Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered I&APs on 28 May 2018, with details of the open house meetings and the release of the draft EIA report. 5.1.2 Notification of Postponement of the Open House Meetings On 4 June 2018, a notification letter was sent to I & AP’s indicating that the scheduled open house meetings had been postponed due to unforeseen delays in the preparation of the draft EIA Report. B5.2 Notification of Lapse On 13 August 2018, a notification letter was sent to all I & AP’s indicating that allocated EIA timeframe had lapsed and ERM had commenced with initiating a new EIA process for the project.

Upload: others

Post on 13-Mar-2020

39 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

Annex B5

EIA Phase Notification

B5.1 Notification Letters

5.1.1 Notification Letter

A notification letter was sent to all registered I&APs on

28 May 2018, with details of the open house meetings

and the release of the draft EIA report.

5.1.2 Notification of Postponement of the Open House

Meetings

On 4 June 2018, a notification letter was sent to I & AP’s

indicating that the scheduled open house meetings had

been postponed due to unforeseen delays in the

preparation of the draft EIA Report.

B5.2 Notification of Lapse

On 13 August 2018, a notification letter was sent to all I

& AP’s indicating that allocated EIA timeframe had

lapsed and ERM had commenced with initiating a new

EIA process for the project.

Page 2: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

Annex B5.1

Notification Letters

Page 3: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

EIA for Exploration Drilling within Offshore Block ER236, KZN,

South Africa: Notification of Public Meetings

Reply all |E

South Africa Project ENI Offshore ExplorationERM

Bcc:

Mon 2018/05/28 6:28 PM

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

Page 1 of 5EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: Notif...

2018/05/29https://outlook.office365.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMk...

Page 4: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

Page 2 of 5EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: Notif...

2018/05/29https://outlook.office365.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMk...

Page 5: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

Page 3 of 5EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: Notif...

2018/05/29https://outlook.office365.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMk...

Page 6: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

28 May 2018

ERM Ref: 0414229

Dear Stakeholder,

RE: Environmental Impact Assessment for Exploration Drilling within Block ER236, off the East Coast

of South Africa

Eni South Africa BV (Eni), and Sasol Africa Limited (Sasol) hold an Exploration Right 12/3/236 (ER 236)

off the East Coast of South Africa. Eni has the operatorship of Block ER 236. Eni and Sasol are

considering the possibility of conducting an exploration drilling programme in Block ER 236 to assess

the commercial viability of the hydrocarbon reservoir for future development. The project requires

Environmental Authorisation (EA) from the National Department of Mineral Resources (DMR) under

the National Environmental Management Act (NEMA) (Act No. 107 of 1998), as amended, through an

Environmental Impact Assessment (EIA) process, which commenced in January 2018.

The Final Scoping Report was approved by PASA on 16 April 2018, and ERM have commenced with

the preparation of the draft Environmental Impact Assessment Report (EIA Report). Stakeholders are

invited to attend one of the below listed open house meetings where the findings of the draft EIA will

communicated. The meeting will follow an open house format and the participants will have the

opportunity to interact with the project team, ask questions and provide comment.

The draft EIA is currently being finalised and registered stakeholders will receive notification when

the report is available for comment. The draft EIA will be released for a 30 day comment period as

per the requirements of NEMA.

Details of the public meetings are as follows:

Day and Date Location Venue Time

Monday 11 June

2018

East London Premier Regent Hotel

22 Esplanade St,

Quigney Beach, East

London, 5201

16:00 – 19:00

Tuesday 12 June

2018

Port Elizabeth Boardwalk Hotel

Beach Rd, Summerstrand,

Port Elizabeth

16:00 – 19:00

Wednesday 13 June

2018

Richards Bay Premier Hotel The

Richards

3 Hibberd Dr, Meer En

See, Richards Bay

16:00 – 19:00

Thursday 14 June

2018

Durban Gooderson Tropicana

Hotel

85 OR Tambo Parade,

South Beach, Durban

16:00 – 19:00

Sent Items

[email protected]; [email protected]; [email protected];

Lindsey Bungartz; Charlene Jefferies; Khosi Dlamini; Reinett Mogotshi; Vicky Stevens;

Ingeborg McNicoll

Page 4 of 5EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: Notif...

