Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
DISTRICT IRRIGATION PLAN
Lower Dibang Valley
Arunachal Pradesh
District Irrigation Plan (PMKSY) Lower Dibang Valley
District Irrigation Plan
Under Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY)
2016- 2021
Lower Dibang Valley
Arunachal Pradesh
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office: 24, Rajendra Place, NABARD Building, New Delhi –
110125
Reg. Office: Plot No. C24, G Block, 3rd Floor, NABARD Building
Bandra Kurla Complex,
Bandra East, Mumbai-400051
NO…………………Dated………………
CERTIFICATE
This is to certify that District Irrigation Plan (DIP) for Lower Dibang Valley District,
Arunachal Pradesh has been prepared by the NABCONS in collaboration with the
DLIC as per the operational Guidelines of PMKSY issued by the Ministry of
Agriculture Cooperation and Farmers Welfare, Govt. of India, in the year 2015-2016.
The DIP is approved and hereby vetted through DLIC.
(Deepak Shinde, IAS) (M.Lego)
Deputy Commissioner-cum-Chairman PD (ATMA)-cum-Member Secretary
DLIC, PMKSY DLIC, PMKSY Lower Dibang Valley District Lower Dibang Valley District Arunachal Pradesh Arunachal Pradesh
District Irrigation Plan (PMKSY) Lower Dibang Valley
FOREWORD Water is vital for human and animal life and for maintaining ecological balance for developmental efforts. With the ever increasing demand for water due to population growth, urbanization and industrialization, making water available for multiple uses in an economical and optimal manner assumes great significance. Against the above backdrop, Government of India formulated PMKSY with the vision of extending the coverage of irrigation (“Har Khet Ko Pani”) and improving water-use efficiency (More Crop Per Drop) in a focused manner with end-to-end solution on water resource creation, distribution, management, field application and extension activities. Under PMKSY, an integrated planning and management of water resources has been envisaged through estimation of water budget for each of the districts and sub-districts and preparation of strategic action plan to address the water gap through District Irrigation Plans (DIPs). PMKSY will be implemented only in an area development mode by adopting a decentralized State level planning and project execution structure that will allow States to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years.
This District Irrigation Plan has been prepared based on an assessment of water resource availability and demand for water resource from multiple users, present and future water balance at block and district levels and multiple strategies to augment water resources and improve efficiency of existing water facilities through Strategic Action Plan under PMKSY.
Preparation of the District irrigation Plan (DIP) required coordinated efforts by multiple stakeholders and departments. The efforts made by the Departments of Agriculture, which is the nodal Department for implementation of PMKSY, WRD, RWD, Horticulture Department, District Rural Development Agency (DRDA), ATMA as also the support received from NABARD Consultancy Services (NABCONS) in preparation of the District Irrigation Plan of is duly acknowledged. The DIP aims to create an Irrigation Potential of 58422.20 Hectares (AIBP- 290.00 Ha, Har Khet Ko Pani- 23616.13 Ha, Per Drop More Crop- 27792.00 Ha, and Watershed -6724.05 Ha) of the total 73413 Hectares
of cultivable area in the district at an estimated proposed cost of ₹ 1002.97 Crore.
The PMKSY components as contemplated in the DIP envisage creating an irrigation potential of nearly 79.58% of the total available CCA in the district which would boost the agriculture production of the district in particular and the State in general. The total financial outlay under the Scheme for the district of Lower Dibang Valley is ₹ 100297.20 lakh (i.e., ₹ 1002.97 Crore) as against the Command Area of 58422.20 Hectare. After threadbare discussion, the District Level Implementation Committee (DLIC) unanimously accepted and approved the planned outlay of ₹ 100297.20 lakh under the PMKSY for 05 Years (2016 to 2021). (Deepak Shinde, IAS)
Deputy Commissioner cum Chairman, PMKSY Lower Dibang Valley District Arunachal Pradesh
District Irrigation Plan (PMKSY) Lower Dibang Valley
Table of Content
Topic / Sub-topics Page Number
Executive Summary 1-3
Introduction 1
Background 1
Vision 9
Objectives 9
Strategy/Approach 10
Programme Components 10
1. Accelerated Irrigation Benefit Programme (AIBP) 10
2. PMKSY (Har Khet Ko Pani) 10
3. PMKSY (Per Drop More Crop) 11
4. PMKSY (Watershed Development) 12
Rationale/Justification 12
Methodology 13
Chapter-I General Information of the District 14
General Information of the District 14
1.1 District Profile 14
Administrative Set-up of the District 14
1.2 Demography 16
1.3 Bio-mass and Livestock 17
1.3.1 Small Animals 20
1.3.2 Large Animals 21
1.4 Agro-ecology, Climate, Hydrogeology and Topography 22
1.4.1 Climate 25
1.4.2 Hydrogeology 26
1.4.3 Topography 28
1.4.4 Rainfall & Temperature 28
1.5 Soil Profile 31
1.6 Soil Erosion and Runoff Status 34
1.7 Land Use Pattern 34
Chapter – II District Water Profile 39
2.1 Area-wise, Crop-wise Irrigation Status 39
2.2 Production and Productivity of Major Crops 43
2.3 Irrigation Base Classification 47
Chapter – III District Water Availability 48
3.1 Status of Water Availability 48
3.2 Status of Ground Water Availability 50
3.3 Status of Command Area 50
3.4 Existing Type of Irrigation 52
Chapter-IV Water Requirement/Demand 54
4.1 Domestic Water Demand 54
4.2 Crop Water Demand 56
4.3 Livestock Water Demand 57
District Irrigation Plan (PMKSY) Lower Dibang Valley
Topic / Sub-topics Page Number
4.4 Industrial Water Demand 58
4.5 Water Demand for Power Generation 59
4.6 Total Water Demand for Various Sectors 59
4.7 Water Budget 61
Chapter-V Strategic Action Plan for Irrigation in Lower Dibang Valley District under PMKSY
63
5.1 Block-wise Total Plan of the District 63
5.2 Share of Participating Departments on Total Outlay 64
5.3 Component-wise Plan 65
5.4 Year-wise Plan of Participating Department 66
5.5 Expected Outcome 67
5.6 Detailed Strategic Action Plan for Irrigation in Respect of Lower Dibang Valley District, Arunachal Pradesh under PMKSY (Annexure-I- IX)
69-271
Annexure-X -Important Maps of Lower Dibang Valley District 272-275
List of Tables
List of Tables
Sl. No. Page Numbers
Chapter-I General Information of the District
Table 1.1 General profile of Lower Dibang Valley District 16
Table 1.2 Demography of Lower Dibang Valley District 19
Table.1.3 Biomass and Livestock Population Details of the District 24
Table.1.4 Agro Ecology, Climate, Hydrology and Topography of Lower Dibang Valley District
30
Table.1.5 Soil Profile of the Lower Dibang Valley District 33
Table 1.7 Land use Pattern in Lower Dibang Valley District
37
Chapter-II District water profile
Table. 2.1 Area-wise, Crop-wise Irrigation status of Lower Dibang Valley District
42
Table.2.2 Block-wise Production and Productivity of major Crops 45
Table 2.3 Irrigation Based Classification of the District 47
Chapter-III Water Availability
Table.3.1 Status of Water Availability in Lower Dibang Valley
District 49
Table.3.2 Status of Ground Water Availability 50
Table 3.3 Status of Command Area 51
Table 3.4 Existing Type of Irrigation 53
District Irrigation Plan (PMKSY) Lower Dibang Valley
Chapter-IV Water Requirement/Demand
Table 4.1 Domestic water Demand of Lower Dibang Valley District
55
Table. 4.2. Block-wise Crop Water Requirement of the District 57
Table. 4.3 Livestock Water Demand of the District 58
Table 4.4 Block-wise Industrial Water Requirement 58
Table.4.5 Water Demand for Power Generation 59
Table 4.6.1 Present Water Demand of the District for Various Sectors 60
Table 4.6.2: Projected Water Demand of the District for Various Sectors During 2020
60
Table. 4.7 Water Budget of Lower Dibang Valley District 62
Chapter-V Strategic Action Plan for Irrigation
Table 5.1: Block-wise total Outlay of the District 63
Table.5.2 Component-wise Break-up Total Outlay 65
Table 5.3. Year-wise Allocation of Outlay of Plan under Different Departments
67
Table 5.4. Block-wise Physical Target for Command Area/ Irrigation Potential to be Created
68
District Irrigation Plan (PMKSY) Lower Dibang Valley
Abbreviations Decoded
Abbreviations Decoded Forms
NDC National Development Council
GoI Government of India
C-DAP Comprehensive District Agriculture Plan
ICT Information and Communications Technology
BCM Billion Cubic Metres
GDP Gross Domestic Product
AIBP Accelerated Irrigation Benefits Programme
CADWM Command Area Development and Water Management
MI Micro Irrigation
SWMA Supplementary Water Management Activities
NITI Aayog National Institution for Transforming India Aayog
NRM Natural resource Management
IWMP Integrated Watershed Management Programme
PRI Panchayati Raj Institutions
DRDA District Rural Development Agencies
NRLM National Rural Livelihoods Mission
C.D. Blocks Community development block
BPL Below Poverty Line
SC/ST Scheduled Caste/ Scheduled Tribe
Nos. Number
ATMA Agriculture Technology Management Agency MSL
TGA Total Geographical Area
GCA Gross Cropped Area
GIA Gross Irrigated Area
NSA Net Sown Area
MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act
CI Cropping Intensity
Qtl/yr Quintal per year
GIA Gross Irrigated Area
MCM Million Cubic Metres
Bgl Below ground Level
CCA Culturable Command Area
LPD Litre Per Day
CAD Command Area Development
DIP District Irrigation Plan
SIP State Irrigation Plan
DLIC District Level Implementation Committee
STP Sewage Treatment Plant
WRD Water Resource Department
RWD Rural Work Department
DRDA Department of Rural Development Agency
ATMA Agricultural Technology and Management Agency
District Irrigation Plan (PMKSY) Lower Dibang Valley
1
Executive Summary In an agrarian economy like India, agriculture utilizes the major share of country’s exploitable water resources. Though the sector utilizes the maximum share of exploitable water resources, availability of the same at different locations to different extent makes it vital to adopt effective utilization of water through storage, channelizing and judicial use. At some places like Punjab and Haryana, the environmental and socio-economic rationale for this sector is now being questioned. Accordingly, it is needed to challenge and change the fundamentals of the prevailing view of water resources exploitation. A new and more suitable approach to water resources allocation is necessary if the population is to be adequately fed, without further degradation and destruction of the critical ecosystem services. Water productivity needs to be enhanced considerably, and economic cost-benefit analysis and pricing regimes can play a significant role in such a process. However, these economic measures will not be sufficient on their own. They will need to be buttressed by technological innovation and institutional changes in order to encourage a more equitable distribution of resources and to mitigate potential international conflicts across 'shared' water basins. Water has unique characteristics that determine both its allocation and use as a resource by agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a situation of growing water scarcity and rising demands for non-agricultural (household and industrial) use of water, reassessment of sectoral allocations of water is inevitable. In developing countries, irrigated agriculture plays a vital role in contributing towards domestic food security and poverty alleviation. Therefore, achievement of these objectives is dependent on adequate allocations of water to agriculture. Justification of such allocations requires that irrigated agriculture to be a cost-effective means of achieving stated political or social objectives, such as food security or poverty alleviation, and that all externalities be taken into account in the pricing mechanism. Improved allocation of irrigation water is required within the agriculture sectors in order to achieve greater efficiency in the use of irrigation water and existing irrigation infrastructure. Reallocation is also required in order to reduce waterlogging and salinization of irrigated land to decrease the negative environmental impacts and other externalities of irrigation (caused by over extraction of groundwater and depletion and pollution of surface water). Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency and productivity of current water use to bring more prosperity to the rural areas. Priorities of Government of India were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious”. Government is committed to giving high priority to water security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all options including linking of rivers, where feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”. PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme like Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be
District Irrigation Plan (PMKSY) Lower Dibang Valley
2
implemented in an area development mode only by adopting a decentralized state level planning and projectised execution structure that will allow the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be supervised and coordinated utilizing the existing mechanism and structure available under Rashtriya Krishi Vikas Yojana (RKVY) program with State Agriculture Department acting as the State Nodal Agency for implementation of PMKSY. However, the implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the respective program ministry/department. The five chapters along with introductory chapter, explains the profile of district, its water requirement for agriculture and allied sector, water availability, assessment of water requirement for various sectors and strategic action plan for augmentation and effective management of available water resources.
During the course of preparation of District Irrigation Plan (DIP) for the district of Lower Dibang Valley, the team visited Lower Dibang District to collect data and have interaction with all the stakeholders. Methodology adopted to prepare DIP are Collection of primary and secondary data from the field from various sources including published documents and websites, Various meetings were held to obtain ground level realities and data from key personnel/stakeholders through structured, unstructured interviews, focused group discussions etc., Meetings with various State Government departments and related institutions were held , GIS maps of the area’s/clusters were studied to understand the land morphology, topography of the district, Focused group discussions and interaction with of agriculture officers, horticulture officers, soil conservation officers, extension officers, rural development department, animal husbandry department, irrigation officers for identifying the key issues and focus areas of the region. In the district, the Panchayat level schemes were identified as per the need and potential and resolutions were passed by the Panchayat to include the schemes in PMKSY. The Panchayat resolutions were then consolidated and put up in the Block Development Committee and a block plan was put up in the Zila Parishad along with the programme of other line departments participating in implementation of PMKSY. On the basis of detailed discussion and analysis of data, the team arrived at the projection of various components of PMKSY and Department-wise plan for 5 years from 2016-17 to 2020-21 as detailed in the Plan.
District Demography As per 2011 census, the total population of the district is 54080 out of which the male population is 28053 and 26027 are female. The district has a sex ratio of 928 females per 1000 male as compared to State Ratio of 938 females per 1,000 males. The literacy rate of the district in Census 2011 is 69.13%. The Male literacy rate is 75.55%, while for female it is 62.19%.
The population density of the district as recorded by 2011 census is 14 people per sq. km. as compared to State average of 17 people per sq. km. Compared to the population density of the state (17 persons per sq.km), the district has much lower population density, i.e., 82% of the State average. Further, the district has a total of 314 villages out of which 264 villages inhabited and 50 villages are uninhabited. The decadal percentage growth of population as per Census 2011 is 7.2% as compared to the population of 2001. In the previous census of India 2001, Lower Dibang Valley District recorded increase of 36.76 percent to its population compared to 1991.
Agriculture The economy of the district is mainly agrarian and paddy is the predominant commodity that is cultivated three times a year (winter, summer and autumn). The other important crops of the district are pulses, oilseeds, sugarcane, mustard, vegetables, potato, sugarcane, fruits etc. Almost all horticultural crops like fruits, Spices, potato, Orange, Pulses, Black gram Banana and major Rabi and Kharif vegetables are grown extensively in the district.
District Irrigation Plan (PMKSY) Lower Dibang Valley
3
District Water Profile
The annual Replenishable ground water resource of the Lower Dibang Valley district as per latest report
of CGWB is 950.40 MCM. Net ground water availability of the district is 855.36 MCM while net ground water draft for all uses is 0.34mcm. Projected demand for domestic and industrial uses up to 2025 is 0.62 MCM. Ground water availability for future irrigation use is 854.41 MCM. Stage of ground water development is thus negligible (0.03%) and the district can be categorized as safe. Lower Dibang Valley district is under the Safe category. Water Demand and Gap Total present water requirement for the district is 191.77.85 MCM while the total future water requirement for the district is 192.10 MCM. Presently, maximum water demand is for Roing-Koronu block which is 101.31 MCM, while minimum is for Hunli-Desali block as 23.39 MCM. In projected future, maximum water demand is for Roing-Koronu block with 101.53 MCM while minimum future water demand for Hunli-Desali block is 23.41 MCM. The water budget clearly shows the water gap of 116.07 MCM in present and of 116.40 MCM in future between the water availability and requirement.
