District Irrigation Plan, West Garo Hills District 1 | Page DISTRICT IRRIGATION PLAN WEST GARO HILLS, MEGHALAYA

Upload: others

Post on 04-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

1 | P a g e

DISTRICT IRRIGATION PLAN

WEST GARO HILLS, MEGHALAYA

Page 2: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

2 | P a g e

District Irrigation Plan, 2016-2020

West Garo Hills, Meghalaya

NABARD CONSULTANCY SERVICES PVT. LTD.

Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125

Reg. Office : Plot No. C24, G Taluka, 3rd Floor, NABARD Building

Bandra Kurla Complex, Bandra East, Mumbai-400051

Page 3: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

3 | P a g e

FOREWORD

Pradhan Mantri Krishi Sinchai Yojana (PMKSY) is a national mission to improve farm

productivity and ensure better utilization of the resources in the country. The primary

objectives of PMKSY are to attract investment in irrigation system at field level, develop and

expand cultivable land in the country enhance rain water use in order to minimize wastage of

water, enhance crop per drop by implementing water – saving technologies and precision

irrigation. The plan additionally calls for bringing ministries, offices, organizations, research

and financial institutions occupied with creation and recycling of water under one platform so

that an exhaustive and holistic outlook of the whole water cycle is considered. The goal is to

open the doors for optimal water budgeting in all the sectors.

In order to achieve the objectives, the District Irrigation Plan of West Garo Hills district,

Meghalaya is prepared by District level Implementation Committee consisting of various

Departments and NABCONS after thoroughly studying the scenario of the district. I wish to

thank all the members of DLIC, NABCONS and all other officers/ officials of all the line

departments for preparation of District Irrigation Plan and wish them good luck for its better

implementation.

Place: Tura, West Garo Hills Deputy Commissioner,

Date: West Garo Hills

Page 4: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

4 | P a g e

ACKNOWLEDGEMENT

It is my sincere privilege to express my deep sense of gratitude and heartfelt thanks to the

Ministry of Agriculture and Farmers’ Welfare and other concerned departments of

Government of India for providing an opportunity to prepare an exhaustive irrigation plan

covering all the components of PMKSY for the benefit of major farming community in the

district.

I am also highly thankful to the Deputy Commissioner, West Garo Hills who is also the

Chairman of this District Level Implementation Committee (DLIC) for his extensive support

and guidance towards the preparation of this District Irrigation Plan and making it possible to

present the same in an implementable manner. I also thank all the members of the DLIC for

providing the desired data/ programme to be taken up in the Plan.

District Agriculture Officer

West Garo Hills

Page 5: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

5 | P a g e

Table of Contents List of Tables ........................................................................................................................................... 7

List of Figures .......................................................................................................................................... 8

List of Maps ............................................................................................................................................. 8

List of Abbrevitions ................................................................................................................................. 9

Executive Summary ............................................................................................................................... 10

Introduction .......................................................................................................................................... 14

Background ....................................................................................................................................... 14

Vision ................................................................................................................................................. 20

Objective ........................................................................................................................................... 20

Strategy/approach ............................................................................................................................ 21

Programme Components .................................................................................................................. 21

Rationale/ Justification ..................................................................................................................... 23

Methodology ..................................................................................................................................... 24

Chapter 1 : General Information of the District .................................................................................... 25

1.1 District Profile ............................................................................................................................. 25

1.2 District Demography ................................................................................................................... 26

1.3 Biomass and Livestock ................................................................................................................ 27

1.4 Agro-Ecology, Climate, Hydrology and Topography ................................................................... 28

1.5 Soil Profile ................................................................................................................................... 29

1.6 Land Use pattern ......................................................................................................................... 30

Chapter 2 : District Water Profile .......................................................................................................... 31

2.1 Area wise, Crop wise, irrigation Status ....................................................................................... 31

2.2 Production and Productivity of Major crops ............................................................................... 31

2.3 Irrigation based classification ..................................................................................................... 32

Chapter 3 : Water Availability in West Garo Hills ................................................................................. 34

3.1 Status of Water Availability......................................................................................................... 34

3.2 Status of Ground Water Availability ........................................................................................... 35

3.3 Status of Command Area ............................................................................................................ 35

3.4 Existing type of Irrigation ............................................................................................................ 36

Chapter 4 : Water Requirement/Demand ............................................................................................ 37

4.1 Domestic Water Demand ............................................................................................................ 37

4.2 Crop water demand .................................................................................................................... 38

Page 6: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

6 | P a g e

4.3 Livestock water demand ............................................................................................................. 39

4.4 Industrial water demand ............................................................................................................. 40

4.5 Water demand for Power Generation ........................................................................................ 41

4.6 Total water demand of the district for various sectors .............................................................. 41

4.7 Water Budget .............................................................................................................................. 42

Chapter 5 : Strategic Action Plan for Irrigation in District under PMKSY .............................................. 43

5.1 Department wise, year wise plan ............................................................................................... 43

5.2 Component wise, year wise plan ................................................................................................ 44

5.3 Block wise, year wise plan .......................................................................................................... 45

5.4 Suggestions ................................................................................................................................. 45

5.5 Period of Implementation ........................................................................................................... 46

5.6 Monitoring and Evaluation ......................................................................................................... 46

5.7 Expected Output and Outcome .................................................................................................. 47

5.8 Conclusion ................................................................................................................................... 47

Annexure I : Strategic Action Plan by Water Resources Department ................................................. 49

Annexure II : Strategic Action Plan by Agriculture Department ......................................................... 67

Annexure III : Strategic Action Plan by Horticulture Department ..................................................... 113

Annexure IV : Strategic Action Plan by Soil Conservation Department .............................................. 140

Annexure V : Maps .............................................................................................................................. 150

Page 7: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

7 | P a g e

List of Tables Table 1-1: District Profile ...................................................................................................................... 25

Table 1-2: Demography of West Garo Hills........................................................................................... 27

Table 1-3: Population of Small and Large Animals in West Garo Hills .................................................. 27

Table 1-4: Agro-ecology, Topography and Climate of West Garo Hills district .................................... 29

Table 1-5: Soil Types of West Garo Hills district ................................................................................... 30

Table 1-6: Land use pattern in West Garo Hills district ........................................................................ 30

Table 2-1: Area wise, Crop wise, irrigation Status of West Garo Hills .................................................. 31

Table 2-2: crop-wise production and productivity of different types of crops .................................... 31

Table 2-3: Block-wise irrigation based classification ............................................................................ 33

Table 3-1: Status of Water availability in West Garo Hills district (in MCM) ........................................ 34

Table 3-2: Status of Ground Water Availability (in MCM) in West Garo Hills district .......................... 35

Table 3-3: Status of command area (in Ha.) ......................................................................................... 36

Table 3-4: Existing types of Irrigation in West Garo Hills district.......................................................... 36

Table 4-1: Domestic water demand (MCM) ......................................................................................... 37

Table 4-2: Crop water requirement (MCM) .......................................................................................... 39

Table 4-3: Livestock water demand (MCM) .......................................................................................... 40

Table 4-4: Industrial Water Requirement (in MCM) in West Garo Hills district ................................... 41

Table 4-5: Water Demand for Power generation (in MCM) ................................................................. 41

Table 4-6: Present Water Demand of the district for various sectors .................................................. 42

Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020) ..................... 42

Table 4-8: Water Budget (Volume in MCM) ......................................................................................... 42

Table 5-1: Department-wise year-wise proposal under PMKSY ........................................................... 43

Table 5-2: Component wise, year wise plan ......................................................................................... 44

Table 5-3: Block wise, year wise plan ................................................................................................... 45

Table 5-4: Block wise area to be brought under irrigation in DIP of West Garo Hills district .............. 47

Page 8: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

8 | P a g e

List of Figures Figure 1-1: Number of persons in West Garo Hills district ................................................................... 27

Figure 1-2: Number of livestock in West Garo Hills district .................................................................. 28

Figure 1-3: Gross Cropped Area, Net Sown Area and Cropping Intensity in West Garo Hills district .. 30

Figure 4-1: Domestic Water Demand (in MCM) in West Garo Hills district ......................................... 38

Figure 4-2: Crop Water Potential (in MCM) in West Garo Hills district ................................................ 39

Figure 4-3: Livestock Water Demand (in MCM) in West Garo Hills district .......................................... 40

Figure 5-1: Year wise plan ..................................................................................................................... 43

Figure 5-2: Component wise plan ......................................................................................................... 44

Figure 5-3: Block wise plan ................................................................................................................... 45

List of Maps Map 1: Location of West Garo Hills district in Meghalaya.................................................................... 25

Map 2: District Map ............................................................................................................................ 150

Map 3: Selsella block ........................................................................................................................... 151

Map 4: Dadenggiri block ..................................................................................................................... 152

Map 5: Tikrikilla block ......................................................................................................................... 153

Map 6: Rongram block ........................................................................................................................ 154

Map 7: Gambegre block ...................................................................................................................... 155

Map 8: Dalu block ............................................................................................................................... 156

Page 9: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

9 | P a g e

List of Abbrevitions

NDC National Development Council

GoI Government of India

C-DAP Comprehensive District Agriculture Plan

ICT Information and Communications Technology

BCM Billion Cubic Metres

GDP Gross Domestic Product

AIBP Accelerated Irrigation Benefits Programme

CADWM Command Area Development and Water Management

MI Micro Irrigation

SWMA Supplementary Water Management Activities

NITI Aayog National Institution for Transforming India Aayog

NRM Natural resource Management

IWMP Integrated Watershed Management Programme

PRI Panchayati Raj Institutions

DRDA District Rural Development Agencies

NRLM National Rural Livelihoods Mission

C.D. Blocks Community development block

BPL Below Poverty Line

SC/ST Scheduled Caste/ Scheduled Tribe

Nos. Number

ATMA Agriculture Technology Management Agency MSL

TGA Total Geographical Area

GCA Gross Cropped Area

GIA Gross Irrigated Area

NSA Net Sown Area

MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act

CI Cropping Intensity

Qtl/yr Quintal per year

GIA Gross Irrigated Area

MCM Million Cubic Metres

Bgl Below ground Level

CCA Culturable Command Area

LPD Litre Per Day

CAD Command Area Development

DIP District Irrigation Plan

SIP State Irrigation Plan

DLIC District Level Implementation Committee

STP Sewage Treatment Plant

WRD Water Resource Department

RWD Rural Work Department

DRDA Department of Rural Development Agency

ATMA Agricultural Technology and Management Agency

Page 10: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

10 | P a g e

Executive Summary

In an agrarian economy like India, agriculture utilizes the major share of country’s

exploitable water resources. Though the sector utilizes the maximum share of exploitable

water resources, availability of the same at different locations to different extent makes it

vital to adopt effective utilization of water through storage, channelizing and judicial use. At

some places like Punjab and Haryana, the environmental and socio-economic rationale for

this capture by the sector is now being questioned. Accordingly, it is needed to challenge and

change the fundamentals of the prevailing view of water resources exploitation. A new and

more suitable approach to water resources allocation is necessary if the population is to be

adequately fed, without further degradation and destruction of the critical ecosystem services.

Water productivity needs to be enhanced considerably, and economic cost-benefit analysis

and pricing regimes can play a significant role in such a process. However, these economic

measures will not be sufficient on their own. They will need to be buttressed by technological

innovation and institutional changes in order to encourage a more equitable distribution of

resources and to mitigate potential international conflicts across 'shared' water basins.

Water has unique characteristics that determine both its allocation and use as a resource by

agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a

situation of growing water scarcity and rising demands for non-agricultural (household and

industrial) use of water, reassessment of sectoral allocations of water are inevitable. In

developing countries, irrigated agriculture plays a vital role in contributing towards domestic

food security and poverty alleviation. Therefore, achievement of these objectives is

dependent on adequate allocations of water to agriculture. Justification of such allocations

requires that irrigated agriculture be a cost-effective means of achieving stated political or

social objectives, such as food security or poverty alleviation, and that all externalities be

taken into account in the pricing mechanism. Improved allocation of irrigation water is

required within the agriculture sectors in order to achieve greater efficiency in the use of

irrigation water and existing irrigation infrastructure. Reallocation is also required in order to

reduce waterlogging and salinization of irrigated land, to decrease the negative environmental

impacts and other externalities of irrigation (caused by over extraction of groundwater and

depletion and pollution of surface water).

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency and

Page 11: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

11 | P a g e

productivity of current water use to bring more prosperity to the rural areas. Priorities of

Government of India were reflected in the Hon’ble President’s address to the joint Session of

the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.

Government is committed to giving high priority to water security. It will complete the long

pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Yojana’ with the motto of ‘Har Khet Ko Pani.’ There is a need for seriously considering all

options including linking of rivers, where feasible; for ensuring optimal use of our water

resources to prevent the recurrence of floods and drought. By harnessing rain water through

‘Jal Sanchay’ and ‘Jal Sinchan,’ we will nurture water conservation and ground water

recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop.”

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five

years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of

Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of

Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,

CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together

under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme

like Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya

Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural

Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund

(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of

Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),

Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in

an area development mode only by adopting a decentralized state level planning and

projectised execution structure that will allow the state to draw up their own irrigation

development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be

supervised and coordinated utilizing the existing mechanism and structure available under

Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture department acting as

the State Nodal Agency for implementation of PMKSY. However, the implementing

departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per

drop more crop) and PMKSY (watershed development) will be decided by the respective

program ministry/department.

The five chapters along with introduction chapter, explains the profile of district, its water

requirement for agriculture and allied sector, water availability, assessment of water

Page 12: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

12 | P a g e

requirement for various sectors and strategic action plan for augmentation and effective

management of available water resources.

District Demography:

Total population of the district is 4,96,586 out of which 2,49,952 is male population while

2,46,634 is female population. Selsella is the most populated C. & R.D. Block followed by

Rongram whereas Gambegre has the lowest population among the C. & R.D. Blocksof the

District. In terms of sex-ratio, Dadenggiri C. & R.D. Block has the highest (996) figure

whereas Gambegre and Zikzak C. & R.D. Blockshave the lowest figure in the district. In the

West Garo Hills District, SelsellaC. & R.D. Block and Rongram C. & R.D. Block have the

highest number of Scheduled Caste and Scheduled Tribe population respectively while

Dadenggiri and Gambegre C. & R.D. Block has the lowest number of Scheduled Caste and

Scheduled Tribe population respectively.

Agriculture in West Garo Hills:

The district has a forest area of 1390 sq. km., i.e. about 45% of the total geographical area.

The net area sown is 47400 ha. and the total cropped area is 65181 ha. Fallow land covers

about 12%, net area sown is about 26%, while the total cropped area is about 33%. Principal

crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture products

include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger, garlic etc.

are also grown.

Demand for water and the gap:

The water budget of the district for the base year 2015-16 and 2020-21 as per water

availability and demand. The present water availability/demand and also for 2020 are worked

out as explained above and the water gap is found out. The water budget clearly shows the

water gap of -2200.68 MCM in present and of -2193.95 MCM in future between the water

availability and requirement. The negative gap indicates that there is sufficient water

resources for irrigation, domestic and the industrial uses without creating any deficit in our

water potential.

PMKSY Financial Proposal:

Total plan of West Garo Hills district for four years works out to be Rs. 103068.92 lakh.

Maximum share of Rs. 69548.51 lakh is for Water Resources Department followed by Soil &

Page 13: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

13 | P a g e

Water Conservation Department with Rs. 25278.62 lakh. The total plan of four years is divided in

to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.

Expected Output & Outcome:

Total of 52944.64 hectares area will be brought under irrigation. Highest area i.e. 17159.49

hectares will be brought under irrigation in Selsella block while the lowest area i.e. 3922.19

hectares will be brought under irrigation in Gambegre block.

Blocks Total Command Area/ Irrigation Potential (Ha.) Total Estimated Cost (in Rs.

Lakhs)

Dadenggiri 4091.60 5576.73

Dalu 8196.76 10232.51

Gambegre 3922.19 8012.51

Rongram 8349.66 21200.97

Selsella 17159.49 26977.74

Tikrikilla 11224.94 31068.46

Grand Total 52944.64 103068.92

Page 14: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

14 | P a g e

Introduction

Background

Preparation of decentralized area specific district planning process visualized in various plans

took concrete shape through the years and initiatives like specific guidelines on

methodologies and processes for preparation of district plans; framework for preparation of

perspective plan, medium term and annual plans by then planning commission in 1969 and

the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at

district and sub district level; local self-government in urban areas; constitution of district

planning committee to consolidate the plans prepared at Panchayats and municipalities and

prepare a draft development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by planning

commission on preparation of district level plans and making it an integral part of the process

of preparation of the states 11th five year plan. The Planning commission issued guidelines in

August 2006 for preparation of the district plans. The guidelines define the District Planning

as ‘the process of preparing an integrated plan for the local government sector in a district

taking into account the resources (natural, human and financial) available and covering the

sectoral activities and schemes assigned to the district level and below and those

implemented through local governments in a state. The document that embodies this

statement of resources and their allocation for various purposes is known as the District

Plan”.

Government of India through a resolution in National Development Council on 29th May

2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow

growth of agriculture and allied sectors by incentivizing states to draw up plans for their

agriculture sectors more comprehensively. The NDC resolution states "GoI will introduce a

new Additional Central Assistance Scheme to incentivize states to draw up plans for their

agriculture sector more comprehensively, taking agro-climatic conditions, natural resource

issues and technology into account, and integrating livestock, poultry and fisheries, etc. This

will involve a new scheme for Additional Central Assistance (ACA) to State Plans,

administered by the Union Ministry of Agriculture over and above its existing Centrally

Sponsored Schemes, to supplement the State-specific strategies including special schemes for

beneficiaries of land reforms. The newly created National Rainfed Area Authority will, on

Page 15: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

15 | P a g e

request, assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a Comprehensive District Agriculture

Plans (C-DAP) that will fully utilize available resources and will include allied agriculture

sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture

plans to help the states prepare C-DAP. As per these guidelines, the objective of district

planning is ‘to design an integrated and participatory action plan for the development of local

area in general and agriculture and allied sectors in particular’. The objectives of C-DAP are:

To prepare a C-DAP through participatory process involving various organisations

and stakeholders.

To enable optimum utilisation of scarce natural, physical & financial resources.

To assess and plan for the infrastructure required to support the agriculture

development.

To establish linkages with the required institutional support services, like credit,

technology transfer, ICT, research etc.

To evolve an action plan for achieving sustainable agricultural growth with food

security and cropping system that will improve farmers’ income.

The guidelines required the state/ district authorities to (i) ensure that the agricultural plans

are prepared for the district and then integrated into the agricultural plans of the State based

on the agro-climatic conditions, availability of technology, trained manpower and natural

resources; (ii) local needs/ crops/ feed and fodder/ animal husbandry/ dairying/ fisheries/

priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock

and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was the

Government of India guidelines issued in 2015 in the form of a template for the preparation

of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri

Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP

mandatory for the states to receive funds from the program. The present report is a product of

these long drawn efforts of Government of India to strengthen the decentralized planning

process in the country focusing on the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance and

promotion of developmental activities. Considering its vital importance and ever increasing

demand for water, in the face of population growth, urbanization & industrialization and

Page 16: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

16 | P a g e

considerations of climatic change, making water, an increasingly a scarce resource, available

to multiple uses, planning and management of this vital resources, utilization of water

economically, optimally and equitably assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of Water

Resources suggests an availability of 1123 billion cubic meters (BCM) against a current

estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources

estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water

availability in the immediate future seems to be adequate; with the near constant supply of

water resources in the face of increasing demand on account of population growth,

urbanization and industrialization will strain the water supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to

1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The

projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters

in 2050 suggesting shortage of water in the medium term1. Further, the all India water

balance estimates does not reflect the variations in water balance across time and space-

certain areas having a positive water balance and the others facing acute shortage. The

problem is further accentuated by water quality related issues.

With the abundant surface and ground water supply in the first five decades since

independence, more than 80 percent of the total available water resources were allocated for

irrigation purposes and the rest meeting the domestic and industrial demands. In a recent

study2 on the demand of water for agriculture, suggest that domestic demand (34 BCM in

2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM in 2000, 92

BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance water available

after meeting the demand of water for agriculture (605 BCM in 2000, 675 BCM in 2025 and

637 BCM in 2050). This change is partly because of the changing sectoral contributions of

India’s GDP and also partly because of dynamics of irrigation development in the country

where the initial expansion in area under irrigation is propelled by the availability of

abundant water resources and availability of good quality land. This is no longer the case in

many of the states where the availability of land and water are serious constraints for further

1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, GoI, New Delhi 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-

2050:Business-as-usual scenario and deviations. Research Report 123, International Water

Management Institute, Colombo.

Page 17: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

17 | P a g e

expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012

out of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is

Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential

Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of

the net sown area in the country dependent on rainfall which makes farming a high risk and

less productive.

The competing demands for water resources and the emerging issues and concerns were to be

addressed through certain basic principles and commonality in approaches in dealing with

planning, development and management of water resources3 under an Integrated Water

Resource Management framework. The main objectives of water resource management as

delineated in National Water Policy 2012 are:

a) Planning, development and management of water resources need to be governed by

common integrated perspective considering local, regional, State and national context,

having an environmentally sound basis, keeping in view the human, social and

economic needs.

b) Principle of equity and social justice must inform use and allocation of water.

c) Good governance through transparent informed decision making is crucial to the

objectives of equity, social justice and sustainability. Meaningful intensive

participation, transparency and accountability should guide decision making and

regulation of water resources.

d) Water needs to be managed as a common pool community resource held, by the state,

under public trust doctrine to achieve food security, support livelihood, and ensure

equitable and sustainable development for all.

e) Water is essential for sustenance of eco-system, and therefore, minimum ecological

needs should be given due consideration.

f) Safe Water for drinking and sanitation should be considered as pre-emptive needs,

followed by high priority allocation for other basic domestic needs (including needs

of animals), achieving food security, supporting sustenance agriculture and minimum

eco-system needs. Available water, after meeting the above needs, should be allocated

in a manner to promote its conservation and efficient use.

3Ministry of Water Resources, National Water Policy, 2012, GoI, New Delhi.

Page 18: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

18 | P a g e

g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,

river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the

basic hydrological unit is the river basin, which should be considered as the basic

hydrological unit for planning.

h) Given the limits on enhancing the availability of utilizable water resources and

increased variability in supplies due to climate change, meeting the future needs will

depend more on demand management, and hence, this needs to be given priority,

especially through (a) evolving an agricultural system which economizes on water use

and maximizes value from water, and (b) bringing in maximum efficiency in use of

water and avoiding wastages.

i) Water quality and quantity are interlinked and need to be managed in an integrated

manner, consistent with broader environmental management approaches inter-alia

including the use of economic incentives and penalties to reduce pollution and

wastage.

j) The impact of climate change on water resources availability must be factored into

water management related decisions. Water using activities need to be regulated

keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency and

productivity of current water use to bring more prosperity to the rural areas. Priorities of

Government of India were reflected in the Hon’ble President’s address to the joint Session of

the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.

Government is committed to giving high priority to water security. It will complete the long

pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all

options including linking of rivers, where feasible; for ensuring optimal use of our water

resources to prevent the recurrence of floods and drought. By harnessing rain water

through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground

water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five

years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of

Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of

Page 19: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

19 | P a g e

Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,

CADWM, MI, SWMA, Watershed& Convergence with MGNREGA were brought together

under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme

likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya

Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural

Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund

(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of

Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),

Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in

an area development mode only by adopting a decentralized state level planning and

projectised execution structure that will allow the state to draw up their own irrigation

development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be

implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture

department acting as the State Nodal Agency. However, the implementing departments for

the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop)

and PMKSY (watershed development) will be decided by the respective program

ministry/department.

The funds under this program would be provided to the states as per the pattern of assistance

of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog.

During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An

outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided

to the state governments from this centrally sponsored scheme is subject to fulfilment of

certain conditions.Firstly, a state will become eligible to access PMKSY fund only if it has

prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the

initial year, and the expenditure in water resource development for agriculture sector in the

year under consideration is not less than the baseline expenditure, which is defined as the

average of the expenditure in irrigation sector irrespective of the department in the state plan

in three years prior to the year under consideration. Secondly, States will be given additional

weightage for levying charges on water and electricity for irrigation purposes, so as to ensure

sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be

decided based on

Page 20: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

20 | P a g e

Share of percentage of unirrigated area in the state vis-à-vis national average

including prominence of areas classified under Desert Development Programme

(DDP) and Drought Prone Area Development Programme (DPAP)

Increase in percentage share of expenditure on water resource development for

agriculture sector in State Plan expenditure in the previous year over three years prior

to it and

Improvement in irrigation efficiency in the state.

Vision

The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to

ensure access to some means of protective irrigation to all agricultural farms in the country,

to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

Objective

The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation of

district level and, if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area under

assured irrigation (Har Khet ko Pani),

c) Integration of water source, distribution and its efficient use, to make best use of

water through appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase availability both

in duration and extent,

e) Enhance the adoption of precision-irrigation and other water saving technologies

(More crop per drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation practices

g) Ensure the integrated development of rainfed areas using the watershed approach

towards soil and water conservation, regeneration of ground water, arresting runoff,

providing livelihood options and other NRM activities.

h) Promote extension activities relating to water harvesting, water management and crop

alignment for farmers and grass root level field functionaries.

Page 21: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

21 | P a g e

i) Explore the feasibility of reusing treated municipal waste water for peri-urban

agriculture, and

j) Attract greater private investments in irrigation.

Strategy/approach

To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct water

sources; construction of water harvesting structures, secondary & micro storage,

groundwater development, enhancing potentials of traditional water bodies at village

level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis

(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.

b) Developing/ augmenting distribution network where irrigation sources (both assured

and protective) are available or created;

c) Promotion of scientific moisture conservation and run off control measures to

improve ground water recharge so as to create opportunities for farmers to access

recharged water through shallow tube/dug wells;

d) Promoting efficient water conveyance and field application devices within the farm

viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other

application devices etc.;

e) Encouraging community irrigation through registered user groups/farmer producers’

organizations/NGOs; and

f) Farmer oriented activities like capacity building, training and exposure visits,

demonstrations, farm schools, skill development in efficient water and crop

management practices (crop alignment) including large scale awareness on more crop

per drop of water through mass media campaign, exhibitions, field days, and

extension activities through short animation films etc.

Programme Components

PMKSY has following four components:

1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of

ongoing Major and Medium Irrigation including National Projects.

2. PMKSY (Har Khet ko Pani): This component focuses on-

Page 22: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

22 | P a g e

a) Creation of new water sources through Minor Irrigation (both surface and ground

water)

b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of

traditional water sources, construction rain water harvesting structures (Jal Sanchay);

c) Command area development, strengthening and creation of distribution network from

source to the farm;

d) Ground water development in the areas where it is abundant, so that sink is created to

store runoff/ flood water during peak rainy season.

e) Improvement in water management and distribution system for water bodies to take

advantage of the available source which is not tapped to its fullest capacity (deriving

benefits from low hanging fruits). At least 10% of the command area to be covered

under micro/precision irrigation.

f) Diversion of water from source of different location where it is plenty to nearby water

scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement

requirements beyond IWMP and MGNREGS irrespective of irrigation command.

g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at

feasible locations.

3. PMKSY (Per Drop More Crop)

a) Programme management, preparation of State/District Irrigation Plan, approval of

annual action plan, Monitoring etc.

b) Promoting efficient water conveyance and precision water application devices like

drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

c) Topping up of input cost particularly under civil construction beyond permissible

limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,

distribution system etc.

d) Construction of micro irrigation structures to supplement source creation activities

including tube wells and dug wells (in areas where ground water is available and not

under semi critical/ critical/ over exploited category of development) which are not

supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and

MGNREGS as per Taluka/district irrigation plan.

