dual tech 2012 residential
TRANSCRIPT
-
7/31/2019 Dual Tech 2012 Residential
1/2
g
How it Works for Hot & Cold Lines How it Works for Drain Lines
Leaks? Back Ups?
No more pinhole leaks
or heavy metals leaching
into your water!
*Master Licensee, U.S. Navy Patent #5,707,702
No more scale build up
or root intrusion!
*U.S. Patents #6,691,741 #7,216,674 #7,849,883 #7,849,883
*Canadian Patents #2,462,853 #2,505,939
Additional Patents Pending
1. Corroded pipes
are sand blasted
to prepare for
rehabilitation.
2. Shots of
epoxy are then
moved through-
out the entire
piping system.
3. The end result
is a protective
epoxy barrier
between the
pipes and water.
1. Blocked and
root-intruded pipes
are cleaned with a
cutting tool.
2. An epoxy
impregnated liner is
pulled into placeand infated with
an internal rubber
bladder. The liner
is left to cure.
3. The bladder is
removed, leaving
behind a pipe
within a pipe.
1-800-834-9597 www.nuowtech.com [email protected]
Fix Your Pipes From The Inside!Problem Solved, Guaranteed! Less TIME! Less MESS! Less MONEY!
Nu Flow Potable Water Epoxy #7000 (a) Nu Flow #2000 Pipe Lining
Lic. #882102
Lic. #CFC1427131
Lic. #40306
Lic. #0077809
-
7/31/2019 Dual Tech 2012 Residential
2/2
Nu Flows in-place restoration technology has beneted our customers in a wide variety of ways, which includes
dramatic savings in cost, time, inconvenience and destruction when compared to a traditional pipe replacement.
Residential Property Customers
Location: Marco Island, Florida
Situation:The residents of the 27-story beachfront condo knew thattheir badly corroded inbound potable water main could failat any time. The entire condos water supply was in jeopardy
until the water main was cleaned and lined. Part of the 6steel water main runs underground, making it difcult to access.
Solution:Nu Flow cleaned and lined the water main by usinaccess points, which prevented having to put any hbuilding. Our patented blown-in epoxy created a
coating within the host pipe. Nu Flow provided twater to the building and nished the job within on
Whe re li fe in te ra ct s wit h in fr as t
Gulfview Club Condominium: Potable Water Main Rehabilitation
Location: Escondido, California
Situation:Aged copper potable pipes caused chronic pinhole leaks,slab leaks, mold damage and ooding to timeshares at theluxurious Welk Resort. Management decided to have NuFlow rehabilitate all hot and cold potable lines in 298 units,which are between 20 and 30 years old.
Solution:Nu Flow coordinated with the resortsmanagemenno disruption to residents ortimeshare availability. Twater was kept on-site to reduce inconvenience. Ou
epoxy lining created a new pipe inside the host pipea long-term solution and preventing future corrosion
Wh er e li fe in te ra cts wi th in fr as tr
Welk Resort Timeshares: Entire Potable System Rehabilitation
Location: La Jolla, California
Situation:The customers sanitary system experienced chronic backupsdue to heavy root intrusion in the pipe line. This 4" claysewer pipe line runs 6 to 9 feet underneath hilly terrain fromthe homes yard and through his neighbors yard. Thecustomer wanted a no-dig solution to preserve the yards.
Solution:Nu Flow successfully cleaned and lined this underground drainline without having to dig up any yard. After the blockedsanitary line was cleaned and reinstated, our Pull-in-Place linerwas installed using existing access points. This structural linerforms a new, protective pipe that will prevent future failures.
Whe re li fe in ter ac ts wit h in fr as tr uc tur e.
Hidden Valley Home: Underground Drain Line Rehabilitation
Location: Portland, Oregon
Situation:This historic apartment complexs 80-year-old galvanized
and copper potable pipes experienced pinhole leaks, lowow and would not provide hot water due to heavy corrosion.The HOA saught after an effective long-term solution thatwas also cost-effective, quick and not destructive.
Solution:Nu Flow was chosen by the residents to rehabilitate thefailing potable system because our patented, in-place pipe lining technology is more cost-effective, time-efcient andless invasive than other methods of repair.Our epoxy coatinghas prevented problems with the pipe system since ourwork.
Whe re li fe in te ra ct s wi th in fr as tr uc tu re .
Salerno Apartments: Hot and Cold Potable System Rehabilitation
Location: Coronado Island, California
Situation:Part of the 10 cast iron mainline for Las Flores Tower wasmissing. A traditional, costly re-pipe would have caused
destruction to the lobby, driveway and street. The copper hot
recirculation lines and vertical cast iron storm drains experienced
corrosion and leaks.
Solution:Nu Flow cleaned and lined all three 36-year-old pipe sy stemsby accessing the existing connection points on the roof andinside the parking garage. The mainline and storm drain lineswere lined with our Pull-in-Place structural lining and the
potable system was lined with our blown-in epoxy coating.
Wh er e li fe int er ac ts wi th in fr as tr uc tur e.
.
Las Flores Tower Condominium: Drain and Potable Rehabilitation
Location: Louisville, Kentucky
Situation:Vertical drain stacks were clogged in the 10-story apartmentbuilding and leaking because of grease buildup. The system
consists of 21 stacks with cast iron pipes 100 feet long and3 in diameter.
Solution:Nu Flow was able to retrot 10 oors at a time withouthaving to relocate any residents or cause any destruction
to the building. The drain stacks are now free of corrosion,buildup and pinhole leaks.
Whe re li fe in te ra cts wi th in fr as tr uc tur e.
Christian Care Communities: Vertical Drain Stacks Rehabilitation
Location: Solana Beach, California
Situation:This luxorious waterfront condominium experienced constantslab leaks and pinhole leaks. The copper water pipes, whichrange rom 1/2 to 2 in diameter, were about 35 years old.The residents wanted a long-term solution to st op the leaks
that would not destroy the property.
Solution:Nu Flow cleaned and lined the potable water lines withvirtually no disruption to the residents and without caus ingdestruction to the property, as opposed to the massiveconstruction, disruption and relocation that would havebeen required for a traditional re-pipe.
Wh er e li fe in te ra cts wit h inf ra st ru ctu re .
Solana Beach and Tennis Club: Potable Cold Water Line Rehabilitation
Location: Brooklyn, New York
Situation:3 cast iron drain line that runs under the garbage compactorroom and elevator shaft was corroded and caused backups.The customer needed a long-term solution with an installation
process that would not destroy the property.
Solution:Nu Flow cleaned the cast iron pipe with our scorpion cutter torestore ow, then we retrotted the drain line using our Pull-in-Place structural drain liner using only two access points.Nu Flows trenchless solution saved the customer fromcostly and disruptive repairs and renovation.
Wh er e li fe in te ra cts wit h inf ra st ru ctu re .
Trump Village West Apartment Complex: Drain Line Rehabilitation
Location: Houston, Texas
Situation:This 19-story condominiums potable water main and branches,around 40 years old, experienced common failures, includingleaks and discolored water. These galvanized pipe lines arelocated within the luxurious units walls and foors. The condosHOA did not want a destructive, time-consuming repipe.
Solution:Nu Flow technicians worked within the condominiuschedule and time slots, as well as provided te
water for the residents to minimize disruption. Nu Linideal solution for the customer because it is a non-dsolution, so there was no damage to the pristine b
Whe re li fe in te rac ts wit h inf ra st
.
The Woodway Condominium: Potable System Rehabilitation