md41-mps single item multi level-ecc6

6
SAP PP/QM User manual Published by Team of SAP Consultants at SAPTOPJOBS Visit us at www.sap-topjobs.com Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS

Upload: ashutosh-maurya

Post on 16-Nov-2015

8 views

Category:

Documents


5 download

DESCRIPTION

MD41-MPS Single Item Multi Level

TRANSCRIPT

  • SAP PP/QM User manual

    Published by Team of

    SAP Consultants at

    SAPTOPJOBS

    Visit us at www.sap-topjobs.com

    Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS

  • MPS single item Multi Level Definition:- Master Production Schedule (MPS) is similar to Material Requirement Planning. It will ensure the right availability right material at right time. Once the production plan or requirements are maintained in SAP MRP run will take place. Normally MPS run will be done for specific high value material whose planning results are to be confirmed manually. MPs run will plan and pass on the dependant requirement bu tit will not create any procurement proposal for the material which are planned with MRP run. I.e. in the material master MRP type PD. To summarize, it is almost similar to MRP with different transaction codes. Objective :- Total On line MPS planning is to be done for a given plan. This document explains the process of running MPS for a single item multi level run for a material. Prerequisites:- PP Master Data Menu path :- Logistics Production Production Planning MPS MPS MD41 Single item Multi level

  • Single-Item, Multi-Level

  • 1. Maintain the following data:

    Field Name Values Material Enter value in

    Material.

    Plant Enter value in Plant.

    Scheduling Enter value in Scheduling. Example: 2

    2. Click Enter .

  • 3. Click Enter . 4. Click Enter . 5. Click Back F3 . 6. Click Exit Shift+F3 .

  • SAP PP/QM User manual

    Published by Team of

    SAP Consultants at

    SAPTOPJOBS

    Visit us at www.sap-topjobs.com

    Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS