enterprise wide risk management department (ewrm) · enterprise wide risk management department...
TRANSCRIPT
ENTERPRISE WIDE RISK MANAGEMENT DEPARTMENT (EWRM)
PROJECT RISK AND INSURANCE MANAGEMENT SYSTEM
USER MANUAL
EWRM
Prepared by :
ERP21 SDN. BHD.
LOT 8, JALAN PJU 3/39,
SUNWAY DAMANSARA TECHNOLOGY PARK,
47810 PETALING JAYA,
SELANGOR DARUL EHSAN.
Phone No. : 603 – 7885 0468
Fax No. : 603 – 7885 0727
Copyright ©2012 ERP21 Sdn Bhd
All rights reserved. No part of this publication may be reprinted, reproduced, stored in a retrieval
system or transmitted, in any form or by any means, without the prior permission in writing from the
owner.
First published and distributed in May 2012
TABLE OF CONTENTS
1.0 INTRODUCTION TO PRMS ..................................................................................................................... 4
1.1 VISION OF THE SYSTEM ................................................................................................................................. 4 1.2 BENEFITS OF THE SYSTEM .............................................................................................................................. 5 1.3 THE MAIN STAKEHOLDERS AND THE KEY BENEFITS .............................................................................................. 5 1.4 ABBREVIATION ........................................................................................................................................... 8
2.0 NEW USER REGISTRATION .................................................................................................................... 9
2.1 REGISTRATION OF TNB’S STAFF .................................................................................................................... 9 2.2 REGISTRATION OF NON-TNB’S STAFF .......................................................................................................... 11
3.0 SYSTEM LOGIN ................................................................................................................................... 13
4.0 SYSTEM MANAGEMENT ..................................................................................................................... 13
4.1 FORGOT PASSWORD FOR TNB STAFF ........................................................................................................... 13
5.0 INSURANCE PROCUREMENT ............................................................................................................... 14
5.1 PROCESS MASTER POLICY - UPLOAD PURCHASE ORDER (PO) ........................................................................... 14 5.2 CONTRACT FOR SERVICES ........................................................................................................................... 16 5.3 NON-MASTER POLICY ................................................................................................................................ 20
6.0 NOTIFY CLAIM .................................................................................................................................... 24
6.1 PROJECT LISTING ....................................................................................................................................... 24 6.2 NOTIFY CLAIM WITHOUT COVER ................................................................................................................. 27
7.0 VIEW EXISTING CLAIM ........................................................................................................................ 30
7.1 VIEW CLAIM INFORMATION, IMMEDIATE ADVICE OR UPDATE CLAIM PROGRESS. ................................................. 30 7.2 SPECIAL CASE CLAIM (EWRM ONLY) ........................................................................................................... 34
8.0 INSURANCE PROCUREMENT REPORT ................................................................................................. 35
8.1 LIST OF POLICY TYPE BY DEPARTMENT & DIVISION ......................................................................................... 35 8.2 TOTAL PREMIUM WITH COVER NOTE AND WITHOUT COVER NOTE ................................................................... 37 8.3 NO. OF DECLARATION WITH COVER NOTE AND WITHOUT COVER NOTE ............................................................ 38 8.4 OUTSTANDING PREMIUM WITH/ WITHOUT PO FROM TNB ............................................................................ 39 8.5 PREMIUM REPORT .................................................................................................................................... 41 8.6 NO. OF DECLARATION FOR GIT ................................................................................................................... 41 8.7 VALUE OF CARGO FOR GIT ......................................................................................................................... 42 8.8 PREMIUM ADVICE COMMUNICATED TO INSURED PARTY WITHIN 48 HOURS ....................................................... 43 8.9 LIST OF PROJECT REQUEST FOR EXTENSION .................................................................................................... 44
9.0 INSURANCE CLAIM REPORT ................................................................................................................ 45
9.1 LIST OF NEW CLAIMS ................................................................................................................................. 45 9.2 LIST OF CLAIMS WITH OFFERS BY INSURER .................................................................................................... 46 9.3 LIST OF CLAIMS WITH CHEQUE .................................................................................................................... 47 9.4 LIST OF CLOSED CLAIMS .............................................................................................................................. 48 9.5 LIST OF CLAIMS AWAITING FOR DOCUMENTS ................................................................................................. 49 9.6 CLAIM LISTING .......................................................................................................................................... 50 9.7 CLAIM RATIO ............................................................................................................................................ 50 9.8 CLAIM STATUS FROM YEAR TO YEAR ............................................................................................................ 51 9.9 CLAIM STATUS FOR YEAR ............................................................................................................................ 52 9.10 TIME TAKEN TO FORWARD CHEQUE TO CLAIMANT .......................................................................................... 53 9.11 INSURER’S DECISION OBTAINED ................................................................................................................... 54
User Manual – EWRM
PRMS – User Manual Page 4 of 56
1.0 INTRODUCTION TO PRMS
Project Risk Management Information System (PRMS) is a new system developed for TNB’s
Enterprise Wide Risk Management (EWRM) department to address some the issues that are
inherent in the current business processes and IT systems.
