harper limbach brochure
DESCRIPTION
ÂTRANSCRIPT
9051 Florida Mining BoulevardSuite 103Tampa, Florida 33634P. 813.207.0057F. 813.885.5289
SYSTEMS THAT WORK
www.limbachinc.com
COMMERCIAL ○ HIGHER EDUCATION ○ K-12 ○ GOVERNMENT ○ HEALTHCARE ○ HOSPITALITY & ENTERTAINMENT ○ INDUSTRIAL ○ MISSION CRITICAL ○ SCIENCE & TECHNOLOGY ○ TRANSPORTATION
EXECUTIVE TEAM
LOCAL MANAGEMENT TEAM
Mike McCannPresident
Dominick Traina Financial Manager
LIMBACH TEAM
CONTACTINFO Mike McCann
PresidentPhone: 813-666.1169
Cell: 813.495.2649Email: [email protected]
TACITKNOWLEDGE
Nick AngerosaVice President
1 14
WarrenKlemm OrlandoBranch
Manager
Larry Turnage
OrlandoOperationsManager
Robert WilderOrlandoSafety
Manager
GaryKuitunen
TampaSafety
Manager
Gary
TampaSafety
Manager
GregFox
TampaProject
Executive
RonRoberts
ChiefEstimator
GeorgeRiveraService
Manager
OFFSITE
SCAN QR CODE WITH YOUR SMARTPHONE TO LEARN MORE ABOUT OFFSITE
OR GO TO WWW.LIMBACHINC.COM/SERVICES/OFFSITE-CONSTRUCTION
NATIONAL PRESENCE
with local attention
Limbach’s Offsite mechanical systems offer tremendous benefits to the overall project. This includes: Increased Project Safety, Higher Productivity, Enhanced Quality Control, Compressed Schedule, Better Fit and Sequencing, and Minimization of Waste.
Heading into the Next
100 Years of Excellence
• Team construct/ design assist engagement due to budget issues.
• Harper Limbach able to redesign project in conjunction with engineer resulting in $4,000,000 in savings for the owner.
• Resulting in the construction of an 18 story, five star hotel with dynamic steam and chilled water, hot water, and control systems.
• Harper Limbach successfully completed mechanical systems in LifeLink’s new, state of the art tissue bank facility in 2010.
• Harper Limbach was instrumental in commissioning the building, working with a consulting engineer and construction manager to achieve complete owner satisfaction.
• Harper Limbach was hired in 2012 as a design-build contractor to complete LifeLink fit-out spaces and continue their relationship with Skanska and LifeLink.
FOUR SEASONSSUCCESSFUL
PROJECTSPROVEN RESULTS
SUCCESSFULPROJECTS
PROVEN RESULTS
• Team construct/ design assist engagement due to budget issues.
• Harper Limbach able to redesign project in conjunction with engineer resulting in $4,000,000 in savings for the owner.
• Resulting in the construction of an 18 story, five star hotel with dynamic steam and chilled water, hot water, and control systems.
• Harper Limbach successfully completed mechanical systems in LifeLink’s new, state of the art tissue bank facility in 2010.
• Harper Limbach was instrumental in commissioning the building, working with a consulting engineer and construction manager to achieve complete owner satisfaction.
• Harper Limbach was hired in 2012 as a design-build contractor to complete LifeLink fit-out spaces and continue their relationship with Skanska and LifeLink.
FOUR SEASONSSUCCESSFUL
PROJECTSPROVEN RESULTS
SUCCESSFULPROJECTS
PROVEN RESULTS
“BEGIN WITH THE END IN MIND”
• Tampa Bay service group
• Seamless transition from construction to commissioning and service after completion.
• Full time local commissioning manager with relevant experience in complex systems.
• “All In Approach” – Full Engagement
SERVICE/COMMISSIONING
○Limbach Modeling & Production System is a “model that lives” and assists the team with efficient management of any design revisions.
○LMPS allows for complete coordination, building the building virtually before starting in the field.
○LMPS leads to LEAN implementation, prefabrication and “Just in time” delivery - mission critical to success on any premier project, logistics & schedule.
○LMPS allows for system & equipment information transfer.
LMPS
www.
limba
chinc
.com/
abou
t/safe
ty
We have made safety a part of the cultural fabric at Limbach, where all employees are entitled to a safe and healthful work environment.
