signal list al-fanar project hhr-1 to hhr-6

26
DIGITAL INPUT OUTPUT LIST HHR1 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Cable Tunnel1 under 380KV GIS Supply Fan and Exhaust Fan Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1 26 21 4 0 Total With 20% Spare 31 25 5 0 PACU 2A & 2B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1

Upload: sheraaz87

Post on 19-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

Building Automation Project

TRANSCRIPT

Page 1: Signal List Al-fanar Project HHR-1 to HHR-6

DIGITAL INPUT OUTPUT LIST

HHR‐1 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       

Cable Tunnel‐1 under 380KV GIS Supply Fan and Exhaust Fan Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          Exhaust Fan CMD     2       Room Temperature        1    Humidity Sensor        1    

26  21  4  0 

Total With 20% Spare   31  25  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          

Page 2: Signal List Al-fanar Project HHR-1 to HHR-6

Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 3A & 3B (110KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   4          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  4          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        0    Fire Smoke Dampers Status  2       Fire Smoke Dampers CMD     2       

Cable Tunnel‐3 from Control Building to 110KV Supply Fan and Exhaust Fan  Supply Fan Trip Status          

Page 3: Signal List Al-fanar Project HHR-1 to HHR-6

Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Thermostat/ Humidstat Status        1    Thermostat/ Humidstat CMD        1    

27  18  3  0 

Total With 20% Spare   32  22  4  0 

PACU 4A & 4B (110KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   4          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  4          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        0    Fire Smoke Dampers Status  2       Fire Smoke Dampers CMD     2       Thermostat/ Humidstat Status        1    Thermostat/ Humidstat CMD        1    

24  16  3  0 

Total With 20% Spare   29  19  4  0 

PACU 5A & 5B (13.8 KV Switchgear Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       

Page 4: Signal List Al-fanar Project HHR-1 to HHR-6

Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  15  4  0 

Page 5: Signal List Al-fanar Project HHR-1 to HHR-6

Total With 20% Spare   24  18  5  0 

PACU 7A & 7B (380KV Control Building)  DI  DO  AI  AO Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 

Total With 20% Spare   36         

26  7  0 

PACU 8A & 8B (380KV Control Building)  DI  DO  AI  AO Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       

Page 6: Signal List Al-fanar Project HHR-1 to HHR-6

Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    

Cable Tunnel‐2 from Control Building to 380KV GIS Supply Fan and Exhaust Fan Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 

Total With 20% Spare   37         

26  7  0 

HHR‐2 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel interlock  1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    

Page 7: Signal List Al-fanar Project HHR-1 to HHR-6

Return Air Temperature        1    Fire Smoke Dampers Status  1          Fire Smoke Dampers CMD     1       

Cable Tunnel‐1 under 380KV GIS SF‐1&2 EF‐1&2 Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          Exhaust Fan CMD     2       Cable Tunnel‐4 from 380KV GIS to 110KV GIS SF‐5 & EF‐5)             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Room Temperature        1    Humidity Sensor        1    

29  23  4  0 

Total With 20% Spare   35  28  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1          Fire Smoke Dampers CMD     1       Room Temperature        1    

Page 8: Signal List Al-fanar Project HHR-1 to HHR-6

Humidity Sensor        1    20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 3A & 3B (110KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   4          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Heater Trip Status  4          Heater Trip CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        0    Fire Smoke Dampers Status  2          Fire Smoke Dampers CMD     2       

Cable Tunnel‐3 from Control Building to 110KV GIS SF‐4 EF‐4  Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Thermostat/ Humidstat Status        1    Thermostat/ Humidstat CMD        1    

27  18  3  0 

Total With 20% Spare   32  22  4  0 

PACU 4A & 4B (110KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   4          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       

Page 9: Signal List Al-fanar Project HHR-1 to HHR-6

SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  4          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        0    Fire Smoke Dampers Status  2       Fire Smoke Dampers CMD     2       Thermostat/ Humidstat Status        1    Thermostat/ Humidstat CMD        1    

24  16  3  0 

Total With 20% Spare   29  19  4  0 

PACU 5A & 5B (13.8 KV Switchgear Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

Page 10: Signal List Al-fanar Project HHR-1 to HHR-6

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1          Fire Smoke Dampers CMD     1       

Cable Tunnel‐5 from 33KV SWGR to Transformer SF‐6 & EF‐6             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Room Temperature        1    Humidity Sensor        1    

23  17  4  0 

Total With 20% Spare   28  20  5  0 

PACU 7A & 7B (380KV Control Building)  DI  DO  AI  AO Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       

Page 11: Signal List Al-fanar Project HHR-1 to HHR-6

Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 

Total With 20% Spare   36         

26  7  0 

PACU 8A & 8B (380KV Control Building)  DI  DO  AI  AO Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          