1.1 Vision of the system
Vision of the system is to improve the overall management of project portfolio and
project risks with special focus on the delivery of end-to-end services for insurance
procurement and claim processing. The vision is supported by the following
objectives.
• To improve Project Risk Management practices for timely and accuracy of
declaration
• To improve recovery of loss through insurance and contractual clauses
• To improve communications and sharing of project insurance and claims issues
with project managers and relevant departments
• To create a standardised platform for risk assessment of projects across TNB
and
• To be able to measure and rank contractor performance based on their
capabilities and losses incurred in the project
User Manual – EWRM
PRMS – User Manual Page 5 of 56
1.2 Benefits of the system
The major anticipated benefits of this project as follows.
• All projects undertaken are adequately covered by insurance as a risk mitigation
• To avoid potential rejection of claims or unresolved claims due to incomplete,
inaccurate or missing information
• To improve process efficiency and stakeholder satisfaction by lowering cost of
processing and faster service turnaround time whilst maintaining the agreed
quality targets
• To has more time available for EWRM to focus on value-adding, strategic and
planning activities to take the business to the next level of service performance
through continuous business process improvements
1.3 The main stakeholders and the key benefits
Stakeholder Key Benefits
TNB Management � assurance that the company comply fully to the national laws
and other regulatory bodies requirements with respect to OSH
� more accurate and up-to-date information to improve policy
decision making especially in the areas of risk management,
OSH and tender management
User Manual – EWRM
PRMS – User Manual Page 6 of 56
Enterprise Wide
Risk Management
Department
(EWRM)
� comprehensive overview of project portfolio (project value,
status, performance, etc)
� improve overall customer service (faster service turnaround
time)
� reduce incidents of unsuccessful claims
� improve insurer’s confidence of TNB projects
� monitor project manager & contractor performance
� deliver a more comprehensive project risk management
platform
� better handling of critical equipments
� better detection of fraud
Project Manager � easier to complete project risks documentations (available
guides/templates on-line)
� easier to communicate or share critical project information e.g.
project issues
� improve customer service (more efficient insurance submission
& claims processing)
� improve decision making due to availability and accuracy of
critical project information
� easier to monitor contractor performance
Insured Party � assurance that all risks are adequately covered adequately
� reduce time in claims processing due to faster investigation time
Insurance Company
(Insurer) or Broker
� on-line access to insurance request resulting in faster
turnaround time for insurance proposal & quotations
(elimination of errors due to manual input, incomplete
User Manual – EWRM
PRMS – User Manual Page 7 of 56
information, etc)
Contractor � improve quality of project deliverables due to improvements in
insurance & claims processes
Logistics Service
Department
� timely and more accurate information to improve logistics
planning and scheduling
Finance
Department
� earlier notification for payments disbursement (improve cash
flow planning)
� avoid potential penalty due to missed or late premium payments
Risk Managers &
Coordinator
� ability to check/verify that all projects have completed risk
assessment especially >RM100m
� assurance that critical risks are being managed & monitored
proactively by project managers
Occupational Safety
& Health
� ability to check/verify project conformance to OSH standards,
policy and guidelines
� complete and timely submissions of OSH-related incidents
Legal Services � single and up-to-date copy of all contract documents
� faster preparation and review of contract documents with
version controls
Procurement
Department
� more accurate & timely information to improve procurement
planning
� availability of contractor/supplier performance data is useful for
future contract negotiations
HODs � more accurate and timely KPI reporting
ICT Department � easier to support the system post-live (from many applications
to only a few)
User Manual – EWRM
PRMS – User Manual Page 8 of 56
1.4 Abbreviation
Abbreviation Descriptions
PRMS Project Risk and Insurance Management System
TNB Tenaga Nasional Berhad
EWRM Enterprise Wide Risk Management Department
ERP21 ERP21 Sdn Bhd
ICT Information and Communication Technology
HOD Head of Department
OSH Occupational Safety & Health
User Manual – EWRM
PRMS – User Manual Page 9 of 56
2.0 NEW USER REGISTRATION
A new user is required to register online as a main pre-requisite to access to the system.
