EN Department: Structure and opportunities
Roberto LOSITO
-
61
67 11
27 32
7678
37
5
Operation
Infrastructure
Accelerators
Experimental Areas
Projects
Consolidation
Upgrades
New facilities
Design & Manufacturing
Studies
26/09/2017 2ILO Forum
-
26/09/2017 3
Data Dec. 2016
ILO Forum
-
26/09/2017 4
The mandate concerns the operation and maintenance of the cooling
systems, pumping stations, air conditioning installations and fluid
distribution systems for the PS, SPS and LHC including their
experimental areas and special cooling systems of LHC sub-detectors.
It also provides service to the Computer Centre and some
miscellaneous installations.
CV: Cooling and Ventilation Group
Group Leader
Mauro Nonis
ILO Forum
-
Cooling
26/09/2017 5
Cooling plants (raw, demineralised water,
C3F8, C6F14)
150
Pipelines 800 km
Hydrants 800 points
Cooling towers (450 MW) 22
Chilled water plants 6-12 °C (73 MW) 35
Water network (3 pumping stations) 5’400 m3/h
Equivalent to a small town of 45’000 inhabitants
10% of the water needs of Geneva
ILO Forum
-
Ventilation
26/09/2017 6
Heating,
ventilation and air
conditioning
1’500 units
from 2’000 to 120’000 m3/h
each
Compressed air 14 stations
200 km network
km m3/h
Eurotunnel 50 540’000
LHC 27 290’000
ILO Forum
-
26/09/2017 7
The mandate concerns the electrical distribution network from 400 kV
to 400/230 V. Its main missions are to operate, maintain, extend and
renovate the network, analyse and make projections for CERN
electrical energy consumption and manage relations with the energy
suppliers.
EL : Electrical Engineering Group
Group Leader
Nicolas Bellegarde
ILO Forum
-
Electricity Distribution
26/09/2017 8
Normal source EDF > 300 MW
Emergency source SIG/ALPIQ ≤ 60 MW
Annual Consumption 1.26 TWh
⅙ of Geneva
Instantaneous Power 180 MW
½ - ⅓ of Geneva
ILO Forum
-
26/09/2017 9
Cabling
The mandate also concerns the cabling activities. Its main missions
are to install control cables, water cooled cables, and fibre optics for
users. This activities include the management of infrastructures (cable
trays, ducts, patch panels,etc.) and the necessary removal of old and
unused installations.
EN-EL is also in charge of the controls of their distribution network.
ILO Forum
-
26/09/2017 10
The mandate concerns the management of department resources in
terms of personnel, material, industrial support, as well as group
secretariats.
It also concerns support and expertise in matter of project, risks and
quality management as well as organizational process.
ARP : Administration, Resources and
Performance group
Group Leader
Luigi Serio
ILO Forum
-
26/09/2017 11
The mandate concerns transport and handling services for the CERN
technical infrastructures, accelerators and experiments. This includes
the design, the tendering/procurement, the installation, the
commissioning, the operation, the maintenance and decommissioning of
standard industrial and custom built transport and handling equipment.
HE : Transport and Handling Group
Group Leader
Ingo Ruehl
ILO Forum
-
350 Cranes / 800 Hoists
2000 Lifting Beams
80 Working Platforms
400 Lifting Equipment
100 Tractors
50 Special Vehicles
About 4000 assets in Total
130
Lifts
26/09/2017 12
HE : Transport and Handling Group
ILO Forum
-
26/09/2017 13
The mandate concerns the beamlines, infrastructure and management of
CERN’s experimental areas and provides engineering support and
services including associated contracts. EA is furthermore supporting the
LHC experiments and managing the respective ATS interface, as well as
participating in and partly hosting the management of a number of CERN-
wide projects (AWAKE, R2E, etc.).
