district irrigation plan, west garo hills district · cadwm command area development and water...
TRANSCRIPT
District Irrigation Plan, West Garo Hills District
1 | P a g e
DISTRICT IRRIGATION PLAN
WEST GARO HILLS, MEGHALAYA
District Irrigation Plan, West Garo Hills District
2 | P a g e
District Irrigation Plan, 2016-2020
West Garo Hills, Meghalaya
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Taluka, 3rd Floor, NABARD Building
Bandra Kurla Complex, Bandra East, Mumbai-400051
District Irrigation Plan, West Garo Hills District
3 | P a g e
FOREWORD
Pradhan Mantri Krishi Sinchai Yojana (PMKSY) is a national mission to improve farm
productivity and ensure better utilization of the resources in the country. The primary
objectives of PMKSY are to attract investment in irrigation system at field level, develop and
expand cultivable land in the country enhance rain water use in order to minimize wastage of
water, enhance crop per drop by implementing water – saving technologies and precision
irrigation. The plan additionally calls for bringing ministries, offices, organizations, research
and financial institutions occupied with creation and recycling of water under one platform so
that an exhaustive and holistic outlook of the whole water cycle is considered. The goal is to
open the doors for optimal water budgeting in all the sectors.
In order to achieve the objectives, the District Irrigation Plan of West Garo Hills district,
Meghalaya is prepared by District level Implementation Committee consisting of various
Departments and NABCONS after thoroughly studying the scenario of the district. I wish to
thank all the members of DLIC, NABCONS and all other officers/ officials of all the line
departments for preparation of District Irrigation Plan and wish them good luck for its better
implementation.
Place: Tura, West Garo Hills Deputy Commissioner,
Date: West Garo Hills
District Irrigation Plan, West Garo Hills District
4 | P a g e
ACKNOWLEDGEMENT
It is my sincere privilege to express my deep sense of gratitude and heartfelt thanks to the
Ministry of Agriculture and Farmers’ Welfare and other concerned departments of
Government of India for providing an opportunity to prepare an exhaustive irrigation plan
covering all the components of PMKSY for the benefit of major farming community in the
district.
I am also highly thankful to the Deputy Commissioner, West Garo Hills who is also the
Chairman of this District Level Implementation Committee (DLIC) for his extensive support
and guidance towards the preparation of this District Irrigation Plan and making it possible to
present the same in an implementable manner. I also thank all the members of the DLIC for
providing the desired data/ programme to be taken up in the Plan.
District Agriculture Officer
West Garo Hills
District Irrigation Plan, West Garo Hills District
5 | P a g e
Table of Contents List of Tables ........................................................................................................................................... 7
List of Figures .......................................................................................................................................... 8
List of Maps ............................................................................................................................................. 8
List of Abbrevitions ................................................................................................................................. 9
Executive Summary ............................................................................................................................... 10
Introduction .......................................................................................................................................... 14
Background ....................................................................................................................................... 14
Vision ................................................................................................................................................. 20
Objective ........................................................................................................................................... 20
Strategy/approach ............................................................................................................................ 21
Programme Components .................................................................................................................. 21
Rationale/ Justification ..................................................................................................................... 23
Methodology ..................................................................................................................................... 24
Chapter 1 : General Information of the District .................................................................................... 25
1.1 District Profile ............................................................................................................................. 25
1.2 District Demography ................................................................................................................... 26
1.3 Biomass and Livestock ................................................................................................................ 27
1.4 Agro-Ecology, Climate, Hydrology and Topography ................................................................... 28
1.5 Soil Profile ................................................................................................................................... 29
1.6 Land Use pattern ......................................................................................................................... 30
Chapter 2 : District Water Profile .......................................................................................................... 31
2.1 Area wise, Crop wise, irrigation Status ....................................................................................... 31
2.2 Production and Productivity of Major crops ............................................................................... 31
2.3 Irrigation based classification ..................................................................................................... 32
Chapter 3 : Water Availability in West Garo Hills ................................................................................. 34
3.1 Status of Water Availability......................................................................................................... 34
3.2 Status of Ground Water Availability ........................................................................................... 35
3.3 Status of Command Area ............................................................................................................ 35
3.4 Existing type of Irrigation ............................................................................................................ 36
Chapter 4 : Water Requirement/Demand ............................................................................................ 37
4.1 Domestic Water Demand ............................................................................................................ 37
4.2 Crop water demand .................................................................................................................... 38
District Irrigation Plan, West Garo Hills District
6 | P a g e
4.3 Livestock water demand ............................................................................................................. 39
4.4 Industrial water demand ............................................................................................................. 40
4.5 Water demand for Power Generation ........................................................................................ 41
4.6 Total water demand of the district for various sectors .............................................................. 41
4.7 Water Budget .............................................................................................................................. 42
Chapter 5 : Strategic Action Plan for Irrigation in District under PMKSY .............................................. 43
5.1 Department wise, year wise plan ............................................................................................... 43
5.2 Component wise, year wise plan ................................................................................................ 44
5.3 Block wise, year wise plan .......................................................................................................... 45
5.4 Suggestions ................................................................................................................................. 45
5.5 Period of Implementation ........................................................................................................... 46
5.6 Monitoring and Evaluation ......................................................................................................... 46
5.7 Expected Output and Outcome .................................................................................................. 47
5.8 Conclusion ................................................................................................................................... 47
Annexure I : Strategic Action Plan by Water Resources Department ................................................. 49
Annexure II : Strategic Action Plan by Agriculture Department ......................................................... 67
Annexure III : Strategic Action Plan by Horticulture Department ..................................................... 113
Annexure IV : Strategic Action Plan by Soil Conservation Department .............................................. 140
Annexure V : Maps .............................................................................................................................. 150
District Irrigation Plan, West Garo Hills District
7 | P a g e
List of Tables Table 1-1: District Profile ...................................................................................................................... 25
Table 1-2: Demography of West Garo Hills........................................................................................... 27
Table 1-3: Population of Small and Large Animals in West Garo Hills .................................................. 27
Table 1-4: Agro-ecology, Topography and Climate of West Garo Hills district .................................... 29
Table 1-5: Soil Types of West Garo Hills district ................................................................................... 30
Table 1-6: Land use pattern in West Garo Hills district ........................................................................ 30
Table 2-1: Area wise, Crop wise, irrigation Status of West Garo Hills .................................................. 31
Table 2-2: crop-wise production and productivity of different types of crops .................................... 31
Table 2-3: Block-wise irrigation based classification ............................................................................ 33
Table 3-1: Status of Water availability in West Garo Hills district (in MCM) ........................................ 34
Table 3-2: Status of Ground Water Availability (in MCM) in West Garo Hills district .......................... 35
Table 3-3: Status of command area (in Ha.) ......................................................................................... 36
Table 3-4: Existing types of Irrigation in West Garo Hills district.......................................................... 36
Table 4-1: Domestic water demand (MCM) ......................................................................................... 37
Table 4-2: Crop water requirement (MCM) .......................................................................................... 39
Table 4-3: Livestock water demand (MCM) .......................................................................................... 40
Table 4-4: Industrial Water Requirement (in MCM) in West Garo Hills district ................................... 41
Table 4-5: Water Demand for Power generation (in MCM) ................................................................. 41
Table 4-6: Present Water Demand of the district for various sectors .................................................. 42
Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020) ..................... 42
Table 4-8: Water Budget (Volume in MCM) ......................................................................................... 42
Table 5-1: Department-wise year-wise proposal under PMKSY ........................................................... 43
Table 5-2: Component wise, year wise plan ......................................................................................... 44
Table 5-3: Block wise, year wise plan ................................................................................................... 45
Table 5-4: Block wise area to be brought under irrigation in DIP of West Garo Hills district .............. 47
District Irrigation Plan, West Garo Hills District
8 | P a g e
List of Figures Figure 1-1: Number of persons in West Garo Hills district ................................................................... 27
Figure 1-2: Number of livestock in West Garo Hills district .................................................................. 28
Figure 1-3: Gross Cropped Area, Net Sown Area and Cropping Intensity in West Garo Hills district .. 30
Figure 4-1: Domestic Water Demand (in MCM) in West Garo Hills district ......................................... 38
Figure 4-2: Crop Water Potential (in MCM) in West Garo Hills district ................................................ 39
Figure 4-3: Livestock Water Demand (in MCM) in West Garo Hills district .......................................... 40
Figure 5-1: Year wise plan ..................................................................................................................... 43
Figure 5-2: Component wise plan ......................................................................................................... 44
Figure 5-3: Block wise plan ................................................................................................................... 45
List of Maps Map 1: Location of West Garo Hills district in Meghalaya.................................................................... 25
Map 2: District Map ............................................................................................................................ 150
Map 3: Selsella block ........................................................................................................................... 151
Map 4: Dadenggiri block ..................................................................................................................... 152
Map 5: Tikrikilla block ......................................................................................................................... 153
Map 6: Rongram block ........................................................................................................................ 154
Map 7: Gambegre block ...................................................................................................................... 155
Map 8: Dalu block ............................................................................................................................... 156
District Irrigation Plan, West Garo Hills District
9 | P a g e
List of Abbrevitions
NDC National Development Council
GoI Government of India
C-DAP Comprehensive District Agriculture Plan
ICT Information and Communications Technology
BCM Billion Cubic Metres
GDP Gross Domestic Product
AIBP Accelerated Irrigation Benefits Programme
CADWM Command Area Development and Water Management
MI Micro Irrigation
SWMA Supplementary Water Management Activities
NITI Aayog National Institution for Transforming India Aayog
NRM Natural resource Management
IWMP Integrated Watershed Management Programme
PRI Panchayati Raj Institutions
DRDA District Rural Development Agencies
NRLM National Rural Livelihoods Mission
C.D. Blocks Community development block
BPL Below Poverty Line
SC/ST Scheduled Caste/ Scheduled Tribe
Nos. Number
ATMA Agriculture Technology Management Agency MSL
TGA Total Geographical Area
GCA Gross Cropped Area
GIA Gross Irrigated Area
NSA Net Sown Area
MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act
CI Cropping Intensity
Qtl/yr Quintal per year
GIA Gross Irrigated Area
MCM Million Cubic Metres
Bgl Below ground Level
CCA Culturable Command Area
LPD Litre Per Day
CAD Command Area Development
DIP District Irrigation Plan
SIP State Irrigation Plan
DLIC District Level Implementation Committee
STP Sewage Treatment Plant
WRD Water Resource Department
RWD Rural Work Department
DRDA Department of Rural Development Agency
ATMA Agricultural Technology and Management Agency
District Irrigation Plan, West Garo Hills District
10 | P a g e
Executive Summary
In an agrarian economy like India, agriculture utilizes the major share of country’s
exploitable water resources. Though the sector utilizes the maximum share of exploitable
water resources, availability of the same at different locations to different extent makes it
vital to adopt effective utilization of water through storage, channelizing and judicial use. At
some places like Punjab and Haryana, the environmental and socio-economic rationale for
this capture by the sector is now being questioned. Accordingly, it is needed to challenge and
change the fundamentals of the prevailing view of water resources exploitation. A new and
more suitable approach to water resources allocation is necessary if the population is to be
adequately fed, without further degradation and destruction of the critical ecosystem services.
Water productivity needs to be enhanced considerably, and economic cost-benefit analysis
and pricing regimes can play a significant role in such a process. However, these economic
measures will not be sufficient on their own. They will need to be buttressed by technological
innovation and institutional changes in order to encourage a more equitable distribution of
resources and to mitigate potential international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a resource by
agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a
situation of growing water scarcity and rising demands for non-agricultural (household and
industrial) use of water, reassessment of sectoral allocations of water are inevitable. In
developing countries, irrigated agriculture plays a vital role in contributing towards domestic
food security and poverty alleviation. Therefore, achievement of these objectives is
dependent on adequate allocations of water to agriculture. Justification of such allocations
requires that irrigated agriculture be a cost-effective means of achieving stated political or
social objectives, such as food security or poverty alleviation, and that all externalities be
taken into account in the pricing mechanism. Improved allocation of irrigation water is
required within the agriculture sectors in order to achieve greater efficiency in the use of
irrigation water and existing irrigation infrastructure. Reallocation is also required in order to
reduce waterlogging and salinization of irrigated land, to decrease the negative environmental
impacts and other externalities of irrigation (caused by over extraction of groundwater and
depletion and pollution of surface water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency and
District Irrigation Plan, West Garo Hills District
11 | P a g e
productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of
the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.
Government is committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani.’ There is a need for seriously considering all
options including linking of rivers, where feasible; for ensuring optimal use of our water
resources to prevent the recurrence of floods and drought. By harnessing rain water through
‘Jal Sanchay’ and ‘Jal Sinchan,’ we will nurture water conservation and ground water
recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop.”
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme
like Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural
Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund
(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),
Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in
an area development mode only by adopting a decentralized state level planning and
projectised execution structure that will allow the state to draw up their own irrigation
development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be
supervised and coordinated utilizing the existing mechanism and structure available under
Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture department acting as
the State Nodal Agency for implementation of PMKSY. However, the implementing
departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per
drop more crop) and PMKSY (watershed development) will be decided by the respective
program ministry/department.
The five chapters along with introduction chapter, explains the profile of district, its water
requirement for agriculture and allied sector, water availability, assessment of water
District Irrigation Plan, West Garo Hills District
12 | P a g e
requirement for various sectors and strategic action plan for augmentation and effective
management of available water resources.
District Demography:
Total population of the district is 4,96,586 out of which 2,49,952 is male population while
2,46,634 is female population. Selsella is the most populated C. & R.D. Block followed by
Rongram whereas Gambegre has the lowest population among the C. & R.D. Blocksof the
District. In terms of sex-ratio, Dadenggiri C. & R.D. Block has the highest (996) figure
whereas Gambegre and Zikzak C. & R.D. Blockshave the lowest figure in the district. In the
West Garo Hills District, SelsellaC. & R.D. Block and Rongram C. & R.D. Block have the
highest number of Scheduled Caste and Scheduled Tribe population respectively while
Dadenggiri and Gambegre C. & R.D. Block has the lowest number of Scheduled Caste and
Scheduled Tribe population respectively.
Agriculture in West Garo Hills:
The district has a forest area of 1390 sq. km., i.e. about 45% of the total geographical area.
The net area sown is 47400 ha. and the total cropped area is 65181 ha. Fallow land covers
about 12%, net area sown is about 26%, while the total cropped area is about 33%. Principal
crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture products
include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger, garlic etc.
are also grown.
Demand for water and the gap:
The water budget of the district for the base year 2015-16 and 2020-21 as per water
availability and demand. The present water availability/demand and also for 2020 are worked
out as explained above and the water gap is found out. The water budget clearly shows the
water gap of -2200.68 MCM in present and of -2193.95 MCM in future between the water
availability and requirement. The negative gap indicates that there is sufficient water
resources for irrigation, domestic and the industrial uses without creating any deficit in our
water potential.
PMKSY Financial Proposal:
Total plan of West Garo Hills district for four years works out to be Rs. 103068.92 lakh.
Maximum share of Rs. 69548.51 lakh is for Water Resources Department followed by Soil &
District Irrigation Plan, West Garo Hills District
13 | P a g e
Water Conservation Department with Rs. 25278.62 lakh. The total plan of four years is divided in
to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.
Expected Output & Outcome:
Total of 52944.64 hectares area will be brought under irrigation. Highest area i.e. 17159.49
hectares will be brought under irrigation in Selsella block while the lowest area i.e. 3922.19
hectares will be brought under irrigation in Gambegre block.
Blocks Total Command Area/ Irrigation Potential (Ha.) Total Estimated Cost (in Rs.
Lakhs)
Dadenggiri 4091.60 5576.73
Dalu 8196.76 10232.51
Gambegre 3922.19 8012.51
Rongram 8349.66 21200.97
Selsella 17159.49 26977.74
Tikrikilla 11224.94 31068.46
Grand Total 52944.64 103068.92
District Irrigation Plan, West Garo Hills District
14 | P a g e
Introduction
Background
Preparation of decentralized area specific district planning process visualized in various plans
took concrete shape through the years and initiatives like specific guidelines on
methodologies and processes for preparation of district plans; framework for preparation of
perspective plan, medium term and annual plans by then planning commission in 1969 and
the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at
district and sub district level; local self-government in urban areas; constitution of district
planning committee to consolidate the plans prepared at Panchayats and municipalities and
prepare a draft development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by planning
commission on preparation of district level plans and making it an integral part of the process
of preparation of the states 11th five year plan. The Planning commission issued guidelines in
August 2006 for preparation of the district plans. The guidelines define the District Planning
as ‘the process of preparing an integrated plan for the local government sector in a district
taking into account the resources (natural, human and financial) available and covering the
sectoral activities and schemes assigned to the district level and below and those
implemented through local governments in a state. The document that embodies this
statement of resources and their allocation for various purposes is known as the District
Plan”.
Government of India through a resolution in National Development Council on 29th May
2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow
growth of agriculture and allied sectors by incentivizing states to draw up plans for their
agriculture sectors more comprehensively. The NDC resolution states "GoI will introduce a
new Additional Central Assistance Scheme to incentivize states to draw up plans for their
agriculture sector more comprehensively, taking agro-climatic conditions, natural resource
issues and technology into account, and integrating livestock, poultry and fisheries, etc. This
will involve a new scheme for Additional Central Assistance (ACA) to State Plans,
administered by the Union Ministry of Agriculture over and above its existing Centrally
Sponsored Schemes, to supplement the State-specific strategies including special schemes for
beneficiaries of land reforms. The newly created National Rainfed Area Authority will, on
District Irrigation Plan, West Garo Hills District
15 | P a g e
request, assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a Comprehensive District Agriculture
Plans (C-DAP) that will fully utilize available resources and will include allied agriculture
sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture
plans to help the states prepare C-DAP. As per these guidelines, the objective of district
planning is ‘to design an integrated and participatory action plan for the development of local
area in general and agriculture and allied sectors in particular’. The objectives of C-DAP are:
To prepare a C-DAP through participatory process involving various organisations
and stakeholders.
To enable optimum utilisation of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like credit,
technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food
security and cropping system that will improve farmers’ income.
The guidelines required the state/ district authorities to (i) ensure that the agricultural plans
are prepared for the district and then integrated into the agricultural plans of the State based
on the agro-climatic conditions, availability of technology, trained manpower and natural
resources; (ii) local needs/ crops/ feed and fodder/ animal husbandry/ dairying/ fisheries/
priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock
and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was the
Government of India guidelines issued in 2015 in the form of a template for the preparation
of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri
Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP
mandatory for the states to receive funds from the program. The present report is a product of
these long drawn efforts of Government of India to strengthen the decentralized planning
process in the country focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance and
promotion of developmental activities. Considering its vital importance and ever increasing
demand for water, in the face of population growth, urbanization & industrialization and
District Irrigation Plan, West Garo Hills District
16 | P a g e
considerations of climatic change, making water, an increasingly a scarce resource, available
to multiple uses, planning and management of this vital resources, utilization of water
economically, optimally and equitably assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry of Water
Resources suggests an availability of 1123 billion cubic meters (BCM) against a current
estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources
estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water
availability in the immediate future seems to be adequate; with the near constant supply of
water resources in the face of increasing demand on account of population growth,
urbanization and industrialization will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to
1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The
projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters
in 2050 suggesting shortage of water in the medium term1. Further, the all India water
balance estimates does not reflect the variations in water balance across time and space-
certain areas having a positive water balance and the others facing acute shortage. The
problem is further accentuated by water quality related issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were allocated for
irrigation purposes and the rest meeting the domestic and industrial demands. In a recent
study2 on the demand of water for agriculture, suggest that domestic demand (34 BCM in
2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM in 2000, 92
BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance water available
after meeting the demand of water for agriculture (605 BCM in 2000, 675 BCM in 2025 and
637 BCM in 2050). This change is partly because of the changing sectoral contributions of
India’s GDP and also partly because of dynamics of irrigation development in the country
where the initial expansion in area under irrigation is propelled by the availability of
abundant water resources and availability of good quality land. This is no longer the case in
many of the states where the availability of land and water are serious constraints for further
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, GoI, New Delhi 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water
Management Institute, Colombo.
District Irrigation Plan, West Garo Hills District
17 | P a g e
expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012
out of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is
Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential
Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of
the net sown area in the country dependent on rainfall which makes farming a high risk and
less productive.
The competing demands for water resources and the emerging issues and concerns were to be
addressed through certain basic principles and commonality in approaches in dealing with
planning, development and management of water resources3 under an Integrated Water
Resource Management framework. The main objectives of water resource management as
delineated in National Water Policy 2012 are:
a) Planning, development and management of water resources need to be governed by
common integrated perspective considering local, regional, State and national context,
having an environmentally sound basis, keeping in view the human, social and
economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to the
objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making and
regulation of water resources.
d) Water needs to be managed as a common pool community resource held, by the state,
under public trust doctrine to achieve food security, support livelihood, and ensure
equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum ecological
needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive needs,
followed by high priority allocation for other basic domestic needs (including needs
of animals), achieving food security, supporting sustenance agriculture and minimum
eco-system needs. Available water, after meeting the above needs, should be allocated
in a manner to promote its conservation and efficient use.
3Ministry of Water Resources, National Water Policy, 2012, GoI, New Delhi.
District Irrigation Plan, West Garo Hills District
18 | P a g e
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,
river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the
basic hydrological unit is the river basin, which should be considered as the basic
hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future needs will
depend more on demand management, and hence, this needs to be given priority,
especially through (a) evolving an agricultural system which economizes on water use
and maximizes value from water, and (b) bringing in maximum efficiency in use of
water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an integrated
manner, consistent with broader environmental management approaches inter-alia
including the use of economic incentives and penalties to reduce pollution and
wastage.
j) The impact of climate change on water resources availability must be factored into
water management related decisions. Water using activities need to be regulated
keeping in mind the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency and
productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of
the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.
Government is committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all
options including linking of rivers, where feasible; for ensuring optimal use of our water
resources to prevent the recurrence of floods and drought. By harnessing rain water
through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground
water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
District Irrigation Plan, West Garo Hills District
19 | P a g e
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed& Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme
likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural
Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund
(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),
Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in
an area development mode only by adopting a decentralized state level planning and
projectised execution structure that will allow the state to draw up their own irrigation
development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be
implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture
department acting as the State Nodal Agency. However, the implementing departments for
the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop)
and PMKSY (watershed development) will be decided by the respective program
ministry/department.
The funds under this program would be provided to the states as per the pattern of assistance
of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog.
During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An
outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided
to the state governments from this centrally sponsored scheme is subject to fulfilment of
certain conditions.Firstly, a state will become eligible to access PMKSY fund only if it has
prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the
initial year, and the expenditure in water resource development for agriculture sector in the
year under consideration is not less than the baseline expenditure, which is defined as the
average of the expenditure in irrigation sector irrespective of the department in the state plan
in three years prior to the year under consideration. Secondly, States will be given additional
weightage for levying charges on water and electricity for irrigation purposes, so as to ensure
sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be
decided based on
District Irrigation Plan, West Garo Hills District
20 | P a g e
Share of percentage of unirrigated area in the state vis-à-vis national average
including prominence of areas classified under Desert Development Programme
(DDP) and Drought Prone Area Development Programme (DPAP)
Increase in percentage share of expenditure on water resource development for
agriculture sector in State Plan expenditure in the previous year over three years prior
to it and
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to
ensure access to some means of protective irrigation to all agricultural farms in the country,
to produce ‘per drop more crop’, thus bringing much desired rural prosperity.
Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of
district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation (Har Khet ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use of
water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability both
in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving technologies
(More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation practices
g) Ensure the integrated development of rainfed areas using the watershed approach
towards soil and water conservation, regeneration of ground water, arresting runoff,
providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
District Irrigation Plan, West Garo Hills District
21 | P a g e
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct water
sources; construction of water harvesting structures, secondary & micro storage,
groundwater development, enhancing potentials of traditional water bodies at village
level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis
(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.
b) Developing/ augmenting distribution network where irrigation sources (both assured
and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to access
recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm
viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other
application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers’
organizations/NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on more crop
per drop of water through mass media campaign, exhibitions, field days, and
extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of
ongoing Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet ko Pani): This component focuses on-
District Irrigation Plan, West Garo Hills District
22 | P a g e
a) Creation of new water sources through Minor Irrigation (both surface and ground
water)
b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of
traditional water sources, construction rain water harvesting structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution network from
source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is created to
store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies to take
advantage of the available source which is not tapped to its fullest capacity (deriving
benefits from low hanging fruits). At least 10% of the command area to be covered
under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby water
scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement
requirements beyond IWMP and MGNREGS irrespective of irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at
feasible locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan, approval of
annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices like
drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond permissible
limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,
distribution system etc.
d) Construction of micro irrigation structures to supplement source creation activities
including tube wells and dug wells (in areas where ground water is available and not
under semi critical/ critical/ over exploited category of development) which are not
supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and
MGNREGS as per Taluka/district irrigation plan.
District Irrigation Plan, West Garo Hills District
23 | P a g e
e) Secondary storage structures at tail end of canal system to store water when available
in abundance (rainy season) or from perennial sources like streams for use during dry
periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage
pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and agronomic
measures including cropping alignment to maximise use of available water including
rainfall and minimise irrigation requirement (Jal Sanrakshan);
h) Capacity building, training and awareness campaign including low cost publications,
use of pico projectors and low cost motion films for encouraging potential use of
water sources through technological, agronomical and management practices
including community irrigation.
i) The extension workers will be empowered to disseminate relevant technologies under
PMKSY only after requisite training is provided to them especially in the area of
promotion of scientific moisture conservation and agronomic measures, improved/
innovative distribution system like pipe and box outlet system, etc. Appropriate
Domain Experts will act as Master Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A to be
made use in the field of water use efficiency, precision irrigation technologies, on
farm water management, crop alignment etc. and also to do intensive monitoring of
the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water harvesting,
in-situ moisture conservation and other allied activities on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed Talukas including renovation of traditional water bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management including
irrigation related priorities was identified for West Garo Hills district by the peoples’
representatives of district with support from administration and technical experts. For
District Irrigation Plan, West Garo Hills District
24 | P a g e
instance the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA
program, Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya
Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the
Integrated District Development Plan etc. identified number of irrigation related issues for
West Garo Hills district including (i) creating irrigation potential through water harvesting
structure, Nalla and Check Bundh, Percolation and Recharge tanks (ii) promoting water use
efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse
cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement
of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil
conservation of arable & non-arable land through engineering measures; (vi) increase the
forest cover in the district and (vii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited West Garo
Hills district to collect data and have interaction with all the stakeholders. Methodology
adopted to prepare DIP is outlined in brief as under:
a) Primary and secondary were collected data from field through various sources including
published documents and websites.
b) Various meetings were held to obtain ground level information and data from key
personnel/ stakeholders through structured, unstructured interviews/ formats, focused
group discussions etc.
c) GIS maps of the areas/clusters were studied to understand the land morphology and
topography of the district.
d) Focused group discussions and interaction with agriculture officers, horticulture officers,
soil conservation officers, extension officers, rural development department, animal
husbandry department, irrigation officers both at Talukas anddistrict level for identifying
the key issues and focus areas of the region.
e) Discussion with NABARD officer of the district was also held during the visit.
On the basis of detailed discussion and analysis of data, the team arrived at the projections of
various components of PMKSY and Department wise plan for five years from 2016-17 to
2020-21 as detailed in the plan.
District Irrigation Plan, West Garo Hills District
25 | P a g e
Chapter 1 : General Information of the District
1.1 District Profile
The West Garo Hills district lies on the western part of the state of Meghalaya bounded by
the East Garo Hills district on the east, the South Garo Hills on the south-east, the Goalpara
district of Assam on the north and north-west and Bangladesh on the south. The district is
situated approximately between the latitudes 90° 25' and 89° 50' E, and the longitudes of 26°
and 25° 10' N. There are six blocks in the district which are Dadenggiri, Dalu, Gambegre,
Rongram, Selsella and Tikrikilla.
The population is pre-dominantly inhabited by the Garos, a tribe with a matrilineal society
belonging to the Bodo family of the Tibeto-Burman race tribes. Other indigenous inhabitants
are the Hajongs, Rabhas, Koches, Rajbansis, Meches, Kacharis and Dalus. The district is also
inhabited by Bengalis, Assamese, Nepalese, Marwaries, Biharis and people from other parts
of India.
Map 1: Location of West Garo Hills district in Meghalaya
Table 1-1: District Profile
Name of the District District Code Latitude Longitude
West Garo Hills 293 25°10’00 to 26°0’00 N 89°50’00 to 90°25’00 E
Source: Census of India 2011, West Garo Hills
When Meghalaya State was created in 1972, the entire Garo Hills formed a single district and
retained the name Garo Hills district, given from the time of British rule. The West Garo hills
district was created on 22nd October, 1976 (vide Notification No. HPL.399/75/140, dated 9th
Oct., 1976) keeping Tura as its headquarters by bifurcating the then composite Garo Hills
District Irrigation Plan, West Garo Hills District
26 | P a g e
District into West Garo Hills and East Garo Hills Districts. The West Garo Hills is once again
bifurcated, creating South Garo Hills by up gradatingBaghmara Subdivision to District level
in 1991 ( Vide Notification No. HPL.275/84/141, dated 18th June, 1992).
1.2 District Demography
The West Garo Hills district holds second position among the districts of Meghalaya in terms
of population and holds third position in terms of the area. The West Garo Hills district has
the third lowest decadal growth rate of population during 2001-2011 among the districts of
Meghalaya. In terms of population per sq.km, West Garo Hillsdistrict is the second most
densely populated district of Meghalaya, only after East Khasi Hills. The West Garo Hills
district is the third most urbanised district of Meghalaya, only after East Khasi Hills and East
Garo Hills. The West Garo Hills district has the third highest sex-ratio (984) among the
districts of Meghalaya however, which is less than the State sex-ratio of 989. The West Garo
Hills district has the second highest sex ratio (976) of the population in the age group of 0-
6years among the districts of Meghalaya. The West Garo Hills district has the highest
Scheduled caste population and second highest Scheduled Tribepopulation among all the
districts of the State. In terms of the sex ratio of the Scheduled Caste and Scheduled Tribe,
the District holds the first and the third position respectively. The West Garo Hills District
has the second lowest literacy rate (67.6%) in the State which is much lesser then the literacy
rate (74.7%) of the State. The West Garo Hills District ranks third in work participation rate
(39.7%) along with East Garo Hills District among all the districts of the State. The West
Garo Hills District has the third lowest percentage of cultivators to the total workers among
the districts of the State. The West Garo Hills District ranks fourth in terms of percentage of
the agriculture labourers and other workers to the total workers respectively and has the
highest proportion of the workers in household industry to the total workers among the
districts of Meghalaya. Selsella is the most populated C. & R.D. Block followed by Rongram
whereas Gambegre has the lowest population among the C. & R.D. Blocksof the District. In
terms of sex-ratio, Dadenggiri C. & R.D. Block has the highest (996) figure whereas
Gambegre and Zikzak C. & R.D. Blockshave the lowest figure in the district. In the West
Garo Hills District, SelsellaC. & R.D. Block and Rongram C. & R.D. Block have the highest
number of Scheduled Caste and Scheduled Tribe population respectively while Dadenggiri
and Gambegre C. & R.D. Block has the lowest number of Scheduled Caste and Scheduled
Tribe population respectively.
District Irrigation Plan, West Garo Hills District
27 | P a g e
Table 1-2: Demography of West Garo Hills
Name of the
blocks
Population SC ST Total
M* F CH SC
NHH
SC
MM
ST
NHH
ST
MM NHH MM
Selsella 88349 86857 34198 626 3046 15296 78712 33999 175206
Dadenggiri 20842 20753 7681 7 41 7760 40351 8025 41595
Tikrikilla 29267 29121 10069 103 507 10313 52729 11484 58388
Rongram 67114 66642 19299 541 2701 19555 106987 24819 133756
Gambegre 17029 16517 6304 9 43 5642 32484 5863 33546
Dalu 27351 26744 9559 108 464 8617 47108 10169 54095
Total 249952 246634 87110 1394 6802 67183 358371 94359 496586
Figure 1-1: Number of persons in West Garo Hills district
Source: Census of India 2011, West Garo Hills
*M- Male, F- Female, CH- Children 0-14 years, NHH- No. of households, NM- No. of members, T-Total, R-
Rural, U-Urban
1.3 Biomass and Livestock
Next to Agriculture and Horticulture, Livestock rearing is an important enterprise of the
district. Cows, buffaloes, draft animals, goats pigs, poultry/ducks are main commodities of
livestock enterprise. Cross breed cows, improved breed buffaloes and upgraded pigs in small
numbers are also reared in almost all the blocks of the district. Mostly the local breeds are
common. The population of the Large and Small animals is given in Table no. 1-3.
Table 1-3: Population of Small and Large Animals in West Garo Hills
Blocks
Small Animals Large Animals
Poultry
(Nos.)
Pigs
(Nos.)
Goats
(Nos.)
Sheeps
(Nos.)
Indigenous Cow
(Nos.)
In Descriptive
Buffalo (Nos.)
Selsella 83793 11459 15556 3958 44969 1755
Dadenggiri 52345 5679 2681 0 13942 164
Tikrikilla 81794 7055 4545 157 24491 235
Rongram 64988 9137 7320 170 21602 52
Gambegre 26157 6612 9286 0 16113 0
175206
41595
58388
133756
33546
54095
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu
Nu
mb
er o
f p
erso
ns
District Irrigation Plan, West Garo Hills District
28 | P a g e
Dalu 47400 7524 10229 64 23383 1136
Total 356477 47466 49617 4349 144500 3342
Figure 1-2: Number of livestock in West Garo Hills district
Source: Department of Animal Husbandry, West Garo Hills
1.4 Agro-Ecology, Climate, Hydrology and Topography
In general, the district has a mildly tropical climate. The climate of the district is largely
controlled by southwest monsoon and seasonal winds. The district being relatively lower in
altitude to the rest of Meghalaya, experiences a fairly high temperature for most part of the
year. The average rainfall is 3289.2 mm, of which more than two-thirds occur during the
monsoon, with winter being practically dry. The district has mostly dense tropical mixed
forest, and a small patch of temperate forest in the higher parts of the Tura range. There are
four seasons in the district namely summer, monsoon or rainy, autumn and winter. The
summer season extends from the end of March to mid-May, which is characterized by
relatively high temperature. Rainy season commences with the onset of southwest monsoon
in April and lasts up to October. This is followed by short autumn from mid-October to
November. This season indicates the slow retreating of monsoon with clear and sunny sky.
Winter season extends from December to the end of March. This is the coldest season of the
year with sharp decline in the temperature. Winter is basically dry with lower diurnal range of
temperature in the northern and southern foothills, whereas central upland portion
experiences temperate climate and the places of medium altitude of the northern, southern
and western part of the district experiences sub-tropical climate. The district receives a fairly
high rainfall throughout the year. Most of the precipitation occurs during the rainy season i.e.
between April and October due to southwest monsoon.
83
79
3
52
34
5
81
79
4
64
98
8
26
15
7
47
40
0
30
97
3
83
60
11
75
7
16
62
7
15
89
8
17
81
7
46
72
4
14
10
6 24
72
6
21
65
4
16
11
3 24
51
9
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu
Nu
mb
er f
o L
ives
tock
Poultry Small Animals Large Animals
District Irrigation Plan, West Garo Hills District
29 | P a g e
Table 1-4: Agro-ecology, Topography and Climate of West Garo Hills district
Agro
Ecological
Zone Type
Type of
Terrain
Normal
Annual
Rainfall
(mm)
Average
Monthly
Rainfall
(mm)
Average Weekly Temperature (0C)
Period
Summer
(Apr-May)
Winter (Oct-
Mar) Rainy (Jun-Sep)
Mi
n
Ma
x
Me
an
Mi
n
Ma
x
Me
an
Mi
n
Ma
x
Me
an
Warm per
humid Hilly
undulating 3289.2 115
11.
1 35
22.
9 8.4 25
16.
7
20.
7
38.
1 29 Eco region
Red and
laterite
Source: CGWB, West garo Hills
1.5 Soil Profile
Geomorphologically, the district is an undulatory one, with the E-W trending Garo hill range
of Central Upland zone and plains fringing the northern, western and the south-western
borders. The altitude of the Garo Hills District ranges from 23 m amsl to 1631 m. amsl. The
Garo Hills area comprises of the Tura Range, the Arbella Range and the Ranggira Range.
The Tura range is one of the most important mountain ranges in the West Garo Hills which
comprises of many peaks. To the west of the Tura range low hill ranges run from north to
south, and to the north of the Tura range hill ranges run parallel to it, gradually increasing in
height till they meet in the south. The West Garo Hills district also represents the remnant of
ancient plateau of Indian Peninsular shield that is deeply dissected suggesting several
geotectonic and structural deformities that the plateau has undergone. Broadly, the district
can be divided into the following geomorphic units.
Denudational Low and High Hills: It occupies the major part of the district comprising of
hard rocks like granite and gneiss. It is moderately dissected by fractures and joints
forming a good number of narrow intermontane valleys.
Dissected Plateau: It is found in the southern portion of district comprising of soft and
friable rocks like shale, sandstone and quartzite.
Deep Gorges: In the southern parts of the district, Tertiary rocks comprising sandstone,
shale and limestone are dissected to form deep narrow elongated intermontane valleys of
tectonic origin along major lineaments.
Alluvial Plain: It is exposed in the northern, western and the south-western parts of the
district comprising fluviatile sediments.
District Irrigation Plan, West Garo Hills District
30 | P a g e
Table 1-5: Soil Types of West Garo Hills district
Soil Type Land Slope
Major Soil Class Area
(Ha)
0-3%
(Ha)
3-8%
(ha)
8-25%
(ha)
>25%
(ha)
Fine Loam 2,56,879 0 51686 149955 55238
Source: Department of Agriculture, West Garo Hills
1.6 Land Use pattern
The district has a forest area of 1390 sq. km., i.e. about 45% of the total geographical area.
The net area sown is 47400 ha. and the total cropped area is 65181 ha. Fallow land covers
about 12%, net area sown is about 26%, while the total cropped area is about 33%. Principal
crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture products
include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger, garlic etc.
are also grown. The following table gives the block wise information on land use pattern.
Table 1-6: Land use pattern in West Garo Hills district
Blocks TGA*
(Ha)
Area Under Agriculture Area
under
Forest
(Ha)
Area
under
Wasteland
(Ha)
Area
under
other
use
(Ha)
GCA
(Ha)
NSA
(Ha)
AST
(Ha)
CI
(%)
Selsella 53500 16169 11877 4292 136.14% 20813 4344 12174
Dadenggiri 61700 8923 6433 2490 138.71% 30577 2695 19505
Tikrikilla 33000 9083 5893 3190 154.13% 14049 2384 7484
Rongram 62200 10753 7873 2880 136.58% 26463 3484 21500
Gambegre 39100 8894 6700 2194 132.75% 17048 2292 10866
Dalu 59902 11359 8624 2735 131.71% 30097 3204 15242
Total 309402 65181 47400 17781 137.51% 139047 18403 86771
Figure 1-3: Gross Cropped Area, Net Sown Area and Cropping Intensity in West Garo Hills district
Source: Department of Agriculture, West Garo Hills
*TGA- Total Geographical Area, GCA- Gross Cropped Area, NSA- Net Sown Area, AST-
Area Sown more than once, CI- Cropping Intensity
120.00%
125.00%
130.00%
135.00%
140.00%
145.00%
150.00%
155.00%
160.00%
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
Cro
pp
ing
Inte
nsi
ty (
%)
Are
a in
Ha.
Gross Cropped Area Net Sown Area Cropping intensity (%)
District Irrigation Plan, West Garo Hills District
31 | P a g e
Chapter 2 : District Water Profile
Water is vital for survival of both plants and animals. It is the central component of the planet
Earth controlling the weather, climate, plant and animal kingdom. It supports agriculture,
forestry, navigation, industries and hydroelectricity generation and other uses such as for
recreation, water sports activities etc. The importance of water has been recognized all over
the world. Water resource development and management practices are given top priorities all
over the world to avoid the water crisis in future. This chapter outlines the different type of
crops, productivity and irrigation status of the West Garo Hills district.
2.1 Area wise, Crop wise, irrigation Status
Out of total area of 41274 hectares, total irrigated area is 16509.6 hectares while total rainfed
area is 24764.4 hectares. For horticulture crops, 2963 hectares is irrigated area while 20031
hectares is rainfed area. The crop wise irrigated and rainfed area sown in different seasons
like Kharif, Rabi and Summer in the district for each block is given in the table below.
Table 2-1: Area wise, Crop wise, irrigation Status of West Garo Hills
Crop
Types
Kharif (Area in ha) Rabi (Area in ha) Summer Crop(Area in ha)
Horticulture &
Plantation Crops (Area
in ha)
I R T I R T I R T I R T
Cereals 4009.6 6014.4 10024 3000.4 4500.6 7501 4049.2 6073.8 10123 -- -- --
Coarse
Cereals 1128.8 1693.2 2822 -- -- -- -- -- -- -- -- --
Pulses -- -- -- 418.4 627.6 1046 -- -- -- -- -- --
Oil
Seeds -- -- -- 1582 2373 3955 -- -- -- -- -- --
Fibre 980 1470 2450 -- -- -- 1341.2 2011.8 3353 -- -- --
Other
Crops -- -- -- -- -- -- -- -- -- 2963 20031 22994
Total 6118.4 9177.6 15296 5000.8 7501.2 12502 5390.4 8085.6 13476 2963 20031 22994
Source: Department of Agriculture and Department of Horticulture, West Garo Hills
2.2 Production and Productivity of Major crops
Principal crops grown in the district are rice, maize, millets, oilseeds and pulses. Horticulture
products include orange, pineapple and banana. Vegetables like potato, sweet potato, ginger,
garlic etc. are also grown. The crop-wise production and productivity of different types of
crops are given in the table below.
Table 2-2: crop-wise production and productivity of different types of crops
Season
Crop Sown Total
Cereals Coarse
Cereals Pulses
Oil
Seeds Fibre
Any other
crops P Y C
Kharif
Rice
(winter) 214814 2143 118258
Maize
44475 1576 58910
Cotton
4116 168 -
Rabi Rice
345796 4610 115892
District Irrigation Plan, West Garo Hills District
32 | P a g e
(Spring)
Pea
2797 825 62306
Cow
pea 3731 820 62306
Lentil
2119 841 62306
Raped
seed &
Mustard
26301 665 45461
Summer
Rice
(Ahu) 79763 1737 115892
Jhum
Paddy 45797 828 -
Jute
33711 1673 73164
Mesta
9593 717 73164
Horticult
ure &
Plantatio
n
Black
pepper 1860 164 85000
Ginger 151480 605 144000
Turmeric 21440 5858 144000
Potato 2613 7708 86660
Khasi
mandarin 35150 2687 130000
Assam
lemon 7060 2361 90000
Pine apple 270160 8378 85028
Banana 195630 12870 85000
Papaya 12740 9579 87583
Straw
berry 35 2333 170208
Cashewnut 97260 2695 85000
Tea 1600 6133 280000
Arecanut 92450 2052 87583
Vegetable 30850 11757 90000
Source: Department of Agriculture and Horticulture, West Garo Hills
P: Production (kg/yr), Y: Productivity or Yield (Kgs/ha), C: Cost of Cultivation (Rs./ha)
2.3 Irrigation based classification
Irrigation has so far played only a minimal role in agriculture in the Garo Hills. The
topography itself makes alignment and construction of channels difficult and comparatively
costly. However, even in areas where the lay of the land is more favourable, irrigation is
confined to areas bordering rivers and streams. Farmers in the hills have traditionally
depended upon rainfall, the months of heavy rainfall being May to September. The abundant
supply of rain during the growing season reduces the dependence on artificial alternatives,
except during the brief dry spell before the monsoons. As shown in the table below, the gross
irrigated area and net irrigated area in West Garo Hills district is 19472.6 hectares and 6118.4
hectares respectively while un-irrigated or totally rainfed area in the district is 192186
hectares.
District Irrigation Plan, West Garo Hills District
33 | P a g e
Table 2-3: Block-wise irrigation based classification
District
Irrigated (Area in Ha) Rainfed (Area in Ha)
Gross Irrigated
Area
Net Irrigated
Area
Partially Irrigated/Protective
Irrigation
Un-Irrigated or
Totally Rainfed
West Garo Hills 19472.6 6118.4 -- 44795.4
Source: Department of Agriculture and Horticulture, West Garo Hills
District Irrigation Plan, West Garo Hills District
34 | P a g e
Chapter 3 : Water Availability in West Garo Hills
Water availability is an important issue for ascertaining the demand of water for domestic,
livestock, irrigation, industrial and power generation projects. The water availability depends
on topography, climatic conditions, rainfall, soil profile, infiltration rate, run off and human
activities over the catchment area. The changes in the water levels of the surface source are
mainly because of the variations in the inflow from the upper catchments. The fluctuations
constitute a sensitive indicator of past and present climate and human activities at a local and
regional scale. In the hydrological point of view, the entire West Garo Hills district falls
under the Brahmaputra basin.
3.1 Status of Water Availability
For creating access to water source either assured or protective to each farmer will require a
demand and supply assessment of crop water requirements, effective rainfall and potential
source of existing and new water sources considering the geo-hydrological and agro
ecological scenario of the block. The master plan will include information on all sources of
available water, distribution network, defunct water bodies, new potential water sources both
surface and sub-surface system, application to conveyance provisions, crops and cropping
system aligned to available/designed quantity of water and suitability to local agro ecology.
All activities pertaining to water harvesting, water augmentation from surface ad sub surface
sources, distribution and application of water including repair, renovation and restoration of
water bodies, major, medium and minor irrigation works, command area development etc. are
to be taken up within the frame work of this muster plan. Emphasis is to be given for deriving
the potential benefit from low hanging fruits like extending the reach/ coverage of water
source through effective distribution and application mechanism, reducing the gap between
potential created and utilized through more focus on command area development and
precision irrigation. Proper integration of creation of diversion head work and water
harvesting structures, distribution system like canals and command area development works
and precision farming is to be made for best possible use of water resources. Status of water
availability in different sources is given in the table below.
Table 3-1: Status of Water availability in West Garo Hills district (in MCM)
Sl. No. Sources Kharif Rabi Total
1 Surface Irrigation
(i) Canal (Major & medium irrigation)
(ii) Minor Irrigation tanks 2.52 1.41 3.93
(iii) Lift Irrigation/ Diversion
District Irrigation Plan, West Garo Hills District
35 | P a g e
(iv) Various water bodies including Rain Water Harvesting 0.33 0.04 0.37
(v) Treated Effluent Received from STP
(vi) Untreated Effluent
(vii) Perennial sources of water
2 Ground Water
(i) Open Well
(ii) Deep Tube Well 2885 2885
(iii) Medium Tube Well
(iv) Shallow Tube Wells
Source: Central Ground Water Board Report
3.2 Status of Ground Water Availability
Thirty one exploratory wells and one slim hole have been drilled in this district down to depth
ranging from 30 to 300 m bgl, out of which 2 wells were abandoned. Aquifer zones
encountered in wells range from 18 to 170 m with yield of 7.2 to 150 m3/hr. Auto flow wells
are reported from Ampati, Bairagipara, Zikzak etc. The depth to water level varies from 0.53
m bgl to 8.3 m bgl. The aquifer comprises sand and sand with gravel, while clay forms leaky
aquitard. It can be seen that even though 2 to 4 aquifers have been encountered in individual
boreholes, the sand and sand and gravel beds are inter connected laterally/vertically at places.
The maximum cumulative aquifer thickness is encountered around Ichaguri, Borkona,
Barengapara and Betasing in alluvial areas of West Garo Hills District. The granitic basement
is encountered at a very shallow depth (less than 50 m.bgl) in the northern part of the district,
while in the western and southern part of the district, basement has not been met even at a
depth of 225 m.bgl. The dynamic groundwater resources have been assessed based on
Ground Water Resources Estimation Methodology of 1997 (GEC 97). The over-all stage of
ground water development of the West Garo Hills District is a meager 0.59% and is
categorised as SAFE.
Table 3-2: Status of Ground Water Availability (in MCM) in West Garo Hills district
District Status Draft Recharge Gap
West Garo Hills 0.59% Safe category 1.54 2885 2883.46
Source: Central Ground Water Board, West garo Hills
3.3 Status of Command Area
Information regarding the other services command area is given in the table below. Total
canal command area in the district is 93934 ha out of which 7031.7 ha is developed while
86902.3 ha is undeveloped. Total developed area (canal command and other services) in the
district is 7151.7 ha while total undeveloped area (canal command and other services) in the
district is 86902.3 ha.
District Irrigation Plan, West Garo Hills District
36 | P a g e
Table 3-3: Status of command area (in Ha.)
Name of the
Block
Name of Information of Canal
Command
Information on other
services Command Total Area
TA DA UA TA DA UA DA UA
Selsella 20771 3046.8 17724.2 0 0 0 3046.8 17724.2
Dadenggiri 14591 382 14209 0 0 0 382 14209
Tikrikilla 13230 1150 12080 120 120 0 1270 12080
Rongram 15834 510.6 15323.4 0 0 0 510.6 15323.4
Gambegre 11265 1337.7 9927.3 0 0 0 1337.7 9927.3
Dalu 18243 604.6 17638.4 0 0 0 604.6 17638.4
Total 93934 7031.7 86902.3 120 120 0 7151.7 86902.3
Source: Minor Irrigation Department, West Garo Hills
*TA: Total Area, DA: Developed Area and UA: Undeveloped Area
3.4 Existing type of Irrigation
Types of irrigation in West Garo Hills district is given in the table below. Out of the total
7031.7 hectares of command area, command area by surface water is 6911.7 hectares while
the same by ground water is 120 hectares.
Table 3-4: Existing types of Irrigation in West Garo Hills district
Name of the Block Unit Surface Irrigation Ground Water
Govt. Canals Tube wells
Selsella No. 25 --
Area (ha.) 3046.8 --
Dadenggiri No. 8 --
Area (ha.) 382 --
Tikrikilla No. 10 --
Area (ha.) 1030 120
Rongram No. 19 --
Area (ha.) 510.6 --
Gambegre No. 11 --
Area (ha.) 1337.7 --
Dalu No. 18 --
Area (ha.) 604.6 --
Source: Water Resources Department, West Garo Hills
District Irrigation Plan, West Garo Hills District
37 | P a g e
Chapter 4 : Water Requirement/Demand
Whenever an engineer is given the duty to design a water supply scheme for a particular use
of the community, it becomes imperative upon him, to first of all, evaluate the amount of
water available and the amount of water required/ demanded by the public. In fact, the first
study is to consider the demand, and then the second requirement is to find sources to fulfil
that demand. Many a times a compromise is sought between the two. It is very difficult to
precisely assess the quantity of water demanded by the public since there are many variable
factors affecting water consumption. The various type of water demands for a district may be
as follows.
4.1 Domestic Water Demand
This includes the water requirement in private buildings for drinking, cooking, bathing, lawn
sprinkling, gardening, sanitary purposes etc. The amount of domestic water consumption per
person shall vary according to the living conditions of the consumers. On an average, this
domestic consumption under normal conditions in Indian city is expected to be around 135
litres/ day/ person as per IS: 1172-1971. In a developed and an effluent country like USA,
this figure goes as high as 340 litres/ day/ person. This is because more water is consumed in
rich living, air cooling/conditioning, automatic household appliances, car washing etc. The
total domestic consumption generally amounts to 55% to 60% of the total water consumption.
The total domestic water demand shall be equal to the total design population multiplied by
the per capita domestic consumption i.e. 140 litre/ day. As the last population census was
made in 2011, the actual population of the district in 2015 is not readily available.
Considering the population of the West Garo Hills district as per Census, 2011 the projected
population in 2020 is worked out assuming the last decadal growth of 26.80% and annual
exponential growth rate of 2.68% to apply for the period 2011-2020 (9 years).The domestic
water demand is given in the table below.
Table 4-1: Domestic water demand (MCM)
Blocks
Population
as per 2011
census
Population in
2015
Water
demand
(MCM)
Projected
Population in
2020
Gross Water
Demand
(MCM)
Selsella 175206 193988 9.91 217466 11.11
Dadenggiri 41595 46054 2.35 51628 2.64
Tikrikilla 58388 64647 3.30 72471 3.70
Rongram 133756 148095 7.57 166018 8.48
Gambegre 33546 37142 1.90 41637 2.13
Dalu 54095 59894 3.06 67143 3.43
Total 496586 549820 28.10 616363 31.50
District Irrigation Plan, West Garo Hills District
38 | P a g e
Figure 4-1: Domestic Water Demand (in MCM) in West Garo Hills district
4.2 Crop water demand
Water requirement of a crop means the total quantity and the way in which a crop requires
water, from the time it is sawn to the time it is harvested (crop period). Different crops will
have different water requirements and the same crop may have different water requirements
at different places of the same country depending upon the climate, type of soil, method of
cultivation and useful rainfall etc. The total quantity of water required by the crop for its full
growth may be expressed in Hectare-m or in Million Cubic meter or simply as a depth to
which the total supplied irrigation water would stand above the surface without percolation or
evaporation. This depth is known as delta for the crop. On the other hand duty is defined as
the area irrigated per cumec of discharge running for the base period. The duty helps us in
designing the efficient canal irrigation system. If we know the crops area required to be
irrigated and their duties, we can work out the discharge required for designing the canal.
Consumptive use for a particular crop may be defined as the total amount of water used by
the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or
from plant leaves, in any specified time. Therefore, crop water requirements are defined as
“the depth of water needed to meet the water loss through evapo-transpiration of a disease
free crop, growing in large fields under non restricting soil conditions including soil water
and fertility and achieving full production under the given growing environment.
Consumptive use for a particular crop may be defined as the total amount of water used by
the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0
50000
100000
150000
200000
250000
Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu
Wat
er D
eman
d in
MC
M
Nu
mb
er o
f p
erso
ns
Population in 2015 Projected Population in 2020
Present Water Demand (MCM) Gross Water Demand in 2020 (MCM)
District Irrigation Plan, West Garo Hills District
39 | P a g e
from plant leaves, in any specified time. Thus crop water requirement is nothing but the
consumptive use itself, but exclusive of effective precipitation, stored soil moisture or ground
water. Consumptive use or evapotranspiration depends upon all those factors on which
evaporation and transpiration depend such as, temperature, sunlight, wind movement etc. The
crop water requirement of different bocks in the West Garo Hills district has been worked out
and a statement is prepared as shown in table below which outlines the required and available
water potential in the district.
Table 4-2: Crop water requirement (MCM)
Block Area
sown (ha)
Irrigated
area (ha)
Crop
Water
Demand
(MCM)
Water
potential
required
(MCM)
Existing
Water
potential
(MCM)
Water
potential
to be
created
(MCM)
Selsella 16169.00 4850.70 161.69 161.69 48.51 113.18
Dadenggiri 8923.00 2676.90 89.23 89.23 26.77 62.46
Tikrikilla 9083.00 2724.90 90.83 90.83 27.25 63.58
Rongram 10753.00 3225.90 107.53 107.53 32.26 75.27
Gambegre 8894.00 2668.20 88.94 88.94 26.68 62.26
Dalu 11359.00 3407.70 113.59 113.59 34.08 79.51
Total 65181.00 19554.30 651.81 651.81 195.54 456.27
Figure 4-2: Crop Water Potential (in MCM) in West Garo Hills district
4.3 Livestock water demand
The livestock water demand of the district is determined by multiplying the total livestock
population in the district by the per capita water requirement (litres/ day/ no.) for each
category of the population. As per livestock census of 2003 & 2007, there was 24%
population growth in four years (Average yearly growth rate being 6%). With the existing
48.51
26.77 27.2532.26
26.6834.08
113.18
62.46 63.58
75.27
62.26
79.51
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu
Wat
er P
ote
nti
al in
MC
M
Existing Water Potential (MCM) Water Potential to be created (MCM)
District Irrigation Plan, West Garo Hills District
40 | P a g e
population recorded for a base year, the total projected livestock population in 2020 may be
worked out and accordingly the livestock water demand is worked out.
Table 4-3: Livestock water demand (MCM)
Block
Total
number of
livestock
Present
Water
demand
(MCM)
Water
demand in
2020
(MCM)
Existing
Water
potential
(MCM)
Water
potential to
be created
(MCM)
Selsella 161490 2.06 2.68 2.06 0.62
Dadenggiri 74812 0.96 1.24 0.96 0.29
Tikrikilla 118277 1.51 1.96 1.51 0.45
Rongram 103269 1.32 1.72 1.32 0.40
Gambegre 58168 0.74 0.97 0.74 0.22
Dalu 89747 1.15 1.49 1.15 0.34
Total 605763 7.74 10.06 7.74 2.32
Figure 4-3: Livestock Water Demand (in MCM) in West Garo Hills district
4.4 Industrial water demand
This includes the quantity of water required to be supplied to offices, factories, different
industries, hostels, hospitals etc. This quantity will vary considerably with the nature of city
and with the type of industries and commercial establishments present in it. On an average, a
provision of 20-25% of the total water consumption is generally made in the design for these
uses. In small residential communities, the industrial use may be as low as 45 litre/ day, but in
industrial cities, it may be as high as 450 litres/ day. Some of the industries may develop their
own supplies and may place little or no demand on municipal system. Zoning of the city
affects the location of the industries and may help in estimating future industrial demands.
0.00
0.50
1.00
1.50
2.00
2.50
3.00
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Selsella Dadenggiri Tikrikilla Rongram Gambegre Dalu
Wat
er D
eman
d in
MC
M
Nu
mb
er o
f Li
vest
ock
Total number of livestock Present water demand (MCM)
Water Demand in 2020 (MCM)
District Irrigation Plan, West Garo Hills District
41 | P a g e
Table 4-4: Industrial Water Requirement (in MCM) in West Garo Hills district
Name of
the Blocks Name of the industry
Water
Demand
(MCM)
Water
Demand
in 2020
(MCM)
Existing
Water
Potential
(MCM)
Water
Potential
to be
created
(MCM)
Selsella
M/s K.D Agro Industries 0.06 0.084 0.06 0.024
M/s Prime Crusher Industry 0.0009 0.00126 0.0009 0.00036
M/s Romendra Rice Mill 0.0003 0.00042 0.0003 0.00012
M/s Shekhar Stone Crusher 0.0009 0.00126 0.0009 0.00036
M/s Mega Mustard Oil 0.0015 0.0021 0.0015 0.0006
Gambegre
M/s Aminda Rangsa Rice De- Husking 0.0003 0.00042 0.0003 0.00012
M/s Marak Turmeric Factory 0.045 0.063 0.045 0.018
M/s Janesa Food & Beverages 0.015 0.021 0.015 0.006
Dadenggiri M/s Pearson Rubber Processing Unit 0.0006 0.00084 0.0006 0.00024
Rongram M/s Babilsi Catering 0.003 0.0042 0.003 0.0012
M/s Cheasa Automobiles 0.003 0.0042 0.003 0.0012
Total 0.1305 0.1827 0.1305 0.0522
Source: DICC, West Garo Hills
4.5 Water demand for Power Generation
Presently there is no any power plant in the West Garo Hills district and in the years to come
i.e. up to the year 2020, there is no any plan to tap resources for power generation and it was
informed that the water requirement for power generation may be treated as nil. Hence there
is no demand for water from power sector.
Table 4-5: Water Demand for Power generation (in MCM)
Name of the
District
Power
Requirement
(MW)
Water
Demand
(MCM)
Water
Demand in
2020 (MCM)
Existing
Water
Potential
(MCM)
Water
Potential to
be created
(MCM)
West garo Hills 45 0.85 1.8 0.85 0.95
Source: MeECL, Tura
4.6 Total water demand of the district for various sectors
The total water demand of the district for all the sectors described in 4.1 to 4.5 are given in
the are assessed by summing up all the values of water demand for domestic uses, livestock,
power and industrial/commercial uses etc. The current water demand has been indicated in
Table 4-5 and the projected water demand has been depicted in Table 4-6. Total present water
requirement for the district is 688.62 MCM while the total future water requirement for the
district is 695.35 MCM. In present, maximum water demand is for Selsella block which is
174.58 MCM while minimum is for Gambegre block which is 91.64 MCM. In projected
future, maximum water demand is for Selsella block which is 177.37 MCM while minimum
is for Gambegre block which is 92.12 MCM.
District Irrigation Plan, West Garo Hills District
42 | P a g e
Table 4-6: Present Water Demand of the district for various sectors
Block
Demand from Components (MCM) Total
MCM Domestic Crop Livestock Industrial Power
generation
Selsella 9.91 161.69 2.06 0.0636
0.85
174.58
Dadenggiri 2.35 89.23 0.96 0.0006 92.54
Tikrikilla 3.30 90.83 1.51 -- 95.64
Rongram 7.57 107.53 1.32 0.006 116.42
Gambegre 1.90 88.94 0.74 0.0603 91.64
Dalu 3.06 113.59 1.15 -- 117.80
Total 28.10 651.81 7.74 0.1305 0.85 688.62
Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020)
Block
Demand from Components (MCM) Total
MCM Domestic Crop Livestock Industrial Power
generation
Selsella 11.11 161.69 2.68 0.08904
1.8
177.37
Dadenggiri 2.64 89.23 1.24 0.00084 93.11
Tikrikilla 3.70 90.83 1.96 -- 96.50
Rongram 8.48 107.53 1.72 0.0084 117.74
Gambegre 2.13 88.94 0.97 0.08442 92.12
Dalu 3.43 113.59 1.49 -- 118.51
Total 31.50 651.81 10.06 0.1827 1.8 695.35
4.7 Water Budget
The water budget of the district for the base year 2015-16 and 2020-21 as per water
availability and demand is given in the table below. The present water availability/demand
and also for 2020 are worked out as explained above and the water gap is found out. The
water budget clearly shows the water gap of -2200.68 MCM in present and of -2193.95
MCM in future between the water availability and requirement. The negative gap indicates
that there is sufficient water resources for irrigation, domestic and the industrial uses without
creating any deficit in our water potential.
Table 4-8: Water Budget (Volume in MCM)
District
Existing Water
Availability (MCM) Total
(MCM)
Water Demand
(MCM) Water Gap (MCM)
Surface
water
Ground
water Present
Projected
(2020) Present
Projected
(2020)
West Garo Hills 4.3 2885 2889.3 688.62 695.35 -2200.68 -2193.95
District Irrigation Plan, West Garo Hills District
43 | P a g e
Chapter 5 : Strategic Action Plan for Irrigation in District under
PMKSY
The present DIP for West Garo Hills District is prepared duly considering all the data
collected from the line department and converging data of all departments in each block and
thus a realistic Action Plan is assured as prevented in the format for the years. The total
required of this comprehensive DIP is coming for Rs. 103068.92 lakhs for 4 years.
5.1 Department wise, year wise plan
Total plan of West Garo Hills district for four years works out to be Rs. 103068.92 lakh (Table
5-2). Maximum share of Rs. 69548.51 lakh is for Water Resources Department followed by
Soil & Water Conservation Department with Rs. 25278.62 lakh. The total plan of four years is
divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20. Fig. 5-1 indicates year -wise
share in PMKSY for four years from 2016-17 to 2019-20.
Table 5-1: Department-wise year-wise proposal under PMKSY
Departments
Total Command
Area/ Irrigation
Potential (Ha.)
2016- 2017
(in Rs.
lakhs)
2017- 2018
(in Rs.
lakhs)
2018- 2019
(in Rs.
lakhs)
2019- 2020
(in Rs.
lakhs)
Total
Estimated
Cost (in Rs.
lakhs)
Agriculture 9007.32 1470.31 1435.49 1328.01 1319.98 5553.79
Horticulture 670.00 638.00 690.00 657.00 703.00 2688.00
Soil Conservation 22497.56 9339.97 6096.51 5268.60 4573.54 25278.62
Water Resources 20769.75 9885.38 29204.71 5755.60 24702.83 69548.51
Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92
Figure 5-1: Year wise plan
21333.66
37426.71
13009.20
31299.35
0.00
5000.00
10000.00
15000.00
20000.00
25000.00
30000.00
35000.00
40000.00
2016-17 2017-18 2018-19 2019-20
Am
ou
nt
in R
s. L
akh
s
District Irrigation Plan, West Garo Hills District
44 | P a g e
5.2 Component wise, year wise plan
As discussed above about various components of PMKSY, the plan is prepared accordingly.
Table 5-3 shows component wise plan for 4 years starting from 2016-17 to 2019-20. The
strategic action plan is divided in to 5 components i.e. AIBP, Har Khet Ko Pani, Per Drop
More Crop, PMKSY-Watershed and Convergence with MGNREGA. AIBP component is of
Rs. 20000 lakh, which will be executed by Water Resources department. Har Khet Ko Pani
(HKKP) component is of Rs. 67460.83 lakh, which will be executed by Water Resources,
Soil Conservation and Agriculture departments. Per Drop More Crop (PDMC) components is
of Rs. 5187.85 lakh, which will be executed mainly by Agriculture and Horticulture
departments. Watershed component has a total proposal of Rs. 10282.54 lakh which will be
implemented by Soil Conservation department. Convergence with MGNREGA has a total
proposal of Rs. 137.70 lakh which will be implemented by Soil Conservation department. All
the stakeholders need to have coordination among themselves to have the maximum
irrigation efficiency and to avoid duplicity. Fig. 5-2 represents the graphical representation of
various components of PMKSY, year wise plan and share.
Table 5-2: Component wise, year wise plan
Components
Total Command
Area/ Irrigation
Potential (Ha.)
2016-17 (in
Rs. Lakhs)
2017-18 (in
Rs. Lakhs)
2018-19 (in
Rs. Lakhs)
2019-20 (in
Rs. Lakhs)
Total
Estimated
Cost (in
Rs. lakhs)
AIBP 2500 0.00 20000.00 0.00 0.00 20000.00
Har Khet Ko
Pani 27642.64 16568.51 14157.16 9125.61 27609.55 67460.83
Per Drop
More Crop 6867.24 1322.43 1342.04 1249.25 1274.13 5187.85
Watershed 15680.86 3400.27 1895.26 2602.85 2384.17 10282.54
Convergence 253.90 42.45 32.25 31.50 31.50 137.70
Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92
Figure 5-2: Component wise plan
20000
67460.83
5187.8510282.54
137.700
10000
20000
30000
40000
50000
60000
70000
80000
AIBP Har Khet KoPani
Per DropMore Crop
Watershed Convergencewith
MGNREGA
Am
ou
nt
in R
s. L
akh
s
District Irrigation Plan, West Garo Hills District
45 | P a g e
5.3 Block wise, year wise plan
Block wise, year wise strategic action plan is given in the table below. The highest amount of
Rs. 31068.46 lakh (which is 30.14 % of the total amount) is proposed for Tikrikilla block
while the lowest amount of Rs. 5576.73 lakh (which is 5.4% of the total amount) is proposed
for Dadenggiri block.
Table 5-3: Block wise, year wise plan
Blocks
Total Command
Area/ Irrigation
Potential (Ha.)
2016-17
(in Rs.
Lakhs)
2017-18
(in Rs.
Lakhs)
2018-19
(in Rs.
Lakhs)
2019-20
(in Rs.
Lakhs)
Total
Estimated
Cost (in Rs.
lakhs)
Dadenggiri 4091.60 1899.79 1352.23 1477.43 847.28 5576.73
Dalu 8196.76 3701.43 2516.49 2128.88 1885.72 10232.51
Gambegre 3922.19 4131.65 1085.77 1172.02 1623.07 8012.51
Rongram 8349.66 2418.32 2415.75 3252.51 13114.39 21200.97
Selsella 17159.49 6435.52 5581.18 2903.30 12057.74 26977.74
Tikrikilla 11224.94 2746.95 24475.30 2075.06 1771.15 31068.46
Grand Total 52944.64 21333.66 37426.71 13009.20 31299.35 103068.92
Figure 5-3: Block wise plan
5.4 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of concerned Gram Panchayat and then
finalize the village plan and prepare DPR.
All the structures planned should be geo tagged and marked on map, so that social
auditing of the projects can be conducted. This will also avoid duplicity and wastage of
resources.
5576.73
10232.51
8012.51
21200.97
26977.74
31068.46
0.00
5000.00
10000.00
15000.00
20000.00
25000.00
30000.00
35000.00
Dadenggiri Dalu Gambegre Rongram Selsella Tikrikilla
Am
ou
nt
in R
s. L
akh
s
District Irrigation Plan, West Garo Hills District
46 | P a g e
The Departments should supplement each other so that the maximum irrigation efficiency
is achieved.
Priority should be given to projects to minimize the gap in potential created and potential
utilized.
Execution of the schemes should be properly planned to avoid time and cost overrun.
There should be smooth fund flow for timely completion of the project and to avoid cost
escalation.
5.5 Period of Implementation
It is proposed that the planned activities and outlay will be spent in a period of 4 years. Some
of the activities relating to extension, small irrigation works etc., are recurring and hence will
have a period of implementation less than a year. Through these activities PMKSY program
is expected to increase the water availability meeting the water demand from multiple
sources. A total of Rs. 103068.92 Lakhs will be spent during the next 4 years covering
46316.64 hectares.
5.6 Monitoring and Evaluation
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be monitored by the
District Level Irrigation Committee. Further, the activities, outputs and outcomes will be
reported in web based MIS of PMKSY for review at state and national level. Some of the key
indicators that will be used to monitor and evaluate the progress of PMKSY include:
1. Annual irrigation water supply per unit irrigated area measured as the ratio of total
volume of irrigation water supplied at intake divided by total area irrigated in all seasons
2. Potential created and utilized measured as the ratio of total potential utilized (measured
crop area) to irrigation potential created
3. Output (agricultural production) per unit irrigated area measured as the ratio of total value
of agriculture production divided by the total irrigated area
4. Output (agricultural production) per unit irrigation water supply measured as the ratio of
total value of agriculture production divided by the total volume of irrigated water
supplied
District Irrigation Plan, West Garo Hills District
47 | P a g e
5. Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total
Management, Operation and Maintenance (MOM) costs for the system divided by total
area irrigated (potential utilized)
6. Total Operations & Maintenance (O&M) cost per unit volume of water supplied
measured as total Management, Operation and Maintenance (MOM) costs for the system
divided Total volume of water supplied (all uses)
7. Equity performance measured as actual area irrigated in head, middle and tail divided by
Command area in head, middle and tail
5.7 Expected Output and Outcome
Table below represents the block-wise target proposed by various department to bring
additional land under irrigated cultivation through PMKSY. Total of 52944.64 hectares area
will be brought under irrigation. Highest area i.e. 17159.49 hectares will be brought under
irrigation in Selsella block while the lowest area i.e. 3922.19 hectares will be brought under
irrigation in Gambegre block.
Table 5-4: Block wise area to be brought under irrigation in DIP of West Garo Hills district
Blocks Total Command Area/ Irrigation Potential (Ha.)
Dadenggiri 4091.60
Dalu 8196.76
Gambegre 3922.19
Rongram 8349.66
Selsella 17159.49
Tikrikilla 11224.94
Grand Total 52944.64
5.8 Conclusion
The PMKYS District Irrigation Plan was prepared at Block level & District level. Through
PMKSY, DIP is envisaging to increase irrigation potential in the district. The model
irrigation plan envisages educating the farmers to adhere to the scientific practices in the
command area .This will increase the crop production per unit area of agriculture land. As
such majority of the agriculture in West Garo Hills is rainfed and the aforementioned minor
irrigation projects will facilitate better availability of water. A lot of Water Harvesting and
conservation structures, like Farm Ponds Check Dams, Nalah bunds are proposed which shall
enhance the Net Irrigated Area. The ground water potential is yet to be estimated for the use
of drinking and irrigation to the non-command areas. This shall favour micro irrigation
activities in the region mainly drip and sprinkler irrigation. This will also spur a change in
cropping patterns and farmers will show interests towards vegetable and other horticultural
crops. This can be boost commercial precision agriculture fostering local economy. There is
District Irrigation Plan, West Garo Hills District
48 | P a g e
high potential for micro irrigation in West Garo Hills and the plan has been proposed for
maximum utilization of the same. New Structures shall provide more surface water
opportunities and shall act as support for the livestock. This is one of the major water needs
that go unnoticed. The plan aims for cattle troughs and village ponds that favour cattle and
other livestock. Increased Water Availability shall spur many Agro-based industries in the
region providing employment generation. The holistic irrigation plan was prepared at Block
level & District level. PMKSY DIP will fulfil the resource gap in the irrigation chain.
Irrigation to every farm will be achieved through completion of surface minor projects
proposed under AIBP. Under Per Drop More crop, we will achieve enhance cropping &
productivity which leads to rural prosperity. The cost of the DIP is about Rs. 103068.92
lakhs. This will enhance total use efficiency management for higher yield in the district.
District Irrigation Plan, West Garo Hills District
49 | P a g e
Annexure I : Strategic Action Plan by Water Resources Department
Name of the Block: Rongram
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerned
Ministry/
Department
Component Activity
Total
Number/
Capacity
(cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
(9+11+13+15) (10+12+14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14
1 Mongalgre MoWR HKKP
Surface
Minor
900 85 127.37 85.00 127.37
2 Rongekgre 750 25 37.24 25.00 37.24
Total 1650 110 164.61 110.00 164.61 0.00 0.00 0.00 0.00 0.00 0.00
1 Dollonggre
MoWR HKKP Surface
Minor
1050 65 129.59 65.00 129.59 - - - - - -
2 Anogre 750 40 79.75 40.00 79.75 - - - - - -
3 Rongkhongre 6250 60 119.77 60.00 119.77 - - - - - -
4 Asigre 2500 200 200.00 - - - - 200.00 200.00 - -
5 Chibra Agal 850 20 40.00 - - 20.00 40.00 - - - -
6 Gabil 650 25 50.00 - - - - - - 25.00 50.00
Total 12050 410 619.11 165.00 329.11 20.00 40.00 200.00 200.00 25.00 50.00
1 Edenbari
MoWR HKKP
Improvem
ent of
existing
schemes
1600 215 150.00
215.00 150.00
2 Soragre 1200 183 120.00
183.00 120.00
Total 2800 398 270.00 0.00 0.00 398.00 270.00 0.00 0.00 0.00 0.00
1 Watregre MoWR HKKP
RRR of
Water
Bodies
50219 120 150.00 120.00 150.00 - - - - - -
Total 50219 120 150.00 120.00 150.00 0 0 0 0 0 0
1 Rongekgre MoWR HKKP
Lined
Field
Channels
850 60 85.00 - - - - - - 60 85
Total 850 60 85.00 0.00 0.00 0.00 0.00 0.00 0.00 60 85
1 Ganolgre
MoWR HKKP Micro
Irrigation
105 6 10.50 - - 6 10.5 - - - -
2 Chandigre 30 7 12.50 - - 7 12.5 - - - -
3 Alakama 24 5 10.60 - - 5 10.6 - - - -
4 Chandigre 750 15 30.00 - - - - - - 15 30
5 Balupara 100 5.00 ₹ 5.00 - - 5.00 5.00 - - - -
Total 1009 38 68.6 0 0 23 38.6 0 0 15 30
1 Oragitok MOA &
Secondary 150 7.00 5.87 7.00 5.87 - - - - - -
District Irrigation Plan, West Garo Hills District
50 | P a g e
2 Boldamgre
FW-DAC&
FW
Storage
Structures
(Jalkund)
150 5.00 6.64 5.00 6.64 - - - - - -
Total 300 12 12.511 12 12.511 0 0 0 0 0 0
1 Selbalgre
State
Irrigation
Departme
nt
Name of
the Scheme
Multi
Purpose
Reservoirs
2520 5 60.00 5.00 60.00 - - - - - -
2 Upper
Chitoktak 5500 - 120.00 - - - - - 120 - -
3 Selbal Nokat 6250 5 40.00 5.00 40.00 - - - - - -
4 Samingre 8400 5 26.00 - - 5 26 - - - -
5 Ringrey 7500 - 100.00 - - - - - - - 100
6 Samingre 7000 6 32.40 - - 6 32.4 - - - -
7 Baljek Agal 6300 80 160.00 - - - - 80 160 - -
8 boldorengg
re 6500 - 145.00 - - - - - - - 145
9 Selbalgre 7500 300 1000.00 - - - - - - 300 1,000.00
10 Chibragre 5500 35 60.00 - - - 60 - - - -
11 Chibragre 6500 40 70.00 - - - 70 - - - -
12 Kalakgre 600 10.00 200.00 - - 10.00 200.00 - - - -
13 Sakalgre 900 14.00 400.00 - - 14.00 400.00 - - - -
14 Gurare 1000 60.00 1,000.00 - - - - 60.00 1000.00 - -
15 Matchurigre 320 10.00 70.00 - - - - 10.00 70.00 - -
16 Rongram 500 45.00 10,000.00 - - - - - - 45.00 10,000.00
Total 72,790.00 615.00 13,483.40 10.00 100.00 35.00 788.40 150.00 1,350.00 345.00 11,245.00
1 Selbalgre
State
Irrigation
Department
Name of
the Scheme Jalkund
850 10 14.50 10.00 14.50 - - - - - -
2 Oragitok 750 9 14.50 - - 9 14.5 - - - -
3 Aranggre 950 9 14.50 - - 9 14.5 - - - -
4 Digranggre 860 10 14.50 - - 10 14.5 - - - -
5 Dingringgre 160 7.5 8.80 7.50 8.80 - - - - - -
6 Boldamgre 150 5 7.90 5.00 7.90 - - - - - -
7 Oragitok 150 7 8.50 7.00 8.50 - - - - - -
8 Ganolgre 320 5.5 9.20 5.50 9.20 - - - - - -
9 Alla Kama 155 5.5 8.50 5.50 8.50 - - - - - -
10 Rengsangre 180 5 8.50 5.00 8.50 - - - - - -
11 Waribokgre 225 4.5 8.90 - - 4.5 8.9 - - - -
12 Aguragre 190 4 8.50 - - 4 8.5 - - - -
13 Digranggre 220 7 9.20 - - 7 9.2 - - - -
14 Rengsangre 190 4.5 7.90 - - 4.5 7.9 - - - -
15 Samingre 180 5 8.30 - - 5 8.3 - - - -
16 Misimagre 220 7 8.90 - - - - 7 8.9 - -
17 Aranggre 160 9 9.20 - - - - 5 9.2 - -
18 Chibragre 180 6 8.90 - - - - 5.5 8.9 - -
19 Chandigre 150 6 8.80 - - - - 6 8.8 - -
District Irrigation Plan, West Garo Hills District
51 | P a g e
20 Soragre 420 6 5.94
6 5.94
21 Pagugre 240 3 2.97
3 2.97
22 Pagugre 240 4 3.96
4 3.96
23 Rongkhongre 270 2.5 2.48
2.5 2.48
24 Matchurigre 190 5 9.20
5 9.2
25 Rewanang
160 8.00 10.00 - - 8.00 10.00 - - - -
Total 7760 155 222.55 45.5 65.9 76.5 111.65 28.5 45 0 0
1 Dura
Kantragre
State
Irrigation
Departme
nt
Name of
the Scheme
Spring
Rejuvenati
on Project
- - 7.50 - 7.50 - - - - - -
2 Upper
Chitoktak - - 8.20 - 8.20 - - - - - -
3 Deran Gittim - - 7.35 - 7.35 - - - - - -
4 Wakagre - - 7.25 - 7.25 - - - - - -
5 Wabok
Gittim - - 8.50 - 8.50 - - - - - -
6 Dakopgre - - 7.80 - 7.80 - - - - - -
7 Rengsangre
- 10.0 - - - -
8 Rongkhon
Agal - - 7.50 - 7.50 - - - - - -
9 Boldorenggre - - 7.65 - 7.65 - - - - - -
10
Upper
Rongkhon
(Bosco
Mount)
- - 8.20 - - - 8.2 - - - -
11 Chasingre - - 7.90 - - - 7.9 - - - -
12 Gandrak.
10.00
10 - - - -
13 Ringrey
Ading - - 10.20 - - - 10.2 - - - -
14
Chasingre
(Near
NEHU)
- - 8.25 - - - 8.25 - - - -
15 Balsanang - - 9.50 - - - 9.5 - - - -
16 Ballonggre - - 9.80 - - - 9.8 - - - -
17 Balsanang - - 9.10 - - - 9.1 - - - -
18 Rongkhon - - 8.90 - - - 8.9 - - - -
19 Agillanggre. - - 8.70 - - - 8.7 - - - -
20 Duragre - - 7.60 - - - 7.6 - - - -
21 Ganol Apal - - 7.90 - - - 7.9 - - - -
22 Asanang - - 7.70 - - - 7.7 - - - -
23 Chibragre - - 8.30 - - - 8.3 - - - -
24 Asanang - - 8.40 - - - 8.4 - - - -
25 Rongchigre - - 8.60 - - - 8.6 - - - -
District Irrigation Plan, West Garo Hills District
52 | P a g e
26 Aguragre - - 8.25 - - - 8.25 - - - -
27 Ringrey
Gittim - - 8.90 - - - 8.9 - - - -
28 Waribokgre - - 8.40 - - - 8.4 - - - -
29 Samingre - - 8.35 - - - 8.35 - - - -
30 Digranggre - - 8.90 - - - 8.9 - - - -
31 Megapgre - - 8.30 - - - 8.3 - - - -
32 Waribokgre I - - 8.60 - - - - - 8.6 - -
33 Ringgi Apal - - 9.50 - - - - - 9.5 - -
34 Allotgre - - 8.90 - - - - - 8.9 - -
35 Waribokgre
II - - 8.65 - - - - - 8.65 - -
36 Songkonggre - - 9.00 - - - - - 9 - -
37 Samingre - - 8.55 - - - - - 8.55 - -
38 Warisepgre - - 8.90 - - - - - 8.9 - -
39 Dingringgre - - 8.60 - - - - - 8.6 - -
40 Aguragre - - 8.90 - - - - - 8.9 - -
41 Boldamgre - - 8.70 - - - - - 8.7 - -
42 Spring Hills - - 8.65 - - - - - 8.65 - -
43 Watregre - - 9.10 - - - - - 9.1 - -
44 Rongkhongre - - 8.50 - - - - - 8.5 - -
45 Rongkhongre - - 9.20 - - - - - 9.2 - -
46 Rongkhongre - - 9.20 - - - - - 9.2 - -
47 Rongkhong
re - - 8.50 - - - - - 8.5 - -
48 Danakgre - - 10.20 - - - - - 10.2 - -
49 Sunny Hills - - 8.50 - - - - - 8.5 - -
50 Matchurigre - - 9.20 - - - - - 9.2 - -
51 Oragitok - - 8.90 - - - - - - - 8.9
52 Chandigre - - 9.20 - - - - - - - 9.2
53 Misimagre - - 8.70 - - - - - - - 8.7
54 Bolbokgre - - 8.90 - - - - - - - 8.9
55 Rengsangre - - 8.85 - - - - - - - 8.85
56 Badagonggre - - 9.00 - - - - - - - 9
57 Babadam - - 8.85 - - - - - - - 8.85
58 Matchakol
gre - - 8.80 - - - - - - - 8.8
59 Burny Hills - - 9.10 - - - - - - - 9.1
60 Edenbari - - 8.00 - - - 8.00 - - - -
61 Edenbari - - 10.00 - - - 10.00 - - - -
62 Pagugre - - 8.00 - - - 8.00 - - - -
63 Rongkhongre - - 8.00 - - - 8.00 - - - -
District Irrigation Plan, West Garo Hills District
53 | P a g e
Total 0.00 0.00 535.55 0.00 61.75 0.00 234.15 0.00 169.35 0.00 80.30
Grand Total 1,49,428 1,918.00 15,611.33 462.50 883.88 552.50 1,482.80 378.50 1,764.35 445.00 11,490.30
Name of the Block: Gambegre
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerned
Ministry/
Department
Component Activity Total Number/
Capacity (cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
(9+11+13+15) (10+12+14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14
1 Anangpara
MoWR HKKP Surface
Minor
1050 50 97.64 50 97.64 - - - - - -
2 Nengja
bolchugre 750 55 107.25 55 107.25 - - - - - -
3 Dabelagre 2500 215 284.53 215 284.53 - - - - - -
4 Alabagre
65 128.03 65 128.03 - - - - - -
5 Badupara 850 80 117.29 80 117.29 - - - - - -
6 Doldigre - 89 - - - 89 267.00 - - - -
7 Jembagre - 30 - - - 30 75.00 - - - -
8 Mahalang 2520 12 46.89 12 46.89 - - - - - -
9 Suringre 6250 16 76.88 - - 16 76.88 - - - -
10 Melim 8400 15 48.69 - - 15 48.69 - - - -
11 Rongkhon
wabokgre 7000 1.6 35.2 - - 1.6 35.20 - - - -
12 Churabudugre 6500 45 113 - - 45 - - - - -
Total 35820 673.6 1055.4 477 781.63 196.6 502.77 0 0 0 0
1 Ringdee
MoWR HKKP
Improveme
nt of
existing
schemes
52500 500 1250 500 1,250.00 - - - - - -
2 Dengnakpara 56250 198 594 198 594 - - - - - -
3 Amindagre 50750 275 688 275 688 - - - - - -
Total 159500 973 2,532.00 973 2,532.00 0 0 0 0 0 0
1 Goragre
MoWR HKKP
Lined
Field
Channels
155 55 137 - - - - 150 137
2 Nengja
bolchugre 180 55 137 - - - -
55 137
3 Anangpara 225 50 125 - - - - 50 125
4 Dengnakpara - 198 - - - - - - - 198 396
5 Amindagre - 275 - - - - - - - 275 550
6 Nengja
Bolchugre - 55 - - - - - - - 55 110
7 Badupara - 80 - - - - - 80 160 - -
District Irrigation Plan, West Garo Hills District
54 | P a g e
8 Dabellagre - 215 - - - - - 215 430 - -
Total 560 983 399 0 0 0 0 495 852 583 1193
1 Bolchugre MOA &
FW-DAC&
FW
Secondary
Storage
Structures
(Jalkund)
250 5.40 6.930 5.40 6.930 - - - - - -
2 Badupara 300 5.00 4.950 5.00 4.950 - - - - - -
Total 550 10.4 11.88 10.4 11.88 0 0 0 0 0 0
1 Bolong State
Irrigation
Department
Name of
the Scheme RKVY
220 6 19 - - - - - - 6 19
2 Dia 180 6 26 - - 6 26.00 - - - -
Total 400 12 45 0 0 6 26.00 0 0 6 19
1 Okabra
songma 220 6.75 6.7 6.75 6.7 - - - - - -
2 Okabra
Songgitcham
State
Irrigation
Department
Name of
the Scheme Jalkund
160 6 5.93 6 5.93 - - - - - -
3 Babagre 180 6.5 6.47 6.5 6.47 - - - - - -
4 Nengja
bolchugre 150 2.6 7.5 - - 2.60 9.00 - - - -
5 Nengja
bolchugre 190 3 7.5 - - 5.40 5.32 - - - -
6 Dabellagre - 3 8 - - 2.50 6.00 - - - -
7 Gambegre - 3 8 - - 3.00 6.00 - - - -
8 Goragre - - - - - 3.50 6.00 - - - -
9 Goragre - - - - - 4.00 8.00 - - - -
Total 900 30.85 50.1 19.25 19.1 21 40.32 0 0 0 0
Grand Total 197730 2682.85 4093.38 1479.65 3344.61 223.6 569.09 495 852 589 1212
Name of the block: Dalu
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerned
Ministry/
Department
Component Activity
Total
Number/
Capacity
(cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
(9+11+13+15) (10+12+14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14
1 Songjelpara
MOWR HKKP Surface
Minor
3000 100 - - - - - - - - -
2 Banaikali 11250 140 - - - - - - - - -
3 Asiragre 1125 39 77.039 39 77.039 - - - - - -
4 Dijingpita 2880 32 63.49 32 63.49 - - - - - -
5 Bengka 4680 58 115.42 58 115.42 - - - - - -
6 Koinadubi 1120 70 139.3 70 139.3 - - - - - -
7 Nokchi 6000 38 75 - - 38 75 - - - -
District Irrigation Plan, West Garo Hills District
55 | P a g e
8 Amongpara 2350 75 150 - - 75 150 - - - -
9 Mibonpara 2530 72 144 - - 72 144 - - - -
10 Mibon Nokat 4500 35 70 - - 35 70 - - - -
11 Alagre 4000 64 128 - - 64 128 - - - -
12 Bamonpara 4000 35 70 - - 35 70 - - - -
13 Chandapara 1600 38 76 - - 38 76 - - - -
14 Adugachol 13500 150 300 - - 130 260 - - - -
15 Makalgonchu 1600 30 60 - - 30 60 - - - -
16 Rengsipara 800 34 68 - - - - 34 68 - -
17 Rengsipara 3200 38 76 - - - - 38 76 - -
18 Ontapara 2400 36 72 - - - - 36 72 - -
19 Rangapara 1600 48 80 - - - - 48 80 - -
20 Posengagre 2500 35 70 - - - - 35 70 - -
21 Josipara 1800 50 100 - - - - 50 100 - -
22 Salbaripara 1200 28 56 - - - - - - 28 56
23 Baburam Bil 1400 18 36 - - - - - - 18 36
24 Kongtokpara 960 18 36 - - - - - - 18 36
25 Wagegitok 1470 16 32 - - - - - - 16 32
26 Rengrampara 960 40 80 - - - - - - 40 80
Total 82425 1337 2174.249 199 395.249 517 1033 241 466 120 240
1 Gonchu
MOWR HKKP
Improvem
ent of
Existing
Schemes
5000 48 71.5 - - 48 71.5 - - - -
2 Koreng
Nokat 6750 54 80 - - 54 80 - - - -
3 Makalpara 9000 59 88 - - - - 59 88 - -
4 Akinpara 960 36 36 - - - - - - 36 36
Total 21710 197 275.5 0 0 102 151.5 59 88 36 36
1 Josipara MOWR HKKP
RRR of
Water
Bodies
51840 170 325 170 325 - - - - - -
Total 51840 170 325 170 325 0 0 0 0 0 0
1 Koreng
Nokat
MOWR HKKP Lined Field
Channels
- 54 29.06 54 29.06 - - - - - -
2 Grajingfield - 46 34.5 - - 46 34.5 - - - -
3 Gonchudare - 48 36 - - - - 48 36 - -
4 Makkalpara - 59 47 - - - - - - 59 47
Total 0 207 146.56 54 29.06 46 34.5 48 36 59 47
1 Matchokpara MOA &
FW-DAC&
FW
Secondary
Storage
Structures
(Jalkund)
450 6.00 5.750 6.00 5.750 - - - - - -
2 Konapara 300 10.00 9.963 10.00 9.963 - - - - - -
3 Sonagre
Rongjibol 300 7.50 6.626 7.50 6.626 - - - - - -
Total 1050 23.5 22.339 23.5 22.339 0 0 0 0 0 0
1 Rangamati State Name of RKVY 250 18.5 18.53 18.5 18.53 - - - - - -
District Irrigation Plan, West Garo Hills District
56 | P a g e
2 Rongsep Irrigation
Departme
nt
the scheme 250 9.7 17.52 9.7 17.52 - - - - - -
3 Mandang 300 19.5 31.1 19.5 31.1 - - - - - -
4 Kimkol 320 11.7 18.91 11.7 18.91 - - - - - -
5 Amongpara 300 20 42 - - 20 42 - - - -
6 Marapara 300 20 42 - - 20 42 - - - -
7 Moitojora 320 10 21 - - 10 21 - - - -
8 Barongpara 400 15 31.5 - - 15 31.5 - - - -
9 Rimrangpara 200 25 52.5 - - 25 52.5 - - - -
10 Mibonpara 450 18 37.8 - - - - 18 37.8 - -
11 Harchati 500 15 31.5 - - - - 15 31.5 - -
12 Mandal 250 11 23.1 - - - - 11 23.1 - -
13 Sonajuri 300 12 25.2 - - - - 12 25.2 - -
14 Madra 320 20 42 - - - - 20 42 - -
15 Jijikapara 300 25 52.5 - - - - - - 25 52.5
16 Matchimpara 250 15 31.5 - - - - - - 15 31.5
17 Dalamgre 200 20 42 - - - - - - 20 42
18 Chongnapara 180 18 37.8 - - - - - - 18 37.8
19 Rongbokgre 200 25 52.5 - - - - - - 25 52.5
Total 5590 328.4 650.96 59.4 86.06 90 189 76 159.6 103 216.3
1 Amongpara State
Irrigation
Departme
nt
Name of
the scheme
Multi
Purpose
Reservoirs
2835 43 275.48 43 275.48 - - - - - -
2 Karong
Jengtalgre 560 10 48.04 10 48.04 - - - - - -
Total 3395 53 323.52 53 323.52 0 0 0 0 0 0
1 Darong Adu
State
Irrigation
Departme
nt
Name of
the scheme Jalkund
200 9.5 9.41 9.5 9.41 - - - - - -
2 Chongpot
Dopogre 250 8 7.92 8 7.92 - - - - - -
3 Tibapara 200 5 4.95 5 4.95 - - - - - -
4 Chandapara 150 6 5.94 6 5.94 - - - - - -
5 Chandapara 350 7 6.93 7 6.93 - - - - - -
6 Sonagre 300 6 5.94 6 5.94 - - - - - -
7 Jonangpara 300 10 9.9 10 9.9 - - - - - -
8 Chongpot
Mronggre 250 7.5 7.43 7.5 7.43 - - - - - -
9 Cheptapara 200 7 6.93 7 6.93 - - - - - -
10 Konapara 200 9 8.91 9 8.91 - - - - - -
11 Masangpani 180 6 5.94 6 5.94 - - - - - -
12 Josipara 250 8 7.92 8 7.92 - - - - - -
13 Josipara 250 6 5.94 6 5.94 - - - - - -
14 Matchokpara 300 6 5.94 6 5.94 - - - - - -
15 Rimrangpara 320 7 6.93 7 6.93 - - - - - -
16 Rimrangpara 300 9 8.91 9 8.91 - - - - - -
District Irrigation Plan, West Garo Hills District
57 | P a g e
17 Tibapara 400 7 7 - - 7 7 - - - -
18 Chikasin 420 5 5 - - 5 5 - - - -
19 Rangdapara 500 10 10 - - 10 10 - - - -
20 Rangapara 550 10 10 - - 10 10 - - - -
21 Kontokpara 550 4 4 - - 4 4 - - - -
22 Rangapara 500 8 8 - - 8 8 - - - -
23 Rongsep 200 8 8 - - 8 8 - - - -
24 Bengkajora 250 8.5 8.5 - - 8.5 8.5 - - - -
25 Koinabhoi 250 7.5 7.5 - - 7.5 7.5 - - - -
26 Konapara 250 7.5 7.5 - - 7.5 7.5 - - - -
27 Posengagre 200 9 9 - - - - 9 9 - -
28 Basulpara 150 8 8 - - - - 8 8 - -
29 Asiragre 180 10 10 - - - - 10 10 - -
30 Lower
Bamonpara 150 9 9 - - - - 9 9 - -
31 Gorangpara 250 10 10 - - - - 10 10 - -
32 Mrop 250 9 9 - - - - 9 9 - -
33 Kokokpara 200 10 10 - - - - - - 10 10
34 Cheptapara 150 5 5 - - - - - - 5 5
35 Cheptapara 300 10 10 - - - - - - 10 10
36 Rengrampara 350 8 8 - - - - - - 8 8
37 Rengrampara 350 8.5 8.5 - - - - - - 8.5 8.5
Total 10400 289 287.84 117 115.84 75.5 75.5 55 55 41.5 41.5
1 Darong Adu
State
Irrigation
Department
Name of
the scheme
Spring
Rejuvenation
Project
- - 6.5 - 6.5 - - - - - -
2 Karonggre
No.1 - - 8.68 - 8.68 - - - - - -
3 Karonggre
No.2 - - 8.41 - 8.41 - - - - - -
4 Karonggre
Songma - - 6.71 - 6.71 - - - - - -
5 Machangpani - - 6.66 - 6.66 - - - - - -
6 Koreng
Nokat - - 8.5 - - - 8.5 - - - -
7 Lower
Bamonpara - - 9.2 - - - 9.2 - - - -
8 Tibapara - - 9.35 - - - 9.35 - - - -
9 Sonagre
Rongjibol - - 8.55 - - - 8.55 - - - -
10 Rengrampara - - 9.8 - - - 9.8 - - - -
11 Magupara - - 9.35 - - - 9.35 - - - -
12 Natan Nokat
A - - 9.45 - - - 9.45 - - - -
District Irrigation Plan, West Garo Hills District
58 | P a g e
13 Jijikapara - - 9.52 - - - - - 9.52 - -
14 Rengsipara - - 8.55 - - - - - 8.55 - -
15 Rongdapara - - 8.2 - - - - - 8.2 - -
16 Natan Nokat
B - - 8.5 - - - - - 8.5 - -
17 Natanpara - - 9.2 - - - - - 9.2 - -
18 Rengrampara - - 8.85 - - - - - 8.85 - -
19 Magupara - - 9.25 - - - - - 9.25 - -
20 Baburam Bil - - 9.8 - - - - - - - 9.8
21 Kongtokpara - - 9.5 - - - - - - - 9.5
Total 0 0 182.53 0 36.96 0 64.2 0 62.07 0 19.3
Grand Total 176410 2604.9 4388.498 675.9 1334.028 830.5 1547.7 479 866.67 359.5 600.1
Name of the Block: Selsella
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departmen
t
Componen
t Activity
Total
Number/
Capacity
(cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.) (9+11+13+15
)
(10+12+14+16
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14
1 Selsella
MOWR HKKP Surface
Minor
52500 312 773.35
2 Benabazar 11250 105 145.95
3 Kalupara 11250 76 151.71 76 151.71 - - - - - -
4 Chidinagre 12600 85 169.79 85 169.79 - - - - - -
5 Kalpara 3600 30 59.7 - - 30 59.7 - - - -
6 Marok 7500 40 79.6 - - 40 79.6 - - - -
7 Okanggre 6000 40 79.6 - - 40 79.6 - - - -
8 Kalangaon 12000 60 119.4 - - 60 119.
4 - - - -
9 Chamagre 12250 60 119.4 - - 60 119.
4 - - - -
10 Jonkipara 6750 40 79.6 - - - - 40 79.
6 - -
11 Mandagre 13125 50 99.5 - - - - 50 99.
5 - -
12 Bolbokgri 12000 40 79.6 - - - - 40 79.
6 - -
13 Taironggre 18000 30 59.7 - - - - 30 59. - -
District Irrigation Plan, West Garo Hills District
59 | P a g e
7
14 Dimdima 10500 45 89.55 - - - - 45 89.
55 - -
15 Ballonggre 7500 30 59.7 - - - - 30 59.
7 - -
16 Kangkalapara 4000 40 79.6 - - - - 40 79.
6 - -
17 Attamburi 4500 40 79.6 - - - - 40 79.
6 - -
18 Balujora 14000 50 99.5 - - - - 50 99.5 - -
19 Wanokgri 4500 25 49.75 - - - - - - 25 49.75
20 Jongnapara 9000 30 59.7 - - - - - - 30 59.7
21 Sapalguri 12600 35 69.65 - - - - - - 35 69.65
22 Rongkakgri 15750 40 79.6 - - - - - - 40 79.6
23 Dingnapara 13125 35 69.65 - - - - - - 35 69.65
24 Kongkaramana 16875 80 159.2 - - - - - - 80 159.2
25 Sapalgri 18000 60 119.4 - - - - - - 60 119.4
Total 309175 1478 3031.8 161 321.5 230 457.7 365
726.3
5 305 606.95
1 Ujenggri
MOWR HKKP
RRR of
Water
Bodies
50625 162 112.91 162 37.9
9
2 Dolgiri 50350 200 132.35 200 1.36
3 Bolsalgre 50400 382 758.43 382 758.43 - - - - - -
4 Rajabala 4750000 100 1,000.00 - - - - - - 100 1,000.00
Total
4901375.
0 844 2003.69 744.00 797.78 0.00 0.00 0.00 0.00 100.00 1000.00
1 Jigabari
MOWR HKKP Lined Field
Channels
- 230 169.57 230 169.57
2 Belbari - 95 48.1 95 48.1
3 Kasipara - 95 76
95 76
4 Kalapani - 98 78.4
98 78.
4
5 Nidanpur - 78 62.4
78 62.4
Total 0 596 434.47 325 217.67 95 76 98 78.4 78 62.4
1 Nengkalpara State
Irrigation
Departme
nt
Name of
the scheme RKVY
750 10 13.34 10 13.3
4 - - - - - -
2 Chikolgrang
Noksik 600 8 12.5 - - 8 12.5 - - - -
Total 1350 18 25.84 10 13.34 8 12.5 0 0 0 0
1 Megonggre State
Irrigation
Departmen
t
Name of
the scheme Jalkund
600 8 7.827 8 7.82
7 - - - - - -
2 Chikindaregre 315 8 7.942 8 7.94
2 - - - - - -
3 Shyamnagar 350 10 9.84 10 9.84 - - - - - -
District Irrigation Plan, West Garo Hills District
60 | P a g e
4 Lalmati 675 9.8 9.578 9.8 9.57
8 - - - - - -
5 Chidina
Songma 750 10 10 10 10 - - - - - -
6 Chidina 350 9 10 - - 9 10 - - - -
7 Mandagre 450 10 10 - - 10 10 - - - -
8 Rongsaigre 900 10 10 - - 10 10 - - - -
9 Matramchigre 675 9 10 - - - - 9 10 - -
10 Alokdia 540 9 10 - - - - 9 10 - -
11 Morasati 675 10 10 - - - - - - 10 10
12 Nagnipara 600 8 10 - - - - - - 8 10
13 Bokonggre 420 10.00 9.90 - - 10.00 9.90 - - - -
14 Chisikgre 380 10.00 9.90 - - 10.00 9.90 - - - -
15 Danokgre 350 9.00 8.91 - - - - 9.00 8.91 - -
16 Rongchandalgr
e 420 10.00 9.90 - - - - 10.00 9.90 - -
Total 8450 149.8 153.797 45.8 45.187 49 49.8 37 38.81 18 20
1 Ganchenggre
State
Irrigation
Departme
nt
Name of
the scheme
Spring
Rejuvenatio
n Project
- - 11.438 - 11.438 - - - - - -
2 Rongramgre - - 11.037 - 11.037 - - - - - -
3 Selsella
Apalgre - - 10.67 -
10.6
7 - - - - - -
4 Gaudia - - 10.87 - 10.8
7 - - - - - -
5 Chinabatgre - - 11.379 - 11.379 - - - - - -
6 Baklagre - - 10.86 - - - 10.86 - - - -
7 Nisnipara No.1 - - 10.5 - - - 10.5 - - - -
8 Nisnipara No.2 - - 11.5 - - - 11.5 - - - -
9 Chamaguri
No.1 - - 11.2 - - - 11.2 - - - -
10 Nisnipara No.3 - - 10.89 - - - 10.89 - - - -
11 Nesipara - - 9.5 - - - 9.5 - - - -
12 Sampalgre - - 10.8 - - - - - 10.8 - -
13 Dimdima - - 10.5 - - - - - 10.5 - -
14 Ramjong - - 11.25 - - - - - 11.25 - -
15 Singgimari - - 11.28 - - - - - 11.28 - -
16 Chikolgrang - - 11.5 - - - - - 11.5 - -
17 Komilabra - - 11.65 - - - - - - - 11.65
18 Damagre - - 11.85 - - - - - - - 11.85
19 Sampalgre - - 10.85 - - - - - - - 10.85
20 Chamguri No.2 - - 10.2 - - - - - - - 10.2
21 Bangsidua - - 10.5 - - - - - - - 10.5
Total 0 0 230.224 0 55.394 0 64.45 0 55.33 0 55.05
District Irrigation Plan, West Garo Hills District
61 | P a g e
1 Sarkarpara State
Irrigation
Departmen
t
Name of
the scheme
Multi
Purpose
Reservoirs
750 10.00 58.12 10.00 58.12 - - - - - -
2 Mronggre 3500000 3000.00 24,000.00 - - - - - - 3000.00 9,000.00
Total 3500750 3010.00 24,058.12 10.00 58.12 0.00 0.00 0.00 0.00 3000.00 9,000.00
1 Chikindaregre MOA &
FW-
DAC&
FW
Secondary
Storage
Structures
(Jalkund)
315 8.00 7.989 8.00 7.99 - - - - - -
2 Chidina
Songma 750 10.00 9.449 10.00 9.45 - - - - - -
Total 1065 18.00 17.44 18.00 17.44 0.00 0.00 0.00 0.00 0.00 0.00
1 Gumaijhora Other Loan
Projects
Name of
the scheme NABARD
60000 345 490.27 - - 345 490.27 - - - -
2 Kalchengpara 21000 478 950.07 - - 478 950.07 - - - -
Total 81000 823 1440.34 0 0 823
1440.3
4 0 0 0 0
Grand Total 8803165 6936.80 31395.72 1313.80
1526.4
3 1205.00
2100.7
9 500.00
898.8
9 3501.00
10744.4
0
Name of the Block: Dadenggre
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerned
Ministry/
Department
Component Activity
Total
Number/
Capacity
(cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
(9+11+13+15) (10+12+14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14
1 Bangranggre
MOWR HKKP Surface
Minor
17500 70 132.24 - - - - - - - -
2 Gambalgre 11250 70 138.85 70 138.85 - - - - - -
3 Damal Asim 24000 80 159.2 - - 80 159.2 - - - -
4 Lower Baljek
Aduma 9000 50 99.5 - - 50 99.5 - - - -
5 Dagagre
Chenggagre 16875 50 99.5 - - 50 99.5 - - - -
6 Dilsegre 11250 40 79.6 - - - - 40 79.6 - -
7 Upper Baljek
Aduma 5400 30 59.7 - - - - 30 59.7 - -
8 Rambatgre 7500 30 59.7 - - - - 30 59.7 - -
9 Chibong Apal 10800 50 99.5 - - - - - - 50 99.5
10 Dara Apal 11250 50 99.5 - - - - - - 50 99.5
11 Baljek
Songgitcham 5760 40 79.6 - - - - - - 40 79.6
District Irrigation Plan, West Garo Hills District
62 | P a g e
Total 130585 560 1106.89 70 138.85 180 358.2 100 199 140 278.6
1 Rongadathgri MOWR HKKP
Improvem
ent of
Existing
Schemes
5625 60 79.05 60 79.05 - - - - - -
Total 5625 60 79.05 60 79.05 - - - - - -
1 Egopara MOWR HKKP Lined - 60 51 - - 60 51 - - - -
Field
Channels
2 Jambira - 90 76.5 - - 90 76.5 - - - -
3 Gimegre - 71 60.35 - - 71 60.35 - - - -
Total 5625 281 266.9 60 79.05 221 187.85 0 0 0 0
1 Rondupara
MOA &
FW-DAC&
FW
Secondary
Storage
Structures
(Jalkund)
450 8.00 7.927 8.00 7.927 - - - - - -
Total 450 8 7.927 8 7.927 0 0 0 0 0 0
1 Bolmagre State
Irrigation
Department
Name of
the scheme RKVY
360 6 13.5 - - 6 13.5 - - - -
2 Renchi Asim 540 5 11.25 - - 5 11.25 - - - -
3 Ajigre 600 14 31.5 - - - - 14 31.5 - -
4 Bokmagre 510 8 18 - - - - - - 8 18
Total 2010 33 74.25 0 0 11 24.75 14 31.5 8 18
1 Bangranggre
No.1
State
Irrigation
Departme
nt
Name of
the scheme Jalkund
360 6 5.975 6 5.975 - - - - - -
2 Bangranggre
No.2 720 8 7.15 8 7.15 - - - - - -
3 Sotmarenggre
No.1 525 10 9.9 10 9.9 - - - - - -
4 Sotmarenggre
No.2 300 5 4.99 5 4.99 - - - - - -
5 Gimegre 540 10 10 10 10 - - - - - -
6 Sadolpara Jal
Gram No.1 600 9 8.91 9 8.91 - - - - - -
7 Sadolpara Jal
Gram No.2 600 10 9.9 10 9.9 - - - - - -
8 Sadolpara Jal
Gram No.3 540 8 7.92 8 7.92 - - - - - -
9 Aduma 540 8 7.92 8 7.92 - - - - - -
10 Rondupara 720 6 5.94 6 5.94 - - - - - -
11 Sindapara 200 10 9.9 - - 10 9.9 - - - -
12 Rongsakgre 200 10 9.9 - - 10 9.9 - - - -
13 Asimgre 150 8 7.92 - - 8 7.92 - - - -
14 Noadinggre 350 9 8.91 - - 9 8.91 - - - -
15 Daregre 250 7 6.93 - - 7 6.93 - - - -
District Irrigation Plan, West Garo Hills District
63 | P a g e
16 Rom 350 8 7.92 - - - - 8 7.92 - -
17 Chibongagre 400 6 5.94 - - - - 6 5.94 - -
18 Jangrapara
No.1 150 5 4.95 - - - - 5 4.95 - -
19 Jangrapara
No.2 200 5 4.95 - - - - 5 4.95 - -
20 Teksragre 350 8 7.92 - - - - 8 7.92 - -
21 Kalsingre 360 9 8.91 - - - - - - 9 8.91
22 Rongnabakgre 600 10 9.9 - - - - - - 10 9.9
23 Rongkhongre 600 10 9.9 - - - - - - 10 9.9
24 Katananggre 520 8 7.92 - - - - - - 8 7.92
25 Rabonggre 350 9.00 8.91 - - 9.00 8.91 - - - -
26 Kamagre 300 8.00 7.92 - - 8.00 7.92 - - - -
27 Chandigre 320 8.00 7.92 - - - - 8.00 7.92 - -
28 Chandigre 450 10.00 9.90 - - - - 10.00 9.90 - -
29 Jangnakpara 250 9.00 8.91 - - - - - - 9.00 8.91
30 Galwanggre 320 10.00 9.90 - - - - - - 10.00 9.90
Total 10125 193 190.475 80 78.605 44 43.56 32 31.68 37 36.63
1 Rongsanggre
No.1
State
Irrigation
Departme
nt
Name of
the scheme
Spring
Rejuvenati
on Project
- - 10.76 - 10.76 - - - - - -
2 Rongsanggre
No.2 - - 11.24 - 11.24 - - - - - -
3 Sadolpara
No.1 - - 11.97 - 11.97 - - - - - -
4 Sadolpara
No.2 - - 11.66 - 11.66 - - - - - -
5 Chibragre - - 11.8 - 11.8 - - - - - -
6 Chibong Apal - - 10.75 - 10.75 - - - - - -
7 Rongchugre - - 11.2 - 11.2 - - - - - -
8 Rimchugre - - 10.5 - - - 10.5 - - - -
9 Sindapara - - 11.5 - - - 11.5 - - - -
10 Rongsanggre - - 10.8 - - - - - 10.8 - -
11 Rongkongri
No.1 - - 10.5 - - - - - 10.5 - -
12 Rongkongri
No.2 - - 10.2 - - - - - 10.2 - -
13 Digonggre
No.1 - - 9.8 - - - - - - - 9.8
14 Digonggre
No.2 - - 10.5 - - - - - - - 10.5
15 Digonggre
No.3 - - 11.2 - - - - - - - 11.2
District Irrigation Plan, West Garo Hills District
64 | P a g e
Total 0 0 164.38 0 79.38 0 22 0 31.5 0 31.5
1 Sindapara State
Irrigation
Department
Name of
the scheme
Multi
Purpose
Reservoirs
360 10.00 35.00 - - 10.00 35.00 - - - -
2 Rongsakgre
540 10.00 32.00 - - 10.00 32.00 - - - -
Total 900 20.00 67.00 - - 20.00 67.00 0.00 0.00 0.00 0.00
1 Romgri Other loan
Projects
NABARD 12000 60 102.64 60 102.64 - - - - - -
Total 12000 60 102.64 60 102.64 0 0 0 0 0 0
Name of the Block: Tikrikilla
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerned
Ministry/
Department
Component Activity
Total
Number/
Capacity
(cum)
Total
Command
Area (hac.)
