August 27, 2021

Long Range Transmission Planning Workshop

Year 10 and 20 Insights:Future 1 Reliability Analysis Results

1

Agenda

• Updates on stakeholder response to the initial results

• Focused steady state reliability issues for Future 1, Year

10 and 20 models

• Future 1 initial solution testing

• Ongoing studies and upcoming study plans

• Next Steps

2

Highlights on information exchange with stakeholders for

reliability analysis and feedback

3

MISO Sharefile location: https://misoenergy.sharefile.com/f/fof89d75-4353-4393-bcd2-f543bb3ce5f1

LRTP website: https://www.misoenergy.org/planning/transmission-planning/long-range-transmission-planning/

• Modeling and input files

• Reviewed line by line comments for their system

• Proposed projects to mitigate the issues seen on posted

results

• Proposed alternative lower cost solutions including

terminal equipment upgrades, line uprates, re-sagging,

protection upgrade, etc.

• Internal studies and presentations

• Modeling document

• Powerflow models and associated input files

to perform studies and study scope

• MISO proposed Indicative roadmap projects

list and associated parameter files

• Study results as they become available

• Near term and future study plans

• Focus area and important issues

Feedback receivedInformation shared with Stakeholder

MISO completed contingency analysis for basecase powerflow

models for Future 1 models

4

Year 20Year 10

Future 1 Future 2 Future 3 Future 1 Future 2 Future 3

*First pass focuses on West, East, Central planning sub-regions

Powerflow Models

Posted for Stakeholder feedbackN-1 Analysis

N-1-1 Analysis

Today’s discussion will focus on the evaluation performed on part of the

proposed solutions in MISO’s F1 indicative roadmap

5

Future 1 Indicative Roadmap Subset of F1 Indicative roadmap

As an initial set of solutions MISO is evaluating a subset of the F1

Indicative Roadmap in the area of more concentrated issues

6

Max Loading %

LRTP solution

>90% issues fixed

90% - 40% issues fixed

<40% issues fixed

Thermal issues

* % is based on total count of issues resolved by the LRTP solution to the total basecase issues

257 unique overloaded

Facilities

29,324 different events#

#Monitored elements + Contingency pair across all models

7

Max Loading % Loading % change

10.00

Thermal issues

Severity of issues range from modest to severe, and tested project set

shows significant headroom is gained for most issues

* % change is computed on worst loading element

8

• The map shows examples of the delta

change in loading on selected facilities

• Central Iowa

• Webster Area 50% average change

• Montezuma to Bondurant 61% average

Big Stone

30–40% change

Split Rock

23% change

Granite falls

~30% change

Wilmarth & Helena

~50% change

Eau Claire

26% change

SE MN

20-50% change

E Iowa

24-53% changeRaun area

30-60% change

SE IA&NE MO

9-30% changeLRTP Line

% Average Decrease

Decrease in loadings on affected

transmission is significant

Colors are average decrease in loading % from base cases to cases with projects applied.

Darker green, the greater the average change

Parallel efforts are ongoing for additional Model building, Issue

Identification and solution testing along with stakeholder communication

• Examination of existing and next limiting elements for the constraints.

• Scoping of transfer analysis to capture important expected system conditions and initiate

the analysis.

• Compare and choose among different solution alternatives

• Rationale to the solution idea with the LRTP

• Matching of the issues to the solution ideas

• Feasibility of the solution ideas

• Distribution factor screening to target for high impact solutions

• AC contingency analysis and comparison with selected set of solution ideas

9

Northeast Iowa Area Results

10

Flows across NE Iowa

• Shoulder Light Load and Winter cases,

some Summer issues near Adams

• Multiple contingency category events

that break West to East and North to

south paths

• Similar results in both year models

Thermal Issues

LRTP Solution

Central and Southeast Iowa Area Results

Flows from Central IA towards East and

South outlets

• Winter cases, some issues seen on

Light Load and Shoulder cases

• Mostly events that break W>E and

N>S paths

• Similar limiting elements for both year

models

11

Thermal Issues

LRTP Solution

Western Iowa Area Issues

Flows across and out of Western Iowa

• Shoulder Light Load and Winter

• Mostly P1 and P2 issues, some P6 driven

subregional limiters

12

13

• Occurs in Winter and Shoulder

cases

• Worst issues observed for the

East/West loss of 230 kV line

• Overloads on 230kV from Big Stone

to Hankinson, and Forman 230/115

kV

• Voltages around 0.92 p.u. post

contingent

13

Bigstone / Hankinson Area

Thermal Issues

LRTP Solution

Low Voltages

• Worst loading in Shoulder

• Contingency events at Lyon Co overloads Wilmarth to Helena 345 kV line

• Contingency events at Wilmarthcauses overload on 345/115kV transformer at Wilmarth

