emergency response at nbp, an assessment
TRANSCRIPT
-
7/28/2019 Emergency Response at NBP, An Assessment
1/38
EMERGENCY RESPONSE AT THE NEW BILIBID PRISON:
AN ASSESSMENT
I. INTRODUCTION
The security industry and the government share the
responsibility of protecting lives and property.
Anticipatory Management or preparedness helps to avoid loss
of lives and properties, and assures continuity of
operation which is important to the recovery of the
facility after the disaster or emergency crisis.
Every industrial facility should be equipped to cope
with the hazards and disasters of todays complex world.
Storms, fires, explosions, sabotage, civil disturbances,
and other disasters pose visible and anticipated threats.
The same goes with the government institution, specifically
the prisons.
In prison facilities, the challenge of disasters is
quite different and more ominous than that of the business
industry. Riots, mass escapes, and threats of attacks from
the leftist, rightist, and terrorist are the expected daily
occurrence and that must be competently managed. These
risks and challenges are more prevalent and should be
addressed with proper planning and execution of emergency
1
-
7/28/2019 Emergency Response at NBP, An Assessment
2/38
response/preparedness or vigilance so that the recluse of
the society will be effectively confined.
Coordinated planning with local and national civil
preparedness council guarantees provisions for the fullest
utilization of available resources. Also, the mutual
assistance agreements with other government institutions
assure help in cases of emergencies.
Both of these are keys to prison community
preparedness. It helps to ensure continuity of operations
and limits interruption of the prison system. In addition
to these, plans should be well circulated so everyone is
aware and is expected to execute it as planned anytime.
Every facility, whether government or private firms
regardless of size, should establish an internal
organization that will be able to protect lives and
property in time of any adversity and emergency. Emergency
preparedness is regarded as the backbone for survival and
recovery. Hence, recovery planning is very essential and
also mandatory to secure the safety and security of the
institutions personnel and property so as to continue its
function and to carry out its primary mission. The prison
institution is not exempted from it; rather it would
2
-
7/28/2019 Emergency Response at NBP, An Assessment
3/38
require more specific, detailed and defined strategies
since it caters to a very high-risk group of individuals.
This paper will present the assessment of the
Emergency Response at NBP. Specifically it will appraise
the following: first, the existence of viable written
emergency preparedness plan in case of riots and other
prison disturbances; second, the responsiveness of the
written emergency preparedness plan; and third, the
readiness of the NBP to execute it in when emergency
situations arises.
But prior to the assessment of the NBP Emergency
Response, it is important to discuss first the emergency
planning. This is to better understand its essentials,
features, types and elements as it is applied to NBP.
II. EMERGENCY PLANNING
Emergency planning is, first and foremost, the plan
which includes the detailed set of policies and procedures
to any reasonably foreseeable emergency or disaster that
would affect the safety of people and assets of the
organization. The plan should be in written form, and it
should stipulate in detailed manner the steps to be taken
and should identify who the lead persons responsible to
execute the plan in a given emergency. Note that there are
3
-
7/28/2019 Emergency Response at NBP, An Assessment
4/38
two key elements in any contingency plan: first, what is to
be done; and second, who is to do it.
Having a detailed plan of action ensures that the
right people, equipment and facilities are available in any
crisis, and that everyone both the management and employees
will know what to do, what to expect, and who is/are in
charge. This crisis response must be swift and sure.
Confusion and panic are all too common and must be avoided.
If the twin objectives of preventing or minimizing injury
or accident to people, and preventing or minimizing loss of
assets are to be achieved in an emergency, the key people
in the organization must be able to act quickly and
responsibly.
Advance planning has other advantages. It makes it
possible to enlist those who will be involved in the crisis
situation. Since all facets of the organization will,
typically be affected, all should have some input in the
planning. The committee approach, in fact, is most commonly
used in developing emergency plans. This collaborative and
cooperative effort enables the organization to anticipate
and identify problems in different areas and to respond and
be prepared to act on them accordingly.
Types of Emergencies
4
-
7/28/2019 Emergency Response at NBP, An Assessment
5/38
While it is impossible to predict all emergencies that
might occur, it is possible to make reasonable estimates of
the vulnerabilities of a given facility in a particular
geographical location. In the past decade, the most common
emergencies have been fire, calamity, bomb threat, and
labor dispute, of which most organizations have specific
contingency plans for these man-made and natural hazards,
and these have already been discussed. Other threats may be
relatively predictable for a given site, such as the
possibility of explosion, a spill or a chemical leak in a
chemical plant. In developing emergency and disaster plans,
priority should naturally be given to those areas of most
immediate concern.
The types of emergencies that require emergency plans
include: airplane crash; bomb and bomb threat; building
collapse; civil disturbance; earthquake; fire; flood; riot;
sabotage; strikes and pickets; utility failure; and storm.
While game plan should exist for each emergency, a
possible standard procedure should be adopted, since there
are many common elements in the emergency response to any
crisis. Whenever possible, the same chain of command should
exist, the same communications, the same command post and
control center, and the same first aid center. Evacuation
5
-
7/28/2019 Emergency Response at NBP, An Assessment
6/38
routes should be identical for a bomb threat or fire. An
important rule in all such planning is to keep it simple.
Employing common elements in all plan helps to eliminate
confusion and uncertainty during the frantic first moments
of disaster.
Emergency Personnel and Equipment Records
It is already stated that emergency plan should be in
writing, preferably in an emergency planning manual, and
copies of which should be immediately available to
designated members of management, the emergency team,
security, finance, and other key employees with its
specific responsibilities. Plans should be reviewed
periodically and kept updated.
Permanent records must be kept in a secure location
(such as the security office), and should include the
following: (1) names and phone numbers of management
personnel to be notified; (2) names of emergency forces as
to assignments, location, and phone numbers; (3) names of
back-up emergency forces; (4) list of emergency equipment
and supplies, including type, location, quantity, back-up,
and outside support; (5) building plans; (6) mutual aid
agreement; (7) Outside organizations (police, fire,
6
-
7/28/2019 Emergency Response at NBP, An Assessment
7/38
hospital, and ambulance) with their locations and phone
numbers; and emergency planning.