Total Funds
(Lacs.) Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
Command
Area
(hac.)
Fund
(lacs.)
(9+11+13+15) (10+12+14+16)
1 2 3 4 5 6 7 8 9 10 11 12 13 1
4 15 14
1 Balupara MOWR AIBP Medium
Irrigation 360000 2500.00 20000.00 - - 2500.00 20000.00 - - - -
Total 360000 2500.00 20000.00 - - 2500.00 20000.00 - - - -
1 Raksamgre
MOWR HKKP Surface
Minor
43750 182 271.67 - - - - - - - -
2 Ronipara 15000 80 147.27 - - - - - - - -
3 Belguri 15750 70 139.37 70 139.37 - - - - - -
4 Watregre 9375 45 81.65 45 81.65 - - - - - -
5 Sagolchiga 13500 60 119.11 60 119.11 - - - - - -
6 Balupara 105000 800 1,592.00 - - 800 1,592.00 - - - -
7 Chiblekgre 12150 60 119.4 - - 60 119.4 - - - -
8 Mothapara 15000 50 99.5 - - - - 50 99.5 - -
9 Chimagre 14400 80 159.2 - - - - 80 159.2 - -
10 Kosidamgre 15000 70 139.3 - - - - - - 70 139.3
11 Andalsikgre 13500 70 139.3 - - - - - - 70 139.3
12 Ronggatgre 10000 65.00 129.94 - - 65.00 129.94 - - - -
13 Khasiapara 37500 70.00 139.93 - - 70.00 139.93 - - - -
Total 272425 1567 3007.77 175 340.13 860 1711.4 130 258.7 140 278.6
1 Photamati
MOWR HKKP
Improvem
ent of
Existing
Schemes
145920 567 680.4 - - - - 567 680.4 - -
2 Hatugaon 22500 150 180 - - 150 180 - - - -
Total 168420 717 860.4 0 0 150 180 567 680.4 0 0
1 Kadamsali MOWR HKKP
Groundwater
Development
- 40 36 40 36 - - - - - -
2 Kaimbathapara - 40 36 40 36 - - - - - -
District Irrigation Plan, West Garo Hills District
65 | P a g e
3 Paham - 40 36 40 36 - - - - - -
Total 0 120 108 120 108 0 0 0 0 0 0
1 Hatugaon MOWR HKKP
Lined Field
Channels
- 150 100.83 150 100.83 - - - - - -
2 Anggaripara - 78 62.4 - - 78 62.4 - - - -
Total 0 228 163.23 150 100.83 78 62.4 0 0 0 0
1 Jongchipara
MOA &
FW-DAC&
FW
Secondary
Storage
Structures
(Jalkund)
450 8.70 8.555 8.70 8.555 - - - - - -
Total 450 8.70 8.56 8.70 8.56 - - - - - -
1 Lower Watregre State
Irrigation
Departme
nt
Name of
the scheme RKVY
1200 7 13.72 7 13.72 - - - - - -
2 Surigre 840 9 20.25 - - 9 20.25 - - - -
3 Rongmachu 900 12 27 - - 12 27 - - - -
4 Lethengpara 900 14 31.5 - - - - 14 31.5 - -
5 Didapara 1080 7 15.75 - - - - 7 15.75 - -
Total 4920 49 108.22 7 13.72 21 47.25 21 47.25 0 0
1 Jongchipara
State
Irrigation
Departme
nt
Name of
the scheme Jalkund
200 8.7 8.731 8.7 8.731 - - - - - -
2 Lower Rimbegre 250 9 8.593 9 8.593 - - - - - -
3 Tikrikilla
Boldamgre 200 9.5 8.844 9.5 8.844 - - - - - -
4 Raksamgre
Songgitchamgre 350 8 7.92 8 7.92 - - - - - -
5 Raksamgre 450 8 7.92 8 7.92 - - - - - -
6 Doldonga 600 18 17.82 - - 18 17.82 - - - -
7 Deosali 250 10 9.9 - - 10 9.9 - - - -
8 Didapara 250 10 9.9 - - 10 9.9 - - - -
9 Dalchengkona
No.1 200 5 4.95 - - - - 5 4.95 - -
10 Dalchengkona
No.2 200 5 4.95 - - - - 5 4.95 - -
11 Dalchengkona
No.3 150 6 5.94 - - - - 6 5.94 - -
12 Manda Kosakgre
No.1 200 5 4.95 - - - - - - 5 4.95
13 Manda Kosakgre
No.2 150 6 5.94 - - - - - - 6 5.94
14 Dodanggre 320 10.00 9.90 - - 10.00 9.90 - - - -
Total 3770 118.2 116.258 43.2 42.008 48 47.52 16 15.84 11 10.89
1 Upper Raksamgre State
Irrigation
Department
Name of
the scheme
Multi
Purpose
Reservoirs
2400 50.00 180.00
50.00 180.00 - - - -
2 Rongbokgre 15000 30.00 120.00
30.00 120.00 - - - -
Total 17400 80.00 300.00
80.00 300.00 - - - -
1 Lower Watregre State Name of Spring - - 11.72 - 11.72 - - - - - -
District Irrigation Plan, West Garo Hills District
66 | P a g e
No.1 Irrigation
Departme
nt
the scheme Rejuvenation
Project 2
Lower Watregre
No.2 - - 11.83 - 11.83 - - - - - -
3 Renchigre - - 10.68 - 10.68 - - - - - -
4 Sindapara - - 11.04 - 11.04 - - - - - -
5 Chiblekgre - - 9.8 - - - 9.8 - - - -
6 Balsrigittim - - 10.2 - - - 10.2 - - - -
7 Manda Kosakgre
No.1 - - 10.5 - - - 10.5 - - - -
8 Manda Kosakgre
No.2 - - 9.5 - - - 9.5 - - - -
9 Boldamgre - - 11.2 - - - 11.2 - - - -
10 Mandagre - - 11.5 - - - 11.5 - - - -
11 Dalchenkona
No.1 - - 10.8 - - - - - 10.8 - -
12 Dalchenkona
No.2 - - 10.2 - - - - - 10.2 - -
13 Dalchenkona
No.3 - - 10.5 - - - - - 10.5 - -
14 Kosidamgre - - 9.8 - - - - - 9.8 - -
15 Andalsikgre No.1 - - 9.5 - - - - - 9.5 - -
16 Andalsikgre No.2 - - 9.2 - - - - - 9.2 - -
17 Rongmakgre - - 10.8 - - - - - - - 10.8
18 Didapara No.1 - - 11.2 - - - - - - - 11.2
19 Didapara No.2 - - 11.5 - - - - - - - 11.5
20 Didapara No.3 - - 11.8 - - - - - - - 11.8
21 Didapara No.4 - - 11.45 - - - - - - - 11.45
22 Didapara No.5 - - 11.25 - - - - - - - 11.25
Total 0 0 235.97 0 45.27 0 62.7 0 60 0 68
1 Nagargaon Other loan
Projects NABARD 3600 206 201.523 60
- - - - - -
Total 3600 206 201.523 60 0 0 0 0 0 0 0
District Irrigation Plan, West Garo Hills District
67 | P a g e
Annexure II : Strategic Action Plan by Agriculture Department
Name of the Block: Rongram C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerne
d
Ministry/
Departm
ent
Compone
nt Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Kamagre MoA&F
W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.50 6.00 1.00 6.00
1.00 6.00
2 Tebronggre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.50 12.00 2.00 6.00
1.50 6.00
3 Bangdagre MoA&F
W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.00 6.00 1.20 6.00
1.30 6.00
4 Dittegre MoA&F
W HKKP M.I. Checkd Dam 4.00 6.70 24.00 2.10 6.00 1.50 6.00 1.40 6.00 1.70 6.00
5 Dollong
Manda
MoA&F
W HKKP M.I. Checkd Dam 2.00 2.50 12.00
1.20 6.00 1.30 6.00
6 Bolmagre MoA&F
W HKKP M.I. Checkd Dam 3.00 3.50 18.00 1.50 6.00 0.90 6.00 1.10 6.00
7 Urrenggre MoA&F
W HKKP M.I. Checkd Dam 4.00 3.10 24.00 0.90 6.00 0.70 6.00 0.80 6.00 0.70 6.00
8 Dolong
Songma
MoA&F
W HKKP M.I. Checkd Dam 3.00 4.30 18.00 1.20 6.00 1.50 6.00 1.60 6.00
9 Rangwalkamg
re
MoA&F
W HKKP M.I. Checkd Dam 2.00 2.60 12.00
1.40 6.00
1.20 6.00
10 Robagre MoA&F
W HKKP M.I. Checkd Dam 3.00 3.80 18.00 1.10 6.00 1.30 6.00 1.40 6.00
11 Galwang
Songma
MoA&F
W HKKP M.I. Checkd Dam 2.00 0.00 12.00
6.00
6.00
12 Jendragre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.40 6.00
1.40 6.00
13 Misimagre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.70 12.00 1.30 6.00
1.40 6.00
District Irrigation Plan, West Garo Hills District
68 | P a g e
14 Bibragre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00 1.70 6.00
1.40 6.00
15 Tosekgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00
1.50 6.00
1.50 6.00
16 Matchurigre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.40 6.00
1.40 6.00
17 Damjonggre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.30 12.00 1.70 6.00
1.60 6.00
18 Chidekgre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.80 12.00
1.70 6.00
1.10 6.00
19 Marak
Jabetgre
MoA&F
W HKKP M.I. Checkd Dam 2.00 2.30 12.00 1.00 6.00
1.30 6.00
20 Derikgre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.80 12.00
1.40 6.00
1.40 6.00
21 Rencha Apal MoA&F
W HKKP M.I. Checkd Dam 2.00 2.50 12.00 1.20 6.00
1.30 6.00
22 Romba
Adinggre
MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00
1.50 6.00
1.60 6.00
23 Marak
Songma
MoA&F
W HKKP M.I. Checkd Dam 2.00 0.00 12.00
6.00
6.00
24 Silsekgre MoA&F
W HKKP M.I. Checkd Dam 3.00 4.40 18.00 1.40 6.00 1.60 6.00 1.40 6.00
25 Teksragre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00
1.60 6.00
1.50 6.00
26 Anogre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00
1.60 6.00
1.40 6.00
27 Marakpara MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00 1.50 6.00
1.50 6.00
28 Bugakolgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.20 12.00
1.40 6.00 1.80 6.00
29 Mongalgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00
1.40 6.00 1.60 6.00
30 Waram
Songma
MoA&F
W HKKP M.I. Checkd Dam 3.00 3.90 18.00 1.50 6.00 1.10 6.00 1.30 6.00
31 Gindopara MoA&F
W HKKP M.I. Checkd Dam 3.00 4.10 18.00 1.80 6.00 1.20 6.00
1.10 6.00
32 Rengsanggre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.10 6.00
1.10 6.00
33 Mrigre MoA&F HKKP M.I. Checkd Dam 2.00 2.60 12.00 1.30 6.00
1.30 6.00
District Irrigation Plan, West Garo Hills District
69 | P a g e
W
34 Kalakgre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.30 6.00
1.30 6.00
35 Chandigre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.80 12.00 1.40 6.00
1.40 6.00
36 Gondenggre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00
1.60 6.00
1.40 6.00
37 Rombagre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.40 6.00
1.40 6.00
38 Rongdenggre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.40 6.00
1.40 6.00
39 Bamigre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.00 12.00 1.40 6.00
1.60 6.00
40 Megapgre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.40 6.00
1.40 6.00
41 Tapragre MoA&F
W HKKP M.I. Checkd Dam 1.00 1.50 6.00
1.50 6.00
42 Wategre MoA&F
W HKKP M.I. Checkd Dam 3.00 4.10 18.00 1.40 6.00 1.60 6.00 1.10 6.00
43 Botegre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.30 12.00
1.10 6.00
1.20 6.00
44 Rongpotgre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.40 12.00 1.10 6.00
1.30 6.00
45 Ampanggre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.00 12.00
1.00 6.00
1.00 6.00
46 Sasatgre MoA&F
W HKKP M.I. Checkd Dam 3.00 4.00 18.00 1.20 6.00 1.40 6.00 1.40 6.00
47 Sakalgre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.80 12.00
1.40 6.00 1.40 6.00
48 Boladinggre MoA&F
W HKKP M.I. Checkd Dam 2.00 2.80 12.00 1.40 6.00
1.40 6.00
49 Rongramgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00
1.50 6.00
1.60 6.00
50 Timbogre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.40 12.00 1.70 6.00
1.70 6.00
51 Silsotgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.40 12.00
1.70 6.00 1.70 6.00
52 Chokagre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00 1.60 6.00
1.50 6.00
District Irrigation Plan, West Garo Hills District
70 | P a g e
53 Arbella
Chidekgre
MoA&F
W HKKP M.I. Checkd Dam 2.00 2.70 12.00 1.40 6.00
1.30 6.00
54 Dijingro Apal MoA&F
W HKKP M.I. Checkd Dam 2.00 2.40 12.00 1.50 6.00
0.90 6.00
55 Rongsep
Adinggre
MoA&F
W HKKP M.I. Checkd Dam 2.00 2.00 12.00 1.30 6.00
0.70 6.00
56 Buripara MoA&F
W HKKP M.I. Checkd Dam 2.00 3.50 12.00
1.40 6.00
2.10 6.00
57 Chidaogre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.70 12.00 1.90 6.00
1.80 6.00
58 Gambarigre MoA&F
W HKKP M.I. Checkd Dam 2.00 0.00 12.00
6.00
6.00
59 Goeragre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.80 12.00 1.90 6.00
1.90 6.00
60 Rongdikgre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.30 12.00 1.40 6.00
1.90 6.00
61 Asigre MoA&F
W HKKP M.I. Checkd Dam 2.00 3.10 12.00
1.40 6.00 1.70 6.00
62 Rangwal
Kamgre
MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
63 Matchurigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
64 Chandigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
65 Gondenggre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
66 Rombagre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
67 Rongdenggre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
68 Chiokgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
69 Wattegre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
70 Rongpotgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
71 Ampanggre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
72 Timbogre MoA & PDMC Surface Water 2.00 3.00 0.85 1.50 0.42
1.50 0.42
District Irrigation Plan, West Garo Hills District
71 | P a g e
FW Pumpsets
73 Rongchigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
74 Baladinggre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
75 Sasatgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
76 Rongramgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
77 Donsimagre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
78 Silsotchigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
79 Chokagre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85
1.50 0.42 1.50 0.42
80 Manggakgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
81 Diringgro
Apal
MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
82 Damjonggre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
83 Sropgre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
84 Chidaogre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
85 Agisimgre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
86 Goeragre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
87 Rongdikgre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
88 Asigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
89 Dorenggre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
90 Rongandigre MoA &
FW PDMC
Surface Water
Pumpsets 2.00 3.00 0.85 1.50 0.42
1.50 0.42
91 Daljagre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
District Irrigation Plan, West Garo Hills District
72 | P a g e
92 Mongalgre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
93 Bugakolgre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
94 Marakapara MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
95 Robagre MoA &
FW PDMC
Surface Water
Pumpsets 1.00 1.50 0.42
1.50 0.42
96 Buripara MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
97 Chidaogre MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
98 Gambarigre MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
99 Goeragre MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
0 Rongdikgre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
1 Asigre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
2
Rangwal
Kamgre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
3 Matchurigre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
4 Chandigre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
5 Gondenggre
MoA &
FW PDMC Treadle Pump 2.00 0.80 0.70 0.40 0.35 0.40 0.35
10
6
Rongram
block
MoA &
FW PDMC
Training within the
block
2000.0
0 5.00 500.00 1.25 500.00 1.25 500.00 1.25 500.00 1.25
10
7
Rongram
block
MoA &
FW PDMC
Exposure
Visit(Inter state)×
7days
80.00
4.48 20.00 1.12 20.00 1.12 20.00 1.12 20.00 1.12
10
8
Rongram
block
MoA &
FW PDMC
Exposure
Visit(Inter distric)×
3days
60.00
0.72 15.00 0.18 15.00 0.18 15.00 0.18 15.00 0.18
10
9
Rongram
block
MoA &
FW PDMC
Exposure
Visit(within
District)× 2days
120.00
0.72 30.00 0.18 30.00 0.18 30.00 0.18 30.00 0.18
District Irrigation Plan, West Garo Hills District
73 | P a g e
Total 2467.0
0 267.00 810.95 637.80
204.5
9 632.60
205.0
2 628.90
200.2
5 627.70
201.0
9
District Irrigation Plan, West Garo Hills District
74 | P a g e
Name of the Block: Gambegre C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerne
d
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Nengja
Bolchugre MoA&FW HKKP
M. I. Check
Dam at
Dikki
Suram
Stream
1 10 7.8 10 7.8
2 Nengja
Bolchugre MoA&FW HKKP
M. I. Check
Dam at
Matcha
Deram
Stream
1 8 11.25
8 11.25
3 Nengja
Bolchugre MoA&FW HKKP
M. I. Check
Dam at
Tebi
Stream
1 11 7.8
11 7.8
4 Aminda
Simsang MoA&FW HKKP
M. I. Check
Dam at
Darichik
Stream
1 15 9.6 15 9.6
5 Kirupara
Bokmagre MoA&FW HKKP
M. I. Check
Dam at
Okka
Stream
1 4 4.5 4 4.5
6 Kirupara
Bokmagre MoA&FW HKKP
M. I. Check
Dam at
Bokma
Stream
1 5 4.5
5 4.5
7 Rimrangpara MoA&FW HKKP
M. I. Check
Dam at
Chambil
Stream
1 3 11.25 3 11.25
District Irrigation Plan, West Garo Hills District
75 | P a g e
8 Dabelagre MoA&FW HKKP
M. I. Check
Dam at
Apal
Stream
1 8 7.2 8 7.2
9 Dabelagre MoA&FW HKKP
M. I. Check
Dam at
Melim
Stream
(L/Reaches
)
1 15 9
15 9
10 Suringgre MoA&FW HKKP
M. I. Check
Dam at
Choka
Stream
1 7 6 7 6
11 Chollongpara MoA&FW HKKP
M. I. Check
Dam at
Gudal
Stream
1 5 9 5 9
12 Anchenggre MoA&FW HKKP
M. I. Check
Dam at
Chibasal
Stream
1 4 6.48 4 6.48
13 Anchenggre MoA&FW HKKP
M. I. Check
Dam at
Chibongba
ng Stream
1 3 6
3 6
14 Gambegre MoA&FW HKKP
M. I. Check
Dam at
Chigitchak
Stream
1 3 4.2 3 4.2
15 Chigitchakgre MoA&FW HKKP
M. I. Check
Dam at
Skili
Stream
1 5 6.75 5 6.75
16 Churabudigre MoA&FW HKKP
M. I. Check
Dam at
Chijong
Stream
1 10 9 10 9
17 Churabudigre MoA&FW HKKP M. I. Check 1 10 8.4
10 8.4
District Irrigation Plan, West Garo Hills District
76 | P a g e
Dam at
Mega
Stream
(U/Reaches
)
18 Churabudigre MoA&FW HKKP
M. I. Check
Dam at
Mega
Stream
(L/Reaches
)
1 9 0
9
19 Churabudigre MoA&FW HKKP
M. I. Check
Dam at
Diblock
Stream
1 8 11.25
8 11.25
20 Churabudigre MoA&FW HKKP
M. I. Check
Dam at
Maraka
Stream
1 15 8.4 15 8.4
21 Churabudigre MoA&FW HKKP
M. I. Check
Dam at
Gangjam
Stream
1 18 9
18 9
22 Dilnigre MoA&FW HKKP
M. I. Check
Dam at Dia
Stream
1 10 9 10 9
23 Dabelagre MoA&FW HKKP
M. I. Check
Dam at
Mellim
Stream
1 9 6
9 6
24 Aminda
Simsang MoA&FW HKKP
M. I. Check
Dam at
Bringa
Stream
1 12 7.2
12 7.2
25 Nengja
Bolchugre MoA&FW HKKP
M. I. Check
Dam at
Asim
Stream
1 12 9
12 9
26 Dabelagre MoA&FW HKKP M. I. Check 1 15.2 7.02
15.2 7.02
District Irrigation Plan, West Garo Hills District
77 | P a g e
Dam at
Mellim
Stream
27 Dilnigre MoA&FW HKKP
M. I. Check
Dam at Dia
Stream
1 10.12 10.5
10.12 10.5
28 Aminda
Simsang MoA&FW HKKP
M. I. Check
Dam at
Bringga
Stream
1 20 7.2
20 7.2
29 Gambegre MoA&FW HKKP
M. I. Check
Dam at
Gopram
Chiring
1 11 6
11 6
30 Nengja
Bolchugre MoA&FW HKKP
Repairing
of
Damaged
MIP Dam
at Seel
stream
1 7 3.8 7 3.8
31 Churabudigre MoA&FW PDMC Water
Pump 6 12 2.5455 4 0.8485 4 0.8485 2
0.424
3 2
0.4242
5
32 Mebitpara MoA&FW PDMC Water
Pump 4 10 1.697 2.5
0.4242
5 2.5
0.4242
5 2.5
0.424
3 2.5
0.4242
5
33 Aminda
Simsang MoA&FW PDMC
Water
Pump 4 8 1.697 2
0.4242
5 2
0.4242
5 2
0.424
3 2
0.4242
5
34 Aminda
Rangsa MoA&FW PDMC
Water
Pump 4 8 1.697 2
0.4242
5 2
0.4242
5 2
0.424
3 2
0.4242
5
35 Dabelagre MoA&FW PDMC Water
Pump 4 8 1.697 2
0.4242
5 2
0.4242
5 2
0.424
3 2
0.4242
5
36 Rangmangre MoA&FW PDMC Water
Pump 4 7 1.697 1.75
0.4242
5 1.75
0.4242
5 1.75
0.424
3 1.75
0.4242
5
37 Rakwapara MoA&FW PDMC Water
Pump 4 6 1.697 1.5
0.4242
5 1.5
0.4242
5 1.5
0.424
3 1.5
0.4242
5
38 Gambegre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
39 Dilnigre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
40 Aminda MoA & PDMC Treadle 2 0.8 0.7 0.4 0.35 0.4 0.35
District Irrigation Plan, West Garo Hills District
78 | P a g e
Simsang FW Pump
41 Aminda
Rangsa
MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
42 Suringgre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
43 Nengja
Bolchugre
MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
44 Amakgre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
45 Dabelagre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
46 Anchenggre MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
47 Badupara MoA &
FW PDMC
Treadle
Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
48 Gambegre
block
MoA &
FW PDMC
Training
within the
block
2000
5 500 1.25 500 1.25 500 1.25 500 1.25
49 Gambegre
block
MoA &
FW PDMC
Exposure
Visit(Inter
state)×
7days
80
4.48 20 1.12 20 1.12 20 1.12 20 1.12
50 Gambegre
block
MoA &
FW PDMC
Exposure
Visit(Inter
distric)×
3days
60
0.72 15 0.18 15 0.18 15 0.18 15 0.18
51 Gambegre
block
MoA &
FW PDMC
Exposure
Visit(withi
n District)×
2days
120
0.72 30 0.18 30 0.18 30 0.18 30 0.18
Total 2340 349.32 253.75 690.8 112.60
4 676.9 81.474 627.8 26.7 614 32.97
District Irrigation Plan, West Garo Hills District
79 | P a g e
Name of the Block: Selsella C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerne
d
Ministry/
Departm
ent
Compon
ent Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fun
d
(lac
s)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fund
(lacs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 SmokSonggital MoA&F
W HKKP MIP Check Dam 1 3 8.4 3 8.4
2 Dengasi MoA&F
W HKKP MIP Check Dam 1 39 8.1 39 8.1
3 Sangkarigre MoA&F
W HKKP MIP Check Dam 1 37.6 9.6 37.6 9.6
4 Modhupara MoA&F
W HKKP MIP Check Dam 1 18.41 9.6 18.41 9.6
5 Chamaguri MoA&F
W HKKP MIP Check Dam 1 4 9.6 4 9.6
6 Apalgre MoA&F
W HKKP MIP Check Dam 1 14.66 10.8 14.66 10.8
7 Chismokgre MoA&F
W HKKP MIP Check Dam 1 12.40 9.6 12.40 9.6
8 Garobadha MoA&F
W HKKP MIP Check Dam 1 23.40 10.8 23.40 10.8
9 Mukdangra MoA&F
W HKKP MIP Check Dam 1 12.70 8.1
12.70 8.1
10 Maljanggre MoA&F
W HKKP MIP Check Dam 1 19.10 9.6
19.10 9.6
11 Baghmara MoA&F
W HKKP MIP Check Dam 1 20.00 10.5
20.00 10.5
12 Andharkona MoA&F
W HKKP MIP Check Dam 1 20.00 9.6
20.00 9.6
13 Dalupara MoA&F
W HKKP MIP Check Dam 1 15.00 9.6
15.00 9.6
14 Chengjora MoA&F
W HKKP MIP Check Dam 1 20.00 9.6
20.00 9.6
15 Abisilla MoA&F
W HKKP MIP Check Dam 1 3 12
3 12
District Irrigation Plan, West Garo Hills District
80 | P a g e
16 New Dengasi MoA&F
W HKKP MIP Check Dam 1 5 9.6
5 9.6
17 Mukdangra
Ghatgre
MoA&F
W HKKP MIP Check Dam 1 10 9.6
10 9.6
18 Nogapara MoA&F
W HKKP MIP Check Dam 1 6 10.8
6 10.8
19 Ronggekgre A MoA&F
W HKKP MIP Check Dam 1 10 10.8
10 10.8
20 Ronggekgre B MoA&F
W HKKP MIP Check Dam 1 20 9.6
20 9.6
21 Balnanggre MoA&F
W HKKP MIP Check Dam 1 25 10.8
25 10.8
22 Ranggira
Bolsalgre
MoA&F
W HKKP MIP Check Dam 1 10 9.6
10 9.6
23 Dopatchigre MoA&F
W HKKP MIP Check Dam 1 15 9.6
15 9.6
24 Chokonggre MoA&F
W HKKP MIP Check Dam 1 10 10.8
10 10.8
25 Goramara MoA&F
W HKKP MIP Check Dam 1 10 9.6
10 9.6
26 Kanchikona MoA&F
W HKKP MIP Check Dam 1 15 8.4
15 8.4
27 Porapara MoA&F
W HKKP MIP Check Dam 1 20 10.8
20 10.8
28 Diglapara MoA&F
W HKKP MIP Check Dam 1 40 10.8
40 10.8
29 Old Harigaon MoA&F
W HKKP MIP Check Dam 1 40 9.6
40 9.6
30 New Harigaon MoA&F
W HKKP MIP Check Dam 1 10 10.8
10 10.8
31 Nokatgre MoA&F
W HKKP MIP Check Dam 1 20 10.8
20 10.8
32 Gongglanggre MoA&F
W HKKP MIP Check Dam 1 10 9.6
10 9.6
33 Noonmati MoA&F
W HKKP MIP Check Dam 1 12 10.8
12 10.8
34 Koraitola MoA&F
W HKKP MIP Check Dam 1 10 10.8
10 10.8
35 Asimgre MoA&F HKKP MIP Check Dam 1 10.00 9.6
10.00 9.6
District Irrigation Plan, West Garo Hills District
81 | P a g e
W
37 Naginipara MoA&F
W HKKP MIP Check Dam 1 13 9 13 9
38 Bangalkhata MoA&F
W HKKP MIP Check Dam 1 15 5.4 15 5.4
39 Sindapara MoA&F
W HKKP MIP Check Dam 1 10 12.75 10 12.75
40 Thakimagre MoA&F
W HKKP MIP Check Dam 1 12 6 12 6
41 Rangmalgre MoA&F
W HKKP MIP Check Dam 1 10 5.4 10 5.4
42 Mengkakgre MoA&F
W HKKP MIP Check Dam 1 8 8.25
8 8.25
43 Alogdia MoA&F
W HKKP MIP Check Dam 1 6 2.4
6 2.4
44 Dijinggre MoA&F
W HKKP MIP Check Dam 1 7 4.95
7 4.95
45 Amokgre MoA&F
W HKKP MIP Check Dam 1 5 2.1
5 2.1
46 Songjalgre MoA&F
W HKKP MIP Check Dam 1 7 3.15
7 3.15
47 Gimbil A·ding MoA&F
W HKKP MIP Check Dam 1 9 3.15
9 3.15
48 Rongadotgre MoA&F
W HKKP MIP Check Dam 1 6 2.7
6 2.7
49 Koijuri MoA&F
W HKKP MIP Check Dam 1 8 2.4
8 2.4
50 Katalbari MoA&F
W HKKP MIP Check Dam 1 6 0.36
6 0.36
51 Deldela MoA&F
W HKKP MIP Check Dam 1 9 4.95
9 4.95
52 Arigre MoA&F
W HKKP MIP Check Dam 1 9 11.7
9 11.7
53 Gimigre MoA&F
W HKKP MIP Check Dam 1 12 7.2
12 7.2
54 Rangmalgre MoA&F
W HKKP MIP Check Dam 1 9 6
9 6
55 Wadagokgre MoA&F
W HKKP MIP Check Dam 1 8 4.95
8 4.95
District Irrigation Plan, West Garo Hills District
82 | P a g e
56 Peradanga MoA&F
W HKKP MIP Check Dam 1 9 5.4
9 5.4
57 Dalansa MoA&F
W HKKP Kodom Stream 1 10 8.1
10 8.1
58 Melagre MoA&F
W HKKP Naokata Stream 1 13 13.2 13 13.2
59 Mangsagre MoA&F
W HKKP Makbil Stream 1 8 9.6 8 9.6
60 Dokagre MoA&F
W HKKP Ginje Stream 1 9 14.4 9 14.4
61 Rongramgre MoA&F
W HKKP Matchok Stream 1 15 16.8 15 16.8
62 Chinabatgre MoA&F
W HKKP Chinabat Stream 1 14 13.2 14 13.2
63 Petchuagre MoA&F
W HKKP Petchua Stream 1 13 12 13 12
64 Ganchenggre MoA&F
W HKKP Gancheng Stream 1 17 9.9 17 9.9
65 Kanglapara MoA&F
W HKKP
Wakantabisik
Stream 1 11 14.4
11 14.4
66 Tongtangpara MoA&F
W HKKP Dama Stream 1 16 14.4
16 14.4
67 Matchinanggre MoA&F
W HKKP Tanbo Stream 1 10 11.7
10 11.7
68 Wajadagre MoA&F
W HKKP Rongbru Stream 1 13 21
13 21
69 Rengmagre MoA&F
W HKKP
Rongkabok
Stream 1 8 13.5
8 13.5
70 Asimgre MoA&F
W HKKP
Thobriusalak
Stream 1 9 18
9 18
71 Kalchengpara MoA&F
W HKKP Dadong Stream 1 15 18
15 18
72 Wakantagre MoA&F
W HKKP Sima Stream 1 14 14.4
14 14.4
73 Dipkaigaon MoA&F
W HKKP Pagla Stream 1 13 18
13 18
74 Dumduma MoA&F
W HKKP Jerki Stream 1 17 12.6
17 12.6
75 Kodaldhowa MoA&F HKKP Wakanta Stream 1 11 16.8
11 16.8
District Irrigation Plan, West Garo Hills District
83 | P a g e
W
76 Chandrapathar MoA&F
W HKKP Bakla Stream 1 16 12.6
16 12.6
77 Wakantagre MoA&F
W HKKP Watri Stream 1 14 14.4
14 14.4
78 Rochonpara MoA&F
W HKKP Singwil Stream 1 13 18
13 18
79 Kharigaon MoA&F
W HKKP
Chipong Misel
Stream 1 12 12.6
12 12.6
80 Khorakona MoA&F
W HKKP Kawak Stream 1 11 16.8
11 16.8
81 Babetpara MoA&F
W HKKP Mekbor Stream 1 16 17.1
16 17.1
82 Rochonpara MoA&F
W HKKP Chima Stream 1 16 18
16 18
83 Salbilla
(Bherberi)
MoA&F
W HKKP Singwil Stream 1 20 21.6
20 21.6
84 Merenggipara MoA&F
W HKKP Gola Stream 1 25 20.4
25 20.4
85 Chandrapathar MoA&F
W HKKP Chandra Stream 1 29 20.4
29 20.4
86 Chamaguri MoA&F
W HKKP Bolchu Stream 1 15 16.8
15 16.8
87 Okanggre MoA&F
W HKKP Bela Stream 1 15 16.8
15 16.8
88 Nichinipara MoA&F
W HKKP Mela Stream 1 17 14.4
17 14.4
89 Rabhakona MoA&F
W HKKP Champal Stream 1 19 16.5
19 16.5
90 Koikuri MoA&F
W HKKP Rabha Stream 1 20 16.8
20 16.8
91 Batabari MoA&F
W HKKP Grimjong Stream 1 20 14.4
20 14.4
92 SmokSonggital MoA&F
W PDMC Pump Set 12 12 5.091 3 1.273 3
1.27
3 3
1.27
3 3 1.273
93 Dengasi MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
94 Sangkarigre MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
District Irrigation Plan, West Garo Hills District
84 | P a g e
95 Modhupara MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
96 Chamaguri MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
97 Chismokgre MoA&F
W PDMC Pump Set 18 18 7.6365 5 2.121 5
2.12
1 4
1.69
7 4 1.697
98 Garobadha MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
99 Mukdangra MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
100 Maljanggre MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
101 Baghmara MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
102 Andharkona MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
103 Dalupara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
104 Chengjora MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
105 Abisilla MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
106 New Dengasi MoA&F
W PDMC Pump Set 6 6 2.5455 2 0.849 2
0.84
9 2
0.84
9
107 Mukdangra
Ghatgre
MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
108 Nogapara MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
109 Ronggekgre A MoA&F
W PDMC Pump Set 35 35 14.8488 9 3.818 9
3.81
8 9
3.81
8 8 3.394
110 Ronggekgre B MoA&F
W PDMC Pump Set 37 37 15.6973 10 4.243 9
3.81
8 9
3.81
8 9 3.818
111 Balnanggre MoA&F
W PDMC Pump Set 38 38 16.1215 10 4.243 10
4.24
3 9
3.81
8 9 3.818
112 Ranggira
Bolsalgre
MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
113 Dopatchigre MoA&F
W PDMC Pump Set 23 23 9.75775 6 2.546 6
