ADVANCED VISION MOROCCO ELECTRO MECHANICAL WORKS Delivering Innovative And Reliable Solutions COMPANY PRESENTATION July 2017

Upload: others

Post on 11-Sep-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED

VISION MOROCCOELECTRO MECHANICAL WORKS

Delivering Innovative And Reliable Solutions

COMPANY PRESENTATION

July 2017

Page 2: HVAC Fire Protection Plumbing Transformers/Panels

01INTRODUCTION

02QUICK NOTES ABOUT AVM

03LOCAL & INTERNATIONAL CERTIFICATIONS

04OUR SUBSIDIARIES

05ON-GOING PROJECTS (MOROCCO )

06MAJOR INTERNATIONAL PROJECTS

TABLE OF CONTENTS

ADVANCED VISION MOROCCO

07LOCAL & INTERNATIONAL CERTIFICATIONS

Page 3: HVAC Fire Protection Plumbing Transformers/Panels

INTRODUCTION

01

ADVANCED VISION MOROCCO

Page 4: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Advanced Vision Morocco is one of the elite group of companies under the umbrella of ConstructionProducts Holding Company (CPC) that was established officially in Morocco in January 2014 after severalyears of services alongside the group.

It is Specialized in Design and Build of Electrical, Mechanical, Infrastructure and renewable energysystems for Industrial, Commercial, residential, hospitals projects.

CPC group was established as a holding company in Jeddah in 2005, and now has branches in the majorcities of Saudi Arabia, Morocco, Qatar, Syria, UAE, Kuwait and Africa.

Members Of

Group

Page 5: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Members Of

Group

Bahra Precast CompanyUnited Arab Aluminum

Company Empower Contracting Modern Time Technical

Systems Bahra Steel Company Vision Networks Co International Tube & Conduit Co.

Vision Electromechanical Company

First Vision Company AMC AREECO PREMCO Marble and Granite International Company

PREMCO Ready Mix Co

FAME AXAL Construction LtdRental Equipment

Company

Bahra Cables Company (BCC)

HUTA Foundation Works Maytas Infra Saudi Arabia

Fast finishing Contracting Co

Page 6: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Members Of

Group

Al Harameyn Gate SACODECO Riyadh Steel Company

Advanced VisionSystems

WARED

PREMCO United Chemical Products Roots Steel

Tatweer Building S.A.F.A.D

Polyco

Al MarasemCPC Focus Engineering

Focus Preferred Eng

Global New Material Technology

United Arab Aluminum Company Qatar

Roberts Paint Egypt

TATWEER

MGIC

Page 7: HVAC Fire Protection Plumbing Transformers/Panels

Saudi Binladin Group – KSA ProjectsJAMARAAT BRIDGE Al-Faisaliyah Tower

Period : 2006-2017 Period : 1998-2000

King Abdul Aziz International Airport

Period : 1997 - 2017

Page 8: HVAC Fire Protection Plumbing Transformers/Panels

Saudi Binladin Group – KSA ProjectsKING ABDUL AZIZ SPECIALIST HOSPITAL TAIF KING ABDUL AZIZ ENDOWMENT PROJECT

Period : 1998-2001 Period : 1978

TABUK AIRPORT DEVELOPMENT

Page 9: HVAC Fire Protection Plumbing Transformers/Panels

Saudi Binladin Group – KSA ProjectsALHARAM ALNABAWI EXPANSION QUBA MOSQUE

Period : 1989-1993 Period : 1989-1993

HOLY MOSQUE EXPANSION

Period : 2006-2017

Page 10: HVAC Fire Protection Plumbing Transformers/Panels

Saudi Binladin Group – UAE ProjectsSHK HAMDAN BIN MOHAMED SPORT COMPLEX INTERCHANGE SHEIKH ZAYED ROAD SHARJAH INTERNATIONAL AIRPORT

Period : 2010 Period : 2002 - 2003 Period : 2005 - 2009

Page 11: HVAC Fire Protection Plumbing Transformers/Panels

Saudi Binladin Group – UAE ProjectsFUJAIRAH HOUSING COMPLEX AL BUHAIRA PLAZA AL MUSA TOWER

Period : 1993 - 1995 Period : 1933 - 1995 Period : 1990 - 1992

Page 12: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

CPC Group is present and active in Africathrough numerous projects in Morocco,Egypt, and Senegal covering allconstruction fields, with a growing focuson power generation.

Page 13: HVAC Fire Protection Plumbing Transformers/Panels

OUR MISSION

ADVANCED VISION MOROCCO

Our mission is to be the pioneer in designing and building projects, introducing Pre-engineered Electro –Mechanical solutions, to provide fast response, cost savings, low maintenance costs and longer operating life for all project

conditions and requirements.

With this strategy, AVM has gained its reputation as one of the leading Electro -Mechanical contractors, currently executing a number of prestigious projects in Morocco, and keeping up with the increasingly stringent international

standards.

We put at your disposal all of our know-how accumulated throughout 25 years as projects , and more than 12 years as CPC Services to ensure first class product and services

Page 14: HVAC Fire Protection Plumbing Transformers/Panels

OUR STRUCTURE

CPC INTERNATIONAL

ADVANCED VISION MOROCCO

AVIA VISION INFRA VISION AFRICA

ADVANCED VISION EGYPT

VISION GARAN

Current manpower resources 67 engineers & Management staff 348 technicians & Site Staff

Current manpower resources • 12 engineers & Management staff• 120 technicians & Site Staff

Member of Casablanca Financial City (CFC)

CPC KSA

To Carry all MEPOperations in Egypt

FUTURE PROJECTS IN AFRICA

ADVANCED VISION MOROCCO

Page 15: HVAC Fire Protection Plumbing Transformers/Panels

QUICK NOTES ABOUT AVM

02

ADVANCED VISION MOROCCO

Page 16: HVAC Fire Protection Plumbing Transformers/Panels
Page 17: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Distribution of Site and Head Office Employees

Position Number

General Manager 1

Head of Departments 10

Project Managers 9

Technical Office Engineers 14

Technical Office Draftmen 12

Adimistrative & HO staff 25

Mechanical Site Engineers 7

Electrical Site Engineers 9

LC Site Engineers 3

BMS Site Engineers 3

Position Number

Infrastructure & Civil Engineers 10

Mechanical Supervisors 11

Electrical Supervisors 12

LC Supervisors 5

Pipes Fitters 67

AC technicians 16

Ductman 33

Electrician 52

LC Technician 22

Welders 18

Site Adimistrative & Logistics 35

Page 18: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

AVM Properties

THE HEAD OFFICE DUCT WORKSHOP MAIN WAREHOUSES

Head Office: office shelf A = 500 m²

16170 CASA PRINCIPAL, Etage 4, Lot 441

Lotissement Al AFFAC – CasablancaMOROCCO

Means Of ProductionAVM has established a duct factory located in Martyl – Tetouan used for the fabrication rectangular air duct ,plenum boxes , volume dampers and Fire rated Duct using a variety of innovative machinery and tools

PMV List21 - Light Utility Vehicles03 - Skidsteer loader09 - Crane/Sewage/Dump Trucks 06 - Bus 05 - Backhoe loader 03 - Crawler & wheeled Excavator01 - Telescopic Fork Lift

• Casablanca warehouses A= 1200 m²• Bouskoura warehouse A= 2400 m²• Benslimane Warehouse A= 1000 m²• Tetouan Warhouse A= 800 m²• Marrakech Warehouse A= 2000 m²

PARK VEHICLES

Page 19: HVAC Fire Protection Plumbing Transformers/Panels

LOCAL & INTERNATIONAL

CERTIFICATES

03

ADVANCED VISION MOROCCO

Page 20: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

More than any other company, Advanced Vision Morocco must be exemplary in Quality,

Health, Safety and Environment (QHSE). Being part of the CPC Group of companies, a

recognized leader in these fields and thus having these competencies in its DNA, the

Advanced Vision Morocco aims to continuously improve internal processes to better protect

the health and safety of its employees and subcontractors, while also minimizing its impact

on the environment and also to deliver added value services to its clients. Integrating new

acquisitions while efficiently contributing to the Group's business plan is a key QHSE

challenge. To address these needs, an internal network of QHSE professionals, lead by

Noureddine Manfalouti, has been widely deployed throughout our company, supported by

a central team in charge of supporting it.