Security Responsibilities
While it is impossible to stipulate the duties
involved by the security people in an emergency, it is
suffice to mention that this is expanded from the normal
expected functions. It is all about the smooth
coordination, involvement and anticipatory management that
lead to the protection of lives and properties. The
security duties are expanded from the normal expected
responsibilities and it includes:
Establish communication with police
Activate emergency steps to protect people,
property, & valuable information
Mobilize an emergency guard force
Control Movement of personnel & others
Control entrances and exits
Control classified and dangerous areas
Control evacuation as ordered
May diversify as in fire fighting, first
aid, etc
7
-
7/28/2019 Emergency Response at NBP, An Assessment
8/38
Thus, emergency and disaster planning is a total
management responsibility where the security department
will always play an active, vital and prominent role.
III. THE NEW BILIBID PRISON
The New Bilibid Prison is one of the seven penal
institutions under the Bureau of Corrections---a line
agency under the Department of Justice. The construction of
New Bilibid Prison started in 1936. It was established by
virtue of Commonwealth Act No. 67 and officially became
operational on November 15, 1940. It was officially named
as the New Bilibid Prison on January 22, 1941, basically to
differentiate it from the Bilibid Prison in Manila which
later called as the Old Bilibid Prison.
The prison reservation has had an original land area
of 587 hectares, part of which was arable. Today after
series of proclamations, it was trimmed down to only 237-
hectares. The prison compound proper then, an area of 300
x 300 meters or a total of nine hectares with a total
capacity of 3,000 prisoners, is what known today as the
Maximum Security Compound.
Today, various facilities were constructed to
accommodate the fast growing numbers of national prisoners.
There are three prison camps, which house inmates according
8
-
7/28/2019 Emergency Response at NBP, An Assessment
9/38
to security classifications, the maximum, medium and
minimum security prisoners. There is a separate facility
for newly convicted inmates, juveniles, and inmates soon to
be released. These are the Reception and Diagnostic Center,
the Muntinlupa Juvenile Training Center, and the Halfway
House, respectively. (Vinarao: BuCor Centennial Book, 1905
to 2005)
As of June 31, 2005, the NBP has maintained 18,327
inmates complemented by 641 prison guards or guard to
inmates ratio of 1:29. (Management Division: BuCor
Accomplishment Report, January to June 2005)
Peaceful atmosphere has generally prevailed inside the
prison compounds. This can be attributed to the restoration
of conjugal visits, and the intensive campaign against
illegal drugs and other contrabands and the strict
implementation of safety and security procedures.
As of June 2005, a total of 36 escape incidents
occurred. Majority of these escapes were minimum security
inmates working in an open wall within the prison
reservation.
It is worthy to mention that in the past three
decades, there has never been any emergency case that has
not been curbed to its controllable level. Perhaps this is
9
-
7/28/2019 Emergency Response at NBP, An Assessment
10/38
possible because of existing emergency plan and contingency
planning being stressed in the daily operations.
The succeeding topics will focus on these aspects of
security planning adopted at NBP in case of riots and
prison disturbances.
IV. NBP EMERGENCY RESPONSE PROCEDURES
The basis of the NBP emergency response is embodied in
the Bureau of Corrections Operation Manual specifically in
Part IV Section 1 to 9 which explicitly identifies the
component of emergency planning, the control center, the
coordinator, the expected action to be taken and the lead
person/s. Included also are the procedures to be taken in
cases of jailbreaks, fire and other disturbances. The full
texts of which are presented below:
PART IV. SECURITY PROCEDURES DURINGEMERGENCIES, RIOTS,
ESCAPES OR MAJOR DISTURBANCES
SECTION 1. Emergency controlcenter. A prison shall establish a Control Centerto control, execute and monitor the proper andtimely implementation of detailed plans of action to
cope with the emergency situations caused by firesor conflagrations, riots or other violentdisturbances, or escapes. The Control Center shallbe under the command of the Superintendent or, inhis absence, the Assistant Superintendent, and inthe latters absence, the most senior prison guardpresent.
SEC. 2. Riots and other prisondisturbances. In the event of riots or other
10
-
7/28/2019 Emergency Response at NBP, An Assessment
11/38
prison disturbances, all officials and employees ofthe prison were the incident occurs shall be placedon twenty-four-(24)-hour alert to perform such
tasks as may be necessary to quell the disorder ornormalize the situation.
SEC. 3. Sounding of alarm. Whenever a riot or escape alarm is sounded, eitherby siren, bell or gun fire, all inmates shall beordered to lie flat on the ground, face down andwith arm and legs spread out. On such occasions,when warnings are disregarded, the guards shalluse reasonable force to carry out the instructions.
SEC. 4. Procedure during riots anddisturbances. The following procedures shall befollowed in the case of riots and other violent
disturbances:a. At the sound of the first alarm, allinmates shall be locked up inside theirrespective cells/quarters. An inmate workcrew shall be immediately returned to theprison compound or to previously designatedareas for accounting and confinement afterhead count.b. If the disturbance occurs duringvisiting hours, all visitors shall beimmediately ushered out of prison compoundor if this is not possible, brought to a pre-
determined area inside said compound. Inthe latter case, the visitors shall not beallowed to leave said area or the compounduntil the disturbance has ceased and theinmate have been properly accounted for.c. At the same time, all guards who arenot on duty shall be directed to immediatelyreport to the Desk Officer. All critical postsshall be manned to prevent escapes. Themost senior guard present shall takecommand of the custodial force and makeassessment of the situation.
d. All telephone calls to and from theprison compound shall be controlled.e. The Armorer shall issue the necessaryanti-riot equipment and firearms.f. Based on his assessment of theprevailing conditions, the guard in commandshall deploy the guards into the followinggroups:
11
-
7/28/2019 Emergency Response at NBP, An Assessment
12/38
1st Group This is the initial wave ofanti-riot assault contingent who shall bearmed with wicker shields, protective
headgear, gas masks and night sticks orbatons, when these are available. Theobjectives of this group are to dispense therioters and get their leaders.
2nd Group This is the back-up forceof the 1st Group who shall be equipped withtear gas guns and gas grenades.
