MINUTE ITEM This Cofendor Item No Qaft .... WOS Jsr,oved OS Minute ITEM C No. by the State Lands C 12 4 omrnlsslon by a vote Qf i/- at Its ll lls Jcf :: s 2 ?1E;Ft1ng. _ I I 11/15/94 PRC 78G3 W 40698 PRC 7809 W 24986 Willard Frey Gonzalez APPROVE A MINERAL EXTRACTION LEASE AND SURFACE ESTATE AGREEMENT, NAPA AND YOLO COUNTIES APPLICANT: Homestake Mining Company of California Attention: Dennis B. Goldstein 650 California Street, 10th Floor San Francisco, California 94108-2788 AREA, TYPE LAND AND LOCATION: This item involves approximately 305 acres of School Land located immediately adjacent to and on both sides of the McLaughlin Open Pit gold mine in Napa and Yolo Counties (see land description Exhibit "A" and site map Exhibit "B"). A dispute exists between Homestake Mining Company of California (Homestake) and the State of California (State) over the title to the mineral and the surface estate of the proposed lease area. LAND USE: .. - The lease area, referred to in the proposed lease as the "Mineral Property", contains approximately 305.12 acres comprised of Lots l through 11 and the NE 1/4 of the SE 1/4 of Section 36, Township 12 North, Range 5 West, MDB&M, situated in the counties of Napa and Yolo. The Mineral Property is enclosed within the approximately 17,000 acres McLaughlin Gold Mine Property and is adjacent to the 214 acre open pit mine which is in active gold production. The Mineral Property is to be explored for gold and other valuable minerals by a mandatory drilling of exploration drill holes from the surf ace and possibly by underground drifting from within the existing open pit. The prospecting work to be conducted under the terms of the mineral extraction lease is fully described in the "Prospecting and Development Plan, Exhibit A", of the mining lease on file in the off ice of the Commission, The Surf ace Estate Agreement covers the same area as the mineral extraction lease and allows Homestake to occupy and use the surf ace estate and the improvements thereto and to comply with the reclamation plans for the surface. This -1- CALENDAR PAGE MINUTE PAGE 624

Upload: nguyencong

Post on 10-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

MINUTE ITEM This Cofendor Item No Qaft ....

WOS Jsr,oved OS Minute lfe~ENDAR ITEM

CNo. by the State Lands C 12 4

omrnlsslon by a vote Qf i/-to~ at Its ll lls Jcf ::

s 2 ?1E;Ft1ng. _ I I

11/15/94 PRC 78G3 W 40698 PRC 7809 W 24986

Willard Frey Gonzalez

APPROVE A MINERAL EXTRACTION LEASE AND SURFACE ESTATE AGREEMENT,

NAPA AND YOLO COUNTIES

APPLICANT: Homestake Mining Company of California Attention: Dennis B. Goldstein 650 California Street, 10th Floor San Francisco, California 94108-2788

AREA, TYPE LAND AND LOCATION: This item involves approximately 305 acres of School Land located immediately adjacent to and on both sides of the McLaughlin Open Pit gold mine in Napa and Yolo Counties (see land description Exhibit "A" and site map Exhibit "B"). A dispute exists between Homestake Mining Company of California (Homestake) and the State of California (State) over the title to the mineral and the surface estate of the proposed lease area.

LAND USE:

.. -

The lease area, referred to in the proposed lease as the "Mineral Property", contains approximately 305.12 acres comprised of Lots l through 11 and the NE 1/4 of the SE 1/4 of Section 36, Township 12 North, Range 5 West, MDB&M, situated in the counties of Napa and Yolo. The Mineral Property is enclosed within the approximately 17,000 acres McLaughlin Gold Mine Property and is adjacent to the 214 acre open pit mine which is in active gold production. The Mineral Property is to be explored for gold and other valuable minerals by a mandatory drilling of exploration drill holes from the surf ace and possibly by underground drifting from within the existing open pit. The prospecting work to be conducted under the terms of the mineral extraction lease is fully described in the "Prospecting and Development Plan, Exhibit A", of the mining lease on file in the off ice of the Commission,

The Surf ace Estate Agreement covers the same area as the mineral extraction lease and allows Homestake to occupy and use the surf ace estate and the improvements thereto and to comply with the reclamation plans for the surface. This

-1-

CALENDAR PAGE

MINUTE PAGE

624

Page 2: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

---- -· CALENDAR ITEM NO. C 12 4 (CONT'D)

agreement provides for the continued use and occupancy by Homestake of the surface estate until terminated by the parties in writing.

