jan de nul dredging dredging ltd. boskalis westminster ... · 1 royal boskalis royal...
TRANSCRIPT
11
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Jan De Nul Jan De Nul DredgingDredging Ltd.Ltd.Boskalis Westminster Middle East Ltd.Boskalis Westminster Middle East Ltd.
Ras Laffan Joint VentureRas Laffan Joint Venture
Ras Laffan Port Expansion ProjectRas Laffan Port Expansion Project
Doha May 6Doha May 6thth and 7and 7thth 20082008on the occasion of the on the occasion of the
Dredging and Sustainability ConferenceDredging and Sustainability Conference
22
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
ContentsContents
IntroductionIntroductionPlan ViewPlan ViewContractContractOperationsOperationsMaterialsMaterialsKey FiguresKey FiguresActual SituationActual SituationPlanning to goPlanning to go
33
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
IntroductionIntroductionLocation Ras LaffanLocation Ras LaffanNorth FieldNorth Field
910 . 10910 . 101212 cu. Ft, orcu. Ft, or 26 . 1026 . 101212 mm³³, or, or 26,000 billion m26,000 billion m³³
RLC End UsersRLC End Users New ProjectsNew Projects
Ras Laffan
70 km.
44
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
IntroductionIntroductionRas Laffan ExpansionRas Laffan Expansion
LNGLNG-- 2005: 26 million T / 2005: 26 million T / annumannum-- 2010: 77 million T / 2010: 77 million T / annumannum-- Towards capacity of Towards capacity of
around 225 million around 225 million tonnes tonnes of products per of products per yearyear
Ras Laffan Ras Laffan MasterplanMasterplan
-- Current developmentCurrent development106 km106 km²² →→
246 km246 km²²
55
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
IntroductionIntroductionNakilatNakilat (Qatar Gas Transport Company) (Qatar Gas Transport Company) 46 LNG tankers and 14 LPG tankers planned before 201046 LNG tankers and 14 LPG tankers planned before 2010total costs US$ 15 billiontotal costs US$ 15 billion-- 25 Q25 Q--Flex LNG tankers: capacity between 210.000Flex LNG tankers: capacity between 210.000--217.000 217.000 m3m3-- 21 Q21 Q--Max LNG tankers: capacity 265.000 m3Max LNG tankers: capacity 265.000 m3
Q- Max LNG tanker at Daewoo Shipyard
77
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
LNG Tank Farm
Existing Port
Main Breakwater10,0 km.
LNG Basin
Liquid Products
Basin
Outer Breakwater800 m.
Dry Dock
Bulk Materials
Offloading Facility
Liquid Products
Tank Farm
Southern Breakwater10,2 km.
Plan ViewPlan View
-13,50 m. CD
-15,00 m. CD
Liquid Products Causeway
6,3 km.
Central Cargo Causeway
6,1 km.Cont. Quay
1,1 km
88
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Epic contractEpic contractClient:Client:Qatar PetroleumQatar Petroleum
Main Contractor:Main Contractor:Jan De Nul Dredging LtdJan De Nul Dredging LtdandandBoskalis Westminster Middle East LtdBoskalis Westminster Middle East LtdRas Laffan Joint VentureRas Laffan Joint Venture
Contract Value:Contract Value:Euro 677.253.666,00 + US$ Euro 677.253.666,00 + US$
1.291.570.750,711.291.570.750,71Total Value: Euro 1.720.081.000,Total Value: Euro 1.720.081.000,--
Award date: Award date: 17 November 200517 November 2005
99
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Contract Contract -- DesignDesignSogreahSogreahGrenoble, FranceGrenoble, FranceDHI DenmarkDHI DenmarkHR Wallingford UKHR Wallingford UKEngineers JVEngineers JV
3D modelFor selected areas physical models are used to measure overtopping
Swell Wave Direction 112.50 N
1010
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Contract Contract -- EnvironmentEnvironmentTurtle MonitoringTurtle MonitoringReallocation Oyster bedsReallocation Oyster bedsWater quality monitoringWater quality monitoringSea grass monitoringSea grass monitoring
1111
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– HSE HSE –– Safety Banners and Sign BoardsSafety Banners and Sign Boards
Dear All,
As you all are aware, new arrivals must follow
a safety induction. On every Wednesday and
Sunday at 13:00 hrs in Room No. 27, there will
be a safety induction for those who are new
and for those who did not yet received an induction
as yet.