Please follow the steps given below.
1) Open Internet Explorer (IE) browser in your desktop.
2) Please visit http://prms.tnb.com.my/ and a main page of the system will be displayed
as in figure a.
3) Click at New User Registration. There are 2 types of user registration i.e. registration
for TNB’s and non TNB’s staff.
Figure a
2.1 Registration of TNB’S Staff
Figure b
1) Select ‘Yes’ at dropdown menu.
User Manual – EWRM
PRMS – User Manual Page 10 of 56
2) Click Next button.
Figure c
1) Fill up the form.
2) Click Register button to register user.
Figure d
1) Pop-up message will display.
2) Click OK button. System will automatically activated user as Project Manager
and may login to the system.
User Manual – EWRM
PRMS – User Manual Page 11 of 56
2.2 Registration of Non-TNB’S Staff
Figure e
1) Select user type.
2) Click Next button.
Figure f
3) Select user role.
4) Click Next button.
User Manual – EWRM
PRMS – User Manual Page 12 of 56
Figure g
5) Fill up the form.
6) Click Cancel button to cancel registration.
7) Click Register button.
Figure h
8) Pop-up message will be display.
9) Click OK button.
User Manual – EWRM
PRMS – User Manual Page 13 of 56
3.0 SYSTEM LOGIN
Figure 1
Log into the system using your Staff No as Username and email password as the Password
to log into the system as in Figure 1.
1) Enter username and password.
2) Click Login button.
4.0 SYSTEM MANAGEMENT
4.1 Forgot Password for TNB Staff
Figure 2
1) Select ‘Yes’ at dropdown menu.
2) Click at ‘AD Password System’ hyperlink.
3) System will directly go to TNB’s AD Password System.
User Manual – EWRM
PRMS – User Manual Page 14 of 56
5.0 INSURANCE PROCUREMENT
5.1 Process Master Policy - Upload Purchase Order (PO)
1) Go to menu Insurance Procurement >> Insurance Listing – CEAR / WC / MOC as in
Figure 3.
Figure 3
2) You may search your project by using the filtering component provided. At the top
of the page, enter one or combination of information and click Search button as in
Figure 4.
Figure 4
User Manual – EWRM
PRMS – User Manual Page 15 of 56
3) A List of Insurance Policy is displayed at the bottom of the screen. Under the
column of Purchase Order, click hyperlink Upload PO at selected insurance policy.
4) A new screen will display as in Figure 5. At the field of File, click Browse button.
Figure 5
5) Choose file to upload, enter information and click Upload & Save button.
Figure 6
6) A pop up message will be displayed as in Figure 7 when the Purchase Order is
successfully saved. Click OK button.
User Manual – EWRM
PRMS – User Manual Page 16 of 56
Figure 7
7) List of uploaded file will be displayed as in Figure 8. You may access the file by
single click at hyperlink under the column File Name.
8) Click Delete button to delete the existing record as in Figure 8.
Figure 8
5.2 Contract For Services
1) Go to menu Insurance Procurement >> Project Listing (Contract For Services) as in
Figure 9.
Figure 9
2) You may search your project by using the filtering component provided. Enter one
or combination of information and click Search button as in Figure 10.
User Manual – EWRM
PRMS – User Manual Page 17 of 56
3) A project listing is displayed at the bottom of the screen. Under the column of
Project Title, click the hyperlink of selected project to view the project information
details.
Figure 10
4) You are required to call/contact the person in charge and fill in the Project Manager
Information, Contractor Information and Insurance Information at each tab as in
Figure 11, 12 and 13. Click Save button to save the record.
Figure 11
User Manual – EWRM
PRMS – User Manual Page 18 of 56
Figure 12
Figure 13
5) A pop up message will be displayed as in Figure 14 when the record is successfully
saved. Click OK button.