Page 23: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

23 | P a g e

e) Secondary storage structures at tail end of canal system to store water when available

in abundance (rainy season) or from perennial sources like streams for use during dry

periods through effective on-farm water management;

f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage

pipes, underground piping system.

g) Extension activities for promotion of scientific moisture conservation and agronomic

measures including cropping alignment to maximise use of available water including

rainfall and minimise irrigation requirement (Jal Sanrakshan);

h) Capacity building, training and awareness campaign including low cost publications,

use of pico projectors and low cost motion films for encouraging potential use of

water sources through technological, agronomical and management practices

including community irrigation.

i) The extension workers will be empowered to disseminate relevant technologies under

PMKSY only after requisite training is provided to them especially in the area of

promotion of scientific moisture conservation and agronomic measures, improved/

innovative distribution system like pipe and box outlet system, etc. Appropriate

Domain Experts will act as Master Trainers.

j) Information Communication Technology (ICT) interventions through NeGP-A to be

made use in the field of water use efficiency, precision irrigation technologies, on

farm water management, crop alignment etc. and also to do intensive monitoring of

the Scheme.

4. PMKSY (Watershed Development)

a) Effective management of runoff water and improved soil & moisture conservation

activities such as ridge area treatment, drainage line treatment, rain water harvesting,

in-situ moisture conservation and other allied activities on watershed basis.

b) Converging with MGNREGS for creation of water source to full potential in

identified backward rainfed Talukas including renovation of traditional water bodies

Rationale/ Justification

In reference to the status and need of irrigation, the water resource management including

irrigation related priorities was identified for West Garo Hills district by the peoples’

representatives of district with support from administration and technical experts. For

Page 24: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

24 | P a g e

instance the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA

program, Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya

Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the

Integrated District Development Plan etc. identified number of irrigation related issues for

West Garo Hills district including (i) creating irrigation potential through water harvesting

structure, Nalla and Check Bundh, Percolation and Recharge tanks (ii) promoting water use

efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse

cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement

of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil

conservation of arable & non-arable land through engineering measures; (vi) increase the

forest cover in the district and (vii) land improvement measures.

Methodology

During the course of preparation of District Irrigation Plan (DIP) the team visited West Garo

Hills district to collect data and have interaction with all the stakeholders. Methodology

adopted to prepare DIP is outlined in brief as under:

a) Primary and secondary were collected data from field through various sources including

published documents and websites.

b) Various meetings were held to obtain ground level information and data from key

personnel/ stakeholders through structured, unstructured interviews/ formats, focused

group discussions etc.

c) GIS maps of the areas/clusters were studied to understand the land morphology and

topography of the district.

d) Focused group discussions and interaction with agriculture officers, horticulture officers,

soil conservation officers, extension officers, rural development department, animal

husbandry department, irrigation officers both at Talukas anddistrict level for identifying

the key issues and focus areas of the region.

e) Discussion with NABARD officer of the district was also held during the visit.

On the basis of detailed discussion and analysis of data, the team arrived at the projections of

various components of PMKSY and Department wise plan for five years from 2016-17 to

2020-21 as detailed in the plan.

Page 25: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

25 | P a g e

Chapter 1 : General Information of the District

1.1 District Profile

The West Garo Hills district lies on the western part of the state of Meghalaya bounded by

the East Garo Hills district on the east, the South Garo Hills on the south-east, the Goalpara

district of Assam on the north and north-west and Bangladesh on the south. The district is

situated approximately between the latitudes 90° 25' and 89° 50' E, and the longitudes of 26°

and 25° 10' N. There are six blocks in the district which are Dadenggiri, Dalu, Gambegre,

Rongram, Selsella and Tikrikilla.

The population is pre-dominantly inhabited by the Garos, a tribe with a matrilineal society

belonging to the Bodo family of the Tibeto-Burman race tribes. Other indigenous inhabitants

are the Hajongs, Rabhas, Koches, Rajbansis, Meches, Kacharis and Dalus. The district is also

inhabited by Bengalis, Assamese, Nepalese, Marwaries, Biharis and people from other parts

of India.

Map 1: Location of West Garo Hills district in Meghalaya

Table 1-1: District Profile

Name of the District District Code Latitude Longitude

West Garo Hills 293 25°10’00 to 26°0’00 N 89°50’00 to 90°25’00 E

Source: Census of India 2011, West Garo Hills

When Meghalaya State was created in 1972, the entire Garo Hills formed a single district and

retained the name Garo Hills district, given from the time of British rule. The West Garo hills

district was created on 22nd October, 1976 (vide Notification No. HPL.399/75/140, dated 9th

Oct., 1976) keeping Tura as its headquarters by bifurcating the then composite Garo Hills

Page 26: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

26 | P a g e

District into West Garo Hills and East Garo Hills Districts. The West Garo Hills is once again

bifurcated, creating South Garo Hills by up gradatingBaghmara Subdivision to District level

in 1991 ( Vide Notification No. HPL.275/84/141, dated 18th June, 1992).

1.2 District Demography

The West Garo Hills district holds second position among the districts of Meghalaya in terms

of population and holds third position in terms of the area. The West Garo Hills district has

the third lowest decadal growth rate of population during 2001-2011 among the districts of

Meghalaya. In terms of population per sq.km, West Garo Hillsdistrict is the second most

densely populated district of Meghalaya, only after East Khasi Hills. The West Garo Hills

district is the third most urbanised district of Meghalaya, only after East Khasi Hills and East

Garo Hills. The West Garo Hills district has the third highest sex-ratio (984) among the

districts of Meghalaya however, which is less than the State sex-ratio of 989. The West Garo

Hills district has the second highest sex ratio (976) of the population in the age group of 0-

6years among the districts of Meghalaya. The West Garo Hills district has the highest

Scheduled caste population and second highest Scheduled Tribepopulation among all the

districts of the State. In terms of the sex ratio of the Scheduled Caste and Scheduled Tribe,

the District holds the first and the third position respectively. The West Garo Hills District

has the second lowest literacy rate (67.6%) in the State which is much lesser then the literacy

rate (74.7%) of the State. The West Garo Hills District ranks third in work participation rate

(39.7%) along with East Garo Hills District among all the districts of the State. The West

Garo Hills District has the third lowest percentage of cultivators to the total workers among

the districts of the State. The West Garo Hills District ranks fourth in terms of percentage of

the agriculture labourers and other workers to the total workers respectively and has the

highest proportion of the workers in household industry to the total workers among the

districts of Meghalaya. Selsella is the most populated C. & R.D. Block followed by Rongram

whereas Gambegre has the lowest population among the C. & R.D. Blocksof the District. In

terms of sex-ratio, Dadenggiri C. & R.D. Block has the highest (996) figure whereas

Gambegre and Zikzak C. & R.D. Blockshave the lowest figure in the district. In the West

Garo Hills District, SelsellaC. & R.D. Block and Rongram C. & R.D. Block have the highest

number of Scheduled Caste and Scheduled Tribe population respectively while Dadenggiri

and Gambegre C. & R.D. Block has the lowest number of Scheduled Caste and Scheduled

Tribe population respectively.

Page 27: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

27 | P a g e

Table 1-2: Demography of West Garo Hills

Name of the

blocks

Population SC ST Total

M* F CH SC

NHH

SC

MM

ST

NHH

ST

MM NHH MM

Selsella 88349 86857 34198 626 3046 15296 78712 33999 175206

Dadenggiri 20842 20753 7681 7 41 7760 40351 8025 41595

Tikrikilla 29267 29121 10069 103 507 10313 52729 11484 58388

Rongram 67114 66642 19299 541 2701 19555 106987 24819 133756

Gambegre 17029 16517 6304 9 43 5642 32484 5863 33546

Dalu 27351 26744 9559 108 464 8617 47108 10169 54095

Total 249952 246634 87110 1394 6802 67183 358371 94359 496586

Figure 1-1: Number of persons in West Garo Hills district

Source: Census of India 2011, West Garo Hills

*M- Male, F- Female, CH- Children 0-14 years, NHH- No. of households, NM- No. of members, T-Total, R-

Rural, U-Urban

1.3 Biomass and Livestock

Next to Agriculture and Horticulture, Livestock rearing is an important enterprise of the

district. Cows, buffaloes, draft animals, goats pigs, poultry/ducks are main commodities of

livestock enterprise. Cross breed cows, improved breed buffaloes and upgraded pigs in small

numbers are also reared in almost all the blocks of the district. Mostly the local breeds are

common. The population of the Large and Small animals is given in Table no. 1-3.

Table 1-3: Population of Small and Large Animals in West Garo Hills

Blocks

Small Animals Large Animals

Poultry

(Nos.)

Pigs

(Nos.)

Goats

(Nos.)

Sheeps

(Nos.)

Indigenous Cow

(Nos.)

In Descriptive

Buffalo (Nos.)

Selsella 83793 11459 15556 3958 44969 1755

Dadenggiri 52345 5679 2681 0 13942 164

Tikrikilla 81794 7055 4545 157 24491 235

Rongram 64988 9137 7320 170 21602 52

Gambegre 26157 6612 9286 0 16113 0

175206

41595

58388

133756

33546

54095

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu

Nu

mb

er o

f p

erso

ns

Page 28: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

28 | P a g e

Dalu 47400 7524 10229 64 23383 1136

Total 356477 47466 49617 4349 144500 3342

Figure 1-2: Number of livestock in West Garo Hills district

Source: Department of Animal Husbandry, West Garo Hills

1.4 Agro-Ecology, Climate, Hydrology and Topography

In general, the district has a mildly tropical climate. The climate of the district is largely

controlled by southwest monsoon and seasonal winds. The district being relatively lower in

altitude to the rest of Meghalaya, experiences a fairly high temperature for most part of the

year. The average rainfall is 3289.2 mm, of which more than two-thirds occur during the

monsoon, with winter being practically dry. The district has mostly dense tropical mixed

forest, and a small patch of temperate forest in the higher parts of the Tura range. There are

four seasons in the district namely summer, monsoon or rainy, autumn and winter. The

summer season extends from the end of March to mid-May, which is characterized by

relatively high temperature. Rainy season commences with the onset of southwest monsoon

in April and lasts up to October. This is followed by short autumn from mid-October to

November. This season indicates the slow retreating of monsoon with clear and sunny sky.

Winter season extends from December to the end of March. This is the coldest season of the

year with sharp decline in the temperature. Winter is basically dry with lower diurnal range of

temperature in the northern and southern foothills, whereas central upland portion

experiences temperate climate and the places of medium altitude of the northern, southern

and western part of the district experiences sub-tropical climate. The district receives a fairly

high rainfall throughout the year. Most of the precipitation occurs during the rainy season i.e.

between April and October due to southwest monsoon.

83

79

3

52

34

5

81

79

4

64

98

8

26

15

7

47

40

0

30

97

3

83

60

11

75

7

16

62

7

15

89

8

17

81

7

46

72

4

14

10

6 24

72

6

21

65

4

16

11

3 24

51

9

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu

Nu

mb

er f

o L

ives

tock

Poultry Small Animals Large Animals

Page 29: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

29 | P a g e

Table 1-4: Agro-ecology, Topography and Climate of West Garo Hills district

Agro

Ecological

Zone Type

Type of

Terrain

Normal

Annual

Rainfall

(mm)

Average

Monthly

Rainfall

(mm)

Average Weekly Temperature (0C)

Period

Summer

(Apr-May)

Winter (Oct-

Mar) Rainy (Jun-Sep)

Mi

n

Ma

x

Me

an

Mi

n

Ma

x

Me

an

Mi

n

Ma

x

Me

an

Warm per

humid Hilly

undulating 3289.2 115

11.

1 35

22.

9 8.4 25

16.

7

20.

7

38.

1 29 Eco region

Red and

laterite

Source: CGWB, West garo Hills

1.5 Soil Profile

Geomorphologically, the district is an undulatory one, with the E-W trending Garo hill range

of Central Upland zone and plains fringing the northern, western and the south-western

borders. The altitude of the Garo Hills District ranges from 23 m amsl to 1631 m. amsl. The

Garo Hills area comprises of the Tura Range, the Arbella Range and the Ranggira Range.

The Tura range is one of the most important mountain ranges in the West Garo Hills which

comprises of many peaks. To the west of the Tura range low hill ranges run from north to

south, and to the north of the Tura range hill ranges run parallel to it, gradually increasing in

height till they meet in the south. The West Garo Hills district also represents the remnant of

ancient plateau of Indian Peninsular shield that is deeply dissected suggesting several

geotectonic and structural deformities that the plateau has undergone. Broadly, the district

can be divided into the following geomorphic units.

Denudational Low and High Hills: It occupies the major part of the district comprising of

hard rocks like granite and gneiss. It is moderately dissected by fractures and joints

forming a good number of narrow intermontane valleys.

Dissected Plateau: It is found in the southern portion of district comprising of soft and

friable rocks like shale, sandstone and quartzite.

Deep Gorges: In the southern parts of the district, Tertiary rocks comprising sandstone,

shale and limestone are dissected to form deep narrow elongated intermontane valleys of

tectonic origin along major lineaments.

Alluvial Plain: It is exposed in the northern, western and the south-western parts of the

district comprising fluviatile sediments.

Page 30: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

30 | P a g e

Table 1-5: Soil Types of West Garo Hills district

Soil Type Land Slope

Major Soil Class Area

(Ha)

0-3%

(Ha)

3-8%

(ha)

8-25%

(ha)

>25%

(ha)

Fine Loam 2,56,879 0 51686 149955 55238

Source: Department of Agriculture, West Garo Hills

1.6 Land Use pattern

The district has a forest area of 1390 sq. km., i.e. about 45% of the total geographical area.

The net area sown is 47400 ha. and the total cropped area is 65181 ha. Fallow land covers

about 12%, net area sown is about 26%, while the total cropped area is about 33%. Principal

crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture products

include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger, garlic etc.

are also grown. The following table gives the block wise information on land use pattern.

Table 1-6: Land use pattern in West Garo Hills district

Blocks TGA*

(Ha)

Area Under Agriculture Area

under

Forest

(Ha)

Area

under

Wasteland

(Ha)

Area

under

other

use

(Ha)

GCA

(Ha)

NSA

(Ha)

AST

(Ha)

CI

(%)

Selsella 53500 16169 11877 4292 136.14% 20813 4344 12174

Dadenggiri 61700 8923 6433 2490 138.71% 30577 2695 19505

Tikrikilla 33000 9083 5893 3190 154.13% 14049 2384 7484

Rongram 62200 10753 7873 2880 136.58% 26463 3484 21500

Gambegre 39100 8894 6700 2194 132.75% 17048 2292 10866

Dalu 59902 11359 8624 2735 131.71% 30097 3204 15242

Total 309402 65181 47400 17781 137.51% 139047 18403 86771

Figure 1-3: Gross Cropped Area, Net Sown Area and Cropping Intensity in West Garo Hills district

Source: Department of Agriculture, West Garo Hills

*TGA- Total Geographical Area, GCA- Gross Cropped Area, NSA- Net Sown Area, AST-

Area Sown more than once, CI- Cropping Intensity

120.00%

125.00%

130.00%

135.00%

140.00%

145.00%

150.00%

155.00%

160.00%

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Cro

pp

ing

Inte

nsi

ty (

%)

Are

a in

Ha.

Gross Cropped Area Net Sown Area Cropping intensity (%)

Page 31: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

31 | P a g e

Chapter 2 : District Water Profile

Water is vital for survival of both plants and animals. It is the central component of the planet

Earth controlling the weather, climate, plant and animal kingdom. It supports agriculture,

forestry, navigation, industries and hydroelectricity generation and other uses such as for

recreation, water sports activities etc. The importance of water has been recognized all over

the world. Water resource development and management practices are given top priorities all

over the world to avoid the water crisis in future. This chapter outlines the different type of

crops, productivity and irrigation status of the West Garo Hills district.

2.1 Area wise, Crop wise, irrigation Status

Out of total area of 41274 hectares, total irrigated area is 16509.6 hectares while total rainfed

area is 24764.4 hectares. For horticulture crops, 2963 hectares is irrigated area while 20031

hectares is rainfed area. The crop wise irrigated and rainfed area sown in different seasons

like Kharif, Rabi and Summer in the district for each block is given in the table below.

Table 2-1: Area wise, Crop wise, irrigation Status of West Garo Hills

Crop

Types

Kharif (Area in ha) Rabi (Area in ha) Summer Crop(Area in ha)

Horticulture &

Plantation Crops (Area

in ha)

I R T I R T I R T I R T

Cereals 4009.6 6014.4 10024 3000.4 4500.6 7501 4049.2 6073.8 10123 -- -- --

Coarse

Cereals 1128.8 1693.2 2822 -- -- -- -- -- -- -- -- --

Pulses -- -- -- 418.4 627.6 1046 -- -- -- -- -- --

Oil

Seeds -- -- -- 1582 2373 3955 -- -- -- -- -- --

Fibre 980 1470 2450 -- -- -- 1341.2 2011.8 3353 -- -- --

Other

Crops -- -- -- -- -- -- -- -- -- 2963 20031 22994

Total 6118.4 9177.6 15296 5000.8 7501.2 12502 5390.4 8085.6 13476 2963 20031 22994

Source: Department of Agriculture and Department of Horticulture, West Garo Hills

2.2 Production and Productivity of Major crops

Principal crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture

products include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger,

garlic etc. are also grown. The crop-wise production and productivity of different types of

crops are given in the table below.

Table 2-2: crop-wise production and productivity of different types of crops

Season

Crop Sown Total

Cereals Coarse

Cereals Pulses

Oil

Seeds Fibre

Any other

crops P Y C

Kharif

Rice

(winter) 214814 2143 118258

Maize

44475 1576 58910

Cotton

4116 168 -

Rabi Rice

345796 4610 115892

Page 32: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

32 | P a g e

(Spring)

Pea

2797 825 62306

Cow

pea 3731 820 62306

Lentil

2119 841 62306

Raped

seed &

Mustard

26301 665 45461

Summer

Rice

(Ahu) 79763 1737 115892

Jhum

Paddy 45797 828 -

Jute

33711 1673 73164

Mesta

9593 717 73164

Horticult

ure &

Plantatio

n

Black

pepper 1860 164 85000

Ginger 151480 605 144000

Turmeric 21440 5858 144000

Potato 2613 7708 86660

Khasi

mandarin 35150 2687 130000

Assam

lemon 7060 2361 90000

Pine apple 270160 8378 85028

Banana 195630 12870 85000

Papaya 12740 9579 87583

Straw

berry 35 2333 170208

Cashewnut 97260 2695 85000

Tea 1600 6133 280000

Arecanut 92450 2052 87583

Vegetable 30850 11757 90000

Source: Department of Agriculture and Horticulture, West Garo Hills

P: Production (kg/yr), Y: Productivity or Yield (Kgs/ha), C: Cost of Cultivation (Rs./ha)

2.3 Irrigation based classification

Irrigation has so far played only a minimal role in agriculture in the Garo Hills. The

topography itself makes alignment and construction of channels difficult and comparatively

costly. However, even in areas where the lay of the land is more favourable, irrigation is

confined to areas bordering rivers and streams. Farmers in the hills have traditionally

depended upon rainfall, the months of heavy rainfall being May to September. The abundant

supply of rain during the growing season reduces the dependence on artificial alternatives,

except during the brief dry spell before the monsoons. As shown in the table below, the gross

irrigated area and net irrigated area in West Garo Hills district is 19472.6 hectares and 6118.4

hectares respectively while un-irrigated or totally rainfed area in the district is 192186

hectares.

Page 33: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

33 | P a g e

Table 2-3: Block-wise irrigation based classification

District

Irrigated (Area in Ha) Rainfed (Area in Ha)

Gross Irrigated

Area

Net Irrigated

Area

Partially Irrigated/Protective

Irrigation

Un-Irrigated or

Totally Rainfed

West Garo Hills 19472.6 6118.4 -- 44795.4

Source: Department of Agriculture and Horticulture, West Garo Hills

Page 34: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

34 | P a g e

Chapter 3 : Water Availability in West Garo Hills

Water availability is an important issue for ascertaining the demand of water for domestic,

livestock, irrigation, industrial and power generation projects. The water availability depends

on topography, climatic conditions, rainfall, soil profile, infiltration rate, run off and human

activities over the catchment area. The changes in the water levels of the surface source are

mainly because of the variations in the inflow from the upper catchments. The fluctuations

constitute a sensitive indicator of past and present climate and human activities at a local and

regional scale. In the hydrological point of view, the entire West Garo Hills district falls

under the Brahmaputra basin.

3.1 Status of Water Availability

For creating access to water source either assured or protective to each farmer will require a

demand and supply assessment of crop water requirements, effective rainfall and potential

source of existing and new water sources considering the geo-hydrological and agro

ecological scenario of the block. The master plan will include information on all sources of

available water, distribution network, defunct water bodies, new potential water sources both

surface and sub-surface system, application to conveyance provisions, crops and cropping

system aligned to available/designed quantity of water and suitability to local agro ecology.

All activities pertaining to water harvesting, water augmentation from surface ad sub surface

sources, distribution and application of water including repair, renovation and restoration of

water bodies, major, medium and minor irrigation works, command area development etc. are

to be taken up within the frame work of this muster plan. Emphasis is to be given for deriving

the potential benefit from low hanging fruits like extending the reach/ coverage of water

source through effective distribution and application mechanism, reducing the gap between

potential created and utilized through more focus on command area development and

precision irrigation. Proper integration of creation of diversion head work and water

harvesting structures, distribution system like canals and command area development works

and precision farming is to be made for best possible use of water resources. Status of water

availability in different sources is given in the table below.

Table 3-1: Status of Water availability in West Garo Hills district (in MCM)

Sl. No. Sources Kharif Rabi Total

1 Surface Irrigation

(i) Canal (Major & medium irrigation)

(ii) Minor Irrigation tanks 2.52 1.41 3.93

(iii) Lift Irrigation/ Diversion

Page 35: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

35 | P a g e

(iv) Various water bodies including Rain Water Harvesting 0.33 0.04 0.37

(v) Treated Effluent Received from STP

(vi) Untreated Effluent

(vii) Perennial sources of water

2 Ground Water

(i) Open Well

(ii) Deep Tube Well 2885 2885

(iii) Medium Tube Well

(iv) Shallow Tube Wells

Source: Central Ground Water Board Report

3.2 Status of Ground Water Availability

Thirty one exploratory wells and one slim hole have been drilled in this district down to depth

ranging from 30 to 300 m bgl, out of which 2 wells were abandoned. Aquifer zones

encountered in wells range from 18 to 170 m with yield of 7.2 to 150 m3/hr. Auto flow wells

are reported from Ampati, Bairagipara, Zikzak etc. The depth to water level varies from 0.53

m bgl to 8.3 m bgl. The aquifer comprises sand and sand with gravel, while clay forms leaky

aquitard. It can be seen that even though 2 to 4 aquifers have been encountered in individual

boreholes, the sand and sand and gravel beds are inter connected laterally/vertically at places.

The maximum cumulative aquifer thickness is encountered around Ichaguri, Borkona,

Barengapara and Betasing in alluvial areas of West Garo Hills District. The granitic basement

is encountered at a very shallow depth (less than 50 m.bgl) in the northern part of the district,

while in the western and southern part of the district, basement has not been met even at a

depth of 225 m.bgl. The dynamic groundwater resources have been assessed based on

Ground Water Resources Estimation Methodology of 1997 (GEC 97). The over-all stage of

ground water development of the West Garo Hills District is a meager 0.59% and is

categorised as SAFE.

Table 3-2: Status of Ground Water Availability (in MCM) in West Garo Hills district

District Status Draft Recharge Gap

West Garo Hills 0.59% Safe category 1.54 2885 2883.46

Source: Central Ground Water Board, West garo Hills

3.3 Status of Command Area

Information regarding the other services command area is given in the table below. Total

canal command area in the district is 93934 ha out of which 7031.7 ha is developed while

86902.3 ha is undeveloped. Total developed area (canal command and other services) in the

district is 7151.7 ha while total undeveloped area (canal command and other services) in the

district is 86902.3 ha.

Page 36: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

36 | P a g e

Table 3-3: Status of command area (in Ha.)

Name of the

Block

Name of Information of Canal

Command

Information on other

services Command Total Area

TA DA UA TA DA UA DA UA

Selsella 20771 3046.8 17724.2 0 0 0 3046.8 17724.2

Dadenggiri 14591 382 14209 0 0 0 382 14209

Tikrikilla 13230 1150 12080 120 120 0 1270 12080

Rongram 15834 510.6 15323.4 0 0 0 510.6 15323.4

Gambegre 11265 1337.7 9927.3 0 0 0 1337.7 9927.3

Dalu 18243 604.6 17638.4 0 0 0 604.6 17638.4

Total 93934 7031.7 86902.3 120 120 0 7151.7 86902.3

Source: Minor Irrigation Department, West Garo Hills

*TA: Total Area, DA: Developed Area and UA: Undeveloped Area

3.4 Existing type of Irrigation

Types of irrigation in West Garo Hills district is given in the table below. Out of the total

7031.7 hectares of command area, command area by surface water is 6911.7 hectares while

the same by ground water is 120 hectares.

Table 3-4: Existing types of Irrigation in West Garo Hills district

Name of the Block Unit Surface Irrigation Ground Water

Govt. Canals Tube wells

Selsella No. 25 --

Area (ha.) 3046.8 --

Dadenggiri No. 8 --

Area (ha.) 382 --

Tikrikilla No. 10 --

Area (ha.) 1030 120

Rongram No. 19 --

Area (ha.) 510.6 --

Gambegre No. 11 --

Area (ha.) 1337.7 --

Dalu No. 18 --

Area (ha.) 604.6 --

Source: Water Resources Department, West Garo Hills

Page 37: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

37 | P a g e

Chapter 4 : Water Requirement/Demand

Whenever an engineer is given the duty to design a water supply scheme for a particular use

of the community, it becomes imperative upon him, to first of all, evaluate the amount of

water available and the amount of water required/ demanded by the public. In fact, the first

study is to consider the demand, and then the second requirement is to find sources to fulfil

that demand. Many a times a compromise is sought between the two. It is very difficult to

precisely assess the quantity of water demanded by the public since there are many variable

factors affecting water consumption. The various type of water demands for a district may be

as follows.

4.1 Domestic Water Demand

This includes the water requirement in private buildings for drinking, cooking, bathing, lawn

sprinkling, gardening, sanitary purposes etc. The amount of domestic water consumption per

person shall vary according to the living conditions of the consumers. On an average, this

domestic consumption under normal conditions in Indian city is expected to be around 135

litres/ day/ person as per IS: 1172-1971. In a developed and an effluent country like USA,

this figure goes as high as 340 litres/ day/ person. This is because more water is consumed in

rich living, air cooling/conditioning, automatic household appliances, car washing etc. The

total domestic consumption generally amounts to 55% to 60% of the total water consumption.

The total domestic water demand shall be equal to the total design population multiplied by

the per capita domestic consumption i.e. 140 litre/ day. As the last population census was

made in 2011, the actual population of the district in 2015 is not readily available.

Considering the population of the West Garo Hills district as per Census, 2011 the projected

population in 2020 is worked out assuming the last decadal growth of 26.80% and annual

exponential growth rate of 2.68% to apply for the period 2011-2020 (9 years).The domestic

water demand is given in the table below.