PROPOSED LEASE TERMS: l. The primary term of this lease shall be 15 years with a

right of renewal for one additional term of 10 years.

2. Annual rental of $7.50 per acre for the first through fifth lease years; $15.00 per acre for the sixth through tenth years; and $60.00 per acre for the tenth through fifteen years.

3. For gold, silver and other precious metals produced from the Mineral Property by underground mining methods, Homestake shall pay the State, a production royalty of three percent (3%) of the gross proceeds received from the sale thereof; for precious metals produced by open pit or surface mining methods, Homestake shall pay the State, a production royalty of four percent (4%) of the gross proceeds from the sale thereof.

4. For production of other "hard minerals" from the Mineral Property, Homestake will pay the State, a production royalty of ten percent (10%) of the gross proceeds for the sale thereof.

5. All State royalties will be deposited into an interest bearing escrow account pending resolution of the surface and mineral ownership dispute.

6. Homestake shall diligently prospect the Mineral Property during the first 24 months of the lease term in accordance with the "Prospecting and Development Plan", Exhibit A, of the mineral extraction lease.

BACKGROOND: The McLaughlin Open Pit Gold Mine is located at the junction of Lake, Napa and Yolo Counties and has been in production since 1985. The open pit mine and associated processing plant have a production capacity of over 5,000 tons of ore per day. Production of gold in 1993 totaled over 305,000 ounces. Over two million ounces of gold have been produced

-2-

... '

• CALENDAR PAGE - 625

MINUTE PAGE

Page 3: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

CALENDAR ITEM NO. C 12 4 (CONT'D)

from the McLaughlin Open Pit Gold Mine since startup of the operation.

STATUTORY AND OTHER REFERENCES: A. P.R.C.: Div. 6, Parts 1 and 2; Div. 13. B. Cal. Code Regs.: Title 3, Div. 3;

AB 884: N/A

OTHER PERTINENT INFORMATION: 1. The County of Napa and the Bureau of Land Management

(BLM) jointly prepared and certified EIR 048/EIS-INT 83-30 in 1984, SCH No. 82101201, as the environmental document for the permitting and licensing of the mining and mining related activities at the McLaughlin Mine. A copy of this EIR/EIS is on file in the offices of the Commission.

2. Homestake has submitted copies of State and local agency required reclamation plan, environmental monitoring manual, emergency response plan, mine/mill spill prevention, control and countermeasure plan, and contiguous lands management plan.

3. Homestake shall pursue environmental review and permitting by local and State agencies for any future mining, exploration or development activities not described and analyzed in the certified EIR/EIS and already permitted by the Lead Agency, Napa County.

EXHIBITS: A. Land Description B. Site Map C. CEQA Findings

IT IS RECOMMENDED THAT THE COMMISSION: 1. FIND THAT THE COUNTY OF NAPA, AS CEQA LEAD AGENCY, AND THE

BUREAU OF LAND MANAGEMENT, HAVE PREPARED AND CERTIFIED EIR 048/EIS-INT 83-30, STATE CLEARINGHOUSE NO. 82101201 FOR THIS PROJECT AND THAT THE COMMISSION HAS REVIEWED AND CONSIDERED THE INFORMATION THEREIN.

2. ADOPT THE CEQA FINDINGS MADE IN CONFORMANCE WITH SECTION

-3-

CALENDAR PAGE 626

MINUTE PAGE

Page 4: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

CALENDAR ITEM NO. C 12 4 (CONT'D)

15096(h) OF THE STATE CEQA GUIDELINES, AS CONTAINED IN EXHIBIT "C", ATTACHED HERETO.

3. AUTHORIZE ISSUANCE OF A MINERAL EXTRACTION LEASE AND EXECUTION OF SURFACE ESTATE AGREEMENT WITH HOMESTAKE MINING COMPANY OF CALIFORNIA FOR A PRIMARY TERM OF FIFTEEN YEARS EFFECTIVE ON THE FIRST DAY OF THE MONTH FOLLOWING THE MONTH IN WHICH THE LEASE AND SURFACE ESTATE AGREEMENT ARE APPROVED BY THE STATE LANDS COMMISSION.