Figure 14
6) Please refer to a panel as in Figure 15 to upload Insurance document, premium advice
or invoice. Click at Browse button to upload document.
User Manual – EWRM
PRMS – User Manual Page 19 of 56
Figure 15
7) Choose file to upload, select Document Type, key in Description and click Upload
button. Please refer to Figure 16.
Figure 16
8) A pop up message will be displayed as in Figure 17 when the file is successfully
uploaded. Click OK button.
Figure 17
User Manual – EWRM
PRMS – User Manual Page 20 of 56
9) List of uploaded file will be displayed as in Figure 18. You may access the file by single
click at the hyperlink of selected record under the column of File Name.
Figure 18
10) Click Delete button to delete the selected record.
*Notes : Once document is uploaded; to change the insurer company, you have to delete
all the uploaded document first. Then, you may select a different insurer.
5.3 Non-Master Policy
1) Go to menu Insurance Procurement >> Insurance Listing – Non Master Policy
(EWRM) as in Figure 19.
Figure 19
2) You may search your project by using the filtering component as in Figure 20. Enter
one or combination of information and click Search button.
3) A List of Insurance Policy is displayed at the bottom of the screen. Under the
column of Contract No, click the hyperlink of selected project to process the
insurance policy.
User Manual – EWRM
PRMS – User Manual Page 21 of 56
Figure 20
4) For the policy of GIT and Contract for Services, select Insurer and upload relevant
document as in Figure 21.
5) For the policy of CEAR, WC and MOC, select Master Policy, Insurer, upload relevant
document and enter Gross Premium, Government Service Tax, Stamp Duty and Total
Premium Payable as in Figure 22.
User Manual – EWRM
PRMS – User Manual Page 22 of 56
Figure 21
Figure 22
User Manual – EWRM
PRMS – User Manual Page 23 of 56
6) To upload documents (Premium Advice, Invoice, Purchase Order, Cover Note, Policy
Endorsement or Insurance Policy), click Browse button.
7) Choose file to upload, enter relevant information and click Upload & Save button.
Figure 23
8) A pop up message will be displayed as in Figure 24 when the file is successfully
uploaded. Click OK button.
Figure 24
9) List of uploaded file will be displayed as in Figure 25. You may You may access the file
by single click at the hyperlink of selected record under the column of File Name.
Figure 25
User Manual – EWRM
PRMS – User Manual Page 24 of 56
10) Click Delete button to delete the selected record.
11) Enter the information of Gross Premium, Government Service Tax, Stamp Duty and
Total Premium Payable. Click Save button to save the record.
Figure 26
6.0 NOTIFY CLAIM
1) Go to menu Insurance Claim >> Search Existing Project.
Figure 27
6.1 Project Listing
1) Under the list of project manager’s project, click hyperlink in column Contract No
to notify claim for the selected project. You may search your project by using the
filtering component provided. Click Search button. Please refer to Figure 28.
Figure 28
User Manual – EWRM
PRMS – User Manual Page 25 of 56
2) You may search your project by using the filtering component provided. Click
Search button.
3) Enter claim information.
Figure 29
4) On selecting Insurance Policy, list of policy (that has been paid) for the selected
policy type will be displayed below. Choose one policy from the list.
Figure 30
User Manual – EWRM
PRMS – User Manual Page 26 of 56
5) For Witness Name and Contact No, enter information and click Save button.
Record will be displayed bottom of the page. Repeat the same step for more than
one witness.
Figure 31
6) Click Save button to save the record. A pop up message will be displayed when the
record is successfully saved. Click OK button.
Figure 32
7) The information is saved and will be displayed at the bottom of the page. You may
edit the information before submitting to insurer by clicking Edit button under
Action column.
Figure 33
8) Add more claim notification for same project repeating step 2 until 6. Submit all claims
by clicking button Submit to Insurer. Confirmation message box appear. Click OK button to
proceed OR Cancel button to cancel submission as in Figure 34.
User Manual – EWRM
PRMS – User Manual Page 27 of 56
Figure 34
9) A pop up message will be displayed upon successful submission of the claim(s) to
insurer . Click OK button. Insurer will receive acknowledgement email that claim(s)
notification has been submitted to them. Please refer to Figure 35.
