1 PRE-FEASIBILITY REPORT For Proposed Expansion of Manufacturing Facility of Polymers based on Vinyl acetate monomer & Poly vinyl alcohol and adhesives based on vinyl acetate & Polyvinyl. At Plot No -58, MIDC Mahad, Dist-Raigad – 402 309, Maharashtra Project Proponent M/s. Pidilite Industries Ltd. Name of the Industrial Unit M/s. Pidilite Industries Ltd. Plot No. C- 58, M.I.D.C., Mahad, Taluka - Mahad, Dist. Raigad State - Maharashtra, India Registered Office M/s. Pidilite Industries Ltd. Ramkrishna Mandir Road Off Sir Mathuradas Vasanji Road, Andheri (East) Mumbai - 400059 Maharashtra, INDIA Phone: +91 22 3308 7000 Fax: +91 22 2835 7700

Upload: buikhue

Post on 19-Aug-2018

383 views

Category:

Documents


16 download

TRANSCRIPT

1

PRE-FEASIBILITY REPORT

For PPrrooppoosseedd EExxppaannssiioonn ooff MMaannuuffaaccttuurriinngg FFaacciilliittyy ooff PPoollyymmeerrss bbaasseedd oonn VViinnyyll

aacceettaattee mmoonnoommeerr && PPoollyy vviinnyyll aallccoohhooll aanndd aaddhheessiivveess bbaasseedd oonn vviinnyyll aacceettaattee &&

PPoollyyvviinnyyll..

At

PPlloott NNoo --5588,, MMIIDDCC MMaahhaadd,,

DDiisstt--RRaaiiggaadd –– 440022 330099,,

MMaahhaarraasshhttrraa

Project Proponent MM//ss.. PPiiddiilliittee IInndduussttrriieess LLttdd..

Name of the Industrial Unit M/s. Pidilite Industries Ltd.

Plot No. C- 58,

M.I.D.C., Mahad, Taluka - Mahad, Dist. Raigad

State - Maharashtra, India

Registered Office

M/s. Pidilite Industries Ltd. Ramkrishna Mandir Road

Off Sir Mathuradas Vasanji Road,

Andheri (East) Mumbai - 400059

Maharashtra, INDIA

Phone: +91 22 3308 7000

Fax: +91 22 2835 7700

2

1.0 EXECUTIVE SUMMARY The company started small with a single factory and a simple product on offer – Fevicol- a

synthetic resin adhesive for use in carpentry and woodworking. The brand name “Fevicol” as

coined by the company means freedom from cumbersome animal fat that was until then the only

available glue.

The first modern manufacturing plant for pigments and emulsions is set up in Kondivita village,

Andheri (W), Mumbai; which today serves as the corporate head-office of Pidilite.

Fevicol makes its mark and is established as the carpenter’s preferred choice of synthetic adhesive

that is reliable and durable.

In 1990, the name Pidilite Industries Pvt. Ltd. is incorporated. Thus, the first step towards brand

recognition is taken.

We develop most of our products in-house with the help of a strong, research-driven innovation

overlaid with consumer insights. A well-equipped and well-staffed R&D centre continuously

develops and enhances products for consumers, craftsmen and industries.

Pidilite also established a state-of-the-art research centre in Singapore that is now a member of

Singapore Chemical Industry Council (SCIC).

Pidilite is a socially responsible business. We believe in giving back to our community. As a result of

this, over the last five decades, our commitment to be socially aware and responsible in the

community has remained unchanged.

We support a number of projects related to Rural Development, Education and Healthcare to

socially-uplift the community and support sustainable development.

Over 100 small & medium-sized projects have been undertaken in relation to water conservation

and watershed development. These include construction of new dams, repair and renovation of old

dams, digging and deepening ponds and percolation tanks.

Shri Balvant Parekh Science City was founded by Pidilite at Bhavnagar. Replete with facilities like

conference hall, computer unit, physics laboratory and library, this Science City uses novel methods

to generate interest among students and helps develop analytical skills among them.

Since its inception, Hanumant Hospital has successfully treated over 2,25,000 patients and

provides comprehensive healthcare facilities to low-income families. It is a recognized centre for

treatment of TB patients, HIV patients and also an approved vaccination centre.

Applicability of EIA Notification 2006

The proposed project is Expansion of existing manufacturing facility at C 58, Mahad MIDC. The

proposed site is in MIDC Notified Industrial estate, Mahad. The MIDC industrial estate falls within

2.5 KM of village Kamble Tarf Birwadi which is declared Ecologically sensitive by the Dr

Kasturiranghan committee vide OM of MoEF dt 13.11.2013. The SLEAC Maharashtra has held that

any project within 5km of a village classified as Eco sensitive be treated as a Category A project as

per OM dt 25th June 2014 of the MOEF. Thus, the project category is 5 (f) & it falls under Screening

Category A of the EIA notification dated 14-09-2006 & Order dated 25.06.2014 and therefore

requires prior Environmental Clearance from the Ministry of Environment & Forests, NewDelhi.

3

2.0 INTRODUCTION OF THE PROJECT/ BACK GROUND INFORMATION

2.1 Identification of project and project proponent.

The present proposal is for expansion of homopolymer manufacturing facility located at Plot No. C 58, M.I.D.C, Mahad, Dist. Raigad.

Since its inception in 1959, Pidilite Industries Limited has been a pioneer in consumer and

speciality chemicals in India. Over two-third of the company’s sales come from products and

segments it has pioneered in India.

Our product range includes Adhesives and Sealants, Construction and Paint Chemicals,

Automotive Chemicals, Art Materials, Industrial Adhesives, Industrial and Textile Resins and

Organic Pigments and Preparations. Most of the products have been developed through strong

in-house R&D.

The Group's turnover is about Rs. 4283.20 Crores for the year 2013-14.

Pidilite Industries is the market leader in adhesives and sealants, construction chemicals,

hobby colours and polymer emulsions in India. Our brand name Fevicol has become

synonymous with adhesives to millions in India and is ranked amongst the most trusted brands

in India.

Pidilite is also growing it's International presence through acquisitions and setting up

manufacturing facilities and sales offices in important regions around the world. Fevicol is now

the largest selling adhesives brand in Asia. Promoter Information: Shri S K Parekh (Vice Chairman) is a Promoter Director of the Company and has been serving

as a Director since 1969. Shri S K Parekh has experience in the Senior Management of over 59

years. He is a Whole-Time Director of Parekh Marketing Limited. He is a Director of Pidichem

Private Limited, Fevicol Company Limited, Kalva Marketing and Services Limited, Ruchiket

Private Limited and Pargro Investments Private Limited. He is a member of

Shareholders’/Investors’ Grievance Committee of the Company. He is related to Shri N K

Parekh, Joint Managing Director of the Company.

Shri A N Parekh is a Promoter Director of the Company and has been working with the

Company since 1996. He is a Chemical Engineer with qualification of B.S. Chem. Engg. (U.S.A.)

and having total business experience of 19 years. He joined the Company in Sales and

Marketing department and was promoted to the position of Vice President and then to the

position of Sr. Vice President. He has been appointed as a Whole-time Director of the Company

since 1st July 2005. He is a Director of Parkem Dyes & Chemicals Private Limited, Kalpaj Sales &

Agencies Private Limited, Jess Trading India Private Limited, Dr. Fixit Institute of Structural

Protection & Rehabilitation (a Company under Section 25 of the Companies Act, 1956), Synapse

Technologies Inc, USA, Wisdom Controls Inc, USA, Jupiter Chemicals LLC, Dubai, Pidilite

Industries Egypt (SAE), Pidilite Speciality Chemicals Bangladesh Private Limited, Pidilite

Bamco Limited, Pidilite USA Inc. and Sarla Technologies Middle East LLC. Shri A N Parekh is

related to Shri N K Parekh, Joint Managing Director of the Company. Shri M B Parekh is a Promoter Director of the Company and has been serving as a Director of

the Company since 1972. He is a qualified Chemical Engineer [B.Chem.Engg.(Bom),

M.S.Chem.Engg. (U.S.A)] and has experience in the industry for about 43 years. He is a

Managing Director of Vinyl Chemicals (India) Limited and Chairman & Managing Director of the

Company. He is a Director of Fevicol Company Limited, Kalva Marketing and Services Limited,

4

Harton Private Limited, Devkalyan Sales Private Limited, Trivenikalyan Trading Private

Limited, Pargro Investments Private Limited, Excel Industries Limited and Dr. Fixit Institute of

Structural Protection & Rehabilitation (a Company under Section 25 of the Companies Act,

1956). He is a member of the Audit Committee Of Vinyl Chemicals (India) Limited and also of

the company. Shri M B Parekh is related to Shri A B Parekh, Whole-Time Director of the

Company.