-4-

CALENDAR PAGE 627 LI_"'- ..ILL ·--MINUTE PAGE

Page 5: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

EXHIBIT "A"

LAND DESCRIPTION

w 40698/24968

Lots 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, and the NE 1/4 of the SE 1/4 of Section 36,

Township 12 North, Range 5 West, Mount Diablo Base & Meridian, said land is

situated in the Counties of Napa and Yolo, State of California, including 305.12

acres, more or less, also identified as the "Mineral Property".

END OF DESCRIPTION

Prepared by SFBCC Team August 1994

CALENDAR PAGE 628 MINUTE PAGE

Page 6: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

EXHIBIT "B" Site Map W40698/24968

Homestake Mining Mineral Lease Yolo County Napa County

NOlE:

THIS EXHIBIT IS SOLELY FOR PURPOSE OF GENERALLY DEFINING THE LEASE PREMISE, AND IS NOT INTENDED TO BE, NOR SHALL IT BE CONSTRUED AS, A WAIVER OR LIMITATION OF ANY ST A TE INTEREST IN TIIE SUBJECT OR A..NY OTHER PROPERTY.

CALENDAR PAGE

M:CNUTE PAGE JKH 1

Page 7: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

L -. -·-

... _

CEOA F um I NGS

CALENDAR PAGE 630

MINUTE PAGE

Page 8: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

L i ,_

I. [

I '

,-!

,.....

I

--I

r I

-

-

-!

' I,

-

BACKGRJUNO:

McLALGHLIH GOLD MINE PR:>JECT Use Permit C/U-198283)

RECX>..,..ENDEO

FINDINGS OF THE a>NSERVATION, DEVELOPMENT ANO PLANNING a>t~ISSION OF 'THE COUNTY OF NAPA MADE IN ACCX>RDANCE ·Willi 'THE PR)VISIONS OF 'THE CALIFORNIA ENVIRONfof:NTAL OUAlliY ACT OF 1970, AS AMENDED.

1. The Homestake Mining Company ts proposing to develop a gold mine and ex-traction facilfty Involving approximately 1,450 acres and located along Berryessa/Knoxville Road-M:>rgan Valley Poad near the junction of Napa, Lake and Yolo Counties. The project Is known as the Mclaughlin Gold Mine Project (Mclaughlin Project>.

The project Includes the mining of ore from an open pit in Napa and Yolo Counties, crushing and grinding in Napa County for transoort in a slurry pipeline to a mill processing facility In Lake County. The tailings will be deposited in a tailings disPosal site in lake County. Waste rock wf I I be disposed in a waste rock disposal site in Napa County. Water wi 11 be suppl led from -a reservoir in Yolo County. A portion of fJorgan Valley Road and Berryessa/Knoxville Road in Napa and L~ke Counties will be relocated and improved. P.G.& E. transmission fines (115 KV Power Line) will be extended from Lower Lake qenerally along M::>rgan Valley Road to the mine site.

Facilities located in Napa County include approximately 80% of the mine pit, waste rock disposal site, crushing and grindin~ facilltles, mine truck shop/office and warehouse, domestic sewage treatment facilities and holding pond, sediment control ponds M-1, f~2, W-1 and W-3, low gr-ade ore stockpiles, topsoil stockpile A, slurry pipeline/waterline, 115 KV high voltage main electrical substation, tank farm and fuel dispensing island on Napa County Assessor's Parcels No's. 15-010-03, 04, 05, 07, 08, 11, 15, 16, 17, 19 & 20; 15-020-01, 03, 04, 06 & 07; and 15-100-08.

2. The Mclaughlin Project requires that discretfonary permits be approved by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and local Special Dfstrlcts. <See Tables 1.1 and 1.2 of the Final EIR/EIS>. Napa County's permit require­ments include the approval of a Use Permit and Surface Minin~ and Reclam­ation Permit CSMARA) by the Conservation, Development and Plannlng Corrrnlssion CCOPC).

