romelectro general presentation
TRANSCRIPT
Romelectro Presentationdiscover the
business power
Mission Standing for the Group’s ethical principles, our services’ quality and promoting the highest professional standards generate our clients’ appreciation. What makes us different in the energy and environment market are: our unique technological solutions already implemented, the integrated approach and our experts’ specializations and skills diversity. Flexibility and adaptation to current challenges represent our strengths. A group of powerful companies united by a common purpose “turning objectives into results”
Vision
Our Group members’ experience and tradition have gathered common valences:
Creativity, determination, cooperation, transparency; Trust, solidarity, honesty, integrity; Responsibility in inter-human relations and partnerships; Respect for the environment and the community
Values
1971 Romelectro is set up as the foreign trade company of the Ministry of Energy
1974-1978 First export works for dams and
OHTLs in Iran and Algeria
1980 Complex T&D contracts in Egypt, Iraq, Jordan, Lebanon, Malaysia
1982–1984 Turnkey works of Vafregan Dam in Iran
1990 Power T&D works in the Philippines and Thailand
1993 Romelectro is present in 19 countries
1994 Romelectro becomes a 100% private company
2004 Starting of the turnkey execution works for the Complex Hydro-development of Jiu Canyon, Bumbești–Livezeni Stretch
44 years at a Glance (1)
discover the business power
2005 Romelectro becomes major
shareholder in ISPE, CELPI and Electromontaj Carpaţi Sibiu, setting up Romelectro Group
2008 Romelectro becomes investor of Ecogen Energy Buzau and starts the Construction of a Combined Heat and Power Plant in Buzău
2009 Romelectro becomes investor of Voineasa Micro Hydro Power Plant
2007-2014 Romelectro develops environmental protection competencies (low Nox burners, Dense Slurry Systems, Flue Gas Desulphurisation)
2014 Romelectro signs the contract with Timisoara Municipality for first representative Waste to
Energy contract in Romania2014 Romelectro signed the contract for
Bradu 400/220/110/20 kV substation Refurbishing
2015 Romelectro signed the contract for Stejaru HPP Refurbishment
44 years at a Glance (2)
discover the business power
EPC Contractor, Project Developer and Investor in the fields of power and heat generation, power transmission & distribution, environmental protection and industry
Leader as consulting and engineering company in the field of power generation, power T&D, environmental protection and industry
Contractor for design, construction and testing for steel structures in the field of power T&D and telecommunication.
Contractor for construction and installation works for power Transmission and Distribution projects.
Romelectro Group structure
Roles on the market
• EPC Contractor • Investor • Project Developer • Strategic Partner• Electricity trader
About Romelectro
MARKET AREAS
Power Generation -Thermal
Environmental Protection
IndustryPower Generation - Hydro
Power Transmission and Distribution
About Romelectro
Romelectro offer
• Turn-key contracting• Studies, research and development• Technical consultancy• Commercial and institutional consultancy• FEED, Basic and detailed engineering• Equipment supplier• Installation and assembling services • Civil works• Site supervision and project management• Commissioning• Rehabilitation and modernisation programs
As Romelectro’s expertise over the years extends to most of the heat and power plants in Romania, we have the necessary competences, technologies, resources and know-how to answer to our clients’ needs for both green field projects and existing power plants.As investor and project developer, Romelectro transformed the existing power plant of Buzău into a modern Combined Heat and Power Plant, using high efficiency technology. References:• Complex rehabilitation, retrofitting and upgrading programs in the field of thermal power plants and cogeneration plants developed for more than 3,000 MW.• Engineering and design for more than 15,000 MW in conventional & nuclear power plants, representing 90% of the total installed capacity of Romania. • Projects for new facilities using both conventional fuels and renewable energy sources (biomass, biofuel, waste).
IndustryPower Generation Hydro
Environmental Protection
Power Trasmisson & Distrbution
Power Generation - Thermal
• As EPC Contractor, Romelectro is leading the complex development of the Jiu River on Bumbeşti–Livezeni stretch and the construction of two hydropower plants with an installed power of more than 60 MW.
• As investor and general contractor, Romelectro developed 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW.
• Romelectro carried out the feasibility studies for the Ramdane Djamel and Zaouia Dams (Algeria); detailed technical design for the Bougous and Bouhalloufa Dams (Algeria); turnkey execution of the Vafreghan Dam (Iran); execution of the El – Fakia (Algeria) and turnkey heightening of the Ksob Dam (Algeria).
• Recently Romelectro signed for the rehabilitation of Stejaru HPP 210 MW.
Power Generation - Hydro
Power Generation Thermal
Environmental Protection
Power Trasmisson & Distrbution
Industry
Power Generation - Hydro
Romelectro’s capabilities in the Power Transmission and Distribution field have been proved through the 45 years long hystory of domestic and international projects:
• Engineering for more than 22,000 km of OHTLs in Romania and about 10,000 km OHTLs (750 kV, 400 kV, 220 kV, 110 kV) km in countries like Iran, Iraq, Philippines, Jordan, Syria, Algeria or Malaysia
• Design, engineering, construction for more than 150 high voltage substations
• Grid connection studies for more than 30,000 MW of wind energy farms
• Strategies and forecasting studies for the National Power System
Power Generation Thermal
IndustryPower Generation Hydro
Environmental Protection
Power Transmission & Distribution
Power Generation Thermal
IndustryPower Generation Hydro
Power Trasmisson & Distrbution
Environmental Protection
In line with the environmental protection related goals set by the EU Energy 2020 Strategy and the EU Energy 2050 Roadmap, Romelectro promotes and implements the most advanced tehnologies: • Ash and slag removal and storage in dense slurry system: projects for 12
coal-fired boilers at Oltenia Energy Complex.
• Flue gas desulphurization at Ișalnița TPP.
• NOx emission reduction: projects for 14 gas-fired boilers at Galați CHPP, Iernut TPP, Progresu CHPP, București Vest CHPP and București Sud CHPP.
Energy efficiency in Industry
Romelectro takes over the whole chain from technical general audit to implementation, going through: Technical audit (thermal, electrical, utilities), Projects technical-economic analysis – opportunity, prefeasibility and feasibility studies, cost – benefit analysis, Business plan, Identifying financing/co-financing sources for investment, financial model, social, economic and environmental impact assessment, turn-key contracts.
We cover all energetic issuesFactory energy dispatcher • Energy management system• New power generation resources• Specific thermal, mechanical and electrical solutions• Electrical distribution system SCADA systems (electric/thermal power, water, natural
gas, heavy fuel oil etc) • DCS or PLC systems for process management• Process simulation systems • Security systems, Video - data - voice networks
Power Generation Thermal
Power Generation Hydro
Environmental Protection
Power Trasmisson & Distrbution
Industry
V
PROJECTS
FACTS AND FIGURES • 2 x 315 MW power units• 3317 ÷ 5543 mg/Nm³ rated
sulphur dioxide emission, estimated in the current operation
• 200 mg/Nm³ maximum SO₂ concentration after project implementation
• Wet desulphurization plant using limestone slurry
• 96% desulphurization efficiency
Ișalnița TPP - Flue gas desulphurisation systemPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Scope of the project: reducing the sulphur dioxide (SO₂) emissions, discharged together with the flue gas resulting from power units no. 7 and no. 8 at Ișalniţa TPP – SE Craiova – Oltenia Energy Complex.