Advanced Vision Morocco is proud to have a record of Zero deaths since it’s inception.

Advanced Vision Morocco had it’s ISO certification in February 2016 renewed for the year

of 2017, a testament to its tireless dedication to its goals, and the diligent efforts of all its

employees.

Quality, Health, Safety & Environment

Page 21: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

QHSE - Site IncidentsQHSE - Site Incidents

SITENUMBER OF ACCIDENTS

2016

NUMBER OF ACCIDENTS

2017

AVM H.O 0 0

GARAN 9 3

SIEMENS 0 0

TETOUAN 5 0

DUCT FACTORY 1 0

SALMANYA 0 1

PRESTIGIA 0 0

BENSLIMANE 8 0

MAIN STORE 1 0

TOTAL ACCIDENTS 24 4

0

1

2

3

4

5

6

Janvier Fevrier Mars Avril Mai Juin

Monthly work Accident Monitoring 2017

Page 22: HVAC Fire Protection Plumbing Transformers/Panels

Certificates for AVM and its IndividualsAs part of its continuous efforts to adapt with the local market, Advanced Vision Morocco has strived to have it’s business activitiesapproved by several local governmental firms.

Advanced Vision Morocco is proud to announce that the company is now Classified at level 1 allowing her to conduct HVAC, LowCurrent and Electrical works in Public sector projects.

Here is brief of AVM’s latest earned certifications:

01Classified at Level 1 to conduct HVAC,plumbing , electrical and low currentworks in Public sector projects. .

02ISO Certification: obtained OHSA 9001,14001, and 18001 certificates in 2016and then renewed in 2017 by AVMauditor Bureau Veritas.

04Listed among LYDEC (Lyonnaise desEaux de Casablanca) approvedcontractors to bid on Sewage andpotable water networks works forprojects up to 1 Millions Dhs inCasablanca.

05Enrolls two CNPP-certified engineersthat assist Advanced Vision Morocco indesigning and validating Life & Safety(fire fighting and fire alarm systems) inaccordance with Moroccan andEuropean codes.

03Listed among ONEE (OfficialNationale de l’electricite et de l’eaupotable) approved contractors toconduct Medium Voltage and Highvoltage works for projects up to 1Millions Dhs in Casablanca.

06Enrolls a list of certified welders,medium voltage supervisors,Generator supervisors, trainedplumbing supervisors, and trainedsecurity systems supervisors.

ADVANCED VISION MOROCCO

Page 23: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

01Government Classification / Class 1

Page 24: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

ISO Certification (Renewed for 2017)02

Page 25: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

ONEE Certification

• Our current classification withthe government is Class B, which allows us to apply for unlimited amounts of LV (lowvoltage) government projectsand up to 10 million Dhs of MV (medium voltage) projects.

• We are currently in the processof applying for Class A, whichwould allow us to apply for unlimited amounts of both LV and MV government projects.

03

Page 26: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

04Lydec Certification

Page 27: HVAC Fire Protection Plumbing Transformers/Panels

OUR SUBSIDIARIES

04

ADVANCED VISION MOROCCO

Page 28: HVAC Fire Protection Plumbing Transformers/Panels

Our Subsidiaries

ADVANCED VISION MOROCCO

A V I A

Page 29: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

As of 2017, Vision AFRICA, along with its sistercompanies (led by Advanced Vision Morocco), areactively engaged in projects throughout Africa as a resultof the rapid expansion of business opportunities on thecontinent.

Vision AFRICA (along with its sister companies) are inthe negotiations phase for several ground-breakingprojects all across Africa. Some of the projects undernegotiation cover Equatorial Guinea, Chad, Zambia, andthe Ivory Coast, and cover many diversified projects,from airports to residential & commercial districts andMega-projects.

Vision AFRICA and its sister companies aim to makefull use of their international experience developing megaprojects in order to aid in the development and theconstruction efforts of the African continent.

Advanced Vision Africa

Page 30: HVAC Fire Protection Plumbing Transformers/Panels

Advanced Vision ICAD Africa

ADVANCED VISION MOROCCO

AVIA is an emerging technology company in the world of developing Africa with a committed ambition to support and grow with the vision of Modern Africa.

AVIA is the technology provider with an aim to bring solution to every requirement in the field of ICT (Information and communication Technologies) and MEP (Mechanical, Electrical and Plumbing) divisions by spreading its wings to the domains like Aviation (Airports , Airlines, Air Navigation, Air Cargo, Ground Handling, Drones etc.), Sea Ports, Hospitals, Hotels, Stadiums, Palaces etc.

AVIA brings the expertise in the field of system designing, installation, Testing & Commissioning, Integration, Handover, ORAT (Operational Readiness & Transfer) and Operations & Maintenance with the help of specialized global partnered companies.

AVIA is more concerned and respectful in addressing the Local culture, Environmental challenges with the renewal energy options in all aspects of their approaches. AVIA serves customers with skilled SMEs (Subject Matter Experts) and Project management professionals aided by all the relevant standards like Quality, Safety, Governance, Industry organizations and Project management.

A V I A

Page 31: HVAC Fire Protection Plumbing Transformers/Panels

List of Completed and On-going Projects

VICTORIA CITY –Morocco

Fire Protection, High Current, HVAC, Low

Current, Plumbing

Third Haram Extension & Service Tunnel – ShameyahProject

Fire Protection, High Current, HVAC,

Plumbing

SENEGAL AIRPORT

Airport Operations Services, Low Current

Samaa Marina –Marriott HotelTetouan – Morocco

Fire Protection, High Current, HVAC, Low

Current, Plumbing

Private Residence –Ben Sleiman –Morocco

Fire Protection, High Current, HVAC, Low

Current, Plumbing

Private Palace –Bouskoura – Morocco

Fire Protection, High Current, HVAC, Low

Current, Plumbing

ADVANCED VISION MOROCCO

Page 32: HVAC Fire Protection Plumbing Transformers/Panels

List of Completed and On-going Projects

Princess NouraUniversity For Women – Riyadh, K.S.A.