• Double tower outages cause issues along entire 345 kV path

14

South West Twin Cities

Wilmarth

Helena

Thermal Issues

LRTP Solution

Western MN

15

• Shoulder, Winter Day and Night

• Granite Falls area 230 kV and 115 kV

• Multiple contingency events on 345

kV system to south and west

Thermal Issues

LRTP Solution

16

• Seen in Shoulder case

• 345 kV overloading caused by double

tower outage near Stone Lake

• 138 kV overloads caused by certain

contingency types at Rocky Run

• Loss of single element in Shoulder

causes overloads

Thermal Issues

Wisconsin Area

Some of the issues that we see are caused by the specific siting

of individual resource

17

• Northern Wisconsin – Solar outlet issues

• Sited 768 MW of solar at Ironwood for F1Y20

• Causes overloads and low voltage on entire

115kV system

• Many different contingencies makes the situation

worst

• Not seeking for LRTP solution

Thermal Issues

MISO Central planning area issues are driven by flow

to/from multiple neighboring states

18

• West to East Flows:

• Fargo 345/138 XFMRs, Sandburg 161/138 kV

XFMR, Marblehead-Palmyra, Herleman-Quincy

• Bunsonville, Goose Creek area

• Zachary, Adiar area

• Southern IL/MO Issues around

Lutesville/Essex area

• IL/IN wind zone (Goodland Area):

• Paxton-Gilman -Watseka-Sheldon South-

• Grandtower area

• Cayuga, Wallace, Nucor, Whitestown area

Issues observed in Southern Michigan may be resolved

by regional solutions

19

• South-central Michigan

• Issues around Argenta, Battle Creek, Tompkins, Oneida, Majestic 345kV flow corridor

• Parallel 138kV flow paths between METC and ITCT also get impacted

• Situations get worse in 20 year out models

• South-eastern Michigan

• Outages involve Morocco 345/138kV substation, overloads

shown around Whiting area

• For loss of 345kV flow paths from West to East Michigan,

overloads of Wayne 345kV transformer

• Situation gets even worse in 20 year out models

Argenta Majestic

LRTP Indicative roadmap solution

MISO started analyzing indicative roadmap ideas and will also

continue to perform issue identification

• Violation Identification

• Steady state contingency analysis

• Future 1, Year 10 and year 20 models

• Future 2, Future 3 models

• Impact of Generation siting on results

• Transfer Analysis

• Additional scenarios to capture possible system conditions as informed by the RIIA study.

• Solution Testing

• Alternatives will draw from indicative roadmap as well as other proposed solutions

• Compare and choose solutions

• Solution refinement

• Effectiveness of Solution

• Security Assessment

• Cost effectiveness over time and economic values

20

Completed

In-progress

MISO is exploring transfer analysis scenarios to more fully

capture the variability in system conditions across the footprint

Transfer scenarios complement the 7 basecase dispatch conditions which are not sufficient to capture all dispatch conditions

• Prevailing Weather Patterns

• Non uniform intra-day dispatch of renewables in different areas

• Variability of Wind/Solar dispatch across large geographic footprint (wind drought, cloud cover in different subregions)

• Changing weather conditions across the footprint

• Reliably serve load following a weather event in a subregion

• Use of dispatchable resources in other areas to cover sudden loss of renewables in a subregion

• Future availability of dispatchable resources

• Higher renewable penetration in regions of rich supply

• Unavailability of gas units due to increase in retirements

21

Transfer analysis provides further insights into system behavior

as renewable penetration increases

• LRTP F1 models represent a single outcome with mild renewable penetration levels

• At renewable penetration levels of F1 a significant amount of thermal resources remain in operation around the traditional load centers. At higher levels of penetration, conventional resources will be displaced by renewables remote from load centers

• F1 base models do not capture the locational differences of renewable production – uniform dispatch of renewables

• RIIA highlighted the need for transmission to support energy adequacy in a new era of high penetration levels of renewable resources

• The variable nature of renewables presents challenges to ensure reliability for all ours of the year as system conditions change due to the shifting transfers from remote renewable resources to the area load centers

• While MISO large footprint provides a broad geographic diversity as well as solar and wind diversity, areas of renewable production are not uniform and tend to cluster in areas of high production potential.