The two plants are being executed identically, with the same type of equipment, delivered by the same suppliers.
Starting year: 2012Commissioning year: 2014Client: Oltenia Energy Complex – SE Craiova
Babcock Noell GmbH – Consortium Leader Romelectro – Consortium Partner Ispe – Engineering
Dense Slurry System at Turceni TPP
Turceni TPP is the largest coal fired producer, supplying more than 10% of the energy consumed in Romania.
Scope of the project: Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology. The new investment consists mainly of:
• two dense slurry preparation stations• bagger pumps replacement• dry ash transport installation• air compressor station• one wastewater treatment plant
Starting year: 2009Commissioning year: 2012Client: Turceni TPP
Romelectro: EPC Contractor
FACTS AND FIGURES• 4 × 330 MW units
• 4 × 155 t/h of dry solids (30 t/h bottom ash + 105 t/h fly ash + 20 t/h FGD gypsum)
• 5 × 450 kW + 1 × 250 kW
Atlascopco compressors
• 8 sets of Metso Mineral centrifugal pump grups
• CIRCUMIX continuous mixing technology
• 4900 m transport distance
• 24 m geodetic level difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Turceni TPP - Dense Slurry System
Dense Slurry System at Craiova II CHPP
Part of Oltenia Energy Complex, Craiova II CHPP
(2 × 150 MW) has a significant importance both for the Romanian power sector and for the city of Craiova, being the only heat producer both for population and strategic industrial consumers such as Ford automotive factory and other plants on the industrial platform. Scope of the project: Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening.
Starting year: 2008Commissioning year: 2010Client: Craiova II CHPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 2 × 150 MW power units (+8 district heating boilers)
• 2 × 86 t/h of dry solids• (6 t/h bottom ash + 60 t/h
fly ash + 20 t/h dry gypsum)• 1:1 water to solid ratio • CIRCUMIX continuous
mixing technology• 2 × 140 m3/h + 1 × 110
m3/h transport slurry lines • 3 sets of Feluwa hose
diaphragm slurry pumps for distance transport
• 9400 m transport distance• 90 m geodetic level
difference
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Craiova II CHPP - Dense Slurry System
Ișalnița TPP - Dense Slurry System
Part of Oltenia Energy Complex, Ișalnița TPP (2 × 315 MW) has a significant importance for the Romanian power sector being one of the largest power generation capacities operation in Romania.
Scope of the project: Increasing the stability of the slag and ash storage of SE Ișalnița, on the right and left banks of Jiu river, using dense fluid technology. The solution is designed to transform the existing heavily polluting ash handling system to match the eco-friendly dense slurry technology.
Starting year: 2008Commissioning year: 2010Client: Ișalnița TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 2 × 315 MW power units, 4 × 510 t/h boilers
• 4 × 77 t/h of dry solids (5 t/h bottom ash + 52 t/h fly ash + 20 t/h dry gypsum)
• CIRCUMIX continuous mixing technology
• 3 × 120 m3/h transport slurry lines – 1 ash field
• 4 sets of Warman centrifugal pump groups
• 3 pumps/group for distance transport
• 4600 m transport distance• 45 m geodetic level
difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Rovinari TPP - Dense Slurry System
The second largest coal fired producer in Romania, with an installed power of 1320 MW (4 x 330 MW), Rovinari TPP supplies about 9% of the total electricity generated on the local market.
Scope of the project: New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW)
Starting year: 2008Commissioning year: 2010Client: Rovinari TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 4 x 330 MW units
• 4 x 190 t/h at dry solids (30 t/h fly bottom ash + 127 t/h fly ash + 33 t/h dry gypsum)
• CIRCUMIX continuous mixing technology
• 4 x 270 m3/h transport slurry lines
• 4 sets of Warman centrifugal pump groups
• 7000 m transport distance• 32 m geodetic level
difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Galați CHPP Low NOx (1)
Scope of the project: : Modernization and retrofitting of firing systems of 4 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS.
For each of the C6, C7 and C8 steam boilers , the new installation consists of:
• 6 low NOx mixed burners for heavy fuel oil and natural gas• a new modern system for heavy fuel oil and natural gas supply• a new BMS (Burner Management System) unit• a new DCS (Distributed Control System) unit• emission monitoring system• methane leakage monitoring system
PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 4 x 420 t/h steam boilers
• 6 x 53 MW mixed heavy fuel oil – natural gas low NOx burners/boiler body (for C6, C7 and C8)
• 6 x 53 MW natural gas low NOx burners/boiler body (for C5)
Galați CHPP Low NOx (2)
For C5 steam boiler, the new installation consists of:
• 6 low NOx burners for natural gas• 8 low NOx burners for blast furnace gas• a new modern system for natural gas supply• a new modern system for blast furnace gas supply• a new BMS (Burner Management System) unit• a new DCS (Distributed Control System) unit• emission monitoring system• methane leakage monitoring system
Starting year: 2008Commissioning year: 2013Client: Electrocentrale Galați
Romelectro: EPC Contractor
PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 8 x 21 MW blast furnace gas low NOx burners /boiler body
• BMS type SIL3, failsafe, double redundant /boiler body
• DCS type Ovation /boiler body
Iernut TPP - Low NOx
Scope of the project: modernization and retrofitting of firing systems of 4 x 320 t/h natural gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS. For each boiler, the new installation consists of:
• 10 low NOx burners • a new modern system for natural gas supply• a new BMS (Burner Management System) unit• upgrading and extension of existing DCS for integration of new BMS• emission monitoring system• methane leakage monitoring system
Starting year: 2009Commissioning year: 2011Client: ELCEN București
Romelectro: EPC Contractor
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 2 x 215 MW units
• 2 x 640 t/h (4 x 320 t/h) steam boilers type PK-47-2
• 10 x 30 MW low NOx burners / boiler body
• BMS type SIL3, failsafe, triple redundant / boiler body
FACTS AND FIGURES • 2 x 420 t/h steam boilers• 4 ESP casings are to be
fitted with new inner instalation components
• 400 mm collecting electrodes spacing optimised design
• 24 new high-performance 120 kW power transformers with high-frequency technology to supply high voltage to the retrofitted ESP’s
• 2 new improved ESP monitoring and control systems
• 48 mg/Nm³ maximum dust emissions at ESP’s outlet, after project completion
Govora CHPP - Electrostatic precipitators modernization PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Govora CHPP is the only thermal energy producer for Râmnicu-Vâlcea area in Romania. It is also the only steam supplier for Râmnicu Vâlcea industrial platform and it can deliver power to the national power grid.