2.54
6 6
2.54
6 5 2.121
114 Chokonggre MoA&F PDMC Pump Set 16 16 6.788 4 1.697 4 1.69 4 1.69 4 1.697
District Irrigation Plan, West Garo Hills District
85 | P a g e
W 7 7
115 Goramara MoA&F
W PDMC Pump Set 23 23 9.75775 6 2.546 6
2.54
6 6
2.54
6 5 2.121
116 Kanchikona MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
117 Porapara MoA&F
W PDMC Pump Set 38 38 16.1215 10 4.243 10
4.24
3 9
3.81
8 9 3.818
118 Diglapara MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
119 Old Harigaon MoA&F
W PDMC Pump Set 40 40 16.97 10 4.243 10
4.24
3 10
4.24
3 10 4.243
120 New Harigaon MoA&F
W PDMC Pump Set 15 15 6.36375 4 1.697 4
1.69
7 4
1.69
7 3 1.273
121 Nokatgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
122 Gongglanggre MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
123 Noonmati MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
124 Koraitola MoA&F
W PDMC Pump Set 15 15 6.36375 4 1.697 4
1.69
7 4
1.69
7 3 1.273
125 Asimgre MoA&F
W PDMC Pump Set 30 30 12.7275 8 3.394 8
3.39
4 7
2.97
0 7 2.970
126 Dijinggre MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
127 Katalbari MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
128 Rongsanggre MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
129 Songjalgre MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
130 Phershakandi MoA&F
W PDMC Pump Set 10 10 4.2425 3 1.273 3
1.27
3 2
0.84
9 2 0.849
131 Nikikona MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
132 Peradongga MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
133 Bahijhora MoA&F
W PDMC Pump Set 5 5 2.12125 2 0.849 2
0.84
9 1
0.42
4
District Irrigation Plan, West Garo Hills District
86 | P a g e
134 Wakantagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
135 Gaoragre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
136 Kharigaon MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
137 Damalgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
138 Mangrugre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
139 Salbilla-I MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
140 Alotgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
141 Kaluapara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
142 Mronggre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
143 Rangsagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
144 Simbukolgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
145 Tongtongpara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
146 Wajatagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
147 Dumduma MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
148 Shankarpara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
149 Kodaldhowa MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
150 Rajangjola MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
151 Mangsagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
152 Nonipara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
153 Khalpara MoA&F PDMC Pump Set 20 20 8.485 5 2.121 5 2.12 5 2.12 5 2.121
District Irrigation Plan, West Garo Hills District
87 | P a g e
W 1 1
154 Balachanda MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
155 Balachanda II MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
156 Khilbuin MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
157 Rabhakona MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
158 Aigarh MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
159 Ketkipara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
160 Batabari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
161 Koikuri MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
162 Chirakhawa MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
163 Dublamari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
164 Bandabok MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
165 Bhajamara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
166 Khasigre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
167 Khasimati MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
168 Dolguri MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
169 Melagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
170 Marakapara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
171 Chidinagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
172 Mangchimgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
District Irrigation Plan, West Garo Hills District
88 | P a g e
173 Rengma
Apalgre
MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
174 Khagagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
175 Rongmagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
176 Gutlibari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
177 Dalansa MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
178 Asimgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
179 Baklagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
180 Babedpara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
181 Haldibari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
182 Bhalukmari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
183 Kolsadubi MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
184 Agipenggre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
185 Nokatgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
186 Singwilgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
187 Ramjonggre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
188 Singimari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
189 Apalgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
190 Salbilla-III MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
191 Amguri MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
192 Kalchengpara MoA&F PDMC Pump Set 20 20 8.485 5 2.121 5 2.12 5 2.12 5 2.121
District Irrigation Plan, West Garo Hills District
89 | P a g e
W 1 1
193 Tongtangpara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
194 Matchigre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
195 Abima MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
196 Chokchokia MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
197 Rochonpara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
198 Ujenggre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
199 Jeldupara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
200 Chandakona MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
201 Jigabari MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
202 Merenggipara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
203 Chamaguri MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
204 Marok MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
205 Dipkaigaon MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
206 Jongkipara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
207 Jatihara MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
208 Dodoretgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
209 Galwanggre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
210 Mandagre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
211 Domagitok MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
District Irrigation Plan, West Garo Hills District
90 | P a g e
212 Bolsalgre MoA&F
W PDMC Pump Set 20 20 8.485 5 2.121 5
2.12
1 5
2.12
1 5 2.121
213 Old Harigaon MoA&F
W PDMC
Shallow Tube
Well 4 40 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
214 New Harigaon MoA&F
W PDMC
Shallow Tube
Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
215 Nokatgre MoA&F
W PDMC
Shallow Tube
Well 4 20 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
216 Gongglanggre MoA&F
W PDMC
Shallow Tube
Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
217 Noonmati MoA&F
W PDMC
Shallow Tube
Well 4 10 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
218 Koraitola MoA&F
W PDMC
Shallow Tube
Well 4 17 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
219 Asimgre MoA&F
W PDMC
Shallow Tube
Well 4 26.40 2.2 1.5 0.55 1.5 0.55 1.5 0.55 1.5 0.55
220 Burijhar MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
221 Bhanggerpar MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
222 Sarokpara MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
223 Pabomari MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
224 Pathorkata MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
225 Morokkandi MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
226 Goladigli MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
227 Paham MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
228 Nidanpur MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
229 haribangga MoA&F
W PDMC
Shallow Tube
Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85
230 Bholarbhita MoA&F
W PDMC
Shallow Tube
Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85
231 Bhangakhata MoA&F PDMC Shallow Tube 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
District Irrigation Plan, West Garo Hills District
91 | P a g e
W Well
232 Char-Batapara MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
233 Puskunipara MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
234 Borshibandi MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
235 Dewankata MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
236 Punonagor MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
237 Shymding (M) MoA&F
W PDMC
Shallow Tube
Well 25 37.5 13.75 10.5 3.85 9 3.3 9 3.3 9 3.3
238 Solartek MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
239 Islampur MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
240 Nimaikata MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
241 Gudibala MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
242 Gomaijhora MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
243 Shail Kandi MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
244 Nayagaon (G) MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
245 Belbari MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
246 Rajpur MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
247 Aski Kandi MoA&F
W PDMC
Shallow Tube
Well 25 37.5 13.750 10.5 3.85 9 3.3 9 3.3 9 3.3
248 Qnajani MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
249 Old Bhaitbari MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
250 Gashbari MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
District Irrigation Plan, West Garo Hills District
92 | P a g e
251 Nayagaon (B) MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
252 Nolbari MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
253 Bhotduba MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
254 Bhaitbari
(Babu)
MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
255 Morasuti MoA&F
W PDMC
Shallow Tube
Well 20 30 11 7.5 2.75 7.5 2.75 7.5 2.75 7.5 2.75
256 Bowabari MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
257 Kandargaon MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
258 Phersa kandi MoA&F
W PDMC
Shallow Tube
Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85
259 Williumpin MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
260 Alogdia MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
261 Nolbari (L) MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
262 Puskunipara MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
263 Shym Nagar MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
264 Rongsaigre MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
265 Bangsiduba MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
266 Shymding (G) MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
267 Demdema MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
268 Budebela MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
269 Gimbil A·ding MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
270 Naginipara MoA&F PDMC Shallow Tube 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
District Irrigation Plan, West Garo Hills District
93 | P a g e
W Well
271 Gimigre MoA&F
W PDMC
Shallow Tube
Well 15 22.5 8.25 6 2.2 6 2.2 6 2.2 4.5 1.65
272 Rangmalgre MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
273 Babilgri MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
274 Arigre MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
275 Bahijhora (G) MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
276 Mengkakgre MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
277 Wadagokgre MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
278 kamargaon MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
279 Rongmachokgr
e
MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
280 Thakimagre MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
281 Sidapara MoA&F
W PDMC
Shallow Tube
Well 10 15 5.5 4.5 1.65 4.5 1.65 3 1.1 3 1.1
282 Amoggre MoA&F
W PDMC
Shallow Tube
Well 5 7.5 2.75 3 1.1 1.5 0.55 1.5 0.55 1.5 0.55
283 Sidakandi MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
284 Ambari MoA&F
W PDMC
Shallow Tube
Well 30 45 16.5 12 4.4 12 4.4 10.5 3.85 10.5 3.85
285 Bharal MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
286 Pathranga MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
287 Kalogaon MoA&F
W PDMC
Shallow Tube
Well 45 67.5 24.75 18 6.6 16.5 6.05 16.5 6.05 16.5 6.05
288 Sialkandi MoA&F
W PDMC
Shallow Tube
Well 50 75 26.95 19.5 7.15 19.5 6.6 18 6.6 18 6.6
289 Rajabala MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
District Irrigation Plan, West Garo Hills District
94 | P a g e
290 Magurmari MoA&F
W PDMC
Shallow Tube
Well 75 112.5 41.25 28.5 10.45 28.5
10.4
5 28.5
10.4
5 27 9.9
291 Garodubi MoA&F
W PDMC
Shallow Tube
Well 75 112.5 41.25 28.5 10.45 28.5
10.4
5 28.5
10.4
5 27 9.9
292 U/ Haripur MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
293 L/ Haripur MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
294 Silkata MoA&F
W PDMC
Shallow Tube
Well 75 112.5 41.25 28.5 10.45 28.5
10.4
5 28.5
10.4
5 27 9.9
295 Namabila MoA&F
W PDMC
Shallow Tube
Well 80 120 44 30 11 30 11 30 11 30 11
296 Sakmal MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
297 Shabribari MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
298 Konarchar MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
299 Lalmati MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
300 Kasharipara MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
301 Char
Kasharipara
MoA&F
W PDMC
Shallow Tube
Well 50 75 27.5 19.5 7.15 19.5 7.15 18 6.6 18 6.6
302 Hallidaganj MoA&F
W PDMC
Shallow Tube
Well 45 67.5 24.75 18 6.6 16.5 6.05 16.5 6.05 16.5 6.05
303 Char
Magurmari
MoA&F
W PDMC
Shallow Tube
Well 70 105 38.5 27 9.9 27 9.9 25.5 9.35 25.5 9.35
304 Namabila II MoA&F
W PDMC
Shallow Tube
Well 65 97.5 35.75 25.5 9.35 24 8.8 24 8.8 24 8.8
305 SmokSonggital MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
306 Dengasi MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
307 Sangkarigre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
308 Modhupara MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
309 Chamaguri MoA & PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
District Irrigation Plan, West Garo Hills District
95 | P a g e
FW
310 Apalgre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
311 Chismokgre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
312 Garobadha MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
313 Mukdangra MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
313 Maljanggre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
313 Selsella block MoA &
FW PDMC
Training within
the block 2000
5 500 1.25 500 1.25 500 1.25 500 1.25
313 Selsella block MoA &
FW PDMC
Exposure
Visit(Inter state)×
7days
80
4.48 20 1.12 20 1.12 20 1.12 20 1.12
313 Selsella block MoA &
FW PDMC
Exposure
Visit(Inter
distric)× 3days
60
0.72 15 0.18 15 0.18 15 0.18 15 0.18
313 Selsella block MoA &
FW PDMC
Exposure
Visit(within
District)× 2days
120
0.72 30 0.18 30 0.18 30 0.18 30 0.18
6809 6824.7 3165.5 2303
778.5
19 2231
806.
9 2161
773.
02 2275
807.0
74
District Irrigation Plan, West Garo Hills District
96 | P a g e
Name of the Block: Tikrikilla C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
No.
Name of the
Village
Concerne
d
Ministry/
Departm
ent
Compon
ent Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total
Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Khatonggre MoA&F
W HKKP Checkdam 1 10 10.80 10 10.80
2 Damachiga MoA&F
W HKKP Checkdam 1 6 9.80 6 9.80
3 Jurigaon MoA&F
W HKKP Checkdam 1 8 11.00 8 11.00
4 Balbalgre MoA&F
W HKKP Checkdam 2 11 17.80 6 9.00
5 8.8
5 Jugirjhar MoA&F
W HKKP Checkdam 1 7 9.80 7 9.80
6 Nagargaon MoA&F
W HKKP Checkdam 1 10 10.50 10 10.50
7 Dhelapara MoA&F
W HKKP Checkdam 2 3 9.90 10 9.90
8 Bollongitok MoA&F
W HKKP Checkdam 1 5 8.00 5 8
9 U/Watregre MoA&F
W HKKP Checkdam 2 15 19.70 10 10.8
5 8.9
10 Damachiga MoA&F
W HKKP Checkdam 2 10 11.50 6 8.5
6 3
11 Damachiga
Batol
MoA&F
W HKKP Checkdam 1 5 8.00 5 8
12 Mandagre MoA&F
W HKKP Checkdam 1 5 8.50 5 8.5
13 Joyrangre MoA&F
W HKKP Checkdam 1 6 8.90 6 8.9
14 Rangalgre MoA&F
W HKKP Checkdam 1 6 8.90 6 8.9
15 Gonda
apalgre
MoA&F
W HKKP Checkdam 1 6 8.90 6 8.9
District Irrigation Plan, West Garo Hills District
97 | P a g e
16 Bobokjakogr
e
MoA&F
W HKKP Checkdam 1 5 8.50 5 8.5
17 Angkerongdi
kgre
MoA&F
W HKKP Checkdam 1 7 9.00
7 9
18 Bolchuapalg
re
MoA&F
W HKKP Checkdam 1 6 9.00
6 9
19 Bondukmali MoA&F
W HKKP Checkdam 1 6 9.00
6 9
20 Darengchigr
e
MoA&F
W HKKP Checkdam 1 7 9.00
7 9
21 Katonggre MoA&F
W HKKP Checkdam 1 5 9.00
5 9
22 Rongmali MoA&F
W HKKP Checkdam 1 6 8.80
6 8.8
23 Ganarugre MoA&F
W HKKP Checkdam 1 6 8.80
6 8.8
24 Napakgre MoA&F
W HKKP Checkdam 1 6 9.50
6 9.5
25 Matchakgre MoA&F
W HKKP Checkdam 1
9.10
6 9.1
26 Renggigre MoA&F
W HKKP Checkdam 1 5 8.90
5 8.9
27 Raksamgre MoA&F
W HKKP Checkdam 2 11 19.60
6 9.8
5 9.8
28 Laskarpara(
G)
MoA&F
W HKKP Checkdam 1 7 8.90
7 8.9
29 Apalgre MoA&F
W HKKP Checkdam 1 6 8.50
6 8.5
30 Kotchugre MoA&F
W HKKP Checkdam 1 6 8.50
6 8.5
31 Mengonggre MoA&F
W HKKP Checkdam 1 7 9.90
7 9.9
32 Meghapara MoA&F
W HKKP Checkdam 2 14 17.80
8 8.9
6 8.9
33 Kakunanggr
e
MoA&F
W HKKP Checkdam 2 12 16.60
6 8.1 6 8.5
34 Rembiapal MoA&F
W HKKP Checkdam 2 14 19.60
7 9.8 7 9.8
35 Rensingpara MoA&F HKKP Checkdam 1 8 9.80
8 9.8
District Irrigation Plan, West Garo Hills District
98 | P a g e
W
36 Balbalgre MoA&F
W HKKP Check Dam 1 7 9.80
7 9.8
37 Jurigaon MoA&F
W HKKP Check Dam 1 8 9.80
8 9.8
38 Dalchengkon
a
MoA&F
W HKKP Check Dam 1 5 8.10
5 8.1
39 Pedalduba(G
)
MoA&F
W HKKP Check Dam 1 7 9.70
7 9.7
40 Jangrapara MoA&F
W HKKP Check Dam 1 6 9.10
6 9.1
41 Doabokgre MoA&F
W HKKP Check Dam 1 7 9.50
7 9.5
42 Daigre MoA&F
W HKKP Check Dam 2 11 18.00
6 9.5 5 8.5
43 Naguapara MoA&F
W HKKP Checkdam 1 7 9.80
7 9.8
44 Belguri MoA&F
W HKKP Checkdam 1 5 8.20
5 8.2
45 Ampangdam
gre
MoA&F
W HKKP Checkdam 1 5 8.20
5 8.2
46 U/Rembigre MoA&F
W HKKP Checkdam 1 5 8.20
5 8.2
47 L/Rembigre MoA&F
W HKKP Checkdam 1 5 8.20
5 8.2
48 L/Watregre MoA&F
W HKKP Checkdam 2 10 18.30
5 9.8 5 8.5
49 Jelbonggre MoA&F
W HKKP Checkdam 1 5 3.00
5 3
50 Rongbokgre MoA&F
W HKKP Checkdam 1 5 3.00
5 3
51 Dajakagre MoA&F
W HKKP Checkdam 1 5 3.00
5 3
52 Chimagre MoA&F
W HKKP Checkdam 1 5 3.00
5 3
53 U/Chisikgre MoA&F
W HKKP Checkdam 1 5 3.00
5 3
54 Dhapangpara MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
District Irrigation Plan, West Garo Hills District
99 | P a g e
55 Dhapangpara
-I
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
56 Dhapangpara
-II
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
57 L/Khamari MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
58 Nogorpara MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
59 Kongkira MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
60 Sabangre-A MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
61 L/Sabanggre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
62 U/Sabanggre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
63 Odalguri MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
64 Wankolagre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
65 Mohalgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
66 Jengrip MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
67 Dakop MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
68 Matchak
Sangra
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
69 Kalajhar MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
70 Kanchankon
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
71 Photamati MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
72 N/Photamati MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
73 L/Khasengd
hap
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25
74 U/Khasengd MoA&F PDMC Surface water 2 3 0.85
1.5 0.424
1.5 0.42
District Irrigation Plan, West Garo Hills District
100 | P a g e
hap W pump set 25 43
75 Boldampitba
ri
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
76 Bordubi MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
77 Borobatapar
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
78 Abirampara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
79 Aitibi MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
80 Borodoldong
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
81 Jongchipara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
82 Nokatgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
83 L/Damachig
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
84 Bahangre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
85 New
Kalapara
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
86 U/Kalapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
87 Kangakgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
88 Old
Kalapara
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
89 Dingbanggre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
90 Dabakgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
91 Jamdamgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
92 Danbanggre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
93 Gondachibpl
gre
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
District Irrigation Plan, West Garo Hills District
101 | P a g e
94 Rengitchigre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
95 Bolchukaton
gre
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
96 Bolchuading
re
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
97 Chinaramgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
98 Jasingre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
99 Rangtapgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
100 Kosidamgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
101 Borobakra MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
102 Hirapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
103 Kurung MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
104 Saltop
kurung
MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
105 Jengritgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
106 Bawagre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
107 Dilgigre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
108 Rongmakgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
109 Urringgre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
110 Nengbapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
111 Didapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
112 Kalwagre MoA&F
W PDMC
Surface water
pump set 2 3 0.85 1.5
0.424
25 1.5
0.424
25 0.4243
113 Mengotchigr MoA&F PDMC Surface water 2 3 0.85 1.5 0.424
1.5 0.424 0.4243
District Irrigation Plan, West Garo Hills District
102 | P a g e
e W pump set 25 25
114 Tikrikilla MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
115 Katolbari MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
116 Katolbari-II MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
117 Gaguapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
118 Kodamsali MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
119 Berupara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
120 Chamaguri MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
121 Balupara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
122 Baghpara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
123 Dotronggre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
124 Khokapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
125 Khasiapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
126 Dilchigre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
127 Bolsaldamgr
e
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
128 U/Kongrapar
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
129 L/Kongrapar
a
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
130 Nasyapara MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
131 Rabukong MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
132 Ravegre MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
District Irrigation Plan, West Garo Hills District
103 | P a g e
133 Tikrikilla
Achik
MoA&F
W PDMC
Surface water
pump set 2 3 0.85
1.5
0.424
25 1.5
0.42
43
134 Jengritgre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
135 Bawagre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
136 Dilgigre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
137 Rongmakgre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
138 Urringgre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
139 Nengbapara MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
140 Didapara MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
141 Kalwagre MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
142 Mengotchigr
e
MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
143 Tikrikilla MoA &
FW PDMC Treadle Pump 2 0.8 0.70 0.4 0.35 0.4 0.35
144 Tikrikilla
block
MoA &
FW PDMC
Training within
the block 2000
5.00 500 1.25 500 1.25 500 1.25 500 1.25
145 Tikrikilla
block
MoA &
FW PDMC
Exposure
Visit(Inter state)×
7days
80
4.48 20 1.12 20 1.12 20 1.12 20 1.12
146 Tikrikilla
block
MoA &
FW PDMC
Exposure
Visit(Inter
distric)× 3days
60
0.72 15 0.18 15 0.18 15 0.18 15 0.18
147 Tikrikilla
block
MoA &
FW PDMC
Exposure
Visit(within
District)× 2days
120
0.72 30 0.18 30 0.18 30 0.18 30 0.18
Total 2503 618 615.50 740 173.0
0 729 167.8 724 165.3 708.49
109.