PMKSY Financial Proposal Total plan of Lower Dibang Valley District for a period of five year works out to be Rs. 100297.20 lakh (i.e. Rs. 1002.97 Crore). Maximum share of Rs. 58158.74 lakh (57.99%) is for Water Resources and WRD (Tube Well & Ground Water) department followed by Agriculture department with Rs. 17315.52 lakh (17.26%) and RWD (Soil Conservation department) with Rs. 9795.00 lakh (9.77%). The Horticulture department shares 8.52% of total Pan Outlay, i.e. Rs.8540.45 lakh, while DRDA share is 5.80%, i.e. Rs.5812.50 lakh. For providing training and extension services, the Agriculture Department has proposed and additional amount of Rs 675.00 lakh under ATMA. The total plan of five years is equally divided into 5 years i.e. 2016-17, 2017-18, 2018-19, 2019-20 and 2020-21. Expected Outcome The gross irrigated area in the district is 3319 hectare which is around 8.49% of 39089 hectare of the gross cropped area. Agriculture, Horticulture, WRD, and RWD (Soil Conservation) departments of the district have
proposed to bring additional 58422.20 hectares of land out of total 73413 Ha of Culturable Command Area under assured irrigated cultivation system through PMKSY, which will boost up the agriculture and allied sectors’ production and productivity in the district paving the way for generating direct and indirect employment among the local people. Thus, the overall economy of the district would get better and better in the days to come after the contemplated projects get implemented under this flagship programme of PMKSY.
District Irrigation Plan (PMKSY) Lower Dibang Valley
4
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in various plans took
concrete shape through the years and initiatives like specific guidelines on methodologies and processes
for preparation of district plans; framework for preparation of perspective plan, medium term and annual
plans by then planning commission in 1969 and the 73rd and 74th Constitutional Amendments conferring
constitutional status to Panchayats at district and sub-district level; local self-government in urban areas;
constitution of District Planning Committee to consolidate the plans prepared at Panchayats and
Municipalities and prepare a draft development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by Planning Commission
on preparation of district level plans and making it an integral part of the process of preparation of the
States 11th Five Year Plan. The Planning Commission issued guidelines in August 2006 for preparation
of the District Plans. The Guidelines define the District Planning as ‘the process of preparing an integrated
plan for the local government sector in a district taking into account the resources (natural, human and
financial) available and covering the sectoral activities and schemes assigned to the district level and
below and those implemented through local governments in a state. The document that embodies this
statement of resources and their allocation for various purposes is known as the “District Plan”.
Government of India through a resolution in National Development Council on 29th May 2007 conceived
a special Additional Central Assistance Scheme (ACAS) to address the slow growth of agriculture and
allied sectors by incentivizing States to draw up plans for their agriculture sectors more comprehensively.
The NDC resolution states "GoI introduced a new Additional Central Assistance Scheme to incentivize
states to draw up plans for their agriculture sector more comprehensively, taking agro-climatic conditions,
natural resource issues and technology into account, and integrating livestock, poultry and fisheries, etc.
This involved a new scheme for Additional Central Assistance (ACA) to State Plans, administered by the
Union Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to supplement
the State-specific strategies including special schemes for beneficiaries of land reforms. The newly
created National Rain-fed Area Authority on request, was to assist States in planning for rain-fed areas".
The NDC in its resolution advised the States to prepare a Comprehensive District Agriculture Plans (C-
DAP) that will fully utilize available resources and include allied agriculture sectors. Further, GOI issued
a manual on preparation of Comprehensive District Agriculture Plans to help the states prepare C-DAP.
As per these Guidelines, the objective of district planning is ‘to design an integrated and participatory
action plan for the development of local area in general and agriculture and allied sectors in particular’.
The objectives of Comprehensive District Agriculture Plan (C-DAP) were:
1. To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory process
involving various organizations and stakeholders.
District Irrigation Plan (PMKSY) Lower Dibang Valley
5
2. To enable optimum utilization of scarce natural, physical & financial resources.
3. To assess and plan for the infrastructure required to support the agriculture development.
4. To establish linkages with the required institutional support services, like credit, technology
transfer, ICT, research etc.
5. To evolve an action plan for achieving sustainable agricultural growth with food security and
cropping system that will improve farmers’ income. The guidelines required the state/district authorities
to (i) ensure that the agricultural plans are prepared for the district and then integrated into the agricultural
plans of the State based on the agro-climatic conditions, availability of technology, trained manpower and
natural resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying / fisheries /
priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock and fisheries
are reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was the Government
of India guidelines issued in 2015 in the form of a template for the preparation of District Irrigation Plan
(DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
program and made the preparation of DIP and SIP mandatory for the states to receive funds from the
program. The present report is a product of these long drawn efforts of Government of India to strengthen
the decentralized planning process in the country focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance and promotion of
developmental activities. Considering its vital importance and ever increasing demand for water, in the
face of population growth, urbanization & industrialization and considerations of climatic change, making
water, an increasingly a scarce resource, available to multiple uses, planning and management of this
vital resources, utilization of water economically, optimally and equitably assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry of Water Resources
suggests an availability of 1123 billion cubic meters (BCM) against a current estimated demand of 710
BCM. The Standing Committee of the Ministry of Water Resources estimates that this water demand will
rise to 1093 BCM by 2025. Though the existing water availability in the immediate future seems to be
adequate, with the near constant supply of water resources in the face of increasing demand on account
of population growth, urbanization and industrialization will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820 cubic
meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected per capita
availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050 suggesting shortage of
water in the medium term1. Further, the all India water balance estimates does not reflect the variations
1 Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New Delhi.
District Irrigation Plan (PMKSY) Lower Dibang Valley
6
in water balance across time and space- certain areas having a positive water balance and the others
facing acute shortage. The problem is further accentuated by water quality related issues.
With the abundant surface and ground water supply in the first five decades since independence, more
than 80 percent of the total available water resources were allocated for irrigation purposes and the rest
meeting the domestic and industrial demands. In a recent study1on the demand for water from agriculture,
domestic and industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34 BCM
in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM in 2000, 92 BCM in
2025 and 161 BCM in 2050) for water will utilize the total balance water available while agriculture
demand for water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in 2050). This change is
partly because of the changing sectoral contributions of India’s GDP and also partly because of dynamics
of irrigation development in the country where the initial expansion in area under irrigation is propelled by
the availability of abundant water resources and availability of good quality land. This is no longer the
case in many of the states where the availability of land and water are serious constraints for further
expansion of irrigation. Further, as per the erstwhile planning commission up to March 2012 out of 141
million hectares of net sown area in the country 114 (or 81%) million hectares is Irrigation Potential
Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilized (IPU) leaving almost 20%
of irrigated potential unutilized. This leaves 40 percent of the net sown area in the country dependent on
rainfall which makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns were to be
addressed through certain basic principles and commonality in approaches in dealing with planning,
development and management of water resources3 under an Integrated Water Resource Management
framework. The main objectives of water resource management as delineated in National Water Policy
2012 are:
a) Planning, development and management of water resources need to be governed by common
integrated perspective considering local, regional, State and national context, having an environmentally
sound basis, keeping in view the human, social and economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to the objectives of
equity, social justice and sustainability. Meaningful intensive participation, transparency and
accountability should guide decision making and regulation of water resources.
2050: Business-as-usual scenario and deviations. Research Report 123, International Water
Management Institute, Colombo.
2 Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
2 Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025
District Irrigation Plan (PMKSY) Lower Dibang Valley
7
Water needs to be managed as a common pool community resource held, by the state, under public trust
doctrine to achieve food security, support livelihood, and ensure equitable and sustainable development
for all.
d) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs
should be given due consideration.
e) Safe Water for drinking and sanitation should be considered as pre-emptive needs, followed by
high priority allocation for other basic domestic needs (including needs of animals), achieving food
security, supporting sustenance agriculture and minimum eco-system needs. Available water, after
meeting the above needs, should be allocated in a manner to promote its conservation and efficient use.
f) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river, lakes, soil
moisture, and ground water, sea, etc., are interdependent and the basic hydrological unit is the river
basin, which should be considered as the basic hydrological unit for planning.
g) Given the limits on enhancing the availability of utilizable water resources and increased
variability in supplies due to climate change, meeting the future needs will depend more on demand
management, and hence, this needs to be given priority, especially through (a) evolving an agricultural
system which economizes on water use and maximizes value from water, and (b) bringing in maximum
efficiency in use of water and avoiding wastages.
h) Water quality and quantity are interlinked and need to be managed in an integrated manner,
consistent with broader environmental management approaches inter-alia including the use of economic
incentives and penalties to reduce pollution and wastage.
i) The impact of climate change on water resources availability must be factored into water
management related decisions. Water using activities need to be regulated keeping in mind the local geo
climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the
constraints in providing assured irrigation as well as increasing efficiency and productivity of current water
use to bring more prosperity to the rural areas. Priorities of Government of India were reflected in the
Hon’ble President’s address to the joint Session of the Parliament of 16th Lok Sabha where he indicated
that “Each drop of water is precious. Government is committed to giving high priority to water
security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan
Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously
considering all options including linking of rivers, where feasible; for ensuring optimal use of our
water resources to prevent the recurrence of floods and drought. By harnessing rain water
through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water
recharge. Micro irrigation will be popularized to ensure ‘Per drop-More crop”.
District Irrigation Plan (PMKSY) Lower Dibang Valley
8
PMKSY has been approved with an indicative outlay of Rs. 50,000 crore over a period of five years from
2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of Ministry of Water
Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation and
Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed &
Convergence with MGNREGA were brought together under the umbrella program of PMKSY. Further the
scheme seeks convergence with scheme like Mahatma Gandhi National Rural Employment Guarantee
Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission
and Rural Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF),
Members of Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly
Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest
Department (WPSFD) etc. The PMKSY will be implemented in an area development mode only by
adopting a decentralized State level planning and project-wise execution structure that will allow the State
to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years.
The program will be implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with State Agriculture
Department acting as the State Nodal Agency. However, the implementing departments for the four
components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY
(watershed development) will be decided by the respective program ministry/department.
The funds under this program would be provided to the States as per the pattern of assistance of Centrally
Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog. During 2015-16 the
existing pattern of assistance of ongoing Scheme will be continued. An outlay of Rs. 50,000 crores have
been approved for 2015-20. The financial assistance provided to the state governments from this centrally
sponsored scheme is subject to fulfillment of certain conditions. Firstly, a state will become eligible to
access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and State Irrigation Plan
(SIP), excepting for the initial year, and the expenditure in water resource development for agriculture
sector in the year under consideration is not less than the baseline expenditure, which is defined as the
average of the expenditure in irrigation sector irrespective of the department in the state plan in three
years prior to the year under consideration. Secondly, States will be given additional weightage for levying
charges on water and electricity for irrigation purposes, so as to ensure sustainability of the programme.
Thirdly, interstate allocation of PMKSY fund will be decided based on
• Share of percentage of unirrigated area in the state vis-à-vis national average including
prominence of areas classified under Desert Development Programme (DDP) and Drought Prone Area
Development Programme (DPAP);
• Increase in percentage share of expenditure on water resource development for agriculture
sector in State Plan expenditure in the previous year over three years prior to it; and
• Improvement in irrigation efficiency in the state.
District Irrigation Plan (PMKSY) Lower Dibang Valley
9
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure access
to some means of protective irrigation to all agricultural farms in the country, to produce ‘per drop more
crop’, thus bringing much desired rural prosperity.
Objectives
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of district level
and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under assured
irrigation (Har Khet Ko Pani).
b) Integration of water source, distribution and its efficient use, to make best use of water through
appropriate technologies and practices.
c) Improve on-farm water use efficiency to reduce wastage and increase availability both in duration
and extent.
d) Enhance the adoption of precision-irrigation and other water saving technologies (More crop per
drop).
e) Enhance recharge of aquifers and introduce sustainable water conservation practices.
f) Ensure the integrated development of rain-fed areas using the watershed approach towards soil
and water conservation, regeneration of ground water, arresting runoff, providing livelihood options and
other NRM activities.
g) Promote extension activities relating to water harvesting, water management and crop alignment
for farmers and grass root level field functionaries.
h) Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and
i) Attract greater private investments in irrigation.
District Irrigation Plan (PMKSY) Lower Dibang Valley
10
Strategy/Approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct water sources;
construction of water harvesting structures, secondary & micro storage, groundwater development,
enhancing potentials of traditional water bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl
(H.P.); Zabo (Nagaland); Eri, Oranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both assured and
protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to improve ground
water recharge so as to create opportunities for farmers to access recharged water through shallow
tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm viz,
underground piping system, Drip & Sprinklers, pivots, rain-guns and other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers’
organizations/ NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits, demonstrations,
farm schools, skill development in efficient water and crop management practices (crop alignment)
including large scale awareness on more crop per drop of water through mass media campaign,
exhibitions, field days, and extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP)
To focus on faster completion of ongoing Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet Ko Pani)
This component focuses on-
a) Creation of new water sources through Minor Irrigation (both surface and ground water).
District Irrigation Plan (PMKSY) Lower Dibang Valley
11
b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of traditional
water sources, construction rain water harvesting structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution network from source to
the farm;
d) Ground water development in the areas where it is abundant, so that sink is created to store
runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies to take advantage
of the available source which is not tapped to its fullest capacity (deriving benefits from low hanging
fruits). At least 10% of the command area to be covered under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby water scarce
areas, lift irrigation from water bodies/rivers at lower elevation to supplement requirements beyond IWMP
and MGNREGS irrespective of irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at feasible
locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan, approval of annual action
plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices like drips,
sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond permissible limit (40%),
under MGNREGS for activities like lining inlet, outlet, silt traps, distribution system etc.
d) Construction of micro irrigation structures to supplement source creation activities including tube
wells and dug wells (in areas where ground water is available and not under semi critical/ critical/ over
exploited category of development) which are not supported under AIBP, PMKSY (Har Khet Ko Pani),
PMKSY (Watershed) and MGNREGS as per block/district irrigation plan.;
e) Secondary storage structures at tail end of canal system to store water when available in
abundance (rainy season) or from perennial sources like streams for use during dry periods through
effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pump sets including water carriage pipes,
underground piping system;
District Irrigation Plan (PMKSY) Lower Dibang Valley
12
g) Extension activities for promotion of scientific moisture conservation and agronomic measures
including cropping alignment to maximize use of available water including rainfall and minimize irrigation
requirement (Jal Sarankchan);
h) Capacity building, training and awareness campaign including low cost publications, use of pico
projectors and low cost films for encouraging potential use water source through technological,
agronomic and management practices including community irrigation;
i) The extension workers will be empowered to disseminate relevant technologies under PMKSY
only after requisite training is provided to them especially in the area of promotion of scientific moisture
conservation and agronomic measures, improved/ innovative distribution system like pipe and box outlet
system, etc. Appropriate Domain Experts will act as Master Trainers; and
j) Information Communication Technology (ICT) interventions through NeGP-A to be made use in
the field of water use efficiency, precision irrigation technologies, on farm water management, crop
alignment etc. and also to do intensive monitoring of the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation activities such
as ridge area treatment, drainage line treatment, rain water harvesting, in-situ moisture conservation and
other allied activities on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in identified backward
rain-fed blocks including renovation of traditional water bodies.
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management including irrigation
related priorities was identified for Lower Dibang Valley district by the peoples’ representatives of district
with support from administration and technical experts. For instance the reports of Strategic Research
and Extension Plan (SREP) prepared under ATMA, Comprehensive District Agriculture Plan (C-DAP)
prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of
NABARD and the Integrated District Development Plan etc. identified number of irrigation related issues
for the district including (i) promoting water use efficiency through sprinkler and drip irrigation; (iii)
promoting protected poly-house cultivation to minimize risk factors and enhance quality and productivity;
(iv) Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of
soil conservation of arable & non-arable land through engineering measures; (vi) creation of new water
harvesting structures, check dams, ponds, tanks, etc. (vii) increase the forest cover in the district and (viii)
land improvement measures.
