    What is a Submarine Pipeline and what arethe Typical Pipeline Installation Methods?

    Dr. Ng Eng Bin, VP Engineering, EMAS AMC

    14 May 2014

    WIN – EXECUTE – SAFE DELIVERY

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    2/14

    Introduction

    Agenda

    Conventional Pipeline InstallationMethods

    Unconventional Pipeline InstallationMethods

    Overview of Submarine PipelineInstallation Methodologies

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    3/14

    Conventional Pipeline

    Installation Techniques

    Installation Techniques for Submarine Pipelines

    • S-Lay

    • J-Lay• Reel Lay

    Unconventional PipelineInstallation Techniques

    (Examples)

    • Surface Tow

    • Below Surface Tow• Bottom Tow• Bottom Pull• Push Pull Method (for Shorepull)

    • Control Depth Tow Method• Horizontal Directional Drilling

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    4/14

    Conventional Pipeline Installation MethodsS-Lay

    S-LAY INSTALLATION

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    5/14

    Conventional Pipeline Installation MethodsJ-Lay

    J-LAY INSTALLATION

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    6/14

    Conventional Pipeline Installation MethodsReel Lay

    REEL LAY INSTALLATION

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    7/14

    Reel LayEMAS’s Ingleside Spool Base – Texas, USA

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    8/14

    Push-Pull MethodProject Example – Ref. Geocean

    Dredging for Pipeline Installationfrom Shore Approach to Landfall

    Buoyancy Drums to ProvidePositive Buoyancy

    Completion of PUSH-PULLInstallation & Reinstatement

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    9/14

    Surface Tow MethodProject Example – Stripping of Buoyancy Drums

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    10/14

    Surface Tow MethodSchematic: Stripping of Buoyancy Drums and Laying of Pipeline

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    11/14

    Project Requirement:• 8 Pipelines• 2 Fiber Optic Cables

    Bottom Pull Method (Landfall to Landfall)Project Example

    Tanjong Penjuru(Singapore mainland)

    Shell Bukom

    Refinery (BukomIsland)

    Installation Concept:• Build Pipeline & Cable

    Bundle at Bukom• Bottom Pull across

    Shipping Channel• Protect with Rock Berm

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    12/14

    Bottom Pull Method (Landfall to Landfall)Schematic

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    13/14

    Lay Barge

    Laybarge Located inWater Depth 6m - 10m

    Pull Pipeline to Shore1 - 2 km max

    Shore Approach Installation by HDD: Typical Concept

  • 8/16/2019 EMAS Talk PipelinesMay14 Slides

    14/14

    Control Depth Tow Method

    Other Unconventional Pipelay Techniques