4
District Irrigation Plan, West Garo Hills District
104 | P a g e
Name of the Block: Dalu C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
N
o.
Name of the
Village
Concerne
d
Ministry/
Departm
ent
Compon
ent Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fun
d
(lac
s)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
Comma
nd Area
(hac.)
Fun
d
(lacs
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Gangbanga MoA&F
W HKKP
M.I.Check Dam at
Deoghat Stream 1 20 6.75 20 6.75
2 Mibon Nokat MoA&F
W HKKP
M.I.Check Dam at
Mandang Stream 1 8 3 8 3
3 Chandubhoi MoA&F
W HKKP
M.I.Check Dam at
Modonjora Stream 1 10 8.4 10 8.4
4 Amongpara MoA&F
W HKKP
M.I.Check Dam at
Rom Stream 1 9 9 9 9
5 Joshipara MoA&F
W HKKP
M.I.Check Dam at
Bollong Stream 1 15 7.2 15 7.2
6 Chongpot
Mronggre
MoA&F
W HKKP
M.I.Check Dam at
Daching Stream 1 9 7.35 9 7.35
7 Mibonpara MoA&F
W HKKP
M.I.Check Dam at
Regi Stream 1 10 9.45 10 9.45
8 Rimrangpara MoA&F
W HKKP
M.I.Check Dam at
Damdil Stream 1 30 7.2
30 7.2
9 Jijikapara MoA&F
W HKKP
M.I.Check Dam at
Dikge Stream 1 10 6.75
10 6.75
10 Lower
Bamonpara
MoA&F
W HKKP
M.I.Check Dam at
Dilni Stream 1 8 3.6
8 3.6
11 Rongbokgre MoA&F
W HKKP
M.I.Check Dam at
Rongbok Stream 1 11 8.1
11 8.1
12 Gonchudare MoA&F
W HKKP
M.I.Check Dam at
Simchilang Stream 1 12 7.2
12 7.2
13 Dalugaon MoA&F
W HKKP
M.I.Check Dam at
Adu Stream 1 20 8.1
20 8.1
14 Mibonpara MoA&F
W HKKP
M.I.Check Dam at
Jamela Stream 1 8 4.5
8 4.5
15 Joshipara MoA&F
W HKKP
M.I.Check Dam at
Chidare Stream 1 10 6.3
10 6.3
District Irrigation Plan, West Garo Hills District
105 | P a g e
16 Asimgre MoA&F
W HKKP
M.I.Check Dam at
Dorek Stream 1 8 4.5
8 4.5
17 Magupara MoA&F
W HKKP
M.I.Check Dam at
Chigitchak Stream 1 10 6.3
10 6.3
18 Tibapara MoA&F
W HKKP
M.I.Check Dam at
Jankara Stream 1 13 8.1
13 8.1
19 Marapara MoA&F
W HKKP
M.I.Check Dam at
Rongsep Stream 1 12 7.2
12 7.2
20 Khonggre MoA&F
W HKKP
M.I.Check Dam at
Jental Stream 1 11 8.1
11 8.1
21 Gonchudare MoA&F
W HKKP
M.I.Check Dam at
Chikrangkrang
Stream
1 9 6.75
9 6.75
22 Tibapara MoA&F
W HKKP
M.I.Check Dam at
Nasin Stream 1 12 7.2
12 7.2
23 Nabandanggre MoA&F
W HKKP
M.I.Check Dam at
Echongdang
Stream
1 8 5.85
8 5.85
24 Moropgre MoA&F
W HKKP
M.I.Check Dam at
Morop Stream 1 8 7.2
8 7.2
25 Mibon Nokat MoA&F
W HKKP
M.I.Check Dam at
Rimrang Stream 1 9 6
9 6
26 Doldenga MoA&F
W HKKP
M.I.Check Dam at
Doldeng Stream 1 15 12.6
15 12.6
27 Koinabhoi MoA&F
W HKKP
M.I.Check Dam at
Koina Stream 1 12 8.1
12 8.1
28 Kotchu Adok MoA&F
W HKKP
M.I.Check Dam at
Bengga Stream 1 13 9.975
13 9.975
29 Darong Adu MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
30 Jarangkona MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
31 Jarangpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
32 Kotchu Adok MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
33 Halchati MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
34 Koinadubi MoA&F PDMC Surface Water 5 5 2.12125 2 0.84 1 0.424 1 0.424 1 0.424
District Irrigation Plan, West Garo Hills District
106 | P a g e
W Pumpsets 9 3 3 3
35 Tibapara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
36 Chandubhoi MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
37 Magupara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
38 Bamonpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
39 Dapgre MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
40 Kujikura MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
41 Mibonpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
42 Baburambill MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
43 Dalugaon MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
44 Jijikapara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
45 Gangbanga MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
46 Khillapara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
47 Surunanggre MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
48 Possengagre MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
49 Wagegitok MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
50 Mongolagre MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
51 Joshipara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
52 Chandapara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
53 Doldengagre MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
District Irrigation Plan, West Garo Hills District
107 | P a g e
54 Chongpot
Mronggre
MoA&F
W PDMC
Surface Water
Pumpsets 3 3 1.27275 2
0.84
9 1
0.424
3
55 Chongpot Dopo MoA&F
W PDMC
Surface Water
Pumpsets 2 2 0.8485 1
0.42
4 1
0.424
3
56 Nukkanpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
57 Amongpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
58 Gonchudare MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
59 Belbor MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
60 Balijora MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
61 Rimrangpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
62 Kontokpara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
63 Jongnapara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
64 Salbaripara MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
65 Koinabhui MoA&F
W PDMC
Surface Water
Pumpsets 5 5 2.12125 2
0.84
9 1
0.424
3 1
0.424
3 1
0.424
3
66 Kotchu Adok MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
67 Darong Adu MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
68 Jarangkona MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
69 Jarangpara MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
70 Kotchu Adok MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
71 Halchati MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
72 Koinadubi MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
73 Tibapara MoA & PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
District Irrigation Plan, West Garo Hills District
108 | P a g e
FW
74 Chandubhoi MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
75 Magupara MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
76 Dalu block MoA &
FW PDMC
Training within the
block 2000
5 500 1.25 500 1.25 500 1.25 500 1.25
77 Dalu block MoA &
FW PDMC
Exposure
Visit(Inter state)×
7days
80
4.48 20 1.12 20 1.12 20 1.12 20 1.12
78 Dalu block MoA &
FW PDMC
Exposure
Visit(Inter distric)×
3days
60
0.72 15 0.18 15 0.18 15 0.18 15 0.18
79 Dalu block MoA &
FW PDMC
Exposure
Visit(within
District)× 2days
120
0.72 30 0.18 30 0.18 30 0.18 30 0.18
Total 518 295.06 723 88.3
5 705 67.38 673 64.83 677 74.5
District Irrigation Plan, West Garo Hills District
109 | P a g e
Name of the Block: Dadenggre C&RD Block
2016-17 2017-18 2018-19 2019-20
S.
N
o.
Name of
the Village
Concerne
d
Ministry/
Departm
ent
Compon
ent Activity
Total
Numbe
r/
Capaci
ty
(cum)
Total
Command
Area
(9+11+13+
15)
Total
Funds
(Lacs.)
(10+12+14+
16)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
Comma
nd Area
(hac.)
Fund
(lacs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Hollaidanga MoA&F
W HKKP M. I. Check Dam 1 20 10.8 20 10.8
2 Bandenggre MoA&F
W HKKP M. I. Check Dam 1 15 13.65 15 13.65
3 Wankolagre MoA&F
W HKKP M. I. Check Dam 1 10 12 10 12
4 Rongkhong
gre
MoA&F
W HKKP M. I. Check Dam 1 12 10.8 12 10.8
5 Janjallagre MoA&F
W HKKP M. I. Check Dam 1 10.00 12.6 10.00 12.6
6 Bikonggre MoA&F
W HKKP M. I. Check Dam 1 8 11.55 8 11.55
7 Najokgre A MoA&F
W HKKP M. I. Check Dam 1 20 14.4 20 14.4
8 Najokgre B MoA&F
W HKKP M. I. Check Dam 1 25 11.7
25 11.7
9 Cheranokat
gre
MoA&F
W HKKP M. I. Check Dam 1 15 12
15 12
10 Chanangpar
a
MoA&F
W HKKP M. I. Check Dam 1 10 12
10 12
11 Rongkhong
gre
MoA&F
W HKKP M. I. Check Dam 1 10 14.4
10 14.4
12 Dajugre MoA&F
W HKKP M. I. Check Dam 1 5 10.5
5 10.5
13 Chanupara MoA&F
W HKKP M. I. Check Dam 1 15 11.7
15 11.7
14 Bangbanggr
e
MoA&F
W HKKP M. I. Check Dam 1 10 14.4
10 14.4
15 Renehigre MoA&F
W HKKP M. I. Check Dam 1 12 8.4
12 8.4
District Irrigation Plan, West Garo Hills District
110 | P a g e
16 Rongsanggr
e
MoA&F
W HKKP M. I. Check Dam 1 10 9.45
10 9.45
17 Chinarongg
re
MoA&F
W HKKP M. I. Check Dam 1 12 10.8
12 10.8
18 Baljek
Adugre
MoA&F
W HKKP M. I. Check Dam 1 6 16.8
6 16.8
19 Rabonggre MoA&F
W HKKP M. I. Check Dam 1 10 10.5
10 10.5
20 Romgre MoA&F
W HKKP M. I. Check Dam 1 20 13.5
20 13.5
21 Tomagre MoA&F
W HKKP M. I. Check Dam 1 10 14.7
10 14.7
22 Rongrabok
gre
MoA&F
W HKKP M. I. Check Dam 1 15 10.8
15 10.8
23 Gambarigre MoA&F
W HKKP M. I. Check Dam 1 15 11.7
15 11.7
24 Dallanggre MoA&F
W HKKP M. I. Check Dam 1 15 12
15 12
25 Darigre MoA&F
W HKKP M. I. Check Dam 1 15 10.8
15 10.8
26 Chibong
Apal
MoA&F
W HKKP M. I. Check Dam 1 20 13.5
20 13.5
27 Bolchugre MoA&F
W HKKP M. I. Check Dam 1 20 10.8
20 10.8
28 Sadolpara MoA&F
W HKKP M. I. Check Dam 1 15 12
15 12
29 Satigre MoA&F
W PDMC
Surface Water
Pumpsets 5 20 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
30 Chering
Apal
MoA&F
W PDMC
Surface Water
Pumpsets 5 20 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
31 Modelgre MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
32 Bolchugre MoA&F
W PDMC
Surface Water
Pumpsets 5 15 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
33 Hollaidanga MoA&F
W PDMC
Surface Water
Pumpsets 5 25 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
34 Bangrangre MoA&F
W PDMC
Surface Water
Pumpsets 6 15 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
35 Najokgre MoA&F PDMC Surface Water 5 15 2.12125 2 0.848 1 0.424 1 0.424 1 0.424
District Irrigation Plan, West Garo Hills District
111 | P a g e
W Pumpsets 5 25 25 25
36 Bandonggre MoA&F
W PDMC
Surface Water
Pumpsets 3 15 1.27275 1
0.424
25 1
0.424
25 1
0.424
25
37 Rangkhang
gre
MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
38 Romgre MoA&F
W PDMC
Surface Water
Pumpsets 5 20 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
39 Rengrabokg
re
MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
40 Chanupara MoA&F
W PDMC
Surface Water
Pumpsets 5 15 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
41 Rengsakgre MoA&F
W PDMC
Surface Water
Pumpsets 6 10 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
42 Rabonggre MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
43 Cheranggre MoA&F
W PDMC
Surface Water
Pumpsets 5 8 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
44 Durasangsil
gre
MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
45 Sadolpara MoA&F
W PDMC
Surface Water
Pumpsets 6 15 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
46 Tamagre MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
47 Kalsinggre MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
48 Rongchagre MoA&F
W PDMC
Surface Water
Pumpsets 6 10 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
49 Gambaregr
e
MoA&F
W PDMC
Surface Water
Pumpsets 5 13 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
50 Dilsigre MoA&F
W PDMC
Surface Water
Pumpsets 6 20 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
51 Asimgre MoA&F
W PDMC
Surface Water
Pumpsets 4 8 1.697 1
0.424
25 1
0.424
25 1
0.424
25 1
0.424
25
52 Kosigre MoA&F
W PDMC
Surface Water
Pumpsets 5 10 2.12125 2
0.848
5 1
0.424
25 1
0.424
25 1
0.424
25
53 Darigre MoA&F
W PDMC
Surface Water
Pumpsets 6 12 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
54 Dallanggre MoA&F
W PDMC
Surface Water
Pumpsets 6 15 2.5455 2
0.848
5 2
0.848
5 1
0.424
25 1
0.424
25
District Irrigation Plan, West Garo Hills District
112 | P a g e
55 Satigre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
56 Chering
Apal
MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
57 Modelgre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
58 Bolchugre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
59 Hollaidanga MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
60 Bangrangre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
61 Najokgre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
62 Bandonggre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
63 Rangkhang
gre
MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
64 Romgre MoA &
FW PDMC Treadle Pump 2 0.8 0.7 0.4 0.35 0.4 0.35
65 Dadenggre
block
MoA &
FW PDMC
Training within the
block 2000
5 500 1.25 500 1.25 500 1.25 500 1.25
66 Dadenggre
block
MoA &
FW PDMC
Exposure
Visit(Inter state)×
7days
80
4.48 20 1.12 20 1.12 20 1.12 20 1.12
67 Dadenggre
block
MoA &
FW PDMC
Exposure
Visit(Inter distric)×
3days
60
0.72 15 0.18 15 0.18 15 0.18 15 0.18
68 Dadenggre
block
MoA &
FW PDMC
Exposure
Visit(within
District)× 2days
120
0.72 30 0.18 30 0.18 30 0.18 30 0.18
Total 2442 739 413.0195 714 113.2
4 692
106.9
3 671
97.91
1 705
94.93
6
District Irrigation Plan, West Garo Hills District
113 | P a g e
Annexure III : Strategic Action Plan by Horticulture Department
Name of the Block: Dadenggre C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Modelgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
2 Sadolpara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
3 Romgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
4 Damal Asim MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
5 Gimbilgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
6 Bikongre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
7 Amingokgre MoA PDMC Water 1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
114 | P a g e
harvestin
g
sructure
8 Bangnanggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
9 Rongchugre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
10 Aigre Apal MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
11 Rongsakgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
12 Tomagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
13 Rongkemgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
14 Mondugre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
15 Darigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
16 Asimgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
115 | P a g e
17 Baljek
swongitcham MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
18 Chigichakgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
19 Kentapara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
20 Dokramgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
21 Dallangre MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
22 Ajrigre MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
23 Dadengre MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
24 Bolchugre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
25 Hallaidanga MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
26 Disegre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
27 Romgre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
28 Damal Asim MoA PDMC Springkl
er 20 2 13.00
2 13.00
District Irrigation Plan, West Garo Hills District
116 | P a g e
Irrigation
29 Chibongre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
30 Chandigre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
31 Asimgre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
32 Chibong Apal MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
33 Amingokgre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
34 Sathegre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
35 Tamagre
Springkl
er
Irrigation
20 2 13.00
2 13.00
36 Kalsingre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
37 Rankimgre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
38 Dechingre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
39 Chibong apal MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
40 Gimbilgre MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
41 Rongsakgre MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
42 Kama MoA PDMC Drip 2 2 3.00 2 3.00
District Irrigation Plan, West Garo Hills District
117 | P a g e
Mronggre irrigation
43 Sata
Mronggre MoA PDMC
Drip
irrigation 2 2 3.00 2 3.00
44 Chandigre MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
45 dadenggre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
46 Chibonggre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
47 Damal Asim MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
48 Najokgre(A) MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
49 Kalsingre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
50 Rongkongre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
51 Magalpara MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
52 Kangkarongg
re (A) MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
53 Egopara MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
54 Rambatgre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
55 Rongdupara MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
56 Jangrapara MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
57 Kama
boldakgre MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
58 Kama
Mronggre MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
59 Nalsa
Mrongre MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
Grand Total
Total=
98 407.00
District Irrigation Plan, West Garo Hills District
118 | P a g e
Name of the Block: Tikrikilla C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Napakgre MoA PDMC
Springkl
er
Irrigation
30 3 19.00 3 19.00
2 Upper
Watregre MoA PDMC
Springkl
er
Irrigation
30 3 19.00 3 19.00
3 Jugirjhar MoA PDMC
Springkl
er
Irrigation
30 3 19.00 3 19.00
4 Haribhanga MoA PDMC
Springkl
er
Irrigation
30 3 19.00 3 19.00
5 Megongre MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
6 Kakunangre MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
7 Bogadal MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
8 Apalgre MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
9 Matchokgre MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
10 Jangrapara MoA PDMC Springkl
er 30 3 19.00
3 19.00
District Irrigation Plan, West Garo Hills District
119 | P a g e
Irrigation
11 Boldampitbari MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
12 Bakripara MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
13 Kathalbari MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
14 Upper
Khamari MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
15 Dhelapara MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
16 New
Photamati MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
17 Dhapangpara MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
18 Photamati MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
19 Odalguri MoA PDMC
Springkl
er
Irrigation
30 3 19.00
3 19.00
20 Doabokgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
21 Raksamgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
22 Rengsingpara MoA PDMC
Water
harvestin
g
1 1 5.00 1 5.00
District Irrigation Plan, West Garo Hills District
120 | P a g e
sructure
23 Jangrapara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
24 Upper
Khamari MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
25 Jansingre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
26 Chinaramgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
27 Gonda
Chibolgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
28 Ankerongdikg
re MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
29 Jamdangre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
30 Pedaldoba MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
31 Salbari MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
32 Kasidangre MoA PDMC Water
harvestin1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
121 | P a g e
g
sructure
33 Didapara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
34
Jangrapara
Songgitchamg
re
MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
35 Bolonggitok MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
36 Roniasim MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
37 Dilsigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
38 Rambigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
39 Wankolagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
40 Upper
Khamari MoA PDMC
Drip
irrigation 3 3 4.50 3 4.50
41 Sabanggre MoA PDMC Drip
irrigation 3 3 4.50 3 4.50
42 upper
Sabanggre MoA PDMC
Drip
irrigation 3 3 4.50 3 4.50
43 Upper
Watregre MoA PDMC
Drip
irrigation 3 3 4.50 3 4.50
44 Ringigre MoA PDMC Drip 3 3 4.50 3 4.50
District Irrigation Plan, West Garo Hills District
122 | P a g e
irrigation
45 Jamdamgre MoA PDMC Drip
irrigation 3 3 4.50 3 4.50
46 Doabokgre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
47 Raksamgre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
48 Rengsingpara MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
49 Jangrapara MoA PDMC Drip
irrigation 3 3 9.00
3 4.50 3 4.50
50 Roniasim MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
51 Dilsigre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
52 Rambigre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
53 Wankolagre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
54 Napakgre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
55 Bogadal MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
56 Apalgre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
57 Matchokgre MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
58 Boldampitbari MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
59 Bakripara MoA PDMC Drip
irrigation 3 3 4.50
3 4.50
Grand Total
Total=
137 555.50
District Irrigation Plan, West Garo Hills District
123 | P a g e
Name of the Block: Gambegre C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Nengja
Bolchugre MoA PDMC
Springkle
r
Irrigation
40 4 26.00 4 26.00
2 Dilnigre MoA PDMC
Springkle
r
Irrigation
40 4 26.00 4 26.00
3 Aminda
Rangsa MoA PDMC
Springkle
r
Irrigation
20 2 19.00 2 19.00
4 Suringgre MoA PDMC
Springkle
r
Irrigation
40 4 26.00
4 26.00
5 Bandra
A`dinggre MoA PDMC
Springkle
r
Irrigation
40 4 26.00
4 26.00
6 Kopogre MoA PDMC
Springkle
r
Irrigation
20 2 19.00
2 19.00
7 Doldegre MoA PDMC
Springkle
r
Irrigation
40 4 26.00
4 26.00
8 Churabudigr
e MoA PDMC
Springkle
r
Irrigation
20 2 19.00
2 19.00
9 Samanda MoA PDMC
Springkle
r
Irrigation
20 2 19.00
2 19.00
10 Aminda
Simsang MoA PDMC
Springkle
r 40 4 26.00
4 26.00
District Irrigation Plan, West Garo Hills District
124 | P a g e
Irrigation
11 Chigitchakgr
e MoA PDMC
Springkle
r
Irrigation
20 2 19.00
2 19.00
12 Gambegre MoA PDMC
Springkle
r
Irrigation
20 2 19.00
2 19.00
13 Nengja
Bolchugre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
14 Dilnigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
15 Aminda
Rangsa MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
16 Suringgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
17 Bandra
A`dinggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
18 Chengkurigr
e Mellim MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
19 Doldegre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
20 Churabudigr
e MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
125 | P a g e
21 Samanda MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
22 Aminda
Simsang MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
23 Chigitchakgr
e MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
24 Gambegre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
25 Gongbu
Chiring MoA PDMC
Drip
irrigation 2 2 3.00 2 3.00
26 Kopogre MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
27 Lower
Darengre MoA PDMC
Drip
irrigation 2 2 3.00 2 3.00
28 Aminda
Simsang MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
29 Chigitchakgr
e MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
30 Gambegre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
Grand Total
Total=
60 348.00
District Irrigation Plan, West Garo Hills District
126 | P a g e
Name of the Block: Dalu C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Nakdanpara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
2 Magupara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
3 Josipara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
4 Rengrampar
a MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
5 Mandagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
6 Kherapara
Songma MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
7 Songmagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
8 Asurigre MoA PDMC Water 1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
127 | P a g e
harvestin
g
sructure
9 Babelapara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
10 Halchati MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
11 Kotchu
Adok MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
12 Adanggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
13 Piljigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
14 Possenggagr
e MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
15 Songjilpara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
16 Barongpara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
17 Darong Adu MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
128 | P a g e
18 Chandobhui MoA PDMC
Springkle
r
Irrigation
20 2 13.00 2 13.00
19 Killapara MoA PDMC
Springkle
r
Irrigation
20 2 13.00 2 13.00
20 Salbaripara MoA PDMC
Springkle
r
Irrigation
20 2 13.00 2 13.00
21 Koinadubhui MoA PDMC
Springkle
r
Irrigation
20 2 13.00 2 13.00
22 Kanonggre MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
23 machangpan
i MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
24 Rimrangpara MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
25 Makalpara MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
26 Sonagre MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
27 Jijikapara MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
28 Upper
Bamonpara MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
29 Baburambil MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
30 Darong Adu MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
District Irrigation Plan, West Garo Hills District
129 | P a g e
31 Purakhasia MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
32 Dilnegre MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
33 Gangbanga MoA PDMC
Springkle
r
Irrigation
20 2 13.00
2 13.00
34 Tibapara MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
35 Koinadubhui MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
36 Khujibura MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
37 Rengginpara MoA PDMC Drip
irrigation 2 2 3.00 2 3.00
38 Amongpara MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
39 Sununamggr
e MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
40 Jarangkona MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
41 Noksi MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
42 Doldengaggr
e MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
43 Didogre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
44 Belador MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
45 Dapgre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
46 Dalugaun MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
47 Adugachol MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
48 Dalamgre MoA PDMC Drip
irrigation 2 2 3.00
2 3.00
District Irrigation Plan, West Garo Hills District
130 | P a g e
49 Nokdan
Nokat MoA PDMC
Drip
irrigation 2 2 3.00
2 3.00
Total=
81 341.00
District Irrigation Plan, West Garo Hills District
131 | P a g e
Name of the Block: Selsella C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerne
d
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fun
d
(lacs.
)
Comman
d Area
(hac.)
Fun
d
(lacs.
)
Comman
d Area
(hac.)
Fun
d
(lacs.
)
Comman
d Area
(hac.)
Fun
d
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Nengkhalpara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
2 Simbukolgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
3 Boldoka MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
4 Wakhantagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
5 Chambagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00 1 5.00
6 Asimgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
7 Maljanggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
8 Matchinanggre MoA PDMC Water 1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
132 | P a g e
harvestin
g
sructure
9 Marakapara MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
10 Sangkarigre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
11 Apalgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
12 wajadagre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
13 Sugengre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
14 Agipenggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
15 Galwanggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
16 Gimbidua MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
17 Apalgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
District Irrigation Plan, West Garo Hills District
133 | P a g e
18 Mangsanggre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
19 Sasatgre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
20 Chibongre MoA PDMC
Water
harvestin
g
sructure
1 1 5.00
1 5.00
21 Mukdangra MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
22 Harigaon(old) MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
23 Dalupara MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
24 New Harigaon MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
25 Ujenggre MoA PDMC
Springkl
er
Irrigation
20 2 13.00 2 13.00
26 Goramara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
27 Khalchengpara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
28 Rangthapara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
29 Domagitok MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
District Irrigation Plan, West Garo Hills District
134 | P a g e
30 Bhalukmari MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
31 Sangkarigre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
32 Apalgre MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
33 Amguri MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
34 Damalgre(Selsel
la) MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
35 Singimari(Selsel
la) MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
36 Kalupara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
37 Haripur MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
38 Magurmari MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
39 Nayapara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
40 Nonipara MoA PDMC
Springkl
er
Irrigation
20 2 13.00
2 13.00
41 Nengkhalpara MoA PDMC Drip
Irrigation 2 2 3.00 2 3.00
42 Ballongre MoA PDMC Drip
Irrigation 2 2 3.00 2 3.00
43 Boldoka MoA PDMC Drip
Irrigation 2 2 3.00 2 3.00
District Irrigation Plan, West Garo Hills District
135 | P a g e
44 Wakhantagre MoA PDMC Drip
Irrigation 2 2 3.00 2 3.00
45 Matchinagre MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
46 Apalgre MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
47 Asimgre MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
48 Mukdangra MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
49 Simbulkolgre MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
50 Domagitok MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
51 Singimari MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
52 Haripur MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
53 Magurmari MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
54 Nangapara MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
55 Nonipara MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
56 Thongthongpara MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
57 Selsella MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
58 Garobadha MoA PDMC Drip
Irrigation 2 2 3.00
2 3.00
Grand Total
Total=
96 414.00
District Irrigation Plan, West Garo Hills District
136 | P a g e
Name of the Block: Rongram C & RD Block
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departme
nt
Compone
nt Activity
Total
Numbe
r/
Capacit
y (cum)
Total Total
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
Command
Area (hac.) Funds
(9+11+13+1
5) (Lacs.)