Table 4-1: Domestic water demand (MCM)

Blocks

Population

as per 2011

census

Population in

2015

Water

demand

(MCM)

Projected

Population in

2020

Gross Water

Demand

(MCM)

Selsella 175206 193988 9.91 217466 11.11

Dadenggiri 41595 46054 2.35 51628 2.64

Tikrikilla 58388 64647 3.30 72471 3.70

Rongram 133756 148095 7.57 166018 8.48

Gambegre 33546 37142 1.90 41637 2.13

Dalu 54095 59894 3.06 67143 3.43

Total 496586 549820 28.10 616363 31.50

Page 38: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

38 | P a g e

Figure 4-1: Domestic Water Demand (in MCM) in West Garo Hills district

4.2 Crop water demand

Water requirement of a crop means the total quantity and the way in which a crop requires

water, from the time it is sawn to the time it is harvested (crop period). Different crops will

have different water requirements and the same crop may have different water requirements

at different places of the same country depending upon the climate, type of soil, method of

cultivation and useful rainfall etc. The total quantity of water required by the crop for its full

growth may be expressed in Hectare-m or in Million Cubic meter or simply as a depth to

which the total supplied irrigation water would stand above the surface without percolation or

evaporation. This depth is known as delta for the crop. On the other hand duty is defined as

the area irrigated per cumec of discharge running for the base period. The duty helps us in

designing the efficient canal irrigation system. If we know the crops area required to be

irrigated and their duties, we can work out the discharge required for designing the canal.

Consumptive use for a particular crop may be defined as the total amount of water used by

the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or

from plant leaves, in any specified time. Therefore, crop water requirements are defined as

“the depth of water needed to meet the water loss through evapo-transpiration of a disease

free crop, growing in large fields under non restricting soil conditions including soil water

and fertility and achieving full production under the given growing environment.

Consumptive use for a particular crop may be defined as the total amount of water used by

the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or

0.00

2.00

4.00

6.00

8.00

10.00

12.00

0

50000

100000

150000

200000

250000

Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu

Wat

er D

eman

d in

MC

M

Nu

mb

er o

f p

erso

ns

Population in 2015 Projected Population in 2020

Present Water Demand (MCM) Gross Water Demand in 2020 (MCM)

Page 39: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

39 | P a g e

from plant leaves, in any specified time. Thus crop water requirement is nothing but the

consumptive use itself, but exclusive of effective precipitation, stored soil moisture or ground

water. Consumptive use or evapotranspiration depends upon all those factors on which

evaporation and transpiration depend such as, temperature, sunlight, wind movement etc. The

crop water requirement of different bocks in the West Garo Hills district has been worked out

and a statement is prepared as shown in table below which outlines the required and available

water potential in the district.

Table 4-2: Crop water requirement (MCM)

Block Area

sown (ha)

Irrigated

area (ha)

Crop

Water

Demand

(MCM)

Water

potential

required

(MCM)

Existing

Water

potential

(MCM)

Water

potential

to be

created

(MCM)

Selsella 16169.00 4850.70 161.69 161.69 48.51 113.18

Dadenggiri 8923.00 2676.90 89.23 89.23 26.77 62.46

Tikrikilla 9083.00 2724.90 90.83 90.83 27.25 63.58

Rongram 10753.00 3225.90 107.53 107.53 32.26 75.27

Gambegre 8894.00 2668.20 88.94 88.94 26.68 62.26

Dalu 11359.00 3407.70 113.59 113.59 34.08 79.51

Total 65181.00 19554.30 651.81 651.81 195.54 456.27

Figure 4-2: Crop Water Potential (in MCM) in West Garo Hills district

4.3 Livestock water demand

The livestock water demand of the district is determined by multiplying the total livestock

population in the district by the per capita water requirement (litres/ day/ no.) for each

category of the population. As per livestock census of 2003 & 2007, there was 24%

population growth in four years (Average yearly growth rate being 6%). With the existing

48.51

26.77 27.2532.26

26.6834.08

113.18

62.46 63.58

75.27

62.26

79.51

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu

Wat

er P

ote

nti

al in

MC

M

Existing Water Potential (MCM) Water Potential to be created (MCM)

Page 40: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

40 | P a g e

population recorded for a base year, the total projected livestock population in 2020 may be

worked out and accordingly the livestock water demand is worked out.

Table 4-3: Livestock water demand (MCM)

Block

Total

number of

livestock

Present

Water

demand

(MCM)

Water

demand in

2020

(MCM)

Existing

Water

potential

(MCM)

Water

potential to

be created

(MCM)

Selsella 161490 2.06 2.68 2.06 0.62

Dadenggiri 74812 0.96 1.24 0.96 0.29

Tikrikilla 118277 1.51 1.96 1.51 0.45

Rongram 103269 1.32 1.72 1.32 0.40

Gambegre 58168 0.74 0.97 0.74 0.22

Dalu 89747 1.15 1.49 1.15 0.34

Total 605763 7.74 10.06 7.74 2.32

Figure 4-3: Livestock Water Demand (in MCM) in West Garo Hills district

4.4 Industrial water demand

This includes the quantity of water required to be supplied to offices, factories, different

industries, hostels, hospitals etc. This quantity will vary considerably with the nature of city

and with the type of industries and commercial establishments present in it. On an average, a

provision of 20-25% of the total water consumption is generally made in the design for these

uses. In small residential communities, the industrial use may be as low as 45 litre/ day, but in

industrial cities, it may be as high as 450 litres/ day. Some of the industries may develop their

own supplies and may place little or no demand on municipal system. Zoning of the city

affects the location of the industries and may help in estimating future industrial demands.

0.00

0.50

1.00

1.50

2.00

2.50

3.00

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu

Wat

er D

eman

d in

MC

M

Nu

mb

er o

f Li

vest

ock

Total number of livestock Present water demand (MCM)

Water Demand in 2020 (MCM)

Page 41: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

41 | P a g e

Table 4-4: Industrial Water Requirement (in MCM) in West Garo Hills district

Name of

the Blocks Name of the industry

Water

Demand

(MCM)

Water

Demand

in 2020

(MCM)

Existing

Water

Potential

(MCM)

Water

Potential

to be

created

(MCM)

Selsella

M/s K.D Agro Industries 0.06 0.084 0.06 0.024

M/s Prime Crusher Industry 0.0009 0.00126 0.0009 0.00036

M/s Romendra Rice Mill 0.0003 0.00042 0.0003 0.00012

M/s Shekhar Stone Crusher 0.0009 0.00126 0.0009 0.00036

M/s Mega Mustard Oil 0.0015 0.0021 0.0015 0.0006

Gambegre

M/s Aminda Rangsa Rice De- Husking 0.0003 0.00042 0.0003 0.00012

M/s Marak Turmeric Factory 0.045 0.063 0.045 0.018

M/s Janesa Food & Beverages 0.015 0.021 0.015 0.006

Dadenggiri M/s Pearson Rubber Processing Unit 0.0006 0.00084 0.0006 0.00024

Rongram M/s Babilsi Catering 0.003 0.0042 0.003 0.0012

M/s Cheasa Automobiles 0.003 0.0042 0.003 0.0012

Total 0.1305 0.1827 0.1305 0.0522

Source: DICC, West Garo Hills

4.5 Water demand for Power Generation

Presently there is no any power plant in the West Garo Hills district and in the years to come

i.e. up to the year 2020, there is no any plan to tap resources for power generation and it was

informed that the water requirement for power generation may be treated as nil. Hence there

is no demand for water from power sector.

Table 4-5: Water Demand for Power generation (in MCM)

Name of the

District

Power

Requirement

(MW)

Water

Demand

(MCM)

Water

Demand in

2020 (MCM)

Existing

Water

Potential

(MCM)

Water

Potential to

be created

(MCM)

West garo Hills 45 0.85 1.8 0.85 0.95

Source: MeECL, Tura

4.6 Total water demand of the district for various sectors

The total water demand of the district for all the sectors described in 4.1 to 4.5 are given in

the are assessed by summing up all the values of water demand for domestic uses, livestock,

power and industrial/commercial uses etc. The current water demand has been indicated in

Table 4-5 and the projected water demand has been depicted in Table 4-6. Total present water

requirement for the district is 688.62 MCM while the total future water requirement for the

district is 695.35 MCM. In present, maximum water demand is for Selsella block which is

174.58 MCM while minimum is for Gambegre block which is 91.64 MCM. In projected

future, maximum water demand is for Selsella block which is 177.37 MCM while minimum

is for Gambegre block which is 92.12 MCM.

Page 42: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

42 | P a g e

Table 4-6: Present Water Demand of the district for various sectors

Block

Demand from Components (MCM) Total

MCM Domestic Crop Livestock Industrial Power

generation

Selsella 9.91 161.69 2.06 0.0636

0.85

174.58

Dadenggiri 2.35 89.23 0.96 0.0006 92.54

Tikrikilla 3.30 90.83 1.51 -- 95.64

Rongram 7.57 107.53 1.32 0.006 116.42

Gambegre 1.90 88.94 0.74 0.0603 91.64

Dalu 3.06 113.59 1.15 -- 117.80

Total 28.10 651.81 7.74 0.1305 0.85 688.62

Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020)

Block

Demand from Components (MCM) Total

MCM Domestic Crop Livestock Industrial Power

generation

Selsella 11.11 161.69 2.68 0.08904

1.8

177.37

Dadenggiri 2.64 89.23 1.24 0.00084 93.11

Tikrikilla 3.70 90.83 1.96 -- 96.50

Rongram 8.48 107.53 1.72 0.0084 117.74

Gambegre 2.13 88.94 0.97 0.08442 92.12

Dalu 3.43 113.59 1.49 -- 118.51

Total 31.50 651.81 10.06 0.1827 1.8 695.35

4.7 Water Budget

The water budget of the district for the base year 2015-16 and 2020-21 as per water

availability and demand is given in the table below. The present water availability/demand

and also for 2020 are worked out as explained above and the water gap is found out. The

water budget clearly shows the water gap of -2200.68 MCM in present and of -2193.95

MCM in future between the water availability and requirement. The negative gap indicates

that there is sufficient water resources for irrigation, domestic and the industrial uses without

creating any deficit in our water potential.

Table 4-8: Water Budget (Volume in MCM)

District

Existing Water

Availability (MCM) Total

(MCM)

Water Demand

(MCM) Water Gap (MCM)

Surface

water

Ground

water Present

Projected

(2020) Present

Projected

(2020)

West Garo Hills 4.3 2885 2889.3 688.62 695.35 -2200.68 -2193.95

Page 43: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

43 | P a g e

Chapter 5 : Strategic Action Plan for Irrigation in District under

PMKSY

The present DIP for West Garo Hills District is prepared duly considering all the data

collected from the line department and converging data of all departments in each block and

thus a realistic Action Plan is assured as prevented in the format for the years. The total

required of this comprehensive DIP is coming for Rs. 103068.92 lakhs for 4 years.

5.1 Department wise, year wise plan

Total plan of West Garo Hills district for four years works out to be Rs. 103068.92 lakh (Table

5-2). Maximum share of Rs. 69548.51 lakh is for Water Resources Department followed by

Soil & Water Conservation Department with Rs. 25278.62 lakh. The total plan of four years is

divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20. Fig. 5-1 indicates year -wise

share in PMKSY for four years from 2016-17 to 2019-20.

Table 5-1: Department-wise year-wise proposal under PMKSY

Departments

Total Command

Area/ Irrigation

Potential (Ha.)

2016- 2017

(in Rs.

lakhs)

2017- 2018

(in Rs.

lakhs)

2018- 2019

(in Rs.

lakhs)

2019- 2020

(in Rs.

lakhs)

Total

Estimated

Cost (in Rs.

lakhs)

Agriculture 9007.32 1470.31 1435.49 1328.01 1319.98 5553.79

Horticulture 670.00 638.00 690.00 657.00 703.00 2688.00

Soil Conservation 22497.56 9339.97 6096.51 5268.60 4573.54 25278.62

Water Resources 20769.75 9885.38 29204.71 5755.60 24702.83 69548.51

Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92

Figure 5-1: Year wise plan

21333.66

37426.71

13009.20

31299.35

0.00

5000.00

10000.00

15000.00

20000.00

25000.00

30000.00

35000.00

40000.00

2016-17 2017-18 2018-19 2019-20

Am

ou

nt

in R

s. L

akh

s

Page 44: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

44 | P a g e

5.2 Component wise, year wise plan

As discussed above about various components of PMKSY, the plan is prepared accordingly.

Table 5-3 shows component wise plan for 4 years starting from 2016-17 to 2019-20. The

strategic action plan is divided in to 5 components i.e. AIBP, Har Khet Ko Pani, Per Drop

More Crop, PMKSY-Watershed and Convergence with MGNREGA. AIBP component is of

Rs. 20000 lakh, which will be executed by Water Resources department. Har Khet Ko Pani

(HKKP) component is of Rs. 67460.83 lakh, which will be executed by Water Resources,

Soil Conservation and Agriculture departments. Per Drop More Crop (PDMC) components is

of Rs. 5187.85 lakh, which will be executed mainly by Agriculture and Horticulture

departments. Watershed component has a total proposal of Rs. 10282.54 lakh which will be

implemented by Soil Conservation department. Convergence with MGNREGA has a total

proposal of Rs. 137.70 lakh which will be implemented by Soil Conservation department. All

the stakeholders need to have coordination among themselves to have the maximum

irrigation efficiency and to avoid duplicity. Fig. 5-2 represents the graphical representation of

various components of PMKSY, year wise plan and share.

Table 5-2: Component wise, year wise plan

Components

Total Command

Area/ Irrigation

Potential (Ha.)

2016-17 (in

Rs. Lakhs)

2017-18 (in

Rs. Lakhs)

2018-19 (in

Rs. Lakhs)

2019-20 (in

Rs. Lakhs)

Total

Estimated

Cost (in

Rs. lakhs)

AIBP 2500 0.00 20000.00 0.00 0.00 20000.00

Har Khet Ko

Pani 27642.64 16568.51 14157.16 9125.61 27609.55 67460.83

Per Drop

More Crop 6867.24 1322.43 1342.04 1249.25 1274.13 5187.85

Watershed 15680.86 3400.27 1895.26 2602.85 2384.17 10282.54

Convergence 253.90 42.45 32.25 31.50 31.50 137.70

Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92

Figure 5-2: Component wise plan

20000

67460.83

5187.8510282.54

137.700

10000

20000

30000

40000

50000

60000

70000

80000

AIBP Har Khet KoPani

Per DropMore Crop

Watershed Convergencewith

MGNREGA

Am

ou

nt

in R

s. L

akh

s

Page 45: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

45 | P a g e

5.3 Block wise, year wise plan

Block wise, year wise strategic action plan is given in the table below. The highest amount of

Rs. 31068.46 lakh (which is 30.14 % of the total amount) is proposed for Tikrikilla block

while the lowest amount of Rs. 5576.73 lakh (which is 5.4% of the total amount) is proposed

for Dadenggiri block.

Table 5-3: Block wise, year wise plan

Blocks

Total Command

Area/ Irrigation

Potential (Ha.)

2016-17

(in Rs.

Lakhs)

2017-18

(in Rs.

Lakhs)

2018-19

(in Rs.

Lakhs)

2019-20

(in Rs.

Lakhs)

Total

Estimated

Cost (in Rs.

lakhs)

Dadenggiri 4091.60 1899.79 1352.23 1477.43 847.28 5576.73

Dalu 8196.76 3701.43 2516.49 2128.88 1885.72 10232.51

Gambegre 3922.19 4131.65 1085.77 1172.02 1623.07 8012.51

Rongram 8349.66 2418.32 2415.75 3252.51 13114.39 21200.97

Selsella 17159.49 6435.52 5581.18 2903.30 12057.74 26977.74

Tikrikilla 11224.94 2746.95 24475.30 2075.06 1771.15 31068.46

Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92

Figure 5-3: Block wise plan

5.4 Suggestions

For successful implementation of PMKSY plan it is suggested that:

All the stakeholders should convene meeting of concerned Gram Panchayat and then

finalize the village plan and prepare DPR.

All the structures planned should be geo tagged and marked on map, so that social

auditing of the projects can be conducted. This will also avoid duplicity and wastage of

resources.

5576.73

10232.51

8012.51

21200.97

26977.74

31068.46

0.00

5000.00

10000.00

15000.00

20000.00

25000.00

30000.00

35000.00

Dadenggiri Dalu Gambegre Rongram Selsella Tikrikilla

Am

ou

nt

in R

s. L

akh

s

Page 46: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

46 | P a g e

The Departments should supplement each other so that the maximum irrigation efficiency

is achieved.

Priority should be given to projects to minimize the gap in potential created and potential

utilized.

Execution of the schemes should be properly planned to avoid time and cost overrun.

There should be smooth fund flow for timely completion of the project and to avoid cost

escalation.

5.5 Period of Implementation

It is proposed that the planned activities and outlay will be spent in a period of 4 years. Some

of the activities relating to extension, small irrigation works etc., are recurring and hence will

have a period of implementation less than a year. Through these activities PMKSY program

is expected to increase the water availability meeting the water demand from multiple

sources. A total of Rs. 103068.92 Lakhs will be spent during the next 4 years covering

46316.64 hectares.

5.6 Monitoring and Evaluation

The Strategic Action Plan of PMKSY will be monitored by the respective departments

through the regular reporting system and component wise progress will be monitored by the

District Level Irrigation Committee. Further, the activities, outputs and outcomes will be

reported in web based MIS of PMKSY for review at state and national level. Some of the key

indicators that will be used to monitor and evaluate the progress of PMKSY include:

1. Annual irrigation water supply per unit irrigated area measured as the ratio of total

volume of irrigation water supplied at intake divided by total area irrigated in all seasons

2. Potential created and utilized measured as the ratio of total potential utilized (measured

crop area) to irrigation potential created

3. Output (agricultural production) per unit irrigated area measured as the ratio of total value

of agriculture production divided by the total irrigated area

4. Output (agricultural production) per unit irrigation water supply measured as the ratio of

total value of agriculture production divided by the total volume of irrigated water

supplied

Page 47: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

47 | P a g e

5. Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total

Management, Operation and Maintenance (MOM) costs for the system divided by total

area irrigated (potential utilized)

6. Total Operations & Maintenance (O&M) cost per unit volume of water supplied

measured as total Management, Operation and Maintenance (MOM) costs for the system

divided Total volume of water supplied (all uses)

7. Equity performance measured as actual area irrigated in head, middle and tail divided by

Command area in head, middle and tail

5.7 Expected Output and Outcome

Table below represents the block-wise target proposed by various department to bring

additional land under irrigated cultivation through PMKSY. Total of 52944.64 hectares area

will be brought under irrigation. Highest area i.e. 17159.49 hectares will be brought under

irrigation in Selsella block while the lowest area i.e. 3922.19 hectares will be brought under

irrigation in Gambegre block.

Table 5-4: Block wise area to be brought under irrigation in DIP of West Garo Hills district

Blocks Total Command Area/ Irrigation Potential (Ha.)

Dadenggiri 4091.60

Dalu 8196.76

Gambegre 3922.19

Rongram 8349.66

Selsella 17159.49

Tikrikilla 11224.94

Grand Total 52944.64

5.8 Conclusion

The PMKYS District Irrigation Plan was prepared at Block level & District level. Through

PMKSY, DIP is envisaging to increase irrigation potential in the district. The model

irrigation plan envisages educating the farmers to adhere to the scientific practices in the

command area .This will increase the crop production per unit area of agriculture land. As

such majority of the agriculture in West Garo Hills is rainfed and the aforementioned minor

irrigation projects will facilitate better availability of water. A lot of Water Harvesting and

conservation structures, like Farm Ponds Check Dams, Nalah bunds are proposed which shall

enhance the Net Irrigated Area. The ground water potential is yet to be estimated for the use

of drinking and irrigation to the non-command areas. This shall favour micro irrigation

activities in the region mainly drip and sprinkler irrigation. This will also spur a change in

cropping patterns and farmers will show interests towards vegetable and other horticultural

crops. This can be boost commercial precision agriculture fostering local economy. There is

Page 48: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

48 | P a g e

high potential for micro irrigation in West Garo Hills and the plan has been proposed for

maximum utilization of the same. New Structures shall provide more surface water

opportunities and shall act as support for the livestock. This is one of the major water needs

that go unnoticed. The plan aims for cattle troughs and village ponds that favour cattle and

other livestock. Increased Water Availability shall spur many Agro-based industries in the

region providing employment generation. The holistic irrigation plan was prepared at Block

level & District level. PMKSY DIP will fulfil the resource gap in the irrigation chain.

Irrigation to every farm will be achieved through completion of surface minor projects

proposed under AIBP. Under Per Drop More crop, we will achieve enhance cropping &

productivity which leads to rural prosperity. The cost of the DIP is about Rs. 103068.92

lakhs. This will enhance total use efficiency management for higher yield in the district.

Page 49: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

49 | P a g e

Annexure I : Strategic Action Plan by Water Resources Department

Name of the Block: Rongram

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerned

Ministry/

Department

Component Activity

Total

Number/

Capacity

(cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

(9+11+13+15) (10+12+14+16)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14

1 Mongalgre MoWR HKKP

Surface

Minor

900 85 127.37 85.00 127.37

2 Rongekgre 750 25 37.24 25.00 37.24

Total 1650 110 164.61 110.00 164.61 0.00 0.00 0.00 0.00 0.00 0.00

1 Dollonggre

MoWR HKKP Surface

Minor

1050 65 129.59 65.00 129.59 - - - - - -

2 Anogre 750 40 79.75 40.00 79.75 - - - - - -

3 Rongkhongre 6250 60 119.77 60.00 119.77 - - - - - -

4 Asigre 2500 200 200.00 - - - - 200.00 200.00 - -

5 Chibra Agal 850 20 40.00 - - 20.00 40.00 - - - -

6 Gabil 650 25 50.00 - - - - - - 25.00 50.00

Total 12050 410 619.11 165.00 329.11 20.00 40.00 200.00 200.00 25.00 50.00

1 Edenbari

MoWR HKKP

Improvem

ent of

existing

schemes

1600 215 150.00

215.00 150.00

2 Soragre 1200 183 120.00

183.00 120.00

Total 2800 398 270.00 0.00 0.00 398.00 270.00 0.00 0.00 0.00 0.00

1 Watregre MoWR HKKP

RRR of

Water

Bodies

50219 120 150.00 120.00 150.00 - - - - - -

Total 50219 120 150.00 120.00 150.00 0 0 0 0 0 0

1 Rongekgre MoWR HKKP

Lined

Field

Channels

850 60 85.00 - - - - - - 60 85

Total 850 60 85.00 0.00 0.00 0.00 0.00 0.00 0.00 60 85

1 Ganolgre

MoWR HKKP Micro

Irrigation

105 6 10.50 - - 6 10.5 - - - -

2 Chandigre 30 7 12.50 - - 7 12.5 - - - -

3 Alakama 24 5 10.60 - - 5 10.6 - - - -

4 Chandigre 750 15 30.00 - - - - - - 15 30

5 Balupara 100 5.00 ₹ 5.00 - - 5.00 5.00 - - - -

Total 1009 38 68.6 0 0 23 38.6 0 0 15 30

1 Oragitok MOA &

Secondary 150 7.00 5.87 7.00 5.87 - - - - - -

Page 50: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

50 | P a g e

2 Boldamgre

FW-DAC&

FW

Storage

Structures

(Jalkund)

150 5.00 6.64 5.00 6.64 - - - - - -

Total 300 12 12.511 12 12.511 0 0 0 0 0 0

1 Selbalgre

State

Irrigation

Departme

nt

Name of

the Scheme

Multi

Purpose

Reservoirs

2520 5 60.00 5.00 60.00 - - - - - -

2 Upper

Chitoktak 5500 - 120.00 - - - - - 120 - -

3 Selbal Nokat 6250 5 40.00 5.00 40.00 - - - - - -

4 Samingre 8400 5 26.00 - - 5 26 - - - -

5 Ringrey 7500 - 100.00 - - - - - - - 100

6 Samingre 7000 6 32.40 - - 6 32.4 - - - -

7 Baljek Agal 6300 80 160.00 - - - - 80 160 - -

8 boldorengg

re 6500 - 145.00 - - - - - - - 145

9 Selbalgre 7500 300 1000.00 - - - - - - 300 1,000.00

10 Chibragre 5500 35 60.00 - - - 60 - - - -

11 Chibragre 6500 40 70.00 - - - 70 - - - -

12 Kalakgre 600 10.00 200.00 - - 10.00 200.00 - - - -

13 Sakalgre 900 14.00 400.00 - - 14.00 400.00 - - - -

14 Gurare 1000 60.00 1,000.00 - - - - 60.00 1000.00 - -

15 Matchurigre 320 10.00 70.00 - - - - 10.00 70.00 - -

16 Rongram 500 45.00 10,000.00 - - - - - - 45.00 10,000.00

Total 72,790.00 615.00 13,483.40 10.00 100.00 35.00 788.40 150.00 1,350.00 345.00 11,245.00

1 Selbalgre

State

Irrigation

Department

Name of

the Scheme Jalkund

850 10 14.50 10.00 14.50 - - - - - -

2 Oragitok 750 9 14.50 - - 9 14.5 - - - -

3 Aranggre 950 9 14.50 - - 9 14.5 - - - -

4 Digranggre 860 10 14.50 - - 10 14.5 - - - -

5 Dingringgre 160 7.5 8.80 7.50 8.80 - - - - - -

6 Boldamgre 150 5 7.90 5.00 7.90 - - - - - -

7 Oragitok 150 7 8.50 7.00 8.50 - - - - - -

8 Ganolgre 320 5.5 9.20 5.50 9.20 - - - - - -

9 Alla Kama 155 5.5 8.50 5.50 8.50 - - - - - -

10 Rengsangre 180 5 8.50 5.00 8.50 - - - - - -

11 Waribokgre 225 4.5 8.90 - - 4.5 8.9 - - - -

12 Aguragre 190 4 8.50 - - 4 8.5 - - - -

13 Digranggre 220 7 9.20 - - 7 9.2 - - - -

14 Rengsangre 190 4.5 7.90 - - 4.5 7.9 - - - -

15 Samingre 180 5 8.30 - - 5 8.3 - - - -

16 Misimagre 220 7 8.90 - - - - 7 8.9 - -

17 Aranggre 160 9 9.20 - - - - 5 9.2 - -

18 Chibragre 180 6 8.90 - - - - 5.5 8.9 - -

19 Chandigre 150 6 8.80 - - - - 6 8.8 - -

Page 51: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

51 | P a g e

20 Soragre 420 6 5.94

6 5.94

21 Pagugre 240 3 2.97

3 2.97

22 Pagugre 240 4 3.96

4 3.96

23 Rongkhongre 270 2.5 2.48

2.5 2.48

24 Matchurigre 190 5 9.20

5 9.2

25 Rewanang

160 8.00 10.00 - - 8.00 10.00 - - - -

Total 7760 155 222.55 45.5 65.9 76.5 111.65 28.5 45 0 0

1 Dura

Kantragre

State

Irrigation

Departme

nt

Name of

the Scheme

Spring

Rejuvenati

on Project

- - 7.50 - 7.50 - - - - - -

2 Upper

Chitoktak - - 8.20 - 8.20 - - - - - -

3 Deran Gittim - - 7.35 - 7.35 - - - - - -

4 Wakagre - - 7.25 - 7.25 - - - - - -

5 Wabok

Gittim - - 8.50 - 8.50 - - - - - -

6 Dakopgre - - 7.80 - 7.80 - - - - - -

7 Rengsangre

- 10.0 - - - -

8 Rongkhon

Agal - - 7.50 - 7.50 - - - - - -

9 Boldorenggre - - 7.65 - 7.65 - - - - - -

10

Upper

Rongkhon

(Bosco

Mount)

- - 8.20 - - - 8.2 - - - -

11 Chasingre - - 7.90 - - - 7.9 - - - -

12 Gandrak.

10.00

10 - - - -

13 Ringrey

Ading - - 10.20 - - - 10.2 - - - -

14

Chasingre

(Near

NEHU)