EA : Experimental Areas Group
Group Leader
Markus Brugger
ILO Forum
-
26/09/2017 14
EA : Experimental Areas Group
EXPERIMENTAL AREAS BEAMLINES FACILITIES
SUPPORT ACTIVITIES
MECHANICS, VACUUM, CABLING, SCAFFOLDING, INTEGRATION, GAS,
INSTRUMENTATION, DESIGN, PROTOTYPING, SHIELDING,
PLANNING, COORDINATION, SAFETY
PROJECTS
AD-ELENA
EHN1-Extension
ILO Forum
-
26/09/2017 15
The mandate concerns the provision of overarching project coordination for the
accelerator complex, including layout management, integration, scheduling,
work and safety coordination, as well as for different projects.
It also concerns the development and support of the Organization's
engineering, equipment data, maintenance management tools and mechanical
CAD systems.
The mandate includes the maintenance of the metrology and alignment of the
accelerators, of their associated beam transfer lines and of the detectors, for
the whole CERN site.
ACE : Alignment, Coordination and Engineering Group
RE
18
RE
22
RE
28
UJ32
RE
38
RE
42
RE
48
RE
52
RE
58
RE
62
RE
68
RE
72
RE
78
RE
82
RE
88
RE
12
20
15
MAY
NOV
DEC
JAN
FEB
OCT
20
14
OCT
DEC
JAN
JUNE
JULY
AUG
FEB
2013
MAY
LSS LSS Arc 81 LSSR2E R2E R2E
Pt 7LSS Arc 78 LSS
Pt 8LSSArc 56 LSS Pt 6Arc 23 LSS Pt 3 Arc 34 LSS
Pt 1LSS Arc 12 LSS Pt 2 LSS
R2ELSS Arc 67 LSSPt 4 LSS Arc 45 LSS
Pt 5
2013
FEB
MAR
APR
JUNE
MAR
APR
MAY
JULY
SEPT
AUG
OCT
SEPT
NOVNOV
DEC
20
14
JAN
MAR
FEB
APR
MAY
JUNE
AUG
JULY
SEPT
NOV
OCT
FEB
APR
MAR
JUNE
MAY
JULY
AUG
SEPT
DEC
20
15
JAN
MAR
FEB
APR
MAY
APR
MAR
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQA
Cool-down
ELQA
Powering tests
Powering tests
ELQA
Warm-up
Leak tests
ELQALeak tests
Preparation
ELQA
Flushing
ELQACool-down
ELQA
Powering tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQACool-down
ELQA
Powering tests
Powering testsELQA
Warm-upLeak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQACool-down
ELQA
Powering tests
Powering testsELQA
Warm-upLeak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQA
Cool-down
ELQA
Powering tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQA
Cool-down
ELQA
Powering tests
Powering tests
ELQA
Warm-up
Leak tests
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQA
Cool-down
ELQA
Powering tests
Powering tests
ELQA
Warm-up
ELQA
Leak tests
Preparation
ELQA
Flushing
ELQACool-down
ELQA
Powering tests
Leak testsCSCM
lockoutlockout
lockout
lockout lockout
lockout lockoutlockout
Beam Commissioning
Physics
Test DSO
IC total
IC total
IC total
IC total
IC total
IC total
IC total
DFB
AJ
DFB
AK
DFB
AL
DFB
AM
DFB
AN
DFB
AO
DFB
AP
DFB
AA
DFB
AB
DFB
AC
DFB
AD
DFB
AE
DFB
AF
DFB
AG
DFB
AH
DFB
AI
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EP
EP
EP
EP
EP
EP
EP
EP
EE
EE
EE
EE
DFB
XE
DFB
XF
IT D
N3
00
IT D
N3
00
Cry
o
QR
L se
rv.
mo
du
les
DFB
XG
DFB
XH
IT D
N3
00
IT D
N3
00
Cry
o
DFB
XA
DFB
XB
Cry
o
IT D
N3
00
IT D
N3
00
DFB
XC
DFB
XD
IT D
N3
00
IT D
N3
00
Cry
o
QRL leak repair
Cry
o
B3
0R
7
B2
1L8
Q5
L8
C1
5R
1
A2
2R
1
C3
0R
1
C3
3R
1
C3
3L2
A2
9L2
B2
5R
2
C1
5L3 A
23
R2
Q2
3R
3
A2
6R
3
Q2
7R
3
B3
2R
3
C1
7R
4
B3
1R
4
Prepa. Works
Dis
man
tlin
gP
ipin
gC
ablin
g
OF
Cry
o.