3. An Environmental Impact Report/Environmental Impact Statement CFinaf EIR/EIS) was prepared for the Mclaughlin Project. On Juf't 6, ·1983, the COPC certl fied that the Final EIR/EIS was comp-•& 1

- '' - -

the Cal i-fornla Environmental Oual lty Act of 19 'OcAf~d~Qi:fOA), 631

MINUTE PAGE

Page 9: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

the State EIR Guidel Ines and the Napa County CEOA Guldel Ines. Approve! of the El S under provi slons of the Natlonal Poll c:y k::t H:EPA) has been the responslbility of the Bureau of ~nd PJenagement CBLM> and has been approved.

Fl NOIUGS:

1. The CC'PC has read and considered the Information contained in the Flnal EIR/EIS prepared for the Mclaughlln Gold Mine Project.

2. Based on the information contained In the Final EIR/EIS, the COPC has determined the Mclaughlin Project would have a significant effect on the environment.

3. The CC'PC included the environmental mltlgetlon measures, Identified In Attachment B into the Mclaughlin Project which eliniinates or signifi­cantly reduces associated significant environmental effects.

4. The Final EIR/EIS found that the McLaughlin Project would have the following unavoidable significant environmental effects:

UNAVOIM8LE SIGNIFICANT ADVERSE EFFECTS:

Habitat loss from vegetation rerroval durlnq construction and operation •

- Erosion Increases during construction activities.

- Conversion of grazing land to reservoir use, resulting in loss of grazing land.

- Loss of seeps and springs that provide water for wlldllfe and sensitive plants.

Loss of 121 sensitive plant populations.

Increases In noise levels In project vicinity from truck traffic.

Increases In dust generation.

Leaks, spills, or accidents from hazardous materials handling and storage.

- Visual disturbances that would be Inconsistent with BU~'s Visual Resource Management System.

- loss of potentially significant cultural resource sites In the project area.

- Change In land use from a quiet rural industrial type.

-2-

CALENDAR PAGE 632

MINUTE PAGE

Page 10: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

-•

..

Increase In rent levels In Lake County during the peek con­struction period.

Increase in demand for services by new employees In housing un I ts In Lake County.

5. In accordance with Section 15091 of the State CEQA Guidelines, the fol lowing findings are adopted:

a. The COPC has Included Into the McLaughlin Project the environ­mental mitigation measures Identified in Attachment B. Said mitigation measures will eliminate, avoid or slgnlflcantly reduce associated significant environmental effects Identified In the Final EIR/EIS for project related activities located In Napa County.

b. Because the P-1c:Laughl in Project involves land located In two other Counties <Lake and Yolo) and on lands mana~ed by the SLM, the environmental mitigation measures recomnended in the Final EIR/EIS are within the responsibility and jurisdiction of other public agencies and should be adopted by the a~ncies to fully mitigate the associated significant environmental effects of the P-1c:Laughlin Project~

6. In accordance with Section 15091 of the State CEOA Guidelines, the fol lowing finding is adopted:

STATEMENT OF OVERRIDING CONS I OERATIONS:

The following public benefits derived from the project ou1'weiqh the unavoidable significant adverse effects resultino from the construction and operation of the Mclaughlin Gold Project:

a. Sionificant Beneficial Effects of the Mclauchlin Project Identified in the Final EIR/EIS:

Upgrading and real lgnrnent of r-t>rgan Valley Fbad-Berr-yessa/ Kno>CVI I le Fbad resulting In slgnl fl cant Improvement from the standpoint of public safety from Lower Lake to the project SltA•

Electricity and telephone services to properties along ~brgan Valley Pead from proposed transmission and telephone lines from Lower Lake to project area •

Improvement in wa'ter qual lty of Knoxvi I le Creek.

Increase In property value of project site and resultant Increase In revenues to Napa, Lake and Yolo Counties.

Increase in local employment opportunltl !S du£.Jibii'i:l8cfi con- 633 struct ton and operation.

11---C_AL ________ ..,...!1"1"1~--;1 II 4. 1111..• I

MINUTE PAGE ----

-3-

Page 11: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

1 .1 11 :1 1 !l ,, i1 !1 i, l

:1 1 i, ,, :1 , :1 .