1212
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- DredgingDredgingRock dredging by heavyRock dredging by heavyduty cutter suction dredgersduty cutter suction dredgersBarge loading with dredged Barge loading with dredged material by cutter suction material by cutter suction dredgersdredgersDumping by barges of Dumping by barges of dredged material in breakdredged material in break--waters till waters till --3,0 m CD3,0 m CD Cutter Suction Dredger ‘Taurus II”
1
1313
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- TrimmingTrimmingSlopes of dumped Slopes of dumped material in breakwaters material in breakwaters trimmed by backhoes at trimmed by backhoes at designed slope (243 designed slope (243 backhoe weeks)backhoe weeks)Surplus material loaded Surplus material loaded by backhoes and grab by backhoes and grab dredger in small barges dredger in small barges and dumped elsewhereand dumped elsewhere
Grab dredger “Atlantis”
Backhoe “Colbart”
2
1414
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnvOperations Operations -- Protection Protection
BKWBKWSlopes of dumped material Slopes of dumped material in breakwaters protected tillin breakwaters protected till--3,0 m CD by selected 3,0 m CD by selected
quarry run and under layers quarry run and under layers of rockof rockUse of Use of SSDVSSDV’’ss (Side Stone (Side Stone Dumping Vessels)Dumping Vessels)
4
5
3
SSDV “HAM 602” dumping in MBK2
1515
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- BundsBundsConstruction of bunds onConstruction of bunds onboth sides of the both sides of the BKWBKW’’ssfrom general fill or quarryfrom general fill or quarryrun or selected quarry run.run or selected quarry run.Use of local rock Use of local rock transported and placed bytransported and placed bytrucks or dumperstrucks or dumpers
7
8
6
1616
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ReclamationReclamationPumping of sand between Pumping of sand between bunds by bunds by TSHDTSHD’’ss (Trailing(TrailingSuction Hopper Dredgers)Suction Hopper Dredgers)
9
TSHD “Alpha B”
TSHD “Cornelis Zanen”
1717
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- Reclamation BreakwatersReclamation Breakwaters
1818
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- Reclamation Tank FarmsReclamation Tank Farms
1919
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ProfilingProfilingProfiling of selected quarryProfiling of selected quarryrun by long boom hydraulic run by long boom hydraulic excavatorsexcavatorsPlacing of under layers and Placing of under layers and armourarmour (rock) by cable (rock) by cable cranescranes
11
12
10
Placing geotextile
2020
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ProfilingProfilingUnder layer and Under layer and armourarmour of rock of rock (SBK) (SBK)
2222
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ArmourArmourPlacing of Placing of AntifersAntifers andandAccropodsAccropodsCable cranes or hydraulic Cable cranes or hydraulic cranes are usedcranes are used
13
2323
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ArmourArmourOuter side of main Outer side of main breakwaterbreakwatercovered with covered with antifersantifers
2424
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ArmourArmourInner side of outer part main Inner side of outer part main breakwater covered with breakwater covered with accropodsaccropodsPlacing last Placing last antifersantifers on outer part of on outer part of main breakwatermain breakwater
2525
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- ArmourArmour
Trimming under layer before placing accropods
2626
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnvOperations Operations –– InIn--situ situ
concreteconcreteConcrete road (slab) and Concrete road (slab) and crown wall on Main and Lee crown wall on Main and Lee breakwaterbreakwater
14
Batching Plants
2727
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnvOperations Operations –– InIn--situ situ
concreteconcrete
2828
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnvOperations Operations –– InIn--situ situ
concreteconcrete
2929
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralDemolition existing StructuresDemolition existing Structures
Removal roundhead existing BKWRemoval roundhead existing BKWRemoval Removal antifersantifers 7.175 7.175 pcspcs of 3,0 m3 of of 3,0 m3 of which 3.724 are rewhich 3.724 are re--used and 788 used and 788 pcspcsof 6,0 m3 of 6,0 m3
3030
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralDemolition existing StructuresDemolition existing StructuresRemoval Removal antifersantifers 1,5 m3 existing Lee BKW1,5 m3 existing Lee BKW58.000 58.000 pcspcs to be removed, 52.000 to be removed, 52.000 pcspcsare reare re--used in Dryused in Dry--Dock and CCCWDock and CCCW
3131
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralStockpiled Stockpiled antifersantifers for refor re--use in use in CCCWCCCW
3232
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralDryDry--Dock (V.O.)Dock (V.O.)6,7 million m36,7 million m3’’s of sand, 4 million m3 dredged materials of sand, 4 million m3 dredged material
19.248 re19.248 re--used used antifersantifers 1,5 m31,5 m3, , 4.641 re4.641 re--used used antifersantifers 3,0 m33,0 m31,1 million m3 of rock1,1 million m3 of rockValue: US$ 175 millionValue: US$ 175 million
76
51
3b3a
2
48
305 m.