Figure 35
6.2 Notify Claim Without Cover
1) If your project is not listed in List of Project, click at hyperlink HERE to notify claim.
Figure 36
2) Enter project details and click Next button as in Figure 37.
3) Edit the information of Project Manager and click Next button as in Figure 38.
4) Select Contractor’s Company Name and tick person in charge. Click Next button as
in Figure 39.
User Manual – EWRM
PRMS – User Manual Page 28 of 56
Figure 37
Figure 38
User Manual – EWRM
PRMS – User Manual Page 29 of 56
Figure 39
5) Enter Claim Information and click Save button as in Figure 40.
Figure 40
User Manual – EWRM
PRMS – User Manual Page 30 of 56
6) A pop up message will be displayed upon successful saving. Click OK button.
Figure 41
7) List of notified claim will be displayed below for editing or deletion.
Figure 42
7.0 VIEW EXISTING CLAIM
7.1 View Claim Information, Immediate Advice or Update Claim Progress.
1) Go to menu Insurance Claim >> View My Existing Claim
Figure 43
2) List of Claim will be displayed as in Figure 44. You may search your existing claim by
using the searching component provided and click Search button.
3) Click at hyperlink of under Party Making Claim column to view claim information
details, Immediate Advice uploaded, or to update claim progress of the selected claim.
User Manual – EWRM
PRMS – User Manual Page 31 of 56
Figure 44
4) In the screen of EWRM Update as in Figure 45, click at Claim Information tab to view
information details of the claim.
Figure 45
User Manual – EWRM
PRMS – User Manual Page 32 of 56
5) To view Immediate Advice uploaded, click at Loss Adjuster Update tab and click
hyperlink under the File Name column as in Figure 46.
Figure 46
6) To update claim progress, click at EWRM Update tab and key in the information in
appropriate field(s) as in Figure 47.
7) Click Save button to save the record. A pop up message will automatically display
when the process is completely success. Please refer to Figure 48.
User Manual – EWRM
PRMS – User Manual Page 33 of 56
Figure 48
User Manual – EWRM
PRMS – User Manual Page 34 of 56
Figure 49
7.2 Special Case Claim (EWRM only)
1) Go to menu Insurance Claim >> Special Case Claim as in figure below.
Figure 50
2) Key in the information as in Figure 51. All the mandatory fields * is compulsory to
be filled.
Figure 51
User Manual – EWRM
PRMS – User Manual Page 35 of 56
3) Click Save button to save the record. A pop up message will automatically display
when the record is saved. Please refer to Figure 52 as follows.
Figure 52
8.0 INSURANCE PROCUREMENT REPORT
8.1 List of Policy Type by Department & Division
Figure 53
1. Choose information to filter report.
2. Click View Report button to run the report.
3. The report will display as in Figure 54.
Figure 54
User Manual – EWRM
PRMS – User Manual Page 36 of 56
4. To print the report, click at print icon as in Figure 55.
Figure 55
5. A pop up message will display Print Properties as in Figure 56
Figure 56
6. Click OK button.
7. To export the report to another type of document (i.e. PDF, Microsoft Excel (97-
2003), Microsoft Excel (97-2003) Data-Only, Microsoft Excel Workbook Data-
only, Microsoft Word (97-2003), Microsoft Word (97-2003)-Editable, Rich Text
Format (RTF), Character Separated Values (CSV) and XML), choose file format as
in Figure 57.
Figure 57
User Manual – EWRM
PRMS – User Manual Page 37 of 56
8. Click at Export button and a pop up message will display File Download as in
Figure 58.
Figure 58
9. Click Open button to open the document without save the file.
10. Click Save button to save the document.
8.2 Total Premium With Cover Note and Without Cover Note
Figure 59
1. Select start and end Date of Declare as in Figure 59.
2. Click View Report button to run the report.
3. The report will display as in Figure 60.
User Manual – EWRM
PRMS – User Manual Page 38 of 56
Figure 60
8.3 No. of Declaration With Cover Note and Without Cover Note
Figure 61
1. Select start and end Date of Declaration as in Figure 61.
2. Click View Report button to run the report.
3. The report will display as in Figure 62.
User Manual – EWRM
PRMS – User Manual Page 39 of 56
Figure 62
8.4 Outstanding Premium With/ Without PO from TNB
Figure 63
1. Select start and end Date of Declare and date of Compare with as at * as in
Figure 63 above.