Fire Protection, HVAC, Plumbing

Ministry Of Interior (MOI)

Fire Protection, High Current, Plumbing

King Tower Jeddah, K.S.A

Fire Protection, Low Current

King Fahad International Airport

Airport Operations Services, Low Current

King Abdul Aziz University Science & Technology (Kaust)

High Current, HVAC, Plumbing

King Abdul Aziz International Airport (KAIA) – Jeddah, K.S.A

Airport Operations Services, Fire Protection,

Low Current

ADVANCED VISION MOROCCO

Page 33: HVAC Fire Protection Plumbing Transformers/Panels

List of Completed and On-going ProjectsKASCH Riyad

Fire Protection, Low Current

KAIA – Air Traffic Control Tower

Airport Operations Services, Fire

Protection, High Current

Internal Security Forces Camp Cpc 07b (Duhail) – Lekhwiya, Qatar

Fire Protection, High Current, HVAC,

Plumbing

Hajj Terminal King AbdulazizInternational Airport

Airport Operations Services, High

Current, HVAC, Plumbing

General Aviation Terminal

Airport Operations Services, High

Current, Plumbing

Capital Market Authority Tower (Cma)

High Current, HVAC, Low Current, Plumbing

ADVANCED VISION MOROCCO

Abraj Kudai

HVAC, Low Current

Page 34: HVAC Fire Protection Plumbing Transformers/Panels

Advanced Vision Egypt

ADVANCED VISION MOROCCO

Egypt occupies a unique place as Africa’s fastest growing construction market in the continent. With avision to fulfill Egypt’s insatiable demand for innovative construction companies, our visionary parentcompany has invested significant time and effort into the creation of Advanced Vision Egypt, our latestVision creation, with an eye to serving the country’s unique construction needs.

Our team of management and staff in Egypt has started to expand at this time being encounteringexperienced MEP engineers working on promoting our company in this new market and establishing thereputation of the mother company in Egypt.

A list of the recently awarded projects for Vision Egypt, is detailed in the next page

Page 35: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

List of Completed and On-going ProjectsBadr Small and Medium Factories

A group of small and medium factories owned by Egyptian Industrial Development Authority in aim of development of small and medium industrials and investors.

Client : Egyptian Armed Forces (Military Works Department).

Project Location: Badr City.

Project Area: 124,695 m2.

• Supply and installation of underground firefighting network.

• Supply and installation of aboveground firefighting network.

• Supply and installation of all fire hose cabinet inside factories.

• Supply and installation of all equipment located in pump room.

• Testing and commissioning of all fire fighting works.

• Training of Industrial Development Authority maintenance team for the usage of installed equipment how to use and keep in safe all our works and protect this project against fire.

Sadat Small and Medium Factories

A group of small and medium factories owned by Egyptian Industrial Development Authority in aim of development of small and medium industrials and investors.

Client : Egyptian Armed Forces (Military Works Department).

Project Location: Sadat City.

Project Area: 441,455 m2.

• Supply and installation of underground firefighting network.

• Supply and installation of aboveground firefighting network.

• Supply and installation of all fire hose cabinet inside factories.

• Supply and installation of all equipment located in pump room.

• Testing and commissioning of all fire fighting works.

• Training of Industrial Development Authority maintenance team for the usage of installed equipment how to use and keep in safe all our works and protect this project against fire.

New capital (El-Kayan 110)

An administration building consists of 24 sectors, each sector consists of three floor and each floor consists of 28 offices and 8 spaces as utilities

Client : Egyptian Armed Forces (Military Works Department)

Project Location: New capital.

Project Area: 53,737 m2..

• Installing Firefighting Networks.

• Installing Plumbing Networks.

• Installing HVAC Networks.

• Installing Power Networks.

• Installing Lighting Networks.

• Installing Light Current Networks.

• Testing and Commissioning of all Electro-Mechanical works.

Page 36: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Low & Medium Voltage duct banks01

Low current & Security installations 02

Chilled Water Applications03

Water supply and irrigation networks05

External lighting06

Foundations for all kinds of installations (High Mast, Solar panels, wind turbines

etc..)

08

Vision Infra

04

Road and asphalt works 07

Storm water and sewage drainage

Curbstone and pedestrian walk ways

09

Vision Infra was founded in 2015 as an infrastructure company specializing in external networks and road works. Since it was founded, Vision Infra has acquired a

vast fleet of heavy machinery and equipment required to execute any task on site. Our expertise and quality performance of fast track projects has enriched our

contacts with local authorities, suppliers and subcontractors.

Vision Infra has strived to gain certification from ISO and OHSAS as well as accreditation from the local water and electricity authority LYDEC.

Our area of expertise includes but is not limited to the following:

Page 37: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

VISION INFRA STAFFVision Infra’s Site Staff includes more than 100 qualified personnel.

Site Staff

1 Operations Manager 1

2 Construction Manager 1

3 Civil Engineers 5

4 Supervisors 6

5 Senior Surveyors 3

6 Drivers/Heavy Equipment Operators 20

7 Technicians/Mechanics 6

8 Labor 95

Office Staff

1 Head Office Staff 9

2 Design Engineers 5

3 HR Dept. 2

4 Accounting Dept. 2

5 Contracts Dept. 2

Manpower Supply

1 3 Suppliers 250

Page 38: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

VISION INFRA CAPABILITIES - EQUIPMENT

DESCRIPTION : Wheeled Excavator19 TonMAKE: DoosanQTY: 1

DESCRIPTION : Crawler Excavator20 Ton / 34 TonMAKE: Caterpillar/DoosanQTY: 2.

DESCRIPTION : Backhoe LoaderMAKE: JCBQTY: 2

DESCRIPTION : Skidsteer LoaderMAKE: BobcatQTY: 3

DESCRIPTION : Single DrumCompactor 17 TonMAKE: AmmannQTY: 1

DESCRIPTION : Dump TruckMAKE: MANQTY: 2

DESCRIPTION : Telescopic Fork LiftMAKE: ManitoQTY: 1

DESCRIPTION : Crane TruckMAKE: MitsubishiQTY: 1

DESCRIPTION : Sewage TruckMAKE: RenaultQTY: 1

Our vast and diverse fleet of machinery & equipment includes the following :

Heavy Machinery

DESCRIPTION : Excavator Jack MAKE: HammerSoosanQTY: 2

DESCRIPTION : Screening BucketMAKE: MB CrusherQTY: 1

DESCRIPTION : Street Sweeper MAKE: BobcatQTY: 1

DESCRIPTION : Diesel Tank w/ PumpMAKE: N/AQTY: 1

DESCRIPTION : 8 Ton Water Tank w/ PumpMAKE: N/AQTY: 1

DESCRIPTION : Coring Machine MAKE: HILTIQTY: 3

DESCRIPTION : 0.5 Ton Roll CompactorMAKE: AmmannQTY: 2

DESCRIPTION : Mobile Light PostMAKE: VariousQTY: 20

DESCRIPTION : Air Compressor w/ Jack HamerMAKE: DoosanQTY: 1

Equipment & Accessories

We have local and international connections to source any special equipment that a project might require

Page 39: HVAC Fire Protection Plumbing Transformers/Panels

VISION INFRA EQUIPMENT

ADVANCED VISION MOROCCO

Page 40: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

ONGOING VISION INFRA PROJECTS

01VICTORIA CITY PHASE 3 ZONE 7:BOUSKOURA - MOROCCO

02BUHAIRA ADMIN BLDG:BENSLIMANE - MOROCCO

06

03

0504SOLAR FARM PHASE 2:BENSLIMANE - MOROCCO

ROYAL PALACE PERIMETER SECURITY: TANGIER - MOROCCO

DRIVER’S BUILDING:BENSLIMANE - MOROCCO

VICTORIA CITY PHASE 3 ZONE 3-4-6: BOUSKOURA - MOROCCO

Page 41: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

VICTORIA CITY PH3 ZONE 7

Page 42: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

BUHAIRA ADMIN & DRIVER’S BLDG-BENSLIMANE

Page 43: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

SOLAR FARM PH2-BENSLIMANE

Page 44: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

ROYAL PALACE PERIMETER SECURITY- TANGIER

Page 45: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

ROYAL PALACE PERIMETER SECURITY- TANGIER

Page 46: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

VICTORIA CITY PH3 ZONE 3-4-6

Page 47: HVAC Fire Protection Plumbing Transformers/Panels

ON-GOING PROJECTS(MOROCCO)