Shri N K Parekh is a Promoter Director of the Company and has been serving as a Director of

the Company since 1969. He is a qualified Technologist for Dyes and Intermediates and a

qualified Chemical Engineer [B.Sc., B.Sc. (Tech), M.S.Chem.Engg.(U.S.A)] and has experience in

the industry for over 49 years. He is a Joint Managing Director of the Company. He is a Director

of Vinyl Chemicals (India) Limited, Fevicol Company Limited, Parkem Dyes and Chemicals

Private Limited, Ishijas Chemicals Private Limited, The Vacuum Forming Company Private

Limited, Kalpaj Sales and Agencies Private Limited, Pargro Investments Private Limited and Dr.

Fixit Institute of Structural Protection & Rehabilitation (a Company under Section 25 of the

Companies Act, 1956).He is a member of Shareholders’/Investors’Grievance Committee of

Vinyl Chemicals (India) Limited and also of the Company. Shri N K Parekh is related to Shri S K

Parekh, Vice Chairman and Shri A N Parekh, Whole-Time Director of the Company.

Shri A B Parekh is a Promoter Director of the Company and has been serving as a Director of

the Company since 1985. He is a B.Chem (Engg.), M.B.A (USA) and has experience of over 31

years. He is also a Director of The Vacuum Forming Company Private Limited, Ishijas Chemicals

Private Limited, Vapkon Finance & Investment Private Limited, Abhajay Trade & Commerce

Private Limited, Pargro Investments Private Limited, Pidilite USA Inc, Pagel Concrete

Technologies Private Limited, Pidilite Innovation Centre Pte. Limited, Dr. Fixit Institute of

Structural Protection & Rehabilitation (a Company under Section 25 of the Companies Act,

1956), Pidilite Industries Trading (Shanghai) Company Limited, Modern Laboratories Private

Limited and Building Envelope Systems India Limited. Shri A B Parekh is related to Shri M B

Parekh, Managing Director of the Company.

Key Personnel Mr. B. T. Latthe - Unit Head

Mr. Suresh M. Koottala – Head Project

5

2.2 Brief description of nature of the project.

After the success of the chemical plants at Mahad (Maharastra), Vapi (Gujarat), Baddi

(Himachal Pradesh) & Kala Amb (Himachal Pradesh), the company now proposes to expand its

existing Homopolymer production facility at the Mahad C 58 unit. The homopolymers

manufactured at the Mahad unit is the basic raw material for manufacturing adhesives, viz;

Fevicol-SH, Speedx, Marine, etc, used in wood working. The expansion will consist of additional

production equipments. The capacities of other necessary support infra-structure like Waste

Water Treatment plant and other required utilities like Boilers, Cooling tower & DM Plant are

adequate to cater to the expanded capacity. The present 320 KVA Diesel Generator set is

proposed to be replaced with 500 KVA D.G.Set.

SR. NO. PRODUCT PRESENT CAPACITY

PROPOSED CAPACITY

1.

Polymers based on Vinyl acetate monomer

& Poly vinyl alcohol and adhesives based on

vinyl acetate & Polyvinyl alcohol

1500 MT/MONTH

2500 MT/MONTH

2.3 Need for the project and its importance to the country and or region,

Proposed project is needed to serve increasing demand from export & domestic market.

Benefits of the project are manifold:

• To cater to demand in domestic (west zone) market.

• Export of finished goods will earn foreign exchange for the country. In the last fiscal

year (2013-14), the group’s turnover is about INR 4283.20 crores.

• The project will create employment to over 140 persons directly and indirectly on a

permanent basis besides the temporary jobs created during the project phase.

The proposed project is necessitated because of the following reasons:

• To meet market demands of West zone & Exports

• Reduce operational costs and increase productivity.

• Upgradation of the infrastructure in the facility.

Its importance to the country can be accounted by

• Add to foreign exchange generated by Exports.

• Ensure continued employment to existing workforce without affecting work conditions

and hence supporting their families.

• Lead to generation of direct and indirect employment opportunities.

• Reduce dependence on Imports hence reducing Forex risks.

2.4 Demand-Supply Gap.

The adhesives manufactured from the homopolymer, viz; Fevicol-SH, Speedx, Marine, etc are

already manufactured at some of the units within the group. Demand for these proposed

products already exists in the world markets and this project is envisaged to meet the

expanding domestic & global demand for these molecules.

Presently the homopolymer which is proposed to be expanded, is manufactured at the unit at C

58, MIDC Mahad unit. Present capacity, actual dispatch ( for 12-13, 13-14) and the market

projection for next 5 years is as given in below table.

6

2012-2013 In MT

2013-2014 In MT

2014-2015 In MT

2015-2016 In MT

2016-2017 In MT

2017-2018 In MT

2018-2019 In MT

Existing Plant Capacity

18000 18000 18000 18000 18000 18000 18000

Actual Dispatch / Market Forecast

11946 12252 15250 18500 21300 24500 28200

Gap / year

500 3300 6500 10200

Gap / month 42 275 542 850

As per the capacity requirement there is need for additional capacity for these products.

