safety assessment of the superstructure, energy, signaling ... assessment of the superstructure,...

Download Safety assessment of the superstructure, Energy, Signaling ...  assessment of the superstructure, Energy, Signaling Telecomunication ... superstructure, Energy, Signaling, Telecomunication of ... 13230-1 and EN

Post on 06-Feb-2018

213 views

Category:

Documents

0 download

Embed Size (px)

TRANSCRIPT

  • TV SD AG

    Superstructure references

    Safety assessment of the superstructure, Energy, Signaling

    Telecomunication of the Metro Line L12 in Mexico

    Customer/Project

    Task

    Effort

    Independent expert judgement for approval by authority

    Total: 10 experts

    2 Superstructure

    Description Safety assessment superstructure, Energy, Signaling, Telecomunication of the Metro

    Line L12 in Mexico

    Costumer: PMDF, Mexico

    Duration: 2009 still in work

    / Safety Assessment

  • TV SD AG

    Superstructure references

    Safety Assessment of the entire Railway System Line Trento-Male-

    Marilleva, Italy

    Customer/Project

    Task

    Effort

    Independent expert judgement

    for approval by authority

    Total: 15 experts

    2 Superstructure

    Description Safety Assessment Line Trento-Mal-Marilleva, gage 1000 mt

    Customer: Trentino trasporti S.p.A., Trento, Italy

    Duration: 2010 still in work

    / Safety Assessment

  • TV SD AG

    Superstructure references

    Safety assessment of the understructure, superstructure, bridges, tunnel, electrification and

    related interfaces for the HSL between Ankara and Istanbul, Turkey Customer/Project

    Task Independent expert judgement for

    approval by authority

    Description Safety Assessment of the understructure, superstructure, bridges, tunnel, electrification

    and related interfaces ( for example: rolling stock/ superstructure, electrification/

    supertsructure etc.)

    Customer: TCDD, Turkey

    Homologation in Turkey

    Duration: 2007 2010

    / Safety Assessment

  • TV SD AG

    Superstructure references

    Safety Audit for the AL Mashaaer Al Mugaddassah Southern Line,

    Saudi Arabien

    Customer/Project

    Task

    Effort

    Safety audit for the Al Mashaaer Al Mugaddassah

    Southern Line

    Total 8 Expert

    Superstructure 1 Expert

    Description Some days before the start of operation for the period 1 (Operation during Hajj) of the

    Al Mashaaer Al Mugaddassah Southern Line, TV Sd Rail delivered a statement on

    the safety situation of the line

    Costumer: MOMRA, Kingdom of Saudi Arabia

    Duration: 2010

    / Safety Assessment

  • TV SD AG

    Superstructure references

    Safety assessment of the superstructure for a renewal of a

    railway track between Meran and Malles, Italy

    Customer/Project

    Task

    Effort

    Independent expert judgement for

    approval by authority

    Total: over 20 experts

    2 senior experts involved over 3 years

    Description Safety Assessment of the superstructure

    Customer: Italian Governament, Italy

    Homologation in Italy

    Duration: 2002 2005

    / Safety Assessment

  • TV SD AG

    Superstructure references

    SBB: Analysis about the correlation between Track defects and

    rolling stock forces, Switzerland

    Customer/Project

    Task Evaluation in order to define the costs related

    to the track maintenens

    Description Analysis about the correlation between Track defects and rolling stock forces

    Customer: Schweitzerische Bundesbahnen SBB, Bern (Switzerland)

    Duration: 2011

    Effort 2 Experts

    / Consulting

  • TV SD AG

    Superstructure references

    SBB: Catalogue of Requirements for the Track Inspection Vehicle of

    the Swiss Federal Railway, Switzerland

    Customer/Project

    Task Both general requirements as correct positioning, tests on

    repeatability and reproducibility or documentation of

    changes on the vehicle and specific requirements as the

    accuracy of any measurement have been defined. All

    requirements are based on national or international

    normative regulations or on best practice in other

    countries as Germany, Austria and France.

    Description A detailed catalogue defining requirements for the track inspection vehicle was issued.

