edgemont - john laurie park · 2015. 12. 8. · edgemont - john laurie park site evaluation primary...
TRANSCRIPT
-
SKATEPARK TYPOLOGIES KEY MAP
SITE EVALUATION
EDGEMONT
EDGEMONT - JOHN LAURIE PARK
Site EvaluationPrimary Comments
Overall Network Location Connections to Trails Sidewalks run adjacent to site and throughout entire community. A pedestrian overpass (over John Laurie Blvd) links the site to Dalhousie Community.
Access to Public Transportation A couple of Bus Stops surround site
Secondary CommentsPark Compatibility Site currently consists of non‐programmed park space that is surrounded by an outdoor rink and storage building, practice soccer pitch, and small playground. Addition of
skatepark would appear to fit well with surrounding rec amenities.
Safety and Maintenace Excellent separation from nearby roadway (Edgemont Drive). Excellent access for routine maintenance.
Limits Off‐Site Impacts to Residential Communities
Nearest residential lies across Edgemont Dr. Site appears to offer no significant impact on immediate residents
Site Visibility / Passive Observation
Site appears to offer excellent visibility from Edgemont Dr and corresponding sidewalks
Complimentary Facilities Greater location includes tennis courts and sports fields in addition to immediately adjacent outdoor rink, practice soccer pitch and playground
Ease of Development Site does not appear to pose any major impediments to anticipated skatepark construction program (need to verify underground utilities/ROW's)
Achievable Skatepark Size Location appears to be suitable for large neighbourhood level skatepark or small‐mid sized community park (need to confirm potential size of development area)
Shelter Some mature trees near site… closest shelter may be Edgemont Club.
Proximity to Key Amenities Key amenities are not found in immediate area (need to confirm closest location ‐ may be Edgemont Club ‐ private)
Parking Availability Existing parking lies within ~25 meters of potential development area. Existing parking area could likely be expanded
Proximity to Convenience Retail / Concession
No retail in immediate vicinity
Lighting possible tie‐in to rink lighting
Phase 1 Development Suitability Excellent site overall. May need to establish some level of key amenities onsite as this would likely be a popular location.
Community Input
Recommended Skatepark Size