Scope of the project: Modernization of the electrostatic precipitators for boilers no. 5 and no. 6 at Govora CHPP, aiming to reduce the level of dust emissions at maximum 48 mg/Nm3 at ESP’s outlet.
Starting year: 2012Commissioning year: 2013Client: Govora CHPP
Romelectro – EPC ContractorTechno Montaj – Mechanical erectionIcpet Eco – Engineering and design
FACTS AND FIGURES
• 4 x 420 t/h steam boilers
• min 121% power efficiency calculated according to the “Waste Directive”
• min 5.64 Mwe installed electric power
• min. 86% boiler efficiency
• Noxious emissions at the stack - according to Directive 2008/98/EC
• 87000 tons/year - estimated quantity of fuel to be processed
Timișoara TPP - Waste-to-Energy PROJECTS > THERMAL POWER
It is the first major project in Romania in the field of Waste-to-Energy, according to the National Waste Management Strategy, included in the Waste Management Plan
This project proposes the execution of an alternative fuel incineration plant, fuel resulting from the sorting process of municipal waste and generation of electricity and heat.
Objectives: - Discarding the sorted waste by conversion of the resulting alternative fuel into energy, by means of a high efficiency cogeneration plant; - Reducing the methane gas consumption by replacing it with this alternative fuel, the result being approximately 16 million m3/year.
Starting year: 2013Commissioning year: 2016Client: International Recycling Energy Romelectro – Consortium Leader Baumgarte Boylers Systems GmgH – Consortium PartnerISPE – General Designer
PROJECTS > THERMAL POWER
Rovinari TPP unit 4 Modernization of Electric and Automation Installations
• The executed works provided an efficient operation of Power Unit No. 4, in safe and highly reliable conditions. Moreover, the requirements related to the environmental legislation shall also be achieved in operation.
• Full replacement of the 6 and 0.4 kV substations, the DC substations, rectifiers, inverters, and 24 and 220 V DC stationary batteries, digital protections for the power unit, static excitation, substation and IT aggregates for the electrostatic precipitators, DCS – Distributed Control System, firing control system, measurement loops in the boiler and machinery halls, Governor control system of the steam turbine and boiler feed pump turbine.
• ROMELECTRO, acting as Consortium Leader had to identify the best technical solutions and harmonization of the delivered equipment with the existing or refurbished installations.
Starting year: 2013Commissioning year: 2014Client: Complexul Energetic Oltenia – Rovinari TPP Co
PARTNERSHIPRomelectro – Consortium LeaderSAEM Energomontaj IEA – Consortium Partner ISPE – Engineering and Design
Investment for Combined Heat and Power Plant in BuzăuPROJECTS › CONGENERATION
As investor and general contractor, Romelectro developed the project transforming the existing power plant of Buzău into a modern combined heat and power plant, using high efficiency technology.
The new generation capacity is operated by the Special Purpose Vehicle (SPV) created on the basis of private–public joint venture.
Starting year: 2008Commissioning year: 2009Client: Ecogen Buzău (IPP)
Romelectro: Investor, EPC Contractor
FACTS AND FIGURES
• Inhabitants of Buzău City: ~150,000
• Length of primary district heating system: ~26 km
• Length of secondary district heating system: ~56 km
• Total number of apartments: ~35,000
• Number of apartments supplied: ~21,000
Buzău CHPP - Investment for Combined Heat and Power PlantPROJECTS > THERMAL POWER
Complex Hydro-Development of Jiu ValleyPROJECTS › HYDROPOWER
As EPC Contractor, Romelectro executes the complex development of the Jiu River on Bumbești–Livezeni stretch and the construction of two hydropower plants (Dumitra and Bumbesti) with an installed power of approximately 60 MW and Livezeni dam. This project represent the most important investment in Romania in hydropower field after 1990.
Starting year: 2004Commissioning year: 2013 (Dumitra HPP), 2014 (Bumbești HPP) Client: Hidroelectrica
Romelectro: EPC Contractor, Consortium Leader Hidroelectrica and ISPH: Consortium Partners
Jiu Canyon - Complex Hydro-Development PROJECTS > HYDROPOWER
Rehabilitation of Voineasa Micro Hydro Power PlantPROJECTS › HYDROPOWER
Romelectro became the owner of the hydro power capacity on Mănăileasa River in 2006. As investor and EPC Contractor, in 2009 Romelectro started the works for the complete rehabilitation of Voineasa MHPP, creating a new and efficient capacity for harvesting the renewable potential of Mănăileasa River.
Scope of the project: developing the 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW by replacing the old generation capacities with new hydro-mechanical and electrical equipment.
Starting year: 2009Commissioning year: 2011
Romelectro: Investor and EPC Contractor
Voineasa Micro Hydro Power Plant RehabilitationPROJECTS > HYDROPOWER
Complex Hydro-Development of Jiu Valley
Scope of the project: Romelectro is leading for 6 years in a row the turn key project CHE Stejaru Rehabilitation - “Hydropower Romanian School”.
Starting year: 2015Commissioning year: 2021
Romelectro: EPC ContractorThe Hydropower, the central point of the Complex Landscaping of the Bistrita River, with an installed capacity of 210 MW and over 50 years of functioning, summing up over 1.000.000 working hours, is preparing for the implementing of some state-of-the-art solutions, that will assure a high level of availability and security for at least the following 30 years.
Client: HidroelectricaRomelectro: General Contractor, Consortium LeaderLitostroj Power Slovenia: Consortium Partner
Stejaru HPP RehabiliationPROJECTS > HYDROPOWER
Refurbishment of the 400/110 kV Brașov Substation
The 400/110 kV electrical substation in Brașov has a particular importance for the National Power System and for the local grid. It represents a junction for power lines connecting Muntenia, South Transylvania and the poorly covered Moldovian area. The substation supplies the local consumption area (around 167 MW) being also the connecting point for Brașov TPP.
Scope of the project: upgrading of the primary and secondary circuits in the 400/110kV substation, by full refurbishing. The purpose is to complete a new 400 kV outdoor electrical substation, equipped with the modern high-performance conventional installations, as well as a new indoor 110 kV electrical substation, equipped with SF6 insulated installations (GIS cells).
Starting year: 2010Commissioning year: 2013Client: Transelectrica
Romelectro: EPC Contractor, Consortium LeaderCG Holdings Belgium NV: Consortium PartnerISPE: Engineering and designElectromontaj Carpați Sibiu: Erection and commissioning works
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
400/110 kV Brașov Substation Refurbishment PROJECTS > POWER TRANSMISSION & DISTRIBUTION
PROJECTS › POWER TRANSPORT & DISTRIBUTION
Scope of the project:
• replacing the existing primary switch gear • replacing the AT 400 MVA• modernising the internal services • introducing the numerical and SCADA protections and control systems - it is now possible for the substation to be fully remote-controlled by means of the (territorial and national) dispatch • retrofitting works on the drainage and sewage system • modernising the heating, climatising, security as well as the fire extinction system.
