Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 2 SCEC-K&A
1. INTRODUCTION .................................................................................................................. 32. GEOLOGY ........................................................................................................................... 33. GEOTECHNICAL SUBSURFACE INVESTIGATION .......................................................... 44. WATER TABLE LEVEL ....................................................................................................... 55. SEISMICITY ......................................................................................................................... 56. SOIL PARAMETERS DETERMINATION ............................................................................ 57. FOUNDATION DESIGN ....................................................................................................... 8
7.1 BEARING CAPACITY............................................................................................................ 97.2 SETTLEMENT.................................................................................................................... 127.3 LATERAL RESISTANCE ...................................................................................................... 14
8. RECOMMENDATIONS ...................................................................................................... 16
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
3/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 3 SCEC-K&A
1. Introduction
This design report presents the geotechnical conditions encountered at the Rail Bridge located
at Station 447+044. The report includes also calculations for bearing capacity and settlement of
the foundations and concludes with relevant recommendations to be taken into account during
the construction phase. The footings dimensions and stresses are provided based on the
abutment and piers structural calculations.
2. Geology
The geological maps developed in the area indicate that the main formations encountered at the
Rail Bridge location consist of basaltic rock as shown in Figure 1 below.
Figure 1: Geological Map
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
4/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 4 SCEC-K&A
A detailed geological survey was specifically carried out for the whole Project alignment. The
detailed survey indicates one main geological unit of moderately weathered flows in the studiedarea:
UNIT (Qtb): This unit consists mainly of alkaline-olivine flood basalt flows. These basalts are
pale to dark-grey, generally massive at the base and becomes porous, vesicular, scoviaceous
and much darker toward the top; and occur in the form of undulating flat gently sloping plateau
surface; and are characterized by columnar joining and fracturing resulting various sized rock
fragments. Lacustrine marls and clay deposits are interstrafied between basaltic flows.
The distribution and legend of this unit along the alignment route are shown in Figure 2 below:
Figure 2: Soil/Rock units as per the geological survey
3. Geotechnical Subsurface Investigation
The geotechnical investigation at the Rail Bridge location consisted of drilling Seven (7)
boreholes down to a maximum depth of 30m. The in situ testing campaign included carrying out
Standard Penetration Tests (SPT). Samples have also been retrieved from boreholes in order to
carry out lab tests to determine the mechanical, physical and chemical properties of the soil/rock
(sieve analysis, Atterberg limits, direct shear, and unconfined compression test).
The borehole logs and laboratory test results are summarized in Appendices A and B.
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
5/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 5 SCEC-K&A
4. Water Table Level
Ground water table was not encountered during the soil investigation at the executed boreholes
in this area.
5. Seismicity
According to the zonation map developed for the kingdom based on the peak ground
acceleration, PGA, values calculated for 50 years service lifetime with 10% probability of
exceedance, this quadrangle lies in zone 1 implying a peak ground acceleration of 0.1g.
However, this value was checked in view of the project specific geological and seismographic
context and a site specific peak ground acceleration was adopted based on the results of theseismic hazard assessment study. Accordingly, the peak ground acceleration considered for this
bridge is 0.13g.
6. Soil Parameters Determination
The soil profile detailing the encountered subsurface material is provided in Appendix C.
SPT, RQD and unconfined compressive strength results drawn with depth are shown in Figures
3, 4 and 5 below. The graph indicates loose to very dense fill material/silty Sand with presence
of boulders and cobbles at the top 0.5 to 4.5 meters, followed by highly to slightly fractured
Basalt to the termination depth of the boreholes.
Figure 3: SPT versus depth
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
6/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 6 SCEC-K&A
Figure 4: RQD versus depth
Figure 5: Unconfined compressive strength versus depth
Rock is encountered at the following depths along the bridge:
A1: basalt is encountered at 4.5m below NGL
P1: basalt is encountered at 1.5m below NGL
P2: basalt is encountered at 4.5m below NGL
P3: basalt is encountered at 1m below NGL
P4: basalt is encountered at 1.5m below NGL
P5: basalt is encountered at 3m below NGL
A2: basalt is encountered at 1.5m below NGL
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
7/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 7 SCEC-K&A
The expected soil stratigraphy is summarized in the idealized soil profile in Figure 6 below.