- - 8.25 - - - 8.25 - - - -

15 Balsanang - - 9.50 - - - 9.5 - - - -

16 Ballonggre - - 9.80 - - - 9.8 - - - -

17 Balsanang - - 9.10 - - - 9.1 - - - -

18 Rongkhon - - 8.90 - - - 8.9 - - - -

19 Agillanggre. - - 8.70 - - - 8.7 - - - -

20 Duragre - - 7.60 - - - 7.6 - - - -

21 Ganol Apal - - 7.90 - - - 7.9 - - - -

22 Asanang - - 7.70 - - - 7.7 - - - -

23 Chibragre - - 8.30 - - - 8.3 - - - -

24 Asanang - - 8.40 - - - 8.4 - - - -

25 Rongchigre - - 8.60 - - - 8.6 - - - -

Page 52: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

52 | P a g e

26 Aguragre - - 8.25 - - - 8.25 - - - -

27 Ringrey

Gittim - - 8.90 - - - 8.9 - - - -

28 Waribokgre - - 8.40 - - - 8.4 - - - -

29 Samingre - - 8.35 - - - 8.35 - - - -

30 Digranggre - - 8.90 - - - 8.9 - - - -

31 Megapgre - - 8.30 - - - 8.3 - - - -

32 Waribokgre I - - 8.60 - - - - - 8.6 - -

33 Ringgi Apal - - 9.50 - - - - - 9.5 - -

34 Allotgre - - 8.90 - - - - - 8.9 - -

35 Waribokgre

II - - 8.65 - - - - - 8.65 - -

36 Songkonggre - - 9.00 - - - - - 9 - -

37 Samingre - - 8.55 - - - - - 8.55 - -

38 Warisepgre - - 8.90 - - - - - 8.9 - -

39 Dingringgre - - 8.60 - - - - - 8.6 - -

40 Aguragre - - 8.90 - - - - - 8.9 - -

41 Boldamgre - - 8.70 - - - - - 8.7 - -

42 Spring Hills - - 8.65 - - - - - 8.65 - -

43 Watregre - - 9.10 - - - - - 9.1 - -

44 Rongkhongre - - 8.50 - - - - - 8.5 - -

45 Rongkhongre - - 9.20 - - - - - 9.2 - -

46 Rongkhongre - - 9.20 - - - - - 9.2 - -

47 Rongkhong

re - - 8.50 - - - - - 8.5 - -

48 Danakgre - - 10.20 - - - - - 10.2 - -

49 Sunny Hills - - 8.50 - - - - - 8.5 - -

50 Matchurigre - - 9.20 - - - - - 9.2 - -

51 Oragitok - - 8.90 - - - - - - - 8.9

52 Chandigre - - 9.20 - - - - - - - 9.2

53 Misimagre - - 8.70 - - - - - - - 8.7

54 Bolbokgre - - 8.90 - - - - - - - 8.9

55 Rengsangre - - 8.85 - - - - - - - 8.85

56 Badagonggre - - 9.00 - - - - - - - 9

57 Babadam - - 8.85 - - - - - - - 8.85

58 Matchakol

gre - - 8.80 - - - - - - - 8.8

59 Burny Hills - - 9.10 - - - - - - - 9.1

60 Edenbari - - 8.00 - - - 8.00 - - - -

61 Edenbari - - 10.00 - - - 10.00 - - - -

62 Pagugre - - 8.00 - - - 8.00 - - - -

63 Rongkhongre - - 8.00 - - - 8.00 - - - -

Page 53: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

53 | P a g e

Total 0.00 0.00 535.55 0.00 61.75 0.00 234.15 0.00 169.35 0.00 80.30

Grand Total 1,49,428 1,918.00 15,611.33 462.50 883.88 552.50 1,482.80 378.50 1,764.35 445.00 11,490.30

Name of the Block: Gambegre

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerned

Ministry/

Department

Component Activity Total Number/

Capacity (cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

(9+11+13+15) (10+12+14+16)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14

1 Anangpara

MoWR HKKP Surface

Minor

1050 50 97.64 50 97.64 - - - - - -

2 Nengja

bolchugre 750 55 107.25 55 107.25 - - - - - -

3 Dabelagre 2500 215 284.53 215 284.53 - - - - - -

4 Alabagre

65 128.03 65 128.03 - - - - - -

5 Badupara 850 80 117.29 80 117.29 - - - - - -

6 Doldigre - 89 - - - 89 267.00 - - - -

7 Jembagre - 30 - - - 30 75.00 - - - -

8 Mahalang 2520 12 46.89 12 46.89 - - - - - -

9 Suringre 6250 16 76.88 - - 16 76.88 - - - -

10 Melim 8400 15 48.69 - - 15 48.69 - - - -

11 Rongkhon

wabokgre 7000 1.6 35.2 - - 1.6 35.20 - - - -

12 Churabudugre 6500 45 113 - - 45 - - - - -

Total 35820 673.6 1055.4 477 781.63 196.6 502.77 0 0 0 0

1 Ringdee

MoWR HKKP

Improveme

nt of

existing

schemes

52500 500 1250 500 1,250.00 - - - - - -

2 Dengnakpara 56250 198 594 198 594 - - - - - -

3 Amindagre 50750 275 688 275 688 - - - - - -

Total 159500 973 2,532.00 973 2,532.00 0 0 0 0 0 0

1 Goragre

MoWR HKKP

Lined

Field

Channels

155 55 137 - - - - 150 137

2 Nengja

bolchugre 180 55 137 - - - -

55 137

3 Anangpara 225 50 125 - - - - 50 125

4 Dengnakpara - 198 - - - - - - - 198 396

5 Amindagre - 275 - - - - - - - 275 550

6 Nengja

Bolchugre - 55 - - - - - - - 55 110

7 Badupara - 80 - - - - - 80 160 - -

Page 54: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

54 | P a g e

8 Dabellagre - 215 - - - - - 215 430 - -

Total 560 983 399 0 0 0 0 495 852 583 1193

1 Bolchugre MOA &

FW-DAC&

FW

Secondary

Storage

Structures

(Jalkund)

250 5.40 6.930 5.40 6.930 - - - - - -

2 Badupara 300 5.00 4.950 5.00 4.950 - - - - - -

Total 550 10.4 11.88 10.4 11.88 0 0 0 0 0 0

1 Bolong State

Irrigation

Department

Name of

the Scheme RKVY

220 6 19 - - - - - - 6 19

2 Dia 180 6 26 - - 6 26.00 - - - -

Total 400 12 45 0 0 6 26.00 0 0 6 19

1 Okabra

songma 220 6.75 6.7 6.75 6.7 - - - - - -

2 Okabra

Songgitcham

State

Irrigation

Department

Name of

the Scheme Jalkund

160 6 5.93 6 5.93 - - - - - -

3 Babagre 180 6.5 6.47 6.5 6.47 - - - - - -

4 Nengja

bolchugre 150 2.6 7.5 - - 2.60 9.00 - - - -

5 Nengja

bolchugre 190 3 7.5 - - 5.40 5.32 - - - -

6 Dabellagre - 3 8 - - 2.50 6.00 - - - -

7 Gambegre - 3 8 - - 3.00 6.00 - - - -

8 Goragre - - - - - 3.50 6.00 - - - -

9 Goragre - - - - - 4.00 8.00 - - - -

Total 900 30.85 50.1 19.25 19.1 21 40.32 0 0 0 0

Grand Total 197730 2682.85 4093.38 1479.65 3344.61 223.6 569.09 495 852 589 1212

Name of the block: Dalu

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerned

Ministry/

Department

Component Activity

Total

Number/

Capacity

(cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

(9+11+13+15) (10+12+14+16)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14

1 Songjelpara

MOWR HKKP Surface

Minor

3000 100 - - - - - - - - -

2 Banaikali 11250 140 - - - - - - - - -

3 Asiragre 1125 39 77.039 39 77.039 - - - - - -

4 Dijingpita 2880 32 63.49 32 63.49 - - - - - -

5 Bengka 4680 58 115.42 58 115.42 - - - - - -

6 Koinadubi 1120 70 139.3 70 139.3 - - - - - -

7 Nokchi 6000 38 75 - - 38 75 - - - -

Page 55: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

55 | P a g e

8 Amongpara 2350 75 150 - - 75 150 - - - -

9 Mibonpara 2530 72 144 - - 72 144 - - - -

10 Mibon Nokat 4500 35 70 - - 35 70 - - - -

11 Alagre 4000 64 128 - - 64 128 - - - -

12 Bamonpara 4000 35 70 - - 35 70 - - - -

13 Chandapara 1600 38 76 - - 38 76 - - - -

14 Adugachol 13500 150 300 - - 130 260 - - - -

15 Makalgonchu 1600 30 60 - - 30 60 - - - -

16 Rengsipara 800 34 68 - - - - 34 68 - -

17 Rengsipara 3200 38 76 - - - - 38 76 - -

18 Ontapara 2400 36 72 - - - - 36 72 - -

19 Rangapara 1600 48 80 - - - - 48 80 - -

20 Posengagre 2500 35 70 - - - - 35 70 - -

21 Josipara 1800 50 100 - - - - 50 100 - -

22 Salbaripara 1200 28 56 - - - - - - 28 56

23 Baburam Bil 1400 18 36 - - - - - - 18 36

24 Kongtokpara 960 18 36 - - - - - - 18 36

25 Wagegitok 1470 16 32 - - - - - - 16 32

26 Rengrampara 960 40 80 - - - - - - 40 80

Total 82425 1337 2174.249 199 395.249 517 1033 241 466 120 240

1 Gonchu

MOWR HKKP

Improvem

ent of

Existing

Schemes

5000 48 71.5 - - 48 71.5 - - - -

2 Koreng

Nokat 6750 54 80 - - 54 80 - - - -

3 Makalpara 9000 59 88 - - - - 59 88 - -

4 Akinpara 960 36 36 - - - - - - 36 36

Total 21710 197 275.5 0 0 102 151.5 59 88 36 36

1 Josipara MOWR HKKP

RRR of

Water

Bodies

51840 170 325 170 325 - - - - - -

Total 51840 170 325 170 325 0 0 0 0 0 0

1 Koreng

Nokat

MOWR HKKP Lined Field

Channels

- 54 29.06 54 29.06 - - - - - -

2 Grajingfield - 46 34.5 - - 46 34.5 - - - -

3 Gonchudare - 48 36 - - - - 48 36 - -

4 Makkalpara - 59 47 - - - - - - 59 47

Total 0 207 146.56 54 29.06 46 34.5 48 36 59 47

1 Matchokpara MOA &

FW-DAC&

FW

Secondary

Storage

Structures

(Jalkund)

450 6.00 5.750 6.00 5.750 - - - - - -

2 Konapara 300 10.00 9.963 10.00 9.963 - - - - - -

3 Sonagre

Rongjibol 300 7.50 6.626 7.50 6.626 - - - - - -

Total 1050 23.5 22.339 23.5 22.339 0 0 0 0 0 0

1 Rangamati State Name of RKVY 250 18.5 18.53 18.5 18.53 - - - - - -

Page 56: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

56 | P a g e

2 Rongsep Irrigation

Departme

nt

the scheme 250 9.7 17.52 9.7 17.52 - - - - - -

3 Mandang 300 19.5 31.1 19.5 31.1 - - - - - -

4 Kimkol 320 11.7 18.91 11.7 18.91 - - - - - -

5 Amongpara 300 20 42 - - 20 42 - - - -

6 Marapara 300 20 42 - - 20 42 - - - -

7 Moitojora 320 10 21 - - 10 21 - - - -

8 Barongpara 400 15 31.5 - - 15 31.5 - - - -

9 Rimrangpara 200 25 52.5 - - 25 52.5 - - - -

10 Mibonpara 450 18 37.8 - - - - 18 37.8 - -

11 Harchati 500 15 31.5 - - - - 15 31.5 - -

12 Mandal 250 11 23.1 - - - - 11 23.1 - -

13 Sonajuri 300 12 25.2 - - - - 12 25.2 - -

14 Madra 320 20 42 - - - - 20 42 - -

15 Jijikapara 300 25 52.5 - - - - - - 25 52.5

16 Matchimpara 250 15 31.5 - - - - - - 15 31.5

17 Dalamgre 200 20 42 - - - - - - 20 42

18 Chongnapara 180 18 37.8 - - - - - - 18 37.8

19 Rongbokgre 200 25 52.5 - - - - - - 25 52.5

Total 5590 328.4 650.96 59.4 86.06 90 189 76 159.6 103 216.3

1 Amongpara State

Irrigation

Departme

nt

Name of

the scheme

Multi

Purpose

Reservoirs

2835 43 275.48 43 275.48 - - - - - -

2 Karong

Jengtalgre 560 10 48.04 10 48.04 - - - - - -

Total 3395 53 323.52 53 323.52 0 0 0 0 0 0

1 Darong Adu

State

Irrigation

Departme

nt

Name of

the scheme Jalkund

200 9.5 9.41 9.5 9.41 - - - - - -

2 Chongpot

Dopogre 250 8 7.92 8 7.92 - - - - - -

3 Tibapara 200 5 4.95 5 4.95 - - - - - -

4 Chandapara 150 6 5.94 6 5.94 - - - - - -

5 Chandapara 350 7 6.93 7 6.93 - - - - - -

6 Sonagre 300 6 5.94 6 5.94 - - - - - -

7 Jonangpara 300 10 9.9 10 9.9 - - - - - -

8 Chongpot

Mronggre 250 7.5 7.43 7.5 7.43 - - - - - -

9 Cheptapara 200 7 6.93 7 6.93 - - - - - -

10 Konapara 200 9 8.91 9 8.91 - - - - - -

11 Masangpani 180 6 5.94 6 5.94 - - - - - -

12 Josipara 250 8 7.92 8 7.92 - - - - - -

13 Josipara 250 6 5.94 6 5.94 - - - - - -

14 Matchokpara 300 6 5.94 6 5.94 - - - - - -

15 Rimrangpara 320 7 6.93 7 6.93 - - - - - -

16 Rimrangpara 300 9 8.91 9 8.91 - - - - - -

Page 57: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

57 | P a g e

17 Tibapara 400 7 7 - - 7 7 - - - -

18 Chikasin 420 5 5 - - 5 5 - - - -

19 Rangdapara 500 10 10 - - 10 10 - - - -

20 Rangapara 550 10 10 - - 10 10 - - - -

21 Kontokpara 550 4 4 - - 4 4 - - - -

22 Rangapara 500 8 8 - - 8 8 - - - -

23 Rongsep 200 8 8 - - 8 8 - - - -

24 Bengkajora 250 8.5 8.5 - - 8.5 8.5 - - - -

25 Koinabhoi 250 7.5 7.5 - - 7.5 7.5 - - - -

26 Konapara 250 7.5 7.5 - - 7.5 7.5 - - - -

27 Posengagre 200 9 9 - - - - 9 9 - -

28 Basulpara 150 8 8 - - - - 8 8 - -

29 Asiragre 180 10 10 - - - - 10 10 - -

30 Lower

Bamonpara 150 9 9 - - - - 9 9 - -

31 Gorangpara 250 10 10 - - - - 10 10 - -

32 Mrop 250 9 9 - - - - 9 9 - -

33 Kokokpara 200 10 10 - - - - - - 10 10

34 Cheptapara 150 5 5 - - - - - - 5 5

35 Cheptapara 300 10 10 - - - - - - 10 10

36 Rengrampara 350 8 8 - - - - - - 8 8

37 Rengrampara 350 8.5 8.5 - - - - - - 8.5 8.5

Total 10400 289 287.84 117 115.84 75.5 75.5 55 55 41.5 41.5

1 Darong Adu

State

Irrigation

Department

Name of

the scheme

Spring

Rejuvenation

Project

- - 6.5 - 6.5 - - - - - -

2 Karonggre

No.1 - - 8.68 - 8.68 - - - - - -

3 Karonggre

No.2 - - 8.41 - 8.41 - - - - - -

4 Karonggre

Songma - - 6.71 - 6.71 - - - - - -

5 Machangpani - - 6.66 - 6.66 - - - - - -

6 Koreng

Nokat - - 8.5 - - - 8.5 - - - -

7 Lower

Bamonpara - - 9.2 - - - 9.2 - - - -

8 Tibapara - - 9.35 - - - 9.35 - - - -

9 Sonagre

Rongjibol - - 8.55 - - - 8.55 - - - -

10 Rengrampara - - 9.8 - - - 9.8 - - - -

11 Magupara - - 9.35 - - - 9.35 - - - -

12 Natan Nokat

A - - 9.45 - - - 9.45 - - - -

Page 58: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

58 | P a g e

13 Jijikapara - - 9.52 - - - - - 9.52 - -

14 Rengsipara - - 8.55 - - - - - 8.55 - -

15 Rongdapara - - 8.2 - - - - - 8.2 - -

16 Natan Nokat

B - - 8.5 - - - - - 8.5 - -

17 Natanpara - - 9.2 - - - - - 9.2 - -

18 Rengrampara - - 8.85 - - - - - 8.85 - -

19 Magupara - - 9.25 - - - - - 9.25 - -

20 Baburam Bil - - 9.8 - - - - - - - 9.8

21 Kongtokpara - - 9.5 - - - - - - - 9.5

Total 0 0 182.53 0 36.96 0 64.2 0 62.07 0 19.3

Grand Total 176410 2604.9 4388.498 675.9 1334.028 830.5 1547.7 479 866.67 359.5 600.1

Name of the Block: Selsella

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departmen

t

Componen

t Activity

Total

Number/

Capacity

(cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.)

Comman

d Area

(hac.)

Fund

(lacs.) (9+11+13+15

)

(10+12+14+16

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14

1 Selsella

MOWR HKKP Surface

Minor

52500 312 773.35

2 Benabazar 11250 105 145.95

3 Kalupara 11250 76 151.71 76 151.71 - - - - - -

4 Chidinagre 12600 85 169.79 85 169.79 - - - - - -

5 Kalpara 3600 30 59.7 - - 30 59.7 - - - -

6 Marok 7500 40 79.6 - - 40 79.6 - - - -

7 Okanggre 6000 40 79.6 - - 40 79.6 - - - -

8 Kalangaon 12000 60 119.4 - - 60 119.

4 - - - -

9 Chamagre 12250 60 119.4 - - 60 119.

4 - - - -

10 Jonkipara 6750 40 79.6 - - - - 40 79.

6 - -

11 Mandagre 13125 50 99.5 - - - - 50 99.

5 - -

12 Bolbokgri 12000 40 79.6 - - - - 40 79.

6 - -

13 Taironggre 18000 30 59.7 - - - - 30 59. - -

Page 59: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

59 | P a g e

7

14 Dimdima 10500 45 89.55 - - - - 45 89.

55 - -

15 Ballonggre 7500 30 59.7 - - - - 30 59.

7 - -

16 Kangkalapara 4000 40 79.6 - - - - 40 79.

6 - -

17 Attamburi 4500 40 79.6 - - - - 40 79.

6 - -

18 Balujora 14000 50 99.5 - - - - 50 99.5 - -

19 Wanokgri 4500 25 49.75 - - - - - - 25 49.75

20 Jongnapara 9000 30 59.7 - - - - - - 30 59.7

21 Sapalguri 12600 35 69.65 - - - - - - 35 69.65

22 Rongkakgri 15750 40 79.6 - - - - - - 40 79.6

23 Dingnapara 13125 35 69.65 - - - - - - 35 69.65

24 Kongkaramana 16875 80 159.2 - - - - - - 80 159.2

25 Sapalgri 18000 60 119.4 - - - - - - 60 119.4

Total 309175 1478 3031.8 161 321.5 230 457.7 365

726.3

5 305 606.95

1 Ujenggri

MOWR HKKP

RRR of

Water

Bodies

50625 162 112.91 162 37.9

9

2 Dolgiri 50350 200 132.35 200 1.36

3 Bolsalgre 50400 382 758.43 382 758.43 - - - - - -

4 Rajabala 4750000 100 1,000.00 - - - - - - 100 1,000.00

Total

4901375.

0 844 2003.69 744.00 797.78 0.00 0.00 0.00 0.00 100.00 1000.00

1 Jigabari

MOWR HKKP Lined Field

Channels

- 230 169.57 230 169.57

2 Belbari - 95 48.1 95 48.1

3 Kasipara - 95 76

95 76

4 Kalapani - 98 78.4

98 78.

4

5 Nidanpur - 78 62.4

78 62.4

Total 0 596 434.47 325 217.67 95 76 98 78.4 78 62.4

1 Nengkalpara State

Irrigation

Departme

nt

Name of

the scheme RKVY

750 10 13.34 10 13.3

4 - - - - - -

2 Chikolgrang

Noksik 600 8 12.5 - - 8 12.5 - - - -

Total 1350 18 25.84 10 13.34 8 12.5 0 0 0 0

1 Megonggre State

Irrigation

Departmen

t

Name of

the scheme Jalkund

600 8 7.827 8 7.82

7 - - - - - -

2 Chikindaregre 315 8 7.942 8 7.94

2 - - - - - -

3 Shyamnagar 350 10 9.84 10 9.84 - - - - - -

Page 60: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

60 | P a g e

4 Lalmati 675 9.8 9.578 9.8 9.57

8 - - - - - -

5 Chidina

Songma 750 10 10 10 10 - - - - - -

6 Chidina 350 9 10 - - 9 10 - - - -

7 Mandagre 450 10 10 - - 10 10 - - - -

8 Rongsaigre 900 10 10 - - 10 10 - - - -

9 Matramchigre 675 9 10 - - - - 9 10 - -

10 Alokdia 540 9 10 - - - - 9 10 - -

11 Morasati 675 10 10 - - - - - - 10 10

12 Nagnipara 600 8 10 - - - - - - 8 10

13 Bokonggre 420 10.00 9.90 - - 10.00 9.90 - - - -

14 Chisikgre 380 10.00 9.90 - - 10.00 9.90 - - - -

15 Danokgre 350 9.00 8.91 - - - - 9.00 8.91 - -

16 Rongchandalgr

e 420 10.00 9.90 - - - - 10.00 9.90 - -

Total 8450 149.8 153.797 45.8 45.187 49 49.8 37 38.81 18 20

1 Ganchenggre

State

Irrigation

Departme

nt

Name of

the scheme

Spring

Rejuvenatio

n Project

- - 11.438 - 11.438 - - - - - -

2 Rongramgre - - 11.037 - 11.037 - - - - - -

3 Selsella

Apalgre - - 10.67 -

10.6

7 - - - - - -

4 Gaudia - - 10.87 - 10.8

7 - - - - - -

5 Chinabatgre - - 11.379 - 11.379 - - - - - -

6 Baklagre - - 10.86 - - - 10.86 - - - -

7 Nisnipara No.1 - - 10.5 - - - 10.5 - - - -

8 Nisnipara No.2 - - 11.5 - - - 11.5 - - - -

9 Chamaguri

No.1 - - 11.2 - - - 11.2 - - - -

10 Nisnipara No.3 - - 10.89 - - - 10.89 - - - -

11 Nesipara - - 9.5 - - - 9.5 - - - -

12 Sampalgre - - 10.8 - - - - - 10.8 - -

13 Dimdima - - 10.5 - - - - - 10.5 - -

14 Ramjong - - 11.25 - - - - - 11.25 - -

15 Singgimari - - 11.28 - - - - - 11.28 - -

16 Chikolgrang - - 11.5 - - - - - 11.5 - -

17 Komilabra - - 11.65 - - - - - - - 11.65

18 Damagre - - 11.85 - - - - - - - 11.85

19 Sampalgre - - 10.85 - - - - - - - 10.85

20 Chamguri No.2 - - 10.2 - - - - - - - 10.2

21 Bangsidua - - 10.5 - - - - - - - 10.5

Total 0 0 230.224 0 55.394 0 64.45 0 55.33 0 55.05

Page 61: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

61 | P a g e

1 Sarkarpara State

Irrigation

Departmen

t

Name of

the scheme

Multi

Purpose

Reservoirs

750 10.00 58.12 10.00 58.12 - - - - - -

2 Mronggre 3500000 3000.00 24,000.00 - - - - - - 3000.00 9,000.00

Total 3500750 3010.00 24,058.12 10.00 58.12 0.00 0.00 0.00 0.00 3000.00 9,000.00

1 Chikindaregre MOA &

FW-

DAC&

FW

Secondary

Storage

Structures

(Jalkund)

315 8.00 7.989 8.00 7.99 - - - - - -

2 Chidina

Songma 750 10.00 9.449 10.00 9.45 - - - - - -

Total 1065 18.00 17.44 18.00 17.44 0.00 0.00 0.00 0.00 0.00 0.00

1 Gumaijhora Other Loan

Projects

Name of

the scheme NABARD

60000 345 490.27 - - 345 490.27 - - - -

2 Kalchengpara 21000 478 950.07 - - 478 950.07 - - - -

Total 81000 823 1440.34 0 0 823

1440.3

4 0 0 0 0

Grand Total 8803165 6936.80 31395.72 1313.80

1526.4

3 1205.00

2100.7

9 500.00

898.8

9 3501.00

10744.4

0

Name of the Block: Dadenggre

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerned

Ministry/

Department

Component Activity

Total

Number/

Capacity

(cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

(9+11+13+15) (10+12+14+16)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14

1 Bangranggre

MOWR HKKP Surface

Minor

17500 70 132.24 - - - - - - - -

2 Gambalgre 11250 70 138.85 70 138.85 - - - - - -

3 Damal Asim 24000 80 159.2 - - 80 159.2 - - - -

4 Lower Baljek

Aduma 9000 50 99.5 - - 50 99.5 - - - -

5 Dagagre

Chenggagre 16875 50 99.5 - - 50 99.5 - - - -

6 Dilsegre 11250 40 79.6 - - - - 40 79.6 - -

7 Upper Baljek

Aduma 5400 30 59.7 - - - - 30 59.7 - -

8 Rambatgre 7500 30 59.7 - - - - 30 59.7 - -

9 Chibong Apal 10800 50 99.5 - - - - - - 50 99.5

10 Dara Apal 11250 50 99.5 - - - - - - 50 99.5

11 Baljek

Songgitcham 5760 40 79.6 - - - - - - 40 79.6

Page 62: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

62 | P a g e

Total 130585 560 1106.89 70 138.85 180 358.2 100 199 140 278.6

1 Rongadathgri MOWR HKKP

Improvem

ent of

Existing

Schemes

5625 60 79.05 60 79.05 - - - - - -

Total 5625 60 79.05 60 79.05 - - - - - -

1 Egopara MOWR HKKP Lined - 60 51 - - 60 51 - - - -

Field

Channels

2 Jambira - 90 76.5 - - 90 76.5 - - - -

3 Gimegre - 71 60.35 - - 71 60.35 - - - -

Total 5625 281 266.9 60 79.05 221 187.85 0 0 0 0

1 Rondupara

MOA &

FW-DAC&

FW

Secondary

Storage

Structures

(Jalkund)