3rd Group This is composed ofguards who are trained in the properhandling and use of firearms. Under thedirect command of the guard-in-charge, theyshall provide covering fire to the first two
groups.g. When the three groups mentionedabove are ready, the guard-in-charge shalldirect the inmate to cease and desist, toreturn to their respective cells and warnthem of the consequences if they do notobey. The known leaders, if known, shall beaddressed directly.h. If the inmates fail or refuse to heedthe order to return to their cells, the guard-in-charge shall sound the second alarm.
Thereupon the 1st Group shall enter into the
prison compound followed by the 2nd Groupat a discreet distance. The third group shallbe in strategic position, ready to fire if thelives of the guards in the 1st and 2nd Groupsare endangered by overt violent acts of theinmates.i. The 1st Group shall be task withquelling the riot and getting the leaders ofthe rioting group. If they meet stiffresistance, the head of the Group shallimmediately order their withdrawal.
j. Thereafter the guard-in-charge shall
order the 2nd Group to fire tear gas on theinmates. When the area where the riotersare found saturated with gas, the 1st Groupshall attack using batons to force the rioterinto their cells and to get the leaders. Theuse of pressurized water from the fire truck,if any, may be resorted to.
12
-
7/28/2019 Emergency Response at NBP, An Assessment
13/38
k. At the earliest opportunity, the guard-in-charge shall report the prison disturbanceto the nearest police station and to the
Director who shall in turn inform theSecretary.l. When the condition has becomecritical and the disturbance has reached fullintensity, the guard-in-charge shall cause thesounding of the third alarm. At this instance,the Control Center shall notify all Policeagencies nearby for assistance and them allother plans in connection with prisonuprising shall then be executed. Nearbyhospital shall also be notified if the situationdemands.
m. As an extreme measure to preventmass jailbreak or serious assault upon themembers of the prison administration, theselected marksman of the 3rd Group may beobserved by the guard-in-charge to firewarning shots at the rioters. If the rioters donot desist, the order to fire shall be given butonly to maim designated targets belongingto the rioting group.n. After the riot or disturbance, thefollowing procedures shall be followed:
i. Administer first aid to the
injured;ii. Conduct a head count;iii. Segregate ring leaders and
agitators;iv. Assess and determine thedamage to the facilities;v. Investigate the causes of theriot and prosecute the ringleadersand other persons involved in the riot;vi. Repair the damage;vii. Adopt measures to prevent
repetition of similar incidents;
andviii. Submit a report on the incidentto the Secretary.
SEC. 5. Procedure during an escapeor jailbreak. The following procedures shall befollowing in the case of escapes or jail breaks:
a. When a jail break is in progress or hasjust occurred, the Control Center shall
13
-
7/28/2019 Emergency Response at NBP, An Assessment
14/38
immediately sound the alarm and theSuperintendent or the Commander of theGuards shall be notified.
b. At the first sound of the alarm, allinmates shall be locked in their respectivecells while those in work detail shall bemarched in orderly manner to their cells.c. All prison personnel who are not onduty shall report to the prison immediatelyand make themselves available foremergency deployment. The Armorer shallissue firearms to members of the custodialforce who shall be immediately dispatched tostrategic posts.d. A head count shall be made
simultaneously in the different cells/quarterof inmates to determine the identity of theescapee. Prison personnel assigned toessential posts such as the powerhouse,kitchen, hospitals, fire stations, etc. shall alsomake a headcount of the inmates under theirsupervision and report the results thereof tothe Control Center.e. If the identity of the escapee isestablished, his name and other personalcircumstances shall be immediately flashedto all units of the Philippine National Police in
the vicinity.f. Radio and television station and othernews media shall also be notified of theescape and, if possible, provided withphotographs of the escapee.g. A recovery team shall be formed bythe Superintendent to proceed to all knownlairs, hangouts, residence and houses ofimmediate relatives and friends of theescape.h. In case of mass jail breaks, allmembers of the custodial force shall be
immediately issued firearms and assigned tocritical posts to seal of all possible escaperoutes while teams search the prisonpremises. Prison personnel who are off-dutyshall be required to report for dutyimmediately.i. If any prison officer or employee heldhostage by escapee, reasonable caution to
14
-
7/28/2019 Emergency Response at NBP, An Assessment
15/38
insure safety shall be taken. If it is theSuperintendent who is taken hostage, theAssistant Superintendent shall assume
command.j. If no hostage was taken and theescapes is unable to leave the prisonpremises but refuses to surrender to theprison authorities, the basic plan for Riots orDisturbance shall be implemented.k. After the escape, the superintendentshall conduct and investigation relative tothe escape to determine the liability of theofficer/employee under whose custody theinmate escaped. A review of securityprocedures and an ocular inspection of the
prison facilities shall also be made todetermine the existence of any gaps orflaws. A report on the results of said reviewshall be submitted to the Secretary.SEC. 6. Emergency plans for
calamities, etc. Subject to the available andfunding resources, a prison shall establishemergency plans in cases of power failure andnatural disasters such as floods, earthquakes, andother calamities. The plan shall cover the specificroles of prison personnel present, the alarm systemto be used, the emergency power units to be
utilized and the kind of security to be provided andsuch other matters as are necessary to insure thesafety and security of prison personnel andinmates. Likewise, the plans shall also includedetailed procedures for evacuation of inmates incases of floods, earthquakes and other calamities,if such evacuation is necessary.