Figure 6: Idealized soi l profile
The results of the site investigation are used to determine the soil and rock properties that could
be adopted for the foundations calculations. As foundations will be socketed into rock, we are
interested in rock parameters, in particular the unconfined compressive strength. The minimumreported unconfined compression strength 25.0 MPa and the 90 th percentile value is 38.0 MPa.
We have adopted 25.0 MPa as a characteristic strength parameter of rock for bearing capacity
calculations. The in situ and lab test data are also complemented by correlations available in the
technical literature in addition the AASHTO 2002 for comparable soil conditions (References:
Pile Design and Construction Practice 4th edition by Tomlinson and Foundation Analysis and
Design 5th edition by Bowles).
The design is done according to Design Approach 3 which applies partial factors to actions and
to material properties, while resistances are left unfactored. Design Approach 3 employs factors
from Sets A1 or A2, M2, and R3. The factors in Set R3 are all 1.0 and hence resistance is
mostly unfactored. For rock material the partial coefficient on the unconfined compressive
strength is equal to 1.4.
The adopted soil parameters can be summarized as follows:
Table 1: Adopted rock parameters
Material DesignParameters References
Basalt
quc,d 18MPa CharacteristicvaluedividedbypartialsafetyfactorE 1000MPa AsafeestimatefromTomlinsonPileDesignand
ConstructionPractice (
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
8/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 8 SCEC-K&A
7. Foundation Design
The foundation design is carried out in accordance with the Eurocode 7 recommendations. To
check the resistance of the ground and foundations (GEO), Approach 3 is adopted as per the
Project Specifications. The structural loads are summarized in the Table below:
Table 2: Structural Loads and foot ing dimensions
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
9/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 9 SCEC-K&A
Based on the structural loads and in view of the nature of the subsurface material encountered,
it is recommended to adopt a shallow foundation system. Footings shall be socketed within the
basaltic rock to minimize settlements and to provide a proper lateral resistance againsthorizontal loads. It is recommended that the footings be partially socketed into rock (1m for
abutment and 0.5 m for piers) in view of the high lateral loads and in order not exceed the
allowable lateral deformations and to avoid any potential differential lateral behaviour should the
footing be embedded in both soil and rock formations.
7.1 Bearing Capacity
Using Eurocode approach which includes partial safety factor on the unconfined compression
strength of rock, the ultimate bearing capacity is high on rock.
Ultimate bearing capacity can be estimated using the US Corps of Engineers approach for
jointed rock with spacing s less than foundation width B.
Figure 7: Bearing capacity general shear failure by US Corps of Engineer
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
10/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 10 SCEC-K&A
In the case where the shear failure is likely to develop along planes of discontinuity, cohesioncannot be relied upon to provide resistance to failure. In such cases the ultimate bearing
capacity can be estimated from the following equation: 0.5BN+DNq
This Bearing capacity equation is applicable to long continuous foundations with length to width
ratios (L/B) greater than ten. The table below provides correction factors for circular and square
foundations, as well as rectangular foundations with L/B ratios less than ten. The ultimate
bearing capacity is estimated from the appropriate equation by multiplying the correction factor
by the value of the corresponding bearing capacity factor.
Table 3: Corrections factors
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
11/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 11 SCEC-K&A
Table 4: Estimated bearing capacity for Piers and Abutments using US Corps of
Engineers Approach
Also, the allowable bearing capacity can be estimated based on numerous methods proposed in
the technical literature. In view of the good quality of rock, the allowable contact stress for
footings supported on level surfaces in competent rock may be determined using Peck et al.
approach (also used in AASHTO 2002) as shown in Figure 8.
Figure 8: Allowable bearing capacity for footing on Rock (Peck et al. (1974)).