ADVANCED VISION MOROCCO

05

Page 48: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

List of Completed and On-going Projects

Private Project Bouskoura- Casablanca –

Morocco Completed June 2014

1

6

2

7

3 4

9

Private Residence• Bensleiman – Morocco• Completed December 2015

Victoria City Infrastructure works• Bouskoura–Casablanca -

Phase 1: Completed, Phase 3: On Going, ResidentialBuildings: On Going

5

Samaa Marina Marriott Hotel• Tetouan-Morocco• On going

10

Private Project–Phase 3 • Tangier -Morocco• Completed July 2017

P1 complex project • Bensleiman - Morocco • On-hold

11 12

Siemens Wind blade Factory• Tangier–Morocco• On going

Furukawa Cables Factory• Tangier–Morocco• On going

Ritz carlton hotel• Marrakesh - Morocco • On going

Egypt embassy complex• Rabat – Morocco• Final negotiations stage

Fauricia Factory - Tangier• Tangier–Morocco• On going

8 Miscellaneous projects• Bensleiman - Morocco • On-hold

Page 49: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

1 Private Project - Bouskoura

The Project consists of an extension to a private project located inBouskoura – Casablanca, by constructing a new building of 31,094 m2,encompassing VIP Class A and areas to meet with the requirements ofthis prestigious client .

Advanced Vision Morocco has executed the MEP works related tothis project in a record 6 months duration, and accompanied theclient during his royal visit.

Key Figures :

Start Date : December 2013Duration : 6 months Actual status : Handed overSystems Executed : - Plumbing works

- HVAC works- Fire fighting works

- Security systems works

- Low Current and BMS works- Generators installation- MEP External works

Page 50: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

1 Private Project - BouskouraKey figures of Mechanical installation

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

05Assisting in resolution of potential claims

01Chillers : 3 x 750 tons of cooling

02Air Handling units : 32 units

03Underfloor heating covering 1500 m2

04Fire set of UL/ FM 2 electrical pumps 1000 GPM/120 PSI

05Foam and FM 200 suppression system

Page 51: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

1 Private Project - Bouskoura

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

01Generator Sets 3 x 1400 KVA

02Transformer Sets4 x 1250 KVA

03IPTV , Fire Alarm , DATA, Telephone , MATV, WIFI

04External lighting poles 50 High Mast units

Key Figures of Electrical installation

Page 52: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

1 Private Project - Bouskoura

Page 53: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

12 Samaa Marina - Marriott Hotel - Tetouan

This Andalusian inspired hotel will include 190 roomsvarying from normal suites, to executive and presidentialtype suites, in addition to restaurants, fitness & healthcenters, private and main kitchens and large outdoor andindoor swimming pools.

Advanced Vision Morocco is currently executing the MEPworks related to this project and has reached a progress of95 % where the final handing over procedures has started totake place, allowing the Hotel operator start using thehotel.

Project Key Figures :

Start Date : April 2015Duration : 24 months (excluding summer breaks )Actual status : Certified overall progress 95 %Systems Executed : - Plumbing works & MEP External Works

- HVAC and smoke management works- Fire fighting works

- Security systems works

- Low Current and BMS works- Generators and transformer installation

The Project consists of the construction of a 5-stars hotel alongside a private VIP Villa located at Sebta Road, Tetouan, Morocco. The totalbuilt-up area is 37,958 m2, including an outdoor dining area, technical rooms housing the MEP equipment, and a clubhouse.

Page 54: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

2 Samaa Marina - Marriott Hotel - Tetouan

Key figures of Mechanical installation

01Chillers 3x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecastingearningand profitabili

0501 02Fuel Fired boilers 3 x750 kw

03Air Handling units 54 units

04Fan Coil units303 units

05CRAC units14 units

01 02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

06Underfloor heating covering 1800 m2

07Fire set of NF 2 electrical pumps 1500 GPM/140 PSI

08Full sprinkleredhotel rooms and corridors

09Automatic Foam & FM 200 suppression system

Chillers 3 x 250 tons of cooling

Page 55: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

2 Samaa Marina - Marriott Hotel - Tetouan

Key Figures of Electrical installation

01Chillers 3 x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitabili

0501 02Transformer Sets 5 x 1600 KVA + 1 X 2000 kVA

03Data Center 4 rooms including active & passive equipment

04Audio Visual, Sound and IPTV systems

05Access control , CCTV & intrusion security system

0106Fire Alarm System Generator Sets

3 x 1250 KVA + 1 x 500 kVA

Page 56: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

2 Samaa Marina - Marriott Hotel - Tetouan

Page 57: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Victoria City is a major new urban center located in Bouskoura City,designed in a natural living environment close to multiple activitycenters covering an area equaling 2,495,000 m2, minutes fromdowntown. This new concept in ultra-modern look is built on themodel of a city that strives for social diversity and sustainabledevelopment.

The project is expected to include 3200 residential apartments(Economical Type), 14,200 residential apartments (High StandardType), and around 450 villas, alongside the infrastructure networksbeing executed for the 250 hectares area.

Scope of Work :

Phase 1 : MEP External WorksPhase 3 : MEP & Infra structure works RCE5 buildings : MEP works

Page 58: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City – Casablanca 3

Advanced Vision Morocco was able to execute these works after being listed among the contractors list approved by

local Electricity and Water authorities, LYDEC and ONEE.

The external works are divided into 3 phases. AVM has accomplished the MEP works in Phase 1, and is currently completing the remaining works in Phase 3.

1

The MEP works among the residential RCE05 Buildings. The Project consists of 2 connected buildings, composed of 8 blocs each, housing 194 apartments.

2

The project is composed of two main packages:

Page 59: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

01Transformer Sets31 sets

02External lighting poles466 fixtures

03Network for Telephone system9440 m

04Medium & Low Voltage networks

Key Figures Phase 1

Page 60: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Key Figures Phase 1

01Chillers 3 x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitabili

0501 02PVC sewage & rainwater pipe network13,955 m

03Drainage and rainwater connection kits 2,633 units

04PVC PN16 water supply pipe network 18,950 m

05Concrete water supply pipe network 2,655 m

0106HDPE PN16 Irrigation pipe network 3,912 m

HDPE sewage & rainwater pipe network17,408 m

Page 61: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Key Figures Phase 3

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

01Transformer Sets 32 sets

02External lighting poles 677 fixtures

03Network for Telephone system 112,443 m

04Medium & Low Voltage networks

Page 62: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Key Figures Phase 3

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

05Assisting in resolution of potential claims

01HDPE sewage & rainwater pipe network 21,004 m

02Concrete sewage & rainwater pipe network 2,485 m

03Drainage and rainwater connection kits 3,034 units

04PVC PN16 water supply pipe network28,481 m

05HDPE PN16 Irrigation pipe network 11,907 m

Page 63: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Key Figures Phase 3

01Chillers 3 x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitabili

0501 02Excavated volume 59,490 m3

03Curbstones16,430 ml

04Asphalt works 14,566 ml

05Manholes376 units

0106Telephone rooms 161

Backfilledvolume 53,990 m3

Page 64: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Victoria City - Casablanca3

Key Figures RCE 5 Buildings (194 Apartments)

01Chillers 3 x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitabili

0501 02External lighting composed of garden lights.