SEC. 7. Features of emergencyplans. Subject to the availability of funds andequipment, emergency plans shall contain thefollowing basic elements or features:
a. Fire
i. A fire crew shall be formedconsisting of prison personnel andinmates chosen according to theirsecurity classification/behavior,intelligence and aptitude. They shallman the prison fire truck, if any.ii. The inmates who are selectedshall be housed separately from the
15
-
7/28/2019 Emergency Response at NBP, An Assessment
16/38
other inmates in close proximity to theControl Center and/or the fireequipment and fire truck, if any. They
may be issued special uniforms foreasy identification.iii. At the first sign of fire, theControl Center shall sound an alarmeither by means of siren or a bell, or atthe same time, notify the firedepartment, police headquarters andother units that may help in puttingout the fire and/or evacuatinginmates.iv. The person in-charge of thekeys to the storage for fire- fighting
equipment, the emergency gates andgates of the different cells/brigades,should distribute the keys to theresponsible personnel concerned.v. The fire crew shall immediatelyrespond to the scene to put out thefire while the other prison personnelshall station themselves according tothe plan.vi. All inmates in the affected areashall be required to help in putting outthe fire.
vii. If there is a need to evacuategovernment records, supplies andequipment, they should be evacuatedto a safe place according to priorityand placed under proper guard.viii. If there is a need to evacuatethe inmates, they shall be evacuatedin an orderly manner, using securemotor vehicles, if any or by any othermeans that will bring them to pre-arranged building or detention centersfor their confinement. If the inmates
are evacuated outside the prison, theyshall be secured by handcuffs or otherinstruments of restraint.ix. When the all clear alarm issounded, first aid shall beadministered to the injured inmatesand a physical count of inmates shallbe made. Security check of the prison
16
-
7/28/2019 Emergency Response at NBP, An Assessment
17/38
to determine the extent of thedamage shall also be done.
x. If the security conditions allow,
the evacuated inmates shall bereturned to the prison. Otherwise, theyshall be retained in the detentionplace where they were evacuated ortransferred to another penalestablishment as the Director maydecide.
xi. A thorough investigation of thecauses of the fire shall be conductedby the Superintendent and the reportthereon submitted to the Director andthe local Fire Department.
SEC. 8. Fire prevention. To preventthe occurrence of fire and to minimize its effects ifsuch has occurred, the following rules shall befollowed:
a. Inmates shall be cautioned against thehazards caused by careless handling of litcigarettes, inflammable materials, fuel,welding equipment, etc.b. Fire extinguisher shall be placed inclose proximity to all housing units andlocated in strategic places in buildings, andwork areas.
c. Empty drums and cans shall be filledwith water/sand and placed in strategicplaces for ready use.d. Keys to emergency exits, cells,brigades and storage places of fire-fightingequipment shall have distinct markings ortags, marked and shall be accessible to theguard on duty.e. Portable floodlights shall, whenavailable, be placed in the Control Center incase of nocturnal fires.f. Government equipment shall be
marked with tags or symbols for easyidentification and priority evacuation in caseof fire or other emergency.SEC. 9. Contingency plan. In any
major prison disturbance, the Superintendent shallpersonally take immediate control and implement astanding contingency plan to repel the aggressionand stabilize the situation. Drills shall be conducted
17
-
7/28/2019 Emergency Response at NBP, An Assessment
18/38
from time to time to familiarize personnel with theirduties under said plan.
As enumerated in the BuCor Operating Manual, it
provides the essential components and elements of the plan
such as:
1. Designating authority to declare an emergency and to
order shutdown and evacuation, total or partial.
2. Establishing an emergency chain of command.
3. Establishing reporting responsibilities and
channels.
4. Designating an emergency headquarters, or command
post.
5. Establishing training Emergency Teams for each
shift.
6. Establishing specific asset protection and life-
saving steps.
7. Designating equipment, facilities, and locations to
be used in an emergency.
8. Communicating necessary elements of the emergency
response plan to all affected personnel.
9. Communication with outside agencies.
10. Public relations and release of information.
18
-
7/28/2019 Emergency Response at NBP, An Assessment
19/38
While the authority to declare an emergency and to
order shutdown and/or evacuation normally rests with the
Superintendent, this sometime is exercised by Assistant
Superintendent of the prison camps. Whoever is so
designated in the plan must be someone available or on call
at all times.
The person in charge of executing the plan has to have
alternates to ensure coverage around the clock. He will be
responsible for initiating action according to the plan in
an emergency, ordering and directing shutdown and/or
evacuation when so authorized, making emergency
announcements, and coordinating emergency responses. Often
this emergency plan in charge is the facilitys
administrator, who will take advantage of existing
organizational chains of command, with orders and
directions filtering down through department heads to
supervisors, foremen, and working personnel.
As indicated, specific responsibilities in the plan
have to be spelled out in advance for prompt, efficient and
effective execution.
V. THE NBP CONTINGENCY PLAN DURING EMERGENCIES
Historically, there were incidents of riots and other
violent disturbance that occurred at NBP but it is notable
19
-
7/28/2019 Emergency Response at NBP, An Assessment
20/38
to mention that all remained to its controllable level.
This can be attributed to its existing contingency plan in
case of emergency situations which are embodied in
Operational Plans as exemplified below:
CONTINGENCY PLAN IN CASE OF RIOTS ANDVIOLENT DISTURBANCES
I. BACKGROUNDA. GeneralPrison riots generally center on complaints
concerning prisoners conditions and demands fortheir improvement. In certain cases, these may becaused by the withholding of privileges previouslyallowed but are curtailed as new issues againstthem surface.Violent disturbances are almost always triggered bythe animosities between rival inmates gangs, suchas Sigue-Sigue Sputnik, Bahala Na Gang, GenuineIlokano Gang, Batman and others. A fight betweentwo gangs may escalate into free-for-all making ithard to control and may result in the increase ofthe number of casualties.
Above conditions are made worse by theconnivance and/or participation with inmates ofsome unscrupulous prison guards and NBPemployees.
B. Support Units1. Special Action Forces2. Adjacent PNP Stations3. Adjacent Fire Stations4. Adjacent Hospitals
II. ASSUMPTIONS1. The main target victims and/or hostages
of rioting inmates are the Director, Assistant
Director, Superintendent, Chief of the NBP Hospitaland other prison officials and/or visitors.2. During riots and disturbances, hostages
and/or victims are mostly prison officials, hospitalstaff, prison guards, BuCor employees and othervisitors.