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
12/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 12 SCEC-K&A
The RQD used in this figure shall be the average RQD for rock within a depth of B below the
base of the footing, where the RQD values are relatively uniform within that interval. If rockwithin a depth of 0.5B below the base of the footing is of poorer quality, the RQD of the poorer
rock shall be used to determine the allowable bearing capacity. The results are summarized in
Table 5 below:
Table 5: Estimated bearing capacity beneath Piers and Abutments
Abutment
A1
PierP1 PierP2 PierP3 PierP4 PierP5 Abutment
A2
RQDValue 0% 15% 8% 35% 0% 0% 0%AllowableBearingCapacity(KPa) 950 1915 1430 3830 950 950 950
Ultimate and allowable bearing capacities are very high and settlements should be checked.
7.2 Settlement
The footing dimensions are as follows: real dimensions P1, P2, P3, P4 and P5 (13mX13m),
Abutment A1 (13mX15.4m) and Abutment A2 (16.5mX19.4m).
The geotechnical investigation indicates that the subsurface material over which footings are
placed is rock. Settlements of the foundations are therefore essentially of immediate/short terms
nature. The settlement can be estimated using the following equation (AASHTO 2002):
Where B and L are the effective width and length of the footing respectively; is the Poissons
ratio assumed to be equal to 0.25; is the elastic modulus of the rock layer beneath the
foundation level. is a factor to account for footing shape and rigidity, table 6 shows the elasticand shape and rigidity used. q0 is the effective stress at the level of the bottom of the foundation.
Table 6: Elastic shape and rigidity factors EPRI (1983)
L/B z,Flexible z,Rigid
Circular 1.04 1.131 1.06 1.082 1.09 1.103 1.13 1.155 1.22 1.2410 1.41 1.41
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
13/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 13 SCEC-K&A
The settlements are divided into two parts: during construction phase (i.e. earth pressure, dead
load) and during service (deck, superimposed loads, live loads, etc.). They are calculated basedon the stresses applied during construction and during service conditions using the effective
foundation dimensions (B and L to take eccentricities into account).
The data used and the corresponding estimated settlements are listed in Tables 7, 8 and 9
below.
Table 7: Subsurface materials for Piers and Abutments
Type Foundationembedmentconditions Foundationmaterial
PierP1 Foundationsshallbesocketedatleast0.5mintogoodrock.Thesoilcoverabovefootingsisaround0.5m. BasalticRock
PierP2 Foundationsshallbesocketedatleast0.5mintogoodrock.Thesoilcoverabovefootingsisaround5m. BasalticRock
PierP3 Foundationsshallbesocketedatleast0.5mintogoodrock.Thesoilcoverabovefootingsisaround0.5m. BasalticRock
PierP4 Foundationsshallbesocketedatleast0.5mintogoodrock.Thesoilcoverabovefootingsisaround0.5m. BasalticRock
PierP5 Foundationsshallbesocketedatleast0.5mintogoodrock.Thesoilcoverabovefootingsisaround1m. BasalticRock
AbutmentA1 Foundationsshallbesocketedatleast1mintogoodrock.Thesoilcoverabovefootingsisaround3m. BasalticRockAbutmentA2 Foundationsshallbesocketedatleast1mintogoodrock. BasalticRock
Table 8: Estimated settlements beneath Piers and Abutments during construction
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
14/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 14 SCEC-K&A
Table 9: Estimated settlements beneath Piers and Abutments during service
*Twosettlementvaluesarecomputed:duringconstructionandduringserviceasperTables8and9above.Thenetsettlementisthedifferencebetweenthesetwovalues.
Based on the above, most of the settlements will occur during construction and settlements
during service conditions are within tolerable limits.
7.3 Lateral Resistance
The footings are partially socketed into rock to provide proper resistance against lateral loads.
