jem meis inc1920 31407 marangoni experiment inc19/20
DESCRIPTION
- PowerPoint PPT PresentationTRANSCRIPT
1 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
JEM MEIS INC1920 31407
Marangoni Experiment Inc19/20
Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA).
Instructor: Yuki Kawai Takuya Takami
2 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Objectives
After this lesson the trainee will be able to:
Marangoni Experiment
MS (Marangoni Surface)
Marangoni Experiment Operations Overview
Key point during Marangoni Experiment Operations
Marangoni Experiment Operations
Explain the science objective of Marangoni Experiment. List onboard outcomes from performing Marangoni Experiment.
List three components of MS. Explain how liquid bridge is formed.
List crew tasks regarding Marangoni Experiment.
Explain what crew must check after assembling MS Core and MS Cassette to prevent fire during experiment. Explain what crew must pay attention to protective covers to prevent broken glass hazard. Identify the parts where crew must not damage nor contaminate. Explain what crew must check just before installation of MS into FPEF. Explain what crew must care during 3-D Camera focus adjustment. Explain what crew must not do while inserting MS Cassette into MS Core .
Perform Marangoni Experiment tasks according to ODF.
3 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Contents:
- Marangoni Experiment
- MS Architecture
- MS Major Components
- Marangoni Experiment Operations Overview
- Key Points during Marangoni Experiment Operations
- Acronyms
Page
4
5
6
8
14
15
Lesson Outline
4 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
The main purpose of Marangoni Experiment is to investigate the transition process to periodic, chaotic and turbulent flows of marangoni convection in a liquid bridge.
Marangoni Experiment
Experimental data (temperature, cooling disk position etc.) monitored by MS and FPEF (downlinked to ground via Fluid Physics Experiment Facility (FPEF))
Video Images taken by MS and FPEF (downlinked to ground via Image Processing Unit (IPU), and IPU VRU Disk will be returned to ground)
Microgravity environment data taken by Microgravity Measurement Apparatus (MMA). (downlinked to ground via Image Processing Unit (IPU))
Onboard Outcomes from the experiment
5 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
MS Architecture
MS (Marangoni Surface) is one of FPEF Experiment Cell, and is able to generate Marangoni convection and measure surface velocity of liquid bridge.
MS consists of three components. Crew member assemble/ disassemble MS.
Install to Install to FPEFFPEF
Liquid bridge formation part
MS Body- has mechanical/ signal/ power interfaces with FPEF. - mounts Surface Velocity Measurement Equipment.
-forms liquid bridge up to 60mm length and creates temperature gradient between heating disk and cooling disk.
Heating disk: 90 deg C (maximum) Cooling disk: 5 deg C (minimum)
MS Core
MS Cassette
-contains heating disk and cooling disk of 30mm in diameter.-has optical windows.
-contains silicone oil (viscosity: 5cSt or 10cSt) with small particles/ photochromic dye.
-crew exchanges MS Cassette as a unit.
MS
30mm in diameter
60mm maximum
liquid bridge
6 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
MS conceptual diagram for Liquid Bridge Surface Observation
CCD Camera
Light Source of GN2 Laser
Mirrors , Prism
Liquid Bridge
MS Major Components
Surface Velocity measurement equipment
Light Source of GN2 Laser
GN2 laser path
CCD Camera
LEDs are used as a backlight
Colored spot
- consists of GN2 laser, mirrors, prism, CCD camera, and LEDs. - irradiates GN2 laser beam to the surface of liquid bridge.- Liquid bridge which contains photochromic dye is colored when it is irradiated by GN2 laser. - observes the movement of the colored spot by CCD Camera to measure surface velocity.
7 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
MS Core
MS Cassette
Liquid Bridge
Sample Pumped
Heating Disk
Cooling Disk
Bellows for Sample Reservoir
GAr Supply & Waste Gas Line
Cooling Water Inlet & Outlet
Peltier Device
Motor
Installation
MS Cassette will be installed into MS Core.
MS Major Components (Cont’d)
Liquid bridge formation part
QDs for cooling water
QDs for gas lines
Liquid bridge formation part MS CoreMS Cassette
MS Core MS Cassette
Liquid bridge formation part
8 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Marangoni Experiment Inc20 Operations Overview
:Crew operation necessary.
:Ground operation.
