linked in power point.3

22
06/15/22 THE FUTURE OF TUBE AND PIPE CONNECTIONS Introduction :

Upload: steve-burke

Post on 27-May-2015

315 views

Category:

Documents


1 download

DESCRIPTION

Introduction to Lokring Technology

TRANSCRIPT

Page 1: Linked in power point.3

04/12/23

THE FUTURE OF TUBE AND PIPE CONNECTIONS

Introduction:

Page 2: Linked in power point.3

LOKRINGSince the first installations in early 1989, LOKRING has become a major

supplier of high performance fluid and gas transfer fittings to the:

Process, Chemical, Marine, Refinery, Mining, Power Generation, Railroad and Automotive Markets.

LOKRING has:

Qualified the SS and CS product line’s to ANSI B31 code standards

Fire Tested to ASTM F1387 and API 607 Rev.#4

Helium Leak Tested to 2x10-11 Std. cc/sec.

Installed millions of fittings

Established a customer base of global industry leaders such as:

Dow Chemical, Texaco, BP, GM, Ford , Merck & Co., E.I. Dupont, Shell Oil, Weyerhaeuser Paper, Union Pacific, ect.

Experienced a rework rate of less than one tenth of 1% (versus much higher rework for conventional pipe joining methods)

Page 3: Linked in power point.3

WELD – NO WELD

Page 4: Linked in power point.3

Introduction to LOKRING

T E C H N O L O G Y C O R P O R A T I O N

Page 5: Linked in power point.3

Introduction to LOKRING

T E C H N O L O G Y C O R P O R A T I O N

Page 6: Linked in power point.3

Introduction to LOKRING

T E C H N O L O G Y C O R P O R A T I O N

Page 7: Linked in power point.3

Step One: Cut the pipe, sawsall-type of saw works quickly and with

no heat generation. Either 110vAC or rechargeable style.

Page 8: Linked in power point.3

Step Two: Briefly sand, gauge and mark each pipe end (LOKRING flange components only

require inlet/single pipe conditioning).

Page 9: Linked in power point.3

Step Three: Slip fitting to one of the prepared pipe ends.

Page 10: Linked in power point.3

Step 4: Span fitting between prepared pipe ends, placement according to

gauge marks and engage first side with tool head and

hand pump.

Page 11: Linked in power point.3

Step 5:

Each installation oval is visible.

Page 12: Linked in power point.3

®

Page 13: Linked in power point.3

THAT'S ALL THERE IS TO IT…THAT'S ALL THERE IS TO IT…...JUST 5 EASY STEPS!!...JUST 5 EASY STEPS!!

CUTCUT PREPPREP INSERTINSERT SWAGE SWAGE INSPECTINSPECT

Page 14: Linked in power point.3

Call for a free product Call for a free product demonstration Todaydemonstration Today

219-256-5419219-256-5419

We provide piping and tubing We provide piping and tubing solutions that save solutions that save

time and money.time and money.

This is a “This is a “NO HOT WORKNO HOT WORK””

Permanent Joint.Permanent Joint.

Page 15: Linked in power point.3

Call for a free product Call for a free product demonstration at your site todaydemonstration at your site today

NONO WELDINGWELDING NO NO FLANGES FLANGES NONO THREADSTHREADS NO NO LEAKSLEAKS

NO KIDDING !NO KIDDING !

Page 16: Linked in power point.3

15V24 Micro-alloyed Carbon Steel product

A. NPS pipe sizes 1/4” NPS – 4” NPS

B. Matching Pipe Specifications ASTM A106 (Seamless)

ASTM A53 (Seamless & ERW)

ASTM 587 (ERW)

C. Pipe Schedules Schedules 40/80 for 1/4” - 4”

and 40/80/160 for 1/2”, 3/4” & 1”

D. Governing Specifications B31.1 (Power Piping and Utilities)

B31.3 (Refinery/Chemical)

E. Operating Temperatures 650°F Maximum

F. Operating Pressure Matching pipe per B31.1/B31.3

®

Page 17: Linked in power point.3

T E C H N O L O G Y C O R P O R A T I O N

Page 18: Linked in power point.3

316L Stainless Steel Product

A. NPS pipe sizes 1/4” NPS – 3” NPS

B. Matching Pipe Specifications ASTM A312 SS Pipe (Seamless) ASTM A312 SS Pipe (ERW)ASTM A106, ASTM A53 (CS pipe)

C. Pipe Schedules Schedules 10/40/80 for 1/4” – 3”

D. Governing Specifications B31.1 (Power Piping and Utilities)B31.3 (Refinery/Chemical)B31.4 /B31.5/B31.8

E. Operating Temperatures -150F/800F (-101/425C)

F. Operating Pressure Matching pipe per B31.1/B31.3

T E C H N O L O G Y C O R P O R A T I O N

Page 19: Linked in power point.3

T E C H N O L O G Y C O R P O R A T I O N

Page 20: Linked in power point.3

333 AISI/SAE 4130 NACECarbon Steel Product

A. NPS pipe sizes 1/2” NPS – 4” NPS

B. Matching Pipe Specifications ASTM A333 Gr 6

ASTM A106, API 5L

& A53 Grades B

C. Pipe Schedules Schedules 40/80 for 1/2 - 4”

40/80/160 for 1/2 – 2”

D. Governing Specifications B31.1 (Power Piping and Utilities)

B31.3 (Refinery/Chemical)

E. Operating Temperatures -50F/400F

F. Operating Pressure Matching pipe per B31.1/B31.3

T E C H N O L O G Y C O R P O R A T I O N

Page 21: Linked in power point.3

T E C H N O L O G Y C O R P O R A T I O N

Page 22: Linked in power point.3

Thank you for taking time out Thank you for taking time out from your busy schedulefrom your busy schedule

STEVE BURKE Exclusive Distributor

440-479-3986