450 8.00 7.927 8.00 7.927 - - - - - -

Total 450 8 7.927 8 7.927 0 0 0 0 0 0

1 Bolmagre State

Irrigation

Department

Name of

the scheme RKVY

360 6 13.5 - - 6 13.5 - - - -

2 Renchi Asim 540 5 11.25 - - 5 11.25 - - - -

3 Ajigre 600 14 31.5 - - - - 14 31.5 - -

4 Bokmagre 510 8 18 - - - - - - 8 18

Total 2010 33 74.25 0 0 11 24.75 14 31.5 8 18

1 Bangranggre

No.1

State

Irrigation

Departme

nt

Name of

the scheme Jalkund

360 6 5.975 6 5.975 - - - - - -

2 Bangranggre

No.2 720 8 7.15 8 7.15 - - - - - -

3 Sotmarenggre

No.1 525 10 9.9 10 9.9 - - - - - -

4 Sotmarenggre

No.2 300 5 4.99 5 4.99 - - - - - -

5 Gimegre 540 10 10 10 10 - - - - - -

6 Sadolpara Jal

Gram No.1 600 9 8.91 9 8.91 - - - - - -

7 Sadolpara Jal

Gram No.2 600 10 9.9 10 9.9 - - - - - -

8 Sadolpara Jal

Gram No.3 540 8 7.92 8 7.92 - - - - - -

9 Aduma 540 8 7.92 8 7.92 - - - - - -

10 Rondupara 720 6 5.94 6 5.94 - - - - - -

11 Sindapara 200 10 9.9 - - 10 9.9 - - - -

12 Rongsakgre 200 10 9.9 - - 10 9.9 - - - -

13 Asimgre 150 8 7.92 - - 8 7.92 - - - -

14 Noadinggre 350 9 8.91 - - 9 8.91 - - - -

15 Daregre 250 7 6.93 - - 7 6.93 - - - -

Page 63: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

63 | P a g e

16 Rom 350 8 7.92 - - - - 8 7.92 - -

17 Chibongagre 400 6 5.94 - - - - 6 5.94 - -

18 Jangrapara

No.1 150 5 4.95 - - - - 5 4.95 - -

19 Jangrapara

No.2 200 5 4.95 - - - - 5 4.95 - -

20 Teksragre 350 8 7.92 - - - - 8 7.92 - -

21 Kalsingre 360 9 8.91 - - - - - - 9 8.91

22 Rongnabakgre 600 10 9.9 - - - - - - 10 9.9

23 Rongkhongre 600 10 9.9 - - - - - - 10 9.9

24 Katananggre 520 8 7.92 - - - - - - 8 7.92

25 Rabonggre 350 9.00 8.91 - - 9.00 8.91 - - - -

26 Kamagre 300 8.00 7.92 - - 8.00 7.92 - - - -

27 Chandigre 320 8.00 7.92 - - - - 8.00 7.92 - -

28 Chandigre 450 10.00 9.90 - - - - 10.00 9.90 - -

29 Jangnakpara 250 9.00 8.91 - - - - - - 9.00 8.91

30 Galwanggre 320 10.00 9.90 - - - - - - 10.00 9.90

Total 10125 193 190.475 80 78.605 44 43.56 32 31.68 37 36.63

1 Rongsanggre

No.1

State

Irrigation

Departme

nt

Name of

the scheme

Spring

Rejuvenati

on Project

- - 10.76 - 10.76 - - - - - -

2 Rongsanggre

No.2 - - 11.24 - 11.24 - - - - - -

3 Sadolpara

No.1 - - 11.97 - 11.97 - - - - - -

4 Sadolpara

No.2 - - 11.66 - 11.66 - - - - - -

5 Chibragre - - 11.8 - 11.8 - - - - - -

6 Chibong Apal - - 10.75 - 10.75 - - - - - -

7 Rongchugre - - 11.2 - 11.2 - - - - - -

8 Rimchugre - - 10.5 - - - 10.5 - - - -

9 Sindapara - - 11.5 - - - 11.5 - - - -

10 Rongsanggre - - 10.8 - - - - - 10.8 - -

11 Rongkongri

No.1 - - 10.5 - - - - - 10.5 - -

12 Rongkongri

No.2 - - 10.2 - - - - - 10.2 - -

13 Digonggre

No.1 - - 9.8 - - - - - - - 9.8

14 Digonggre

No.2 - - 10.5 - - - - - - - 10.5

15 Digonggre

No.3 - - 11.2 - - - - - - - 11.2

Page 64: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

64 | P a g e

Total 0 0 164.38 0 79.38 0 22 0 31.5 0 31.5

1 Sindapara State

Irrigation

Department

Name of

the scheme

Multi

Purpose

Reservoirs

360 10.00 35.00 - - 10.00 35.00 - - - -

2 Rongsakgre

540 10.00 32.00 - - 10.00 32.00 - - - -

Total 900 20.00 67.00 - - 20.00 67.00 0.00 0.00 0.00 0.00

1 Romgri Other loan

Projects

NABARD 12000 60 102.64 60 102.64 - - - - - -

Total 12000 60 102.64 60 102.64 0 0 0 0 0 0

Name of the Block: Tikrikilla

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerned

Ministry/

Department

Component Activity

Total

Number/

Capacity

(cum)

Total

Command

Area (hac.)

Total Funds

(Lacs.) Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

Command

Area

(hac.)

Fund

(lacs.)

(9+11+13+15) (10+12+14+16)

1 2 3 4 5 6 7 8 9 10 11 12 13 1

4 15 14

1 Balupara MOWR AIBP Medium

Irrigation 360000 2500.00 20000.00 - - 2500.00 20000.00 - - - -

Total 360000 2500.00 20000.00 - - 2500.00 20000.00 - - - -

1 Raksamgre

MOWR HKKP Surface

Minor

43750 182 271.67 - - - - - - - -

2 Ronipara 15000 80 147.27 - - - - - - - -

3 Belguri 15750 70 139.37 70 139.37 - - - - - -

4 Watregre 9375 45 81.65 45 81.65 - - - - - -

5 Sagolchiga 13500 60 119.11 60 119.11 - - - - - -

6 Balupara 105000 800 1,592.00 - - 800 1,592.00 - - - -

7 Chiblekgre 12150 60 119.4 - - 60 119.4 - - - -

8 Mothapara 15000 50 99.5 - - - - 50 99.5 - -

9 Chimagre 14400 80 159.2 - - - - 80 159.2 - -

10 Kosidamgre 15000 70 139.3 - - - - - - 70 139.3

11 Andalsikgre 13500 70 139.3 - - - - - - 70 139.3

12 Ronggatgre 10000 65.00 129.94 - - 65.00 129.94 - - - -

13 Khasiapara 37500 70.00 139.93 - - 70.00 139.93 - - - -

Total 272425 1567 3007.77 175 340.13 860 1711.4 130 258.7 140 278.6

1 Photamati

MOWR HKKP

Improvem

ent of

Existing

Schemes

145920 567 680.4 - - - - 567 680.4 - -

2 Hatugaon 22500 150 180 - - 150 180 - - - -

Total 168420 717 860.4 0 0 150 180 567 680.4 0 0

1 Kadamsali MOWR HKKP

Groundwater

Development

- 40 36 40 36 - - - - - -

2 Kaimbathapara - 40 36 40 36 - - - - - -

Page 65: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

65 | P a g e

3 Paham - 40 36 40 36 - - - - - -

Total 0 120 108 120 108 0 0 0 0 0 0

1 Hatugaon MOWR HKKP

Lined Field

Channels

- 150 100.83 150 100.83 - - - - - -

2 Anggaripara - 78 62.4 - - 78 62.4 - - - -

Total 0 228 163.23 150 100.83 78 62.4 0 0 0 0

1 Jongchipara

MOA &

FW-DAC&

FW

Secondary

Storage

Structures

(Jalkund)

450 8.70 8.555 8.70 8.555 - - - - - -

Total 450 8.70 8.56 8.70 8.56 - - - - - -

1 Lower Watregre State

Irrigation

Departme

nt

Name of

the scheme RKVY

1200 7 13.72 7 13.72 - - - - - -

2 Surigre 840 9 20.25 - - 9 20.25 - - - -

3 Rongmachu 900 12 27 - - 12 27 - - - -

4 Lethengpara 900 14 31.5 - - - - 14 31.5 - -

5 Didapara 1080 7 15.75 - - - - 7 15.75 - -

Total 4920 49 108.22 7 13.72 21 47.25 21 47.25 0 0

1 Jongchipara

State

Irrigation

Departme

nt

Name of

the scheme Jalkund

200 8.7 8.731 8.7 8.731 - - - - - -

2 Lower Rimbegre 250 9 8.593 9 8.593 - - - - - -

3 Tikrikilla

Boldamgre 200 9.5 8.844 9.5 8.844 - - - - - -

4 Raksamgre

Songgitchamgre 350 8 7.92 8 7.92 - - - - - -

5 Raksamgre 450 8 7.92 8 7.92 - - - - - -

6 Doldonga 600 18 17.82 - - 18 17.82 - - - -

7 Deosali 250 10 9.9 - - 10 9.9 - - - -

8 Didapara 250 10 9.9 - - 10 9.9 - - - -

9 Dalchengkona

No.1 200 5 4.95 - - - - 5 4.95 - -

10 Dalchengkona

No.2 200 5 4.95 - - - - 5 4.95 - -

11 Dalchengkona

No.3 150 6 5.94 - - - - 6 5.94 - -

12 Manda Kosakgre

No.1 200 5 4.95 - - - - - - 5 4.95

13 Manda Kosakgre

No.2 150 6 5.94 - - - - - - 6 5.94

14 Dodanggre 320 10.00 9.90 - - 10.00 9.90 - - - -

Total 3770 118.2 116.258 43.2 42.008 48 47.52 16 15.84 11 10.89

1 Upper Raksamgre State

Irrigation

Department

Name of

the scheme

Multi

Purpose

Reservoirs

2400 50.00 180.00

50.00 180.00 - - - -

2 Rongbokgre 15000 30.00 120.00

30.00 120.00 - - - -

Total 17400 80.00 300.00

80.00 300.00 - - - -

1 Lower Watregre State Name of Spring - - 11.72 - 11.72 - - - - - -

Page 66: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

66 | P a g e

No.1 Irrigation

Departme

nt

the scheme Rejuvenation

Project 2

Lower Watregre

No.2 - - 11.83 - 11.83 - - - - - -

3 Renchigre - - 10.68 - 10.68 - - - - - -

4 Sindapara - - 11.04 - 11.04 - - - - - -

5 Chiblekgre - - 9.8 - - - 9.8 - - - -

6 Balsrigittim - - 10.2 - - - 10.2 - - - -

7 Manda Kosakgre

No.1 - - 10.5 - - - 10.5 - - - -

8 Manda Kosakgre

No.2 - - 9.5 - - - 9.5 - - - -

9 Boldamgre - - 11.2 - - - 11.2 - - - -

10 Mandagre - - 11.5 - - - 11.5 - - - -

11 Dalchenkona

No.1 - - 10.8 - - - - - 10.8 - -

12 Dalchenkona

No.2 - - 10.2 - - - - - 10.2 - -

13 Dalchenkona

No.3 - - 10.5 - - - - - 10.5 - -

14 Kosidamgre - - 9.8 - - - - - 9.8 - -

15 Andalsikgre No.1 - - 9.5 - - - - - 9.5 - -

16 Andalsikgre No.2 - - 9.2 - - - - - 9.2 - -

17 Rongmakgre - - 10.8 - - - - - - - 10.8

18 Didapara No.1 - - 11.2 - - - - - - - 11.2

19 Didapara No.2 - - 11.5 - - - - - - - 11.5

20 Didapara No.3 - - 11.8 - - - - - - - 11.8

21 Didapara No.4 - - 11.45 - - - - - - - 11.45

22 Didapara No.5 - - 11.25 - - - - - - - 11.25

Total 0 0 235.97 0 45.27 0 62.7 0 60 0 68

1 Nagargaon Other loan

Projects NABARD 3600 206 201.523 60

- - - - - -

Total 3600 206 201.523 60 0 0 0 0 0 0 0

Page 67: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

67 | P a g e

Annexure II : Strategic Action Plan by Agriculture Department

Name of the Block: Rongram C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerne

d

Ministry/

Departm

ent

Compone

nt Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Kamagre MoA&F

W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.50 6.00 1.00 6.00

1.00 6.00

2 Tebronggre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.50 12.00 2.00 6.00

1.50 6.00

3 Bangdagre MoA&F

W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.00 6.00 1.20 6.00

1.30 6.00

4 Dittegre MoA&F

W HKKP M.I. Checkd Dam 4.00 6.70 24.00 2.10 6.00 1.50 6.00 1.40 6.00 1.70 6.00

5 Dollong

Manda

MoA&F

W HKKP M.I. Checkd Dam 2.00 2.50 12.00

1.20 6.00 1.30 6.00

6 Bolmagre MoA&F

W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.50 6.00 0.90 6.00 1.10 6.00

7 Urrenggre MoA&F

W HKKP M.I. Checkd Dam 4.00 3.10 24.00 0.90 6.00 0.70 6.00 0.80 6.00 0.70 6.00

8 Dolong

Songma

MoA&F

W HKKP M.I. Checkd Dam 3.00 4.30 18.00 1.20 6.00 1.50 6.00 1.60 6.00

9 Rangwalkamg

re

MoA&F

W HKKP M.I. Checkd Dam 2.00 2.60 12.00

1.40 6.00

1.20 6.00

10 Robagre MoA&F

W HKKP M.I. Checkd Dam 3.00 3.80 18.00 1.10 6.00 1.30 6.00 1.40 6.00

11 Galwang

Songma

MoA&F

W HKKP M.I. Checkd Dam 2.00 0.00 12.00

6.00

6.00

12 Jendragre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.40 6.00

1.40 6.00

13 Misimagre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.70 12.00 1.30 6.00

1.40 6.00

Page 68: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

68 | P a g e

14 Bibragre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00 1.70 6.00

1.40 6.00

15 Tosekgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00

1.50 6.00

1.50 6.00

16 Matchurigre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.40 6.00

1.40 6.00

17 Damjonggre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.30 12.00 1.70 6.00

1.60 6.00

18 Chidekgre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.80 12.00

1.70 6.00

1.10 6.00

19 Marak

Jabetgre

MoA&F

W HKKP M.I. Checkd Dam 2.00 2.30 12.00 1.00 6.00

1.30 6.00

20 Derikgre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.80 12.00

1.40 6.00

1.40 6.00

21 Rencha Apal MoA&F

W HKKP M.I. Checkd Dam 2.00 2.50 12.00 1.20 6.00

1.30 6.00

22 Romba

Adinggre

MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00

1.50 6.00

1.60 6.00

23 Marak

Songma

MoA&F

W HKKP M.I. Checkd Dam 2.00 0.00 12.00

6.00

6.00

24 Silsekgre MoA&F

W HKKP M.I. Checkd Dam 3.00 4.40 18.00 1.40 6.00 1.60 6.00 1.40 6.00

25 Teksragre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00

1.60 6.00

1.50 6.00

26 Anogre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00

1.60 6.00

1.40 6.00

27 Marakpara MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00 1.50 6.00

1.50 6.00

28 Bugakolgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.20 12.00

1.40 6.00 1.80 6.00

29 Mongalgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00

1.40 6.00 1.60 6.00

30 Waram

Songma

MoA&F

W HKKP M.I. Checkd Dam 3.00 3.90 18.00 1.50 6.00 1.10 6.00 1.30 6.00

31 Gindopara MoA&F

W HKKP M.I. Checkd Dam 3.00 4.10 18.00 1.80 6.00 1.20 6.00

1.10 6.00

32 Rengsanggre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.10 6.00

1.10 6.00

33 Mrigre MoA&F HKKP M.I. Checkd Dam 2.00 2.60 12.00 1.30 6.00

1.30 6.00

Page 69: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

69 | P a g e

W

34 Kalakgre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.30 6.00

1.30 6.00

35 Chandigre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.80 12.00 1.40 6.00

1.40 6.00

36 Gondenggre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00

1.60 6.00

1.40 6.00

37 Rombagre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.40 6.00

1.40 6.00

38 Rongdenggre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.40 6.00

1.40 6.00

39 Bamigre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.00 12.00 1.40 6.00

1.60 6.00

40 Megapgre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.40 6.00

1.40 6.00

41 Tapragre MoA&F

W HKKP M.I. Checkd Dam 1.00 1.50 6.00

1.50 6.00

42 Wategre MoA&F

W HKKP M.I. Checkd Dam 3.00 4.10 18.00 1.40 6.00 1.60 6.00 1.10 6.00

43 Botegre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.30 12.00

1.10 6.00

1.20 6.00

44 Rongpotgre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.40 12.00 1.10 6.00

1.30 6.00

45 Ampanggre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.00 12.00

1.00 6.00

1.00 6.00

46 Sasatgre MoA&F

W HKKP M.I. Checkd Dam 3.00 4.00 18.00 1.20 6.00 1.40 6.00 1.40 6.00

47 Sakalgre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.80 12.00

1.40 6.00 1.40 6.00

48 Boladinggre MoA&F

W HKKP M.I. Checkd Dam 2.00 2.80 12.00 1.40 6.00

1.40 6.00

49 Rongramgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00

1.50 6.00

1.60 6.00

50 Timbogre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.40 12.00 1.70 6.00

1.70 6.00

51 Silsotgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.40 12.00

1.70 6.00 1.70 6.00

52 Chokagre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00 1.60 6.00

1.50 6.00

Page 70: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

70 | P a g e

53 Arbella

Chidekgre

MoA&F

W HKKP M.I. Checkd Dam 2.00 2.70 12.00 1.40 6.00

1.30 6.00

54 Dijingro Apal MoA&F

W HKKP M.I. Checkd Dam 2.00 2.40 12.00 1.50 6.00

0.90 6.00

55 Rongsep

Adinggre

MoA&F

W HKKP M.I. Checkd Dam 2.00 2.00 12.00 1.30 6.00

0.70 6.00

56 Buripara MoA&F

W HKKP M.I. Checkd Dam 2.00 3.50 12.00

1.40 6.00

2.10 6.00

57 Chidaogre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.70 12.00 1.90 6.00

1.80 6.00

58 Gambarigre MoA&F

W HKKP M.I. Checkd Dam 2.00 0.00 12.00

6.00

6.00

59 Goeragre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.80 12.00 1.90 6.00

1.90 6.00

60 Rongdikgre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.30 12.00 1.40 6.00

1.90 6.00

61 Asigre MoA&F

W HKKP M.I. Checkd Dam 2.00 3.10 12.00

1.40 6.00 1.70 6.00

62 Rangwal

Kamgre

MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

63 Matchurigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

64 Chandigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

65 Gondenggre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

66 Rombagre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

67 Rongdenggre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

68 Chiokgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

69 Wattegre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

70 Rongpotgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

71 Ampanggre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

72 Timbogre MoA & PDMC Surface Water 2.00 3.00 0.85 1.50 0.42

1.50 0.42

Page 71: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

71 | P a g e

FW Pumpsets

73 Rongchigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

74 Baladinggre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

75 Sasatgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

76 Rongramgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

77 Donsimagre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

78 Silsotchigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

79 Chokagre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85

1.50 0.42 1.50 0.42

80 Manggakgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

81 Diringgro

Apal

MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

82 Damjonggre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

83 Sropgre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

84 Chidaogre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

85 Agisimgre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

86 Goeragre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

87 Rongdikgre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

88 Asigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

89 Dorenggre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

90 Rongandigre MoA &

FW PDMC

Surface Water

Pumpsets 2.00 3.00 0.85 1.50 0.42

1.50 0.42

91 Daljagre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

Page 72: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

72 | P a g e

92 Mongalgre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

93 Bugakolgre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

94 Marakapara MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

95 Robagre MoA &

FW PDMC

Surface Water

Pumpsets 1.00 1.50 0.42

1.50 0.42

96 Buripara MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

97 Chidaogre MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

98 Gambarigre MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

99 Goeragre MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

0 Rongdikgre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

1 Asigre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

2

Rangwal

Kamgre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

3 Matchurigre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

4 Chandigre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

5 Gondenggre

MoA &

FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35

10

6

Rongram

block

MoA &

FW PDMC

Training within the

block

2000.0

0 5.00 500.00 1.25 500.00 1.25 500.00 1.25 500.00 1.25

10

7

Rongram

block

MoA &

FW PDMC

Exposure

Visit(Inter state)×

7days

80.00

4.48 20.00 1.12 20.00 1.12 20.00 1.12 20.00 1.12

10

8

Rongram

block

MoA &

FW PDMC

Exposure

Visit(Inter distric)×

3days

60.00

0.72 15.00 0.18 15.00 0.18 15.00 0.18 15.00 0.18

10

9

Rongram

block

MoA &

FW PDMC

Exposure

Visit(within

District)× 2days

120.00

0.72 30.00 0.18 30.00 0.18 30.00 0.18 30.00 0.18

Page 73: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

73 | P a g e

Total 2467.0

0 267.00 810.95 637.80

204.5

9 632.60

205.0

2 628.90

200.2

5 627.70

201.0

9

Page 74: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

74 | P a g e

Name of the Block: Gambegre C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerne

d

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Nengja

Bolchugre MoA&FW HKKP

M. I. Check

Dam at

Dikki

Suram

Stream

1 10 7.8 10 7.8

2 Nengja

Bolchugre MoA&FW HKKP

M. I. Check

Dam at

Matcha

Deram

Stream

1 8 11.25

8 11.25

3 Nengja

Bolchugre MoA&FW HKKP

M. I. Check

Dam at

Tebi

Stream

1 11 7.8

11 7.8

4 Aminda

Simsang MoA&FW HKKP

M. I. Check

Dam at

Darichik

Stream

1 15 9.6 15 9.6

5 Kirupara

Bokmagre MoA&FW HKKP

M. I. Check

Dam at

Okka

Stream

1 4 4.5 4 4.5

6 Kirupara

Bokmagre MoA&FW HKKP

M. I. Check

Dam at

Bokma

Stream

1 5 4.5

5 4.5

7 Rimrangpara MoA&FW HKKP

M. I. Check

Dam at

Chambil

Stream

1 3 11.25 3 11.25

Page 75: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

75 | P a g e

8 Dabelagre MoA&FW HKKP

M. I. Check

Dam at

Apal

Stream

1 8 7.2 8 7.2

9 Dabelagre MoA&FW HKKP

M. I. Check

Dam at

Melim

Stream

(L/Reaches

)

1 15 9

15 9

10 Suringgre MoA&FW HKKP

M. I. Check

Dam at

Choka

Stream

1 7 6 7 6

11 Chollongpara MoA&FW HKKP

M. I. Check

Dam at

Gudal

Stream

1 5 9 5 9

12 Anchenggre MoA&FW HKKP

M. I. Check

Dam at

Chibasal

Stream

1 4 6.48 4 6.48

13 Anchenggre MoA&FW HKKP

M. I. Check

Dam at

Chibongba

ng Stream

1 3 6

3 6

14 Gambegre MoA&FW HKKP

M. I. Check

Dam at

Chigitchak

Stream

1 3 4.2 3 4.2

15 Chigitchakgre MoA&FW HKKP

M. I. Check

Dam at

Skili

Stream

1 5 6.75 5 6.75

16 Churabudigre MoA&FW HKKP

M. I. Check

Dam at

Chijong

Stream

1 10 9 10 9

17 Churabudigre MoA&FW HKKP M. I. Check 1 10 8.4

10 8.4

Page 76: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

76 | P a g e

Dam at

Mega

Stream

(U/Reaches

)

18 Churabudigre MoA&FW HKKP

M. I. Check

Dam at

Mega

Stream

(L/Reaches

)

1 9 0

9

19 Churabudigre MoA&FW HKKP

M. I. Check

Dam at

Diblock

Stream

1 8 11.25

8 11.25

20 Churabudigre MoA&FW HKKP

M. I. Check

Dam at

Maraka

Stream

1 15 8.4 15 8.4

21 Churabudigre MoA&FW HKKP

M. I. Check

Dam at

Gangjam

Stream

1 18 9

18 9

22 Dilnigre MoA&FW HKKP

M. I. Check

Dam at Dia

Stream

1 10 9 10 9

23 Dabelagre MoA&FW HKKP

M. I. Check

Dam at

Mellim

Stream

1 9 6

9 6

24 Aminda

Simsang MoA&FW HKKP

M. I. Check

Dam at

Bringa

Stream

1 12 7.2

12 7.2

25 Nengja

Bolchugre MoA&FW HKKP

M. I. Check

Dam at

Asim

Stream

1 12 9

12 9

26 Dabelagre MoA&FW HKKP M. I. Check 1 15.2 7.02

15.2 7.02

Page 77: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

77 | P a g e

Dam at

Mellim

Stream

27 Dilnigre MoA&FW HKKP

M. I. Check

Dam at Dia

Stream

1 10.12 10.5

10.12 10.5

28 Aminda

Simsang MoA&FW HKKP

M. I. Check

Dam at

Bringga

Stream

1 20 7.2

20 7.2

29 Gambegre MoA&FW HKKP

M. I. Check

Dam at

Gopram

Chiring

1 11 6

11 6

30 Nengja

Bolchugre MoA&FW HKKP

Repairing

of

Damaged

MIP Dam

at Seel

stream

1 7 3.8 7 3.8

31 Churabudigre MoA&FW PDMC Water

Pump 6 12 2.5455 4 0.8485 4 0.8485 2

0.424

3 2

0.4242

5

32 Mebitpara MoA&FW PDMC Water

Pump 4 10 1.697 2.5

0.4242

5 2.5

0.4242

5 2.5

0.424

3 2.5

0.4242

5

33 Aminda

Simsang MoA&FW PDMC

Water

Pump 4 8 1.697 2

0.4242

5 2

0.4242

5 2

0.424

3 2

0.4242

5

34 Aminda

Rangsa MoA&FW PDMC

Water

Pump 4 8 1.697 2

0.4242

5 2

0.4242

5 2

0.424

3 2

0.4242

5

35 Dabelagre MoA&FW PDMC Water

Pump 4 8 1.697 2

0.4242

5 2

0.4242

5 2

0.424

3 2

0.4242

5

36 Rangmangre MoA&FW PDMC Water

Pump 4 7 1.697 1.75

0.4242

5 1.75

0.4242

5 1.75

0.424

3 1.75

0.4242

5

37 Rakwapara MoA&FW PDMC Water

Pump 4 6 1.697 1.5

0.4242

5 1.5

0.4242

5 1.5

0.424

3 1.5

0.4242

5

38 Gambegre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

39 Dilnigre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

40 Aminda MoA & PDMC Treadle 2 0.8 0.7 0.4 0.35 0.4 0.35

Page 78: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

78 | P a g e

Simsang FW Pump

41 Aminda

Rangsa

MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

42 Suringgre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

43 Nengja

Bolchugre

MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

44 Amakgre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

45 Dabelagre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

46 Anchenggre MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

47 Badupara MoA &

FW PDMC

Treadle

Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

48 Gambegre

block

MoA &

FW PDMC

Training

within the

block

2000

5 500 1.25 500 1.25 500 1.25 500 1.25

49 Gambegre

block

MoA &

FW PDMC

Exposure

Visit(Inter

state)×

7days

80

4.48 20 1.12 20 1.12 20 1.12 20 1.12

50 Gambegre

block

MoA &

FW PDMC

Exposure

Visit(Inter

distric)×

3days

60

0.72 15 0.18 15 0.18 15 0.18 15 0.18

51 Gambegre

block

MoA &

FW PDMC

Exposure

Visit(withi

n District)×

2days

120

0.72 30 0.18 30 0.18 30 0.18 30 0.18

Total 2340 349.32 253.75 690.8 112.60

4 676.9 81.474 627.8 26.7 614 32.97

Page 79: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

79 | P a g e

Name of the Block: Selsella C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerne

d

Ministry/

Departm

ent

Compon

ent Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fun

d

(lac

s)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fund

(lacs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 SmokSonggital MoA&F

W HKKP MIP Check Dam 1 3 8.4 3 8.4

2 Dengasi MoA&F

W HKKP MIP Check Dam 1 39 8.1 39 8.1

3 Sangkarigre MoA&F

W HKKP MIP Check Dam 1 37.6 9.6 37.6 9.6

4 Modhupara MoA&F

W HKKP MIP Check Dam 1 18.41 9.6 18.41 9.6

5 Chamaguri MoA&F

W HKKP MIP Check Dam 1 4 9.6 4 9.6

6 Apalgre MoA&F

W HKKP MIP Check Dam 1 14.66 10.8 14.66 10.8

7 Chismokgre MoA&F

W HKKP MIP Check Dam 1 12.40 9.6 12.40 9.6

8 Garobadha MoA&F

W HKKP MIP Check Dam 1 23.40 10.8 23.40 10.8

9 Mukdangra MoA&F

W HKKP MIP Check Dam 1 12.70 8.1

12.70 8.1

10 Maljanggre MoA&F

W HKKP MIP Check Dam 1 19.10 9.6

19.10 9.6

11 Baghmara MoA&F

W HKKP MIP Check Dam 1 20.00 10.5

20.00 10.5

12 Andharkona MoA&F

W HKKP MIP Check Dam 1 20.00 9.6

20.00 9.6

13 Dalupara MoA&F

W HKKP MIP Check Dam 1 15.00 9.6

15.00 9.6

14 Chengjora MoA&F

W HKKP MIP Check Dam 1 20.00 9.6

20.00 9.6

15 Abisilla MoA&F

W HKKP MIP Check Dam 1 3 12

3 12

Page 80: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

80 | P a g e

16 New Dengasi MoA&F

W HKKP MIP Check Dam 1 5 9.6

5 9.6

17 Mukdangra

Ghatgre

MoA&F

W HKKP MIP Check Dam 1 10 9.6

10 9.6

18 Nogapara MoA&F

W HKKP MIP Check Dam 1 6 10.8

6 10.8

19 Ronggekgre A MoA&F

W HKKP MIP Check Dam 1 10 10.8

10 10.8

20 Ronggekgre B MoA&F

W HKKP MIP Check Dam 1 20 9.6

20 9.6

21 Balnanggre MoA&F

W HKKP MIP Check Dam 1 25 10.8

25 10.8

22 Ranggira

Bolsalgre

MoA&F

W HKKP MIP Check Dam 1 10 9.6

10 9.6

23 Dopatchigre MoA&F

W HKKP MIP Check Dam 1 15 9.6

15 9.6

24 Chokonggre MoA&F

W HKKP MIP Check Dam 1 10 10.8

10 10.8

25 Goramara MoA&F

W HKKP MIP Check Dam 1 10 9.6

10 9.6

26 Kanchikona MoA&F

W HKKP MIP Check Dam 1 15 8.4

15 8.4

27 Porapara MoA&F

W HKKP MIP Check Dam 1 20 10.8

20 10.8

28 Diglapara MoA&F

W HKKP MIP Check Dam 1 40 10.8

40 10.8

29 Old Harigaon MoA&F

W HKKP MIP Check Dam 1 40 9.6

40 9.6

30 New Harigaon MoA&F

W HKKP MIP Check Dam 1 10 10.8

10 10.8

31 Nokatgre MoA&F

W HKKP MIP Check Dam 1 20 10.8

20 10.8

32 Gongglanggre MoA&F

W HKKP MIP Check Dam 1 10 9.6

10 9.6

33 Noonmati MoA&F

W HKKP MIP Check Dam 1 12 10.8

12 10.8

34 Koraitola MoA&F

W HKKP MIP Check Dam 1 10 10.8

10 10.8

35 Asimgre MoA&F HKKP MIP Check Dam 1 10.00 9.6

10.00 9.6

Page 81: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

81 | P a g e

W

37 Naginipara MoA&F

W HKKP MIP Check Dam 1 13 9 13 9

38 Bangalkhata MoA&F

W HKKP MIP Check Dam 1 15 5.4 15 5.4

39 Sindapara MoA&F

W HKKP MIP Check Dam 1 10 12.75 10 12.75

40 Thakimagre MoA&F

W HKKP MIP Check Dam 1 12 6 12 6

41 Rangmalgre MoA&F

W HKKP MIP Check Dam 1 10 5.4 10 5.4

42 Mengkakgre MoA&F

W HKKP MIP Check Dam 1 8 8.25

8 8.25

43 Alogdia MoA&F

W HKKP MIP Check Dam 1 6 2.4

6 2.4

44 Dijinggre MoA&F

W HKKP MIP Check Dam 1 7 4.95

7 4.95

45 Amokgre MoA&F

W HKKP MIP Check Dam 1 5 2.1

5 2.1

46 Songjalgre MoA&F

W HKKP MIP Check Dam 1 7 3.15

7 3.15

47 Gimbil A·ding MoA&F

W HKKP MIP Check Dam 1 9 3.15

9 3.15

48 Rongadotgre MoA&F

W HKKP MIP Check Dam 1 6 2.7

6 2.7

49 Koijuri MoA&F

W HKKP MIP Check Dam 1 8 2.4

8 2.4

50 Katalbari MoA&F

W HKKP MIP Check Dam 1 6 0.36

6 0.36

51 Deldela MoA&F

W HKKP MIP Check Dam 1 9 4.95

9 4.95

52 Arigre MoA&F

W HKKP MIP Check Dam 1 9 11.7

9 11.7

53 Gimigre MoA&F

W HKKP MIP Check Dam 1 12 7.2

12 7.2

54 Rangmalgre MoA&F

W HKKP MIP Check Dam 1 9 6

9 6

55 Wadagokgre MoA&F

W HKKP MIP Check Dam 1 8 4.95

8 4.95

Page 82: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

82 | P a g e

56 Peradanga MoA&F

W HKKP MIP Check Dam 1 9 5.4

9 5.4

57 Dalansa MoA&F

W HKKP Kodom Stream 1 10 8.1

10 8.1

58 Melagre MoA&F

W HKKP Naokata Stream 1 13 13.2 13 13.2

59 Mangsagre MoA&F

W HKKP Makbil Stream 1 8 9.6 8 9.6

60 Dokagre MoA&F

W HKKP Ginje Stream 1 9 14.4 9 14.4

61 Rongramgre MoA&F

W HKKP Matchok Stream 1 15 16.8 15 16.8

62 Chinabatgre MoA&F

W HKKP Chinabat Stream 1 14 13.2 14 13.2

63 Petchuagre MoA&F

W HKKP Petchua Stream 1 13 12 13 12

64 Ganchenggre MoA&F

W HKKP Gancheng Stream 1 17 9.9 17 9.9

65 Kanglapara MoA&F

W HKKP

Wakantabisik

Stream 1 11 14.4

11 14.4

66 Tongtangpara MoA&F

W HKKP Dama Stream 1 16 14.4

16 14.4

67 Matchinanggre MoA&F

W HKKP Tanbo Stream 1 10 11.7

10 11.7

68 Wajadagre MoA&F

W HKKP Rongbru Stream 1 13 21

13 21

69 Rengmagre MoA&F

W HKKP

Rongkabok

Stream 1 8 13.5

8 13.5

70 Asimgre MoA&F

W HKKP

Thobriusalak

Stream 1 9 18

9 18

71 Kalchengpara MoA&F

W HKKP Dadong Stream 1 15 18

15 18

72 Wakantagre MoA&F

W HKKP Sima Stream 1 14 14.4

14 14.4

73 Dipkaigaon MoA&F

W HKKP Pagla Stream 1 13 18

13 18

74 Dumduma MoA&F

W HKKP Jerki Stream 1 17 12.6

17 12.6

75 Kodaldhowa MoA&F HKKP Wakanta Stream 1 11 16.8

11 16.8

Page 83: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

83 | P a g e

W

76 Chandrapathar MoA&F

W HKKP Bakla Stream 1 16 12.6

16 12.6

77 Wakantagre MoA&F

W HKKP Watri Stream 1 14 14.4

14 14.4

78 Rochonpara MoA&F

W HKKP Singwil Stream 1 13 18

13 18

79 Kharigaon MoA&F

W HKKP

Chipong Misel

Stream 1 12 12.6

12 12.6

80 Khorakona MoA&F

W HKKP Kawak Stream 1 11 16.8

11 16.8

81 Babetpara MoA&F

W HKKP Mekbor Stream 1 16 17.1

16 17.1

82 Rochonpara MoA&F

W HKKP Chima Stream 1 16 18

16 18

83 Salbilla

(Bherberi)

MoA&F

W HKKP Singwil Stream 1 20 21.6

20 21.6

84 Merenggipara MoA&F

W HKKP Gola Stream 1 25 20.4

25 20.4

85 Chandrapathar MoA&F

W HKKP Chandra Stream 1 29 20.4

29 20.4

86 Chamaguri MoA&F

W HKKP Bolchu Stream 1 15 16.8

15 16.8

87 Okanggre MoA&F

W HKKP Bela Stream 1 15 16.8

15 16.8

88 Nichinipara MoA&F

W HKKP Mela Stream 1 17 14.4

17 14.4

89 Rabhakona MoA&F

W HKKP Champal Stream 1 19 16.5

19 16.5

90 Koikuri MoA&F

W HKKP Rabha Stream 1 20 16.8

20 16.8

91 Batabari MoA&F

W HKKP Grimjong Stream 1 20 14.4

20 14.4

92 SmokSonggital MoA&F

W PDMC Pump Set 12 12 5.091 3 1.273 3

1.27

3 3

1.27

3 3 1.273

93 Dengasi MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

94 Sangkarigre MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

Page 84: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

84 | P a g e

95 Modhupara MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

96 Chamaguri MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

97 Chismokgre MoA&F

W PDMC Pump Set 18 18 7.6365 5 2.121 5

2.12

1 4

1.69

7 4 1.697

98 Garobadha MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

99 Mukdangra MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

100 Maljanggre MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

101 Baghmara MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

102 Andharkona MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

103 Dalupara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

104 Chengjora MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

105 Abisilla MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

106 New Dengasi MoA&F

W PDMC Pump Set 6 6 2.5455 2 0.849 2

0.84

9 2

0.84

9

107 Mukdangra

Ghatgre

MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

108 Nogapara MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

109 Ronggekgre A MoA&F

W PDMC Pump Set 35 35 14.8488 9 3.818 9

3.81

8 9

3.81

8 8 3.394

110 Ronggekgre B MoA&F

W PDMC Pump Set 37 37 15.6973 10 4.243 9

3.81

8 9

3.81

8 9 3.818

111 Balnanggre MoA&F

W PDMC Pump Set 38 38 16.1215 10 4.243 10

4.24

3 9

3.81

8 9 3.818

112 Ranggira

Bolsalgre

MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

113 Dopatchigre MoA&F

W PDMC Pump Set 23 23 9.75775 6 2.546 6

2.54

6 6

2.54

6 5 2.121

114 Chokonggre MoA&F PDMC Pump Set 16 16 6.788 4 1.697 4 1.69 4 1.69 4 1.697

Page 85: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

85 | P a g e

W 7 7

115 Goramara MoA&F

W PDMC Pump Set 23 23 9.75775 6 2.546 6

2.54

6 6

2.54

6 5 2.121

116 Kanchikona MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

117 Porapara MoA&F

W PDMC Pump Set 38 38 16.1215 10 4.243 10

4.24

3 9

3.81

8 9 3.818

118 Diglapara MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

119 Old Harigaon MoA&F

W PDMC Pump Set 40 40 16.97 10 4.243 10

4.24

3 10

4.24

3 10 4.243

120 New Harigaon MoA&F

W PDMC Pump Set 15 15 6.36375 4 1.697 4

1.69

7 4

1.69

7 3 1.273

121 Nokatgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

122 Gongglanggre MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

123 Noonmati MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

124 Koraitola MoA&F

W PDMC Pump Set 15 15 6.36375 4 1.697 4

1.69

7 4

1.69

7 3 1.273

125 Asimgre MoA&F

W PDMC Pump Set 30 30 12.7275 8 3.394 8

3.39

4 7

2.97

0 7 2.970

126 Dijinggre MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

127 Katalbari MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

128 Rongsanggre MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

129 Songjalgre MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

130 Phershakandi MoA&F

W PDMC Pump Set 10 10 4.2425 3 1.273 3

1.27

3 2

0.84

9 2 0.849

131 Nikikona MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

132 Peradongga MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

133 Bahijhora MoA&F

W PDMC Pump Set 5 5 2.12125 2 0.849 2

0.84

9 1

0.42

4

Page 86: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

86 | P a g e

134 Wakantagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

135 Gaoragre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

136 Kharigaon MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

137 Damalgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

138 Mangrugre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

139 Salbilla-I MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

140 Alotgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

141 Kaluapara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

142 Mronggre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

143 Rangsagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

144 Simbukolgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

145 Tongtongpara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

146 Wajatagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

147 Dumduma MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

148 Shankarpara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

149 Kodaldhowa MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

150 Rajangjola MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

151 Mangsagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

152 Nonipara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

153 Khalpara MoA&F PDMC Pump Set 20 20 8.485 5 2.121 5 2.12 5 2.12 5 2.121

Page 87: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

87 | P a g e

W 1 1

154 Balachanda MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

155 Balachanda II MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

156 Khilbuin MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

157 Rabhakona MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

158 Aigarh MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

159 Ketkipara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

160 Batabari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

161 Koikuri MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

162 Chirakhawa MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

163 Dublamari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

164 Bandabok MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

165 Bhajamara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

166 Khasigre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

167 Khasimati MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

168 Dolguri MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

169 Melagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

170 Marakapara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

171 Chidinagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

172 Mangchimgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

Page 88: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

88 | P a g e

173 Rengma

Apalgre

MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

174 Khagagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

175 Rongmagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

176 Gutlibari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

177 Dalansa MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

178 Asimgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

179 Baklagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

180 Babedpara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

181 Haldibari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

182 Bhalukmari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

183 Kolsadubi MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

184 Agipenggre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

185 Nokatgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

186 Singwilgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

187 Ramjonggre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

188 Singimari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

189 Apalgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

190 Salbilla-III MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

191 Amguri MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

192 Kalchengpara MoA&F PDMC Pump Set 20 20 8.485 5 2.121 5 2.12 5 2.12 5 2.121

Page 89: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

89 | P a g e

W 1 1

193 Tongtangpara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

194 Matchigre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

195 Abima MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

196 Chokchokia MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

197 Rochonpara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

198 Ujenggre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

199 Jeldupara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

200 Chandakona MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

201 Jigabari MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

202 Merenggipara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

203 Chamaguri MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

204 Marok MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

205 Dipkaigaon MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

206 Jongkipara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

207 Jatihara MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

208 Dodoretgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

209 Galwanggre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

210 Mandagre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

211 Domagitok MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

Page 90: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

90 | P a g e

212 Bolsalgre MoA&F

W PDMC Pump Set 20 20 8.485 5 2.121 5

2.12

1 5

2.12

1 5 2.121

213 Old Harigaon MoA&F

W PDMC

Shallow Tube

Well 4 40 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

214 New Harigaon MoA&F

W PDMC

Shallow Tube

Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

215 Nokatgre MoA&F

W PDMC

Shallow Tube

Well 4 20 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

216 Gongglanggre MoA&F

W PDMC

Shallow Tube

Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

217 Noonmati MoA&F

W PDMC

Shallow Tube

Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

218 Koraitola MoA&F

W PDMC

Shallow Tube

Well 4 17 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

219 Asimgre MoA&F

W PDMC

Shallow Tube

Well 4 26.40 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55

220 Burijhar MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

221 Bhanggerpar MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

222 Sarokpara MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

223 Pabomari MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

224 Pathorkata MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

225 Morokkandi MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

226 Goladigli MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

227 Paham MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

228 Nidanpur MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

229 haribangga MoA&F

W PDMC

Shallow Tube

Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85

230 Bholarbhita MoA&F

W PDMC

Shallow Tube

Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85

231 Bhangakhata MoA&F PDMC Shallow Tube 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

Page 91: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

91 | P a g e

W Well

232 Char-Batapara MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

233 Puskunipara MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

234 Borshibandi MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

235 Dewankata MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

236 Punonagor MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

237 Shymding (M) MoA&F

W PDMC

Shallow Tube

Well 25 37.5 13.75 10.5 3.85 9 3.3 9 3.3 9 3.3

238 Solartek MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

239 Islampur MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

240 Nimaikata MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

241 Gudibala MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

242 Gomaijhora MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

243 Shail Kandi MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

244 Nayagaon (G) MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

245 Belbari MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

246 Rajpur MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

247 Aski Kandi MoA&F

W PDMC

Shallow Tube

Well 25 37.5 13.750 10.5 3.85 9 3.3 9 3.3 9 3.3

248 Qnajani MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

249 Old Bhaitbari MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

250 Gashbari MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

Page 92: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

92 | P a g e

251 Nayagaon (B) MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

252 Nolbari MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

253 Bhotduba MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

254 Bhaitbari

(Babu)

MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

255 Morasuti MoA&F

W PDMC

Shallow Tube

Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75

256 Bowabari MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

257 Kandargaon MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

258 Phersa kandi MoA&F

W PDMC

Shallow Tube

Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85

259 Williumpin MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

260 Alogdia MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

261 Nolbari (L) MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

262 Puskunipara MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

263 Shym Nagar MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

264 Rongsaigre MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

265 Bangsiduba MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

266 Shymding (G) MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

267 Demdema MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

268 Budebela MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

269 Gimbil A·ding MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

270 Naginipara MoA&F PDMC Shallow Tube 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

Page 93: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

93 | P a g e

W Well

271 Gimigre MoA&F

W PDMC

Shallow Tube

Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65

272 Rangmalgre MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

273 Babilgri MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

274 Arigre MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

275 Bahijhora (G) MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

276 Mengkakgre MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

277 Wadagokgre MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

278 kamargaon MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

279 Rongmachokgr

e

MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

280 Thakimagre MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

281 Sidapara MoA&F

W PDMC

Shallow Tube

Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1

282 Amoggre MoA&F

W PDMC

Shallow Tube

Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55

283 Sidakandi MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

284 Ambari MoA&F

W PDMC

Shallow Tube

Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85

285 Bharal MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

286 Pathranga MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

287 Kalogaon MoA&F

W PDMC

Shallow Tube

Well 45 67.5 24.75 18 6.6 16.5 6.05 16.5 6.05 16.5 6.05

288 Sialkandi MoA&F

W PDMC

Shallow Tube

Well 50 75 26.95 19.5 7.15 19.5 6.6 18 6.6 18 6.6

289 Rajabala MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

Page 94: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

94 | P a g e

290 Magurmari MoA&F

W PDMC

Shallow Tube

Well 75 112.5 41.25 28.5 10.45 28.5

10.4

5 28.5

10.4

5 27 9.9

291 Garodubi MoA&F

W PDMC

Shallow Tube

Well 75 112.5 41.25 28.5 10.45 28.5

10.4

5 28.5

10.4

5 27 9.9

292 U/ Haripur MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

293 L/ Haripur MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

294 Silkata MoA&F

W PDMC

Shallow Tube

Well 75 112.5 41.25 28.5 10.45 28.5

10.4

5 28.5

10.4

5 27 9.9

295 Namabila MoA&F

W PDMC

Shallow Tube

Well 80 120 44 30 11 30 11 30 11 30 11

296 Sakmal MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

297 Shabribari MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

298 Konarchar MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

299 Lalmati MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

300 Kasharipara MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

301 Char

Kasharipara

MoA&F

W PDMC

Shallow Tube

Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6

302 Hallidaganj MoA&F

W PDMC

Shallow Tube

Well 45 67.5 24.75 18 6.6 16.5 6.05 16.5 6.05 16.5 6.05

303 Char

Magurmari

MoA&F

W PDMC

Shallow Tube

Well 70 105 38.5 27 9.9 27 9.9 25.5 9.35 25.5 9.35

304 Namabila II MoA&F

W PDMC

Shallow Tube

Well 65 97.5 35.75 25.5 9.35 24 8.8 24 8.8 24 8.8

305 SmokSonggital MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

306 Dengasi MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

307 Sangkarigre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

308 Modhupara MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

309 Chamaguri MoA & PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

Page 95: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

95 | P a g e

FW

310 Apalgre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

311 Chismokgre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

312 Garobadha MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

313 Mukdangra MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

313 Maljanggre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

313 Selsella block MoA &

FW PDMC

Training within

the block 2000

5 500 1.25 500 1.25 500 1.25 500 1.25

313 Selsella block MoA &

FW PDMC

Exposure

Visit(Inter state)×

7days

80

4.48 20 1.12 20 1.12 20 1.12 20 1.12

313 Selsella block MoA &

FW PDMC

Exposure

Visit(Inter

distric)× 3days

60

0.72 15 0.18 15 0.18 15 0.18 15 0.18

313 Selsella block MoA &

FW PDMC

Exposure

Visit(within

District)× 2days

120

0.72 30 0.18 30 0.18 30 0.18 30 0.18

6809 6824.7 3165.5 2303

778.5

19 2231

806.

9 2161

773.

02 2275

807.0

74

Page 96: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

96 | P a g e

Name of the Block: Tikrikilla C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

No.

Name of the

Village

Concerne

d

Ministry/

Departm

ent

Compon

ent Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total

Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Khatonggre MoA&F

W HKKP Checkdam 1 10 10.80 10 10.80

2 Damachiga MoA&F

W HKKP Checkdam 1 6 9.80 6 9.80

3 Jurigaon MoA&F

W HKKP Checkdam 1 8 11.00 8 11.00

4 Balbalgre MoA&F

W HKKP Checkdam 2 11 17.80 6 9.00

5 8.8

5 Jugirjhar MoA&F

W HKKP Checkdam 1 7 9.80 7 9.80

6 Nagargaon MoA&F

W HKKP Checkdam 1 10 10.50 10 10.50

7 Dhelapara MoA&F

W HKKP Checkdam 2 3 9.90 10 9.90

8 Bollongitok MoA&F

W HKKP Checkdam 1 5 8.00 5 8

9 U/Watregre MoA&F

W HKKP Checkdam 2 15 19.70 10 10.8

5 8.9

10 Damachiga MoA&F

W HKKP Checkdam 2 10 11.50 6 8.5

6 3

11 Damachiga

Batol

MoA&F

W HKKP Checkdam 1 5 8.00 5 8

12 Mandagre MoA&F

W HKKP Checkdam 1 5 8.50 5 8.5

13 Joyrangre MoA&F

W HKKP Checkdam 1 6 8.90 6 8.9

14 Rangalgre MoA&F

W HKKP Checkdam 1 6 8.90 6 8.9

15 Gonda

apalgre

MoA&F

W HKKP Checkdam 1 6 8.90 6 8.9

Page 97: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

97 | P a g e

16 Bobokjakogr

e

MoA&F

W HKKP Checkdam 1 5 8.50 5 8.5

17 Angkerongdi

kgre

MoA&F

W HKKP Checkdam 1 7 9.00

7 9

18 Bolchuapalg

re

MoA&F

W HKKP Checkdam 1 6 9.00

6 9

19 Bondukmali MoA&F

W HKKP Checkdam 1 6 9.00

6 9

20 Darengchigr

e

MoA&F

W HKKP Checkdam 1 7 9.00

7 9

21 Katonggre MoA&F

W HKKP Checkdam 1 5 9.00

5 9

22 Rongmali MoA&F

W HKKP Checkdam 1 6 8.80

6 8.8

23 Ganarugre MoA&F

W HKKP Checkdam 1 6 8.80

6 8.8

24 Napakgre MoA&F

W HKKP Checkdam 1 6 9.50

6 9.5

25 Matchakgre MoA&F

W HKKP Checkdam 1

9.10

6 9.1

26 Renggigre MoA&F

W HKKP Checkdam 1 5 8.90

5 8.9

27 Raksamgre MoA&F

W HKKP Checkdam 2 11 19.60

6 9.8

5 9.8

28 Laskarpara(

G)

MoA&F

W HKKP Checkdam 1 7 8.90

7 8.9

29 Apalgre MoA&F

W HKKP Checkdam 1 6 8.50

6 8.5

30 Kotchugre MoA&F

W HKKP Checkdam 1 6 8.50

6 8.5

31 Mengonggre MoA&F

W HKKP Checkdam 1 7 9.90

7 9.9

32 Meghapara MoA&F

W HKKP Checkdam 2 14 17.80

8 8.9

6 8.9

33 Kakunanggr

e

MoA&F

W HKKP Checkdam 2 12 16.60

6 8.1 6 8.5

34 Rembiapal MoA&F

W HKKP Checkdam 2 14 19.60

7 9.8 7 9.8

35 Rensingpara MoA&F HKKP Checkdam 1 8 9.80

8 9.8

Page 98: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

98 | P a g e

W

36 Balbalgre MoA&F

W HKKP Check Dam 1 7 9.80

7 9.8

37 Jurigaon MoA&F

W HKKP Check Dam 1 8 9.80

8 9.8

38 Dalchengkon

a

MoA&F

W HKKP Check Dam 1 5 8.10

5 8.1

39 Pedalduba(G

)

MoA&F

W HKKP Check Dam 1 7 9.70

7 9.7

40 Jangrapara MoA&F

W HKKP Check Dam 1 6 9.10

6 9.1

41 Doabokgre MoA&F

W HKKP Check Dam 1 7 9.50

7 9.5

42 Daigre MoA&F

W HKKP Check Dam 2 11 18.00

6 9.5 5 8.5

43 Naguapara MoA&F

W HKKP Checkdam 1 7 9.80

7 9.8

44 Belguri MoA&F

W HKKP Checkdam 1 5 8.20

5 8.2

45 Ampangdam

gre

MoA&F

W HKKP Checkdam 1 5 8.20

5 8.2

46 U/Rembigre MoA&F

W HKKP Checkdam 1 5 8.20

5 8.2

47 L/Rembigre MoA&F

W HKKP Checkdam 1 5 8.20

5 8.2

48 L/Watregre MoA&F

W HKKP Checkdam 2 10 18.30

5 9.8 5 8.5

49 Jelbonggre MoA&F

W HKKP Checkdam 1 5 3.00

5 3

50 Rongbokgre MoA&F

W HKKP Checkdam 1 5 3.00

5 3

51 Dajakagre MoA&F

W HKKP Checkdam 1 5 3.00

5 3

52 Chimagre MoA&F

W HKKP Checkdam 1 5 3.00

5 3

53 U/Chisikgre MoA&F

W HKKP Checkdam 1 5 3.00

5 3

54 Dhapangpara MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

Page 99: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

99 | P a g e

55 Dhapangpara

-I

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

56 Dhapangpara

-II

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

57 L/Khamari MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

58 Nogorpara MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

59 Kongkira MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

60 Sabangre-A MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

61 L/Sabanggre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

62 U/Sabanggre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

63 Odalguri MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

64 Wankolagre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

65 Mohalgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

66 Jengrip MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

67 Dakop MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

68 Matchak

Sangra

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

69 Kalajhar MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

70 Kanchankon

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

71 Photamati MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

72 N/Photamati MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

73 L/Khasengd

hap

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25

74 U/Khasengd MoA&F PDMC Surface water 2 3 0.85

1.5 0.424

1.5 0.42

Page 100: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

100 | P a g e

hap W pump set 25 43

75 Boldampitba

ri

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

76 Bordubi MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

77 Borobatapar

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

78 Abirampara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

79 Aitibi MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

80 Borodoldong

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

81 Jongchipara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

82 Nokatgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

83 L/Damachig

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

84 Bahangre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

85 New

Kalapara

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

86 U/Kalapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

87 Kangakgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

88 Old

Kalapara

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

89 Dingbanggre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

90 Dabakgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

91 Jamdamgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

92 Danbanggre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

93 Gondachibpl

gre

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

Page 101: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

101 | P a g e

94 Rengitchigre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

95 Bolchukaton

gre

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

96 Bolchuading

re

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

97 Chinaramgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

98 Jasingre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

99 Rangtapgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

100 Kosidamgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

101 Borobakra MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

102 Hirapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

103 Kurung MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

104 Saltop

kurung

MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

105 Jengritgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

106 Bawagre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

107 Dilgigre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

108 Rongmakgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

109 Urringgre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

110 Nengbapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

111 Didapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

112 Kalwagre MoA&F

W PDMC

Surface water

pump set 2 3 0.85 1.5

0.424

25 1.5

0.424

25 0.4243

113 Mengotchigr MoA&F PDMC Surface water 2 3 0.85 1.5 0.424

1.5 0.424 0.4243

Page 102: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

102 | P a g e

e W pump set 25 25

114 Tikrikilla MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

115 Katolbari MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

116 Katolbari-II MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

117 Gaguapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

118 Kodamsali MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

119 Berupara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

120 Chamaguri MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

121 Balupara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

122 Baghpara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

123 Dotronggre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

124 Khokapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

125 Khasiapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

126 Dilchigre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

127 Bolsaldamgr

e

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

128 U/Kongrapar

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

129 L/Kongrapar

a

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

130 Nasyapara MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

131 Rabukong MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

132 Ravegre MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

Page 103: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

103 | P a g e

133 Tikrikilla

Achik

MoA&F

W PDMC

Surface water

pump set 2 3 0.85

1.5

0.424

25 1.5

0.42

43

134 Jengritgre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

135 Bawagre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

136 Dilgigre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

137 Rongmakgre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

138 Urringgre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

139 Nengbapara MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

140 Didapara MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

141 Kalwagre MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

142 Mengotchigr

e

MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

143 Tikrikilla MoA &

FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35

144 Tikrikilla

block

MoA &

FW PDMC

Training within

the block 2000

5.00 500 1.25 500 1.25 500 1.25 500 1.25

145 Tikrikilla

block

MoA &

FW PDMC

Exposure

Visit(Inter state)×

7days

80

4.48 20 1.12 20 1.12 20 1.12 20 1.12

146 Tikrikilla

block

MoA &

FW PDMC

Exposure

Visit(Inter

distric)× 3days

60

0.72 15 0.18 15 0.18 15 0.18 15 0.18

147 Tikrikilla

block

MoA &

FW PDMC

Exposure

Visit(within

District)× 2days

120

0.72 30 0.18 30 0.18 30 0.18 30 0.18

Total 2503 618 615.50 740 173.0

0 729 167.8 724 165.3 708.49

109.