INCIDENT & INJURY FREE
SCAN QR CODE TO LEARN MORE OR GO TOwww.propertycasualty360.com/2012/08/20/safety-zealot
IIF
OFFSITE
SCAN QR CODE WITH YOUR SMARTPHONE TO LEARN MORE ABOUT OFFSITE
OR GO TO WWW.LIMBACHINC.COM/SERVICES/OFFSITE-CONSTRUCTION
NATIONAL PRESENCE
with local attention
Limbach’s Offsite mechanical systems offer tremendous benefits to the overall project. This includes: Increased Project Safety, Higher Productivity, Enhanced Quality Control, Compressed Schedule, Better Fit and Sequencing, and Minimization of Waste.
Limbach’s Offsite Prefabrication offers tremendous benefits to the overall project. This includes: Increased Project Safety, Higher Productivity, Enhanced Quality Control, Compressed Schedule, Better Fit and Sequencing, and Minimization of Waste... A LEAN process.
PREFABRICATION
SCAN QR CODE WITH YOUR SMARTPHONE TO LEARN MORE ABOUT OFFSITE
OR GO TO WWW.LIMBACHINC.COM/SERVICES/OFFSITE-CONSTRUCTION
• If requested by PJ Dick, Limbach will provide “LEAN Boot Camp” training sessions to other subcontractors.
• Project planning for material storage and handling that seeks to maintain jobsite crew productivity and workflow, including offsite fabrication - key to high rise construction logistics.
• Working with PJ Dick, establish collaborative pull planning sessions, weekly planning and daily huddles to ensure the levels of communication remain high and obstacles are removed from the path of the installation crews.
• Peer Reviewed project plans to leverage the collective knowledge of the entire Limbach organization.
HIGHLIGHTS OF LIMBACH’S LEAN STRATEGIES INCLUDE:
LEAN
SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS OR GO TO WWW.LIMBACHINC.COM/COXTEAMBIOS
LEDS
LIMBACH ENGINEERING & DESIGN SERVICES
With our in-house engineering group, Limbach Engineering and Design Services (LEDS), we provide additional service for Value Management and not just a budgeting service.
• Professional Engineers to challenge the design team and bring alternative solutions
• Conceptual estimating of design alternatives
• Right-sizing of equipment for energy efficiency and cost control
• Constructability reviews from best in class project management
SCAN
QR
CODE
TO
LEAR
N MO
RE O
R GO
TO
WW
W.LI
MBAC
HINC
>COM
/TEA
M-CO
NSTR
UCT
“BEGIN WITH THE END IN MIND”
• Tampa Bay service group
• Seamless transition from construction to commissioning and service after completion.
• Full time local commissioning manager with relevant experience in complex systems.
• “All In Approach” – Full Engagement
SERVICE/COMMISSIONING
○Limbach Modeling & Production System is a “model that lives” and assists the team with efficient management of any design revisions.
○LMPS allows for complete coordination, building the building virtually before starting in the field.
○LMPS leads to LEAN implementation, prefabrication and “Just in time” delivery - mission critical to success on any premier project, logistics & schedule.
○LMPS allows for system & equipment information transfer.
LMPS
EXECUTIVE TEAM
LOCAL MANAGEMENT TEAM
Mike McCannPresident
Dominick Traina Financial Manager
LIMBACH TEAM
CONTACTINFO Mike McCann
PresidentPhone: 813-666.1169
Cell: 813.495.2649Email: [email protected]
TACITKNOWLEDGE
Nick AngerosaVice President
1 14
WarrenKlemm OrlandoBranch
Manager
Larry Turnage
OrlandoOperationsManager
Robert WilderOrlandoSafety
Manager
GaryKuitunen
TampaSafety
Manager
Gary
TampaSafety
Manager
GregFox
TampaProject
Executive
RonRoberts
ChiefEstimator
GeorgeRiveraService
Manager
9051 Florida Mining BoulevardSuite 103Tampa, Florida 33634P. 813.207.0057F. 813.885.5289
SYSTEMS THAT WORK
www.limbachinc.com
COMMERCIAL ○ HIGHER EDUCATION ○ K-12 ○ GOVERNMENT ○ HEALTHCARE ○ HOSPITALITY & ENTERTAINMENT ○ INDUSTRIAL ○ MISSION CRITICAL ○ SCIENCE & TECHNOLOGY ○ TRANSPORTATION