Starting year: 2004Commissioning year: 2006Client: Transelectrica – Cluj Subsidiary
JACOBSEN Elektro As (Norway): Consortium Leader Romelectro: Local Partner
400/220 kV Roşiori Electrical Substation RetrofittingPROJECTS > POWER TRANSMISSION & DISTRIBUTION
PROJECTS › POWER TRANSPORT & DISTRIBUTION
Modernization of Electrical Substations PROJECTS > POWER TRANSMISSION & DISTRIBUTION
• Refurbishment of the 220/110 kV Barboși Substation
• Refurbishment and modernization of 110 kV and 220 kV bays in FAI Substation
• Extension and modernization of the 110/20 kV Dumbrava - Sibiu Substation
• Primary equipment upgrade in the 110/20 kV Petrila Substation • Refurbishment of the 220/110/20 kV Turnu Măgurele Substation• Upgrade of the 110 kV bays in HPP Ciunget Substation• Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP
• Modernization of the 110 kV Electrical Substation of Govora HPP
• Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation • Modernization of the 220/110 kV Vetiş Electrical Substation
PROJECTS › POWER TRANSPORT & DISTRIBUTION
BARBOSI ELECTRICAL SUBSTATION 220/110kVPROJECTS > POWER TRANSMISSION & DISTRIBUTION
In 2013, Romelectro began the works for refurbishing the Barbosi substation, consisting of:•Replacing the existing primary equipment in the substation due to their old age (over 30 years of operation);•Replacing the existing protections with modern digital protections;•Introducing the central control system (SCADA) so that the substation will operate with no personnel;•Increasing the safety in operation of the substation for both the electricity supply of the 0 (zero) degree consumer - Arcelor Mittal Galati and the wind electricity transit in the Dobrogea area towards the Moldova area through 220kV Lacul Sarat-Filesti OHTL in the 220kV Barbosi Substation - 220kV Focsani Vest OHTL.
CLIENT: Transelectrica – ST Constanta
PROJECT STARTING YEAR: 2013PROJECT COMPLETION YEAR: 2014
PARTNERSHIP:Romelectro: EPC Contractor, Consortium LeaderElectromontaj Carpati Sibiu: Consortium Partner
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: to connect the Dumeşti and Românești Wind Farms to the National Power Grid through a new 110 kV line cell executed in the 220/110 kV FAI Substation
The characteristics of this projects are:• mounting of new 110 kV cell in the FAI substation, required to connect the new user;• mounting the control and protection equipment in the FAI substation for the new 110
kV cell in Dumeşti Wind Farm;• providing a measurement group in the 110 kV FAI transformer station to meter the
electricity consumed /generated by the user;• providing the equipment to monitor the quality of the electricity for the new 110 kV
cell in Dumeşti Wind Farm.
Starting year: 2013Commissioning year: 2014Client: Transelectrica
Romelectro: EPC Contractor
Connection of 99 MW Dumești and 30 MW Românești Wind Power Plants to the National Power Grid
Refurbishment of the 400/110 kV Brașov Substation
The 400/220/110 kV Bradu Substation is of special importance for the National Power Grid and also for Pitești and Rîmnicu Vâlcea areas. It represents an important connection point of the Muntenia and Oltenia networks with the one in Transylvania.
The main refurbishing works shall consist in:• refurbishment of the 400 kV Substation, 220 kV Substation, 110 kV Substation and
of 20 kV Substation • procurement and mounting of 2 x 400/400/80 MVA, 400/231/22 kV autotransformers • procurement and mounting of 2 x 200/200/60 MVA, 231/121/10,5 kV
autotransformers• procurement and mounting of 2 x 16 MVA, 110/20 kV transformers• control – protection (SCPA) and metering system• remote protection and telecommunication systems• refurbishing the DC and AC internal services installation • constructions and architecture works • achieving the 400 kV Țânțăreni OHTL connection
Starting year: 2014Commissioning year: 2018Client: Transelectrica
Romelectro: EPC Contractor
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Refurbishment of the 400/220/110 kV Bradu Substation PROJECTS > POWER TRANSMISSION & DISTRIBUTION
Grid Connection of the Green Field 800 MW CCGT BraziPROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: the (400)/220/110 kV Banca Substation was conceived to evacuate in National Power Grid a power of approximately 406 MW generated by Ivesti, Falciu 1 and Falciu 2 Wind Farms.
The characteristics of this projects are:• execution of a (400)/220/110 kV transformer substation• connection of the transformer substation in 220 kV DC Gutinaș-FAI and Gutinaș-
Munteni OHTL (belonging to Transelectrica-ST Bacău) by means of an approximately 0.3 km 220 kV DC OHTL
• regulating the coexistence of the 110 kV Bârlad- Roșiești OHTL (belonging to EoN Moldova) to the 220 kV OHTL in the Banca Substation;
Starting year: 2012Commissioning year: 2013Client: Transelectrica
Romelectro: EPC Contractor
Connection of 300 MW Ivești, 88 MW Falciu 1 and 18 MW Falciu 2 Wind Power Plants to the National Power System through the new (400)/220/110 kV Banca Substation
Grid Connection of the Green Field 800 MW CCGT BraziPROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: supplying and installing two new Overhead Transmission Lines in order to connect the Green Field 860 MW CCGT (Combined Cycle Gas Turbine) Brazi to the National Power System.
