erowa mts tooling on large machine tables mts application for milling cast aluminum parts
TRANSCRIPT
EROWA MTS Tooling on Large Machine tables
MTS Application for Milling Cast Aluminum parts
iGUZZINI
COMPANY SEGMENT MACHINE PROCESSING TOOLING HANDLING
Production, Lighting Technology 5 AXIS M/C MillingMTSMANUAL (with forklift)
iGUZZINI
Machine is a 5 axis milling machine with 10,000 mm X-axis
iGUZZINI
60 Pallets customer made Spigot spacing of 350x500mm
350mm
500mm
500mm
500mm
iGUZZINI
Two MTS Integral chucks in four customer-constructed base plates at two pallet locations for a total of sixteen MTS chucks.
iGUZZINI
While the machining center is processing parts on the next pallet, the operator changes the pallet containing the previously finished parts.
1 2
1
2
CNC Processing Area
Changing pallet Area
iGUZZINI Benefit
Without EROWA MTS
Setup time: 6-8 hours Setup per weeks: 2 Number of pieces limited to
number of available vises No flexibility to modify
production schedule after set-up has been completed without repeating 6-8 hour set-up.
With EROWA MTSWith EROWA MTS
Setup time: 30 min.Time savings per week: 2 x 6 hours
Total = 12 hours per weekMultiple pieces on palletsChanges in production schedules
can be easily accommodated with minimal impact on productivity.
Reduced lead-times and work-in-process inventory levels