looking-back_cefpi_dps

80
Looking Back To Look Forward Benjamin Gardner and Julie Walleisa

Upload: julie-walleisa-aia-leed-ap-cefp

Post on 07-Aug-2015

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: looking-back_cefpi_dps

Looking Back To Look ForwardBenjamin Gardner and Julie Walleisa

Page 2: looking-back_cefpi_dps

AIA/CES

• CEFPI is a Registered Provider with The American Institute of Architects Continuing Education System (AIA/ CES). Credit(s) earned on completion of this course will be reported to AIA/CES for AIA members.

• The programs presented at this conference are registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

• Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: looking-back_cefpi_dps

Julie Walleisa, AIA, LEED AP, CEFP

• Architect and Certified Educational Facility Planner

• Principal at Dekker/Perich/Sabatini• Specialize in early childhood, K-12, and

higher education design

Page 4: looking-back_cefpi_dps

Benjamin Gardner, AIA, LEED AP

• Architect and Principal at Dekker/Perich/Sabatini

• Background in architecture, construction, and construction management

• Specialize in K-12 design• CEFPI New Mexico Chapter President

Page 5: looking-back_cefpi_dps

Word Association

What do you think of when we say “1950s school” or “1960s school”?

Educational modelsPhysical appearanceBuilding organization

Page 6: looking-back_cefpi_dps

Introduction

http://www.takepart.com/photos/classroom

Page 7: looking-back_cefpi_dps
Page 8: looking-back_cefpi_dps

3 Case Studies

Del Norte HS MCHS Pecos ESHoneycomb Completely Interior Double-loaded

Classroom

TRW

Classroom

Classroom Classroom

Classroom Classroom

Classroom

TRW

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Page 9: looking-back_cefpi_dps

Del Norte High School

• Opened in 1964 on a 45 acre site• Original: 800 students and 124,900sf• Eventual: 1400 students and 265,142sf

• 1965 Pacemaker Award for Revolutionary Design– Honeycomb layout – flexible teaching– Movable partitions in 40% of classrooms– Largest library in the state at the time– Blended fields curriculum

Page 10: looking-back_cefpi_dps

Image courtesy of 1965 DNHS yearbook

Page 11: looking-back_cefpi_dps

Image courtesy of 1965 and 1967 DNHS yearbooks

Page 12: looking-back_cefpi_dps

Image courtesy of 1965 DNHS yearbook

Page 13: looking-back_cefpi_dps

Original Site

Page 14: looking-back_cefpi_dps

Original School1962

Page 15: looking-back_cefpi_dps

Function

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Storage

Partitions in 40% of rooms½Classroom

Spaces for 5‐15 person independent study

Teacher workroom

Resource centers –small single subject libraries

Original  outdoor circulation

Collaboration space

Page 16: looking-back_cefpi_dps

Classroom

Classroom

Classroom

Classroom

Classroom

Classroom

Storage

½Classroom

Classroom Classroom

Teacher workroom

Function

Additional  classroom units

Teacher workroom

Page 17: looking-back_cefpi_dps
Page 18: looking-back_cefpi_dps

19 Classroom Addition1964

• 44 teaching stations total• 12 science labs • 2 music rooms • 1 metal shop • 3 home economics

rooms

Page 19: looking-back_cefpi_dps

Vocational Spaces1967

• Metal and wood shops

Page 20: looking-back_cefpi_dps

Motor Shop & Daycare1973

Page 21: looking-back_cefpi_dps

Science Classrooms & Enclosure

1975

Page 22: looking-back_cefpi_dps

Early Commons

20’