The lateral loads are particularly high for Abutment where the ultimate lateral loads can reach
50,364 KN. The contribution of the soil above footings is conservatively ignored. Different modes
of failures can occur:
a. Failure along interface between footing and rock. In this case the resistance is ensured
by the sliding resistance at the foundation bottom in addition to the rock wedge in front of
the footing. The failure path can also occur along discontinuities. However in view of the
massive nature of the rock encountered as confirmed by the high RQD values reported,
this mode of failure is not likely to occur as the longer the failure paths are, the higher is
the resistance against lateral loads.
b. Failure is initiated by buckling of the upper layer of rock under lateral loads. This failure
mode can be disregarded in view of the high compressive strength of the rock.
c. Rock can be simulated to a c- soil. In view of the relatively high c and values that can
be adopted for the rock mass and the large footing dimensions (thickness, width andlength), resistance is ensured via the passive pressure.
d. Failure by bearing capacity would not happen in view of the large footing dimensions
(thickness, width and length). The lateral pressure would not exceed 400 kPa.
An example of evaluation of lateral resistance for Abutment A2 is provided in Appendix D.
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
15/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 15 SCEC-K&A
a. Failure along interface and discontinui ties
b. Failure by buckl ing c. Failure by bearing capacity
d. Rock simulated to a c- soilFigure 9: Potential failure surfaces under lateral loads
It should be noted that failure by sliding is not expected in view of the high vertical loads applied
on the foundation which restrain it from sliding.
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
16/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 16 SCEC-K&A
8. Recommendations
The following is recommended for the construction of foundations of the Rail Bridge:
1- The allowable bearing capacity is 400 kPa.
2- The expected subsurface material over which foundations are laid consists of moderately
fractured to massive Basalt.
3- Foundation embedment (from Ground surface to bottom of R.C. foundation) shall be:
Abutment A1: 5.5 m depth below the natural ground level, foundation shall be
socketed at least 1m into good rock;
Piers P1: at 3.0 m depth below natural ground level, foundation shall be socketed at
least 0.5m into good rock.
Piers P2: at 8 m depth below natural ground level, foundation shall be socketed at
least 0.5m into good rock.
Piers P3: at 3.2 m depth below natural ground level, foundation shall be socketed at
least 0.5m into good rock.
Piers P4: at 3.2 m depth below natural ground level, foundation shall be socketed at
least 0.5m into good rock.
Piers P5: at 3.7 m depth below natural ground level, foundation shall be socketed at
least 0.5m into good rock.
Abutment A2: at 2.75 m depth below natural ground level, foundation shall be
socketed at least 1m into good rock.
4- Should in situ material encountered on Site be different from those expected then foundation
recommendations shall be revised accordingly.
5- A cautious method of excavation shall be performed so as not to disturb rock around and
under the footings. An even and uniform excavation surface shall be obtained. Proper
preparation of the areas to receive foundations shall be done as per Project Specifications.
6- No ground water is reported so cold paint water proofing should be applied.
7- Existing Utilities are present and all measures for supporting/protecting them should be
provided by the Contractor and properly installed, maintained and monitored and shall be
submitted to the Engineer for approval.
8- Cement type I should be used as chemical tests indicates non aggressive environment.
9- Probing and filling of cavities shall be done as per the approved Method Statement for cavityprobing and filling.
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
17/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 17 SCEC-K&A
APPENDIX A
(BOREHOLE LOGS)
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
18/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 18 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
19/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 19 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
20/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 20 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
21/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 21 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
22/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 22 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
23/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 23 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
24/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 24 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
25/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 25 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
26/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 26 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
27/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 27 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
28/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 28 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
29/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 29 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
30/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 30 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
31/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 31 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
32/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 32 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
33/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 33 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
34/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 34 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
35/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 35 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
36/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 36 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
37/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 37 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
38/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 38 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
39/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 39 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
40/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 40 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
41/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 41 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
42/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 42 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
43/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 43 SCEC-K&A
656.64
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
44/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 44 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
45/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 45 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
46/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 46 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
47/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 47 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
48/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 48 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
49/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 49 SCEC-K&A
655.51
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
50/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 50 SCEC-K&A
E=570910.531N=2704853.443
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
51/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 51 SCEC-K&A
E=570910.531N=2704853.443
655.14
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
52/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 52 SCEC-K&A
E=570910.531N=2704853.443
655.14
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
53/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 53 SCEC-K&A
E=570910.531N=2704853.443 655.14
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
54/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 54 SCEC-K&A
E=570910.531N=2704853.443 655.14
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
55/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 55 SCEC-K&A
E=570910.531N=2704853.443 655.14
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
56/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 56 SCEC-K&A
APPENDIX B
LAB TEST RESULTS
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
57/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 57 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
58/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 58 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
59/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 59 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
60/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 60 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
61/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 61 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