2018/05/29https://outlook.office365.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMk...

Page 7: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

Friday 15 June 2018 Port Shepstone Venture Inn

366 Commercial Rd,

Umtentweni, Port

Shepstone

15:00 – 18:00

Please contact ERM should you have any questions:

Email: [email protected]

Tel: 021 681 5400

Website: www.erm.com/eni­exploration­eia

Post: Postnet Suite 90, Private Bag X12,Tokai, 7966

Thank you for your participation in this process.

Your sincerely,

Lindsey Bungartz

Senior Consultant

ERM Southern Africa (Pty) Ltd

2nd Floor | Great Westerford | 240 Main Road | Rondebosch | 7700 | Cape Town | South Africa

T +27 21 681 5400 | F +27 21 686 0736

W www.erm.com

Page 5 of 5EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: Notif...

2018/05/29https://outlook.office365.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMk...

Page 8: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

RE: EIA for Exploration Drilling within Offshore Block ER236, KZN,

South Africa: Postponement of Public Meetings

Reply all |E

ERM South Africa Project ENI Offshore Exploration

Bcc:

Mon 2018/06/04 9:20 PM

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

Reply all |

Delete

Junk |

Page 1 of 5RE: EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: ...

2018/06/05https://outlook.office.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMkADI...

Page 9: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

Reply all |

Delete

Junk |

Page 2 of 5RE: EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: ...

2018/06/05https://outlook.office.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMkADI...

Page 10: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

Reply all |

Delete

Junk |

Page 3 of 5RE: EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: ...

2018/06/05https://outlook.office.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMkADI...

Page 11: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

Dear Stakeholder,

Due to unforeseen delays in the preparation of specialist studies and revisions to the draft

Environmental Impact Assessment (EIA) Report, we have been obliged to postpone the release of the

draft EIA report, as well as the public meetings planned for the week of 11 June 2018. We will notify

all registered stakeholders as soon as we reschedule the public meetings. We will ensure that

stakeholders are given the optimal time allowed for by legislation to comment and participate in the

process.

Day and Date Location Venue

Monday 11

June 2018

East London

Premier Regent

Hotel

22 Esplanade St,

Quigney Beach, East

London, 5201

Tuesday 12

June 2018

Port Elizabeth

Boardwalk Hotel

Beach Rd,

Summerstrand, Port

Elizabeth

Wednesday

13 June 2018

Richards Bay

Premier Hotel The

Richards

3 Hibberd Dr, Meer En

See, Richards Bay

Thursday

14 June 2018

Durban

Gooderson Tropicana

Hotel

85 OR Tambo Parade,

South Beach, Durban

Friday 15 June

2018

Port Shepstone

Venture Inn

366 Commercial Rd,

Umtentweni, Port

Shepstone

We apologise for any inconvenience caused.

Yours sincerely,

Lindsey

Lindsey Bungartz

Senior Consultant

ERM Southern Africa (Pty) Ltd

2nd Floor | Great Westerford | 240 Main Road | Rondebosch | 7700 | Cape Town | South Africa

T +27 21 681 5400 | F +27 21 686 0736 |

W www.erm.com

Sent Items

...

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]; Lindsey Bungartz;

Khosi Dlamini; Charlene Jefferies; Ingeborg McNicoll

Reply all |

Delete

Junk |

Page 4 of 5RE: EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: ...

2018/06/05https://outlook.office.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMkADI...

Page 12: EIA Phase Notification - ERM · 2019-10-24 · Annex B5 EIA Phase Notification B5.1 Notification Letters 5.1.1 Notification Letter A notification letter was sent to all registered

Reply all |

Delete

Junk |

Page 5 of 5RE: EIA for Exploration Drilling within Offshore Block ER236, KZN, South Africa: ...

2018/06/05https://outlook.office.com/owa/?viewmodel=ReadMessageItem&ItemID=AAMkADI...