Starting year: 2008Commissioning year: 2010Client: OMV Petrom
Romelectro: EPC Contractor
FACTS AND FIGURES
Connection point: 400/220/110 kV Brazi West Substation
Length: 3 km Voltage level:
• 400 kV for the double circuit DONAU type towers
• 220 kV for the simple circuit RODELTA type towers
Distance between the axes: 80 m
Grid Connection of the Green Field 860 MW CCGT Brazi PROJECTS > POWER TRANSMISSION & DISTRIBUTION
44 Years of Sustainable Development on Domestic and International Markets
Project Client Contract performance period
Execution of a Waste-to-Energy Plant and incorporating it within Timișoara Sud TPP
International Recycling Timișoara (IRE)
2014 – 2016
Rehabilitation and modernization of 330 MW Power Unit No. 4 operating on lignite in SE Rovinari; Modernization of the electric power and automation plants
Oltenia Energy Complex –SE Rovinari
2014 – 2014
Process water supply installation for the desulphurization plants related to power units no. 4 and 5
Oltenia Energy Complex – SE Rovinari
2014 – 2014
Execution of works for taking over the gypsum slurry from the flue gas desulphurization plant of unit no. 4 to the dense slurry plant related to unit no. 3
Oltenia Energy Complex – SE Rovinari
2014 – 2014
Automation Works - Interconnection of the dense slurry plant to the dry ash collecting and taking over plant of Cenextra related to the project: "Ash collecting, transport and automatic loading plant, unit no. 3
Oltenia Energy Complex – SE Turceni
2014 – 2014
Rehabilitation / Modernization of the electrostatic precipitator in power unit no. 7, execution and connection of the gas circuit between power unit no. 7 and desulphurization plant no. 6
Oltenia Energy Complex – SE Turceni
2014 – 2014
Interface execution between the dense slurry plant and the desulphurization plant
Oltenia Energy Complex –SE Turceni
2012 – 2014
Flue gas desulphurization plants for power units no. 7 and no. 8 at Ișalniţa TPP
Oltenia Energy Complex –SE Craiova
2012 – 2014
Modernization of the excitation system and protections of Unit 7 generator in Ișalnița TPP
Oltenia Energy Complex – SE Craiova
2012 - 2014
Electrostatic precipitators modernization at Govora CHPP Govora CHPP 2012 – 2013
Projects in Romania THERMAL POWER PROJECTS
Projects in Romania
Proiect Client Contract performance period
Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology
Oltenia Energy Complex –SE Turceni
2009 – 2012
Modernization and retrofitting of firing systems of4 x 320 t/h gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS
ELCEN BucureștiIernut TPP
2009 – 2011
Modernization and retrofitting of firing systems of 5 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS
Electrocentrale GalațiGalați CHPP
2008 – 2013
Investement for Combined Heat and Power Plant of 6 MWe and 80 Gcal in Buzău
Ecogen Buzău (IPP) 2008 – 2009
Increasing the stability of the slag and ash storage of Ișalnița (2 x 315 MW), on the right and left banks of Jiu river, using dense fluid technology
SE CraiovaIșalnița TPP
2008 – 2010
Refurbishment and upgrade of electrical and automation installation for 330 MW unit no. 6 at TPP Rovinari
SE Rovinari 2008 – 2010
New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW)
SE Rovinari 2008 – 2010
Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening
SE CraiovaCraiova II CHPP
2008 – 2010
Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP - boiler 2
ELCEN București Progresu CHPP
2007 – 2007
THERMAL POWER PROJECTS
Projects in Romania
Projects in Romania
Project Client Contract performance period
Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP, boilers 3 and 4
ELCEN București Progresu CHPP
2006 – 2007
Rehabilitation and modernizing of 315 MW unit no. 7 in Işalniţa TPP SE CraiovaIșalnița TPP
2005 - 2006
Rehabilitation of the firing installations for 525 t/h steam boiler no.2 in Bucureşti Vest CHPP and no. 5 and 6 in Bucureşti Sud CHPP, by replacing with modern low NOx burners
ELCEN București 2004 – 2006
Refurbishment of 330 MW units no. 4 and 5 in Turceni TPP (Program A3)
Turceni TPP 1995 – 2003
Refurbishment of 330 MW units no. 3 and 7 in Turceni TPPand no. 5 and 6 in Rovinari TPP (Program A2)
Turceni TPPRovinari TPP
1994 – 1998
Refurbishment of 330 MW units no. 2 and 6 in Turceni TPPand no. 3 and 4 in Rovinari TPP (Program A1)
Turceni TPPRovinari TPP
1991 - 1994
Projects in Romania
HIDRO POWER PROJECTS
Project Client Contract performance period
Hydropower development of the Jiu River on the Livezeni – Bumbeşti strech, with the execution of 2 hydropowerplants with an installed power of 60 MW
Hidroelectrica 2004 – 2014
Rehabilitation of Voineasa Micro Hydro Power Plant, Voineasa I, II, III
Romelectro 2009 – 2011
THERMAL POWER PROJECTS
Projects in Romania
Proiect Client Contract performance period
Rehabilitation of the 400/220/110/20 kV Bradu Substation Transelectrica 2014 - 2018
Switching to a 400 kV voltage of the Porțile de Fier – Reșița – Timișoara – Sacalaz – Arad axis/Stage I: Extension of the 400 kV Porțile de Fier Substation
TranselectricaCraiova Subsidiary
2013 - 2015
Rehabilitation of the 220/110 kV Barboși Substation Transelectrica 2012 - 2014
Turnkey (400)/220/110 kV Banca Substation Transelectrica 2012 - 2013
Refurbishment of the 400/110 kV Braşov Substation Transelectrica 2010 – 2013
Refurbishment and modernization of the 110 kV and 220 kV bays in FAI Substation
TranselectricaBacău Subsidiary
2007 - 2011
Extension and modernization aiming to increase the safety in operation of the 110/20 kV Dumbrava Sibiu Substation
Electrica TransilvaniaSud
2007 – 2009
Primary equipment upgrade in the 110/20 kV Petrila Substation
Transelectrica 2007 – 2007
Refurbishment of the 220/110/20 kV Turnu Măgurele Substation
Transelectrica 2006 - 2011
Modernization of the protection systems of 250 MVA transformer and 110 kV PDB in 400/110 kV Braşov, Dârste, Domneşti, Medgidia Sud, Pelicanu, Tulcea Vest, Smârdan, Drăgăneşti Olt Substations
Transelectrica 2006 – 2009
Upgrade of the 110 kV bays in HPP Ciunget Substation HidroelectricaRâmnicu Vâlcea Subsidiary
2006 – 2008
Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP
HidroelectricaRâmnicu Vâlcea Subsidiary
2006 - 2007
ELECTRICAL SUBSTATIONS
Projects in Romania
Projects in Romania
Proiect Client Contract performance period
Modernization of the 110kV Electrical Substation of Govora HPP HidroelectricaRâmnicu Vâlcea Subsidiary
2006 – 2007
Turnkey refurbishment of the 110/10 (20) kV Bucureşti Centru Substation
Electrica Muntenia Sud
2005 – 2007
Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation
Transelectrica 2005 – 2005
Refurbishment of the 400/220 kV Roşiori Electrical Substation TranselectricaCluj Subsidiary
2004 – 2006
Modernizing works at the 220/110 kV Vetiş Electrical Substation TranselectricaCluj Subsidiary
2004 – 2006
Turnkey modernization of the 110/20 kV Electrical Substation Borsec
Electrica Transilvania Sud 2003 – 2005
Turnkey modernization of the 110/10 kV Cluj Centru Electrical Substation
Electrica Transilvania Nord 2003 - 2004
Turnkey refurbishment of the 6(20) kV Fileşti – Galaţi connection Substation
Electrica Muntenia Nord 2002 – 2003
ELECTRICAL SUBSTATIONS
Projects in Romania
Projects in Romania
Proiect Client Contract performance period
Connection to the Electricity Transmission Network of 99 MW Dumești Wind Farm and 30 MW Românești Wind Farm, by executing a 110 kV line cell in the 220/110 kV Fai Substation
TranselectricaBacau Subsidiary
2013 - 2014
Coexistence conditions between the existing 110 kV Bârlad – Roșiori OHTL and new 220 kV OHTL connections for the (400)/220/110 kV Banca Substation for connecting 300 MW Ivești, 88 MW Falciu and 18 MW Falciu 2 Wind Farms to the electric grid
Transelectrica 2012 - 2013
Top overhaul of 400 kV Mintia-Sibiu OHTL Transelectrica 2011 - 2014
Rehabilitation of the 220 kV OHTL Lotru - Sibiu Transelectrica 2007 – 2010
400 kV OHTL Oradea – Nadab – Békéscsaba, new interconnexion line with Hungary
Transelectrica 2006 – 2008
Rehabilitation of the 400 kV Bucureşti South – Gura Ialomiţei OHTL
Transelectrica 2006 - 2007
Execution of 220kV and 400 kV connections of Iernut Substations
Transelectrica 2005 – 2006
Emergency works of the Sibiu – Țânțăreni 400 kV OHTL Transelectrica 2005 – 2005
Rehabilitation of 220 kV Brazi Vest – Târgovişte OHTL Transelectrica 2004 - 2005
Improving the dispatcher transmission system by executing the interconnecting of the data transmission system between the National Dispatch Centers in Romania and Bulgaria
Transelectrica 2003 – 2004
Rehabilitation of 220 kV Borzeşti – Gutinaş OHTL Transelectrica 2003 – 2003
Projects in Romania OVERHEAD TRANSMISSION LINES
Projects in RomaniaMajor Projects in AsiaPHILIPPINES
THAILAND
Project Client Contract performanceperiod
138 kV Compostela - Banilad OHTL Technical specification: Foundation pads and chimneys, double triangle hot zinc plated poles, active 2xACSR 400 mm2 Condor conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors.