Also presently these products being manufactured at Mahad location, caters to the

requirements of west zone in the country and fulfills export requirements.

This expansion of the capacity will enable to meet the domestic & export future demands.

2.5 Imports vs. Indigenous production.

70% Raw materials will be imported to manufacture proposed products.

2.6 Export Possibility.

Possibly approx. 25% of the total production will be exported.

2.7 Domestic / export Markets.

Rest of the approx. 75% of total production will be sold to domestic market.

2.8 Employment Generation (Direct and Indirect) due to the project.

For proposed project direct & indirect employment generation will be approximately to 140

nos.

3.0 PROJECT DISCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any.

Expansion Project within existing unit premises. No interlinked or interdependent project.

3.2 Location (map showing general location, specific location, and project boundary & Project

site layout) with coordinates.

Latitude: 18.08° 5’ 0” N

Longitude: 73.41° 25' 0" E

Detailed site plan is attached as Annexure-1 • The unit has total 6,750 sq.m. of land area. Green belt development will be 338 sq.m.

• The site is located within Mahad, MIDC Industrial area, hence there is no agricultural or

forest land involved in the project site.

• The estate is located at sufficient distance from reserved forests and sanctuaries,

archeological sites and historical sites to ensure that there is no impact of industrial

activities.

7

3.3 Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted,

It is proposed to enhance the capacity of the existing facility to improve productivity & reduce

manufacturing costs at minimum possible investment, by addition of Reactor, Blenders, Hold

tanks, Day tanks & Pumps. The capacity of the existing Waste water treatment facility &

utilities – boiler, cooling tower, D.M Water plant is sufficient to cater to the proposed enhanced

capacity. The plant building needs to be extended to accommodate the additional equipments.

Hence, alternate sites were not considered.

3.4 Size or magnitude of operation.

M/s. Pidilite Industries Ltd. is a large scale industry. The total monthly production capacity

after the completion of proposed expansion will be 2500 MT/month

3.5 Project description with process details

Detailed manufacturing process of proposed products are attached as an Annexure-2

3.6 Raw material required along with estimated quantity, Likely source, marketing area of

final product/s, Mode of transport of raw material and Finished product

The raw materials required for the proposed production will be either imported or procured

from domestic market and transported conveniently by road.

Detail raw material kg/MT is explained Annexure-3

The products (homopolymers) will be used in the manufacture of adhesives which will be sold

in the west zone within the country & Exported.

3.7 Resource optimization/ recycling and reuse envisaged in the project, if any, should be

briefly outline

Rain water harvesting is already implemented at unit (proposed site of expansion)

3.8 Availability of water & its sources, Energy power requirement

• Water : Shall be supplied by MIDC - water requirement after completion of proposed

project is : 135 KL/Day. (Detail attached as Annexure-4)

• Electricity Power shall be supplied by MSEDCL.

Total power requirement of Electricity @ 333 KVA (Max demand)

The present installed DG Set of 320 KVA is proposed to be replaced with a 500 KVA

DG set as standby source of electricity in case of powers supply failure.

• Furnace Oil consumption for proposed project shall be approx. 1 MT/day.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal

8

Wastewater Generation, Treatment and Disposal

• The unit is a zero discharge unit. The unit is a member of CETP, Mahad, but does not

discharge any effluent to the same.

• The effluent generated from the process (wash water) is recycled back to the process & that

generated from boiler, cooling tower & DM plant is treated & reused in gardening.

After proposed project: effluent generation will increase by 5.5 KL/day (Industrial 3.5

KLD + Domestic 2 KLD)

• The domestic & industrial effluents will be treated in the existing company’s own effluent

treatment plant & the treated water is recycled in process / reused for gardening.(Detail

attached as Annexure-4)

• Effluent treatment plant (Installed capacity – 10 KL/day) is operating in the existing unit

which has low load, and is sufficient to treat additional effluent generated.

• The Institute of Chemical technology, Mumbai had conducted an evaluation of the

proposed site (existing unit where expansion is proposed) & their report is attached as

Annexure-5

Air pollution and Control Measures

Flue gas Emission:

• Furnace oil is used as fuel for boilers & HSD for DG set.

• All stacks are provided with sampling point and access ladder.Annexure-6

Process Emissions :

During process of polymerization the reactor vent containing mainly water vapor ,

goes to vent gas scrubber , where gases are scrubbed with DM water and vented in

atmosphere through vent pipe 20 meter height above the ground . Scrubbed water

solution is DM Water, which is used in the manufacturing process. (Annexure 7).