Page 12: Signal List Al-fanar Project HHR-1 to HHR-6

Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 & EF‐3 Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 

Total With 20% Spare   37         

26  7  0 

HHR‐3 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       

Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2        Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          

Page 13: Signal List Al-fanar Project HHR-1 to HHR-6

Exhaust Fan CMD     2       Room Temperature        1    Humidity Sensor        1    

26  21  4  0 

Total With 20% Spare   31  25  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       

Page 14: Signal List Al-fanar Project HHR-1 to HHR-6

Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  15  4  0 

Total With 20% Spare   24  18  5  0 

PACU 3A & 3B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 Total With 20% Spare   36          7  0 

Page 15: Signal List Al-fanar Project HHR-1 to HHR-6

26  

PACU 4A & 4B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    

Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 

Total With 20% Spare   37        

26  7  0 

HHR‐4 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          

Page 16: Signal List Al-fanar Project HHR-1 to HHR-6

Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       

Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2        Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          Exhaust Fan CMD     2       Room Temperature        1    Humidity Sensor        1    

26  21  4  0 

Total With 20% Spare   31  25  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       

Page 17: Signal List Al-fanar Project HHR-1 to HHR-6

Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  15  4  0 

Total With 20% Spare   24  18  5  0 

PACU 3A & 3B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          

Page 18: Signal List Al-fanar Project HHR-1 to HHR-6

Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 

Total With 20% Spare   36          

26  7  0 

PACU 4A & 4B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    

Page 19: Signal List Al-fanar Project HHR-1 to HHR-6

Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 

Total With 20% Spare   37          

26  7  0 

HHR‐5 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       

Page 20: Signal List Al-fanar Project HHR-1 to HHR-6

Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2        Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          Exhaust Fan CMD     2       Room Temperature        1    Humidity Sensor        1    

26  21  4  0 

Total With 20% Spare   31  25  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          

Page 21: Signal List Al-fanar Project HHR-1 to HHR-6

Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  15  4  0 

Total With 20% Spare   24  18  5  0 

PACU 3A & 3B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    

Page 22: Signal List Al-fanar Project HHR-1 to HHR-6

Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 

Total With 20% Spare   36          

26  7  0 

PACU 4A & 4B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    

Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 Total With 20% Spare   37            7  0 

Page 23: Signal List Al-fanar Project HHR-1 to HHR-6

26  

HHR‐6 PACU 1A & 1B (380KV GIS Building)  DI  DO  AI  AO Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       

Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2        Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Exhaust Fan Trip Status  2          Exhaust Fan CMD     2       Room Temperature        1    Humidity Sensor        1    

26  21  4  0 

Total With 20% Spare   31  25  5  0 

PACU 2A & 2B (380KV GIS Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          

Page 24: Signal List Al-fanar Project HHR-1 to HHR-6

Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     6       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

20  17  4  0 

Total With 20% Spare   24  20  5  0 

PACU 6A & 6B (33KV Switchgear Building)  DI  Do  AI  Ao Filter Dirty Status   3          Fire Alarm Control Panel   1          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA  1          Compressor 1&2 Trip Status  4       Compressor 1&2 CMD     4       Heater Trip Status  2          Heater Trip CMD     4       Supply Fan Trip Status  2       Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        1    Return Air Temperature        1    Fire Smoke Dampers Status  1       Fire Smoke Dampers CMD     1       Room Temperature        1    Humidity Sensor        1    

Page 25: Signal List Al-fanar Project HHR-1 to HHR-6

20  15  4  0 

Total With 20% Spare   24  18  5  0 

PACU 3A & 3B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1    Exhaust Fan Trip Status  2          Exhaust Fan CMD     2          30  22  6  0 

Total With 20% Spare   36          

26  7  0 

PACU 4A & 4B (380KV Control Building)  DI  Do  AI  Ao Filter Dirty Status   6          Fire Alarm Control Panel   3          Return Air Damper Status  2          Return Air Damper CMD     2       SCADA     1       Compressor 1&2 Trip Status  4          Compressor 1&2 CMD     4       Supply Fan Trip Status  2          

Page 26: Signal List Al-fanar Project HHR-1 to HHR-6

Supply Fan CMD     2       Supply Fan Flow Status  2          Supply Air Damper Status  2          Supply Air Damper CMD     2       Supply Air Temperature        2    Return Air Temperature         1    

Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands             Supply Fan Trip Status  1          Supply Fan CMD     1       Supply Fan Flow Status  1          Exhaust Fan Trip Status  1          Exhaust Fan CMD     1       Electrical Duct Heater Trip Status  1          Electrical Duct Heater CMD     3       Fire/Smoke Damper Status  6          Fire/Smoke Damper CMD     6       Room Temperature        1    Space Humidity        1    Mixing Humidity Space        1       31  22  6  0 

Total With 20% Spare   37          

26  7  0