Dylan Clarke, Engineer, John Holland delivered this presentation at the 2013 Australian Tunnelling conference. The two day conference is supported by the Australasian Tunnelling Society and brings together tunnelling leaders, engineers and industry experts to share best practice in tunnelling design, construction, safety and maintenance. The 2012 program focussed on updates from Australasia’s current and future projects, plus case studies from leading International projects - sharing best practice and lessons learnt from the forefront of the latest tunnelling projects. For more information about the event, please visit the conference website: http://www.informa.com.au/tunnellingconference

TRANSCRIPT

Page 1: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

November 2013

Sydney Opera House Vehicle Access and Pedestrian Safety Project

Page 2: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

What we will discuss

› The need › The engineered solution › The realisation

› Ramp › Main Dock › Opera Theatre Corridor

Page 3: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Reasons for VAPS Project

Page 4: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Project Organisation

• Client: Sydney Opera House

• Clients Designers: •  Architect - Scott Carver, •  Structures - Arup, •  Services consultants

• Construction: John Holland

Page 5: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Project Details

Page 6: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Project Details

Page 7: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Instrumentation & Monitoring

•  6 x inclinometers •  2 x extensometers •  205 surface and

building monitoring points

•  4 stage trigger levels •  Automated system

Page 8: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Ramp, Mined Tunnel & Pedestrian Emergency Tunnel

Page 9: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

› 50m long ramp and cut & cover section › 14m deep at tunnel

portal › Conventional excavation › Approx 8000 BCM

Ramp, Mined Tunnel & Pedestrian Emergency Tunnel

Page 10: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

› Total 3000 BCM › Bolted section 1600 BCM

•  Lattice girder section 1400BCM

•  22 lattice girder sets

Ramp, Mined Tunnel & Pedestrian Emergency Tunnel

Page 11: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

› Three layers of support installation › Square profile lattice

girder

•  1.44m advances •  Full support in three

advances from face

Ramp, Mined Tunnel & Pedestrian Emergency Tunnel

Page 12: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Ramp, Mined Tunnel & Pedestrian Emergency Tunnel

Page 13: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Main Loading Dock & Truck Turning Bay

Page 14: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Main Loading Dock & Truck Turning Bay

Page 15: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Main Loading Dock & Truck Turning Bay

Page 16: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Main Loading Dock & Truck Turning Bay

Page 17: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Opera corridor, Lift 21, Stair 9 & Cross Cut Tunnel

Page 18: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Opera corridor, Lift 21, Stair 9 & Cross Cut Tunnel

Page 19: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Opera corridor, Lift 21, Stair 9 & Cross Cut Tunnel

Page 20: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

What does it take to deliver a project like this?

› A client with a need › A risk engineered solution › A committed team that values

› Integrity › Innovation › Collaboration › Accountability › Care

Page 21: Dylan Clarke, John Holland: Project Update: Sydney Opera House VAPS

Questions?