District Irrigation Plan (PMKSY) Lower Dibang Valley
13
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited Lower Dibang District to
collect data and have interaction with all the stakeholders. Methodology adopted to prepare DIP is
outlined in brief as under:
a) Collection of primary and secondary data from the field from various sources including published
documents and websites.
b) Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused group discussions etc.
c) Meetings with various State Government departments and related institutions were held
d) GIS maps of the area’s/clusters were studied to understand the land morphology, topography of
the district.
e) Focused group discussions and interaction with of agriculture officers, horticulture officers, soil
conservation officers, extension officers, rural development department, animal husbandry department,
irrigation officers for identifying the key issues and focus areas of the region.
f) Discussion with NABARD officer of was also held during the visit.
g) Team members also participated in the State Level workshop and held active discussions with
GoI officers, State Level officers and scientists of various institutions
In the district, the Panchayat level schemes were identified as per the need and potential and resolutions
were passed by the Panchayat to include the schemes in PMKSY. The Panchayat resolutions were then
consolidated and put up in the Block Development Committee and a block plan was put up in the Zila
Parishad along with the programme of other line departments participating in implementation of PMKSY.
On the basis of detailed discussion and analysis of data, the team arrived at the projection of various
components of PMKSY and Department-wise plan for 5 years from 2016-17 to 2020-21 as detailed in the
Plan.
District Irrigation Plan (PMKSY) Lower Dibang Valley
14
Chapter-I
General Information of the District
1.1 District Profile
Lower Dibang Valley is the 15th District of Arunachal Pradesh has an immense treasure house of natural
beauty, tribal culture, traditional arts and crafts and unique wild life. The District has picturesque hills and
encircles by mighty river, like Dibang, Deopani, Epipani, Sisiri etc. The district having a geographical area of
3900 Sq. Km and is located in the Eastern part of the State and the Valley extend between the latitude 270 -
30'N to 280 33'N and longitudes between 950 -15'E to 960-30'E. The district was born on 16 December 2001.
It is named after the river Dibang – one of the tributaries of the mighty Brahmaputra, which drains the area.
Dibang originates from the Southern bank of the great Himalayan range near a place called AthuPopu in
Dibang Valley bordering China & flows down through the Dibang Valley & Lower Dibang Valley & finally
meets the river Lohit & Siang before merging into Brahmaputra. It borders Upper & East Siang on West,
Anjaw & Lohit on the East & Dibang Valley on the North. It has 3 subdivisions, 6 administrative circles with 3
CD Blocks with population of 54,080 as per 2011 Census. The district HQ is located at Roing & at 565 km
away from state capital Itanagar.The resources available in the district are plenty, but the ways and means
to achieve the economic stability with the objective of improving the quality of life of its people through gainful
utilization of the resources are not well defined. Technology has been relegated to the back resulting
stagnation of growth.
Comparative Table of Demographic Details of Lower Dibang Valley
Description 2011 Census 2001 Census
Actual Population 54,080 50,448
Male 28,053 27,156
Female 26,027 23,292
Population Growth 7.20% 36.76%
Area Sq. Km 3,900 3,900
Density/km2 14 13
Proportion to Arunachal Pradesh Population 3.91% 4.59%
Sex Ratio (Per 1000) 928 858
Child Sex Ratio (0-6 Age) 948 955
Average Literacy 69.13 59.78
Male Literacy 75.55 68.5
Female Literacy 62.19 49.37
Total Child Population (0-6 Age) 8,009 9,313
Male Population (0-6 Age) 4,112 4,764
Female Population (0-6 Age) 3,897 4,549
Literates 31,849 24,591
Male Literates 18,087 15,338
Female Literates 13,762 9,253
Child Proportion (0-6 Age) 14.81% 18.46%
Boys Proportion (0-6 Age) 14.66% 17.54%
Girls Proportion (0-6 Age) 14.97% 19.53%
Source: Census of India 2011
District Irrigation Plan (PMKSY) Lower Dibang Valley
15
Map 1 Location map of Dibang Valley District
CHINA
District Irrigation Plan (PMKSY) Lower Dibang Valley
16
Table 1.1. General profile of Lower Dibang Valley
Name of the District
District Code Latitude Longitude
Lower Dibang Valley
258 270 - 30'N to 280 33'N 950 -15'E to 960-30'E
Source: Census of India, 2011
Administrative setup of Lower Dibang Valley District
The Lower Dibang Valley district is the 15th district of Arunachal Pradesh with an area of 3900.00 Sq.km. It
forms a part of eastern Arunachal Pradesh. The district is bounded on the north by the Dibang Valley district,
on the East by the Lohit district and Mc Mohan Line, on the west by East Siang and Upper Siang districts and
on the south by the Tinsukia district of Assam.
At the time of Census 2011, the district has 3(three) Sub-Division and 6 Circles as shown below with its HQ
at Roing.
Sl. No. Name of Sub-division Name of Circle Name of CD Block 1 Roing Roing Roing-Koronu
Koronu
2 Hunli Hunli Hunli-Desali
Desali
3 Dambuk Dambuk Dambuk-Paglam
Paglam
The administrative set up of the district is based on single line administration which aims at keeping close co-
operation amongst various Departments for speedy development of the area and its people. The Deputy
Commissioner is the overall in-charge of the district and maintains law and order with the help of other
administrative Officers and police force. Every Sub-division is under the administrative control of Additional
Deputy Commissioner/Sub-Divisional Officer/Extra Assistant Commissioner. Circle is the lowest unit of
administration and Circle Officer is the administrative head at the Circle.
The villages have their own customary administrative system in the form of traditional village councils. The
village council consists of the Gaon Burahs/Headman and village members. The Assam Frontier
(Administration of Justice Regulation Act 1945 authorizes the village council to settle all civil matters and
certain criminal matters falling within their jurisdiction. However, for all matters, the Deputy Commissioner
exercises the full power as District Magistrate. Moreover, some other administrative officers are also vested
with the magisterial powers. The Guwahati high court has jurisdiction over all the district courts of Arunachal
Pradesh.
There are two Assembly Constituency in the district i.e. 42 Dambuk (ST) and 43 Roing (ST) Assembly
Contituency.The Lower Dibang Valley district falls under the Arunachal East Parliamentary Constituency.
District Irrigation Plan (PMKSY) Lower Dibang Valley
17
1.2 Demography
As per 2011 census, the total population of the district is 54080 out of which the male population is 28053
and 26027 are female. The district has a sex ratio of 928 females per 1000 male as compared to State
Ratio of 938 females per 1,000 males. The literacy rate of the district in Census 2011 is 69.13%. The
Male literacy rate is 75.55%, while for female it is 62.19%.
The population density of the district as recorded by 2011 census is 14 people per sq. km. as compared
to State average of 17 people per sq. km. Compared to the population density of the state (17 persons
per sq.km), the district has much lower population density, i.e., 82% of the State average. Further, the
district has a total of 314 villages out of which 264 villages inhabited and 50 villages are uninhabited. The
decadal percentage growth of population as per Census 2011 is 7.2% as compared to the population of
2001. In the previous census of India 2001, Lower Dibang Valley District recorded increase of 36.76 percent to its
population compared to 1991.
Figure 1. 2: Block-wise Population of Male, Female and Children in district
0
5000
10000
15000
20000
25000
Male Female Children
Population
21881
20115
58595027 4810
17821145 1102
358
Block-wise Demographic Details of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
18
Figure. 1.3. Block-wise Population Category
The total number of household in the district is 11600, out of which 79.74% are in Roing-Koronu CD Block
followed by Dambuk-Paglam CD Block with 15.60% and Hunli-Desali Block with 5%. Roing-Koronu block
is the most populated block with 77.66% of the total population of the district followed by Dambuk-Paglam
and Hunli-Desali CD Block with 18.19% and 4.15% respectively of the total population. As regards the
Schedule Tribe and Schedule Caste population of the district, there is no Schedule Caste population in
the district, while 48.03% of the total population of the district belongs to Schedule Tribes (ST) and the
remaining population are from unreserved category. In Roing-Koronu and Dambuk-Paglam blocks, the
number of ST population is 16485 and 7776 respectively, of total population in the block.
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Roing-Koronu Dambuk-Paglam Hunli-Desali
16485
7776
1713
41996
9837
2247
Population Category
ST
Unreserved
District Irrigation Plan (PMKSY) Lower Dibang Valley
19
Table 1.2. Demography of Lower Dibang Valley
Name of the CD Block
No. of Villages/Town
covered
Population SC ST General Total
M F CH* Total No of househol
d
No of member
s
No of househol
d
No of Member
s
No of househol
d
No of member
s
No of househol
d
No of member
s
Roing-Koronu
Rural (166)
15817 14790 4702 30607 0 0 3309 13090 3324 17517 6633 30607
Roing Urban (1)
6064 5325 1157 11389 0 0 653 3395 1964 7994 2617 11389
Total 21881 20115 5859 41996 0 0 3962 16485 5288 25511 9250 41996
Dambuk-Paglam
Rural (42)
5027 4810 1782 9837 0 0 1555 7776 255 2061 1810 9837
Hunli-Desali
Rural (56)
1145 1102 358 2247 0 0 456 1713 84 534 540 2247
Total 264 28053 26027 7999 54080 0 0 5973 25974 5627 28106 11600 54080
Source: Census of India 2011
District Irrigation Plan (PMKSY) Lower Dibang Valley
20
1.3 Biomass and Livestock
As per Livestock census 2012, a total of 159889 livestock was recorded in the district. The district has
seen a decrease of approximately 28.39% in the total livestock population which was recorded as 223282
during Livestock census 2007. Department of Animal Husbandry is of the view that the main reason for
this reduction is migration of youth from rural to urban areas and decreasing rate of profits in rearing of
livestock. However, it is observed from the data given by the Animal Husbandry department of the district
the total livestock population has been increased during the year 2015. The total livestock of the district
during the year 2015 is found to be 165945, i.e., the district has shown a 3.78% growth in its livestock
population during the year 2015. Thus, assuming a rate 1.06% growth in its livestock population, the total
livestock population of the district in the year 2020 would be 176234.
Figure: 1.3. 1: Population of Small and Large animals in Lower
0
10000
20000
30000
40000
50000
60000
70000
Po
ult
ry
Du
cks
Pig
s
Go
ats
Ind
egin
ou
s C
ow
s
Hyb
rid
Co
w
Ind
escr
ipti
ve B
uff
alo
An
y o
ther
Milc
h o
r M
eat
An
imal
s
Dra
ft A
nim
als
Small Animal Population of the Districtduring 2015
Large Animal Population of the Districtduring 2015
DraftAnimal
Populationduring2015
68026
8636
15525
22257
26039
3060 2163
17186
3053
Livestock Population of the District During 2015
District Irrigation Plan (PMKSY) Lower Dibang Valley
21
Dibang Valley District during 2015
1.3.1 Small Animals
The details of the small animal of the district as per data provided by the Animal Husbandry Department
of the district for the year 2015 are diagrammatically depicted below:
Figure 1.3. 2: Percentage of small animals in the district
It is clearly shown from above graph that more number of people are interested in poultry farming because
their basic food pattern adds more number of non-vegetarians due to the climatic conditions and the
oliculture production is less in that district because the plain land holding is not very high and peoples are
more interested in doing farming for one season due to lack of irrigation facilities.
Figure 1.3. 3: Block-wise Small Animal Population
59.44%
7.55%
13.57%
19.45%
Percentage Distribution of Small Animal of the District
Poultry
Ducks
Pigs
Goats
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Poultry Ducks Pigs Goats
Small Animals
42276
8636 7844
16726
15738
0
56351435
10012
02046
4096
Block-wise Small Animal of the District
Roing-Koronu Dambuk-Paglam Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
22
Population of small animal in the district is 114444. Poultry population accounts for 59.44 % of the number
of small animals in the district followed by Goats (19.45%) and Pigs (13.57%). Among different blocks,
Roing-Koronu ranks first with 65.38% (75482) of the total population of small animals followed by
Dambuk-Paglam (19.76%) and Hunli-Desali Block (14.86%) respectively.
1.3.2. Large Animals
A total of 51501 large animals are there in the district as reported by the Animal Husbandry Department
of the district. The major large animals available in the district are indigenous and hybrid cows, buffalos,
and other milch or meat animals like Mithun and others. A detailed graphical representation of the
available large animals of the district is given below:
Figure 1.3. 4: Percentage of large animals in the district
Figure 1.3. 5: Block wise Large Animal Population
Population of large animals in the district is 48448. Indigenous cow’s population accounts for 53.75% of
the total number of large animals in the district followed by other milch animals (35.47%) and Hybrid cows
(6.32%).
53.75%
6.32%
4.46%
35.47%
Percentage Distribution of Large Animal of the District
Indeginous Cows
Hybrid Cow
IndescriptiveBuffalo
Any other Milchor Meat Animals
0
2000
4000
6000
8000
10000
12000
14000
16000
Indeginous Cows Hybrid Cow IndescriptiveBuffalo
Any other Milchor Meat Animals
Large Animals
14768
2193 1627
3752
11220
867 536
10630
51 0 0
2804
Block-wise Large Animal of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
23
Among different blocks Dambuk-Paglam has highest large animal population and it shares 48% of total
population followed by Roing-Koronu Block with a share of 46% of total population. Hunli-Desali Block
shares only 6% of total large animal population.
District Irrigation Plan (PMKSY) Lower Dibang Valley
24
Table.1.3: Biomass and Livestock Population Details of the District
Biomass and Livestock Population of Lower Dibang Valley District During 2015
Block
Small Animals Large Animals
Draft Animals
Total Poultry Ducks Pigs Goats Sheep
Indigenous Cows
Hybrid Cow
In descriptive
Buffalo
Hybrid Buffalo
Any other Milch or
Meat Animals
Roing-Koronu 42276 8636 7844 16726 0 14768 2193 1627 0 3752 2107 99929
Dambuk-Paglam 15738 0 5635 1435 0 11220 867 536 0 10630 946 47007
Hunli-Desali 10012 0 2046 4096 0 51 0 0 0 2804 0 19009
Total 68026 8636 15525 22257 0 26039 3060 2163 0 17186 3053 165945
Projected Livestock Population of the District During 2020
Block
Small Animals Large Animals
Draft Animals
Total Poultry Ducks Pigs Goats Sheep
Indigenous Cows
Hybrid Cow
In descriptive
Buffalo
Hybrid Buffalo
Any other Milch or Meat
Animals
Roing-Koronu
44897 9171 8330 17763 0 15684 2329 1728 0 3985 2238 106125
Dambuk-Paglam
16714 0 5984 1524 0 11916 921 569 0 11289 1005 49921
Hunli-Desali
10633 0 2173 4350 0 54 0 0 0 2978 0 20188
Total 72244 9171 16488 23637 0 27653 3250 2297 0 18252 3242 176234
District Irrigation Plan (PMKSY) Lower Dibang Valley
25
1.4 Agro-Ecology, Climate, Hydrology and Topography
Lower Dibang Valley is one of the mountainous districts of Arunachal Pradesh with 3900 Sq. Km of land
forming 4.66% of total geographical area of the State. The district comes under humid and subtropical
climate with maximum and minimum temperature recorded as 380 C and 130 C in the month of June and
January respectively. The maximum and minimum humidity recorded at 98% and 56%. Maximum and
minimum rain fall recorded per day 136.40 mm and 1.74 mm. The average annual rainfall of the district
is 2576.92 mm.
1.4.1 Climate
North- East India falls within the sub-tropical monsoon rain forest belt which receives the heaviest rainfall
in the country. In Arunachal Pradesh the wide altitudinal difference along with physiography, contributes
great climatic variations in the state. It is hot and humid in the Brahmaputra plain, the Sub-Himalayan and
the Naga-Patkoi ranges, cooler in Lesser Himalaya and Alpine type in Higher and Tethyan Himalayan
zones. The state has variegated climate due to wide altitudinal range. The climate varies from sub-tropical
in the south temperate and alpine in the north with large areas experiencing snowfalls during winter. It
becomes progressively cold as one move northwards to higher altitudes. Along the foothills, bordering
the plains of Assam, the climate is humid and hot while along the international border towards China, the
state has high and lofty mountains. All along the border with China, many of the high mountains are
permanently snow-capped. Winter season sets in from October and continuous up to February, followed
by summer season from March to Mid-June. Summer season is hot and humid but is less pronounced
because of the early start of the pre-monsoon rains. The area receives rainfall under the 48 influence of
south-west monsoon which generally starts from the month of May to September/October.