Eth
.P
C
WC
CP
ipe
s &
CO
M. #
Eq
uip
.
Co
m. P
C
Shei
ldin
g V
ert
Sheildings
Access
Prepa. Works
Prepa. Works
Dis
man
tlin
gP
ipin
gC
ablin
g
OF
Cry
o
Eth
.P
C
WC
CP
ipe
s &
C
OM
. # E
qu
ip.
Co
m. P
C
Shei
ldin
gs
Sheildings
Access
Porte
Prepa. Works
Cab
ling
Dis
man
tlin
g
Civil eng.
Pip
ing
and
ve
nti
lati
on
Safe
-ro
om
(I)
Cab
le t
rays
Shie
ldin
g R
R5
3Sh
ield
ing
RR
57
UP
S
Mo
ve r
acks
OF
PC
WC
C
Mo
ve r
acks OF
Eth
.
Div
erse
wo
rks
Cry
oge
nic
sU
TA &
C Co
m. P
C
UTA Ac
cess S
afe-
roo
m
Ala
rms
Dis
man
tlin
gC
ablin
g
Civil eng.
Cab
le t
rays
UTAOF
RR
RR
Rac
ksR
acks
Ala
rms
R2E-Test Fire Detection
UP
S
EEt
h.
Tab
leau
tin
Pip
Mo
ve r
acks
Cry
oge
nic
s
Vac
uu
m
Vac
uu
m
Acc
ess
PC
Co
m. P
C UTA
CO
M. #
Eq
uip
.
RR
RR
R2E-Test Evacuation
Disconnect
Eth
.
Mo
UP
S
Mo
CV
act
ivit
ies
Cry
oge
nic
s
Cab
ling
Shie
ldin
g
Shielding
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
Bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
bea
m v
acu
um
A7L1A4L1
A1L
A1R
A4R
A7R
A7L2
A6L
I5L2
MKIs
A5L
C4L
B4L2
A4L
B1L
A1L
A1R
A4R2
A5R
A7R2
A7L
B5L
A5L
A4L
IP3
A5R
B5R
A7R
A7L
E5L4
D5L
IP4
B5R4
D5R
E5R4
A6R
A7R
A7L
A5L5
B4L
A4L
A1L
A1R
A4R
B4R
A5R
A7R
E5L
A5L
A4L
IP6
A4R
A5R6
C5R
A7L
A6L
B5L7
A5L7
IP7
A4R
A5RB5R
A6R
A7R
A7L
A6L
A5L
A4L
A1L
A4R
B4R8
c4R
A5R
MKIs
I5RA6R
A7R8
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Surv
ey
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cabling
Cab
ling
Cab
ling
Cabling
Cabling
Cab
ling
Cab
ling
Cabling
Cab
ling
Cab
ling
Cabling
Cab
ling
Cab
ling
Cabling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
Cab
ling
WC
C
WC
C
WC
C
WC
C
WC
C
SC t
ests
SC t
ests
SC t
ests
SC t
ests
SC t
ests
UP
S
UP
S
SF M
ain
ten
ance
UP
S
UP
S
UP
S
SF M
ain
ten
ance
UW
Mai
nte
nan
ce
UW
Up
grad
e
SU M
ain
ten
ance
UP
S
UP
S
UP
S
UP
S
UP
S
SF M
ain
ten
ance
New
SF
UW
Mai
nte
nan
ce
UW
Up
grad
e
SU M
ain
ten
ance
UP
S
UP
S
UP
S
UP
S
UP
S
SF M
ain
ten
ance
New
SF
UW
Mai
nte
nan
ceU
W U
pgr
ade
SU M
ain
ten
ance
UP
S
UP
S
UP
S
UP
S
UP
S
SF M
ain
ten
ance
New
SF
UW
Mai
nte
nan
ceU
W U
pgr
ade
SU M
ain
ten
ance
Electrical Maintenance - No accessElectrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Acc.