03Low voltage distribution system

04Videophone and Telephone system

05Water supply and drainage system

0106Fire protection system based on Fire hose cabinets

Transformers sets : 2x 400 Kva

Page 65: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Project - Tangier4

The Project consists of an extension to a private project located in Tangier – by constructing new buildings covering a surface area of 22,706 m2, encompassing VIP Class A buildings, staff accommodations, power stations, chiller plants and sewage collection plants; in addition to the external network providing water supply, drainage, fire fighting, central chilled water supply, low current, as well as low and medium voltage services to all buildings.Advanced Vision Morocco has executed the MEP and Infrastructure works related to this project in a record 5 months duration and accompanied the client during the VIP visit.

Key Figures :

Start Date : February 2016Duration : 5 months Actual Status : Handed over Systems Executed : - Plumbing works

- HVAC & MEP External works- Fire fighting works

- Security systems works

- Low Current and BMS works- Generators installation

Page 66: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Project - Tangier4

Key figures of Mechanical installation

01 02Air Handling units 24 units

03Fan Coil units 101 units

04Fire set of UL/ FM 2 electrical pumps 1500 GPM/120 PSI

05Booster set composed of 5 Irrigation & 4 water supply pumps

06Foam and FM 200 suppression system 3255 Gallons

07PresinsulatedChilled water pipes (up to 300 mm )2144 m

08HDPE PN 16 pipes irrigation , water supply and fire fighting external network

Chillers4 x 320 tons

Page 67: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Project - Tangier4

Key figures of Electrical Installation:

01Medium Voltage Infrastructure

• MV loop: 1.7Km (external works)• 5No MV/LV power stations• 8No Power transformers totalizing 12.8

MVA • SCADA supervised power stations

02Emergency Power Supply

• 3No Soundproofed power station

• 6No Gensets totalizing 9.6 MVA of load

• 3No buried fuel tanks totalizing 110m3

03Low Voltage Distribution

• 12No Main Distribution Boards

• 67No Distribution Switchboards

• LV cable: 80Km main feeders (single core)

04Low Current Systems

• 21No interconnected Fire Alarm Control Panels• Two Data Center- 8 Core switch• 37No MDF/IDF• Wi-Fi coverage, IP telephony, IPTV, IP CCTV and IP Access Control• LC external network: 5Km • Conference room: Pop up screens, conference systems (wired and

wireless), video conference…• BMS : 1500 points

Page 68: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Project - Tangier4

Page 69: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Siemens Wind Blade Factory - Tangier5

Key Figures :

Start Date : October 2016Duration : 10 monthsActual Status : Certified overall progress 94 % Systems Executed : - Plumbing system

- HVAC system- Fire fighting System

- Process Heating system

- Compressed air system

The Project consists of a production facility occupying asurface area of 37,500 m² and located 35Km from TangierMed Port, in Tangier Automotive city, TAC, dedicated forthe fabrication of wind turbine rotor blades.

Advanced Vision Morocco is in charge of the execution ofall mechanical systems needed for the project.Using its experience in the engineering field, AVM was ableto assist in fulfilling this prestigious client’s requirements,while complying with the strict regulations of this newlyestablished free zone.

Page 70: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Siemens Wind Blade Factory - Tangier5

Key figures of Mechanical installation

01Preparing schedulesfor the projectmanager or the projectexecutive

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitability

05Assisting in resolution of potential claims

01Chillers 2 x1070 KW

02Heat pumps2 x 355 KW

03Boilers3x500 KW +1x1400KW

04Air handling units (4 pipes system) 65 units

05Air Compressors 3x55 KW

Page 71: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

01Fire set of Diesel + Electric pump working 1500 GPM and 120 Psi

02Fully sprinklered network for factory through network of blacksteel pipes exceeding14,555 m

03Siphonic rainwater system using ductile iron pipes

04Aluminum compressed air network ensuring distribution among all areas of factory

Siemens Wind Blade Factory - Tangier5

Key figures of Mechanical installation

Page 72: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Siemens Wind Blade Factory - Tangier5

Page 73: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Residence - Benslimane6

The project consists of the construction of a VIP Villa located in Benslimane .The total built up area is 6,020 m2 distributed among 5

floors surrounded by beautiful landscape areas including an indoor heated swimming pool, gym, pantries and VIP rooms offering tremendous mountain overviews.

Advanced Vision Morocco has completed the MEP and infrastructure works related to this project.

Key Figures :

Start Date : March 2015Duration : 12 monthsActual Status : Handed over Systems Executed : Plumbing works ( inc. Solar

system)HVAC worksHeating for Swimming pools

Low Voltage worksLow current worksMEP & Infra structure worksExecution of Sewage plant

Page 74: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Residence - Benslimane6

Key figures of Mechanical installation

01Reversible DX ducted and High wall units 76 units

02Heat pumps for heating of Swimming pool 2 x 75 Kw

03Booster sets for irrigation and water supply 2 x 105 GPM@7 Bars

04Underfloor heating covered area1055 m2

Page 75: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Residence - Benslimane6

Key figures of Electrical installation

01Chillers 3 x 250 tonsof cooling

02Evaluating general conditions on a monthly basis

03Completing special studies for senior management

04Forecasting earningand profitabili

0501 02Generator350 KVA

03UPS30 KVA

04MDB – EMDB

05Off Grid Solar System for External Light

0106Connected to Solar System through on MV network loop

Transformer1250 KVA

Page 76: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Private Residence - Benslimane6

Page 77: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

P1 Project - Benslimane7

The project consists of the construction of a complex composed of main Villa B01 of 22,400 m2, Power House, Helipad & Chiller building B02 of 2,400 m2, and Staff accommodation building B04 of 2,903 m2 overviewing astonishing landscape areas spread between the mountains and valleys of Benslimane Region .

Advanced Vision Morocco has executed the MEP works related to this project up to December 2014, the date when the project was put on hold by the client.

Key Figures :

Start Date : April 2014Duration : 20 monthsActual Status : On Hold – Subject to redesignSystems Executed : Plumbing works

HVAC worksHeating for Swimming poolsUnderfloor heating system Low Voltage worksLow current worksMEP & Infra structure works

Page 78: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

P1 Project - Benslimane7

Key figures of Mechanical installation

Transformers sets : 2x 400 Kva

01 02Fan coil units131 units

03DX Air Handling units 13 units

04Duct network 7,000 m2

05Automatic Foam & CO2 suppression system 7,200 lbs

06Underfloor heating covered 3,303 m2

07Fully sprinkleredbuilding with UL/ FM fire pump operation at 1,000 GPM AND 120 PSI

Three pipes VRV system 305 tons

Page 79: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Miscellaneous projects- Benslimane8

The project consists of the construction of an Elevated water tanks of 800 m3 capacity and 40 m height used to distribute potable water to several buildings located in Benslimane complex .

Advanced Vision Morocco has executed the plumbing and electrical works related to this project including all galvanized steel pipes ,valves , internal & external lighting till the handing over to the local water authority

Key Figures :

Start Date : December 2016Duration : 5 monthsActual Status : CompletedSystems Executed : Plumbing works

Lighting works MEP & Infra structure worksDisinfection works

Elevated water tank

Page 80: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Miscellaneous projects- Benslimane8

Photovoltaic Solar plant

The project consists of the installation of an ON-GRIDPhotovoltaic plant delivering 944 Kw through 3,614panels installed around a lake, in a parking area, and onthe roof of a building.This plant has allowed great savings for the client,ensuring reduced consumption during the day .