(10+12+14+1
6)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Dura
Kantragre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00 2 10.00
2 Darechikgre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00 2 10.00
3 Chibragre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00 2 10.00
4 Baladinggre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00 2 10.00
5 Duragre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
6 Asanang MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
7 Rongchigre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
8 Oragitok MoA PDMC Water 2 2 10.00
2 10.00
District Irrigation Plan, West Garo Hills District
137 | P a g e
harvestin
g
sructure
9 Chandigre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
10 Sasatgre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
11 Sakalgre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
12 Waribokgre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
13 Samingre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
14 Dollonggre MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
15 Rongdenggr
e MoA PDMC
Water
harvestin
g
sructure
2 2 10.00
2 10.00
16 Chibragre MoA PDMC Drip
irrigation 5 5 7.50 5 7.50
17 Baladinggr
e MoA PDMC
Drip
irrigation 5 5 7.50 5 7.50
18 Bebragre MoA PDMC Drip
irrigation 5 5 7.50 5 7.50
19 Tosikgre MoA PDMC Drip
irrigation 5 5 7.50 5 7.50
District Irrigation Plan, West Garo Hills District
138 | P a g e
20 Misimamggr
e MoA PDMC
Drip
irrigation 5 5 7.50 5 7.50
21 Durakalakgr
e MoA PDMC
Drip
irrigation 5 5 7.50 5 7.50
22 Jengjalgre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
23 Ganolnol
Songma MoA PDMC
Drip
irrigation 5 5 7.50
5 7.50
24 Dodenanggr
e MoA PDMC
Drip
irrigation 5 5 7.50
5 7.50
25 Dura
Kantragre MoA PDMC
Drip
irrigation 5 5 7.50
5 7.50
26 Darechikgre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
27 Chibragre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
28 Baladinggre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
29 Duragre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
30 Asanang MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
31 Rongchigre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
32 Oragitok MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
33 Chandigre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
34 Sasatgre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
35 Sakalgre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
36 Waribokgre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
37 Samingre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
38 Dollonggre MoA PDMC Drip
irrigation 5 5 7.50
5 7.50
39 Rongdenggr MoA PDMC Drip 5 5 7.50
5 7.50
District Irrigation Plan, West Garo Hills District
139 | P a g e
e irrigation
40 Robagre MoA PDMC
Springkle
r
Irrigation
100 10 65.00 10 65.00
41 Edenbari MoA PDMC
Springkle
r
Irrigation
100 10 65.00
10 65.00
42 Ganol Apal MoA PDMC
Springkle
r
Irrigation
50 5 32.50
5 32.5
43 Jenmdragre MoA PDMC
Springkle
r
Irrigation
50 5 32.50
5 32.5
44 Asanang MoA PDMC
Springkle
r
Irrigation
50 5 32.50
5 32.5
45 Chibrasalgre MoA PDMC
Springkle
r
Irrigation
50 5 32.50
5 32.5
46 Dodenanggr
e MoA PDMC
Springkle
r
Irrigation
50 5 32.50
5 32.5
Grand Total
Total=
195 622.50
District Irrigation Plan, West Garo Hills District
140 | P a g e
Annexure IV : Strategic Action Plan by Soil Conservation Department
Name
of the
Block
Village/location
Concern
ed
Ministry
/
Departm
ent
Compo
nent Activity
Total
Number/
Watershe
d/
capacity(
Cum)
Total
Comman
d
area(Ha)
(9+11+1
3+15)
Total
Fund
(lacs)
(10+12+1
4+16)
2016-17 2017-18 2018-19 2019-20
Comm
and
Area
(ha)
Funds.
(Lacs)
Comm
and
Area
(ha)
Funds
.
(Lacs)
Comm
and
Area
(ha)
Funds
.
(Lacs)
Comm
and
Area
(ha)
Funds
.
(Lacs)
1 2 3 4 5 6 7
9 10 11 12 13 14 15 16
Dalu
Doldenggagre, Karonggre,
joshipara, Thibapara, rengsipara,
Bakla RVP (on-
going) 23 511 765.83 511 765.830
Akinpara, Kurapara,
Possengagre, Selbalgre,
Ranggapara
Grim RVP (on-
going) 34 248 371.6750 248 371.675
Jijika, Awalgre, Chandanpara,
Asimgre, Bamonpara Jijika RVP 14 145 362.50
145 362.5
Rongadong,Barongpara,
Dingkajoa. Chigitchak RVP 9 113 281.60
113 281.6
Rimrangpara, Rongbokgre,
Babugre &
Mandanggre/Chongnapara,Sanje
ngpara,
Madragre.
Surface minor
irrigation 27 574 1434.00
306 765.00 268 669.00
Selsell
a
Dalupara,N/Hairgaon,Nokatgre,
Mukdanggra,Rongkekgre,Denga
si B,Asimgre
Lower Pilgi
RVP (on-going) 20 341 511.96 341 511.96
Jada
Asi,Dokagre,Bolsalgre,Rongsang
gre,Gambaregre
Dongdonga
RVP (on-going) 27 521 781.15 521 781.15
Chisimokgre, Dengasi,
Dopatchigre,Bolsalgre Dak RVP 6 197 492.50
197 492.5
Okkanggre, Dilnapara Gindo RVP 17 355 887.35
355 887.35
Korakona,Misimanda-gre,
Aronggre. Nawal RVP 6 125 313.05
125 313.05
Nayapara, Ketipara, Seplagre,
Golipara, Rabukona. Sepalgre RVP 6 276 690.00
276 690
Kagagre, Asimgre,
Sekapara/Darenggre, Gimegre
Songma, Wankolagre
Surface minor
irrigation 24 224 559.50
224 559.50
Tikriki
lla
Ronipara,Roni
Asim,Dabangpara,Angaripara, MoWR
Har khet
ko pani
Roni-Dabong
RVP (on-going) 13 420 629.96 420 629.96
District Irrigation Plan, West Garo Hills District
141 | P a g e
Jongchipara
Gonda Apal, megapa-
Ra,Dodinpara. Daljong RVP 5 176 440.50
176 440.5
Pedaldoba. Sakal RVP 5 78 194.50
78 194.5
Borogobal/Lower Sabanggre Surface minor
irrigation 21 320 801.00
150 375.00 170 426.00
Daden
ggre Mongalgre, Dichinggre
Mongalgre
Dichinggre (on-
going)
13 143 214.18 143 214.18
Daden
ggre
Chenggal,Rongkemgre,Daml
Dipo. Chenggal RVP 11 145 362.00
144.8 362
Rongra
m
Renchagre, Silsekgre, Kamagre,
Rongmasugre,Thebronggre
Surface minor
irrigation 3 373 932.63
232 580.75 141
351.87
5
TOTAL
(Surface minor
irrigation )
284 5284 11025.880 2183 3274.76 1610 4024.0
0 912
2280.2
5 579
1446.8
8
Lift irrigation
MoWR Har khet
ko pani
Ground water
development
Selsell
a
Dingnapara Dangga beel
RRR 1 125 375.00 125 375.00
Dodoretchi Bogakona
Chibol RRR 1 227 680.00 227 680.00
Damjonggre
2 27 80.00
27 80.00
Dalu Jonangpara,Gonchudagre,Morop
gre, Asimgre, Sanjengpara Bandra RRR 16 115 345.00 95 285.00
20 60.00
Rongra
m
Tebronggre Tebronggre
RRR 8 102 305.00 102 305.00
Dollong Manda , Dollong
Songma 12 122 366.00
122 366.00
Daden
ggre
Anogre Dachi Lake
RRR 3 93 280.00 93 280.00
Chikasingre Chikasingre
RRR 9 137 410.00 137 410.00
Aigri Apal
118 354.00
118 354.00
Tikriki
lla
Rongmali Deraksi RRR 4 96 287.50 96 287.50
Napakgre,Apalgre
5 48 145.00
48 145.00
Dolwakgre
5 43 130.00
43 130.00
Gambe
gre Okapara Songgitcham
5 25 75.00
25 75.00
TOTAL (RRR) 71 1278 3832.5000 874
2622.50
0 48 145.00 118 354.00 237 711.00
Selsell Ganchenggre, Dongdonga, DoLR- PMKSY 1.a.Ongoing 5 1568 235.200 1568 235.200
District Irrigation Plan, West Garo Hills District
142 | P a g e
a Chipragre,Rongchumgre,
Chepagre,Tallingre,
Kalaichar,Wananggre
MoRD Watersh
ed
(IWMP)
Batch-III &
Batch-IV
(NRM works,
Livelihood
Component,
Production
System & Micro
Enterprise etc.)
b. Other
Component (
Administrative
cost, Institution
& Capacity
building,
Monitoring &
Evaluation) c.
Consolidation
Phase)
Rongra
m
Matchurigre, Selbalgre,
Jongdikgre,Boldamgre,
Buripara,Adugre
4 1100 165.000 1100 165.00
Daden
ggre
Adinggre,Darigre, Dallang,
Kosigre 2 550 82.500 550 82.500
Tikriki
lla Napakgre,Apalgre, Chimagre 2 550 82.500 550 82.500
Gambe
gre
Rongbretgre,Rongari Ading,
Sampalgre,Galwanggre,
Gambegre,Chigitchakgre,
Jengchamgre,Sengminpara,
Somonpara, Rakwapara
6 2222 333.300 2222 333.30
Dalu
Sanjengpara, Ajugre, Madragre,
Tekmanpara,Mongolagre,
Tokpara
4 1610 241.500 1610 241.50
Selsell
a
Chibokgre, Boldakgre,
Samandagre,Sampalgre,
tingmanggre, Megonggre,
Bochigre,Tomagre, Gambaregre,
Lower Sasatgre, Matchinanggre,
Asimgre
DoLR-
MoRD
PMKSY
Watersh
ed
(IWMP)
2.a. Proposed
Batch-VI to
Batch-X
Other
interventions
(EPA, NRM
works,
Livelihood
Component,
Production
System & Micro
Enterprise etc.)
b. Other
Component (
Administrative
cost, Institution
& Capacity
building,
Monitoring &
Evaluation,
DPR
preparation) c.
Consolidation
Phase
6 1325 198.795 32 4.7970 109 16.341
00 451 67.638 733
110.01
9
Rongra
m
Wategre Songgital,Wategre
Apalgre, Anogre, Anogre apal,
DoLR-
MoRD
PMKSY
Watersh
2.a. Proposed
Batch-VI to 10 4901 735.198 211 31.6530 589
88.392
00 2029
304.28
7 2072
310.86
6
District Irrigation Plan, West Garo Hills District
143 | P a g e
Skulgre, Rengsigre, Dittigre,
Rongsep adinggre, Adugre,
Wakbok Apal, Wage Chiring,
Chiokgre,Chidekgre, Makkragre,
Waribokgre,
ed
(IWMP)
Batch-X
Other
interventions
(EPA, NRM
works,
Livelihood
Component,
Production
System & Micro
Enterprise etc.)
b. Other
Component (
Administrative
cost, Institution
& Capacity
building,
Monitoring &
Evaluation,
DPR
preparation) c.
Consolidation
Phase
Daden
ggre
Kangkilapara,
Monggre,makbilkolggre,
Tongtangpara, Rom Sangsilgre
2 1137 170.610 31 4.6800 126 18.858
00 383 57.522 597 89.55
Tikriki
lla
Upper-Rembigre, Rembi
Apalgre,Kotchu Rembigre,
Raksamgre, Pedaldoba,
Hatogaon, Boldamgre,
Nayapara,Dingnapara, Kamari,
Jengrip,Nagorgaon, Renggigre,
Gonda Songgitcham, Dedapara,
Upper Deranchigre, katonggre,
Upper wategre, Sabanggre
9 2360 353.940
167 25.110
00 482 72.324 1710
256.50
6
Gambe
gre
Rongalgre, Gra Adinggre,
Surinanggre 1 530 79.500 32 4.7700 74
11.130
00 265 39.750 159 23.85
Dalu
Jonangpara, Asimgre,
Sesengpara,
Songjelpara,Rongnadigre,
Gorangpara, Naronggre,
Dalbapara, Rengrampara,
Kongkinanggre
6 2983 447.507 63 9.4500 267 40.059
00 941
141.12
9 1712
256.86
9
Total of PMKSY 57 nos.-Watersheds (Ongoing 23 Nos. & Proposed 34 Nos. (IWMP) 57 20837 3125.550 7969 1195.35
0 1333 199.89 4551 682.65 6984.4
1047.6
6
West Garo Hills District Newly Created (Physical in ha)
DoLR-
MoRD
Converg
ence
with
MGNRE
GA
Water
Conservation:
Rongra
m
Matchurigre, Selbalgre,
Jongdikgre, Boldamgre,
Buripara, Adugre, Waram
Songma, Retegre, Dipogre,
Damjonggre
Water
Harvesting:
(Ponds)
19 16.000 24.500 8.00 11.000 2.70 4.500 2.5 4.500 2.80 4.500
Selsell
a Ganchenggre, Dongdonga 12 12.300 20.500 5.00 7.000 2.40 4.500 2.4 4.500 2.50 4.500
Dalu
Sanjengpara,Ajugre
Madragre
Tekmanpara,Mongolagre
Tokpara
10 9.700 15.000 1.00 1.500 2.90 4.500 2.8 4.500 3.00 4.500
Daden
ggre
Adinggre,Darigre
Dallang,Kosigre 11 9.500 16.500 2.30 3.000 2.40 4.500 2.7 4.500 2.10 4.500
District Irrigation Plan, West Garo Hills District
144 | P a g e
Tikriki
lla Chimagre, Napakgre, Apalgre 11 8.600 16.500 2.50 3.000 2.00 4.500 2.1 4.500 2.00 4.500
Gambe
gre 11 9.800 16.500 2.00 3.000 2.50 4.500 3.0 4.500 2.30 4.500
Total of Water Harvesting: (Ponds)
74 65.900 109.500 20.80 28.500 14.9 27.000 15.5 27.000 14.7 27.000
Rongra
m
Matchurigre, Selbalgre,
Jongdikgre, Boldamgre,
Buripara, Adugre, Waram
Songma, Retegre, Dipogre,
Damjonggre
DoLR-
MoRD
Converg
ence
with
MGNRE
GA
a. Other
interventions
( Plantation &
Maintenance
works)
8 15.000 2.250
5.00 0.7500 5.00 0.7500 5.00 0.7500
Selsell
a Ganchenggre, Dongdonga 2 15.000 2.250
5.00 0.7500 5.00 0.7500 5.00 0.7500
Dalu
Sanjengpara,Ajugre
Madragre
Tekmanpara,Mongolagre
Tokpara
DoLR-
MoRD
Converg
ence
with
MGNRE
GA
a. Other
interventions
( Plantation &
Maintenance
works)
4 15.000 2.250
5.00 0.7500 5.00 0.7500 5.00 0.7500
Daden
ggre
Adinggre,Darigre
Dallang,Kosigre 2 15.000 2.250
5.00 0.7500 5.00 0.7500 5.00 0.7500
Tikriki
lla Chimagre, Napakgre, Apalgre 2 108.000 16.200 93.00 13.95 5.00 0.7500 5.00 0.7500 5.00 0.7500
Gambe
gre
Rongbretgre,Rongari Ading
Sampalgre,Galwanggre
Gambegre,Chigitchakgre
Jengchamgre, Sengminpara
Somonpara
Rakwapara
6 20.000 3.000
10.00 1.500 5.00 0.7500 5.00 0.7500
Total of Other interventions ( Plantation & Maintenance works)
24 188.000 28.200 93.000 13.950 35.000 5.250 30.000 4.500 30.000 4.500
TOTAL (Convergence)
98 253.900 137.700 113.80
0 42.450 49.900 32.250 45.500 31.500 44.700 31.500
Selsell
a Batabari, Gongolanggre
Irrigation
Scheme
of other
Line
Departm
ents of
State
Govt.
Water
Cons. &
distributi
on
works
Water
Conservation/H
arvesting
2 7.42 7.00 3.3 2.00 4.12 5.00
Rongra
m Doabok
Water
Conservation 1 2.05 2.00 2.05 2.00
Dalu Tekmanpara, Mongolagre,
Tokpara, Gangbanga, Daluagre
Water
Conservation/H
arvesting
3 10.20 12.00 2.3 2.00 3.9 5.00 4 5.00
Daden
ggre Boldamgre
Water
Conservation 1 2.17 2.00 2.17 2.00
Tikriki
lla
Alokdia/ Chipragre/ Upper
Kamari
Water
Conservation 3 10.20 12.00 2.3 2.00 3.9 5.00 4 5.00
Gambe
gre Adugre
Water
Conservation 1 3.69 2.00 3.69 2.00
District Irrigation Plan, West Garo Hills District
145 | P a g e
TOTAL (Water Cons. & distribution works) 11 35.73 37.00 15.81 12.00 11.92 15.00 8 10.00 0 0.00
Selsell
a Sasatgre,Damjonggre, Dalupara
Irrigation
Scheme
of other
Line
Departm
ents of
State
Govt.
Water
Harvesti
ng
works
farm
pond,
Check
Dam,
Protectio
n Wall,
Irrigatio
n dam.
Water
Conservation,
Protection Wall,
Check Dam
3 8.95 12.00 2.55 2.00 6.4 10.00
Tikriki
lla Ronipara
Water
Conservation 1 1.56 2.00 1.56 2.00
Rongra
m
Anogre Water
Conservation 1 2.33 2.00 2.33 2.00
Thebronggre Water
Conservation 1 3.25 2.00 3.25 2.00
Watregre Songgital, Wategre
Apalgre, Anogre, Anogre Apal,
Skugre, Rongsep
Adinggre,Wage Gittim, Wabok
Apal, Chiokgre, Rangsigre,
Dittigre
Water
Conservation
Pond
16 13.90 32.00
4.7 8.00 2.5 8.00 6.7 16.00
Gambe
gre
Chekwatgre, Kama Jembragre
Galwanggre
RongariAding
Suringgre
Bolchugre
Irrigation
Scheme
of other
Line
Departm
ents of
State
Govt.
Water
Harvesti
ng
works
farm
pond,
Check
Dam,
Protectio
n Wall,
Irrigatio
n dam.
Water
Conservation 6 10.35 12.00 4.1 2.00 2.8 5.00
3.45 5.00
Dalu Adugre, Chekwatgre, Ganipara,
Naronggre,
Water
Conservation 4 6.59 10.20 2.36 5.20
4.23 5.00
Daden
ggre
Amingokgre, darigri, Chengal,
Dalanggri, Rongdenggre,
Jengjal, Chiokgre, Baljek
Aduma, Dilchigre, Dallanggre
Water
Conservation 16 13.90 32.00
4.7 8.00 2.5 8.00 6.7 16.00
TOTAL (Water Harvesting works farm pond) 48 60.83 104.20 16.15 15.20 18.60 31.00 9.23 21.00 16.85 37.00
Selsell
a
Abisela
Externall
y aided
projects
(Jalkund
Type-I)
Jalkund
type-I 1 1.400 9.5000 1.4 9.50000
Gancheng Jalkund
type-I 1 1.200 9.4916 1.2 9.49155
Manga Jalkund
type-I 1 1.000 9.4996 1.0 9.49956
Simbukolgre,Baklagre,
Sampalgre,Tingmangre,Agipeng,
Dapgre Birupara, Chambagre,
Wagopgre, Jeldopara, Asimgre,
Balal Adugre, Kagragre,
Damjonggre, Ganchenggre
Jalkund
type-I 15 150.000 150.00
50 50.00 50 50.00 50 50.00
Tikriki Ronipara Jalkund
1 0.800 9.4996 0.8 9.49963
District Irrigation Plan, West Garo Hills District
146 | P a g e
lla type-I
Bondukmali Jalkund
type-I 1 0.750 9.4995 0.75 9.49948
Bondukmali Jalkund
type-I 1 1.000 9.5000 1.00 9.5000
Laskarpara/Lower
Damachiga/Upper Kamari
Jalkund
type-I 3 30.000 30.0000
10 10.000 10 10.00 10 10.000
Rongra
m
WatregreSonggital
Externall
y aided
projects
(Jalkund
Type-I)
Jalkund
type-I 1 0.900 9.6300 0.9
9.63000
0
Rongdenggre Jalkund
type-I 1 0.530 5.7780 0.53
5.77800
0
WatreApalgre Jalkund
type-I 1 0.600 5.7780 0.6
5.77800
0
WatreApalgre Jalkund
type-I 1 0.500 4.8150 0.5
4.81500
0
RongkhonBoldamgre Jalkund
type-I 1 0.560 5.3000 0.56
5.30000
0
Jengjal Jalkund
type-I 1 0.700 4.7000 0.7
4.70000
0
Asimgre Jalkund
type-I 1 0.800 9.3025 0.8
9.30250
0
Selbalgre Jalkund
type-I 1 0.800 9.4989 0.8
9.49894
0
Rambatgre Jalkund
type-I 1 0.600 9.4986 0.6
9.49859
0
Rambatgre Jalkund
type-I 1 0.870 9.4530 0.87
9.45298
0
WatreApalgre Jalkund
type-I 1 0.650 9.6300 0.65
9.63000
0
Rongdenggre, Jengjal bawegre,
Dittigre, chidaogri, waribokgre,
Chibonggre, Misimagre,
Selbalgre
Jalkund
type-I 17 123.800 123.80
10 10.000 50 50.000 63.8 63.800
Dalu
Mongolagre
Externall
y aided
projects
(Jalkund
Type-I)
Jalkund
type-I 1 0.800 10.0000 0.80 10.0000
Matchokpara Jalkund
type-I 1 0.700 9.5000 0.70 9.5000
Tekmanpara Jalkund
type-I 1 0.500 9.2000 0.50 9.2000
Matchokpara Jalkund
type-I 1 0.620 8.7000 0.62 8.7000
Rohonpara , Nekdalpara Jalkund
type-I 2 20.000 20.0000
20 20.000
District Irrigation Plan, West Garo Hills District
147 | P a g e
Gambe
gre
Aminda Rangsagre Jalkund
type-I 1 0.500 9.4959 0.5 9.4959
Aminda Rangsagre Jalkund
type-I 1 0.600 9.5000 0.6 9.5000
Chekwatgre Jalkund
type-I 1 0.800 9.4913 0.8 9.4913
Dangsapara, dalmagre, Dilnigre Jalkund
type-I 4 39.980 39.9800
19.98 19.980 20 20.000
Daden
ggre
Chigitchakgre Jalkund
type-I 1 0.560 9.6300 0.56 9.6300
Ajigre Jalkund
type-I 1 0.500 9.6300 0.5 9.6300
Total Of Jalkund Type-I 67 383.02 589.30 19 225.52 90 89.980
0 130 130.00 144 143.80
Rongra
m
Danakgre
Externall
y aided
projects
(Multipu
rpose
Reservoi
r)
Multipur
pose
Reservoi
r
4 13.240 42.50500 13.24
42.5050
0
selbalgre
Multipur
pose
Reservoi
r
2 7.830 61.42320 7.83
61.4232
0
Misimagre,
Matchurigre,Selbalgre
Multipur
pose
Reservoi
r
8 33.250 491.62500
25.5
377.54
400 3.25
46.000
0 4.5
68.081
0
Tebronggre
Multipur
pose
Reservoi
r
1 78.000 229.02200 78.00
229.022
00
Selsell
a Kalchengpara
Multipur
pose
Reservoi
r
1 121.000 357.81000 121
357.810
00
Dalu surunanggre
Multipur
pose
Reservoi
r
2 12.750 77.25000 12.75
77.2500
0
Daden
ggre Amingokgre
Multipur
pose
Reservoi
r
3 9.670 73.25550 9.67
73.2555
0
Tikriki Kanchankona/Gondajasingre/Up Multipur
4 47.640 192.81350 6.64 42.8135 16 60.000 10 35.000 15 55.000
District Irrigation Plan, West Garo Hills District
148 | P a g e
lla per Rembigre/Bolsaldamgre pose
Reservoi
r
0 00 0 0
Gambe
gre
Daluagre, Somonpara,
Megapgre, Jengchamgre
Multipur
pose
Reservoi
r
8 75.000 374.18330 40
111.973
30 14
92.550
00 11
74.660
0 10
95.000
0
Total (Multipurpose Reservoir) 33 398.3800 1899.8875
00 289
996.052
500 55.50
530.09
400 24
155.66
000 30
218.08
100
NABAR
D RIDF
Surface Minor
Irrigation (RCC
Dam / WHS /
Channels)
Selsell
a
Deldella, Kaimbatapara,
Ronkhola
Najokjora
RIDF-XX 13 203
156.55669
0 203
156.556
69
Makagre. Maka Apal ,
Chirakhawa
Chidaodao
RIDF-XXIII 8 68 102.0000
68
102.00
0
Dalangsa I, Dalangsa II,
Kalpara,Askipara, Rongchi,
Rongkakgre, Alotgre/
Rengmagre, rengma Apal
68 400 600.0000
296
444.00
0 104
156.00
00
Tikriki
lla
Bakripara ,Odalguri ,Kalajhar
,Kathalbari ,Balupara
Kalajhar RIDF -
XX 11 226
173.63628
0 226
173.636
28
Rengsinpara, Megonggre,
Kosidamgre
Tamsing RIDF-
XXIII 5 136 204.0000
136
204.00
0
Dilsigri, Belguri, Rembigre,
Wankolagre/Rangtapgre,
Ravagre,
Warimagre/Bolsaldamgre,Ampa
ngdamgre, Khokapara
32 917 876.0000
599
399.00
0 132
198.00
0 186
279.00
00
Rongra
m
Balupara
NABAR
D RIDF
Lower Sugri
RIDF - XXII 12 111 166.5000 111 166.5
Mondagre Upper Sugri
RIDF -XXIII 14 73 108.7500
73
108.75
0
Rongbakgre, Kalchenggre
16 96 143.6250
96 143.62
50
Dalu
Halchati.,Kotchu Adok
Bolanggre,Belaburgre,
Balajurigre.
Bengka RIDF -
XXII 27 266 398.2500 266 398.25
Onthapara Mandagre
Jumingre
Dalwe RIDF-
XXIII 8 82 123.0000
82
123.00
0
Jebalgre,Chenggapara/Sadagre,D
imagre, 14 202 303.0000
128
192.00
0 74
111.00
00
District Irrigation Plan, West Garo Hills District
149 | P a g e
Daden
ggre
Baljek Aduma,
Madaigre,Dobadam, Dagalgre,
Rongkemgre/Gambaregre,
romgre
NABAR
D RIDF
48 470 704.2500
367.5
551.25
0 102
153.00
00
TOTAL (RIDF) 276 3248 4059.5679
70 805
894.942
970 957
936.75
00 924
1385.2
500 562
842.62
50
Grand Total 945 31778 24811.586
770 12286
9278.77
1770 4173
6003.9
640 6722
5050.3
10 8597
4478.5
410
District Irrigation Plan, West Garo Hills District
150 | P a g e
Annexure V : Maps
Map 2: District Map
District Irrigation Plan, West Garo Hills District
151 | P a g e
Map 3: Selsella block
District Irrigation Plan, West Garo Hills District
152 | P a g e
Map 4: Dadenggiri block
District Irrigation Plan, West Garo Hills District
153 | P a g e
Map 5: Tikrikilla block
District Irrigation Plan, West Garo Hills District
154 | P a g e
Map 6: Rongram block
District Irrigation Plan, West Garo Hills District
155 | P a g e
Map 7: Gambegre block
District Irrigation Plan, West Garo Hills District
156 | P a g e
Map 8: Dalu block
District Irrigation Plan, West Garo Hills District
157 | P a g e