3. Institution of new prison reforms willtrigger the rise in the incidence of riots anddisturbances.
20
-
7/28/2019 Emergency Response at NBP, An Assessment
21/38
4. Inmates take advantage of riots as anoccasion or opportunity for escape.
5. Rioting inmates can be neutralized
through their Bosyos and Mayores.6. Reasonable force is necessary to control
and contain riots and disturbances.7. Riots and disturbances usually occur at
the BuCor Maximum Security Compounds.III. EXECUTION
A. Planned or calculated riots/violentdisturbances
1. Chief Investigation and IntelligenceSection confirms information on the existence ofplans to state riots or disturbances and reports thesame to the Prison/Penal Farm Superintendent.
2. Upon confirmation, efforts should bemade to prevent its occurrence by:
a. Conducting dialogues with gangleaders to enable proper authorities toascertain the reasons behind the plannedriots and take appropriate preventiveactions.
b. Increasing the strength of custodialforce detailed at the security compoundconcerned.
c. Coordinating with support units tosend contingents in a worst case scenario.
3. In case preventive measures fail,prescriptions for spontaneous riots shall bepursued.
B. Spontaneous riots/violentdisturbances
1. The first person to notice or discover theoccurrence of a riot or disturbance shallimmediately alert other guards/personnel byshouting riot, riot or by firing three successiveshots into the air or by blowing the whistlecontinuously. The prison guard nearest to the sirenswitch, who has observed the commotion or has
heard the warning or has been informed by radio,will sound the general alarm.
2. All inmates not actually involved in therioting will be immediately locked-up in theirrespective cells.
3. The BuCor Director, NBP Superintendentand other authorities must be immediatelyinformed of the incident.
21
-
7/28/2019 Emergency Response at NBP, An Assessment
22/38
4. If the disturbance occurs during visitinghours, all visitors shall be ushered out from thevisiting premises to a safe place of considerable
distance from the riot area.5. Simultaneously all available prison guards
to include those residing within the reservation willimmediately report to the NBP Superintendent, theCommander of the Guards, or the Officer of the Dayand will make themselves available for emergencydeployment. Main gate and all other escape routesmust then be closed to prevent jailbreaks. The OICwill assess the situation and if it so warrants, willcall immediate assistance from the MuntinlupaPolice, Fire Department and/or Hospital and informthe BuCor Director and the NBP Superintendent of
the prevailing situation.6. When things are set, the OIC with the use
of installed sound system shall direct the inmatesto cease and desist from fighting, and ask them toreturn to their respective cells/dormitories or facepossible use of force. Known gang leaders shall becalled by their names and shall be asked to try tostop the riot/disturbance.
7. The armorer shall immediately issuefirearms, teargas canister and gas masks to alertpersonnel. All F/As shall be tagged/receipted (twocopies) for immediate issuance and retrieval.
8. If efforts of the OIC fail, he shall form 2groups as follows:
Group I composed of SWAT personnelarmed with batons, tear gas and gas masks.
Group II composed of PGs and personneltrained in firearms handling, ready to fire uponorders of the Superintendent when the lives of theguards are in danger.
9. Superintendent then orders the throwingof teargas upon clearance with the Prison/PenalFarm Superintendent. The number of canisterthrown shall be enough to produce the desired
effect. When the area is saturated with gas, thepersonnel with gas masks shall attack the inmatesusing the batons to force the rioter to halt and toget their leaders. Responding policemen shall be onstandby for possible assistance.
10. If the fire crew arrives and thedisturbance is still in progress, pressurized waterfrom the fire truck will be used to disperse the
22
-
7/28/2019 Emergency Response at NBP, An Assessment
23/38
rioter. The NBP fire truck shall be ready at all timesto assist in quelling the disturbance.
11. In a worst-case scenario where there
is an imminent danger of mass jailbreak or seriousassault upon the members of the custodial forceand responding policemen and firemen, selectedmarksmen from the 2nd group may be ordered tofire by the NBP Superintendent only after duewarning by oral command, whistles or warningshots. Extreme caution must be exercised toensure safety of responding forces and innocentinmates. Fires aimed at rioters must not beprimarily to kill but to maim only.
12. Custodial personnel assigned at theprison towers shall prevent the possible escape of
inmate rioters who may attempt to climb over theperimeter fence. They shall also warn the SWATteams of the particular areas of disturbance andshall assists through radio or oral communication,in directing any possible assault against the rioters.
13. Custodial personnel/SWAT deployedinside the Maximum Security Compound shall givedue priority in securing areas considered critical,such as:
a. NBP Hospitalb. Control Gatec. Gate 4
d. Building 1e. Building 14f. Post Tower 8
14. To minimize the danger of any riotspilling to other security compounds, MediumSecurity Compound inmates shall be locked in theirrespective cells in case of riots in the MaximumSecurity Compound or other compounds. Moreover,the Minimum Security Compound and otherbuildings close to the Depot shall also be locked toprevent possible escapees from seeking refugethereat.
15. When the need arises, out-of-duty PGsliving within the NBP Reservation and other maleNBP employees shall, upon being informed of theoccurrence of a riot/disturbance, make themselvesavailable to the NBP Superintendent who shall givethem instructions to act as possible reinforcements.
16. During riots, the central gatesinterconnecting the different building/dormitories
23
-
7/28/2019 Emergency Response at NBP, An Assessment
24/38
inside the Maximum Security Compound shall beclosed to contain the disturbance within a particularlocation its spread to adjacent areas.
17. After the riot or disturbance, thefollowing procedures shall be undertaken:
a. NBP Hospital personnel administerfirst aid to the injured;b. Oversees conduct headcount;c. Team leader of Group II supervises thesegregation of leaders and agitators;d. Perimeter guards double checksecurity of compound premises;e. Chief, Intelligence and InvestigationSection conducts thorough investigationof the incident and prosecute those who
have violated laws, rules and regulations;f.General Services Division personnelrepair damages in the prison compound;g. The Penal Superintendents or a studygroup adopts effective measure toprevent repetition of similar incidents;h. Prison/Penal Farm Superintendentssubmits report to Director, Bureau ofCorrections;i. A spot report on the riot/disturbanceincident shall be immediately preparedfor the information of the Department of
Justice and/or other higher authorities.IV. OTHER INSTRUCTIONS
1. Duty RCN personnel and switchboardoperators shall reserve the use of availablecommunication access equipments to the on-goingoperations.