Solid / Hazardous wastes

• The discarded drums / bags / liners are decontaminated by washing with water and will

be sold to MPCB approved merchant.

• Used oil shall be sold to CPCB or MoEF authorized recycler / re processor.

• ETP Sludge shall be sent to CHWTSDF site for final disposal.

• Waste residue including Coagulated slurry, Equipment scrapping to be sent for co-

processing or to common incineration site.

• Filter cloth / Filter media will be generated from filtration process, after decontamination

it will be sold to MPCB approved parties.

• Details of all types of wastes with quantity and their storage and disposal are given in

Annexure-8.

Environmental Monitoring Plan

• The unit has an EHS cell established and prepared an Environmental Monitoring plan for

carrying out the following activities :

1. To follow the trend of parameters those have been identified as critical;

2. To comply with the conditions of consent order of MPCB

3. To check / assess / maintain the efficiency of controlling measures;

• In-house facilities and infrastructure for monitoring of certain parameters are provided.

Where it is not feasible to establish such facilities, the same is done by appointing

external MPCB recognized/ approved agencies.

• The monitoring of environmental parameters is carried out time to time and the reports

9

of all the monitoring / analysis / assessment studies are well-documented.

3.10 Schematic representations of the feasibility drawing which give information of EIA

purpose

It will be submitted later up on the requirement.

4.0 SITE ANALYSIS

4.1 Connectivity

Nearest towns / cities :

Mahad - – 6 kms. towards W

Panvel – 133 towards NW

Pune – 123 kms. towards NE

Chiplun- 81 Kms towards S

� Transport by road

Mahad is situated off National highway 66 (old NH 17) Panvel – Panaji – Kochi road & (NH-66)

is connected with the surrounding districts by road network

� Transport by Rail

Nearest railway station is Veer on Konkan railway which is approximately 16.3 km away from

Mahad MIDC. Broad gauge railway tracks are available for goods and container coaches.

� Transport by Air

Mumbai International airport is 183.9 KM towards NW and Pune Lohegaon Airport is 134.5

KM towards NE from the project site.

4.2 Land form, Land use and land ownership

Project land is acquired from Mahad MIDC, land possession document is attached herewith as

Annexure 9

4.3 Topography(along with map)

The following are the main features of this estate, which make it suitable for industrial

activities of all types.

� The entire estate area (MIDC Industrial area) is located at sufficient height from sea level

and assessed for suitability with respect to topographical and geological requirement for

industrial activities.

� District map and area map from googlemaps.com and googleearth.com are as under,

10

11

Google earth image of the area. (date of Imagery – 01/08/2014)

4.4 Existing land use pattern, nearby water bodies, forest, eco sensitive zones, CRZ.etc.

Sr. No.

Particulars Details

1. Town Mahad MIDC

2. Taluka Mahad

3. District Raigad

4. Latitude Latitude: 18.08° 5’ 0” N

5. Longitude Longitude: 73.41° 25' 0" E

6. Nearest water bodies River Savitri

7. Nearest Highway

NH – 66 = 2 km towards West

8. Nearest Railway station

Veer on Konkan railway which is approximately 16.3

km

9. Nearest Airport/ Airbase

Mumbai International Airport – 183.9 KM towards

NW

Pune Lohegaon Airport / Airbase– 134.5 KM towards

NE

• Proposed land use is allotted for industrial use by MIDC, Mahad.

• The project site is located at 2.5 KM of village Kamble Tarf Birwadi which is listed as Eco

12

sensitive by the Dr Kasturiranghan committee. • The project is not covered under CRZ. • The estate is located at sufficient distance from reserved forests and sanctuaries,

archeological sites and historical sites to ensure that there is no impact of industrial

activities.

4.5 Existing infrastructure

• The plot of area 6750 sq.m. is already having plant & utilities building totaling 3219.36

sq.m. built up area. With internal roads & green belt of 338 sq.m.

• Manufacturing Plant of capacity 1500 MT/month consisting of 10 KL & 20 KL Reactors, 15

KL & 25 KL Blenders, 12 KL Solution preparation vessels, Day tanks, Transfer Pumps

• Utilities such as Boilers, DM Water plant, Cooling tower, DG Set, Underground & Over

ground RM & Fuel (FO) Storage tanks, 200 KL Underground Raw water storage tanks,

Waste water treatment plant

• Administrative office, Security office

• QA/QC Laboratory

• Fire Hydrant & Safety alarm Systems

• 300 KL Underground Fire water storage tank

4.6 Soil classification

The soil classification of Maharashtra state is as under,

13

4.7 Climate data from secondary sources

Temperature The only meteorological observatory in the district is situated at Alibag and data for this station

may be taken as representative of the conditions generally prevailing in the district. Being a

coastal district the diurnal (daily) and seasonal variations of temperature are not large. The

period from March to May is one of increasing temperatures. May is the hottest month with a

mean daily maximum temperature at 36.9⁰C and the mean daily minimum temperature at

29°C. The weather in October and November is almost like the summer months. In the period

from December to February the weather is cooler than in the post-monsoon months.