PAD_MADPAD_MAD
PAD_MAD
PAD_MAD PAD_MADPAD_MAD PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
PAD_MAD
PAD_MAD
PAD_MADPAD_MADPAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
Acc.
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
Prepared by Checked by Approved by
M. BarberanM. BernardiniJ. Coupard
K. Foraz
Kly
stro
ns
Silic
on
oil
reco
nd
itio
nn
ing
MK
D-M
KB
gen
erat
ors
MD
-MK
B te
sts
MD
-MK
B te
sts
Christmas
MK
D -
Entr
y b
oxe
s
MK
D -
Entr
y b
oxe
s
R2E-Test Fire Detection
LHCF
LHCF
UW
SF M
.
UW
SF M
.
UW
SF M
.
UW
SF M
.Group Leader
Katy Foraz
ILO Forum
-
26/09/2017 16
ACE : Alignment, Coordination and Engineering Group
ILO Forum
-
26/09/2017 17
The mandate concerns the CERN community specific engineering
solutions combining mechanical design, production facilities and
material sciences. This group owns, maintains and develops the know-
how on the mechanical constructions in the accelerators and the physics
detectors.
MME :Mechanical
and Materials Engineering Group
Inermet : comparison Autodyn (SPH) between simulation and experiment
Beam
Group Leader
Francesco Bertinelli
ILO Forum
-
MME : domains of activities
18
Engineering & Design
Fabrication
• Machining & Maintenance
• Preparation & Subcontracting
• Assembly & Forming
Materials & Metrology
26/09/2017
Internal design office facilities, 40
designers (Staff and Industrial Support)
CATIA / SmarTeam, ANSYS
Mechanical measurements lab
4000 m2 of internal workshop facilities, 50
technicians (Staff and Industrial Support):
CNC machining, sheet metal work &
welding, electron beam & laser, vacuum
brazing
External subcontracting service
Free access users workshop
Material selection, analysis & metallurgy:
microscopy, mechanical testing
NDT: US, radiography, tomography
350 m2 of internal metrology facilities:
CMM
ILO Forum
-
26/09/2017 19
The mandate concerns the study of beam interactions with matter,
aiming to apply its know-how to particle generation (ISOLDE
Radioactive beam sources, CLIC photoinjectors and polarized e+ e-
sources), and to particle interception (collimators, absorbers and
dumps).
STI : Sources, Targets and Interactions Group
Group Leader
Simone Gilardoni
ILO Forum
-
EN-ACE (Alignment, Coordination and Engineering Tools)
Katy Foraz
-
Cold Mass monitoring - SeriesEquipment (targets and feedtrhoughs) for the Cold Mass monitoring of the series production
Jun-18 Jun-19
Cold Mass monitoring - Series-FSI
FSI system (for qualification) and then to be installed either at point 1 or 5
Dec-18 Dec-19
Alignment sensors for StringHydrostatic Levelling Sensors and Wire Positioning Sensors to be installed in the string
Oct-18 Oct-19
Actuators StringMotors to be installed in the string for the alignment of cryostats
Oct-18 Oct-19
Mechanical parts StringMechanical parts: jacks and other mechanical equipment
Dec-18 Oct-19
Cold mass monitoring - FSI2nd FSI system needed (either for point 1 or point 5)
Jun-22 Jun-23
Alignment sensors for magnets series
Hydrostatic Levelling Sensors and Wire Positioning Sensors to be installed in the cryostats of the series production
Mar-22 Mar-23
Actuators SeriesMotors to be installed in the string for the alignment of the series production of cryostats
Mar-22 Mar-23
Mechanical parts SeriesMechanical parts: jacks and other mechanical equipment for the cryostats series production
Mar-22 Mar-23
26/09/2017 21ILO Forum
-
CAD 20 project
• All mechanical drawings made with CATIA v5, archived through SMARTeam
• Dassault System announced end of life for SMARTeam end 2020.