4

Page 104: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

104 | P a g e

Name of the Block: Dalu C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

N

o.

Name of the

Village

Concerne

d

Ministry/

Departm

ent

Compon

ent Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fun

d

(lac

s)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

Comma

nd Area

(hac.)

Fun

d

(lacs

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Gangbanga MoA&F

W HKKP

M.I.Check Dam at

Deoghat Stream 1 20 6.75 20 6.75

2 Mibon Nokat MoA&F

W HKKP

M.I.Check Dam at

Mandang Stream 1 8 3 8 3

3 Chandubhoi MoA&F

W HKKP

M.I.Check Dam at

Modonjora Stream 1 10 8.4 10 8.4

4 Amongpara MoA&F

W HKKP

M.I.Check Dam at

Rom Stream 1 9 9 9 9

5 Joshipara MoA&F

W HKKP

M.I.Check Dam at

Bollong Stream 1 15 7.2 15 7.2

6 Chongpot

Mronggre

MoA&F

W HKKP

M.I.Check Dam at

Daching Stream 1 9 7.35 9 7.35

7 Mibonpara MoA&F

W HKKP

M.I.Check Dam at

Regi Stream 1 10 9.45 10 9.45

8 Rimrangpara MoA&F

W HKKP

M.I.Check Dam at

Damdil Stream 1 30 7.2

30 7.2

9 Jijikapara MoA&F

W HKKP

M.I.Check Dam at

Dikge Stream 1 10 6.75

10 6.75

10 Lower

Bamonpara

MoA&F

W HKKP

M.I.Check Dam at

Dilni Stream 1 8 3.6

8 3.6

11 Rongbokgre MoA&F

W HKKP

M.I.Check Dam at

Rongbok Stream 1 11 8.1

11 8.1

12 Gonchudare MoA&F

W HKKP

M.I.Check Dam at

Simchilang Stream 1 12 7.2

12 7.2

13 Dalugaon MoA&F

W HKKP

M.I.Check Dam at

Adu Stream 1 20 8.1

20 8.1

14 Mibonpara MoA&F

W HKKP

M.I.Check Dam at

Jamela Stream 1 8 4.5

8 4.5

15 Joshipara MoA&F

W HKKP

M.I.Check Dam at

Chidare Stream 1 10 6.3

10 6.3

Page 105: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

105 | P a g e

16 Asimgre MoA&F

W HKKP

M.I.Check Dam at

Dorek Stream 1 8 4.5

8 4.5

17 Magupara MoA&F

W HKKP

M.I.Check Dam at

Chigitchak Stream 1 10 6.3

10 6.3

18 Tibapara MoA&F

W HKKP

M.I.Check Dam at

Jankara Stream 1 13 8.1

13 8.1

19 Marapara MoA&F

W HKKP

M.I.Check Dam at

Rongsep Stream 1 12 7.2

12 7.2

20 Khonggre MoA&F

W HKKP

M.I.Check Dam at

Jental Stream 1 11 8.1

11 8.1

21 Gonchudare MoA&F

W HKKP

M.I.Check Dam at

Chikrangkrang

Stream

1 9 6.75

9 6.75

22 Tibapara MoA&F

W HKKP

M.I.Check Dam at

Nasin Stream 1 12 7.2

12 7.2

23 Nabandanggre MoA&F

W HKKP

M.I.Check Dam at

Echongdang

Stream

1 8 5.85

8 5.85

24 Moropgre MoA&F

W HKKP

M.I.Check Dam at

Morop Stream 1 8 7.2

8 7.2

25 Mibon Nokat MoA&F

W HKKP

M.I.Check Dam at

Rimrang Stream 1 9 6

9 6

26 Doldenga MoA&F

W HKKP

M.I.Check Dam at

Doldeng Stream 1 15 12.6

15 12.6

27 Koinabhoi MoA&F

W HKKP

M.I.Check Dam at

Koina Stream 1 12 8.1

12 8.1

28 Kotchu Adok MoA&F

W HKKP

M.I.Check Dam at

Bengga Stream 1 13 9.975

13 9.975

29 Darong Adu MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

30 Jarangkona MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

31 Jarangpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

32 Kotchu Adok MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

33 Halchati MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

34 Koinadubi MoA&F PDMC Surface Water 5 5 2.12125 2 0.84 1 0.424 1 0.424 1 0.424

Page 106: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

106 | P a g e

W Pumpsets 9 3 3 3

35 Tibapara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

36 Chandubhoi MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

37 Magupara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

38 Bamonpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

39 Dapgre MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

40 Kujikura MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

41 Mibonpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

42 Baburambill MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

43 Dalugaon MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

44 Jijikapara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

45 Gangbanga MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

46 Khillapara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

47 Surunanggre MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

48 Possengagre MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

49 Wagegitok MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

50 Mongolagre MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

51 Joshipara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

52 Chandapara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

53 Doldengagre MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

Page 107: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

107 | P a g e

54 Chongpot

Mronggre

MoA&F

W PDMC

Surface Water

Pumpsets 3 3 1.27275 2

0.84

9 1

0.424

3

55 Chongpot Dopo MoA&F

W PDMC

Surface Water

Pumpsets 2 2 0.8485 1

0.42

4 1

0.424

3

56 Nukkanpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

57 Amongpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

58 Gonchudare MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

59 Belbor MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

60 Balijora MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

61 Rimrangpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

62 Kontokpara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

63 Jongnapara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

64 Salbaripara MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

65 Koinabhui MoA&F

W PDMC

Surface Water

Pumpsets 5 5 2.12125 2

0.84

9 1

0.424

3 1

0.424

3 1

0.424

3

66 Kotchu Adok MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

67 Darong Adu MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

68 Jarangkona MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

69 Jarangpara MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

70 Kotchu Adok MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

71 Halchati MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

72 Koinadubi MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

73 Tibapara MoA & PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

Page 108: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

108 | P a g e

FW

74 Chandubhoi MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

75 Magupara MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

76 Dalu block MoA &

FW PDMC

Training within the

block 2000

5 500 1.25 500 1.25 500 1.25 500 1.25

77 Dalu block MoA &

FW PDMC

Exposure

Visit(Inter state)×

7days

80

4.48 20 1.12 20 1.12 20 1.12 20 1.12

78 Dalu block MoA &

FW PDMC

Exposure

Visit(Inter distric)×

3days

60

0.72 15 0.18 15 0.18 15 0.18 15 0.18

79 Dalu block MoA &

FW PDMC

Exposure

Visit(within

District)× 2days

120

0.72 30 0.18 30 0.18 30 0.18 30 0.18

Total 518 295.06 723 88.3

5 705 67.38 673 64.83 677 74.5

Page 109: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

109 | P a g e

Name of the Block: Dadenggre C&RD Block

2016-17 2017-18 2018-19 2019-20

S.

N

o.

Name of

the Village

Concerne

d

Ministry/

Departm

ent

Compon

ent Activity

Total

Numbe

r/

Capaci

ty

(cum)

Total

Command

Area

(9+11+13+

15)

Total

Funds

(Lacs.)

(10+12+14+

16)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

Comma

nd Area

(hac.)

Fund

(lacs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Hollaidanga MoA&F

W HKKP M. I. Check Dam 1 20 10.8 20 10.8

2 Bandenggre MoA&F

W HKKP M. I. Check Dam 1 15 13.65 15 13.65

3 Wankolagre MoA&F

W HKKP M. I. Check Dam 1 10 12 10 12

4 Rongkhong

gre

MoA&F

W HKKP M. I. Check Dam 1 12 10.8 12 10.8

5 Janjallagre MoA&F

W HKKP M. I. Check Dam 1 10.00 12.6 10.00 12.6

6 Bikonggre MoA&F

W HKKP M. I. Check Dam 1 8 11.55 8 11.55

7 Najokgre A MoA&F

W HKKP M. I. Check Dam 1 20 14.4 20 14.4

8 Najokgre B MoA&F

W HKKP M. I. Check Dam 1 25 11.7

25 11.7

9 Cheranokat

gre

MoA&F

W HKKP M. I. Check Dam 1 15 12

15 12

10 Chanangpar

a

MoA&F

W HKKP M. I. Check Dam 1 10 12

10 12

11 Rongkhong

gre

MoA&F

W HKKP M. I. Check Dam 1 10 14.4

10 14.4

12 Dajugre MoA&F

W HKKP M. I. Check Dam 1 5 10.5

5 10.5

13 Chanupara MoA&F

W HKKP M. I. Check Dam 1 15 11.7

15 11.7

14 Bangbanggr

e

MoA&F

W HKKP M. I. Check Dam 1 10 14.4

10 14.4

15 Renehigre MoA&F

W HKKP M. I. Check Dam 1 12 8.4

12 8.4

Page 110: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

110 | P a g e

16 Rongsanggr

e

MoA&F

W HKKP M. I. Check Dam 1 10 9.45

10 9.45

17 Chinarongg

re

MoA&F

W HKKP M. I. Check Dam 1 12 10.8

12 10.8

18 Baljek

Adugre

MoA&F

W HKKP M. I. Check Dam 1 6 16.8

6 16.8

19 Rabonggre MoA&F

W HKKP M. I. Check Dam 1 10 10.5

10 10.5

20 Romgre MoA&F

W HKKP M. I. Check Dam 1 20 13.5

20 13.5

21 Tomagre MoA&F

W HKKP M. I. Check Dam 1 10 14.7

10 14.7

22 Rongrabok

gre

MoA&F

W HKKP M. I. Check Dam 1 15 10.8

15 10.8

23 Gambarigre MoA&F

W HKKP M. I. Check Dam 1 15 11.7

15 11.7

24 Dallanggre MoA&F

W HKKP M. I. Check Dam 1 15 12

15 12

25 Darigre MoA&F

W HKKP M. I. Check Dam 1 15 10.8

15 10.8

26 Chibong

Apal

MoA&F

W HKKP M. I. Check Dam 1 20 13.5

20 13.5

27 Bolchugre MoA&F

W HKKP M. I. Check Dam 1 20 10.8

20 10.8

28 Sadolpara MoA&F

W HKKP M. I. Check Dam 1 15 12

15 12

29 Satigre MoA&F

W PDMC

Surface Water

Pumpsets 5 20 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

30 Chering

Apal

MoA&F

W PDMC

Surface Water

Pumpsets 5 20 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

31 Modelgre MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

32 Bolchugre MoA&F

W PDMC

Surface Water

Pumpsets 5 15 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

33 Hollaidanga MoA&F

W PDMC

Surface Water

Pumpsets 5 25 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

34 Bangrangre MoA&F

W PDMC

Surface Water

Pumpsets 6 15 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

35 Najokgre MoA&F PDMC Surface Water 5 15 2.12125 2 0.848 1 0.424 1 0.424 1 0.424

Page 111: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

111 | P a g e

W Pumpsets 5 25 25 25

36 Bandonggre MoA&F

W PDMC

Surface Water

Pumpsets 3 15 1.27275 1

0.424

25 1

0.424

25 1

0.424

25

37 Rangkhang

gre

MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

38 Romgre MoA&F

W PDMC

Surface Water

Pumpsets 5 20 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

39 Rengrabokg

re

MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

40 Chanupara MoA&F

W PDMC

Surface Water

Pumpsets 5 15 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

41 Rengsakgre MoA&F

W PDMC

Surface Water

Pumpsets 6 10 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

42 Rabonggre MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

43 Cheranggre MoA&F

W PDMC

Surface Water

Pumpsets 5 8 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

44 Durasangsil

gre

MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

45 Sadolpara MoA&F

W PDMC

Surface Water

Pumpsets 6 15 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

46 Tamagre MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

47 Kalsinggre MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

48 Rongchagre MoA&F

W PDMC

Surface Water

Pumpsets 6 10 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

49 Gambaregr

e

MoA&F

W PDMC

Surface Water

Pumpsets 5 13 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

50 Dilsigre MoA&F

W PDMC

Surface Water

Pumpsets 6 20 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

51 Asimgre MoA&F

W PDMC

Surface Water

Pumpsets 4 8 1.697 1

0.424

25 1

0.424

25 1

0.424

25 1

0.424

25

52 Kosigre MoA&F

W PDMC

Surface Water

Pumpsets 5 10 2.12125 2

0.848

5 1

0.424

25 1

0.424

25 1

0.424

25

53 Darigre MoA&F

W PDMC

Surface Water

Pumpsets 6 12 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

54 Dallanggre MoA&F

W PDMC

Surface Water

Pumpsets 6 15 2.5455 2

0.848

5 2

0.848

5 1

0.424

25 1

0.424

25

Page 112: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

112 | P a g e

55 Satigre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

56 Chering

Apal

MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

57 Modelgre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

58 Bolchugre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

59 Hollaidanga MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

60 Bangrangre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

61 Najokgre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

62 Bandonggre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

63 Rangkhang

gre

MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

64 Romgre MoA &

FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35

65 Dadenggre

block

MoA &

FW PDMC

Training within the

block 2000

5 500 1.25 500 1.25 500 1.25 500 1.25

66 Dadenggre

block

MoA &

FW PDMC

Exposure

Visit(Inter state)×

7days

80

4.48 20 1.12 20 1.12 20 1.12 20 1.12

67 Dadenggre

block

MoA &

FW PDMC

Exposure

Visit(Inter distric)×

3days

60

0.72 15 0.18 15 0.18 15 0.18 15 0.18

68 Dadenggre

block

MoA &

FW PDMC

Exposure

Visit(within

District)× 2days

120

0.72 30 0.18 30 0.18 30 0.18 30 0.18

Total 2442 739 413.0195 714 113.2

4 692

106.9

3 671

97.91

1 705

94.93

6

Page 113: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

113 | P a g e

Annexure III : Strategic Action Plan by Horticulture Department

Name of the Block: Dadenggre C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Modelgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

2 Sadolpara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

3 Romgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

4 Damal Asim MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

5 Gimbilgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

6 Bikongre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

7 Amingokgre MoA PDMC Water 1 1 5.00

1 5.00

Page 114: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

114 | P a g e

harvestin

g

sructure

8 Bangnanggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

9 Rongchugre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

10 Aigre Apal MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

11 Rongsakgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

12 Tomagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

13 Rongkemgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

14 Mondugre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

15 Darigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

16 Asimgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

Page 115: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

115 | P a g e

17 Baljek

swongitcham MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

18 Chigichakgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

19 Kentapara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

20 Dokramgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

21 Dallangre MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

22 Ajrigre MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

23 Dadengre MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

24 Bolchugre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

25 Hallaidanga MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

26 Disegre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

27 Romgre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

28 Damal Asim MoA PDMC Springkl

er 20 2 13.00

2 13.00

Page 116: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

116 | P a g e

Irrigation

29 Chibongre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

30 Chandigre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

31 Asimgre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

32 Chibong Apal MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

33 Amingokgre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

34 Sathegre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

35 Tamagre

Springkl

er

Irrigation

20 2 13.00

2 13.00

36 Kalsingre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

37 Rankimgre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

38 Dechingre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

39 Chibong apal MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

40 Gimbilgre MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

41 Rongsakgre MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

42 Kama MoA PDMC Drip 2 2 3.00 2 3.00

Page 117: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

117 | P a g e

Mronggre irrigation

43 Sata

Mronggre MoA PDMC

Drip

irrigation 2 2 3.00 2 3.00

44 Chandigre MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

45 dadenggre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

46 Chibonggre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

47 Damal Asim MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

48 Najokgre(A) MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

49 Kalsingre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

50 Rongkongre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

51 Magalpara MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

52 Kangkarongg

re (A) MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

53 Egopara MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

54 Rambatgre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

55 Rongdupara MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

56 Jangrapara MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

57 Kama

boldakgre MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

58 Kama

Mronggre MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

59 Nalsa

Mrongre MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

Grand Total

Total=

98 407.00

Page 118: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

118 | P a g e

Name of the Block: Tikrikilla C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Napakgre MoA PDMC

Springkl

er

Irrigation

30 3 19.00 3 19.00

2 Upper

Watregre MoA PDMC

Springkl

er

Irrigation

30 3 19.00 3 19.00

3 Jugirjhar MoA PDMC

Springkl

er

Irrigation

30 3 19.00 3 19.00

4 Haribhanga MoA PDMC

Springkl

er

Irrigation

30 3 19.00 3 19.00

5 Megongre MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

6 Kakunangre MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

7 Bogadal MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

8 Apalgre MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

9 Matchokgre MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

10 Jangrapara MoA PDMC Springkl

er 30 3 19.00

3 19.00

Page 119: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

119 | P a g e

Irrigation

11 Boldampitbari MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

12 Bakripara MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

13 Kathalbari MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

14 Upper

Khamari MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

15 Dhelapara MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

16 New

Photamati MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

17 Dhapangpara MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

18 Photamati MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

19 Odalguri MoA PDMC

Springkl

er

Irrigation

30 3 19.00

3 19.00

20 Doabokgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

21 Raksamgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

22 Rengsingpara MoA PDMC

Water

harvestin

g

1 1 5.00 1 5.00

Page 120: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

120 | P a g e

sructure

23 Jangrapara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

24 Upper

Khamari MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

25 Jansingre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

26 Chinaramgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

27 Gonda

Chibolgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

28 Ankerongdikg

re MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

29 Jamdangre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

30 Pedaldoba MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

31 Salbari MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

32 Kasidangre MoA PDMC Water

harvestin1 1 5.00

1 5.00

Page 121: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

121 | P a g e

g

sructure

33 Didapara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

34

Jangrapara

Songgitchamg

re

MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

35 Bolonggitok MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

36 Roniasim MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

37 Dilsigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

38 Rambigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

39 Wankolagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

40 Upper

Khamari MoA PDMC

Drip

irrigation 3 3 4.50 3 4.50

41 Sabanggre MoA PDMC Drip

irrigation 3 3 4.50 3 4.50

42 upper

Sabanggre MoA PDMC

Drip

irrigation 3 3 4.50 3 4.50

43 Upper

Watregre MoA PDMC

Drip

irrigation 3 3 4.50 3 4.50

44 Ringigre MoA PDMC Drip 3 3 4.50 3 4.50

Page 122: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

122 | P a g e

irrigation

45 Jamdamgre MoA PDMC Drip

irrigation 3 3 4.50 3 4.50

46 Doabokgre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

47 Raksamgre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

48 Rengsingpara MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

49 Jangrapara MoA PDMC Drip

irrigation 3 3 9.00

3 4.50 3 4.50

50 Roniasim MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

51 Dilsigre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

52 Rambigre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

53 Wankolagre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

54 Napakgre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

55 Bogadal MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

56 Apalgre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

57 Matchokgre MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

58 Boldampitbari MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

59 Bakripara MoA PDMC Drip

irrigation 3 3 4.50

3 4.50

Grand Total

Total=

137 555.50

Page 123: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

123 | P a g e

Name of the Block: Gambegre C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Nengja

Bolchugre MoA PDMC

Springkle

r

Irrigation

40 4 26.00 4 26.00

2 Dilnigre MoA PDMC

Springkle

r

Irrigation

40 4 26.00 4 26.00

3 Aminda

Rangsa MoA PDMC

Springkle

r

Irrigation

20 2 19.00 2 19.00

4 Suringgre MoA PDMC

Springkle

r

Irrigation

40 4 26.00

4 26.00

5 Bandra

A`dinggre MoA PDMC

Springkle

r

Irrigation

40 4 26.00

4 26.00

6 Kopogre MoA PDMC

Springkle

r

Irrigation

20 2 19.00

2 19.00

7 Doldegre MoA PDMC

Springkle

r

Irrigation

40 4 26.00

4 26.00

8 Churabudigr

e MoA PDMC

Springkle

r

Irrigation

20 2 19.00

2 19.00

9 Samanda MoA PDMC

Springkle

r

Irrigation

20 2 19.00

2 19.00

10 Aminda

Simsang MoA PDMC

Springkle

r 40 4 26.00

4 26.00

Page 124: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

124 | P a g e

Irrigation

11 Chigitchakgr

e MoA PDMC

Springkle

r

Irrigation

20 2 19.00

2 19.00

12 Gambegre MoA PDMC

Springkle

r

Irrigation

20 2 19.00

2 19.00

13 Nengja

Bolchugre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

14 Dilnigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

15 Aminda

Rangsa MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

16 Suringgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

17 Bandra

A`dinggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

18 Chengkurigr

e Mellim MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

19 Doldegre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

20 Churabudigr

e MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

Page 125: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

125 | P a g e

21 Samanda MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

22 Aminda

Simsang MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

23 Chigitchakgr

e MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

24 Gambegre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

25 Gongbu

Chiring MoA PDMC

Drip

irrigation 2 2 3.00 2 3.00

26 Kopogre MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

27 Lower

Darengre MoA PDMC

Drip

irrigation 2 2 3.00 2 3.00

28 Aminda

Simsang MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

29 Chigitchakgr

e MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

30 Gambegre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

Grand Total

Total=

60 348.00

Page 126: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

126 | P a g e

Name of the Block: Dalu C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Nakdanpara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

2 Magupara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

3 Josipara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

4 Rengrampar

a MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

5 Mandagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

6 Kherapara

Songma MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

7 Songmagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

8 Asurigre MoA PDMC Water 1 1 5.00

1 5.00

Page 127: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

127 | P a g e

harvestin

g

sructure

9 Babelapara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

10 Halchati MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

11 Kotchu

Adok MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

12 Adanggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

13 Piljigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

14 Possenggagr

e MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

15 Songjilpara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

16 Barongpara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

17 Darong Adu MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

Page 128: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

128 | P a g e

18 Chandobhui MoA PDMC

Springkle

r

Irrigation

20 2 13.00 2 13.00

19 Killapara MoA PDMC

Springkle

r

Irrigation

20 2 13.00 2 13.00

20 Salbaripara MoA PDMC

Springkle

r

Irrigation

20 2 13.00 2 13.00

21 Koinadubhui MoA PDMC

Springkle

r

Irrigation

20 2 13.00 2 13.00

22 Kanonggre MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

23 machangpan

i MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

24 Rimrangpara MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

25 Makalpara MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

26 Sonagre MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

27 Jijikapara MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

28 Upper

Bamonpara MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

29 Baburambil MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

30 Darong Adu MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

Page 129: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

129 | P a g e

31 Purakhasia MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

32 Dilnegre MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

33 Gangbanga MoA PDMC

Springkle

r

Irrigation

20 2 13.00

2 13.00

34 Tibapara MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

35 Koinadubhui MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

36 Khujibura MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

37 Rengginpara MoA PDMC Drip

irrigation 2 2 3.00 2 3.00

38 Amongpara MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

39 Sununamggr

e MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

40 Jarangkona MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

41 Noksi MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

42 Doldengaggr

e MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

43 Didogre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

44 Belador MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

45 Dapgre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

46 Dalugaun MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

47 Adugachol MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

48 Dalamgre MoA PDMC Drip

irrigation 2 2 3.00

2 3.00

Page 130: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

130 | P a g e

49 Nokdan

Nokat MoA PDMC

Drip

irrigation 2 2 3.00

2 3.00

Total=

81 341.00

Page 131: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

131 | P a g e

Name of the Block: Selsella C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerne

d

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fun

d

(lacs.

)

Comman

d Area

(hac.)

Fun

d

(lacs.

)

Comman

d Area

(hac.)

Fun

d

(lacs.

)

Comman

d Area

(hac.)

Fun

d

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Nengkhalpara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

2 Simbukolgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

3 Boldoka MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

4 Wakhantagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

5 Chambagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00 1 5.00

6 Asimgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

7 Maljanggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

8 Matchinanggre MoA PDMC Water 1 1 5.00

1 5.00

Page 132: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

132 | P a g e

harvestin

g

sructure

9 Marakapara MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

10 Sangkarigre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

11 Apalgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

12 wajadagre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

13 Sugengre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

14 Agipenggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

15 Galwanggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

16 Gimbidua MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

17 Apalgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

Page 133: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

133 | P a g e

18 Mangsanggre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

19 Sasatgre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

20 Chibongre MoA PDMC

Water

harvestin

g

sructure

1 1 5.00

1 5.00

21 Mukdangra MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

22 Harigaon(old) MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

23 Dalupara MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

24 New Harigaon MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

25 Ujenggre MoA PDMC

Springkl

er

Irrigation

20 2 13.00 2 13.00

26 Goramara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

27 Khalchengpara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

28 Rangthapara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

29 Domagitok MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

Page 134: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

134 | P a g e

30 Bhalukmari MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

31 Sangkarigre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

32 Apalgre MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

33 Amguri MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

34 Damalgre(Selsel

la) MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

35 Singimari(Selsel

la) MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

36 Kalupara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

37 Haripur MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

38 Magurmari MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

39 Nayapara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

40 Nonipara MoA PDMC

Springkl

er

Irrigation

20 2 13.00

2 13.00

41 Nengkhalpara MoA PDMC Drip

Irrigation 2 2 3.00 2 3.00

42 Ballongre MoA PDMC Drip

Irrigation 2 2 3.00 2 3.00

43 Boldoka MoA PDMC Drip

Irrigation 2 2 3.00 2 3.00

Page 135: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

135 | P a g e

44 Wakhantagre MoA PDMC Drip

Irrigation 2 2 3.00 2 3.00

45 Matchinagre MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

46 Apalgre MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

47 Asimgre MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

48 Mukdangra MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

49 Simbulkolgre MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

50 Domagitok MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

51 Singimari MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

52 Haripur MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

53 Magurmari MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

54 Nangapara MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

55 Nonipara MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

56 Thongthongpara MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

57 Selsella MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

58 Garobadha MoA PDMC Drip

Irrigation 2 2 3.00

2 3.00

Grand Total

Total=

96 414.00

Page 136: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

136 | P a g e

Name of the Block: Rongram C & RD Block

2016-17 2017-18 2018-19 2019-20

S.