Temperature Recorded In Year 2012 at Alibag

(Courtesy: Indian Meteorological Department, Pune)

Relative Humidity: The air is humid throughout the year. Relative humidity is on an average over 80 per cent.

during the south-west monsoon season. In the rest of the year the relative humidity is between

65 per cent and 75 per cent.

Relative Humidity recorded in year 2012 at Alibag Month Relative humidity % January 52

February 43.5

March 33.5

April 28.5

May 33.5

June 58.5

July 79.5

August 81

September 76.5

October 64.5

November 54.5

December 53.5

(Courtesy: Indian Meteorological Department, Pune)

Month (2012)

Maximum Temperature

(⁰C)

Minimum Temperature

(⁰C)

Average Temperature (⁰C)

January 29.9 11.0 20.5

February 31.9 12.1 22.0

March 35.4 15.8 25.6

April 37.7 19.9 28.8

May 36.9 22.4 29.7

June 31.7 22.9 27.4

July 28.4 22.2 25.3

August 27.4 21.6 24.5

September 29.4 20.8 25.1

October 31.4 18.5 25.0

November 30.1 14.4 22.3

December 28.9 11.5 20.2

14

Rainfall: The district has a network of eleven rain gauge stations with records extending to 82 years for

most of the stations. The south-west monsoon commences by about the first week of June and

the rains continue till about the beginning of October. The average annual rainfall for the

district as a whole is 3,028.9 mm. (119.25"). The rainfall increases rapidly from the coast

towards the Western Ghats on the eastern border of the district. In the coastal strip the annual

rainfall decreases from south to north. Nearly 95 per cent, of the annual rainfall is received

during the south-west monsoon months, and the rainfall data is presented in table.

Rainfall Recorded for last 5 years at Alibag

(Courtesy: Indian Meteorological Department, Pune)

Wind Speed:

Winds are very strong and blow from west or south-west during monsoon season. During the

period from October to December winds are generally moderate but sometimes strong in

October and blow from directions between north-east and south-east. In the three months

from January to March the winds continue to be moderate and are predominantly from

directions between north and east. In April while there is a slight strengthening of wind, the

direction is variable. In May there is a further strengthening of winds and the directions are

between south-west and north-west.

Mean Monthly Wind Speed in Year 2012 at Alibag IMD Station Month Wind speed Kmph January 3.2

February 4.0

March 4.5

April 4.9

May 5.5

June 6.1

July 5.7

August 5.3

September 4.2

October 3.4

November 3.1

December 2.7

4.8

(Courtesy: Indian Meteorological Department, Pune)

Social infrastructure available

• Educational facilities in project area are quite good because all nearby villages have

15

primary schools.

• There are secondary and higher secondary schools in Mahad city. There are colleges

having different streams of education.

• The town has private dispensaries and hospitals.

• Drinking water quality is good.

• All small villages have postal and telephone connection facilities.

• Electricity for all purpose (industrial and residential) is available.

• All small villages are connected with pucca roads.

5.0 PLANNING BRIEF 5.1 Planning concept (type of industries, facilities, transportation etc)

M/s. Pidilite Industries Ltd. is a large scale industry. It proposes to expand existing unit at

Mahad MIDC to meet the market demand of existing products.

5.2 Population projection

It will be submitted later as part of EIA report.

5.3 Land use planning, break up along with green belt etc.

Existing and proposed break up of land. Refer Annexure-1- Site plan

5.4 Assessment of infrastructure demand (physical & social)

Well developed Infrastructure since project site is located in Mahad MIDC.

5.5 Amenities/Facilities

The existing amenities/facilities of project area are explained as earlier.

6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial area (processing area)

Site plan is attached as Annexure - 1

6.2 Non processing area

Ware house & storage area are available as per the requirement of product storage.

6.3 Greenbelt

Green belt development is done in 338 sq.m

6.4 Social infrastructure

The project shall be large scale and the total investment will be approximately Rs. 3.41Crore.

The project proponent supports various causes towards the social and economic development

of small villages around Mahad MIDC.

6.5 Connectivity(Transportation)

The existing connectivity is by way of two lane wide road of MIDC and adequate to cater to

16

road traffic in MIDC.

6.6 Drinking water management (Source and supply)

The source of drinking water is MIDC.

6.7 Sewage system

The domestic effluent proposed to be generated (2 KL/day) after expansion will be sent to

septic tank + soak pit. The over flow collected in tank via sand bed and after passing through

sand cum activated carbon filter is used for gardening.

Refer annexure 4 B– for details

6.8 Industrial waste management

• The Industrial waste water generated from the process (wash water) is recycled back to the

process & that generated from boiler, cooling tower & DM plant is treated & reused in

gardening.

• Total Industrial waste water generated after proposed expansion will be 3.5 KL/day

• A 10 KL/day Waste water treatment plant is available and in use in the factory

• The additional wastewater will be treated in existing ETP and the unit will be maintained as

ZERO discharge

Detail water balance diagram of proposed project is attached as annexure:4 A

Detail of schematic diagram of proposed ETP is attached as annexure:4 C

6.9 Solid waste management

• There are four numbers of Hazardous / solid waste categories is being generated & the same

categories will continued to be generated after proposed project.

• The unit will propose for the membership of CHWTSDF Site at Taloja

Detail of Hazardous waste is explained in annexure- 8

6.10 Power requirement and supply source.

• Electricity Power is supplied by MSEDCL.

Total Maximum demand after expansion will be = 333 KVA

The existing 320 KVA DG Set is proposed to be replaced with 500 KVA DG set, as standby

source of electricity in case of power supply failure

7.0 REHABILITATION AND RESETTLEMENT (R&R)Plan

7.1 Policy to be adopted(central/state) in respect of the project affected persons including

home oustees, land oustees and landless laborers (a brief outline to be given)

Not applicable because the unit is in Mahad MIDC.

8.0 PROJECT SCHDULE & COST ESTIMATION

8.1 Likely date of start of construction and likely date of completion (Time schedule)

17

Construction is planned to be started after obtaining Environmental clearance from MoEF, New

Delhi.

Likely completion time is considered approximately six months for commissioning the

expansion project.

8.2 Estimated project cost along with analysis in terms of economic viability of the project

The estimated approx. cost of the project shall be Rs. 3.41 Crores 9.0

Project Cost break-up: ANALYSIS OF PROPOSAL (FINAL RECOMMANDATIONS)

Sr. no Description Cost Rs. (lacs)

1 Equipment cost 119.00

2 Civil Cost 40.00

3 Electrical 21.00

4 Instruments & Automation 31.00

5 Utility Cost (DG Set) 55.00

6 Piping Material & Labour 36.00

7 Fire & Safety Items 10.00

8 Insulation & Painting 6.00

9 Land Cost 0.00

10 Statutory costs 6.00

11 Contingency (5%) 17.00

Total 341.00

9.1 Financial and social benefits with special emphasis on the benefit to the local people

including tribal population any in the area

� From the proposed project, there shall be increase to foreign exchange generated by

Exports.

� Reduce dependence on Imports hence reducing forex risks. � There shall be direct or indirect increase in employment generation for the local people

and

lead to ensure continued employment to existing workforce without affecting work

conditions and hence supporting their families.

� Company shall increase its contribution for community welfare of the local connected area.

� The proposed project shall not have any adverse environmental impacts because adequate

protection measures will be provided to achieve permissible norms of MPCB.

Conclusion:

The proposed project is feasible w.r.t environmental impact since there is no increase

POLLUTION LOAD as well as adequate environmental protection measures are proposed

by the unit.

18

Annexure – 1 – Site Plan (attached separately)

19

Annexure 2

Process Description and Flowchart

Polymers based on Vinyl Acetate & polyvinyl alcohol and adhesives based on vinyl acetate and

polyvinyl

The required quantity of polyvinyl alcohol solution reactor. Required quantity of surfactants,

activators, catalysts are charged to the reactor.

Monomer is then added to the reactor over a period of time maintaing moderate temperature under

atomospheric pressure.

After process, the contents are cooled, if necessary water and other additives are added to the

reactor, product then filtered and packed in drums/road Tankers.

No gases are generated and vented during the process. There is no generation of solid and liquid

waste in the process.

20

Annexure – 3

List of Raw Material & Storage

No Raw material name

Quantity used per

month for 1500

MT/Month

Quantity used per

month for 1000

MT/Month

Storage Details

1. Vinyl acetate

monomer 800 550

Underground

tank 100 MT x 2

nos.