• Studying how to replace Smarteam with new PDM
• At the same time deciding strategy of engineering software to cover different needs:
• Mechanical design
• Building management
• Plant management
2018/19
LS2 < T0 < LS3
26/09/2017 22ILO Forum
-
EN-CV (Cooling and Ventilation)
Mauro NONIS
-
Cooling systems
Project Foreseen IT
date
Foreseen
schedule
Remarks
Consolidation SEQ stations 2018 2019 or
2020
Small cooling
stations in 4 LHC
points
Supply and maintenance of
chillers
2019 2020 - 2023 Frame contract
(3+1+1+1+1)
Consolidation chilled water
pipes in NA
2018 2018 Work in controlled
area
Supply & installation cooling
plant for cryogenics Pt 4
2018 2019
Consolidation power & control
system for NA cooling towers
2018 2019
26/09/2017 ILO Forum
-
Cooling systems
Project Foreseen IT
date
Foreseen
schedule
Remarks
Consolidation chilled water
pipes in PS area
2018 2013 Work in controlled
area
Cooling circuit for new SPS
dump
2019 2020 Work in controlled
area
cooling system for the EL SVC
MEQ 59 station
2018 2018-2019
Consolidate the electrical
cabinets of the cooling system
of SEQ Pt4, 6, 8
2019 2019
Install new chilled water station
for CMS
2018 2019-2020 Works on shaft?
New cooling plant for EA 2018 2019-2020 Work in controlled
area
26/09/2017 ILO Forum
-
Detector cooling systems
26
Project Foreseen IT
date
Foreseen
schedule
Remarks
Supply new chiller LHCb 2019 2019 Reach -65 °C
working temp.
Supply & installation SciFi
lines
2018/2019 2019
26/09/2017 ILO Forum
-
Ventilation systems
27
Project Foreseen IT
date
Foreseen
schedule
Remarks
Consolidation HVAC in
SR1
2019-2020 2020
Consolidation of AD
target HVAC
2019 2020 Work in controlled
area
SPS fire safety project 2018 2019-2020 6 locations. Work in
controlled area
HVAC for new EL
buildings in SPS
2017 2018 6 locations
Consolidation of
regulation of Linac 2
HVAC
2020 2021 Work in controlled
area
Consolidation of Linac
3 HVAC
2018 2019 Work in controlled
area
26/09/2017 ILO Forum
-
Ventilation systems
28
Project Foreseen IT
date
Foreseen
schedule
Remarks
Consolidate the
ventilation in bldg 269
2019 2019
Consolidation of EA
ventilation
2018 2019 Ventilation of hall
26/09/2017 ILO Forum
-
Tendering for HL LHC
Splitting of activities between contract still to be defined:
• Surface vs underground
• Point 1 vs Point 5
• According to schedule
29
Project Foreseen IT
date
Foreseen
schedule
Remarks
Ventilation Plants 2019 – 2020 2022–2023 Pt 1 & 5
At least 2
contracts.
Cooling Plants 2019 – 2020 2022–2023 Pt 1 & 5
At least 2
contracts.