2. An ambulance shall always be on standbyduring riots and disturbance ready to evacuate thewounded/injured and other victims.
3. In case of brownout/power failure when ariot is in progress or is imminent, the
Transportation Section shall utilize available
vehicles to illuminate the gates of the securitycompounds and other probable escape routes.
4. News reporters and other mediarepresentative shall not be allowed to take part inthe anti-riot activities. They shall be prohibited frominterfering in any way in the conduct of operationsto contain the disturbance.
24
-
7/28/2019 Emergency Response at NBP, An Assessment
25/38
5. Religious adviser/volunteers shall assist inevacuation procedures and help in administeringfirst aid to the wounded/injured.
6. During riots, all gates shall be closed toprevent visitors and other unauthorized personsfrom disturbing/delaying the restoration of peaceand order within the security compound.
7. Additional custodial guards shall beposted outside the perimeter fence to foil anypossible attempt by outside force who may takeadvantage of the commotion cause by the riot torescue some inmates.
8. When the outbreak of riots becomeimminent, nearby hospitals and medical clinicsshall be promptly informed and advised to make
prior arrangements to accommodate possibleemergency patients.
9. Custodial guards and other anti-riotpersonnel shall, at all times, observe maximumtolerance in containing riots and disturbances.V. EMERGENCY EVACUATION PROCEDURES
The procedures to be implemented in case ofprison disturbance and other emergencies that maytranspire inside the NBP Maximum SecurityCompound are stated below. These generalprocedures with appropriate revision shall beadopted in the other BuCor Security Compounds.
A. At the sound of siren/alarm1. All personnel inside the Administration
Building must immediately proceed totheir respective office entrance and shutthe door close. Upon security notice,everyone shall:a. Stand up and walk briskly and in anorderly manner towards the main door;b. Once outside the door, walk towardsGate No. 1 and go outside; andc. While moving out must religiously
observed the following:1). Do not panic;2). Avoid unnecessary noise;3). Do not run;4). Assemble at the Flag Pole area andwait for further instructions.
2. Office orderlies
25
-
7/28/2019 Emergency Response at NBP, An Assessment
26/38
a. The designated personnel of an officeshall lock the door behind him and shallsee to it that their respective are
assembled in the Social Hall;b. A uniformed guard from theCommander of the Guards Office shalltake charge of the assembled orderliesand shall see to it that all are accountedfor and at stand guard;c. The civilian personnel then proceedoutside and assemble with the group atthe Flag Pole area; andd. The same procedures shall apply withthe offices in the second floor.
B. The alarm/siren shall be sound twice
as soon as the situation is undercontrol.
VI. LETTER DIRECTIVE
There is continuity in the emergency planning
operations operant and mandated by the present leadership.
Besides those stipulated in the Corrections Operation
Manual, there are memorandum to highlight the importance of
being vigilant and responsible. The other emergency
preparedness plans are in the form of Letter Directive.
Example is presented below. The purpose of this letter
directive is to set a coordinated action in case of
emergency situations.
LETTER DIRECTIVE 01/04 PAGMAMASID
1. REFERENCESa. Bureau of Corrections Operating Manual
dated 30 March 2000.b. Directors guidance
2. GENERAL
26
-
7/28/2019 Emergency Response at NBP, An Assessment
27/38
This letter directive set forth the operationalguidance in conducting pro-active and reactivemeasures and contingency operations during the
observance of the Lenten Season within the NBPreservation area.3. SITUATION
a. Recent developments in Metro Manila isalarming where suspected ABU SAYYAF GROUP(ASG) Terrorist were arrested with explosivesmaterials and one of the demands of the group isthe unconditional release of all Moslem brothers ingovernment custody.
b. Considering that three (3) top leaders ofASG and JEMAAH ISLAMIYAH (JI) namely Hector
JANJALANI, Mohammed AMIN and Argus DWARKINI,
an Indonesian National, are detained at theMaximum Security Compound of the New BilibidPrison, rescue operations or any offensive action tobring havoc to BuCor is not remote.4. MISSION
Intensify pro-active defense and securitymeasures to preempt violent disturbances withincolony reservation area.5. EXECUTION
a. Directors IntentSecure the NBP against the threat, to
maintain the stability and orderliness within
the prison reservation and confinement area.b. Concept of Operation
This security and contingency operation isa continuing activity that has two distinctstages.
ALERT LEVEL I (Pro-active securitymeasure) This ALERT Level I is designedto predict or preempt the probability ofoccurrence of crises at the same timeprepare to handle them when they occur.
ALERT LEVEL II (Reactive/EmergencyCrisis Situation) This ALERT Level II is
when the crisis/emergency situation occurs.This involves planning for probable crisissituation to enable the bureau to react whencrisis occur. The Bureau must organize, planand maintain readiness of special reactionand constrict security when the need arises.
ALERT LEVEL I (PRO ACTIVE SECURITY MEASURE)
27
-
7/28/2019 Emergency Response at NBP, An Assessment
28/38
1) The NBP shall organize one (1) ReadyReaction Platoon with appropriate vehiclesunder the direct supervision of the Assistant
Director for Prison and Security and ready fordeployment to conduct counter offensive,direct actions and special reaction operationsto preempt violent disturbance within theprison reservation and inside confinementarea, on order.2) Strengthen the security of the main gateand strict implementation in the conduct ofcheckpoint and curfew hours with thereservation area.3) Intensify intelligence, counter intelligence,searching and active security patrol within
reservation areas and inside confinementfacilities.
ALERT LEVEL II (REACTIVE/EMERGENCY CRISISSITUATION)
1) The NBP shall activate and organize theControl Center as provided in the BuCoroperating Manual to orchestrate, execute,synchronize and monitor the timelyimplementation of detailed actionplan/contingency operations during crisis oremergency situation.2) At this stage, the Ready Reaction Platoon
will be under the direct supervision of theCrisis Management Team.3) All officials, employees, prison guardsshall be placed on Heighten Alert Status (24hours alert duty) to perform specific andimplied tasks as may be necessary to quellthe disorder and normalize the situation.4) Whenever the alarm Siren is sounded, allprison guards, employees shall take theirrespective pre-designated defense andsecurity post immediately. Likewise, allinmates shall be ordered to lie flat down on
the ground, face down and with arms andlegs spread out in case of riot, and/orpadlocked in their respective dorms in caseof attack.c. Directorial Staff Supervision1) NBP Superintendent
a) Maximize deployment of assignedprison guards to secure the NBP.
