MEW 1993

JEA Jordan Turnkey GLST - 132 kV JEA 1993BREC Iran Design,

Testing, Supply

Clamps - 230 kV Moshanir 1993

West Regional Electric Co. (WREC)

Iran Design, Testing, Supply

Clamps & fittings – 63, 132 kV

Gharb Niroo 1993

Bakhtaran Regional Electric Co. (BREC)

Iran Design, Testing, Supply

GLST, clamps, assembling elements- 230 kV

Moshanir 1993

BREC Iran Design, Testing, Supply

GLST, assembly elements – 400 kV

Moshanir 1993

WREP Iran Design, Testing, Supply

GLST - 132 kV Gharb Niroo 1992

JEA Jordan Design, Supply, Erection

GLST - 132 kV JEA 1992, 1994

KWPA Iran Design, Testing,Supply

GLST, clamps & fittings, assembling elements,insulators - 400 kV

Ghods Niroo 1992

Other projects abroad

Page 57: Romelectro general presentation

Major Export ProjectsClient Country Project

TypeScope of Supply Consulting

EngineerYear

WREP Iran Design, Testing, Supply

GLST, assembling elements - 63 kV

Moshanir 1992

Guilan Regional Electric Co. (GREC)

Iran Design, Testing, Supply

GLST, assembling elements - 230 kV

Moshanir 1992

Avangan Co. Iran Supply Galvanized bolts & nuts 1992

AREC Iran Design, Testing, Supply

GLST, assembling elements - 230, 400 kV

Mona Co. 1992

Tehran Regional Electric Co. (TREC)

Iran Design, Testing, Supply

GLST, assembling elements - 400 kV

Moshanir 1992

EAC Cyprus Supply GLST - 132 kV, tower cross arms

EAC 1992

Telecommunications Co. of Iran

Iran Supply Assembling elements 1992

AREC Iran Design, Testing,Supply

GLST, assembling elements, clamps & fittings,insulators - 230 kV

Moshanir 1991

Electrification of a railway station – Salonic Idomeni

Greece Supply Lattice horizontal galvanized girders

Odon Odostromaton

1991

Other projects abroad

Page 58: Romelectro general presentation

Client Country ProjectType

Scope of Supply Consulting Engineer

Year

EAC Cyprus Supply Galvanized steel cross arms EAC 1991

AREC Iran Supply GLST, clamps and fittings insulators and earth system- 63,132, 230 kV

Moshanir 1991

AREC Iran Design, Testing, Supply

GLST, assembly elements, clamps - 132/154 kVinterconnection

Moshanir 1991

Azerbaijan Regional Electric Co. (AREC)

Iran Supply GLST - 400 kV Moshanir 1990

EAC Cyprus Supply GLST - 132 kV EAC 1990

Boyer Tirana Albania Supply Clamps & fittings, insulators Boyer 1990

EEA Egypt Design, Supply

GLST and assembling elements - 220 kV

EEA 1990

WREP Iran Turnkey GLST - 63, 132 kV Mahab Ghodss 1989EAC Cyprus Design,

SupplyGLST - 132 kV EAC 1989

Major Export ProjectsOther projects abroad

Page 59: Romelectro general presentation

Client Country Project Type

Scope of Supply Consulting Engineer

Year

DGMPRE Iraq Design, Testing, Supply

Conductors - 400 kV DGMPRE 1988

JEA Jordan Turnkey GLST -132 kV JEA 1987

Electricity Authority of Cyprus (EAC)

Cyprus Design, Supply

GLST - 132 kV EAC 1987

DGMPRE Iraq Turnkey GLST - 132 kV DGMPRE 1986, 1987

DGMPRE Iraq Design, Supply

Materials - 132 kV DGMPRE 1986

EEA Egypt Turnkey GLST - 220 kV EEA 1986

EEA Egypt Design, Supply

Clamps & fittings, insulators - 220 kV

EEA 1986

DGMPRE Iraq Turnkey GLST - 400 kV DGMPRE 1985Public Corporation for Electric Power

South Yemen

Design, Erection

Wooden poles – 11, 33 kV

Ewbank 1984

Major Export ProjectsOther projects abroad

Page 60: Romelectro general presentation

Client Country Project Type

Scope of Supply Consulting Engineer

Year

Egyptian Electricity Authority (EEA)

Egypt Turnkey GLST - 220 kV EEA 1984

JEPCO Jordan Turnkey Spun concrete poles - 11, 33 kV

JEA and JEPCO 1984

Jordan Valley Authority Jordan Turnkey GLST - 33 kV Stanley Consultants Inc. + Harza Eng. (USA)

1983, 1984

DGMPRE Iraq Turnkey GLST - 63 kV DGMPRE 1983

West Regional Electric Power (WREP)

Iran Turnkey GLST - 63 kV Mahab Ghodss 1983

WREP Iran Turnkey GLST - 132 kV Mahab Ghodss 1983

Electricity Board of the States of Malaya

Malaysia Turnkey GLST - 132 kV Crown Agency 1983

Yarmouk University Jordan Turnkey GLST - 33 kV Preece, Cardew & Rider

1982

KWPA Iran Design, Supply

GLST - 132, 230 kV Motor Columbus 1982

Major Export ProjectsOther projects abroad

Page 61: Romelectro general presentation

Client Country Project Type

Scope of Supply Consulting Engineer

Year

Directorate General Of Minor Projects & Rural ElectrificationBaghdad ElectricityDistribution (DGMPRE)

Iraq Turnkey GLST - 33 kV DGMPRE 1981

JEPCO Jordan Turnkey GLST - 132 kV Ewbank (GB) 1981

Jordan Electricity Authority (JEPCO)

Jordan Turnkey GLST - 132 kV Preece, Cardew 1979

Azerbaidjan Regional Electric Co. (AREC)

Iran Turnkey GLST - 63 kV Mahab Ghodss 1978

TAVANIR Iran Turnkey GLST - 230 kV Motor Columbus (Switzerland)

1977, 1982

KWPA Iran Turnkey GLST - 230 kV Development & Resources

1975

Khuzestan Water and Power Authority (KWPA)

Iran Turnkey GLST - 132 kV Development & Resources (USA)

1975

Electricité du Liban Lebanon Turnkey GLST - 150 kV Surveillance de Geneve(Switzerland)

1975

Electricité du Liban Lebanon Turnkey GLST - 66 kV Lebanon Electricity 1972

Major Export ProjectsOther projects abroad