465 m.
Queen of the Netherlands
Length: 2.650 m.
3333
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralCompaction of all Reclamation Compaction of all Reclamation 3 million m23 million m2
Compaction on LTFR2 with 5 RIC’s
LTFR2
Menard in Dry-Dock
3434
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralLand water drain and culvertLand water drain and culvert800 m.800 m.
3535
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- SeveralSeveralFencingFencing10,3 km.10,3 km.
3636
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations -- SeveralSeveralNavigational Aids and Navigational Aids and Environmental BuoysEnvironmental Buoys
3737
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Operations Operations –– SeveralSeveralSurvey WorksSurvey Works10 million m2 dredged area10 million m2 dredged area20,258 km20,258 km’’. of breakwaters. of breakwaters12,582 km12,582 km’’. of causeways. of causeways
1,1 km1,1 km’’. of container quay . of container quay areaarea
6 Survey Vessels
3838
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Dredged RockDredged Rock24 million m324 million m3’’s dredged and placed in core and s dredged and placed in core and reclamation reclamation BKWBKW’’ss and Dryand Dry--DockDock
“Taurus II”
3939
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Offshore SandOffshore Sand22 million m322 million m3’’ss
2 borrow areas at 12 nauticalmiles from the shore
Ras Laffan
“Prins der Nederlanden”
“Queen of the Netherlands”
4040
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Local RockLocal Rock30 million tons 30 million tons
4141
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Local RockLocal Rock
4242
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Local RockLocal RockLocal trailers and trucks: average 1.500 trips/dayAround 350 trailers/trucks
4343
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Overseas Rock Overseas Rock Transport on Pontoons towed by TugboatTransport on Pontoons towed by Tugboat
4444
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Overseas RockOverseas Rock8 million tons 8 million tons
United Quarry in Fujairah
Musandam - Oman
Tom Quarry of Archirodon inRas Al-Khaimah
4545
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- Overseas RockOverseas RockUnited Quarries
Musandam
TOM Quarry
4646
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials –– Unloading on SiteUnloading on SiteAccess Channel and LoadAccess Channel and Load--out pontoonsout pontoons4 custom built off/on4 custom built off/on--loading pontoonsloading pontoons
with ramps and spudswith ramps and spuds
4747
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials –– Unloading on SiteUnloading on SiteAccess Channel and LoadAccess Channel and Load--out pontoonsout pontoons4 custom built off/on4 custom built off/on--loading pontoonsloading pontoons
with ramps and spudswith ramps and spuds
4848
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- PrePre--cast concretecast concreteAjman BeAjman Be--Six/Six/InterbetonInterbeton
Total 770.744 m3 of concrete
4949
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- PrePre--cast concretecast concrete
5050
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- PrePre--cast concretecast concrete
5151
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- PrePre--cast concretecast concrete
5252
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials -- PrePre--cast concretecast concrete
5353
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Materials Materials –– InIn--situ concretesitu concreteMobil Concrete QatarMobil Concrete Qatar
Total 302.303 m3 of concrete
5454
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Key Figures Key Figures –– Site Office Site Office
Total area: 3500 m², 150 office rooms1 wing of 940 m² dedicated to QP(32 offices + conference room, kitchen, prayer room, executive offices,…)
Parking for more than 100 cars
5555
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Key Figures Key Figures –– Personnel Personnel
224358499649500
22301114
3344
Employee overview of the project: (as of 23 March 2008)Employees (Ras Laffan):JV Staff (Management, Staff Office, Office Support Staff)JV Land based Crews (Operators, Labours etc…)