28
-
7/28/2019 Emergency Response at NBP, An Assessment
29/38
b) Assign pre-designated defense/securityposition to each prison guards forstrengthen security of the NBP.
c) Organize and standby one (1) fullyarmed Ready Reaction Platoon withcomplete equipment in from of the AdminBuilding ready for deployment on orders.d) Intensify intelligence, counterintelligence and patrol within NBPreservation and inmates confinementarea.e) Coordinate with the nearest PNP or AFPStations for reinforcement as necessary.f) Establish checkpoint along main roadgoing to Admin Building, Medium and
Maximum Security Compound andsubsequently conduct intensive search ofall vehicles including PUJs/Tricycle and beready to engage at all cost as thesituation dictates.g) Establish semi-permanentbarricades/concertina wires to the AdminBuilding, Medium and Minimum SecurityCompound and Main Gate.h) In case of ALERT Level II, secure thethree (3) subject inmates figured out asterrorist in a safe place inside the
Maximum Security Compound andpadlocks all dorms, lock all gatesspecially the Control Gate and Gate 1.i) Direct the FOD to augment the MainGate on call and establish check point at
Justice Triangle.j) To perform other task as directed.
2) Administrative Divisiona) Issue appropriate orders for theassigned members of Ready ReactionPlatoon.b) Coordinate with PNP/AFP elements in
the area for force augmentation asnecessary and consolidate at the MainGate for further inspection.c) Perform other task as directed.
3) General Service Divisiona) Provide one (1) vehicle with driver andfuel to transport the RRP. Vehicle onstandby alert in front of administration
29
-
7/28/2019 Emergency Response at NBP, An Assessment
30/38
building every 1700H, ready fordeployment of order.b) Provide other special services as
requested.c) Perform other task as directed.
4) Supply Division/Armorya) Issue FA and Basic Load ammunition toall Prison Guard. Priority of effort will beto the designated Ready ReactionPlatoon. Guard on Duty, Security andother details on that order.b) Provide Metal Detector and fish-eyesearch mirror for the use of security detailat Main Gate.c) Provide special services/incentives to
deployed personnel. Priority of effort willbe on directly engaged personnel.d) Be ready to re-supply or providelogistic and other equipment asnecessary or as requested.e) Perform other task as directed.
5) Medical Coordinators Officea) Provide medical assistance to allpersonnel. Priority of effort will be onengaged personnel.b) Alert one (1) medical team withambulance ready for deployment on
orders.c) Priority of Medical Evacuation will be onengaged personnel.d) Coordinate with the nearest medicalstation/hospital for medical assistance.e) Perform other task as directed.
6) Public Information Officera) OPR (Office Primary Responsible) forthe control of TRI Media and publicationof press releases and/or new informationand other articles as necessary or asrequested in coordination with the Office
of the Director.b) OPR for the coordination andarrangement of Press Conferences asnecessary or as the director may desire.c) Perform other task as directed.
7) Executive Assistance for Intelligence,Operation and Special Investigation Group, ODC
30
-
7/28/2019 Emergency Response at NBP, An Assessment
31/38
a) Intensify intelligence and counter-intelligence to preempt violentdisturbance and inmate confinement
area.b) OPR for the inner security of theDirector and his immediate family.c) OPR for security of Directors Officeand Directors Quarters.d) Provide daily password/countersignevery 1700He) Provide tactical and Operationsassistance to Crisis Management Center(Control Center) as necessary as directed.f) Provide Tactical and Operationalassistance and technical supervision and
or augmentation to the designated or asdirected.g) Conduct direct action/specialoperations as necessary and/oraugmentation to the designated or asdirectedh) Perform other task as directed.
8) Signal Division (RCN)a) Provide appropriate communicationequipment. Priority of effort will be on theOffice of theDirector/Superintendents/Ready Reaction
Platoon/Guard on Post/Security on thatorder.b. Prepare or update primary andalternate radio net diagram.c) Perform other task as directed.
d. Coordinating Instructions1) Lateral coordination is encouraged2) Prison superintendent and OIC to submitIMPLAN (Attention XA for Operations, ODC)NLT + 2400 hours upon publication.3) C2 and CMC location initially at MonitoringOffice, ODC. Alternate TBAL.
4) Submit SITREP every + 01 upondeployment.
5) Ensure all Post Towers are manned andready to engage armed intruder or threat atall costs.6) Priority of message thruradio/telephone/messenger on that order.
31
-
7/28/2019 Emergency Response at NBP, An Assessment
32/38
7) In case of emergency or crisis situation,custodial personnel (PGs) residing insideprison reservation area shall immediately
report to the Admin Building for properdisposition/accounting prior to occupation ofthe designated position.8) Custodial Personnel residing outside theprison reservation areas shall report to thedesignated consolidation area (TBAL)immediately upon notice or information ofthe alert status for accounting prior tooccupation of the designated position.9) Primary Casualty Evacuation Point will beat Admin Building lobby. Alternate TBAL.10) When the ALERT Level II is in effect, all
civilians and other personnel who are notinvolved in this operations and are loiteringin from of Admin Building or Area ofEngagement (AE) shall be gathered at theAdmin Building lobby or nearest safe placefor their safety.11) Be ready for the conduct of walkthrough/dry run/in-announced call-to-arms(Camp Defense/Contingency Operations)anytime upon publication.12) This letter Directive shall take effect
upon publication.
VII. CONCLUSION
As differed from business and industrial facilities,
the New Bilibid Prison has a distinct and peculiar set-up
when it comes to emergency situation. Inherent to its
operation is the continuous challenge from prisoners in
testing its physical, personnel and security strength. The
prevalence of escape, riots and other prison disturbance is
the order of the day that prison administration must
address objectively, competently and humanely.
