Page 1: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Logo 2005.10.12 NGO

Page 2: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Peace Winds Japan Overview

The concept of PWJ has been “to provide necessary support to people in need” since its establishment in 1996.

Page 3: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Activities

Emergency relief in Afghanistan Medical mobile term in Iraq Well construction in Sierra Leone

Seed distribution in Afghanistan Childcare in Mongolia Coffee industry assistance in East Timor

PWJ activities are roughly two-fold: one is emergency humanitarian relief, aiming to secure the safety of lives and to provide the basic necessities. The other is assistance for restoration and development of ravaged areas, Aiming at retrieval of self-sustaining livelihood.

Peace Winds Japan

Page 4: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Engineering works in the NGOContents

■ Changes of NGO’s environment in Japan

■ Development of Emergency Shelter

■ Earthquake safer design for the people in Afghanistan in Iran

Page 5: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Turning point of Japanese NGO’s : KOSOVO crisis

Japanese NGO’s, Planning of refugee camp in Albania

→To launch Japan Plat Form

First 10days, Suffering form harsh condition →To develop Emergency shelter

Refugee camp in Macedonia on April 1999

 

Page 6: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Structure of Japan Platform

Japan Platform is a system to provide emergency relief in natural disasters and refugee situations more effectively and quickly. This will be realized through an equal partnership of NGOs, business and government, with each constituent making full use of its resources and characteristics.

Page 7: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Development of Emergency shelter

■Suffering of first 10days

  It takes a long time to getting family tent.

Because transportation of a large number family tent isn’t easy in confect area.

■Stand by arrangement

Arrangement living condition for the Psychological and physical stressed

people is foremost task → Emergency Response Unit

Point of Emergency shelter

●Easy Transporting ●Quick set-up●durability●Large capacity

Page 8: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon Shelter1

Original design of Balloon shelter

Model of refugee camp by balloon shelter: capacity is 3000 people

Jun, 2000   Idea of balloon shelter Jul, 2000   Collaboration with Teijin Sep, 2000   Completion of prototype design Oct, 2000 Completion of prototype Nov, 2000 Practical experiment

Page 9: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon Shelter 2

30min setting up

SPECIFICATION

Structure:     Pneumatic structure

Size:      22m(w) x 5.84m(d) x4m(h)

Packing Size :   1m x 1m x 1m

Weight:      60kg ( main body )+ generator, blower, Peg,

Material :     lightweight High tension polyester fabric 「 Tetolon Power lip 」

Power :      Electric blower ( Full time )

Page 10: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon   in INDONESIA

Nov, 2000 Practical experiment for durability and transportation

Page 11: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon   in INDIA

Jan 2001 :  Emergency assistance for Gujarat earthquakes

Page 12: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon   in AFGHANISTAN

Feb 2002 :  Sar-e pul IDP camp

Page 13: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon set up

Page 14: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Balloon   in Nigata Oct 2004 :  Tyuetsu-Earthquake400 people were staying in 2

weeks

Page 15: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Earthquake Safer design for the people

Afghanistan 2002-

Page 16: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   School construction in Kabul, Afghanistan at 2002 1

PWJ constructed 3schools. (20classrooms, 18classrooms, 6classrooms)

Page 17: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   School construction in Kabul, Afghanistan at 2002 2

2, Block making machine

*Automatically operation type

Performance : 1100pc/day(8hours)

*Manually operation type

Performance : 300pc/day(8hours)

Top face has convex

Method of construction

1, Interlocking block system

*Size : 300mm x 150mm x 150mm*Ratio : 1Cement, 5Sand, 1Aggregate*Compression strength (include hole)   35.68t / 446cm2 = 80kg/cm2.

Bottom face has concave

Automatically type

Page 18: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   School construction in Kabul, Afghanistan at 2002 3

Reinforce masonry work

*Each 60cm, set up vertical reinforcing bars with 1:1.5:3 mixed concrete

*Each 5th layer, set reinforcing bars and fill up concrete horizontally

Page 19: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Jun 17-19, 2003 at Kabul university

■   UNCRD Workshop on Earthquake Safer Construction Practices for Non-engineered Buildings

Introducing PWJ method of school construction

Demonstration of shaking table by UNCRD

Page 20: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Humanitarian Network

Page 21: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■  BAM EARTHQUAKE, 2003

Page 22: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Phase 1Since 27th of December 2003

*Distribution : 500tents for BAFIA camp

Non food Items for Zone5,8and12

-cooking stove

-Moocket etc,

■   Bam IRAN, Emergency relief project

Page 23: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■Bam IRAN, Emergency relief project

*Temporary school project

7schools in zone 12,13 and 4

Phase 2 February 2004-

Big roof on the 5 Connexes.