National Electric Power Corporation (NPC)
1994 – 1999
230 kV Talisay - Compostela OHTL Technical specifications:Foundation pads and chimneys, double triangle hot zinc-plated poles, active ACSR 772 mm2 MARTIN conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors.
National Electric Power Corporation (NPC)
1994 – 1999
Project Client Contract performanceperiod
230 kV OHTL Phuket Junction - Phuket 2Technical specifications:Foundation pads and chimneys, double triangle hot zinc plated poles, active 795 MCM ACSR/AW phase conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors.
Electricity Generating Authority of Thailand (EGAT)
1998 – 2002
230 kV OHTL Phangnga - Phuket 2 Technical specifications:Foundation pads and chimneys, double triangle hot zinc plated poles, active 2x1272 MCM ACSR/AW PHEASANT conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors.
Electricity Generating Authority of Thailand (EGAT)
1998 – 2000
Projects in RomaniaMajor Projects in Middle EastJORDANProject Client Project
completion date
D.C Bayader - Amman - Quatrana - Ghar Safi - Ma’an 132 kV OHTL (310 km)
Jordan Electric Authority
1982
D.C. Ma’an - Aqaba and Amman – Sahab 132 kV OHTL (210 km)
Jordan Electric Authority
1984
D.C. Irbid - Yarmouk University 33 kV OHTL (12 km) Yarmouk University 1984
D.C. Subeihi - 33kV OHTL King Talal dam (11 km) Yarmouk University 1986
D.C. Irbid - Wadi Arab 33 kV OHTL (25 km) Jordan Electric Authority
1986
846A JEPCO – Bringing electricity to 14 villages Jordan Electric Power Company
1986
Zarqa – Sabha 132 kV OHTL (40 km) National Electric Power Corporation
1995
25 / 84 – 33 kV and 11kV Medium Voltage OHTL (160 km) Jordan Electric Authority
1987
D.C. Ma’an - Esheidiyeh - Kharrana - Azraq - Rishah 132kV OHTL (327 km)
Jordan Electric Authority
1988
Queen Alia International Airport – Sweima 132 kV OHTL (38 km)
National Electric Power Corporation
2000
Subeihi - Waqqas 132 kV OHTL National Electric Power Corporation
2005
Projects in RomaniaMajor Projects in Middle EastIRAQProject Client Project
completion date
33 kV S.C. OHTL (Northern Area – 210 km; Central Area – 220 km; Western Area – 400 km)
General Rural Electricity Department
1984
33 kV S.C. OHTL (Baghdad Area – 90 km) Baghdad Electrical Distribution
1986
400 kV D.C. OHTL Musaiyb - Baghdad South Musaiyb – Babylon (87.5 km)
Major Electrical Projects Implementation Department
1988
400 kV D.C. OHTL Babylon – Qadisiya (101.5 km) Major Electrical Projects Implementation Department
1988
D.C. Tuba – 6.9 km; Hammar – 7.5 km; 132 kV OHTL; Ramadi – 11.1km Samadiya – 1.8 km; Mashtel – 0.4 km; Annah – 2.4 km
Major Electrical Projects Implementation Department
1989
D.C. Arbil – Dokan 132 kV OHTL (83.8 km) Major Electrical Projects Implementation Department
1989
132 kV D.C. OHTL Darbandikhan - Sulaimaniya 111.5 km (Kirkuk Industries – 5 km; Tarmia - 14.8 km, Musaiyb - 42.2 km)
Major Electrical Projects Implementation Department
1989
Projects in RomaniaMajor Projects in Middle EastELECTRIC TRANSFORMERS & DISTRIBUTION SUBSTATION
TECHNICAL ASSISTANCE, CONSULTING & EQUIPMENT SUPPLY
Project Country Client Contract performanceperiod
Sheich Said -(Aleppo) Syria Sheich Said – Aleppo Cement Factory
1975 - 1977
Al Quaim Cement Plant 2X34 MVA; 33/6.6 kV Iraq Ministry of Industry and Minerals
1982– 1985
Sinjar Cement Plant S/S Iraq Ministry of Industry and Minerals
1982 – 1985
AL Quaim Limestone Quarry S/S Iraq Ministry of Industry and Minerals
1994 – 1999
Project Country Client Contract performanceperiod
Technical assistance and consulting on operating and repairing equipment
Kuwait Ministry of Energy and Water 1991 - 1999
Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company
1998– 1998
Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company
1999 – 1999
Technical assistance and consulting on operating and repairing equipment
United Arab Emirates (Abu Dhabi)
Technical assistance and consulting on operating and repairing equipment
1999 – 2001
Projects in RomaniaMajor Projects in Middle EastIRAN
Turnkey execution of the Vafregan damShort description of the objectiveArch-shaped concrete dam, having an accumulation volume of 230 million cubic meters, which has been built with a view to ensuring water supply for the city of Saveh and also, to providing irrigation to an area of nearly 60.000 ha. At the same time, a hydroelectric plant has been built, having an overall installed capacity of 11 MW.
