eref.fd bvng v fffg656ghg fghlkklb fbv

2
Handing over Hardcopy Files: 1. NCH Files – birect Labor Casual Hire Engineering Services (Pvt) Ltd ya Constructi ye Constructions D.T .Duelabnbn 3. Wrjkjkjkjvv 343fdfdvbvnfront S/C 1 4. Wnt S/hgjg 5. Watfront Stytuhgb/Crtrt 6. Watm, bbmbmbnnmnmeront S/C ghghgh 7. hjhlk;Rodrigo ,gjhPhase 8. R 2015 HKN Handing over the Soft copy documents: Important Folders: Waterfront Project – D: > JKH W/F Project sub contractor bills – D :> JKH > Sub contractor payments W/F Project Client Bills ( Samku, HKN )– D:> JKH> Client Bills W/F HKN Correspondence emails – D :>JKH > HKN > Correspondence emails NCH Bill Finalization correspondence: D :> NCH > NCH Bill finalization correspondence Lemon Leisure Correspondence email for payment – D: > Email to client- correspondence

Upload: bdiit

Post on 02-Feb-2016

223 views

Category:

Documents


0 download

DESCRIPTION

kjkjkj jkjk

TRANSCRIPT

Page 1: Eref.fd Bvng v Fffg656ghg Fghlkklb Fbv

Handing over Hardcopy Files:

1. NCH

Files – birect Labor Casual Hire

Engineering Services (Pvt) Ltd

ya Constructi

ye Constructions

D.T .Duelabnbn

3. Wrjkjkjkjvv 343fdfdvbvnfront S/C 1

4. Wnt S/hgjg

5. Watfront Stytuhgb/Crtrt

6. Watm, bbmbmbnnmnmeront S/C ghghgh

7. hjhlk;Rodrigo ,gjhPhase

8. R 2015 HKN

Handing over the Soft copy documents:

Important Folders:

Waterfront Project – D: > JKH

W/F Project sub contractor bills – D :> JKH > Sub contractor payments

W/F Project Client Bills ( Samku, HKN )– D:> JKH> Client Bills

W/F HKN Correspondence emails – D :>JKH > HKN > Correspondence emails

NCH Bill Finalization correspondence: D :> NCH > NCH Bill finalization correspondence

Lemon Leisure Correspondence email for payment – D: > Email to client- correspondence

Handed Over By Date Checked & Taken Over Date

E.G.Y.R. Gamage Prasanna Walisundara