LEGEND:
Install MS into FPEF
Experiment
Assemble MS (new MS Cassette)
UDC/MMA Activation
Remove MS from FPEF
UDC/MMA Deactivation
MMA Data AcquisitionIPU Video Downlink/Recording
Disassemble MS
MS Maintenance- O-ring exchange, cleaning etc.
Exchange IPU VRU Disk
FPEF Operation IPU Operation MMA Operation
FPEF Maintenance- Lamp exchange
- Load connector connection/disconnection
9 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Assemble MS
1. Attach MS Core and MS Body to MWA by using handle and M
WA I/F tools
2. Install MS Cassette to MS Core
3. Conduct leak check by using MS Hand Pump
4. Install MS Cassette/Core to MS Body
5. Attach Fiber Optic Cable
* Adjust knob of LED/SENSOR CAL as required
* Change temperature channel as required
Assemble MS
MS Body
MS Core MS Cassette
10 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
MS MWA I/F B
MS Handle B
MS Core
-Crew assembles MS Handle B.
-is attached to MS Core, and fixed to MWA I/F B.
-has two direction of fixing to MWA I/F B.
-is used to secure MS Core with MS Handle B to MWA.
-is rotatable every 45 degrees.
MS Body MWA
MS MWA I/F A
-is used to secure MS body to MWA.
- can be folded.
Assemble MS (Cont’d)
11 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Fiber Optic CablesMS Body
MS Hand Pump
MS Cassette
-is attached to MS Cassette to depress inside of liquid bridge formation part.
Engineering Model
Flight Model
MS Core
Assemble MS (Cont’d)
12 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Cover
Knob for LED
Knob for SENSOR CAL
Temperature channel connector
(One of three is connected)
Assemble MS (Cont’d)
13 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
1. Remove FPEF Front Cover2. Check 3-D Camera settings (diaphragm and focus)3. Install MS into FPEF4. Install IR Imager into operations position5. Connect Harnesses/Hoses between FPEF and MS6. Attach Experiment Cover Body7. Connect FPEF Payload Bus Cable8. Connect hoses with FPEF Silicone Filter Unit9. Attach Experiment Cover Plate10. Connect video cables between FPEF and IPU
IR Imager
MS
Experiment Cover Plate Experiment Cover Body
Silicon Filter interface
1553B cable pass through
Experiment Cover Body
Silicone Filter Unit
diaphragm
Install MS into FPEF
focus ring spacer focus ring screw
3-D Camera setting
Install MS into FPEF
diameter of liquid bridge (30 or 50)
14 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
1. Connect FPEF Load Connector P12 to J122. Update FPEF software (Ground)3. Disconnect FPEF Load Connector P12
FPEFLamps
FPEF Maintenance
FPEF Maintenance
Lamp exchange
1. Remove Lamps with Lamp House Cover from FPEF2. Separate Lamp House Cover and Lamps3. Exchange Lamps4. Install new Lamps with Lamp house Cover into FPEF
Load connector connection/disconnection
FPEF Load Connector P12
J12
Lamp House Cover
15 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Category Key Point
Crew Safety - Conduct leak check after assembling MS Core and MS Cassette to prevent fire during experiment.- Do NOT remove more MS protective covers than identified in each step of procedures to prevent broken glass hazard.
Time Critical Operations N/A
Dos and Don’ts - Do NOT damage nor contaminate glass parts of Fiber Optic Cable, windows, cameras or mirrors.- Check the diaphragm of 3-D Camera just before installing MS into FPEF.- Do NOT rotate focus ring screw during adjusting 3-D Camera focus.
Difficulty in Ops. N/A
Possible Mis-Ops. - When inserting MS Cassette into MS Core, if you feel interference, do NOT push MS Cassette any more to prevent silicone oil leakage. At that time pull out MS Cassette once, and try again.
Key Points during Marangoni Experiment Operations
16 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Acronyms
CCDFPEFGArIPUIR MMAMSUDCVRU
Charge Coupled DeviceFluid Physics Experiment FacilityGas ArgonImage Processing UnitInfraredMicrogravity Measurement Apparatus Marangoni SurfaceUtility DC/DC ConverterVideo Record Unit
17 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Appendix
-Lamp housing
18 Training Purposes OnlyJEM MEIS INC1920 31407JMU-081198(Ver. 1.0)
Lamp housing
Front side
Front side
Front side
FPEF Lamp House Cover
FPEF Lamps
Upper side
Lamp 1
Lamp 2
connection point for thermostat-wire