key challenges in india for rooftop pv projects
DESCRIPTION
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS. Nexus Energytech Pvt. Ltd. Arvind Karandikar 9011061710 [email protected]. Types of Challenges. Stakeholders in rooftop grid connect projects. Development challenges. Awareness of all stakeholders - PowerPoint PPT PresentationTRANSCRIPT
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS
Nexus Energytech Pvt. Ltd.
Arvind Karandikar
9011061710
2
Types of Challenges
Development• Permissions• Avenues for
Revenue• Grid related• Financing• Identification of
Partners
Management• Ownership• Access for O&M• Regular
payment recovery
• Replacement costs
• Distributed installations
Technology• Small capacity
inverters• Certifications
and standards for Indian conditions
• Service availability
3
Stakeholders in rooftop grid connect projects
The Project
Regulatory Commission
Utility . Grid Owner
Power Purchaser
Financing Institute
Developer / InvestorEPC
ContractorGovernment Department /
AgencyCEI & other Approvals
Department
4
Development challenges
Awareness of all stakeholders Utility worry about losing well-paying
customers Uncertain policies and changing scenario Process and documentation for project
development in various models Financial closure – project financing Identification of roof owners Identification of suppliers, EPC, O&M
5
Management challenges – 25 years??
Grid availability and quality – LV level Financial strength of utilities or private
clients Payment security mechanism Changes to roofs, locations – own and
neighbors Service manpower and spares Re-validation of different agreements Changes in consumer loads in net
metering Emergency backup supply for buildings
6
Technology challenges
Grid tied inverters – certifications and standards
Roof fixing techniques and availability Protection features Regular calibration of various equipment Timely replacement of components Recycling methods and setups for
material
7
Few Specifics – Net Metering Regulations are yet in draft stage Each SERC has to have own regulation for
the state – requires time Currently net metering attractive only for
high tariff consumers – needs additional incentives
State-wise different connectivity specifications
Low voltage grid strengthening necessary at many places
8
Few Specifics – Gross metering Utilities unwilling / unable to provide FIT
due to possibility of further reducing costs of solar energy
Private customers (for third party sale) unwilling to have long term PPA
Charges of transmission, wheeling, distribution and CSS are high, making solar energy more expensive
9
Way forward …
Rooftop PVRegulations
Gross / Net metering
SolarImport Duties
SubsidiesFinance options
RenewablesLong term policies
IncentivesRPO enforcement
10
More actions …
Capacity Development•Developers and Investors•Bankers•Contractors
Resource Mapping•Weather Stations•Accurate data of commissioned projects
Holistic Sectoral Development•Developers / Investors / Manufacturers•Consumers / National benefits•Energy conservation / efficiency / renewables