The district Lower Dibang Valley has a sub-tropical climate. The district experiences very heavy rainfall
from March to August. The lower belt of the district experience hot climate in summer. The northern belt
of the district i.e. Desali and Hunli circle, enjoy very moderate climate during summer and extreme cold
during winter. The climate prevailing at the district experience subtropical & Subtropical cum Temperate
at different administrative locations. 53 % of the district falls under Thermic Humid (MidHills &
Valleys & 12 % under Per Humid Hyper thermic (Foothills) & 35 % under Alpine & High hills
agroclimatic subregions. It has summits & ridges, Steep side slope, moderately sloping side slope &
narrow inter-hill valleys. The Climate of Lower Dibang Valley District can be classified as under:
Sl. No
Agro-climatic Zone
Characteristics
1 Sub – tropical Plain Zone
The Climate is characterized by hot summer and moderately cool winter. The mean annual rainfall varies from 2590 – 3390 mm, it exceeds PET greater part of the year, and soil remains dry only for a month or so. Mean annual soil temperature is 220 C or higher.
2. Mid tropical Hill Zone
The climate is characterized by mild summer and moderate to severe winter. The mean annual rainfall ranges between 2000 to 5000 mm and it exceeds PET for most part of the year. The mean annual soil temperature varies from 18 to 220C.
Source: District Statistical Office, Lower Dibang Valley
District Irrigation Plan (PMKSY) Lower Dibang Valley
26
1.4.2 Hydrogeology
The water table of the foot hill belt is related to the topography and type of aquifer materials. The slope
of the ground surface is towards south and the aquifer materials gradually become finer towards south.
The depth to water level is in north in the piedmont zone and shallower in the south. Due to highly
bouldery nature of the piedmont zone streams and nallas disappear at the base of the hills and reaper
further in the south, marked by a spring line. This spring line separates the Younger and Older alluvial
sediments. The entire district is occupied by hill ranges with very steep slopes that are more than 20%.
Moreover, no details about the recharge potential in these hills are available. The annual Replenishable
ground water resource of the district is estimated as 950.40 MCM. Net ground water availability of the
district is 855.36 MCM while net ground water draft for all uses is 0.34 MCM. Projected demand for
domestic and industrial uses up to 2025 is 0.62 MCM. Ground water availability for future irrigation use
is 854.41 MCM. Stage of ground water development is thus negligible (0.03%) and the district can be
categorized as safe. Lower Dibang Valley district is under the Safe category. As per field investigation
reports of earlier research, the results of the analysis of the water samples collected from springs and
dug wells are as follows: -
Ranges of chemical constituents
Sl. No. Constituent Source – Dug wells Source – Springs
Range of parameters
1 pH
6.27-6.97 6.94-7.48
2 E.C. (micromhos/cm)
70-195 20-59
3 TDS
50-140 Oct-40
4 Total Hardness
25-115 20
5 Calcium
Jun-24 6
6 Magnesium
Feb-13 8
7 Sodium
01-Apr 01-May
8 Bicarbonate
24-55 18-24
9 Chloride
May-18 07-Nov
(All constituents expressed in mg/l, except pH and EC)
It is seen that quality of water both from springs and dug wells are fresh and suitable for all uses. In
general, the chemical quality of ground water in the district is fresh and potable and can safely be used
for domestic and industrial purposes.
District Irrigation Plan (PMKSY) Lower Dibang Valley
27
District Irrigation Plan (PMKSY) Lower Dibang Valley
28
1.4.3 Topography
Lower Dibang Valley District is a mountainous tract. On account of the existence of the hill ridges and
the valleys its topography assumes typical character. The hill ridges are situated haphazardly. As soon
as one ends the other ridge starts either parallel or in opposite direction. At these intervals the wide or
narrow valleys get the foothills constituting 20% to total geographical area of the district. The wide and
narrow valleys share 35% each to total geographical area. The rest about 10% is the snow clad peaks.
Due to typical topography the rivers are undulated. There are numerous streams and rivers and are
drained by principal rivers Dibang, Dri, Mathu, Ithun, Emra & Talon. These principal rivers of the district
are drained by the westerly flowing Brahmaputra. These rivers have rendered the human habitations into
geographical isolations. At the same time these rivers possess high hydropower potential. The northern
part of it falls within higher mountain zone consisting of tangle peak and valley. The foot hills range lies in
the southern part having plain with low altitudes. The area under Roing, Koronu, Dambuk and Paglam
Circles are plain land, whereas the area under Desali and Hunli circles are hilly terrain with rugged and
steep slopes.
1.4.4 Rainfall & Temperature
Precipitation is the most important element of climate which accelerates hydrological processes and also
generates water resource in an area. Its seasonal variations and distributional pattern are of vital concern
to assess the amount and quality of the available water for various users. The district with continuous
supply of water in the main river channels with a more than threefourth share of annual rain precipitation
during the summer (May to September). As a result, there are significant seasonal imbalances recorded
in the spatial distribution of rainfall. On account of complexity prevailing in the relief features and drainage
systems, the distributional pattern of annual rainfall is also complex. The low land areas receive annual
rainfall exceeding 4186.32 mm on an average. Even the close valley in the lower parts of Lower Dibang
Valley receive more than 3383.2 mm of average annual rainfall.
Thus, annual rainfall in the district varies from 3500 mm to 5000 mm. However, the normal average annual
rainfall in the district is 2576.92 mm. Most of the rainfall is received during the monsoon period (June to
September). Heavy rainfall is received during summer and occasional rainfall during winter and pre-
monsoon period. The rainfall received during summer is under the spell of South-West monsoon. The
onset of South-West monsoon occurs by the end of May or the first week of June and withdraws by late
September or early October. Thus, Lower Dibang Valley falls within the range of heavy rainfall as
compared to the average of the country. Usually the rain sets in from the month of March and lasts upto
September. The month of December usually escapes rainfall. During January the rainfall is experienced.
In the month of February there is comparatively more rainfall as compared to January. The months of
June and July experience the highest rainfall. In this regard may be noted that 90% of total rainfall is
experienced during the monsoon i.e. from May to September. The rest 10% rainfall is spread over from
December to April.
The climate of the district is mainly influenced by orography. It is sub-tropical, wet and highly humid in the
foothills and cold in higher elevations. The district comes under humid and subtropical climate with
District Irrigation Plan (PMKSY) Lower Dibang Valley
29
maximum and minimum temperature recorded as 380 C and 130 C in the month of June and January
respectively. The temperature falls below freezing point during extremely cold period.
District Irrigation Plan (PMKSY) Lower Dibang Valley
30
Table.1.4: Agro Ecology, Climate, Hydrology and Topography of the District Lower Dibang Valley
Sr. No.
Name of
District
Agro Ecological Zone Type
Type of Terrain
Block Area (Ha) Normal Annual Rainfall
(mm)
Average Monthly Rainfall
(mm)
No of Rainy Days (No)
Average Weekly Temperature (°C)
Period
Summer (April-May)
Winter (Oct-Mar)
Rainy (June-Sept)
Min. Max. Mean Min. Max. Mean Min. Max. Mean
1 Lower Dibang Valley
Eastern Himalayan Region, Warm to Hot Per humid Eco-Sub Region Zone-II
Mid Hills, Predominant Mountainous
Terrain
Roing-Koronu 106,800
2576.92 214.74 133 23 38 30.50 13 21.00 17.00 21.00 38.00 29.50 Dambuk-Paglam 113,800
Hunli-Desali 169,400
Total Area 390,000
Source: District Agriculture Office
District Irrigation Plan (PMKSY) Lower Dibang Valley
31
1.5 Soil Profile
The district has soil strongly to moderately acidic in nature (PH 4 to 7) which are loamy sandsandy loam,
rich in organic matter content (0.15 to 3.83% OC) which declines sharply with depth. The soils of Summit
to ridges are mostly shallow to deep, loamy skeletal to sandysketal excessively drained & subject to
severe erosion hazards. Soil shows lack of profile development (A/C horizons). On moderately steep side
slopes of hills, moderately shallow to deep, well to somewhat excessively drained, loamy skeletal/clayey,
fine loamy to fine particle classes with very severe to moderate erosion hazards. On moderate slopes are
deep, well drained, fine/ fine loamy, clayey/loamy skeletal in particle size classes & moderately eroded.
Soil are well developed. Due to excessive precipitation & low temperature, steep hill slopes & tectonically
disturbed in conjunction with human interference on vegetative cover for long, these soil suffer from soil
erosion & landslides, limiting soil depth in steep hill slopes, soil acidity & low CEC & poor base status of
the soil. These acidic soils are rich in organic matter with high rainfall & cold climate favour the plantation
of different temperate & sub tropical fruits like pears, Peach, Plum, Apple, Tea & Pineapple cultivation at
foothill in addition to vegetables.
Soil Type
The nature and properties of soil vary according to topography and elevation of the area. The soils of the
foothills are generally loamy or sandy loam mixed with pebbles and gravels. In the valleys, it is clayey in
nature and rich in organic matter. Soils of the hills and mountains contain high humus and nitrogen. The
nature of the soil is mainly acidic. In major part of the district, the soil is sandy but sometimes clayey in
nature. The soils in the district can broadly divided into-
a) Plain alluvial Soil; and
b) Hilly Soil.
The plain alluvial soil may be further divided into: -
(i) Older Alluvium type
It is the soil of higher level terrace of foothill areas, which consist mainly of coarse sand and organic matter
(ii) Silt type
The silt type soil contains high silt content. It composes the flood plains characterized by shallow surface
layer of silt with sub-soil of coarse sand, sometimes mixed with pebbles and boulders. The soil of the
valleys is favourable for cultivation of Kharif and Rabi crops. The soils of the hills are suitable for shifting
cultivation and dry paddy, maize, etc.
Thus, the different types of soil of the district and the percentage of land covered by these type of soils
are diagrammatically represented below:
District Irrigation Plan (PMKSY) Lower Dibang Valley
32
Figure 1.5. 1: Land Area in Hectare Covered by Different Type of Soil
Figure 1.5.2: Percentage Distribution of Different Type of Soil
0
50,000
1,00,000
1,50,000
2,00,000
2,50,000
3,00,000
Sandy Loam Silty Loam Clayey Soil Sandy Soil
2,80,800
31,200
77532
468
Land Area in Hectare Covered by Different Type of Soil in the District
72.00%
8.00%
19.88%
0.12%
Percentage Distribution of Different Type of Soil of the District
Sandy Loam
Silty Loam
Clayey Soil
Sandy Soil
District Irrigation Plan (PMKSY) Lower Dibang Valley
33
Table.1.5: Soil Profile of the District Lower Dibang Valley
Name of Taluka Soil Type Land Slope
Major Soil Classes Area (ha)
Percentage Share
1. Roing- Koronu 2.Dambuk-Paglam 3. Hunli-Desali
Sandy Loam 280,800 72.00% 0-3% (Ha) 3-8% (ha) 8-25% (ha)
>25% (ha)
Silty Loam 31,200 8.00% NA NA NA NA
Clayey Soil 77532 19.88% NA NA NA NA
Sandy Soil 468 0.12% NA NA NA NA
Total 390,000
Source: Agriculture Contingency plan of district, 2014-15
Note: Land slope measurement hasn’t been done by the department. So the slope values are not available
District Irrigation Plan (PMKSY) Lower Dibang Valley
34
1.6 Soil Erosion and runoff status
Sl. No Soil Category Soil Erosion and Runoff Status Area in Hectare
1 Soils of undulating upland Moderately shallow to deep, well drained, loamy or coarse loamy in texture with moderate to severe erosion hazards. The soils are strongly to moderately acidic in nature (pH 4.5 to 7.2), rich in organic matter (0.8 to 5.2% organic carbon) which decline sharply with depth. CEC is low to medium 93.5 to 23.3 CmolP+kg-1). Base saturation is very low to medium. Appreciable amount of Al3+ is observed.
4715
2 Soils of gentle slopes Deep, well to imperfectly drained, fine/ fine loamy/ coarse loamy or coarse silty with moderate erosion and slight to moderate flood hazard. Soils are moderately to slightly acidic (pH 4.6-5.8) and moderate to high in organic matter content (1.3-3.7% organic carbon).
11779
3 Soils of level to nearly level flood plain
Deep, well to moderately well drained, coarse loamy to coarse silty with moderate flood hazard. Soils on channel bars are moderately shallow, excessively drained and sandy in texture. Soils are slightly acidic to alkaline in nature (pH 5.5-8.4), high in base saturation.
7073
1.7 Land Use Pattern
The land-based enterprises support a large segment of population in the district. The land based
enterprises particularly the cultivation of field crops as well as horticulture crops is considered a critical
determinant of the pace of overall economic development. The efficient use of land resource, therefore,
assumes singular significance with respect to planning of economic activities.
The district is sparsely populated with 4 persons per Sq.km. Plenty of land is available to the tribesman
as natural gift although there is no land record, the land ownership can be classified under three broad
heads: (1) community ownership (2) clan/Individual ownership and (3) Govt. Ownership.
District Irrigation Plan (PMKSY) Lower Dibang Valley
35
The total geographical area of Lower Dibang Valley District is 390000 hectares. The Gross Cropped Area
of the district is 35805 hectares. Out of total Gross Cropped Area of the district, Roing-Koronu Block
shares 20337 hectares i.e., 57.80% of the total Gross Cropped Area of the District and rank 1st in the
district followed by Dambuk-Paglam Block, which contributes 14562 hectares i.e., 40.67% of the total
Gross Cropped Area of the district. Hunli-Desali Block contributes only 2.53% of the Total Gross Cropped
Area of the district.
Further, the district has total Net Shown Area of 34355 Hectares, out of which Roing-Koronu Block covers
19618 Hectares, while Dambuk-Paglam Block covers 13962 Hectares of land and Hunli-Desali Block
covers 775 Hectares of land.
Average cropping intensity of the district is 108%. However, the Hunli-Desali Block has maximum cropping
intensity of 116.90%, followed by Dambuk-Paglam and Roing Koronu Blocks with 104.30% and 103.67%
respectively.
The Block-wise cropping intensity and land use pattern of the district are represented graphically as under:
1.7.1 Block-wise Land Use Pattern of the District
020,00040,00060,00080,000
1,00,0001,20,0001,40,0001,60,0001,80,000
Tota
l Geo
grap
hic
alA
rea
(In
Ha)
Gro
ss C
rop
pe
dA
rea(
In H
a)
Ne
t Sh
ow
n A
rea
(In
Ha)
Are
a Sh
ow
n M
ore
Than
On
ce (
In H
a)
Are
a u
nd
er F
ore
st/
Un
clas
sifi
ed
Fore
st/C
om
mu
nit
yLa
nd
Are
a u
nd
erH
ort
icu
ltu
re a
nd
Pla
nta
tio
n (
In H
a)
Are
a u
nd
erW
aste
lan
d/
Cu
ltiv
able
Wasteland/Curre…
1,06,800
20,337 19,618
719
60,3761878
13276
113800
1456213962
600
78105
112811,438
169400
906 775 131
154515
278 9610
Block-wise Land Use Pattern of the District
Roing-Koronu Dambuk-Paglam Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
36
1.7.2: Block-wise Cropping Intensity of the District
103.67%
104.30%
116.90%
Block-wise Cropping Intensity of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
37
Table 1.7: land use Pattern in Lower Dibang Valley District
Name of the Block/Taluka
Nos. of the Gram
Panchayat
Nos. of the
Villages Covered
Total Geographical Area (In Ha)
Area Under Agriculture Area under Forest/
Unclassified Forest/Community
Land
Area under Horticulture
and Plantation
(In Ha)
Area under Wasteland/ Cultivable
Wasteland/Current Fallow/other
Fallow/Barren and uncultivable Land
Area under other
Uses/other Non-
agricultural uses
Total Geographical Area (In Ha)
Gross Cropped Area (In
Ha)
Net Shown Area
(In Ha)
Area Shown More Than Once
(In Ha)
Cropping Intensity
(%)
Roing-Koronu 34 166 106,800 20,337 19,618 719 103.67% 60,376 1878 13276
23591
Dambuk-Paglam 18 42 113800 14562 13962 600 104.30% 78105 1128 11,438
Hunli-Desali 8 56 169400 906 775 131 116.90% 154515 278 9610
Total 60 264 390000 35805 34355 1450 108% 292996 3284 34324 23591
District Irrigation Plan (PMKSY) Lower Dibang Valley
38
As per National Forest Policy, 66% of the area in the hilly regions of the State and 33% in plains is to be
brought under forest cover. However, keeping in view that about 20% of the area is inaccessible and
beyond the tree limit, the State Government aims to bring 50% of the geographical area under forest
cover. Under Lower Dibang Valley District forest area is more that 75%.