ClientTeheran Regional Water Board (TRWB)
LocationIran, 200 km south of Teheran
Project completion date1992
PartnershipRAH VA SAHTEMAN (MOLAVI) Teheran - associate partner
Projects in RomaniaMajor Projects in North AfricaALGERIA
Feasibility studies for the RAMDANE DJAMEL and ZAOUIA dams. Expertise of the Technical Project for the dams BOUGOUS and BouhalloufaDescriptionThe core business of the contract consisted of Romelectro conducting the projects for the Ramdane Djamel and Zaouia dams in the Feasibility Study stage.
According to the Special Prescription Book, the services were provided in the following 5 stages:Stage 1: Defining the options and the reconaissance programStage 2: Hydrological studyStage 3: Geological and geo-technical studyStage 4: Solution studyStage 5: Feasibility study and bid documents
Also, for the same client, Agence Nationale des Barrages et Transfert (ANBT), the expertise of the technical project for Bouhalloufa and Bougous was conducted. The core business of the contract was for the APD study expertise to be conducted APD according to the Special Prescription Book.
Project starting dateNovember 2002 (Ramdane and Zaouia)May 2001 (Bougous)April 2002 (Bouhalloufa)Project completion dateNovember 2003 (Ramdane and Zaouia)April 2002 (Bougous)September 2002 (Bouhalloufa)
Projects in RomaniaMajor Projects in North AfricaALGERIA
EL-Fakia dam executionShort description of the objectiveDam made of rock blocks piles endowed with a clay core, 49 m high and a 390m crown, which has been built with a view to ensuring water supply for the city of M’Sila and also, to irrigating80.000 ha of farm land.
Client: Directorate for Hydraulic Projects and Works (DHPW)Location: Algeria, 30 km from M’SilaProject completion date: 1985
SONAGHTER - associate local partnerTurnkey heightening of the Ksob damShort description of the objectiveRomelectro has conducted the works aimed at heightening the existing dam by 10m by means of a turnkey contract. It is a complex project which has called for rock excavations of over 37.000 cm,casings of over 100.000 mp and nearly 2.500 tones of metallic partners.
Client: Directorate for Hydraulic Projects (DHP)Location: Algeria, Pre-Sahara area, 30 km from the city of M’SilaProject completion date: 1976
SONAGHTER -associate local partner
1. Performance of studies, designs and technical assistance
Morocco Sidi - Benour SubstationKenya Kinogoni Mining Complex SubstationChina Sini - Veni TPPPeru various locations
2. Turnkey projects:Bangladesh 21 sets of 33/11 kV 2.5 and 5 MWA transformer substations
25 sets of 11/0.4 kV 100-200 kVA transformer substationsPakistan The Lasbella 132/63 kV 2x25 MWA transformer substationIraq The Al Qaim 33/6.6 kV 2x34 MWA + 132/6.6 10 MWA transformer substation
The Sinjar 33/6.6 kV 3x34 MWA transformer substation
Transformers and Distributions Substations
Other projects abroad
Client Country Project Type Scope of supply Consulting Engineer
Year
JEPCO Jordan Turnkey GLST - 132 kV T/L NEPA 2000
NAPOCOR Philippines Turnkey GLST, assembling elements - 500 kV
Edwin Ladingnon
2000
Intracom SA Greece, Intrarom SA Romania
Romania Supply Hot dip galvanised tubular steel antenna towers - 30, 50 m high
Intrarom SA
2000
NMTC Kuwait Turnkey Lattice steel antenna towers - 70 m high
NMTC 2000
Hayat Kuwait Supply Lattice steel antenna towers - 64 m high
NMTC 2000
NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae- 40, 75, 100 m high
MTCo 2000
NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae- 25, 30, 40, 75 m high
MTCo 1999
MEM Peru Design,Testing,Supply
GLST - 220 kV MEM 1999
JEPCO Jordan Turnkey GLST, assembling elements - 132 kV
NEPA 1998
Other projects abroad
Major Export ProjectsClient Country Project Type Scope of Supply Consulting
EngineerYear
MEM Peru Design,Testing,Supply
GLST - 138 kV MEM 1998
ONUR CIVATA Turkey Supply Fittings 1998
JEPCO Jordan Supply,Erection
GLST - 132 kV NEPCO 1998
Consorcio GyM Cosapi Peru Supply GLST - 220 kV MEM 1998
Consorcio Cosapi-Abengoa
Peru Supply GLST - 220 kV MEM 1998
Consorcio Cosapi-Balarezo
Peru Supply GLST - 138 kV MEM 1998
EGAT Thailand Design,Testing,Supply
GLST, assembling elements - 115, 230 kV
EGAT 1997
MEM Peru Design,Testing,Supply
GLST, assemblingelements - 60-138 kV
MEM 1997
Mobifon Romania Supply Hot dip galvanized lattice steel towers fortelecommunications- 40 m high
MOBIFON 1997
Other projects abroad
Client Country Project Type
Scope of Supply Consulting Engineer
Year
National Mobile Telecommunication Co. (NMTC)
Kuwait Supply Steel lattice towers for antennae - 70 m high
MTCo 1997
TREC Iran Design,Testing,Supply
GLST, assembling elements - 230 kV
Moshanir 1997
EEA Egypt Supply Fittings EEA 1997
NAPOCOR Philippines Turnkey GLST - 138, 230 kV Sweed Power & EEDD-NPC
1997
Public Establishment for Distribution and Exploitationof Electric Energy
Syria Supply Gantry towers for transformer station,clamps & fittings - 66/20 kV
PEDEEE 1996
National Electric Power Authority
Nigeria Supply GLST, lighting poles, gantry towers for132/33 kV substation
NEPA 1996
Avangan Iran Design,Testing
GLST - 230 kV Moshanir 1996
Ministry of Energy and Mines (MEM)
Peru Supply GLST - 60 kV MEM 1995, 1996
National Power Corporation (NAPOCOR)
Philippines Turnkey GLST, clamps, fittings, composite insulator strings, power conductors, OHGW, OPGW - 132, 230 kV
Sweed Power 1995
Major Export ProjectsOther projects abroad
Client Country Project Type
Scope of Supply Consulting Engineer
Year
Power Generation and Transmission Co. - Ramin
Iran Design, Testing, Supply
