judson early college academy judson isd - san antonio, texas high school new construction pbk 2010...

17
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Upload: gwendolyn-wright

Post on 11-Jan-2016

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Judson Early College Academy

Judson ISD - San Antonio, TexasHigh School

New ConstructionPBK

2010 Exhibition of School Planning and Architecture

Page 2: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Judson Early College Academy

Page 3: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Judson Early College Academy

ADMINISTRATION

ADMINISTRATION

ACADEMIC

ACADEMIC

PARKINGPARKING

PARKING

PARKING

Page 4: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

A Bridge to Higher EducationCommunity Environment: The school is located on a site as part of a larger college campus. Each building houses separate functions: administration and education. Both buildings were placed on the site to relate to each other and the adjoining college campus. Exterior materials used mimic the rest of the college.

Page 5: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

A Place to GatherCommunity Environment: The administration building includes a commons area which is a large, open, multi-purpose room used for dining and social functions, including community gatherings and educational events or large group instruction. Exterior gathering areas are also provided between and around both buildings which are both linked by a bridge for the second floors.

Page 6: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

The Science & Technology of LearningLearning Environment:The classrooms have a primary and secondary teaching wall and include projectors and screens. Two science labs, fully equipped with storage, sinks, fume hoods and prep rooms have been provided. Both buildings contain data connections and are designed with adaptability for future technological expansion. Building functions are organized and work spaces easily detectable.

Page 7: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Light for LearningLearning Environment:Typical classrooms are equipped similarly to allow flexibility for subject or grade level to be taught. All spaces are environmentally controlled, have dual lighting, and windows to allow natural light.

Page 8: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Materials to LastPhysical Environment - Building materials were selected to provide a low maintenance, long lasting facility that could stand the test of time. Brick, glass and metal were used for the exterior while metal stud construction, VCT and ceramic tile were used on the interior. The MEP system is centrally controlled by the owner for maximum efficiency and prolonged life. Multiple lighting levels are provided for savings on energy usage.

Page 9: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

SustainabilityPhysical Environment –The site drainage was accomplished mostly with an underground system. Landscape areas are dispersed throughout the parking and hardscape areas to provide drainage. Water efficiency was accomplished using water efficient plumbing fixtures, including the landscape irrigation system. The HVAC system is served from the main campus central plant with the air handler units controlled through the building automation system. Lighting is multi-level to allow for energy savings. Strategic locations of window systems were installed for natural light in high traffic and instructional spaces.

Page 10: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Collaboration & PlanningThe planning process included a collaboration of JISD administrators, educators, facility planners and ACCD staff from conception of the program requirements, the design charrette and design development to the review of pricing exercises of the construction documents. The education program was conceived and executed in the development of the design program for an estimated student body of 500 and modified accordingly to suit user needs.

Page 11: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Floor plan – Administration Building

Page 12: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Exhibition of School Planning and Architecture 2010 Project Data

Submitting Firm : PBKProject Role Architecture, Civl Engineering, MEP EngineeringProject Contact Joel E. Hernández, AIA, REFPTitle PartnerAddress 601 N.W. Loop 410, Suite 400City, State or Province, Country San Antonio, Texas 78216Phone 210-829-0123

Joint Partner Firm: N/AProject RoleProject ContactTitleAddressCity, State or Province, CountryPhone

Other Firm: AccuTechProject Role Structural EngineeringProject Contact Henry Martinez, PETitle PrincipalAddress 909 N.E. Loop, Suite 900City, State or Province, Country San Antonio, Texas 78209Phone 210-930-5355

Construction Firm: Satterfield & PontikesProject Role Construction ManagerProject Contact Mike BarbourTitle Project ExecutiveAddress 12015 Starcrest City, State or Province, Country San Antonio, Texas 78247Phone 210-637-5250

Page 13: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Exhibition of School Planning and Architecture 2010 Project Details

Project Name   Judson Early College Academy

City   San Antonio

State Texas

District Name   Judson Independent School District

Supt/President Dr. Willis Mackey

Occupancy Date August 2009

Grades Housed   9 - 12

 

Capacity(Students)   500

Site Size (acres)   10.52

Gross Area (sq. ft.)   55,886

Per Occupant(pupil)   112

gross/net please indicate   Gross

 

Design and Build?   No

If yes, Total Cost: N/A

Includes:   N/A

 

If no,  

Site Development:   $1,916,474

Building Construction:   $9,010,875

Fixed Equipment:   Owner provided equipment

Other:  

 

Total:   $10,927,349

Page 14: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture

Floor plans – Education Building

First Floor

Second Floor

Page 15: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture
Page 16: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture
Page 17: Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture