facility planning & design prepared by: brannon mcgrotha
TRANSCRIPT
Facility Planning & Design
Prepared by:
Brannon McGrotha
ISE482
2
Introduction
Facilities planning 1. Strategy2. Competition (bring in customer)
Significance• U.S. invested $1.038 trillion
(320.8 billion, 92.7%, spent of structures)• Since 1955, 8% of GNP
ISE482
3
Introduction (con’t)
Continuous improvement cycle
School Improvement Cycle
ISE482
4
Introduction (con’t)
Objectives of facilities planning
• Improve customer satisfaction• Increase ROA, ROI• Max customer response speed• Employee safety• Job satisfaction
• Reduce costs• Grow supply chain• Effectively util. people, equip., space, energy
ISE482
5
Introduction (con’t)
Facilities planning process (6 steps)
1. Define the problem
2. Analyze the problem
3. Determine space requirements
4. Evaluate alternatives
5. Select design
6. Implement design
ISE482
6
Product & Process Design
Product Design (assembly drawing)
ISE482
7
Product & Process Design
Product Design (part drawing)
ISE482
8
Product & Process Design
Process Design (parts list)
ISE482
9
Product & Process Design
Process Design (bill of materials)
ISE482
10
Flow, Space, Activity
Flow – depends on lot sizes, unit load sizes,
space, activity relationships
Space – function of the lots, storage system, production equipment and size, layout, building configuration
Relationships – material flow, personnel flow, environmental considerations, org. structure, control issues, process requirements
ISE482
11
Flow, Space, Activity
• Department planning• Volume-variety layout
ISE482
12
Flow, Space, Activity
• Material flow1. Product planning
2. Fixed materials location planning
3. Product family planning
4. Process planning
ISE482
13
Flow, Space, Activity
• Cellular manufacturing
• Space requirements
• Flow patterns• Product department• Process department
• Line balancing
ISE482
14
Flow, Space, Activity
ISE482
15
Material Handling
ISE482
16
Material Handling
Definition- Art and science of moving, storing, protecting, controlling
material- Moving the right amount of material, in the right
condition, place, position, sequence, cost, methods
Scope• 25% of employees• 55% of factory space• 87% production time• 15% - 70% total cost
ISE482
17
Warehouse Operations
• Layout planning
• Receiving
• Shipping
ISE482
18
Capacity Planning
• Measures• Capacity
• Arrival time• Service time• Utilization = (Arrival rate / Service rate)
• Queuing theory(
http://www.csee.umbc.edu/~plusquel/611/slides/chap6_3.html)
Thank You
Questions Comments