The roof is created multipurpose space

8m x 13m (100m2)

Page 24: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ Developing phase

Target method-- Reinforced masonry work

Earthquake safer design for the people

Objectives,

*Provide appropriate earthquake-resistant structure techniques for vernacular houses to the people of Bam

*Disseminate earthquake-safer designs to the people in Bam

Page 25: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Workshop “ Earthquake Safer design for people ” in Bam at 16 may 2004

Page 26: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Old building is in BAM

Quality of construction

For the earthquake safety, not only the building materials should be good quality but also the design and detailing as well as quality of construction should be good.

Page 27: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   We propose 3 methods

1. Reinforced masonry work, using ordinary brick.

2. Stabilized Rammed earth structure

3. Stabilized compressed earth bricks

Page 28: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ 1. Reinforced masonry work

Page 29: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ 2. Stabilized Rammed earth structure

About Rammed Earth ConstructionRammed Earth Construction has evolved from techniques used since ancient times(origin: south Iran) and the growing market led demand for environmentally sustainable development, healthier lifestyles and healthier buildings has led to an Australian and worldwide re-kindling of interest in rammed earth architecture. The modern interpretation allows locally sourced soils and aggregates to be blended on site with special bonding additives.

Iran: Cine wall,

Afghan: Paksa wall

Page 30: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ 3. Stabilized compressed earth bricks

Page 31: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

Mix design

■   Mix design for rammed earth and compressed brick

Density of soil x volume of soil + density of sand x volume of sand + Wt of cement

-Soil: 2 wheelbarrow

- Sand: 1 wheelbarrow

-Cement 2 bucket

-Water: 2,5 bucket

200 x 2 x 1.35 + 200 x 1 x 1.5 + 12.5 x 2 x 3 + 12.5 x 2.5 x 1

Water% = = 3%

Cement% =Wt of cement

Cement% = = 8%12.5 x 2 x 3

200 x 2 x 1.35 + 200 x 1 x 1.5 + 12.5 x 2 x 3

12.5 x 2.5 x 1

Ratio

-Sand: 75%

-Clay and Silt: 17%

-Cement: 8%

• Size of wheelbarrow: 200L

• Size of bucket: 12.5L

• Density of soil: 1.35g/cm3

• Density of sand: 1.5g/cm3

• Density of cement: 3.0g/cm3

• Density of water: 1.0g/cm3

Page 32: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ Ideal Soil For Compressed Rammed Earth and compressed earth bricks

soil

Soil classification

Particle Size (mm)

Clay

Silt

Sand

Gravel 2.000 to 10.0000.075 to 2.0000.002 to 0.0750.001 to 0.002

Page 33: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Stabilized Rammed Earth structure 2

Sieving Soil / 4mm mesh sieve

Dry mixing Preparing batch

Mixing proportion

Soil - 2 wheelbarrows

Sand - 1 wheelbarrow

Cement - 2 buckets

Ratio

Sand - 75%

Clay and Silt - 15%

Cement - 9.5%

Page 34: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Stabilized Rammed Earth structure 3

Wet mixing

Ramming Foundation

Steel Frame for Wall brick

Brick Size: 600 x 230 x 290

Ramming Checking the compression with a Penentrometer

Page 35: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Roof structure

Room 1: Masonry Flat Arch Roof

Room 2: Masonry Doom Roof

Page 36: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Roof structure 1: ( Flat Arch )

I beam should be secured with roof RC beam

Tie band should be secured in place

Wedge insert

Sticking

Cement water

Page 37: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Roof structure 2: ( Stabilized Dome )

Page 38: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Roof structure 2: ( Stabilized Dome )

Page 39: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Model house in Exhibition site

Site Plan by Housing foundation

Page 40: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   School construction 1

Page 41: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   School construction 2

Page 42: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■ School construction 3

Page 43: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Guidebook “ Earthquake Safer design for people

Page 44: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Training for mason 1Training for mason 1

Page 45: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Training for mason 2Training for mason 2

Page 46: Logo2005.10.12 NGO. Peace Winds Japan Overview The concept of PWJ has been to provide necessary support to people in need since its establishment in 1996

■   Training for mason 3Training for mason 3