:1 , ,

USE PERMIT/SMAAA PERMIT FINDINGS

CALENDAR PAGE

MINUTE PAGE

Page 12: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

r I I

Increased oppor-tunlty for reereatlonal use of BLM lands fol lowing upgradl ng of M:>rgan Va I ley lbad-Berryessa/Knoxvi I le lbad.

b. Addltlonal Public Benefits:

Clean-up of the extensive, unraelalmed, disturbed areas at the mine site resulting from the Manhattan Mine operation.

CALENDAR PAGE 635

MINUTE PAGE -4-

Page 13: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

I.

BACKGR)UNO:

McLAUGHLIN GOLD MINE PR:>JECT Use Permit CIU-198283)

REC0""'4ENOED

FINDINGS OF THE COt~SERVATION, DEVELOPMENT ANO PLANNING (X)t.f-11SSION OF THE COUNTY OF NAPA APPR)VING THE t-1clAUGfLIN Gr.LO MHJE PROJECT.

1. The Homestake Mining Company is proposlnq to develop a gold mine and extraction facility involving approximately 1,450 acres and located alonQ Berryessa/Knoxvllle Road-P-br~an Valley Road near the junction of Napa, Lake and Yolo C.Ounties. The project is known as the Mclauqhlin Gold Mine Project (Mclaughlin Project>.

The project includes the mining of ore from an open pit in ~lapa and Yolo Counties, crushing and grinding in Napa County for transool'"t in a slurry pipeline to a mill processing facility in Lake County. The tailings will be deposited in a tailings disposal site in Lake C.Ounty. Waste rock wil I be disposed In a waste rock disposal site In Napa County. Water will be supplied from a reser'JOir in Yolo County. A pol'"tion of tlorgan Valley Fbad and Berryessa/Knoxvi I le Road in Napa and· L~ke Counties will be relocated and impri,ved. P.G.& E. transmission lines (115 KV Power Line) wi 11 be extended from Lower Lake qeneral ly along '-brqan Valley Road to the mine site.

Facilities located in Napa C.Ounty Include approximately 80% of the mine pit, waste rock disposal site, crushinq and ~rindin~ facilities, mine truck shop/office and warehouse, domestic sewage treatment facilities and holding pond, sediment control ponds ~'-1, r~2, W-1 and W-3, low grade ore stockpiles, topsoil stockpile A, slurry plpellne/waterline, 115 KV high voltage main electrical substation, tank farm and fuel dlspensin~ isl and on Napa County Assessor's Parcels No's. 15-010-03, 04, 05, 07, 08, 11, 15, 16, 17, 19 & 20; 15-020-01, 03, 04, 06 & 07; and 15-100-08.

~. The Mclaughlin Project requires that discretionary pel""n'its be approved by Lake, ~Japa and Yolo Counties, the Bureau of Land Management CBUI), various State and Regional agencies, and local Special Districts. <See Tables 1.1 and 1.2 of the Final EIR/EIS>. Napa County's penr:it require­ments include the approval of a Use Permit and Surface Minin~ and Reclam­ation Perrr.it CSMARA) by the C.Onservation, Development and Pl annin~ C.Orrmlsslon CCDPC).

3. An Environmental Impact Report/F.nvlronmental Impact Statement CFlnal EIR/EIS> was prepared for the McLaut;hlin Project. On Jul 6 1983, the CDPC certified that the Final EIR/EIS was comp e e 1n comp ance w1 the Cal 1 fornia EnvironmenTal Ouallty Act of 19 OJ.AW:~d~Cf~OA), 636 the State EIR Guidelines and the Napa r..ounty .A I ne. ppro of the EIS under provisions of the National Po n the responsibi I ity of the Bureau of Land Mana~ement CRU-1) i!!lnd has been "'"""'"""VO,..

Page 14: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

.... '

FINDINGS:

1. The CDPC approves the Use Permit application and SMARA Permit applica­tion CIU-198283) subject to the conditions contained In Attachment .A,__ and the mltl~ation measures contained fn Attachment~·

2. The COPC finds that the Project Oescriptlon/Envlronmental Assessment Report, dated Februe!"Y, 1983 and submitted as part of the appl I cation for a Surface Mining Permit, fs complete and adequately describes the project mining plan •

.3. The CDPC finds that the Flnal EIR/EIS, prepared for the Mclaughlin Project and certified by the Conmisslon on July 6, 1983, compiles with the provisions of the California Environmental Ouality Act of 1970, as amended.