Advanced Vision Morocco has executed the supply &installation of solar panels and support system alongsideall the relevant electrical works.

Key Figures :

Start Date : December 2015Duration : 12 months through 2 phasesActual Status : Completed

Page 81: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Miscellaneous projects- Benslimane8

Wind turbine 250 kW

The project consists of the installation of one ON-GRID wind turbine of 250 KWin Benslimane area and it’s connection with the medium voltage network.

Advanced Vision Morocco has executed the supply & installation of this turbinealongside support systems, and built the electrical room housing the controldevice inverters .

Key Figures :

Start Date : December 2015Duration : 1 monthActual Status : Completed

Page 82: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Miscellaneous projects- Benslimane8

Supply & installation of Fiber optics network exceeding 3000 m length , composed of HDPE pipes used to pull the cables ,alongside all relevant infrastructure works

1

Supply & installation of Water supply network composed HDPE PN16 pipes exceeding 2000 m length , alongside all relevant infrastructure works

2

Supply & installation of Medium Voltage network exceeding 2500 m length , and connecting several buildings network with the photovoltaic and Wind turbine plant network

3

Supply & installation of Irrigation network exceeding 2000 m length , and hooking up several green areas with the water accumulated in basin using innovative BOREHOLE pumps

4

Construction of 6 Transformer rooms , completed alongside all relevant electrical scope .

5

Page 83: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Miscellaneous projects- Benslimane8

Renovation of MEP systems in Farm Villa

1

Construction and MEP works of Maintenance building

2

Page 84: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Ritz Carlton Hotel, Jnan Ammar - Marrakech9

The Project consists of the construction of a 5-stars hotelsurrounded by Polo fields and landscaped areas occupyinga surface of 50 Hectares.

The project also includes the construction of restaurants, acigar bar, clubhouses and 85 villas .

Advanced Vision Morocco has started the execution of theMEP works related to the Villas of this project and willaccompany the client in the other phases of the project .

Key Figures :

Start Date : May 2017Duration : 12 months Systems Executed : - Plumbing works

⁻ HVAC works⁻ Fire fighting works ⁻ Security systems works⁻ Low Current and BMS works⁻ Generators installation⁻ MEP External works

Page 85: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

9 Ritz Carlton Hotel, Jnan Ammar - Marrakech

Page 86: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

10 Furukawa Cables Factory - Tangier

Key Figures :

Start Date : July 2017Duration : 6 monthsSystems Executed : - Plumbing works

- HVAC works- Fire fighting works

Japanese group Furukawa Electric,the world’s third largest fiber-optic

manufacturer, is moving forward with plans to establisha manufacturing facility in Tangier – Morocco, to supplythe entire African continent with cable assemblies.Furukawa will be the first major company in the field toproduce fiber optic cables in Africa.

Advanced Vision Morocco has been awarded themechanical works in this prestigious project in charge ofthe preparation of the relevant design drawings,calculation notes and execution .

Page 87: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

10 Furukawa Cables Factory - Tangier

Site Progress as of 18 July 2017

Page 88: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Egyptian Embassy - Rabat11

The project consists of the construction of The EgyptianEmbassy complex, located in Rabat, and composed ofthree buildings. It is designed to ensure the largestcapacity of visitors with an emphasis on comfort andsafety.

Advanced Vision Morocco is in the final negotiationsstage with the client to conduct the MEP works in thisstrategic project with this prestigious main contractorentering the Moroccan Market, executing this projectwith Arab Contractors.

Key Figures :

Start Date : August 2017Duration : 12 monthsSystems Executed : - Plumbing works

- HVAC works- Fire fighting works- Electrical works- Low Current works- Security Works

Page 89: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Faurecia Factory - Kenitra12

Key Figures :

Start Date : September 2017Duration : 11 monthsScope of Work :

• HVAC system • Compressed air system • Fire fighting system • Plumbing systems• Low current systems• Low and medium voltage systems

Faurecia Automotive System Technologies is the leading manufacturer of automotive seatcovers in North Africa, and has decided to mark its presence in Morocco through athird factory of 12,800 m2, located in the Atlantic Free Zone of Kenitra – Morocco.

Faurecia will be investing 170 million dirhams into this establishement, leading to thecreation of 1,300 jobs, with a potential 500 additional employees in the future. The planthas a daily production output of 10,000 leather and fabric seat covers, in particular for thePeugeot 3008 and 5008. The level of employee training, their established expertise intextiles, and the site's state-of-the-art digital production system make Faurecia abenchmark for the industry.

Advanced Vision Morocco has been awarded the design and build scope of all MEPsystems needed for this prestigious project including the special Cooling, Compressed air,and Low voltage systems needed for the fabrication process.

Page 90: HVAC Fire Protection Plumbing Transformers/Panels

MAJOR INTERNATIONAL

PROJECTS

ADVANCED VISION MOROCCO

06

Page 91: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Major International Projects

1

7

2

8

3

5

10

6

11 12

Princess Noura University• Reyadh – KSA• Completed

King Abdul Aziz University• Jeddah – KSA• On-going

Ministry Of Interior• Jeddah – KSA• Completed

Internal Security Forces Camp • Doha – Qatar• Completed

Third Haram Extension Service Tunnel• Mekkah - KSA• Completed

Hajj Terminal King Abdulaziz Airport • Jeddah – KSA• Completed

General Aviation Terminal• Jeddah – KSA• Completed

Capital Market Authority Tower• Reyadh – KSA• Completed

King Abdullah Specialty Children Hospital -K.S.A.U• Riyadh KSA• Completed

Prince Mohammed Bin Abdul Aziz Hospital • AlMadinah KSA• Completed

13King AbdulazizInternational Airport (Kaia P1072) • Jeddah – KSA• On-going

9 Mas’a Extension Holy Mosque• Mekkah – KSA• On-going

4 SAUDI BINLADIN GROUP – Hospitals Projects

Page 92: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Princess Noura University For Women -Riyadh

The project consists of a university women covering 8 million squaremeters and located north of Riyadh. The total constructed area ofapproximately 3 million square meters. The university includesadministrative buildings, 13 faculties, a 700-bed hospital, laboratories,research centers, and residential area that includes accommodation forstudents and staff, and a tram. The university's capacity is about 40 000students.

design and production of electrical and mechanical systems of 68residential buildings, 4 faculties, 2 stages, 2 school buildings, with a Metrocovering a distance of 12 km with 14 stations, two bus terminals andDepository building complex.