GLST, assembling elements - 230 kV
Ghods Niroo 1995
K.E.SH. - Tirana Albania Supply Clamps & fittings - 132 kV
K.E.SH. 1995
Moshanir P.E. Co. Iran Design,Testing
GLST - 230 kV Moshanir 1995
Tavanir Iran Design,Testing
GLST - 63 kV MATN 1995
TREC Iran Design, Testing, Supply
GLST - 400 kV Moshanir 1993
TREC Iran Design, Testing, Supply
GLST, assembling elements - 230 kV
Moshanir 1993
AREC Iran Design, Testing, Supply
Clamps & fittings - 154, 132, 230 kV
Moshanir 1993
KWPA Iran Supply AAAC conductor Moshanir 1993
National Iranian Copper Industry Co. - Sirjan
Iran Design, Testing, Supply
GLST, clamps, OHGW –230 kV
Moshanir 1993
Major Export ProjectsOther projects abroad
Major Export ProjectsClient Country Project
TypeScope of Supply Consulting
EngineerYear
Ministry of Energy and Water
Kuwait Supply Steelworks, assembling elements
MEW 1993
JEA Jordan Turnkey GLST - 132 kV JEA 1993BREC Iran Design,
Testing, Supply
Clamps - 230 kV Moshanir 1993
West Regional Electric Co. (WREC)
Iran Design, Testing, Supply
Clamps & fittings – 63, 132 kV
Gharb Niroo 1993
Bakhtaran Regional Electric Co. (BREC)
Iran Design, Testing, Supply
GLST, clamps, assembling elements- 230 kV
Moshanir 1993
BREC Iran Design, Testing, Supply
GLST, assembly elements – 400 kV
Moshanir 1993
WREP Iran Design, Testing, Supply
GLST - 132 kV Gharb Niroo 1992
JEA Jordan Design, Supply, Erection
GLST - 132 kV JEA 1992, 1994
KWPA Iran Design, Testing,Supply
GLST, clamps & fittings, assembling elements,insulators - 400 kV
Ghods Niroo 1992
Other projects abroad
Major Export ProjectsClient Country Project
TypeScope of Supply Consulting
EngineerYear
WREP Iran Design, Testing, Supply
GLST, assembling elements - 63 kV
Moshanir 1992
Guilan Regional Electric Co. (GREC)
Iran Design, Testing, Supply
GLST, assembling elements - 230 kV
Moshanir 1992
Avangan Co. Iran Supply Galvanized bolts & nuts 1992
AREC Iran Design, Testing, Supply
GLST, assembling elements - 230, 400 kV
Mona Co. 1992
Tehran Regional Electric Co. (TREC)
Iran Design, Testing, Supply
GLST, assembling elements - 400 kV
Moshanir 1992
EAC Cyprus Supply GLST - 132 kV, tower cross arms
EAC 1992
Telecommunications Co. of Iran
Iran Supply Assembling elements 1992
AREC Iran Design, Testing,Supply
GLST, assembling elements, clamps & fittings,insulators - 230 kV
Moshanir 1991
Electrification of a railway station – Salonic Idomeni
Greece Supply Lattice horizontal galvanized girders
Odon Odostromaton
1991
Other projects abroad
Client Country ProjectType
Scope of Supply Consulting Engineer
Year
EAC Cyprus Supply Galvanized steel cross arms EAC 1991
AREC Iran Supply GLST, clamps and fittings insulators and earth system- 63,132, 230 kV
Moshanir 1991
AREC Iran Design, Testing, Supply
GLST, assembly elements, clamps - 132/154 kVinterconnection
Moshanir 1991
Azerbaijan Regional Electric Co. (AREC)
Iran Supply GLST - 400 kV Moshanir 1990
EAC Cyprus Supply GLST - 132 kV EAC 1990
Boyer Tirana Albania Supply Clamps & fittings, insulators Boyer 1990
EEA Egypt Design, Supply
GLST and assembling elements - 220 kV
EEA 1990
WREP Iran Turnkey GLST - 63, 132 kV Mahab Ghodss 1989EAC Cyprus Design,
SupplyGLST - 132 kV EAC 1989
Major Export ProjectsOther projects abroad
Client Country Project Type
Scope of Supply Consulting Engineer
Year
DGMPRE Iraq Design, Testing, Supply
Conductors - 400 kV DGMPRE 1988
JEA Jordan Turnkey GLST -132 kV JEA 1987
Electricity Authority of Cyprus (EAC)
Cyprus Design, Supply
GLST - 132 kV EAC 1987
DGMPRE Iraq Turnkey GLST - 132 kV DGMPRE 1986, 1987
DGMPRE Iraq Design, Supply
Materials - 132 kV DGMPRE 1986
EEA Egypt Turnkey GLST - 220 kV EEA 1986
EEA Egypt Design, Supply
Clamps & fittings, insulators - 220 kV
EEA 1986
DGMPRE Iraq Turnkey GLST - 400 kV DGMPRE 1985Public Corporation for Electric Power
South Yemen
Design, Erection
Wooden poles – 11, 33 kV
Ewbank 1984
Major Export ProjectsOther projects abroad
Client Country Project Type
Scope of Supply Consulting Engineer
Year
Egyptian Electricity Authority (EEA)
Egypt Turnkey GLST - 220 kV EEA 1984
JEPCO Jordan Turnkey Spun concrete poles - 11, 33 kV
JEA and JEPCO 1984
Jordan Valley Authority Jordan Turnkey GLST - 33 kV Stanley Consultants Inc. + Harza Eng. (USA)
1983, 1984
DGMPRE Iraq Turnkey GLST - 63 kV DGMPRE 1983
West Regional Electric Power (WREP)
Iran Turnkey GLST - 63 kV Mahab Ghodss 1983
WREP Iran Turnkey GLST - 132 kV Mahab Ghodss 1983
Electricity Board of the States of Malaya
Malaysia Turnkey GLST - 132 kV Crown Agency 1983
Yarmouk University Jordan Turnkey GLST - 33 kV Preece, Cardew & Rider
1982
KWPA Iran Design, Supply
GLST - 132, 230 kV Motor Columbus 1982
Major Export ProjectsOther projects abroad
Client Country Project Type
Scope of Supply Consulting Engineer
Year
Directorate General Of Minor Projects & Rural ElectrificationBaghdad ElectricityDistribution (DGMPRE)
Iraq Turnkey GLST - 33 kV DGMPRE 1981
JEPCO Jordan Turnkey GLST - 132 kV Ewbank (GB) 1981
Jordan Electricity Authority (JEPCO)
Jordan Turnkey GLST - 132 kV Preece, Cardew 1979
Azerbaidjan Regional Electric Co. (AREC)
Iran Turnkey GLST - 63 kV Mahab Ghodss 1978
TAVANIR Iran Turnkey GLST - 230 kV Motor Columbus (Switzerland)
1977, 1982
KWPA Iran Turnkey GLST - 230 kV Development & Resources
1975
Khuzestan Water and Power Authority (KWPA)
Iran Turnkey GLST - 132 kV Development & Resources (USA)
1975
Electricité du Liban Lebanon Turnkey GLST - 150 kV Surveillance de Geneve(Switzerland)
1975
Electricité du Liban Lebanon Turnkey GLST - 66 kV Lebanon Electricity 1972
Major Export ProjectsOther projects abroad