Overseas Employees (UAE)Overseas Rocks and Concrete Block Construction (Management, Office staff, Office support staff,
Totals (inclusive crew, staff and labours on leave)
JV Sea based Crews (Crews of vessels, operators etc…)MBK (Management, Office staff, Office support staff, Operators, Labours etc…)SBK (Management, Office staff, Office support staff, Operators, Labours etc…)
Subtotal
5656
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Key Figures Key Figures –– Documents (end of March 2008) Documents (end of March 2008) Qatar PetroleumQatar PetroleumRequests for Inspection (Requests for Inspection (RFIRFI’’ss):): >10.000 >10.000 Reports, Reports, M.o.MM.o.M, Notes: , Notes:
> 2.500> 2.500Design/Construction Drawings:Design/Construction Drawings: > 500> 500 Survey Drawings to QP:Survey Drawings to QP: > 4.700> 4.700Method Statements/Procedures:Method Statements/Procedures: > 300> 300 Correspondence to QP:Correspondence to QP: > 2.700> 2.700Internal JVInternal JVProgress Charts Survey:Progress Charts Survey: > 8.400> 8.400 Weekly Progress Charts:Weekly Progress Charts: > 2.400> 2.400Visa, Resident Permits:Visa, Resident Permits: > 3.500 > 3.500 Hotel reservations:Hotel reservations:
> 400> 400______________________________________________________________________________________________________________________________
__________________Gate Passes RLC:Gate Passes RLC: >37.000 (60%JV, 20% each MBK and SBK)>37.000 (60%JV, 20% each MBK and SBK)Tickets:Tickets: > 2.500 >QAR 5 million> 2.500 >QAR 5 millionIT: Server storage usedIT: Server storage used > 1.900 GB (survey 875, P&E 230)> 1.900 GB (survey 875, P&E 230)
5757
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Actual Situation Dredging (28.03.2008) Actual Situation Dredging (28.03.2008)
5858
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnvActual Situation Breakwater Construction Actual Situation Breakwater Construction
(28.03.2008)(28.03.2008)
5959
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Actual Situation, Satellite Photo of 24.03.2008Actual Situation, Satellite Photo of 24.03.2008
6060
Royal BoskalisRoyal Boskalis WestminsterWestminster nvnv
Actual Situation to go as from 29.03.2008:Actual Situation to go as from 29.03.2008:Activity:Activity: TotalsTotals To goTo go______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
____________________________
Dredging (Dredging (CSDCSD’’ss):): 23,8 million m323,8 million m3 0,545 million m30,545 million m3Trimming (backhoe weeks):Trimming (backhoe weeks): 243 weeks243 weeks
58 weeks58 weeksCleanClean--up dredged areas (up dredged areas (TSHDTSHD’’ss):): 2,3 million m32,3 million m3 1,3 million m31,3 million m3Reclamation (offshore sandReclamation (offshore sand--TSHDTSHD’’ss):): 28,6 million m3*28,6 million m3* 6,1 6,1 million m3*million m3*Local Rock:Local Rock: 30 million tons30 million tons 6,5 million tons6,5 million tonsNumber of trips trucks/trailers (aver. 39 t):Number of trips trucks/trailers (aver. 39 t): 774.709 trips774.709 trips 167.980 167.980 tripstripsOverseas Rock:Overseas Rock: 7,856 million tons7,856 million tons 1,066 million tons 1,066 million tons Number of trips tugboat/barge (8.000 t):Number of trips tugboat/barge (8.000 t): 982 trips982 trips 133 trips133 tripsPrePre--cast concrete (casting/transport):cast concrete (casting/transport): 249.746 pieces249.746 pieces 67.143 67.143 piecespieces
1.926.860 tons1.926.860 tons 502.534 tons502.534 tonsNumber of trips tugboat/barge (6.800 t):Number of trips tugboat/barge (6.800 t): 283 trips283 trips 74 trips74 tripsPlacing of prePlacing of pre--cast units:cast units: 249.746 pieces249.746 pieces 242.767 pieces242.767 piecesInIn--situ concrete:situ concrete: 302.303 m3302.303 m3 220.897 220.897 m3m3Number of trips concrete mixer (10 m3): Number of trips concrete mixer (10 m3): 30.230 trips30.230 trips 22.090 trips22.090 tripsFencing:Fencing: 10,3 km.10,3 km. 5,1 km.5,1 km.
* Measured in TSHD * Measured in TSHD -- 25% = net volumes 21,37 million m3 total and 4,6 million m3 t25% = net volumes 21,37 million m3 total and 4,6 million m3 to goo go
ContractualContractual PlannedPlannedCompletion of Construction:Completion of Construction: 30.10.200830.10.2008
17.02.200917.02.2009