www.dredging.org

Dredging Research in China

Clubavond Ceda Nederland

Transport & Offshore Services17 September 2009

Rotterdam

www.dredging.org

Contents

• Introduction• How is dredging organised in China?• The main Stake Holders• The main Dredging Contractors• The main Dredging Laboratories• Dredging Research• Conclusions

2

www.dredging.org

Introduction

• Yearly dredging market in China about 265 Mm3.• 2/3 is executed by the CCCC Group• 1/3 by others (mainly dredgers of the Ministry of

Water Resources)

• Dredging research is started in the 1990th

3

www.dredging.org 4

Dredging Contractors(Ministry of Transport and Communications)

China Communication Construction Company Ltd.(former called CHEC; China Harbour and Construction Company)

Divisions:• Infrastructure Design• Infrastructure Construction• Dredging• Port Machinery and Manufacturing• Other

www.dredging.org

Dredging Contractors (Ministry of Water Recourses)

• Many small Contractors with small equipment• Are different organised and have there own meetings

in China. • 100 dredgers project ??

5

www.dredging.org

Dredging Laboratories

• CCCC– Shanghai Dredging Company (Lab reconstructed)– Tianjin Dredging Company (plans to build one)– Guangzhou Dredging Company (????)

– Hohai University of Changzhou (Ministry of Education; formally Ministry of Water Recourses)

6

www.dredging.org

Laboratory of Shanghai Dredging Co.

7

www.dredging.org

Dredging Flume

8

www.dredging.org

Dredge Carriage

9

www.dredging.org

Irregular wave flume

10

www.dredging.org

Hopper Loading Model Test Facility

11

www.dredging.org

Sub-surface Dredging Test Facility

12

www.dredging.org

Experiments to improve an environmental cutter head

13

www.dredging.org

Hydro-cyclone Model Test Facility

14

www.dredging.org

Jet Water Nozzle Current Profile Measurement Facility

15

射流的沿程发散、衰减过程

www.dredging.org

Study on the improvement of the jet water coherency in

draghead

16

www.dredging.org

Experimental study on cutting of saturated hard compact soil with

draghead teeth

17

www.dredging.org

Draghead Model Test

18

www.dredging.org

Draghead Design

19

www.dredging.org

Study on High Efficiency Medium Pressure Dredge Pump

20

www.dredging.org

CSD Supervisory Control and Data Acquisition System

21

www.dredging.org

The laboratory of Tianjin Dredging Company

• Is under construction; plans for:– A long (1500 m) pipeline and pump facility ϕ 500 mm– A cutting tank– A sedimentation tank

22

www.dredging.org

Laboratory of the Hohai University

23

www.dredging.org

Cutting Tank under Construction

24

www.dredging.org

Cutting Tank ready for use

25

www.dredging.org

Pump and Pipeline Test Stand

26

www.dredging.org

Resistant test of 90º bend

27

www.dredging.org

Cutter head tests

28

www.dredging.org

Draghead Tests

29

www.dredging.org

Filling the tank with sand

30

www.dredging.org

Tank Operation Screen

31

www.dredging.org

The small Glass Model and Triaxial Test Stand

32

www.dredging.org

The Simulator

33

www.dredging.org

The research (Hohai)

• solid transport• pump performance• soil cutting• mathematical modeling• dredging simulation

In general applied research for contractors.Hardly fundamental (basic) research

34

www.dredging.org

Cutter Head Design

• Some articles about cutter head design are published• On Wodcon XVIII and other EADA/ CHIDA

conferences

35

www.dredging.org

Hydraulic transport (1)

36

www.dredging.org

Hydraulic transport (2)

37

www.dredging.org

Hydraulic transport (3)

38