No

.

Name of the

Village

Concerned

Ministry/

Departme

nt

Compone

nt Activity

Total

Numbe

r/

Capacit

y (cum)

Total Total

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Comman

d Area

(hac.)

Fund

(lacs.

)

Command

Area (hac.) Funds

(9+11+13+1

5) (Lacs.)

(10+12+14+1

6)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Dura

Kantragre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00 2 10.00

2 Darechikgre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00 2 10.00

3 Chibragre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00 2 10.00

4 Baladinggre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00 2 10.00

5 Duragre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

6 Asanang MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

7 Rongchigre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

8 Oragitok MoA PDMC Water 2 2 10.00

2 10.00

Page 137: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

137 | P a g e

harvestin

g

sructure

9 Chandigre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

10 Sasatgre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

11 Sakalgre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

12 Waribokgre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

13 Samingre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

14 Dollonggre MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

15 Rongdenggr

e MoA PDMC

Water

harvestin

g

sructure

2 2 10.00

2 10.00

16 Chibragre MoA PDMC Drip

irrigation 5 5 7.50 5 7.50

17 Baladinggr

e MoA PDMC

Drip

irrigation 5 5 7.50 5 7.50

18 Bebragre MoA PDMC Drip

irrigation 5 5 7.50 5 7.50

19 Tosikgre MoA PDMC Drip

irrigation 5 5 7.50 5 7.50

Page 138: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

138 | P a g e

20 Misimamggr

e MoA PDMC

Drip

irrigation 5 5 7.50 5 7.50

21 Durakalakgr

e MoA PDMC

Drip

irrigation 5 5 7.50 5 7.50

22 Jengjalgre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

23 Ganolnol

Songma MoA PDMC

Drip

irrigation 5 5 7.50

5 7.50

24 Dodenanggr

e MoA PDMC

Drip

irrigation 5 5 7.50

5 7.50

25 Dura

Kantragre MoA PDMC

Drip

irrigation 5 5 7.50

5 7.50

26 Darechikgre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

27 Chibragre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

28 Baladinggre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

29 Duragre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

30 Asanang MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

31 Rongchigre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

32 Oragitok MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

33 Chandigre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

34 Sasatgre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

35 Sakalgre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

36 Waribokgre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

37 Samingre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

38 Dollonggre MoA PDMC Drip

irrigation 5 5 7.50

5 7.50

39 Rongdenggr MoA PDMC Drip 5 5 7.50

5 7.50

Page 139: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

139 | P a g e

e irrigation

40 Robagre MoA PDMC

Springkle

r

Irrigation

100 10 65.00 10 65.00

41 Edenbari MoA PDMC

Springkle

r

Irrigation

100 10 65.00

10 65.00

42 Ganol Apal MoA PDMC

Springkle

r

Irrigation

50 5 32.50

5 32.5

43 Jenmdragre MoA PDMC

Springkle

r

Irrigation

50 5 32.50

5 32.5

44 Asanang MoA PDMC

Springkle

r

Irrigation

50 5 32.50

5 32.5

45 Chibrasalgre MoA PDMC

Springkle

r

Irrigation

50 5 32.50

5 32.5

46 Dodenanggr

e MoA PDMC

Springkle

r

Irrigation

50 5 32.50

5 32.5

Grand Total

Total=

195 622.50

Page 140: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

140 | P a g e

Annexure IV : Strategic Action Plan by Soil Conservation Department

Name

of the

Block

Village/location

Concern

ed

Ministry

/

Departm

ent

Compo

nent Activity

Total

Number/

Watershe

d/

capacity(

Cum)

Total

Comman

d

area(Ha)

(9+11+1

3+15)

Total

Fund

(lacs)

(10+12+1

4+16)

2016-17 2017-18 2018-19 2019-20

Comm

and

Area

(ha)

Funds.

(Lacs)

Comm

and

Area

(ha)

Funds

.

(Lacs)

Comm

and

Area

(ha)

Funds

.

(Lacs)

Comm

and

Area

(ha)

Funds

.

(Lacs)

1 2 3 4 5 6 7

9 10 11 12 13 14 15 16

Dalu

Doldenggagre, Karonggre,

joshipara, Thibapara, rengsipara,

Bakla RVP (on-

going) 23 511 765.83 511 765.830

Akinpara, Kurapara,

Possengagre, Selbalgre,

Ranggapara

Grim RVP (on-

going) 34 248 371.6750 248 371.675

Jijika, Awalgre, Chandanpara,

Asimgre, Bamonpara Jijika RVP 14 145 362.50

145 362.5

Rongadong,Barongpara,

Dingkajoa. Chigitchak RVP 9 113 281.60

113 281.6

Rimrangpara, Rongbokgre,

Babugre &

Mandanggre/Chongnapara,Sanje

ngpara,

Madragre.

Surface minor

irrigation 27 574 1434.00

306 765.00 268 669.00

Selsell

a

Dalupara,N/Hairgaon,Nokatgre,

Mukdanggra,Rongkekgre,Denga

si B,Asimgre

Lower Pilgi

RVP (on-going) 20 341 511.96 341 511.96

Jada

Asi,Dokagre,Bolsalgre,Rongsang

gre,Gambaregre

Dongdonga

RVP (on-going) 27 521 781.15 521 781.15

Chisimokgre, Dengasi,

Dopatchigre,Bolsalgre Dak RVP 6 197 492.50

197 492.5

Okkanggre, Dilnapara Gindo RVP 17 355 887.35

355 887.35

Korakona,Misimanda-gre,

Aronggre. Nawal RVP 6 125 313.05

125 313.05

Nayapara, Ketipara, Seplagre,

Golipara, Rabukona. Sepalgre RVP 6 276 690.00

276 690

Kagagre, Asimgre,

Sekapara/Darenggre, Gimegre

Songma, Wankolagre

Surface minor

irrigation 24 224 559.50

224 559.50

Tikriki

lla

Ronipara,Roni

Asim,Dabangpara,Angaripara, MoWR

Har khet

ko pani

Roni-Dabong

RVP (on-going) 13 420 629.96 420 629.96

Page 141: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

141 | P a g e

Jongchipara

Gonda Apal, megapa-

Ra,Dodinpara. Daljong RVP 5 176 440.50

176 440.5

Pedaldoba. Sakal RVP 5 78 194.50

78 194.5

Borogobal/Lower Sabanggre Surface minor

irrigation 21 320 801.00

150 375.00 170 426.00

Daden

ggre Mongalgre, Dichinggre

Mongalgre

Dichinggre (on-

going)

13 143 214.18 143 214.18

Daden

ggre

Chenggal,Rongkemgre,Daml

Dipo. Chenggal RVP 11 145 362.00

144.8 362

Rongra

m

Renchagre, Silsekgre, Kamagre,

Rongmasugre,Thebronggre

Surface minor

irrigation 3 373 932.63

232 580.75 141

351.87

5

TOTAL

(Surface minor

irrigation )

284 5284 11025.880 2183 3274.76 1610 4024.0

0 912

2280.2

5 579

1446.8

8

Lift irrigation

MoWR Har khet

ko pani

Ground water

development

Selsell

a

Dingnapara Dangga beel

RRR 1 125 375.00 125 375.00

Dodoretchi Bogakona

Chibol RRR 1 227 680.00 227 680.00

Damjonggre

2 27 80.00

27 80.00

Dalu Jonangpara,Gonchudagre,Morop

gre, Asimgre, Sanjengpara Bandra RRR 16 115 345.00 95 285.00

20 60.00

Rongra

m

Tebronggre Tebronggre

RRR 8 102 305.00 102 305.00

Dollong Manda , Dollong

Songma 12 122 366.00

122 366.00

Daden

ggre

Anogre Dachi Lake

RRR 3 93 280.00 93 280.00

Chikasingre Chikasingre

RRR 9 137 410.00 137 410.00

Aigri Apal

118 354.00

118 354.00

Tikriki

lla

Rongmali Deraksi RRR 4 96 287.50 96 287.50

Napakgre,Apalgre

5 48 145.00

48 145.00

Dolwakgre

5 43 130.00

43 130.00

Gambe

gre Okapara Songgitcham

5 25 75.00

25 75.00

TOTAL (RRR) 71 1278 3832.5000 874

2622.50

0 48 145.00 118 354.00 237 711.00

Selsell Ganchenggre, Dongdonga, DoLR- PMKSY 1.a.Ongoing 5 1568 235.200 1568 235.200

Page 142: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

142 | P a g e

a Chipragre,Rongchumgre,

Chepagre,Tallingre,

Kalaichar,Wananggre

MoRD Watersh

ed

(IWMP)

Batch-III &

Batch-IV

(NRM works,

Livelihood

Component,

Production

System & Micro

Enterprise etc.)

b. Other

Component (

Administrative

cost, Institution

& Capacity

building,

Monitoring &

Evaluation) c.

Consolidation

Phase)

Rongra

m

Matchurigre, Selbalgre,

Jongdikgre,Boldamgre,

Buripara,Adugre

4 1100 165.000 1100 165.00

Daden

ggre

Adinggre,Darigre, Dallang,

Kosigre 2 550 82.500 550 82.500

Tikriki

lla Napakgre,Apalgre, Chimagre 2 550 82.500 550 82.500

Gambe

gre

Rongbretgre,Rongari Ading,

Sampalgre,Galwanggre,

Gambegre,Chigitchakgre,

Jengchamgre,Sengminpara,

Somonpara, Rakwapara

6 2222 333.300 2222 333.30

Dalu

Sanjengpara, Ajugre, Madragre,

Tekmanpara,Mongolagre,

Tokpara

4 1610 241.500 1610 241.50

Selsell

a

Chibokgre, Boldakgre,

Samandagre,Sampalgre,

tingmanggre, Megonggre,

Bochigre,Tomagre, Gambaregre,

Lower Sasatgre, Matchinanggre,

Asimgre

DoLR-

MoRD

PMKSY

Watersh

ed

(IWMP)

2.a. Proposed

Batch-VI to

Batch-X

Other

interventions

(EPA, NRM

works,

Livelihood

Component,

Production

System & Micro

Enterprise etc.)

b. Other

Component (

Administrative

cost, Institution

& Capacity

building,

Monitoring &

Evaluation,

DPR

preparation) c.

Consolidation

Phase

6 1325 198.795 32 4.7970 109 16.341

00 451 67.638 733

110.01

9

Rongra

m

Wategre Songgital,Wategre

Apalgre, Anogre, Anogre apal,

DoLR-

MoRD

PMKSY

Watersh

2.a. Proposed

Batch-VI to 10 4901 735.198 211 31.6530 589

88.392

00 2029

304.28

7 2072

310.86

6

Page 143: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

143 | P a g e

Skulgre, Rengsigre, Dittigre,

Rongsep adinggre, Adugre,

Wakbok Apal, Wage Chiring,

Chiokgre,Chidekgre, Makkragre,

Waribokgre,

ed

(IWMP)

Batch-X

Other

interventions

(EPA, NRM

works,

Livelihood

Component,

Production

System & Micro

Enterprise etc.)

b. Other

Component (

Administrative

cost, Institution

& Capacity

building,

Monitoring &

Evaluation,

DPR

preparation) c.

Consolidation

Phase

Daden

ggre

Kangkilapara,

Monggre,makbilkolggre,

Tongtangpara, Rom Sangsilgre

2 1137 170.610 31 4.6800 126 18.858

00 383 57.522 597 89.55

Tikriki

lla

Upper-Rembigre, Rembi

Apalgre,Kotchu Rembigre,

Raksamgre, Pedaldoba,

Hatogaon, Boldamgre,

Nayapara,Dingnapara, Kamari,

Jengrip,Nagorgaon, Renggigre,

Gonda Songgitcham, Dedapara,

Upper Deranchigre, katonggre,

Upper wategre, Sabanggre

9 2360 353.940

167 25.110

00 482 72.324 1710

256.50

6

Gambe

gre

Rongalgre, Gra Adinggre,

Surinanggre 1 530 79.500 32 4.7700 74

11.130

00 265 39.750 159 23.85

Dalu

Jonangpara, Asimgre,

Sesengpara,

Songjelpara,Rongnadigre,

Gorangpara, Naronggre,

Dalbapara, Rengrampara,

Kongkinanggre

6 2983 447.507 63 9.4500 267 40.059

00 941

141.12

9 1712

256.86

9

Total of PMKSY 57 nos.-Watersheds (Ongoing 23 Nos. & Proposed 34 Nos. (IWMP) 57 20837 3125.550 7969 1195.35

0 1333 199.89 4551 682.65 6984.4

1047.6

6

West Garo Hills District Newly Created (Physical in ha)

DoLR-

MoRD

Converg

ence

with

MGNRE

GA

Water

Conservation:

Rongra

m

Matchurigre, Selbalgre,

Jongdikgre, Boldamgre,

Buripara, Adugre, Waram

Songma, Retegre, Dipogre,

Damjonggre

Water

Harvesting:

(Ponds)

19 16.000 24.500 8.00 11.000 2.70 4.500 2.5 4.500 2.80 4.500

Selsell

a Ganchenggre, Dongdonga 12 12.300 20.500 5.00 7.000 2.40 4.500 2.4 4.500 2.50 4.500

Dalu

Sanjengpara,Ajugre

Madragre

Tekmanpara,Mongolagre

Tokpara

10 9.700 15.000 1.00 1.500 2.90 4.500 2.8 4.500 3.00 4.500

Daden

ggre

Adinggre,Darigre

Dallang,Kosigre 11 9.500 16.500 2.30 3.000 2.40 4.500 2.7 4.500 2.10 4.500

Page 144: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

144 | P a g e

Tikriki

lla Chimagre, Napakgre, Apalgre 11 8.600 16.500 2.50 3.000 2.00 4.500 2.1 4.500 2.00 4.500

Gambe

gre 11 9.800 16.500 2.00 3.000 2.50 4.500 3.0 4.500 2.30 4.500

Total of Water Harvesting: (Ponds)

74 65.900 109.500 20.80 28.500 14.9 27.000 15.5 27.000 14.7 27.000

Rongra

m

Matchurigre, Selbalgre,

Jongdikgre, Boldamgre,

Buripara, Adugre, Waram

Songma, Retegre, Dipogre,

Damjonggre

DoLR-

MoRD

Converg

ence

with

MGNRE

GA

a. Other

interventions

( Plantation &

Maintenance

works)

8 15.000 2.250

5.00 0.7500 5.00 0.7500 5.00 0.7500

Selsell

a Ganchenggre, Dongdonga 2 15.000 2.250

5.00 0.7500 5.00 0.7500 5.00 0.7500

Dalu

Sanjengpara,Ajugre

Madragre

Tekmanpara,Mongolagre

Tokpara

DoLR-

MoRD

Converg

ence

with

MGNRE

GA

a. Other

interventions

( Plantation &

Maintenance

works)

4 15.000 2.250

5.00 0.7500 5.00 0.7500 5.00 0.7500

Daden

ggre

Adinggre,Darigre

Dallang,Kosigre 2 15.000 2.250

5.00 0.7500 5.00 0.7500 5.00 0.7500

Tikriki

lla Chimagre, Napakgre, Apalgre 2 108.000 16.200 93.00 13.95 5.00 0.7500 5.00 0.7500 5.00 0.7500

Gambe

gre

Rongbretgre,Rongari Ading

Sampalgre,Galwanggre

Gambegre,Chigitchakgre

Jengchamgre, Sengminpara

Somonpara

Rakwapara

6 20.000 3.000

10.00 1.500 5.00 0.7500 5.00 0.7500

Total of Other interventions ( Plantation & Maintenance works)

24 188.000 28.200 93.000 13.950 35.000 5.250 30.000 4.500 30.000 4.500

TOTAL (Convergence)

98 253.900 137.700 113.80

0 42.450 49.900 32.250 45.500 31.500 44.700 31.500

Selsell

a Batabari, Gongolanggre

Irrigation

Scheme

of other

Line

Departm

ents of

State

Govt.

Water

Cons. &

distributi

on

works

Water

Conservation/H

arvesting

2 7.42 7.00 3.3 2.00 4.12 5.00

Rongra

m Doabok

Water

Conservation 1 2.05 2.00 2.05 2.00

Dalu Tekmanpara, Mongolagre,

Tokpara, Gangbanga, Daluagre

Water

Conservation/H

arvesting

3 10.20 12.00 2.3 2.00 3.9 5.00 4 5.00

Daden

ggre Boldamgre

Water

Conservation 1 2.17 2.00 2.17 2.00

Tikriki

lla

Alokdia/ Chipragre/ Upper

Kamari

Water

Conservation 3 10.20 12.00 2.3 2.00 3.9 5.00 4 5.00

Gambe

gre Adugre

Water

Conservation 1 3.69 2.00 3.69 2.00

Page 145: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

145 | P a g e

TOTAL (Water Cons. & distribution works) 11 35.73 37.00 15.81 12.00 11.92 15.00 8 10.00 0 0.00

Selsell

a Sasatgre,Damjonggre, Dalupara

Irrigation

Scheme

of other

Line

Departm

ents of

State

Govt.

Water

Harvesti

ng

works

farm

pond,

Check

Dam,

Protectio

n Wall,

Irrigatio

n dam.

Water

Conservation,

Protection Wall,

Check Dam

3 8.95 12.00 2.55 2.00 6.4 10.00

Tikriki

lla Ronipara

Water

Conservation 1 1.56 2.00 1.56 2.00

Rongra

m

Anogre Water

Conservation 1 2.33 2.00 2.33 2.00

Thebronggre Water

Conservation 1 3.25 2.00 3.25 2.00

Watregre Songgital, Wategre

Apalgre, Anogre, Anogre Apal,

Skugre, Rongsep

Adinggre,Wage Gittim, Wabok

Apal, Chiokgre, Rangsigre,

Dittigre

Water

Conservation

Pond

16 13.90 32.00

4.7 8.00 2.5 8.00 6.7 16.00

Gambe

gre

Chekwatgre, Kama Jembragre

Galwanggre

RongariAding

Suringgre

Bolchugre

Irrigation

Scheme

of other

Line

Departm

ents of

State

Govt.

Water

Harvesti

ng

works

farm

pond,

Check

Dam,

Protectio

n Wall,

Irrigatio

n dam.

Water

Conservation 6 10.35 12.00 4.1 2.00 2.8 5.00

3.45 5.00

Dalu Adugre, Chekwatgre, Ganipara,

Naronggre,

Water

Conservation 4 6.59 10.20 2.36 5.20

4.23 5.00

Daden

ggre

Amingokgre, darigri, Chengal,

Dalanggri, Rongdenggre,

Jengjal, Chiokgre, Baljek

Aduma, Dilchigre, Dallanggre

Water

Conservation 16 13.90 32.00

4.7 8.00 2.5 8.00 6.7 16.00

TOTAL (Water Harvesting works farm pond) 48 60.83 104.20 16.15 15.20 18.60 31.00 9.23 21.00 16.85 37.00

Selsell

a

Abisela

Externall

y aided

projects

(Jalkund

Type-I)

Jalkund

type-I 1 1.400 9.5000 1.4 9.50000

Gancheng Jalkund

type-I 1 1.200 9.4916 1.2 9.49155

Manga Jalkund

type-I 1 1.000 9.4996 1.0 9.49956

Simbukolgre,Baklagre,

Sampalgre,Tingmangre,Agipeng,

Dapgre Birupara, Chambagre,

Wagopgre, Jeldopara, Asimgre,

Balal Adugre, Kagragre,

Damjonggre, Ganchenggre

Jalkund

type-I 15 150.000 150.00

50 50.00 50 50.00 50 50.00

Tikriki Ronipara Jalkund

1 0.800 9.4996 0.8 9.49963

Page 146: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

146 | P a g e

lla type-I

Bondukmali Jalkund

type-I 1 0.750 9.4995 0.75 9.49948

Bondukmali Jalkund

type-I 1 1.000 9.5000 1.00 9.5000

Laskarpara/Lower

Damachiga/Upper Kamari

Jalkund

type-I 3 30.000 30.0000

10 10.000 10 10.00 10 10.000

Rongra

m

WatregreSonggital

Externall

y aided

projects

(Jalkund

Type-I)

Jalkund

type-I 1 0.900 9.6300 0.9

9.63000

0

Rongdenggre Jalkund

type-I 1 0.530 5.7780 0.53

5.77800

0

WatreApalgre Jalkund

type-I 1 0.600 5.7780 0.6

5.77800

0

WatreApalgre Jalkund

type-I 1 0.500 4.8150 0.5

4.81500

0

RongkhonBoldamgre Jalkund

type-I 1 0.560 5.3000 0.56

5.30000

0

Jengjal Jalkund

type-I 1 0.700 4.7000 0.7

4.70000

0

Asimgre Jalkund

type-I 1 0.800 9.3025 0.8

9.30250

0

Selbalgre Jalkund

type-I 1 0.800 9.4989 0.8

9.49894

0

Rambatgre Jalkund

type-I 1 0.600 9.4986 0.6

9.49859

0

Rambatgre Jalkund

type-I 1 0.870 9.4530 0.87

9.45298

0

WatreApalgre Jalkund

type-I 1 0.650 9.6300 0.65

9.63000

0

Rongdenggre, Jengjal bawegre,

Dittigre, chidaogri, waribokgre,

Chibonggre, Misimagre,

Selbalgre

Jalkund

type-I 17 123.800 123.80

10 10.000 50 50.000 63.8 63.800

Dalu

Mongolagre

Externall

y aided

projects

(Jalkund

Type-I)

Jalkund

type-I 1 0.800 10.0000 0.80 10.0000

Matchokpara Jalkund

type-I 1 0.700 9.5000 0.70 9.5000

Tekmanpara Jalkund

type-I 1 0.500 9.2000 0.50 9.2000

Matchokpara Jalkund

type-I 1 0.620 8.7000 0.62 8.7000

Rohonpara , Nekdalpara Jalkund

type-I 2 20.000 20.0000

20 20.000

Page 147: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

147 | P a g e

Gambe

gre

Aminda Rangsagre Jalkund

type-I 1 0.500 9.4959 0.5 9.4959

Aminda Rangsagre Jalkund

type-I 1 0.600 9.5000 0.6 9.5000

Chekwatgre Jalkund

type-I 1 0.800 9.4913 0.8 9.4913

Dangsapara, dalmagre, Dilnigre Jalkund

type-I 4 39.980 39.9800

19.98 19.980 20 20.000

Daden

ggre

Chigitchakgre Jalkund

type-I 1 0.560 9.6300 0.56 9.6300

Ajigre Jalkund

type-I 1 0.500 9.6300 0.5 9.6300

Total Of Jalkund Type-I 67 383.02 589.30 19 225.52 90 89.980

0 130 130.00 144 143.80

Rongra

m

Danakgre

Externall

y aided

projects

(Multipu

rpose

Reservoi

r)

Multipur

pose

Reservoi

r

4 13.240 42.50500 13.24

42.5050

0

selbalgre

Multipur

pose

Reservoi

r

2 7.830 61.42320 7.83

61.4232

0

Misimagre,

Matchurigre,Selbalgre

Multipur

pose

Reservoi

r

8 33.250 491.62500

25.5

377.54

400 3.25

46.000

0 4.5

68.081

0

Tebronggre

Multipur

pose

Reservoi

r

1 78.000 229.02200 78.00

229.022

00

Selsell

a Kalchengpara

Multipur

pose

Reservoi

r

1 121.000 357.81000 121

357.810

00

Dalu surunanggre

Multipur

pose

Reservoi

r

2 12.750 77.25000 12.75

77.2500

0

Daden

ggre Amingokgre

Multipur

pose

Reservoi

r

3 9.670 73.25550 9.67

73.2555

0

Tikriki Kanchankona/Gondajasingre/Up Multipur

4 47.640 192.81350 6.64 42.8135 16 60.000 10 35.000 15 55.000

Page 148: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

148 | P a g e

lla per Rembigre/Bolsaldamgre pose

Reservoi

r

0 00 0 0

Gambe

gre

Daluagre, Somonpara,

Megapgre, Jengchamgre

Multipur

pose

Reservoi

r

8 75.000 374.18330 40

111.973

30 14

92.550

00 11

74.660

0 10

95.000

0

Total (Multipurpose Reservoir) 33 398.3800 1899.8875

00 289

996.052

500 55.50

530.09

400 24

155.66

000 30

218.08

100

NABAR

D RIDF

Surface Minor

Irrigation (RCC

Dam / WHS /

Channels)

Selsell

a

Deldella, Kaimbatapara,

Ronkhola

Najokjora

RIDF-XX 13 203

156.55669

0 203

156.556

69

Makagre. Maka Apal ,

Chirakhawa

Chidaodao

RIDF-XXIII 8 68 102.0000

68

102.00

0

Dalangsa I, Dalangsa II,

Kalpara,Askipara, Rongchi,

Rongkakgre, Alotgre/

Rengmagre, rengma Apal

68 400 600.0000

296

444.00

0 104

156.00

00

Tikriki

lla

Bakripara ,Odalguri ,Kalajhar

,Kathalbari ,Balupara

Kalajhar RIDF -

XX 11 226

173.63628

0 226

173.636

28

Rengsinpara, Megonggre,

Kosidamgre

Tamsing RIDF-

XXIII 5 136 204.0000

136

204.00

0

Dilsigri, Belguri, Rembigre,

Wankolagre/Rangtapgre,

Ravagre,

Warimagre/Bolsaldamgre,Ampa

ngdamgre, Khokapara

32 917 876.0000

599

399.00

0 132

198.00

0 186

279.00

00

Rongra

m

Balupara

NABAR

D RIDF

Lower Sugri

RIDF - XXII 12 111 166.5000 111 166.5

Mondagre Upper Sugri

RIDF -XXIII 14 73 108.7500

73

108.75

0

Rongbakgre, Kalchenggre

16 96 143.6250

96 143.62

50

Dalu

Halchati.,Kotchu Adok

Bolanggre,Belaburgre,

Balajurigre.

Bengka RIDF -

XXII 27 266 398.2500 266 398.25

Onthapara Mandagre

Jumingre

Dalwe RIDF-

XXIII 8 82 123.0000

82

123.00

0

Jebalgre,Chenggapara/Sadagre,D

imagre, 14 202 303.0000

128

192.00

0 74

111.00

00

Page 149: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

149 | P a g e

Daden

ggre

Baljek Aduma,

Madaigre,Dobadam, Dagalgre,

Rongkemgre/Gambaregre,

romgre

NABAR

D RIDF

48 470 704.2500

367.5

551.25

0 102

153.00

00

TOTAL (RIDF) 276 3248 4059.5679

70 805

894.942

970 957

936.75

00 924

1385.2

500 562

842.62

50

Grand Total 945 31778 24811.586

770 12286

9278.77

1770 4173

6003.9

640 6722

5050.3

10 8597

4478.5

410

Page 150: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

150 | P a g e

Annexure V : Maps

Map 2: District Map

Page 151: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

151 | P a g e

Map 3: Selsella block

Page 152: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

152 | P a g e

Map 4: Dadenggiri block

Page 153: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

153 | P a g e

Map 5: Tikrikilla block

Page 154: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

154 | P a g e

Map 6: Rongram block

Page 155: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

155 | P a g e

Map 7: Gambegre block

Page 156: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

156 | P a g e

Map 8: Dalu block

Page 157: District Irrigation Plan, West Garo Hills District · CADWM Command Area Development and Water Management MI Micro Irrigation ... change the fundamentals of the prevailing view of

District Irrigation Plan, West Garo Hills District

157 | P a g e