62/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 62 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
63/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 63 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
64/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 64 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
65/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 65 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
66/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 66 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
67/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 67 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
68/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 68 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
69/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 69 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
70/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 70 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
71/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 71 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
72/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 72 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
73/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 73 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
74/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 74 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
75/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 75 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
76/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 76 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
77/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 77 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
78/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 78 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
79/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 79 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
80/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 80 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
81/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 81 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
82/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 82 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
83/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 83 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
84/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 84 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
85/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 85 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
86/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 86 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
87/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 87 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
88/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 88 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
89/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 89 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
90/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 90 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
91/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 91 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
92/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 92 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
93/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 93 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
94/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 94 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
95/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 95 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
96/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 96 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
97/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 97 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
98/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 98 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
99/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 99 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
100/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 100 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
101/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 101 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
102/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 102 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
103/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 103 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
104/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 104 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
105/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 105 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
106/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 106 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
107/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 107 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
108/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 108 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
109/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 109 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
110/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 110 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
111/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 111 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
112/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 112 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
113/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 113 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
114/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 114 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
115/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 115 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
116/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 116 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
117/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 117 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
118/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 118 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
119/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 119 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
120/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 120 SCEC-K&A
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
121/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 121 SCEC-K&A
APPENDIX C
(SUMMARY OF LABORATORY TESTS AND GEOLOGICAL PROFILE)
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
122/130
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
123/130
February 2012 123
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
124/130
February 2012 124
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
125/130
February 2012 125
2704853.4
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
126/130
February 2012 126
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
127/130
February 2012 127
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
128/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 128 SCEC-K&A
APPENDIX D
(EXAMPLE OF LATERAL RESISTANCE FOR ABUTMENT A2)
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
129/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
February 2012 129 SCEC-K&A
Sliding: For Abutment A1 which carried the largest lateral load (ultimate load = 50,364
kN), the footing dimensions are 16.5m length, 19.4m width and 2.75m thickness. Takinginto account the cohesion and friction angle adopted, sliding along the interface rock-
footing would not occur (1000 kPa X length X width = 1000 kPa X 19.4m X 16.5m =
320,100 KN).
Failure plane: Consider that failure would happen along a failure plane that has an angle
of 60 from the vertical (around /4+/2). The horizontal resistance from the triangular
wedge of rock would be:
cohesion X length of wedge X cos(30) X length of footing =
1000kPaX5.5mXcos(30)X16.5m=78,591 KN.
Rockwedgecontributiontoresistance
FoundationLateralload L=13m
2.3m cohesion
4.6m
Bearing capacity: Consider a discontinuity with weak infilling material having a low
cohesion of 100 kPa along which failure/sliding will occur. In this case the resistance
provided by this layer against sliding would be equal to the footing dimensions X
cohesion = 19.4mX16.5mX100kPa = 32,010 KN. The remaining pressure caused by the
lateral load of 50,364 KN on the sides of the footing is (50,364KN-32,010)/(thickness X
length) = 18,354/(2.75m X 16.5m) = 405 KPa which is equal to the allowable capacity of
rock.
2.75m
5.5m
L=16.5 m
-
7/29/2019 Hhr Rw Tn c Ooo 20516 Aa
130/130
Haramain High Speed Rail
Geotechnical Design Report
Rail Bridge at Station 447+044
Doc.: HHR-RW-TN-C-OOO-20516-AA
FoundationLateralload L=13m
1.4m
Failurezonealongaweakinfillingzonewithlowcohesion
Resistingrockatthesidesofexcavation
Rock simulated to a c soil: in this case the friction and cohesion of the equivalent soil
will contribute in resisting the loads. Kp can be conservatively taken equal to 1.
Foundation
LateralloadL=13m
2.3m
2.75 m
2.75 m
L=16.5 m
L=16.5 m