32
-
7/28/2019 Emergency Response at NBP, An Assessment
33/38
With the existence of a sound emergency plan, the NBP
has already made the first step of avoiding an emergency
situation to progress into a total disaster.
The emergency procedures and other emergency plans
that have been presented in this paper are only some of the
measures being executed by the NBP administration in
addressing these challenges. These emergency procedures and
plans, through the years, have proven to be effective and
operant in addressing prisons challenge and concerns. It
details the role of each employee to be vigilant and
responsible to respond so as to prevent further
damages/injuries and normalizes the prisons operation the
soonest possible time.
So, can NBP effectively respond the emergency
situation like riots and other man-made prison disturbances
based on the parameter set? Among the parameter used are:
first, existence of viable written emergency preparedness
plan in case of riots and other man-made prison
disturbances; second, the responsiveness of the written
emergency preparedness plan; and third, the readiness of
the NBP in case emergency situations arises.
Evaluating the present position of the NBP based on
the requirements imposed by an ideal emergency plan, the
33
-
7/28/2019 Emergency Response at NBP, An Assessment
34/38
existence of a viable written emergency preparedness plan
is in place. NBP follows these written plans based on the
type of emergency cases. The entire organization has
matured in terms Emergency Preparedness. The procedures to
be undertaken in case of man-made emergency situations are
incorporated in detail at the BuCor Operating Manual,
Operation Plan and Letter Directive.
Likewise, the prison administration has anticipated
every possible emergency scenario---both natural and man-
made--- and has prepared plans for each emergency. It
recognized the importance of good plan. The NBP emergency
plan is not only in writing but precisely and specifically
imbibes by the organization.
As to the responsiveness of the written emergency
preparedness plan, the written emergency plan is considered
responsive in terms of its substances and contents. It
appoints the coordinator, details in simple and clear
writing the action to be observed, the individuals role,
and the location of control center, and the evacuation site.
On the third parameter, the readiness of the NBP to
respond when the emergency situations arises, this cannot
be totally ascertained. There are no absolute measures to
quantify and qualify the readiness since there is no major
34
-
7/28/2019 Emergency Response at NBP, An Assessment
35/38
catastrophe or emergency cases that occurred in the past
three decades. The last emergency cases occurred was in
early eighties involving mass escapes of Hukbong
Makabayan, where more than 70 prisoners were massacred
along the perimeter fence. Also, simulated emergency
exercises where announced early thus, defeated its real
purpose --- ascertaining the readiness in case of emergency
situation.
However the response time of personnel to the
emergency cases was at all time prompt. For the first five
minutes when the emergency was reported, Emergency Response
Teams (ERT) was already in their respective stations.
It is in this regard that emergency readiness should
be reached. It means that preparation has reached the point
where the personnel promptly react to save life and protect
property once the facility is hit or threatened by a major
emergency situation anytime with confidence and competency.
However, because of the constant movement of personnel, the
termination and/or retirement of some and the hiring of new
staffs, the dissemination process of the plan is greatly
disrupted. There must be parameters to indicate whether
transmission of information is effectively done. Likewise,
the principles of unannounced dry-ran is not being
35
-
7/28/2019 Emergency Response at NBP, An Assessment
36/38
observed. Emergency exercises should be unannounced so that
gaps and lapses in the plan recognized and re-written to
suit the present conditions and problems.
VIII.RECOMMENDATIONS
The NBP Emergency preparedness, given the emergency
procedures and plans it has devised, is surely one step
ahead of any emergency situation. However, for the
procedures and plans to be effective, certain steps must be
undertaken in enhancing the skill of its personnel and
upgrading its equipment. Personnel and equipment are always
supplementing one another.
In this regard, the following recommendations are
worthy of considerations:
Continuous security orientation/seminars and in-
service trainings should be undertaken to enhance the
skill and awareness of the prison personnel in the
importance of their role during emergency situation.
Include Emergency plan and its drill as part of the
performance appraisal test of the prison guards and
other staff. It may serve as a gauge or basis for
promotion or recognition.
36
-
7/28/2019 Emergency Response at NBP, An Assessment
37/38
IEC materials are deployed to each office for daily
reminder or the emergency diagram to be place in
conspicuous and strategic areas within the vicinity. A
program specifically destined to challenge the
knowledge and awareness of the staff must be in
placed.
Include in the budget allocation as one of the
priority project the procurement of equipment needed
during emergency situation.
Emergency plan should be reduced in booklet form and
well disseminated to every member of the emergency
response team.
Periodically testing the plan or conduct dry ran
exercises, at least twice a year, for the prompt,
proper, and effective execution of the emergency plan
should emergency situations occurred. Drill must be
done regularly in unannounced manner simulating
emergency cases. Appraisal must be done to identify
gaps and lapses of the emergency preparedness plan. No
matter how exact and accurate the plan, it should be
well disseminated, tested, updated, and re-written to
address some of the recognized problems.
37
-
7/28/2019 Emergency Response at NBP, An Assessment
38/38
Recognition of collaborative efforts after each
emergency exercise must be done to reinforced positive
attitude and responses.
IX. REFERENCES
Bureau of Corrections. Bureau of Corrections Operating
Manual. New Bilibid Prison, 2000: (NBP Reservation,
Muntinlupa City, 1776)
Gion Green & Robert J. Fisher. Introduction to Security.
Butterworth Publisher, 1987: (80 Monvale AvenueStoneham, MA 02180)
James F. Broder. Risk Analysis and the Security Survey.
Butterworth Publisher, 1984: (80 Monvale Avenue
Stoneham, MA 02180)
James V. Bennet.I Chose Prison. Alfred A. Knopf, Inc.,
1969: (United States of America)
Office of the NBP Superintendent. Contingency Plan In Case
Of Riots and Violent Disturbances. New Bilibid Prison,
1998: (NBP Reservation, Muntinlupa City, 1776)
Office of the Asst. Director. Oplan Pagmamasid. Bureau of
Corrections, New Bilibid Prison, 2004: (NBPReservation, Muntinlupa City, 1776)
Philippine Society of Industrial Security. Certified
Security Professional Review Manual. PSIS, 2003:
(Legaspi Tower 3000, Roxas Boulevard, Pasay City)
38