District Irrigation Plan (PMKSY) Lower Dibang Valley
39
Chapter- II
District Water Profile
Irrigation is the artificial application of water to the land or soil. It is used to assist in the growing of
agricultural crops, maintenance of landscapes, and vegetation of disturbed soils in dry areas and during
periods of inadequate rainfall. There is a great necessity of irrigation in Indian agriculture. India has a
great diversity and variety of climate and weather conditions. These conditions range from extreme of
heat to extreme of cold and from extreme dryness to excessive rainfall. Due to some reasons irrigation is
needed in Indian agriculture such as uncertainty of monsoon rainfall, irregularity in distribution of rainfall
throughout the year, excessive rainfall causing flood, draught is an annual event in some areas, minimum
rainfall in winter period, dry soil, introduction of H.Y.V seeds and multiple cropping.
Lower Dibang Valley district economy being largely agrarian, irrigation is to play a vital input, increased
agricultural output to keep pace with food requirement and population. Owing to frequent occurrence of
natural calamities – heavy rainfall, landslides, flood etc. emphasis is to be given to creation of extensive
irrigation facilities so that dependence on nature and uncertainty in agricultural production would be
minimized. Expansion of irrigation facilities and control of flood menace, utilization of ground water
potential tapping thereof at higher scale and common area development works would bridge the gap
between supply and demand of water.
Large irrigation in a compact area for the district is not possible owing to undulating topography. However,
medium and minor irrigation projects at foot hill belts can be created. There is acute need of resource
support of Centre for reconstruction and rejuvenation of irrigation structures along with taping of ground
water potential of the district through PMKSY.
2.1 Area Wise, Crop-Wise Irrigation Status
Irrigation and drinking water supply facility constitutes the basic needs of the rural agricultural economy
of Lower Dibang Valley district. Despite heavy precipitation, the soils of district remain dried to a larger
extent because of its undulating topography, stiff slopes, shallow depth and coarse texture. The Block-
wise irrigation status of the district various agriculture and horticulture crops is represented graphically as
under: -
02000400060008000
1000012000
Irrigated Rain-fed Irrigated Rain-fed Irrigated Rain-fed
Kharif (Area in Ha.) Rabi (Area in Ha) Summer (Area in Ha)
1475
11836
375
4759
951797
625
9227
465
2555
80
1610
145
517
37
139
22
46
Block-wise Irrigation Status of Various Agricultural Crops
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
40
Figure.2.1.1: Block-wise Irrigation Status of Various Agricultural Crops
Figure. 2.1.2 District Irrigation Status of Cropped Area
As indicated in Fig. 2.1.2, the total irrigated area in the district under agricultural crops is 3319 Hectare
and the rain-fed area is 32486 Hectare. Maximum irrigated area of agricultural crops is covered by Roing-
Koronu Block, i.e., 1945 Hectare, out of which 1475 Hectare shared by Kharif crops, 375 Hectare by Rabi
crops and 95 Hectare is shared by Summer crops. Similarly, the block has covered maximum of rain-fed
areas of agricultural crops, i.e., 18392 Hectare, out of which a total of 11832 Hectare covered by Kharif
crops, 4759 Hectare by Rabi crops and 1797 Hectare by Summer crops. Total irrigated area of agricultural
crops covered by Dambuk-Paglam Block is 1170 Hectare, out of which 625 Hectare shared by Kharif
crops, 465 Hectare by Rabi crops and 80 Hectare is shared by summer crops. Similarly, the block has
covered total rain-fed area of agricultural crops is 13392 Hectare, out of which a total of 9227 Hectare
covered by Kharif crops, 2555 Hectare by Rabi crops and 1610 Hectare by Summer crops. The Hunli-
Desali Block has covered least irrigated and rain-fed areas under agricultural crops, i.e., 204 Hectare
irrigated and 702 Hectare Rain-fed area in the block.
The Block-wise percentage distribution of Kharif, Rabi and summer cropped area of the district is
graphically represented below:-
0
5000
10000
15000
20000
25000
30000
35000
Irrigated Area Rain-fed Area
3319
32486
Total Irrigated and Rain-fed Area of the District (In Hectare)
District Irrigation Plan (PMKSY) Lower Dibang Valley
41
Figure.2.1.3: Season-wise Crop Area Distribution of Each Block of the District
The major proportion of land in the district is used for cultivation of cereals. Considering all the blocks,
cereals occupy more than 41% of the gross cropped area under agriculture.
As regards horticulture crops, the district has covered a total of 1983.9 Hectare of land under horticulture.
All the Horticulture cropped area of the district is rain-fed. No irrigated area is under horticulture crops in
the district. Roing-Koronu Block has maximum of 1278 Hectare Horticulture cropped area followed by
Dambuk-Paglam and Hunli-Desali Block with 628 Hectare and 77.9 Hectare respectively. The Block-wise
horticulture crop area distribution of the district is represented graphically as follows:
Figure 2.1. 4: Block wise Area Under Rain-fed for Horticultural Crops
0.00%
20.00%
40.00%
60.00%
80.00%
Kharif Rabi Summar
55.87%61.63%
51.84%41.35% 36.25%46.30%
2.78% 2.11%1.86%
Season-wise Crop Area Distribution of Each Block
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
0
200
400
600
800
1000
1200
1400
Roing-Koronu Dambuk-Paglam Hunli-Desali
1278
628
77.9
Block-wise Horticulture Crop Area in the District (In Hectare)
District Irrigation Plan (PMKSY) Lower Dibang Valley
42
Table. 2.1. Area-wise, Crop-wise Irrigation status of Lower Dibang Valley District
Agriculture Crops
Block Crop Type Kharif (Area in Ha.) Rabi (Area in Ha) Summer (Area in Ha) Total (Area in Ha)
Irrigated Rain-fed
Total Irrigated Rain-fed
Total Irrigated Rain-fed
Total Irrigated Rain-fed
Total
Dambuk-Paglam
Cereals 540 4710 5250 0 0 0 80 1380 1460 620 6090 6710
Coarse Cereals 75 3174 3249 200 115 315 0 0 0 275 3289 3564
Pulses 0 0 0 0 330 330 0 0 0 0 330 330
Oil Seeds 0 0 0 0 2090 2090 0 0 0 0 2090 2090
Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Any other crops 10 1343 1353 265 20 285 0 230 230 275 1593 1868
TOTAL 625 9227 9852 465 2555 3020 80 1610 1690 1170 13392 14562
Roing-Koronu
Cereals 1215 5000 6215 0 0 0 95 1522 1617 1310 6522 7832
Coarse Cereals 250 4976 5226 50 550 600 0 0 0 300 5526 5826
Pulses 0 0 0 0 700 700 0 0 0 0 700 700
Oil Seeds 0 0 0 0 3305 3305 0 0 0 0 3305 3305
Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Any other crops 10 1860 1870 325 204 529 0 275 275 335 2339 2674
TOTAL 1475 11836 13311 375 4759 5134 95 1797 1892 1945 18392 20337
Hunli-Desali
Cereals 25 0 25 0 0 0 9 34 43 34 34 68
Coarse Cereals 120 470 590 20 85 105 0 0 0 140 555 695
Pulses 0 0 0 0 40 40 0 0 0 0 40 40
Oil Seeds 0 0 0 0 5 5 0 0 0 0 5 5
Fibre 0 0 0 0 0 0 0 0 0 0 0 0
Any other crops 0 47 47 17 9 26 13 12 25 30 68 98
TOTAL 145 517 662 37 139 176 22 46 68 204 702 906
DISTRICT TOTAL 2245 21580 23825 877 7453 8330 197 3453 3650 3319 32486 35805
Source: Department of Agriculture, Lower Dibang Valley District
District Irrigation Plan (PMKSY) Lower Dibang Valley
43
Horticulture Crops
Sr. No Type of Crops Blocks
Total Area (Ha) Roing-Koronu Dambuk-Paglam Hunli-Desali
Rain-fed Area (Ha)
Fruits
1 M Orange 1157 593 0 1750
2 Litchi 6 0 0 6
3 Pineapple 58 22 0 80
4 Areca nut 23 4 0 27
5 Banana 26 9 0 35
6 Kiwi 0 0 5.3 5.3
Total 1270 628 5.3 1903.3
1 Large Cardamom 8 0 72.6 80.6
Total 8 0 72.6 80.6
Grand Total 1278 628 77.9 1983.9
Source: Dept. of Horticulture, Lower Dibang Valley District
District Irrigation Plan (PMKSY) Lower Dibang Valley
44
2.2 Production and Productivity of Major Crops
Paddy, Maize, millets, Ginger, Turmeric and wheat are the major cereals crops in Lower Dibang Valley
district. The other food crops which are grown in the district are vegetables, Rapeseed & Mustard, Chili
and Pulses. Among the horticulture crops, the most significant ones are Kiwi, banana, apple, litchi,
pineapple and areca nut and other medicinal and aromatic crops like Ginger, Lager cardamom and
turmeric.
Block
Rain-fed Irrigated Total
Area (ha)
Production (Qtls/Yr)
Productivity or Yield (kg/ha)
Area (ha)
Production (Qtls/Yr)
Productivity or Yield (Kg/ha)
Area (ha)
Production (Qtls/Yr)
Productivity or
Yield (kg/ha)
Roing Koronu
18144 380290 2095.95 2193 46869 2137.21 20337 427159 2100.40
Dambuk Paglam
13607 283049 2080.17 955 21821 2284.92 14562 304870 2093.60
Hunli- Desali 735 16741 2277.69 171 3070 1795.32 906 19811 2186.64
District Total 32486 680080 6454 3319 71760 6217 35805 751840 6381
Block-wise Area production and Productivity of various Crops in the District
Source: - District Agriculture Department
The total area covered under agriculture and horticulture crop production in the district is 35805 hectare.
Roing-Koronu Block has the highest area under irrigated cropping with 55.85% of the total irrigated area
of 32486 Hectare followed by Dambuk- Paglam Block with 41.89%. Further, Roing-Koronu Block also
ranks 1st in rain-fed area as it has highest area under rain-fed cropping with 66.07% of total Rain-fed area
of 3319 Hectare followed by Dambuk-Paglam Block with 28.77%. Hunli-Desali Block contributes only
2.26% and 5.15% of total irrigated and Rain-fed area of the district.
For rain-fed area production Roing-Koronu Block contributes highest with 56% of the total production of
680080 Qtls/year, while, Dambuk-Paglam and Hunli-Desali Block contributes 42% and 2% respectively
irrespective to the area covered under rain-fed condition. As regards irrigated area production, Roing-
Koronu block contributes highest with 65% of total production of the district, i.e., 71760 Qtls/year, while
Dambuk-Paglam and Hunli-Desali Block contributes only 30% and 4% respectively.
The highest yield in the district is of Hunli-Desali Block with 2186.64 kg/ha followed by Roing-Koronu
Block with 2100.40 kg/ha. The Dambuk-Paglam Block is having lowest productivity in the district with
2093.60 kg/ha.
Figure 2.2. 1: Area Production and Productivity of Crops
0200000400000600000
Area(ha) Production (Qtn/Yr)Productivity or Yield(kg/ha)
Total
20337
427159
2100.40
14562 3048702093.60906 19811
2186.64
Block-wise Area Production and Productivity of Cropsof Lower Dibang Valley District
Roing Koronu
Dambuk Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
45
Table.2.2. Block-wise Production and Productivity of major Crops
Block Season
Rain-fed Irrigated Total
Crops Shown
Area (ha)
Production (Qtls/Yr.)
Productivity or Yield (kg/ha)
Area (ha) Production (Qtls/Yr.)
Productivity or Yield (Kg/ha)
Area(ha) Production (Qtls/Yr.)
Productivity or Yield (kg/ha)
Roing-Koronu
Kharif
Paddy 6215 111870 1800 0 0 0 6215 111870 1800
Millet 726 5810 800 0 0 0 726 5810 800
Ginger 1710 140220 8200 0 0 0 1710 140220 8200
Maize 4500 63000 1400 0 0 0 4500 63000 1400
Sugarcane 70 5250 7500 0 0 0 70 5250 7500
Others 5 45 900 0 0 0 5 45 900
Turmeric 85 6800 8000 0 0 0 85 6800 8000
Rabi
Wheat 0 0 0 190 304 160 190 304 160
Maize 0 0 0 410 5330 1300 410 5330 1300
Rapeseed & Mustard
3156 29745 942 0 0 0 3156 29745 942
Pulses 0 0 0 700 8060 1151 700 8060 1151
Others 0 0 0 259 6415 2477 259 6415 2477
Potato 0 0 0 270 21600 8000 270 21600 8000
Summer
Paddy 1617 16170 1000 1617 16170 1000
Chili 60 1380 2300 0 0 0 60 1380 2300
Others 0 0 0 364 5160 1418 364 5160 1418
Roing-Koronu Block Total 18144 380290 2095.95 2193 46869 2137.21 20337 427159 2100.40
Dambuk-Paglam
Kharif
Paddy 5250 94500 1800 0 0 0 5250 94500 1800
Millet 714 5710 800 0 0 0 714 5710 800
Ginger 1295 106190 8200 0 0 0 1295 106190 8200
Maize 2535 35490 1400 0 0 0 2535 35490 1400
Sugarcane 30 2250 7500 0 0 0 30 2250 7500
Others 3 27 900 0 0 0 3 27 900
Turmeric 0 0 0 25 2000 8000 25 2000 8000
Rabi Wheat 0 0 0 45 720 1600 45 720 1600
Maize 0 0 0 270 3510 1300 270 3510 1300
District Irrigation Plan (PMKSY) Lower Dibang Valley
46
Rapeseed & Mustard
2090 18810 900 0 0 0 2090 18810 900
Pulses 0 0 0 330 3800 1152 330 3800 1152
Others 0 0 0 199 4911 2468 199 4911 2468
Potato 0 0 0 86 6880 8000 86 6880 8000
Summer
Paddy 1460 14600 1000 0 0 0 1460 14600 1000
Chili 48 1104 2300 0 0 0 48 1104 2300
Vegetables & Others
182 4368 2400 0 0 0 182 4368 2400
Total Dambuk-Paglam Block 13607 283049 2080 955 21821 2285 14562 304870 2094
Hunli-Desali Block
Kharif
Paddy 25 450 1800 0 0 0 25 450 1800
Millet 95 760 800 0 0 0 95 760 800
Ginger 35 2870 8200 0 0 0 35 2870 8200
Maize 495 6930 1400 0 0 0 495 6930 1400
Sugarcane 5 380 7600 0 0 0 5 380 7600
Others 2 18 900 0 0 0 2 18 900
Turmeric 5 400 8000 0 0 0 5 400 8000
Rabi
Wheat 65 1040 1600 65 1040 1600
Maize 40 520 1300 40 520 1300
Rapeseed & Mustard
5 45 900 0 0 0 5 45 900
Pulses 40 460 1150 40 460 1150
Potato 9 720 8000 9 720 8000
Summer
Paddy 43 4300 10000 0 43 4300 10000
Chili 12 276 2300 0 12 276 2300
Vegetables & Others
13 312 2400 17 330 1941 30 642 4341
Total Hunli-Desali Block 735 16741 2277.69 171 3070 1795.32 906 19811 2186.64
Source: - District Agriculture Office
District Irrigation Plan (PMKSY) Lower Dibang Valley
47
2.3 Irrigation Base Classification
Lower Dibang Valley District the rain-fed crop covers 90% of the total cropped area and remaining cropped
area is irrigated. The Block-wise details of irrigation based classification of the district is given below:-
Table 2.3: Irrigation Base Classification of the District
Name of Blocks Irrigated (Area in ha) Rain-fed (Area in ha)
Gross irrigated Area
Net Irrigated Area
Partially irrigated/ protective irrigation
Un- irrigated or Totally Rain-fed
Roing-Koronu 1945 1,570 375 18,392
Dambuk-Paglam 1170 905 265 13,392
Hunli-Desali 204 167 37 702
Total 3319 2642 677 32,486
From the table above, it is observed that a total of 3319 Hectare land of the district as irrigated area and
32486 Hectare area is unirrigated. Net irrigated area of the district is 2642 Hectare and partially irrigated
area is 677 Hectare. Roing-Koronu Block of the district has maximum irrigated and unirrigated area of
1945 Hectare and 18392 Hectare respectively. Further, Dambuk-Paglam Block of the district has 1170
Hectare area as irrigated and 13392 Hectare as unirrigated land. Only Hunli-Desali Block has minimum
of 204 Hectare area as irrigated and 702 Hectare as unirrigated land. Thus, there is ample potential to
increase the irrigated command area of the district from the gross total area of the district.