    The catalogue is for SBB-internal use

    Customer: Swiss Federal Railway SBB, Bern (Switzerland)

    Duration: 3 Month

    Effort 2 Experts

    b

    erh

    h

    un

    g

    40 mm

    40 mm

    D1 D2

    D3 D4

    / Consulting

  • TV SD AG

    Superstructure references

    Health and Safety executive

    London Piccadilly line, Great Britain

    Customer/Project

    Task

    Effort

    Independent expert judgement for

    approval by authority

    2 senior experts

    Description Derailment investigation

    Customer: H&S executive, London

    / Consulting

  • TV SD AG

    Superstructure references

    Evaluation of track stability with Y-steel sleepers, Italy

    Customer/Project

    Task

    Effort

    FE-Simulation

    Definition of Measurement on the track to control

    the correspondence with the reality

    2 senior experts

    Description Evaluation of track stability

    Customer: Thyssen Krupp, Germany

    Homologation in Italy

    / Consulting

  • TV SD AG

    Superstructure references

    Elektro Thermit Germany, Assessment of Thermit Transition Welds Customer/Project

    Task

    Effort

    Independent expert supervision for

    homologation according to the RFI TCAR SF

    AR 07 005 B and the EN 14730-1

    2 experts

    Description According to the RFI TCAR SF AR 07 005 B and the EN 14730-1 TV SD Rail

    performed the necessary testing for the certification and the homologation of the

    Transition Welds (Rail profiles: 60E1/50E5; 60E1/46E4; 50E5/46E4) in Italy. This

    assessment includes a lot of laboratory testing as static bending, hardness test, etc.

    Customer: Elektro Thermit Halle (Germany)

    Duration: 2011 on going

    / Track components

  • TV SD AG

    Superstructure references

    Voestalpine Hytronics Austria, Independent Safety Assessment for

    the Hydrostar High Speed Line in Korea

    Customer/Project

    Task

    Effort

    Independent Safety Assessment

    4 experts

    Description Independent Safety Assessment for the improvement of the Hydrostar High Speed

    Line in Korea

    Customer: Voestalpine Hytronics Austria

    Duration: 2011

    / Track components

  • TV SD AG

    Superstructure references

    Yapiray Railway Construction, Conformity of Afyon sleeper

    production to EN 13230-1 and EN 13230-2, Turkey

    Customer/Project

    Task

    Effort

    Conformity assessment and TSI

    Certification

    2 experts

    Description A conformity assessment according to EN 13230-1 and EN 13230-2 for the concrete

    sleeper production plant in Afyon was performed. Furthermore EC Certifications

    according to TSI Infrastructure (2008/217/EC) have been issued.

    TSI certification of the sleeper B70 (Afyon factory) acc. To Modul H1

    Customer: Yapiray Railway Construction Systems Industry and Trade Inc., Konya

    (Turkey)

    Duration: 2010

    / Track components

  • TV SD AG

    Superstructure references

    China Railway Construction Corporation, Turkey Customer/Project

    Task

    Effort

    EN 13674-1 Conformity

    Acceptance ot 10% ot the

    Production

    2 experts

    Description Checking the rail production in accordance to the EN 13674-1: Jan. 2008 and

    acceptance of the rails produced for CRCC by Lucchini, Italy

    / Track components

  • TV SD AG

    Superstructure references

    Protem , Arcelor Mittal Poland Customer/Project

    Task

    Effort

    EN 13674-1 Conformity

    2 experts

    Description Checking the rail production in accordance to the EN 13674-1: Jan. 2008

    Company: Protem Ltd. A.T.B. Is Merkenzi G Block 182, Mercunkay Ankara, Turkey

    Duration: 2010

    / Track components

  • TV SD AG

    Superstructure references

    Voestalpine Donawitz Austria, Qualification tests to EN 13674-1:2008 Customer/Project

    Task

    Effort

    Qualification tests

    2 experts

    Description EC Conformity according to EN 13674-1:2008 chapter 8 Qualification tests for the rail

    60E1 R260 and R350HT

    Customer: Voestalpine Leoben-Donawitz (Austria)

    Duration: 2011

    / Track components

  • TV SD AG

    Superstructure references

    Voestalpine BWG Germany, Qualification Tests for Taiwan Customer/Project

    Task

    Effort

    Qualification tests

    for turnouts and

    crossings

    2 experts

    Description Qualification tests for turnouts and

    crossings for Taiwan according to customer

    requirements was performed by TV Sd

    Rail

    Customer: Voestalpine BWG GmbH&CoKG

    Duration: 2010 - 2011

    / Track components

  • TV SD AG

    Superstructure references

    VAE Austria, Homologation of the welding process for Mn crossings

    in according to EN 14587-1 and the RFI TCAR SF AR 06 010 B

    Customer/Project

    Task

    Effort

    Testing and expert report

    2 experts

    Description Homologation of the welding process for Mn crossings in accordance to the EN 14587-

    1 and the RFI TCAR SF AR 06 010 B of the Italian Railway (RFI)

    Customer: VAE Eisenbahnsysteme GmbH Zeltweg (Austria)

    Duration: 2010

    / Track components

  • TV SD AG

    Superstructure references

    Chin