2. Click With PO button to run the report.
3. The report will display as in Figure 64.
4. Click Without PO button to run the report.
5. The report will display as in Figure 65.
User Manual – EWRM
PRMS – User Manual Page 40 of 56
Figure 64
Figure 65
User Manual – EWRM
PRMS – User Manual Page 41 of 56
8.5 Premium Report
Figure 66
1. Select start and end Date of Declaration as in Figure 66 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 67.
Figure 67
8.6 No. of Declaration for GIT
Figure 68
1. Select start and end Date of Declaration or Division as in Figure 68 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 69.
User Manual – EWRM
PRMS – User Manual Page 42 of 56
Figure 69
8.7 Value of Cargo for GIT
Figure 70
1. Select start and end Date of Declaration or Division as in Figure 70 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 71 as follows.
User Manual – EWRM
PRMS – User Manual Page 43 of 56
Figure 71
8.8 Premium Advice Communicated to Insured Party Within 48 Hours
Figure 72
1. Select start and end Date of Declaration * (month) and also year as in Figure 72
above.
2. Click View Report button to run the report.
3. The report will display as in Figure 73 as follows.
User Manual – EWRM
PRMS – User Manual Page 44 of 56
Figure 73
8.9 List of Project Request for Extension
Figure 74
1. Select start and end Date of Declaration of Extension or Division as in Figure 74
above.
2. Click View Report button to run the report.
3. The report will display as in Figure 75 as follows.
User Manual – EWRM
PRMS – User Manual Page 45 of 56
Figure 75
9.0 INSURANCE CLAIM REPORT
9.1 List of New Claims
Figure 76
1. Select Category, start and end Notification Date.
2. Choose other information to filter report as in Figure 76 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 77 as follows.
Figure 77
User Manual – EWRM
PRMS – User Manual Page 46 of 56
9.2 List of Claims With Offers by Insurer
Figure 78
1. Select start and end Notification Date.
2. Choose other information to filter report as in Figure 78 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 79 as follows.
Figure 79
User Manual – EWRM
PRMS – User Manual Page 47 of 56
9.3 List of Claims With Cheque
Figure 80
1. Select start and end Notification Date.
2. Choose other information to filter report as in Figure 80 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 81 as follows.
Figure 81
User Manual – EWRM
PRMS – User Manual Page 48 of 56
9.4 List of Closed Claims
Figure 82
1. Select start and end Notification Date.
2. Choose other information to filter report as in Figure 82 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 83 as follows.
Figure 83
User Manual – EWRM
PRMS – User Manual Page 49 of 56
9.5 List of Claims Awaiting for Documents
Figure 84
1. Select start and end Notification Date.
2. Choose other information to filter report as in Figure 84 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 85 as follows.
Figure 85
User Manual – EWRM
PRMS – User Manual Page 50 of 56
9.6 Claim Listing
Figure 86
1. Select Notification Date – Month and Year.
2. Choose other information to filter report as in Figure 86 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 87 as follows.
Figure 87
9.7 Claim Ratio
Figure 88
1. Select start and end Year.
2. Choose other information to filter report as in Figure 88 above.
3. Click View Report button to run the report.
4. The report will display as in Figure 89 as follows.
User Manual – EWRM
PRMS – User Manual Page 51 of 56
Figure 89
9.8 Claim Status From Year to Year
Figure 90
1. Select start and end Year as in Figure 90 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 91 as follows.
User Manual – EWRM
PRMS – User Manual Page 52 of 56
Figure 91
9.9 Claim Status for Year
Figure 92
1. Select Year as in Figure 92 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 93 as follows.
User Manual – EWRM
PRMS – User Manual Page 53 of 56
Figure 93
9.10 Time Taken to Forward Cheque to Claimant
Figure 94
1. Select start and end Notification Date (Month to Month) and year as in Figure
94 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 95 as follows.
User Manual – EWRM
PRMS – User Manual Page 54 of 56
Figure 95
9.11 Insurer’s Decision Obtained
Figure 96
1. Select start and end Notification Date (Month to Month) and Year as in Figure
96 above.
2. Click View Report button to run the report.
3. The report will display as in Figure 97 as follows.
User Manual – EWRM
PRMS – User Manual Page 55 of 56
Figure 97