Project was GOLD LEED certified

Key Figures :

Beds : 700 beds Surface : 3,000,000 m²Turn key project

1

Page 93: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

• Number of Stations : 14• Length of Routes : 11.62Km • Number of Turns : 6 turns• Fleet : 22 Trains (2 cars per train)• Capacity of the train : 110 people• Capacity of the line : 4,400 Passengers per hour per direction• Commercial speed : 24 km/h• Max speed : 60 km/h

Princess Noura University For Women -Riyadh

1

Page 94: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Princess Noura University For Women -Riyadh

1

Page 95: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Princess Noura University For Women -Riyadh

• The cooling capacity of all buildings exceeds: 21,000 tones

• More than 5,000 tons of air flow distribution ducts and 450 km of black steel pipeHydraulic

• Balancing and aerodynamics carried out by a testing agency and LEED certified test, centralized technical management

• System building with communication interface with the ventilation system, fire protection, FM 200, elevators / escalators, control panel and engine TGBT,

• protection and fire alarm tested and approved by the authority of the local civil defense

CTA : 598; VC (Frozen water): 17,927 VC Dx unit : 950 ; CRAC : 15Ventilations extraction and fresh air: 2,709Chilled water pumps : 300Hot Water Pumps : 230

FM 200 : 672 (Approximately cylinders 200 k lbs agent. integrity testing of the completed )RIA: 450Automatic fire extinguisher: 3,634Sprinkler head: 85,000

Centralized electric water heater : 102Circulating pumps : 261Immigrant pumps : 120

RMUs (13.8 Kva) : 110Transformers : 167 (500 to 1000 KVA) Panels BT : 4490

HVAC

Fire Protection

Plumbing

Transformers/Panels

Lighting: 270,00025 meters HighMast: 110Equipment: 270,000 Isolating switch: 2600

Lighting / Equipment

Inverters : 156 (20 to 60 KVa) Lighting control system: covering an area 220,000 m2 Cables BT : 33 Km Cables MT : 15 Km

Cable/Control System

1

Page 96: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Princess Noura University For Women -Riyadh

1

Page 97: HVAC Fire Protection Plumbing Transformers/Panels

King Abdullah Specialty Children HospitalK.S.A.U – Riyadh KSA

This is the first specialist Children’s Hospital in the Kingdom ofSaudi Arabia, occupying 192,000m2, over 10 levels.

The hospital has been designed as a patient focused facility with thepatient at the center of care. The Hospital is a paperless digitalhospital with all patient files electronically maintained.

All 600 patient rooms (600 beds) are single occupancy with en-suitefacilities and dedicated family area with overnight facilities. EachPaediatric ward has dedicated classrooms, playroom and familyresource facilities.

Saudi Binladin Group has completed the design and build of thisproject delivering all MEP systems and abiding with the highestspecification required by the client

Project was GOLD LEED certified

Key Figures :

Beds : 600 beds Surface : 192,000 m²Turn key project

ADVANCED VISION MOROCCO

2

Page 98: HVAC Fire Protection Plumbing Transformers/Panels

King Abdullah Specialty Children HospitalK.S.A.U – Riyadh KSA

ADVANCED VISION MOROCCO

2

Page 99: HVAC Fire Protection Plumbing Transformers/Panels

Prince Mohammed Bin Abdul Aziz Hospital –AlMadinah KSA

PMBAH is the fifth National Guard Health facility in the Kingdomafter Riyadh, Jeddah, Dammam and Al Ahsa. It is a full servicedfacility with a 215 bed capacity, located at the foot of Mount Uhud onPrince Naif Road;

As the National Guard Health Affairs expands its services to covermore regions in the Kingdom of Saudi Arabia, the Holy City of AlMadinah Al Munawarah was selected as the next project in 2007.Prince Mohammad Bin Abdulaziz Hospital will provide optimalhealth services for the National Guard and their dependents and toother eligible patients during their religious visits to the holy city ofMadinah.

Key Figures :

Beds : 215 beds Surface : 100,000 m²Turn key project

ADVANCED VISION MOROCCO

3

Page 100: HVAC Fire Protection Plumbing Transformers/Panels

SAUDI BINLADIN GROUP – Hospitals Projects

HOLY MOSQUE HOSPITAL Mekkah - KSA

1SIBANI CLINIC Riyadh – KSA

JUN-2003 TO AUG-2004construction of new clinic with a total building-up area of approximately 5,723 m². the construction includes the complete structural corks, architectural works & the electro-mechanical systems required for the building

PRIVATE CLINICJeddah - KSA

APR-2002 TO AUG-2003construction of new clinic with a total building-up area of approximately 3,045m² . the construction includes the complete structural corks, architectural works & the electro-mechanical systems required for the building

KING ABDUL AZIZ SPECIALIST HOSPITAL Taif – KSA

JUL-1998 TO OCT-2001construction of new complete 500 bed hospital complex along with ancillary buildings, housing complex, inclusive of all electro-mechanical system, supply of the medical equipment and associated services, the overall site development and related facilities.

ADVANCED VISION MOROCCO

4

Page 101: HVAC Fire Protection Plumbing Transformers/Panels

SAUDI BINLADIN GROUP – Hospitals Projects

ACCIDENT & EMERGENCY BUILDING Riyadh – KSA

OCT-1994 TO DEC-1997 construction of four storey accident and emergency building including basement. The accident and emergency building includes a physiotherapy center. The construction includes the medical equipment installation, electro-mechanical system and overall furnishing. This is part of the armed forces hospital extension and renovation project

NEW ICU/CCU UNITJeddah - KSA

FEB 1993 TO DEC 1993construction of a new ICU/CCU unit for king khalid national guard hospital inclusive of the medical equipment’s, electro-mechanical system and overall furnishing.

CARDIAC SURGERY BUILDING Riyadh - KSA

JAN-1993 TO NOV-1994a five storey cardiac surgery building plus basement with a bed capacity of 167, inclusive of the medical equipment’s, electro-mechanical system and overall furnishing, part of the armed forces hospital extension and renovation project.

ADEN COVERNORATE GENERAL HOSPITAL Aden - YEMEN

AUG-1990 TO MAR-1992construction of the new general hospital with a 200 bed capacity and with a built up area of 20,000 m², along with the supply and installation of electro-mechanical system, medical equipment’s and other related facilities and the site development.

ADVANCED VISION MOROCCO

4

Page 102: HVAC Fire Protection Plumbing Transformers/Panels

SAUDI BINLADIN GROUP – Hospitals Projects

ARMED FORCES HOSPITALRiyadh - KSA

MAR-1990 TO NOV-1992A turnkey contract for the extension and renovation of the present armed forces hospital complex inclusive of the following: a new 367 bed capacity ,10 storey plus basement VIP hospital building a 7 storey car-park adequate for 850 cars plus basement as service area. Associated building are the laundry, the dental clinic center, the primary health care, the accident & emergency and the fire station; supply and installation of the medical equipment’s and the modification to the existing; complete supply and installation of the electro-mechanical system , relocation and restoration of existing services without disruption in the normal flow pf hospital functions.

AL FALAH MILIRATY HOSPITAL Sharjah - UAE

APR-1980 TO OCT-1982 construction of a complete hospital building inclusive of the supply and installation of the electro-mechanical system, the medical equipment’s and related services, the infrastructures with complete furnishing and the site development..

ADVANCED VISION MOROCCO

4

Page 103: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Internal Security Forces Camp Cpc 07b (Duhail) -Lekhwiya

Main Scope of Works • Sewage water system.• Storm water drainage water system• Potable water distribution system• Irrigation network system• Fire water distribution system• Chilled water reticulation System• Communication and Security system containment and

associated low voltage network• Streets and Parking lot lighting• Tie in points to existing services

Development of the ISF Camp with total area of 250,000 m².27 Buildings of different types including 5 Barracks amongthem.