Page 23: looking-back_cefpi_dps

Personalization

Page 24: looking-back_cefpi_dps

Creating Commons

Freshman Hall

Sophomore Hall

Junior Hall

Senior Hall

AthletesRodeo

Page 25: looking-back_cefpi_dps

Gymnasium, Performing Arts, & Art / Music Classrooms

1977

Page 26: looking-back_cefpi_dps

Portable Classrooms

Page 27: looking-back_cefpi_dps

Plans for Replacement/Renewal

Page 28: looking-back_cefpi_dps

Built Magnet High School On Site

2007

• Project based learning• New Tech Network

school• Hybrid open classroom

and commons

Page 29: looking-back_cefpi_dps

Double Rooms Revisited

DoubleClassroom

DoubleClassroom

DoubleClassroom

Commons

Classroom Classroom

Classroom

Classroom

Page 30: looking-back_cefpi_dps

Replacement School149,000 sf

2010

• Classroom cluster arrangement

• 9th grade academy• Grade level commons

Page 31: looking-back_cefpi_dps

Commons Revisited

Page 32: looking-back_cefpi_dps

Demolished oldAdded Industrial Arts

2014

• Wood shop• Darkroom• Classrooms• Arts studio Demolished 

Existing Facility

Page 33: looking-back_cefpi_dps

New Cafeteria2015

Page 34: looking-back_cefpi_dps

Re-developed Site

• Re-created school green

• 9th grade courtyard• Redone circulation• College campus

feel• Urban identity

Page 35: looking-back_cefpi_dps

Identity

Page 36: looking-back_cefpi_dps

Identity

Photo credit: Kirk Gittings

Page 37: looking-back_cefpi_dps

Community

Photo credit: Patrick Coulie

Page 38: looking-back_cefpi_dps

Transformation / New Identity

Photo credit: Patrick Coulie

Page 39: looking-back_cefpi_dps

MCHS

• Opened in 1967 on a 15 acre site• Original: 106,957sf• Eventual: 142,550sf

• Rural community – whole county• Large CTE/vocational focus• Academic struggles – 65% graduate• Diverse population

Page 40: looking-back_cefpi_dps

MCHS 1967

Image courtesy of 1968 MCHS yearbook

Page 41: looking-back_cefpi_dps

MCHS 1967

Image courtesy of 1968 MCHS yearbook

Page 42: looking-back_cefpi_dps

MCHS Evolution1967

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 43: looking-back_cefpi_dps

MCHS Evolution1979

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 44: looking-back_cefpi_dps

MCHS Evolution1993

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 45: looking-back_cefpi_dps

MCHS Evolution1999

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 46: looking-back_cefpi_dps

MCHS Evolution2005

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 47: looking-back_cefpi_dps

Site Size

Page 48: looking-back_cefpi_dps

Site Size

Page 49: looking-back_cefpi_dps

Site Size

Page 50: looking-back_cefpi_dps

Entry

Image courtesy of 1968 MCHS yearbook

Page 51: looking-back_cefpi_dps

Entry

Page 52: looking-back_cefpi_dps

Entry Control

Image on left courtesy of 1968 MCHS Yearbook

Page 53: looking-back_cefpi_dps

Entry Control

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 54: looking-back_cefpi_dps

Entry Control – New MCHS

Page 55: looking-back_cefpi_dps

Entry Control – New MCHS

Page 56: looking-back_cefpi_dps

Corridors

Page 57: looking-back_cefpi_dps

Corridors

Page 58: looking-back_cefpi_dps

Corridors – New MCHS

LockersView

View

Page 59: looking-back_cefpi_dps

Classrooms• Most classrooms under 700sf• Most without windows or storage

Image courtesy of 1968 MCHS Yearbook

Page 60: looking-back_cefpi_dps

Classrooms• Most classrooms under 700sf• Most without windows or storage

Page 61: looking-back_cefpi_dps

New MCHS Plan

Page 62: looking-back_cefpi_dps

Commons

Base image courtesy of 2011 MCSD Facility Master Plan by SLATERPAULL Architects

Page 63: looking-back_cefpi_dps

Commons

Page 64: looking-back_cefpi_dps

Commons – New MCHS

Page 65: looking-back_cefpi_dps

Commons – New MCHS

Page 66: looking-back_cefpi_dps

Commons – New MCHS

Page 67: looking-back_cefpi_dps

Pecos Elementary School

• Opened in 1954 on a 5 acre site• Original: 450 students and 35,963sf

• Rural community• Military influence• Neighborhood schools• Focus on fundamentals

Page 68: looking-back_cefpi_dps

Original Plan

• No entry control• Poor supervision• Limited specialization• Simple clear layout• Equitable spaces• Relationship to

neighborhood

Page 69: looking-back_cefpi_dps

12’

Generous Corridors

Page 70: looking-back_cefpi_dps

Atmosphere

Page 71: looking-back_cefpi_dps

Atmosphere

Page 72: looking-back_cefpi_dps

Consistency

Page 73: looking-back_cefpi_dps

Renovation

• Easily reconfigured• Classroom size adequate• Enough above ceiling

space for systems• Minor structural

modifications

Page 74: looking-back_cefpi_dps

Site Configuration

Before After

Page 75: looking-back_cefpi_dps

Security & Control Highly visible entry

Secured waiting area/check in

Eyes on approach

Check‐in

Secured entry

Teacher workroom

Vestibule Waiting area

AssistPrincipal

Recept

Corridor

Page 76: looking-back_cefpi_dps

Security & Control

Page 77: looking-back_cefpi_dps
Page 78: looking-back_cefpi_dps
Page 79: looking-back_cefpi_dps

Questions to Ponder

• How does simplicity or innovation look from a distance of 50 years?

• Will the pendulum swing back the other way on things we take for granted today?

• How do you take a deep enough look at lessons from the past before making design decisions?

• We are about to start seeing a slew of projects to renew 1970s and 1980s schools - what can they teach us?

Page 80: looking-back_cefpi_dps

Thank you!

Dekker/Perich/Sabatiniwww.dpsdesign.org

Julie Walleisa [email protected] Gardner [email protected]

All info will be posted online at http://www.dpsdesign.org/how-we-work/knowledge-center