District Irrigation Plan (PMKSY) Lower Dibang Valley
48
Chapter-III
District Water Availability
The district is a predominantly mountainous terrain, with vast plains of Assam on the south. The river
system of the district is a part of the Brahmaputra river basin. The main river system of the district is the
Dibang River. The confluence of Matum River in the west, Dri River on east, both originating in the Tibetan
Plateau takes the name of Dibang River. There are numerous southerly flowing small rivers and streams
tributaries to the Dibang River, except the Iphi Pani River which flows from west to east at the base of hill
north of Roing. Another small river, the Difu River flows from north to south in the eastern part of the
district. The overall drainage pattern of the district is dendritic to sub-parallel. On the northern mountainous
part, it is mostly of dendritic nature. In the valleys of the foothill area, it is sub-parallel flowing from north
to south. The streams and nallas are of losing nature in the piedmont zone and reappearance of these
are observed towards southern part of the district. Agriculture is the mainstay of the people of Lower
Dibang Valley. The agriculture of the district mainly depends on monsoon rainfall. However, the
Government of Arunachal Pradesh is actively engaged in developing permanent cultivation in the low
lying areas along the valleys patches of hill slopes and intermountain valleys. The main field of cultivation
of paddy lies on the foothills from Roing to Shanitpur in the southern part. It is observed that agriculture
is basically monocropped and the farmers depend upon rainfall. However, minor and medium irrigation
projects have been implemented in the district in certain areas. Irrigation potential has been created in
the available land of foothills and valleys. Nos. of minor irrigation projects have been implemented in the
district. Thus, the district has available surface water in the nature of rain water, rivers, nallas and springs.
Surface water is water on the surface of the planet such as in a stream, river, lake, wetland, or pond/tank.
It can be contrasted with groundwater and atmospheric water. Nonsaline surface water is replenished by
precipitation and by recruitment from ground-water. It is lost through evaporation, seepage into the ground
where it becomes ground-water, used by plants for transpiration, extracted by mankind for agriculture,
living, industry etc. or discharged to the sea where it becomes saline.
To derive Surface Water volume basically, we measure volumes and surface areas of a set of farm ponds
and tanks, then develop a relationship between surface areas and volumes. After that using these
relationships calculated volumes of the whole study region surface water bodies based on our remote-
sensing surface area.
3.1 Status of Water Availability
The entire district is occupied by hill ranges with very steep slopes that are more than 20%. Moreover, no
details about the recharge potential in these hills are available. As per GEC, 97 these hilly areas are not
taken into account for resource computation. Due to lack of data especially on population, number of
ground water structures, Draft and other important parameters on watershed basis, the smallest
administrative unit, i.e. the R.D. Block has been taken as the unit of computation. Water level trend is also
District Irrigation Plan (PMKSY) Lower Dibang Valley
49
not available due to lack of ground water abstraction structures, hence, the annual ground water recharges
of all the assessment unit have been computed by the Rainfall Infiltration Factor method.
The annual Replenishable ground water resource of the district is estimated as 950.40 MCM. Net ground
water availability of the district is 855.36 MCM while net ground water draft for all uses is 0.34mcm.
Projected demand for domestic and industrial uses up to 2025 is 0.62 MCM. Ground water availability for
future irrigation use is 854.41 MCM. Stage of ground water development is thus negligible (0.03%) and
the district can be categorized as safe. Lower Dibang Valley district is under the Safe category. The water
requirement for drinking and domestic purposes in the district is mainly met with from the surface water
sources like streams and nallas. Most of the population is being benefited from water supply schemes. In
the Plain area, in Roing sub-division dug wells, hand pumps are available, and lift water supply schemes
are also prevalent.
Major part of the district is covered by hills of consolidated rocks. In the absence of any ground water
structure at present in the mountainous areas, springs constitutes an important source of water supply.
However, mostly the springs are choked due to dirt, or are covered with vegetation. It is worthwhile to
develop these springs. The foothill zone is suitable for the development of ground water through structures
like dug wells, hand pumps and shallow tube wells, etc.
Table.3.1: Status of Water Availability in Lower Dibang Valley
MCM/Hectare
Sources Kharif Rabi Summer Total
Surface Irrigation
Canal (Major & Medium Irrigation)
0 0 0 0
Minor Irrigation Tanks 1.17 7.73 12.69 21.59
Lift Irrigation/ Diversion 4.15 0.33 0.00 4.48
Various Water Bodies including Rain Water harvesting
10.020 15.613 0.000 25.633
Treated Effluent Received from STP
0 0 0 0
Untreated Effluent 0 0 0 0
perennial Sources of Water 0 0 0 0
Surface Irrigation Total 15.34 23.68 12.69 51.70
Ground Water
Open well 4.00 2.00 1.00 7.00
Deep Tube Well 5.00 2.00 2.00 9.00
Medium Tube Well 0.00 0.00 1.00 1.00
Shallow Tube Well 3.00 2.00 2.00 7.00
Ground Water Total 24.00
Total Water Availability in Lower Dibang Valley district 75.70 Source: - CWC, CGWB, District Irrigation and Agriculture office records (MCM per Ha).
District Irrigation Plan (PMKSY) Lower Dibang Valley
50
3.2 Status of Ground Water Availability
Structures like Open Well, tube well, etc. though available but only in minimum extent in the district. Only
ground water in the form of spring is developed throughout the district. Therefore, status of ground water
development may be considered as immature Stage.
As per Central ground water resource board, major part of the district is covered by hills of consolidated
rocks. In the absence of any ground water structure at present in the mountainous areas, springs
constitutes an important source of water supply. However, mostly the springs are choked due to dirt, or
are covered with vegetation. It is worthwhile to develop these springs. The foothill zone is suitable for the
development of ground water through structures like dug wells, hand pumps and shallow tube wells the
piedmont zone is suitable for dug wells, generally 15m deep. The younger alluvium is suitable for all the
shallow ground water structures. Dug wells down with depth of 10 to 20m having diameter 2 to 3 m are
expected to yield 12 to 15 m3/day. Shallow tube wells with depth of 25 m are likely to yield 30 to 35m3/hr.
towards the southern part of the district, bordering Assam, the depth of alluvium increases and deep tube
wells down to 150m may be constructed in this area. Expected yield is 40 to 60 m3/hr.
Table.3.2: Status of Ground Water Availability
S. No Taluka/ Block
Status of block as per central ground water board notification
Ground water (MCM)
Critical Semi-
Critical Safe Draft
Recharge (Annual
Replenishable Ground Water)
Gap
1 Roing- Koronu
Safe 0.34 MCM 950.40 MCM Not
Available 2 Dambuk-Paglam
3 Hunli- Desali
Source: - Central Ground Water Resource Board
District ground water resource are fall under safe zone.
3.3 Status of Command Area
As per records of the Water Resources Department of the district, the village-wise status of canal
command is not available. However, only the status of other service command area in the form of minor
irrigation like open well, tube well and Shallow Tube Well is available with the dept. The Block-wise details
of command area of the district is given below and the village wise command area is given in Annexure
at the end of this report.
District Irrigation Plan (PMKSY) Lower Dibang Valley
51
Figure: 3.3.1- Block-wise Status of other Service Command Area of the District
Table 3.3: Status of Command area
Block Name Number of
Village Covered
Information of Canal Command Information on the other Services Command Area(MIP)
Total Area
Total Area
Developed Area
Undeveloped Area
Total Area
Developed Area
Undeveloped Area
Developed Area
Undeveloped Area
Roing-Koronu 168 0 0 0
27076 3202 23874 3202 23874
Dambuk-Paglam 42 0 0 0 9820 862 8958 862 8958
Hunli-Desali 56 5137 274 4863 274 4863 District Total 266 0 0 0 42033 4338 37695 4338 37695
Source: - District Agriculture Department and CGWB
The percentage distribution of Block-wise other service command Area of the district is represented below:
0
5000
10000
15000
20000
25000
30000
Total Area Developed Area Undeveloped Area
Information on the other Services Command Area(MIP)
27076
3202
23874
9820
862
8958
5137
274
4863
Status off Command Area
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
52
Figure: 3.3.2 Percentage Distribution of Block-wise Other Service
Command Area of the District
From Figure: 3.3.2, it is observed that Roing-Koronu Block of the district has occupied the maximum other
service command area with 64% of total command area of the district, while Dambuk-Paglam and Hunli-
Desali Block occupied with 23% and 12% respectively.
3.4 Existing Type of Irrigation
District economy being largely agrarian, irrigation is to play vital input, increased agricultural output to
keep pace with food requirement and population. The major source of surface irrigation of the district are
Rivers, rain water and Streams & nallas to irrigate 35805 Hectare area of land
Large irrigation in a compact area for the district is not possible owing to undulating topography. However
medium irrigation projects at foot hill belts are to be taken up. There is acute need of resource support for
reconstruction and rejuvenation of irrigation structures along with taping of ground water through
PMKSY.The Existing Type of Irrigation in the district is summarized in Table: 3.4.
Roing-Koronu, 64%
Dambuk-Paglam,23%
Hunli-Desali, 12%
Information on the other Services Command (MIP)
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
53
Table 3.4 Existing Type of Irrigation
Name of the Block
Source of
Irrigation
Surface Irrigation (1) Ground Water (2) Other Source
s Includin
g Traditio
nal WHS (3)
Treated
effluent discharged from
STP
Water extraction devices / Lift
Total
Canal Based
Tanks / Ponds / Reservoirs Tube wells
Open wells Bore well
Electricity pump (4)
Diesel pump (5)
Others (6)
Irrigation sources (1+2+3)
Water
extracting units (4+5+
6)
Govt. Canal
Community /
Pvt. Canal
Community
Ponds Includ
ing Small
Individual / Pvt.
Ponds
Govt. Ponds
Check Dam
Govt. Reservoir
/ Dam
s
Govt.
Pvt.
Community / Govt.
Pvt.
Govt.
Pvt.
Roing-Koronu
No. 0 0 0 0 0 0 0 0 10
0 8 0 0 97.00 0 0 0 0 115 0
Command Area (ha)
0 0 0 0 0 0 0 0 0 0 0 0 0 3202.00 0 0 0 0 3202 0
Dambuk-
Paglam
No. 0 0 0 0 0 0 0 0 4 0 2 0 0 50.00 0 0 0 0 56 0
Command Area (ha)
0 0 0 0 0 0 0 0 0 0 0 0 0 1004.00 0 0 0 0 1004 0
Hunli-Desali
No. 0 0 0 0 0 0 0 0 2 0 4 0 0 37.00 0 0 0 0 43 0
Command Area (ha)
0 0 0 0 0 0 0 0 0 0 0 0 0 274.00 0 0 0 0 274 0
District Irrigation Plan (PMKSY) Lower Dibang Valley
54
Chapter- IV
Water Requirement/Demand
The foregoing Chapters deal with the General Profile, Water Profile and Water Availability of Lower Dibang
Valley District. The present chapter deals with the current (2015) and projected (2020) demand of water
for various sectors. The demand for water has been assessed on the basis of data obtained from different
departments.
4.1 Domestic Water Demand
Data of Census 2011 and 2001 has been considered to arrive at the growth rate of population of the
district. As per Census 2011, the district has shown an annual growth rate of 7.6%. Table 4.1 below
indicates the current and projected block-wise population of the district. Current population (in 2015) has
been calculated by assuming a growth of 3.6% over a period of 5 years (from 2011-2015). Projected
population has been calculated in similar way by assuming a growth of 3.6 % over the period of five years
(from 2015-2020).
It has been assumed that per capita daily water requirement of people residing in urban areas of the
district is 140 L and for population in rural areas, the per capita daily water requirement is 120 L. Using
the same norms domestic water supply demand has been worked out and given in table 4.1. The domestic
water demand has been assessed on the basis of census data obtained Census Handbook of the district.
The present and project Water Demand is estimated in Million Cubic Metre (MCM).
Figure. 4.1. Block-wise Present and Project Domestic Water Demand of the District
with Project Water Gap Water
0.00
0.50
1.00
1.50
2.00
2.50
Present Water Demandin 2015
(In MCM)
Project Water Demandin 2020
(In MCM)
Water Gap
1.992.14
0.15
0.45 0.48
0.030.10 0.110.01
Present and Projected Block-wise Domestic Water Demand of the District with Projected Water Gap
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
55
Figure 4. 1: Domestic water Demand of Lower Dibang Valley District
Blocks 2011 Population
Population in 2015
Present Water
Requirement (2015)
Present Annual Water Requirement (2015) MCM
Projected Population
in 2020
Annual Water Requirement
in 2020
Annual Water Requirement in
(2020) MCM
Present Water
Requirement (MCM)
Water Requirement
in 2020 (MCM)
Gap
Roing-Koronu
Roing Koronu-R
30607 31709 3805062 1.39 34119 4094247 1.49
1.99 2.14 0.15 Roing- Koronu - U
11389 11799 1651861 0.60 12696 1777402 0.65
Dambuk-Paglam
Dambuk-Paglam- R
9837 10191 1222936 0.45 10966 1315879 0.48
0.45 0.48 0.03 Dambuk-Paglam - U
0 0 0 0.00 0 0 0.00
Hunli-Desali
Hunli-Desali - R
2247 2328 279347 0.10 2505 300577 0.11
0.10 0.11 0.01 Hunli-Desali - U
0 0 0 0.00 0 0 0.00
District Total 54080 56027 6959206 2.54 60285 7488105 2.73 2.54 2.73 0.19
District Irrigation Plan (PMKSY) Lower Dibang Valley
56
It can be inferred from the table that considering the growth rate of population of the district, the quantity
of water required in 2020 for domestic consumption shall be approximately 2.73 MCM which is 0.19 MCM
more than the present water requirement. Roing-Koronu Block has highest demand of domestic water
requirement of 2.14 MCM during the year 2020 in comparison to its present requirement of 1.99 MCM.
Further, Hunli-Desali Block has comparatively less domestic water requirement during 2020, i.e., the block
has only .11 MCM domestic water requirement during 2020 as compared to its present requirement of
0.10 MCM
4.2 Crop Water Requirement
As discussed in Chapter 2, cereals are cultivated on major part of the gross cropped area in the district.
Hence, the crop water requirement for major cereals viz. Maize, Paddy, Wheat as assumed by State
Agricultural University has been taken into consideration. The assumptions are as under: For paddy: 0.6
m per ha, for Maize: 0.045 m per ha, for wheat: 0.15 m per ha, Vegetables: 0.18 m per ha and for
Horticulture crops: 0.06 m per ha. The small portion of area under other crops has been taken in category
of vegetables and same assumption has been made.
Figure 4. 2: Block-wise Crop Water Requirement of the District
Water potential required has been derived from water required by crops cultivated under rainfed
conditions. Therefore, the existing water potential represents the water requirement of crops cultivated in
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Water PotentialRequired (MCM)
Existing Water Potential(MCM)
Water Potential to becreated (MCM)
98.65
18.37
80.28
66.04
5.63
60.42
23.22
19.95
3.26
Block-wise Crop Water Requirement of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
57
irrigated areas. It can be concluded from the table that a total water potential of 143.96 MCM is to be
created in the district to fulfil the requirement of crops.
