Page 1: IHEP Cryomodule Status

IHEP Cryomodule Status

Jiyuan Zhai

On behalf of the IHEP ILC SRF R&D Team

AWLC14, May 14, Fermilab

Page 2: IHEP Cryomodule Status

2

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

Page 3: IHEP Cryomodule Status

IHEP ILC-TC1 Cryomodule

3

• Short cryomodule with one low-loss large grain 9-cell cavity (VT 20MV/m, Q0=1.4E10)

• Cylindrical magnetic shield inside helium vessel

• STF type input coupler and tuner• Module assembly to complete in

July 2014, horizontal test in 2015

Page 4: IHEP Cryomodule Status

4

Cryomodule Assembly

Assembly Hall in IHEP Building #2

Page 5: IHEP Cryomodule Status

5

Cavity Clean Room Assembly

Page 6: IHEP Cryomodule Status

6

Cavity Clean Room Assembly

Careful Clean Room Assembly Operations (PFFA)

Beam Tube Assembly Gate Valve Assembly Cavity Assembly Prep

Page 7: IHEP Cryomodule Status

7

Cavity Clean Room Assembly

• Coupler Mounting Test

• Slow Pumping and N2 Purging

• Middle-position slide jack tuner with four guiding rods

• Helium vessel bellow and tuner flanges sagging when loose the support fixtures; will be restored when the tuner is installed.

2mm

Page 8: IHEP Cryomodule Status

8

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

Page 9: IHEP Cryomodule Status

9

Horizontal Test Facility Layout

Power SourceDeliver in end 2014

Cryogenic PlantIn commissioning

TunnelHorizontal test & beam test

Vertical test DewarDeliver in September

IHEP Building #1

Page 10: IHEP Cryomodule Status

10

Cryogenic System in Commissioning

Cold box and compressor: refrigeration [email protected], liquefication: 284 L/h

2K pumps: 8000 m3/h @ 3100 Pa

Page 11: IHEP Cryomodule Status

11

1.3 GHz Klystron and Modulator Ordered• 1.3 GHz 5 MW Klystron and Marx Modulator will deliver in end 2014

Page 12: IHEP Cryomodule Status

12

Outline

• IHEP ILC-TC1 Cryomodule Assembly

• Horizontal Test Facilities

• Cavity Fabrication

Page 13: IHEP Cryomodule Status

13

TESLA-like Cavity Fabrication

• End groups EBW ongoing

• Cavity EBW to be done in July

• Process and test at KEK

Page 14: IHEP Cryomodule Status

14

TESLA Cavity Production

• HERT Company• FG TESLA 9-cell cavity• Pressing and EBW test

and optimization• One prototype in 2014

Page 15: IHEP Cryomodule Status

15

Summary

• IHEP ILC test cryomodule assembly is ongoing and will be finished in July 2014.

• Hardware preparation, environment and component cleanliness, vacuum, alignment and assembly procedures are studied and conducted carefully for cavity clean room assembly.

• Cryogenic system and power source will be ready in end 2014 for the module horizontal test.

• Prototype production of a fine grain TESLA-like 9-cell cavity and a fine grain TESLA 9-cell cavity will be done in mid and end 2014 respectively.

Page 16: IHEP Cryomodule Status

16

Thank you!