Cooling towers
equipment
2019 – 2020 2022 Pt 1 & 5
26/09/2017 ILO Forum
-
EN-EL (Electrical Engineering)
Nicolas BELLEGARDE
-
Replace contract n°
Contract Description Comments
(IT-4329/EN)--
Provision of Electrical Installation Services on the CERN SiteNew contract S218/EN (01.01.2018)
(MS-4247/EN)--
Supply of high voltage cable accessories for rated voltages from 3.3 kV to 30 kV and the provision of installation and connection
IT end 2017
--Supply of optical fibre terminal equipment, patch cables and patch cords
MS + IT 2017
B1377/EN/LHC Supply Of Flexible Water-Cooled Copper Cables For HL-LHC MS + IT 2017
B1368/ENSupply Of Cast-Resin Dry-Type Power Transformers 18/0.4 kV, 18/3.3 kV And 3.3/0.4 kV
MS 2017 + IT 2018
-- Fire walls and deported catchment pit on 400 kV park MS 2017 + IT 2018
B1354/ENSupply, Installation, Commissioning And Maintenance Of Static Uninterruptible Power Supply (Ups) Units
MS end 2017 + IT 2018
B1369/ENSupply, Installation, Commissioning And Maintenance Of 48 V Dc Production And Distribution Battery-Based Systems
MS + IT 2018
26/09/2017 31ILO Forum
-
EN-EA (Experimental Areas)
Markus BRUGGER
-
Contracts (in prep. / upcoming)
33
• Total gas management (IT in preparation)
• IT-4324/EN for cast iron blocks, MS just dispatched to firms
• IT-4372/EN for dismantling and cleaning in controlled areas (with a view to LS2+ activities)
26/09/2017 ILO Forum
-
EN-HE (Handling Engineering)
Ingo Ruehl
-
Ref. Unit DescriptionContract
TypeScope Year
IT-4328 EN-HE-HM EOT cranes above 10t capacity SupplyConsolidation +
New Equipment2018
DO EN-HE-HM Refurbishment of transport platform LASTRA Supply Consolidation 2018
DO EN-HE-HM Refurbishment of electrical sideloader HUBTEX Supply Consolidation 2018
IT-4325 EN-HE-PO Maintenance of road trucks Service Maintenance 2018
DO EN-HE-PO Replacement of road tractor 80t for semi-trailers Supply New Equipment 2018
DO EN-HE-POReplacement of semi-trailer for the transport of floor
operating vehicles (MEWPs, forklifts etc.)Supply New Equipment 2018
DO EN-HE-PO Road transport of ATLAS small wheels Service Special Transports 2019
DO EN-HE-HM Replacement of diesel forklift 14t capacity Supply New Equipment 2019
DO EN-HE-HM Refurbishment of SPS trailer DUMONT Supply Consolidation 2019
DO EN-HE-PO Replacement of road truck with 8m flatbed Service New Equipment 2019
DOEN-HE-
PO/HHMobile platforms rental Rental French Terrritory 2019
DOEN-HE-
PO/HHMobile platforms rental Rental Suisse Terrritory 2019
DO EN-HE-PO Replacement of road tractor for trailers Supply New Equipment 2019
IT EN-HE-LM Replacement of 2 lifts in North Area Supply New Equipment 2020
DO EN-HE-PO LHC inner triplet transport and installation vehicle Supply New Equipment 2020
DO EN-HE-HM 1 x MAFI convoy electrical refurbishment Supply Consolidation 2020
IT EN-HE-HM EOT cranes for HL-LHC project Supply New Equipment 2020
DO EN-HE-HM Replacement of electrical forklifts CH519 & CH520 Supply New Equipment 2020
DO EN-HE-PO Replacement of road truck with 6m flatbed and tarpaulin Supply Consolidation 202026/09/2017 35ILO Forum
-
EN-STISources, Targets and Interactions
Simone GILARDONI
-
Activities
• In charge of special mechanical engineering devices, submitted to beam impact and therefore extremely stressful conditions
• Typically need high accuracy, special materials, strict quality control.
• Qualification criteria often very restrictive: failure of the equipment implies intervention on very radioactive items.
26/09/2017 37ILO Forum
-
Materials
• Typically look for structural materials with excellent elastic region, good thermal conductivity, good strength
• Glidcop
• CuCrZr
• Refractory metals
26/09/2017 38ILO Forum
-
Collimators
• Most radioactive items in the LHC
• Designed to be maintenance free
• Require various know-how in once:
• Precision machining
• Electron Beam Welding
• Brazing
• Mechanical design
26/09/2017 39ILO Forum
-
Robotics
• Use robotics for intervention in radioactive areas
• No large contracts foreseen, but excellent opportunities for collaboration
• Contact person: Mario Di Castro, Alessandro Masi