Table.4.2. Block-wise Crop Water Requirement of the District
Block Crops Area sown (Ha)
Irrigated area (Ha)
Water Potential Required
(MCM)
Existing Water
Potential (MCM)
Water Potential
to be created (MCM)
Roing-Koronu Agriculture &
Horticulture Crops
19618 1945 98.65 18.37 80.28
Dambuk-Paglam
13962 1170 66.04 5.63 60.42
Hunli-Desali 775 204 23.22 19.95 3.26
Total 34355 3319 187.91 43.95 143.96
4.3 Livestock Water Requirement
The requirement of water by livestock in the district has been derived from two livestock census (2003 &
20012), as discussed in second chapter. The table below represents the animal wise water requirement
as well as total water requirement of the district for livestock. The details of Livestock water demand is
graphically represented as follows:
Figure: 4.3. Block-wise Livestock Water Demand of the District
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
Present WaterDemand (MCM)
Water Demand in2020 (MCM)
Existing WaterPotential (MCM)
Water Potential tobe created (MCM)
0.64
0.68
0.64
0.04
0.580.63
0.58
0.05
0.08 0.090.08
0.01
Block-wise Livestock Water Demand of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
58
Table. 4.3 Livestock Water Demand of the District
Block Total No of livestock in
2015
Present Water Demand (MCM)
Water Demand in 2020 (MCM)
Existing Water Potential
(MCM)
Water Potential to be created (MCM)
Roing-Koronu
99929 0.64 0.68 0.64 0.04
Dambuk-Paglam
47007 0.58 0.63 0.58 0.05
Hunli-Desali
19009 0.08 0.09 0.08 0.01
District Total
165945 1.29 1.39 1.29 0.10
Since the record of animal population is given block-wise and, hence, the water requirement has to be
assessed block wise, the total animal has been appropriated among the block based on the percentage
rate of growth at 1.06% for the projection of animal population in 2020. Accordingly, it is inferred that the
water requirement of livestock in 2020 will be 1.39 MCM rather than the present water demand of 1.29
MCM. The water requirement of the livestock has been estimated considering per capita daily water
requirement for cows/buffaloes 65 L, goats/pigs 6 L and Poultry 0.25 L.
4.4 Industrial water Requirement
Industrial water requirement of the District during the year 2020 is found to be .06341 MCM. Thus, the
total Industrial water potential to be created for the district is .00466 MCM only.
Table 4.4 Block-wise Industrial Water Requirement
Block Name of Industry Water demand (MCM)
Water demand in
2020 (MCM)
Existing water
potential (MCM)
Water potential to be created
(MCM)
ROING KORONU
1.Saw Mill
0.03194 0.06308
0.00002 0.00466
2.Saw & Veneer Mill
3.Tea Factory
4.Rice Mill
DAMBUK-PAGLAM 1.Saw Mill
0.00145 0.00029
2.Rice/Atta/Oil Mill
HUNLI-DESALI 1.Rice Mill 0.00002 0.00004
Grand Total in MCM 0.00147 0.06341 0.00002 0.00466
District Irrigation Plan (PMKSY) Lower Dibang Valley
59
4.5 Water Demand for Power Generation
Water requirement for power generation in the district is not available for the Lower Dibang Valley district
as there is no hydel power generation unit in the district. Power is not generated in the district and, hence,
water requirement has been indicated to be zero. The power requirement of district is met through
common grid system of the State.
Table. 4.5 Water Demand for power generation
Block Power Requirement
(MW)
Water Demand (BCM)
Water Demand in
2020 (BCM)
Existing Water Potential (BCM)
Water Potential to be created
(BCM)
Roing-Koronu Nil Nil Nil Nil Nil
Dambuk-Paglam
Nil Nil Nil Nil Nil
Hunli-Desali Nil Nil Nil Nil Nil
4.6 Total Water Demand for various sector
This section presents the total water demand of the district. The total Water Demand of the District has
been calculated by summing up all major sectors consuming water. The current water demand has been
depicted in Figure.4.6 (A) and projected total water demand of the district during 2020 is depicted in
Figure. 4.6 (B). Further, in Table 4.6.1 has represented the total of current water demand of the district
covering all sectors consuming water, while Table. 4.6.2 shows the projected water demand of the district
during 2020 covering all sectors.
Figure. 4.6(A). Present Total Water Demand
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Domestic Crop Livestock Industrial Block-wiseTotal Current
WaterDemand
1.99
98.65
0.64 0.0319400
101.31
0.45
66.04
0.58 0.0014500
67.07
0.10
23.22
0.08 0.0000200
23.39
Sector-wise and Block-wise Present Total Water Demand (In MCM)
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
60
Figure. 4.6(B). Projected Total Water Demand during 2020
Table 4.6. 1: Present Water Demand of the District for Various Sectors
S. No
Block Domestic Crop Livestock Industrial Block-wise Total Current Water
Demand
1 Roing-Koronu
1.99 98.65 0.64 0.0319400 101.31
2 Dambuk-Paglam
0.45 66.04 0.58 0.0014500 67.07
3 Hunli-Desali
0.10 23.22 0.08 0.0000200 23.39
TOTAL 2.54 187.91 1.29 0.03 191.77
Table 4.6. 2: Projected Water Demand of the District for Various Sectors During 2020
S. No Block Domestic Crop Livestock Industrial Block-wise Total
Projected Water Demand (2020)
1 Roing- Koronu
2.14 98.65 0.68 0.06308 101.53
2 Dambuk- Paglam
0.48 66.04 0.63 0.00029 67.15
3 Hunli- Desali
0.11 23.22 0.09 0.00004 23.41
TOTAL 2.73 187.91 1.39 0.06 192.10
The present water demand of the district has been assessed at 191.077 MCM annually. Roing-Koronu
Block being the block with maximum requirement of water (101.31 MCM). Dambuk-Paglam and Hunli-
Desali Block stands at 2nd and 3rd position with approximately 67.07 MCM and 23.39 MCM water
requirement.
0.00
100.00
200.00
Domestic Crop Livestock IndustrialBlock-wise Total Projected Water Demand (2020)
2.14
98.65
0.68 0.06308
101.530.48
66.04
0.63
0.00029
67.15
0.11
23.22
0.09
0.00004 23.41
Sector-wise and Block-wise Projected Total Water Demand during 2020 (In MCM)
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
61
During 2020, the demand may be proportionate to the current water demand and total project water
demand during the year 2020 has been assessed at 192.10 MCM. The projected water requirement of
Roing-Koronu Block during the year 2020 has been estimated as 101.53 MCM, while, for Dambuk-
Paglam Block, the projected water requirement shall be 67.15 MCM and also for Hunli-Desali Block the
projected water requirement is 23.41 MCM.
4.7 Water Budget
Water budget reflects the relationship between input and output of water in the district. Thus, we have a
direct comparison of supply of water and the natural demand for water. The following data provides
current water gap and projected water gap for the district during the year 2020.
Figure. 4.7.1: Block-wise Water Budget of the District
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Present Demand(2015)
ProjectedDemand(2020)
Present Gap(2015)
Projected Gap(2020)
Water Demand(In MCM)
Water Gap(In MCM)
101.31 101.53
74.05 74.27
67.0767.15
38.3538.43
23.39 23.41
3.67 3.69
Block-wise Water Budget of the District
Roing-Koronu
Dambuk-Paglam
Hunli-Desali
District Irrigation Plan (PMKSY) Lower Dibang Valley
62
The total water demand of the district during the year 2020 has been estimated as 192.10 MCM. The
maximum projected demand of water in Roing- Koronu Block during the year 2020 is appeared to be
101.53 MCM, while the same is in case of Dambuk-Paglam Block would be 67.15 MCM and 23.41 MCM
for Hunli-Desali Block. The total projected water gap for the district during the year 2020 has been
estimated at 116.40 MCM as compared to the total present water gap of the district (116.07 MCM). The
maximum projected water gap has been estimated at 74.27 MCM for Roing-Koronu Block and the
minimum gap of 3.69 MCM is estimated for Hunli-Desali Block of the District. The details of the estimated
Block-wise Water Budget of the district is given in Table.4.7.
Table. 4.7 Water Budget of Lower Dibang Valley District
Block Existing water availability (MCM)
Total (MCM)
Water Demand (In MCM)
Water Gap (In MCM)
Surface water
Ground water
Present Projected (2020)
Present Projected (2020)
Roing-Koronu
17.26 10.00 27.26 101.31 101.53 74.05 74.27
Dambuk-Paglam
19.72 9 28.72 67.07 67.15 38.35 38.43
Hunli- Desali
14.72 5 19.72 23.39 23.41 3.67 3.69
District Total
51.70 24.00 75.70 191.77 192.10 116.07 116.40
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00
Present Demand(2015)
Projected Demand(2020)
Present Gap(2015)
Projected Gap(2020)
Water Demand(In MCM)
Water Gap(In MCM)
191.77 192.10
116.07
116.40
District Water Budget
District Irrigation Plan (PMKSY) Lower Dibang Valley
63
Chapter-V
Strategic Action Plan for Irrigation in Lower Dibang Valley District under PMSKY
The water supplied in Lower Dibang Valley district is mainly by tapping surface water sources. The poor
ground water development of the district is mainly due to lack of agricultural practices using modern
techniques and also due to excessive dependence on surface water for drinking water supply or locally
by tapping springs. Moreover, construction of ground water structure like tube wells in this hilly terrain is
difficult and in most of the places of the district it is impossible due to approachability problems. There is
immense scope for creation of irrigation potentials in the valley and foothill areas of the district, which will
boost agriculture and ultimately the state economy.
Water is essential for sustaining life and at the same time, it is an important component for almost all
sectors of the economy. Obviously the schemes for development of water resources for beneficial use of
the society have been taken up since the time immemorial. Considerable progress has been made in
respect of water resources development in India after independence through various plans and such
development have helped in almost five-fold increase in creation of irrigation potential of the country.
There has also been appreciable development in the areas of drinking water supply and other uses.
However, growing population, urbanization and rapid industrialization has led to considerable increase in
demand of water for various purposes e.g., irrigation, domestic needs, industrial requirements etc. Thus,
the water sector has very strong linkages with all other developmental activities. In view of fast changing
development scenario, it is emphasized that the key priorities and identified strategies cannot be
considered as static and, hence, this need to be reviewed and improved upon from time to time. In this
regard a comprehensive “Strategic Plan for District Irrigation” for the district of Lower Dibang Valley has
been prepared in coordination with all line department of the PMKSY.
5.1 Block wise total plan of the district
The total proposed outlay of the district Irrigation Plan for a period of 5 years (2016-2021) is about Rs.
100297.20 lakh distributed among different blocks as given in the table below. The Roing-Koronu block
has the maximum share of total outlay of Rs. 53690.84 lakh and constitutes about 54% followed by
Dambuk-paglam block with a total proposed outlay of Rs.35216.68 lakh contributing 35% and Hunli-
Desali block has minimum share of Rs. 11389.68 lakh contributing only 11% of total outlay of the District
Irrigation Plan
Table 5.1: Block-wise total Outlay of the District (Amount in Rs. Lakhs)
Block-wise Total Outlay of the District
Name of the Block
Name of the Participating Departments Total
WRD WRD (TW & GW)
Agriculture Horticulture ATMA DRDA RWD (Soil
Conservation)
Roing Koronu
26915.14 2399.5 9634.697 5148.51 300.00 3137.00 6156.00 53690.84
Dambuk-Paglam
22842.10 319.00 6001.06 2239.77 225.00 1943.75 1646.00 35216.68
Hunli-Desali 5683.00 0.00 1679.76 1152.17 150.00 731.75 1993.00 11389.68
Total 55440.24 2718.50 17315.52 8540.45 675.00 5812.50 9795.00 100297.20
District Irrigation Plan (PMKSY) Lower Dibang Valley
64
Block-wise share of total outlay of the district is represented in the following diagram.
Figure.5.1 Block-wise Percentage Distribution of Total Outlay of the District
5.2. Share of Participating Departments on Total Outlay
A total of 07 departments of the district such as Agriculture, Horticulture, Department of Water Resources
(WRD), WRD (Tube Well and Ground Water), ATMA, Rural Works Department (Soil Conservation) and
DRDA have participated in the District Irrigation Plan preparation under PMKSY. All the department has
proposed various kind of projects to be implemented under four major components of PMKSY with a
provision for providing training and extension services to the farmers and officials of each line
departments. The details of percentage share of each depts. are as follows:
Figure.5.2 Percentage Distribution of Department-wise Total Outlay of the District
54%35%
11%
Block-wise Percentage Share of Total Outlay of the District
Roing Koronu Dambuk-Paglam Hunli-Desali
0.00%10.00%20.00%30.00%40.00%50.00%60.00%
WR
D
WR
D (
TW &
GW
)
Agr
icu
ltu
re
Ho
rtic
ult
ure
ATM
A
DR
DA
RW
D
55.28%
2.71%
17.26%8.52%
0.67%5.80%
9.77%
Pe
rce
nta
ge S
har
e o
f To
tal O
utl
ay
Name of the Departments
Percentage Distribution of Department-wise Outlay under PMKSY
District Irrigation Plan (PMKSY) Lower Dibang Valley
65
Maximum share of total outlay is contributed by WRD (Water Resources Dept.), with total proposed outlay
of Rs. 55440.24 lakh, i.e., 55.28% of the total estimated cost of the Plan under AIBP and Har Khet Ko
Pani Component, while Agriculture Department has proposed a total outlay of Rs. 17315.52 lakh under
Per Drop More Crop component. Further, WRD (Tube Well and Ground Water) has also proposed a total
estimated cost of Rs. 2718.50 lakh, i.e., 2.71% under Har Khet Ko Pani component and Horticulture
Department also proposed an estimated cost of Rs. 8540.45 lakh, i.e., 8.52% of the total estimated cost
of the Plan. Under Watershed Management Component, both the Soil Conservation Dept. under Rural
Works Dept. and DRDA has proposed different schemes with a proposed cost of Rs. 9795.00 lakh
(9.77%) and Rs. 5812.50 lakh (5.80%) respectively. For training and extension services, the department
of Agriculture, under ATMA has proposed a total cost of Rs. 675.00 lakh to provide training and extension
services to the farmers and officers of all line departments for effective and sustainable use of assets to
be created under PMKSY in the district. The details of schemes proposed by all the implementing
departments are annexed in Annexure- I to X.
Department-wise Proposed Outlay under PMKSY
Participating Department Proposed Estimated Outlay under PMKSY (Rs. In lakh)
Agriculture 17315.52
ATMA 675.00
WRD 55440.24
WRD (TW & GW) 2718.50
Horticulture 8540.45
DRDA 5812.50
RWD 9795.00
Total 100297.20
5.3. Component-wise Plan
No participating department has prepared the year-wise target plan for five years and hence, the total
outlay of the components has been divided equally for five years in order to prepare an estimated yearly
plan for the district. The details of the component-wise yearly plan for 5 years for the district is placed
below:
Table.5.2 Component-wise Break-up Total Outlay
Component-wise Total Outlay of the District with year-wise Break-up
Name of the Component Year-wise Break-up of the Total Outlay Component-wise Total
Outlay 2016-17 2017-18 2018-19 2019-20 2020-21
Accelerated Irrigation Benefit Programme (AIBP)
416 0 0 0 0 416.00
PMKSY Har Khet Ko Pani 11548.55 11548.55 11548.55 11548.55 11548.55 57742.74
PMKSY Per Drop More Crop 5171.19 5171.19 5171.19 5171.19 5171.19 25855.97
PMKSY Watershed 3121.50 3121.50 3121.50 3121.50 3121.50 15607.50
ATMA 135.00 135.00 135.00 135.00 135.00 675.00
Total 20392.24 19976.24 19976.24 19976.24 19976.24 100297.21
District Irrigation Plan (PMKSY) Lower Dibang Valley
66
AIBP and Hark Khet Ko Pani components are to be executed mainly by Water Resource Department and
WRD (Tube Well & Ground Water). Per drop more crop component will be executed by Agriculture and
Horticulture Department. Watershed Management component will be implemented by Rural Development
and Extension & Training services will be executed by ATMA under Agriculture department. However, all
the stakeholders need to have coordination among them to have the maximum irrigation efficiency in the
district. The percentage share of each component of the district irrigation plan is diagrammatically
represented as under:
Figure 5.3: Component wise percentage allocation of total outlay
It is observed that maximum share of 57.57% is for Har Khet Ko Pani component including both WRD
and WRD (Tube Well & Ground Water) department followed by PMKSY Per Drop More Crop with a
share of 25.78%% and PMKSY Watershed component with a share of 15.56% to the total outlay. The
component like ATMA under Per Drop More Crop Component and AIBP has less than 1% share of total
Plan outlay.