2. Poly vinyl alcohol 40 26.66 Paper bags

3. Plasticizers 58 38.66 LDPE Bags

4. Emulsifiers 0.5 0.33

HDPE

bags/HDPE

Carboys

5. Surfactants 0.5 0.33 HDPE Bags

6. Catalysts 2 1.33

HDPE

bags/HDPE

Carboy

21

Annexure 4

A. Water Balance & Waste Water Management

No. Station Existing

input

KL/Day

for 1500

MT/M

Proposed

input

KL/Day

for 1000

MT/M

Existing

losses

KL/day

for 1500

MT/M

Proposed

Losses

KL/day

For 1000

MT/M

Existing

effluent

generation

KL/day

1500

MT/M

Proposed

effluent

generation

on KL/day

for 1000

MT/M

1. Industrial

cooling/boiler

15 24 14 23.5 1* 0.5*

2. Domestic 2.5 2.5 1.5 1.5 1*** 1***

3. Process 51 30 50 part of

product

29 part of

product

1*** 1***

40 Agriculture/

gardeinig

6.5 3.5 6.5 3.5 0 0

Total 75 60 72 57.5 3 2.5

* : Used for cooling tower after treatment

** : Recycled in process

*** : Used for gardening

B. Domestic effluent treatment:

Domestic effluent comes in sewage tank with soak pit and over flow collected in tank via sand bed

and after passing through sand cum activated carbon filter it is used for gardening.

Domestic effluent

Sand bed

Sand and Carbon filter

Gardening

22

C.Effluent Treatment plant – flow diagram

23

Annexure 5

ICT REPROT

24

25

Annexure 6

Stack Details & Flue Gases through Chimney

Boiler Chimney:

Process plant requires steam for the process. We have 3 Boilers having capacity of 850 Kg/hr each.

Flue gases generated in chimney are let out to atmosphere through 34 mt tall stack and inside

diameter of stack is 800 mm

D.G. Set:

320 KVA Diesel generator set is available for emergency power supply, all process plant and

effleunt treatment plant equipments are connected to DG set power network. Vent pipe at 3.5 Meter

height above roof level. This DG Set is proposed to be replaced with 500 KVA DG Set in the

expansion

Chimney No. I II III

Capacity 850 Kg/hr (each) 320 KVA

Fuel type Furnace oil Diesel

Fuel quantity 700 kg/day --

Material of construction CS CS CS

Stack attached to Boiler (common stack attached to

3 boilers of 850 Kg/hr each One

running at a time, 2 stand by)

DG Process vent

Stack heaight

a. Round or rectangularn Round Round Round

b. Above groudn level 34 12.5 20

Stack top

a. Round or rectangular Round Round Round

b. Inside dimensions of stack

at top in mm

800 150 80

Gas quantity KGS/Hr

existing

350 - 30

Material of construction CS CS SS

Flue gas temp in deg

centigrade

180 300 40

Exit velocity of gas M/Sec 4 20.4 1

26

Annexure – 7

Vent Gas Scrubber:

During process of polymerisation negligible gases are generated which contain mainly water vapor,

it goes to vent gas scrubber, where gases are scrubbed with DM water and venterd in atmosphere

through vent pipe 20 meter height above the ground. Scrubber solution is DMW, is used to process

itself.

Scrubber Diagram:

27

Annexure 8

Non Hazardous Solid Waste & Hazardous Waste Management

1. Non hazardous solid waste generation and disposal:

Type of Waste Quantity as

per 1500

MT/M

Quantity as per

additional

proposed 1000

MT/M

Total load for

2500 MT/M

Disposal Unit

Paper bags 370 265 635 Sale Kg/M

Carboy 2 2 4 Sale No/M

Paper/Cloth 8 6 14 Sale Kg/M

2. Hazardous waste generation and disposal:

Category Type of

hazardous

waste

Quantity

as per

existing

consent

1500

MT/M

Impact

of

addition

al

proposed

capacity

1000

MT/M

Present

Status

per

Form 5-

2012-13

Collection Disposal Remark

5.1 Used/spent

oil

200 Ltr/A NIL 200 HDPE

drums

Sale to

MPCB

authorised

party

No

additional

load

23.1 Waste

residue

20.7 MT/A NIL 1085 Closed

open top

HDPE

drums/pa

per bags

CHWTSDF No

additional

load

33.3 Discarded

containers/ba

rrels/liners

used for

hazardous

wastes/chem

icals

2500 Nos/A NIL NIL As such in

HWSA/Cl

osed open

top HDPE

CHWTSDF No

additional

load

34.3 Chemical

sludge for

waste water

treatment

5 MT/A NIL NIL HDPE

barrels

CHWTSDF No

additional

load

28