4. The COPC, In accordance with Section 15091 of the State CEOA Guidelines, made the fol lowing findings:

a. The CDPC has included Into the f"1clau~hlln Project ~he environ­mental mitf~ation measures Identified In Attachment JL_. Said mitigation measures will eliminate, avoid or slonificantly reduce associated significant environmental effects Identified In the Final EIR/EIS for project related activl'f"les located in Napa County.

b. Because the Mclaughlin Project Involves land located In 'hto

r I

l [

I I I I I I I

other Counties C Lake and Yolo) and on I ands rnanaaed by the BLt.1,

1 the environmental miti~atlon measures recomr1ended In the Final EIR/EIS are within the responsibility and jurisdiction of other public agencies and should be adopted by the aaencies to fully miti~ate the associated si!=!ftificant environmental effects of I the MclauQhlin Project.

5. The COPC, In accordance with Section 15091 of the State CEOA Guidelines, made the following finding:

STATEtJENT OF OVERRI 01 NG CDNS I OERATI ONS:

The fol I owing pub I I c benefits derived from the project outwei~h the unavoidable sl~niflcant adverse effects resulting from the construction and operation of the Mclaughlin Gold Project:

a. Sionificant Beneficial Effects of the Mclaughlin Project Identified in the Final EIR/EIS:

Upgrading and realignment of M::>rgan Valley A:>ad-Berryessa/ Knoxville fbad resulting In significant Improvement from the standpoint of public safety from Lower Lake to the project site.

(2) CALENDAR PAGE

MINUTE PAGE

I I I I I

Page 15: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

J.

...,

-'

-1 J

......

I i \

-I I I

i I

.., I

~

~ I. I

I

---

--

6.

7.

. a.

9.

Electrlclty and telephone ser-vlces to properties elong ~rgzin Valley Fbad from proposed transmlssron and telephone I Ines from Lower Lake to project ·arezi.

Improvement In water qua I lty of Knoxvl I I e Creek.

Increase In proper-ty value of project site end resultant increase Jn revenues to Napa, Lake and Yolo Counties.

lncntase in local employment opportunities during project con­struction and operation.

Increased opportunity for recreational use of BLM lands fol lowing upgrading of M:>rgan Valley Fbad-Berryessa/Knoxville A::>ad •

b. Addltional Public Reneflts:

Clean-up of the extensive, unreclalmed, disturbed areas at the mine site resulting from the Manhatten Mine operation.

The COPC finds that the approved project will not ntsult in detrinental effects to the public health, safety or general welfare.

The CCPC finds that the approved project is consistent with the Napa County General Plan.

The COPC finds that the approved project is in confonnance with the Naoa County Zoning Ordinance •

The COPC finds that the approved project Is in confonnance with the California Surface Mining and Reclamation Act of 1975 and the Napa County Surface Mining and Reclamation regulations set forth in the Napa County Code.

10. The COPC finds that the timing of the reclamation activities provides for reclamation to begin upon completion of the minlnq operation. Reclanetion of the waste rock facility will be ongoing throughout the life of the project.

11. The COPC finds that the estimated cost of reclamation reasonably approximates the projected cost of reel amation wor-k proposed in the

12.

reel amation pl an. Prior to conmencement of mining operations, Homestake Mining Company will be required to execute a financial assurance agree­ment with Napa County for reel amatlon and for emergency clean-up and abatement work.

The COPC finds that the Homestake Minlnq Company has provf ded the County with evidence that Homestake has a public llabillty polfcy in force for both the mining and reclamation operation which provides for personal Injury and property protection In - 1" t compensate any or a 11 persons Injured or for p result of the mining or reclamation operatlons11-----------ro:6,..3,.,8~_41

MINUTE PAGE CJ)

Page 16: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

NO TEXT ON THIS PAGE

~ CALENDAR PAGE

Mnm'1'J: PAGE

Page 17: i/- C 12 4archives.slc.ca.gov/Meeting_Summaries/1994_Documents/11...by Lake, Uapa and Yolo Counties, the Bureau of land Management CBLM>, various State and Regional agencies, and

NO TEXT ON THIS PAGE

CALENDAR PAG

MINUTE PAGE