• Reliable operation requires transmission infrastructure to access the areas of renewable production in the hours when the energy is available

• With high renewable penetration levels, the daily ramping needs are met by thermal resources in other areas of the footprint driving intra-day transfers and need for transmission to support bi-directional flow

22

23

An increasingly connected system is needed to balance renewable

variability across an increasingly heterogenous footprint

7pm peak load

4 pm

6 pm

RIIA March 3rd, 2021 Webinar

Load

Wind

Avg. diurnal load vs. wind + solar

Avg. diurnal load vs. wind + solar

*MISO: 10%*LRZ 3: 70%

†MISO: 50%†LRZ 3: 200%

Wind

Solar

Load

*MISO: 10% Penetration †MISO: 50% Penetration

Slide from Renewable Integration Impact Assessment (RIIA) Study

https://www.misoenergy.org/planning/policy-studies/Renewable-integration-impact-assessment

Intra-MISO power flow increases in magnitude and becomes more variable as renewable penetration increases

24

10000

20000

30000

40000

0 20000 40000 10000

20000

30000

40000

50000

0 10000 20000 30000 40000 50000 60000

10000

20000

30000

40000

50000

60000

0 10000 20000 30000 40000 50000 60000 70000

10000

20000

30000

40000

50000

60000

0 20000 40000 60000 80000

50% Renewables40% Renewables

Renewable Generation (MW)

Tota

l In

tra-

MIS

O A

rea

Inte

rch

ange

(MW

)

30% Renewables

20% Renewables

RIIA Phase 1 & 2 Wrap up - 11/14/2019

Slide from Renewable Integration Impact Assessment (RIIA) Study

https://www.misoenergy.org/planning/policy-studies/Renewable-integration-impact-assessment

Wind Drought in West Region: Energy supplied from Central

region

25

• In areas of MISO where we

expect limited thermal

generation as compared to

renewable resource capability

there will be times where we

need to get energy from other

areas.

• Transfer capability will enable

areas with excess gas.

Bubbles represent max capacity of specific unit type in F1

26

Available renewable energy supplying renewable drought areas

• For areas that become deficient in

renewable output access to other

areas with excess renewable

resources allows load to be served

from those low cost resources.

Bubbles represent max capacity of specific unit type in F1

For example, high wind capability in IA/MN can be available to serve

neighboring areas as needed

27

High Wind

Generation Area

• There are certain areas with

high concentration of high

renewable capacity factor and

there will be times where we

will have excess generation

compared to the load.

• Iowa and southern Minnesota

area have high wind generation

• When heavy wind is blowing,

this area can provide power to

support the load in other areas.

Bubbles represent max capacity of specific unit type in F1

Similarly Solar heavy areas will have times when access to external

resources will be valuable

28

• High renewable solar heavy

area suddenly looses solar

• For example, central region

(IL/IN) supplying the power to

Michigan for the sudden loss of

Michigan Solar.

Bubbles represent max capacity of specific unit type in F1

Appendix

30

Reliability Assessment involves multiple iterative phases to

identify the issues and test the solutions

31

Solved?

Yes

Solution Testing

• Regionally focused

• Alternatives will draw from Indicative Roadmap and other proposed solution as appropriate to resolve the observed issues

• Compare and choose solutions

Base LRTP Models

• MTEP21 Futures

• Resource Forecast, Retirements, Load

• MTEP20 TA Topology*

• Dispatch Methodology

Issue Identification

• Contingency Analysis

• Impact of Generation siting on results

• Local/Regional

• Additional Scenarios

• Transfer Analysis

• Stability Analysis

Iterative

refinement

No

Synthesize

issuesMitigation

*Adjusted to MTEP21 based on stakeholder feedback