Location : Doha – Qatar (Duhail)Execution Period : 24 MonthsOwner : Internal Security Forces (ISF) - LekhwiyaConsultant : KEOMain Contractor : QD-SBGDesigner : AEB

5

Page 104: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Ministry Of Interior (MOI)

Ministry Of Interior (Moi) Phase1• Location : Jeddah - Qassim - Asir -

Dammam• Execution Period : 24 Months• Owner : Ministry of Interior• C.R. & Supervisor : Dar Al Handassah• Main Contractor : SBG• Designer : Saudi Diyar Consultants

Ministry Of Interior (Moi) Phase 1 Extension• Location : Jeddah – Qassim - Asir -

Dammam • Execution Period : 12 – 18 Months • Owner : Ministry of Interior • C.R. & Supervisor : Dar Al Handassah• Main Contractor : SBG • Designer : Saudi Diyar Consultants•Ministry Of Interior (Moi) Phase II • Location : Makkah - Riyadh • Execution Period : 18 Months • Owner : Ministry of Interior • Consultant : Dar Al-Handassah• Designer : Saudi Diyar• Main Contractor : SBG

Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV & LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system

Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV& LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system.

Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV & LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system.

6

Page 105: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Hajj Terminal King Abdulaziz International Airport

Hajj Terminal - Phase 1• Location : King Abdul Aziz Airport - Jeddah • Execution Period : 12 Month • Owner : General Aviation of Civil Authority • Consultant : ADPL • Main Contractor : SBG • Design office : Focus Engineering

Extension Of Hajj Terminal - Load Center• Location : King Abdul-Aziz Airport – Jeddah • Total Site Area : 86, 000 . 00 m2

• Execution Period : 9 Month• Owner : General Aviation of Civil Authority • Consultant : Dar Al-Handassah• Main Contractor : SBG

Hajj Terminal - Module A + B • Location : King Abdul Aziz Airport – Jeddah • Execution Period : 12 Mointh• Owner : General Aviation of Civil Authority • Consultant : Dar Al Handassah• Main Contractor : SBG

Limits of benefitsDesign and construction of a load center comprising a high-voltage substation (78 MW), a cooling plant of 15000 tonnes, supplying an air conditioning system to the East and West Hajj Terminals, including all security, security control and monitoring and Building Technical Management (GTB).

Limits of benefitsSupply, installation, supervision and coordination of electromechanical work for terminals A and B at King Abdul Aziz Airport. Including work in the fields of drawing.

Limits of benefitsDesign and construction of electrical and mechanical systems; Installation of low and medium voltage electrical equipment and the realization of their networks; Operation of the internal and external system as: air traffic management system (Apron). BHS baggage handling systems.

7

Page 106: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

King Abdul Aziz University Science & Technology (KAUST)

Town Center - Phase I • Location : Thuwal – Jeddah

• Execution Period : 24 Months

• Owner : KAUST

• Consultant : ARAMCO

• Main Contractor : SBG

Residential & Community Building- Phase II• Location : Thuwal – North of Jeddah

• Execution Period : 18 Months

• Owner : KAUST

• Consultant : ARAMCO

• Main Contractor : SBG

Satellite Substation

• Location : Thuwal – North of Jeddah

• Execution Period : 8 Months

• Owner : KAUST

• Consultant : ARAMCO

• Main Contractor : SBG

Main Scope of Works This project is to build three (3) new satellite 13.8kvsubstations with installation of 13.8kv double – endedswitchgears for providing permanent power supply toresidential and commercial facilities of King AbdullahUniversity of Science and Technology.

Main Scope of Works Engineering, supply and installation, testing andCommissioning and start-built drawings of civil buildings,marine oceanic research enter, residential and commercialbuildings and other services buildings

Main Scope of Works Design & construction of E/M work of 2091 Villas, FireStation, Stadium, Super Markets, Schools, Clubs,Houses and many other buildings

8

Page 107: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Mas’a Extension Holy Mosque Makkah Phase I & II

Main Scope of Works

Design & Build the electrical and mechanical system; the HVAC, Plumbing & fire protection; lighting, power and security systems; monitoring and control system for safety operation and all electromechanical systems.

• Location : Holy Mosque – Makkah

• Execution Period : 12 Months each Phase

• Owner : Presidency of Haramain

• Consultant & Designer : Dar Al-Handassah

• Main Contractor : SBG

Design & build of E/M system of the Mass’a old & new,renovation of services areas and plant rooms

9

Page 108: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

General Aviation Terminal

Main Scope of WorksDesign and build of the Electrical and Mechanical Systems for the following:

• General Aviation Terminal (GA) and associated Apron. • The Aviation Standards & Safety Building (ASSB). • The Dog Kennel Complex •The electro-mechanical works consists of the infrastructure networkserving all buildings the electrical systems the MV switchgears, sub-stations, MV distribution network, the external lighting systemnetwork, chilled water system, water supply system and firefightingsystem network, sewerage system and storm water system andlandscape irrigation system.

• Location : King Abdulaziz International Airport - Jeddah • Execution Period : 12 Months • Owner : General Aviation of Civil Authority • Consultant : ADPL • Main Contractor : SBG

Design & Construction of E/M work of the General AviationStandard &Safety building and the CMC Complex

10

Page 109: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Third Haram Extension & Service Tunnel –Shameyah Project

Main Scope of Works

1. The Electro Mechanical System and Plumbing of bathrooms and ablution areas of the third Haram extension that includes the following:

• Central Cooling Plant • HV Power Plant • Stand By electric generators • Filtration, Sterilization, DW cooling plant & pumps • Water Treatment plant • Automated Central Garbage collection • Seven Ground water reservoirs–Gray water • Plumbing for Seven Ablution & Toilets buildings

2. Service Tunnels that includes the following: • Chilled water piping • Zamzam water piping • Garbage tubes • Gray water network • Waste water network • MV cables • Ventilation System • Rain water network • Fire Fighting system

• Location : Holy Mosque – Makkah • Execution Period : 24 Months • Owner : Presidency of Haramain• Consultant : Dar Al-Handassah• Main Contractor : SBG

Construction of the E/M system & plumbing work and the ablutionarea. Services tunnel that contains the chilled water and Zamzampiping, garbage tubes, gray/waste water network, ventilation,firefighting system etc.

11

Page 110: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

King Abdulaziz International Airport (Kaia P1072)

• Location : King AbdulAziz Airport – Jeddah • Execution Period : 2011-2015 • Owner : General Aviation of Civil Authority • Consultant : Dar Al Handassah• Main Contractor : SBG

Limits of benefits

Medium and low voltage electrical distributionequipment with control of the whole network oflighting, power, mechanical systems and transportsystems. Among the mechanical systems; Heating,Ventilation and Air Conditioning (HVAC), Plumbingand Fire Protection Systems.

Design and realization of electromechanical works.

12

Page 111: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Capital Market Authority Tower (CMA)

Main Scope of Works

• Electrical MV & LV Systems power distribution equipment and Control with all network for lighting, power, Mechanical systems and conveying systems.

• Mechanical Systems include Heating, Ventilation and Air Conditioning HVAC system, Plumbing and Fire Protection System.

• Location : Riyadh • Execution Period : 48 months • Owner : Capital Market Authority• Consultant : HOK Omraniah• Main Contractor : SBG

Design and build of the E/M work.

13

Page 112: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Capital Market Authority Tower (CMA)13

Page 113: HVAC Fire Protection Plumbing Transformers/Panels

OUR CLIENTS AND CONSULTANTS

ADVANCED VISION MOROCCO

07

Page 114: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Our Clients

1 2 3

10

4 5

6 7 8 9

Page 115: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

Our Consultants

1 2 3 4

6 7

5

8 9

Page 116: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED VISION MOROCCO

T hank Y ou!

Page 117: HVAC Fire Protection Plumbing Transformers/Panels

ADVANCED

VISION MOROCCOELECTRO MECHANICAL WORKS