5.4 Year Wise Plan
The strategic action plan proposed under different departments has been further sub-divided based on
year wise allocation of the total outlay. The projects proposed under Strategic Action Plan have been
divided into four phases starting from project initiation and planning. Under this stage resource allocation
will be done by each department for different projects running under their purview. An allocation of 20%
of the total outlay under each department has been assumed under this stage. The second phase is the
implementation stage when the projects will be executed at the ground level and an assumption of 30%
of the total outlay under each department has been assumed at this stage. The third stage being
monitoring and evaluation, where an assumption of 35% has been proposed to determine, if the proposed
activities are falling under the objectives of PMKSY and also to complete the ongoing projects. The final
stage is of review, under which each project executed under different departments will be scrutinized for
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00%
Accelerated Irrigation Benefit Programme (AIBP)
PMKSY Har Khet Ko Pani
PMKSY Per Drop More Crop
PMKSY Watershed
ATMA
0.41%57.57%
25.78%
15.56%
0.67%
Component-wise Percentage Share in Total Outlay
District Irrigation Plan (PMKSY) Lower Dibang Valley
67
any lacunae and the same will be completed under this stage. As per PMKSY Guidelines, the Strategic
Action Plan shall be made for 5-7 Years taking the year 2016-17 as the base year. However, no
department has given any Year-wise break-up of their plan and hence, the total proposed cost of each
dept. has been divided equally for five years taking the method of equal distribution of project outlay. The
details of year-wise break-up is given in Table. 5.3.
Table 5.3. Year wise allocation of outlay under different departments
Name of the Department
Year-wise Estimated Cost (Rs. in Lakhs ) of the Dept. Grand Total
2016-17 2017-18 2018-19 2019-20 2010-21 Agriculture 3463.10 3463.10 3463.10 3463.10 3463.10 17315.52
ATMA 135.00 135.00 135.00 135.00 135.00 675.00
WRD 11420.85 11004.85 11004.85 11004.85 11004.85 55440.24
WRD (TW & GW) 543.70 543.70 543.70 543.70 543.70 2718.50
Horticulture 1708.09 1708.09 1708.09 1708.09 1708.09 8540.45
DRDA 1162.50 1162.50 1162.50 1162.50 1162.50 5812.50
RWD 1959.00 1959.00 1959.00 1959.00 1959.00 9795.00
Total 20392.24 19976.24 19976.24 19976.24 19976.24 100297.21
The total outlay for the district is Rs. 100297.21 lakh for 05 years. The Water Resource Department of
the district constitutes maximum allocation of Rs. 55440.24 followed by Agriculture department with a
with a share of share of Rs. 17315.52 lakh, DRDA with RWD (Soil Conservation) with Rs. 9795.00 lakh,
Horticulture Department with a share of Rs. 8540.00 lakh and DRDA with Rs.5812.50 lakh. The minimum
Share of Rs.2718.50 lakh and Rs. 675.00 lakh is contributed by Tube Well & Ground Water section under
Water Resources Department and ATMA under Agriculture Dept.
5.5 Expected Outcome
The strategic action plan envisages providing assured irrigation in a command area of 58422.18 Ha in
the district out of the total Culturable Command Area (CCA) of 73413 Ha. It is assumed that the irrigation
infrastructure will benefit a command area of at least 79.58% of the total CCA of the district. The
watershed component is projected to achieve a culturable command area of 6724.05 ha by creation of
7475 new water harvesting structures as well as renovation of existing structures. Under the component
Per Drop More Crop, both the Agriculture and Horticulture Department has proposed an area of 24322
Ha. And 3470 Ha. respectively to create irrigation facilities in the field of micro irrigation through
installation of DPAP drip and Sprinkler Irrigation system, creating of water harvesting structures
supplementary water management activities, etc. WRD and WRD (TW & GW) Department has proposed
to create irrigation potential in a maximum of 23906.13 Ha area of land in the district under AIBP and Har
Khet Ko Pani component of PMKSY. A training programme will also be scheduled under PMKSY to
enhance the better knowledge of efficient use of water through drip and other micro irrigation structures.
Table below represents the target proposed by various department to bring additional land under irrigated
cultivation through PMKSY.
District Irrigation Plan (PMKSY) Lower Dibang Valley
68
Table 5-4: Block wise, department wise area in Hectare to be Contemplated for Irrigation Area in Hectare
Block-wise Physical Target for Command Area/ Irrigation Potential to be Created
Name of the Department
Name of the Component
Roing Koronu
Dambuk-Paglam
Hunli-Desali
Total
WRD AIBP & Har Khet Ko Pani
10729 9088.00 2283.00 22100.13
WRD (TW & GW) Har Khet Ko Pani 1625 181 0 1806
Agriculture Per Drop More Crop
10754 11180 2388 24322
Horticulture Per Drop More Crop
2152 968 350 3470
Soil Conservation/RWD
Watershed Management
3105.1 2318 1301 6724.05
Block Total 28365 23735 6322 58422.18
The following expected outcome are intended from the District Irrigation Plan: -
1. A total of 58422.18 Hectares of Irrigation potential is proposed to be created under the four
components of PMKSY. Thus, around 79.58% of the Total Culturable Command Area of the district would
be brought under the command of assured irrigation in the district. It would boost up the gross crop
intensity more significantly as the farmers would be able to go for multiple cropping throughout the year.
2. The Water Resources Department (including both Water Resources and TW & GW) of the district
has proposed to irrigate a total of 23906.13 Ha. of land for a total expenditure of Rs. 58158.74 lakh,
Agriculture department has proposed to irrigate 24322 hectare of area with a proposed cost of Rs.
17315.52 lakh. Soil conservation and DRDA has proposed the amount of Rs. 15607.50 lakh to irrigate a
total area of 6724.05 Hectare respectively.
In terms of economic benefit, the assured water supply to the farm land will result in enhancement of
production and productivity of the crops. This is likely to generate an additional income to the farmers of
the district. This is also likely to increase maydays in non-recurring employment as also create livelihood
opportunities in agriculture and allied sectors of the economy of the district through increased acreage
under crops. The intervention will also contribute both in agriculture & horticulture production and
productivity thereby paving the way of generating direct and indirect employment among the local people.
Thus, the overall economy of the district would get better and better in the days to come after the
contemplated projects get implemented and yield results in terms of enhanced crop production.
District Irrigation Plan (PMKSY) Lower Dibang Valley
69
5.6 Strategic Action Plan for irrigation in respect of District Lower Dibang Valley, Arunachal Pradesh under Pradhan Mantri Krishi Sinchayee
Yojana (PMKSY)
Annexure-I
Strategic Action Plan of Agriculture Department under PMKSY
Sl.No. Name of the Blocks/Sub Districts
Concerned Ministry/
Department
Component Activity Total Number/ Capacity
(cum)
Command Area/Irrigation
Potential (Ha)
Period of Implemen
tation ( 5/ 7 yrs)
Estimated cost(in Lakhs )
1 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Drip 66 66 5 24.55
2 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Sprinkler 80 80 5 46.72
3 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Wide Spaced Crop)
245 245 5 91.14
4 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Close Spaced Crop)
250 250 5 225
5 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Micro Sprinkler)
225 225 5 132.53
6 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Mini Sprinkler)
180 180 5 153.36
7 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Portable)
250 250 5 48
District Irrigation Plan (PMKSY) Lower Dibang Valley
70
8 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Semi-Permanent)
250 250 5 91.5
9 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Large Volume)
150 150 5 47.4
10 Roing-Koronu Micro Irrigation Total
1696 1696 860.197
11 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Topping up of MGNREGA
120 120 5 72.00
12 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Drought Proofing through check Dam
410 1230 5 205.00
13 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Water Harvesting Structures
1500 1870 5 2700.00
14 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Secondary Storage Structures
1500 1180 5 2700.00
15 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Distribution pipe )
5000 1450 5 750.00
16 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Raised bed and furrow System etc)
4000 1430 5 400.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
71
17 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Area Expansion 500 125 5 275.00
18 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Construction of New farm Ponds
1000 440 5 900.00
19 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Awareness Campaign
200 83 5 80.00
20 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Solar Pump Set 450 500 5 292.50
21 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Diesel Pumping Set
500 200 5 75.00
22 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Lining of Ponds 1000 230 5 250.00
23 Roing-Koronu MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Renovation of small Tank
500 200 5 75.00
24 Per Drop More Crop Total 16680 9058 8774.5
25 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Drip 56 56 5 20.832
26 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Sprinkler 64 64 5 37.376
District Irrigation Plan (PMKSY) Lower Dibang Valley
72
27 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Wide Spaced Crop)
150 150 5 55.8
28 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Close Spaced Crop)
130 130 5 117
29 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Micro Sprinkler)
170 170 5 100.13
30 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Mini Sprinkler)
160 160 5 136.32
31 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Portable)
200 200 5 38.4
32 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Semi-Permanent)
250 250 5 36.6
33 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Large Volume)
100 100 5 31.6
34 Micro Irrigation Total 1280 1280 574.058
35 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Topping up of MGNREGA
200 150 120
36 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Drought Proofing through check Dam
500 1000 250
37 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Water Harvesting Structures
1000 1200 1800
District Irrigation Plan (PMKSY) Lower Dibang Valley
73
38 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Secondary Storage Structures
1000 1200 1800
39 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Distribution pipe )
4500 3000 675
40 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Raised bed and furrow System etc.)
1000 1000 100
41 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Area Expansion 200 200 110
42 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Construction of New farm Ponds
250 250 225
43 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Awareness Campaign
80 100 32
44 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Solar Pump Set 250 850 162.5
45 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Diesel Pumping Set
200 400 30
District Irrigation Plan (PMKSY) Lower Dibang Valley
74
46 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Lining of Ponds 400 400 100
47 Dambuk-Paglam MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Renovation of small Tank
150 150 22.5
48 Per Drop More Crop Total 9730 9900 0 5427
49 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Drip 54 54 20.088
50 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation DPAP Sprinkler 24 24 14.016
51 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Wide Spaced Crop)
60 60 22.32
52 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Drip (Close Spaced Crop)
140 140 126
53 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Micro Sprinkler)
110 110 64.79
54 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Mini Sprinkler)
65 65 55.38
55 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Portable)
70 70 25.62
56 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Semi-Permanent)
125 125 45.75
57 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Micro Irrigation Non-DPAP Sprinkler(Large Volume)
50 50 15.8
District Irrigation Plan (PMKSY) Lower Dibang Valley
75
58 Micro Irrigation Total 698 698 389.764
59 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Topping up of MGNREGA
90 90 54
60 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Drought Proofing through check Dam
95 95 47.5
61 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Water Harvesting Structures
250 250 450
62 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Secondary Storage Structures
250 250 450
63 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Distribution pipe )
150 150 22.5
64 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
On Farm Development (Raised bed and furrow System etc.)
300 300 30
65 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Area Expansion 200 200 110
66 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Construction of New farm Ponds
40 40 36
District Irrigation Plan (PMKSY) Lower Dibang Valley
76
67 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Awareness Campaign
165 165 66
68 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Diesel Pumping Set
40 70 6
69 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Lining of Ponds 60 60 15
70 Hunli-Desali MOA &FW- DAC&FW
Per drop more crop
Supplementary water management activities
Renovation of small Tank
20 20 3
71 Per Drop More Crop Total 1660 1690 1290
Total of Agriculture Dept. 31744 24322 17315.52
District Irrigation Plan (PMKSY) Lower Dibang Valley
77
Annexure-II
Strategic Action Plan of Horticulture Department under PMKSY
Sr. No. Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Activity
Total Number/Cap
acity (cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation (
5/ 7 yrs)
Estimated cost(in Lakhs )
1 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Orange
1157 5 2318.14
2 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Banana
295 5 776.31
3 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Arecanut
250 5 657.89
4 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Litchi
105 5 210.38
5 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Kiwi
5 5 10.02
6 Roing Koronu MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Mini Sprinkler for Pineapple
265 5 916.41
7
Roing Koronu MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler for Large Cardamom
75 5 259.36
District Irrigation Plan (PMKSY) Lower Dibang Valley
78
8 Dambuk-Paglam
MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation for Orange
593 5 1188.12
9 Dambuk-Paglam
MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation for Banana
120 5 315.79
10 Dambuk-Paglam
MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation for Arecanut
115 5 302.63
11 Dambuk-Paglam
MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation for Litchi
35 5 70.13
12 Dambuk-Paglam
MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler for Pineapple
105 5 363.11
13 Hunli-Desali MDA & FW-DAC & FW Per drop
more crop (Micro Irrigation)
DPAP Drip Irrigation for Kiwi
40 5 80.14
14
Hunli-Desali MDA & FW-DAC & FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler for Large Cardamom
310 5 1072.03
Total 3470 5 8540.45
District Irrigation Plan (PMKSY) Lower Dibang Valley
79
Annexure-III
Strategic Action Plan of ATMA for Training and Extension Services under PMKSY
Name of the Blocks/Sub Districts
Concerned Ministry/Department
Component Activity Total Number/Capac
ity(cum)
Priority Command Area/Irrigation Potential(Ha)
Period of Implementation (
5/ 7 yrs)
Estimated cost(in Lakhs )
Roing-Koronu
MOA &FW- DAC&FW Per drop more crop
ATMA
Training and Extension Services 2000 5 300.00
Dambuk-Paglam
MOA &FW- DAC&FW Per drop more crop
ATMA
Training and Extension Services 1500 5 225.00
Hunli-Desali
MOA &FW- DAC&FW Per drop more crop
ATMA
Training and Extension Services 1000 5 150.00
Total 4500 675.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
80
Annexure-IV
Strategic Action Plan of Water Resources Department (WRD) under PMKSY
S.No. Name of the
Blocks/Sub Districts
Concerned
Ministry/Department
Component
Activity Location of the Project Total Number/Ca
pacity (cum)
Command
Area/Irrigation Potential(Ha)
Period of
Implementation
( 5/ 7 yrs)
Estimated
cost(in
Lakhs )
Remarks
Work Priority
Longitude E Latitude N
Altitude MSL in Mtr
Section :-Roing-HQ
I. Cluster of MIP under Roing HQ Section under Roing Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Roing-Kornu CD Block
MoWR AIBP C/O Samak MIP for gangkek area in Rayang village
Head work /Channel
950 51'06.18 E 28007'02.12 N
322.50
1 38.00 One Year
(2016-17)
35.00
2 Roing-Kornu CD Block
MoWR AIBP C/O MIC for Boli cultivation field at Meka village.
Head work /Channel
95050'16.53.E 28006'50.43 N
297.00
1 6.00 One Year
(2016-17)
8.00
3 Roing-Kornu CD Block
MoWR AIBP C/O Epik/Longni MIP at Balek village.
Head work /Channel
95051'24.64.E 28005'15.69 N
348.00
1 6.00 One Year
(2016-17)
8.00
4 Roing-Kornu CD Block
MoWR AIBP C/O MIP at Moying korong(Boli area ) at Rayang village
Head work /Channel
95013'46.95.E 28007'46.66 N
302.00
1 6.00 One Year
(2016-17)
10.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
81
5 Roing-Kornu CD Block
MoWR AIBP C/O MIP at Dongkal Ani area in Meka village
Head work /Channel
95050'40.50 E 28007'28.66 N
262.00
1 6.00 One Year
(2016-17)
8.00
6 Roing-Kornu CD Block
MoWR AIBP C/O MIP for Iluta agril field at Chidu village
Head work /Channel
95045'08.64.E 28011'35.69 N
231.5
1 6.00 One Year
(2016-17)
8.00
7 Roing-Kornu CD Block
MoWR AIBP C/O MIP at Tina agril field at Chimiri village
Head work /Channel
95045'51.52.E 28010'40.45N
261.8
1 6.00 One Year
(2016-17)
8.00
Sub Total
7 74.00 85.00
Section :-Roing-I
I. Cluster of MIP under Roing-I Section under Roing Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Roing-Kornu CD Block
MoWR AIBP C/O MIP for Aoha agril field at Horupahar in Abali village.
Head work /Channel
95053'14"E 28001'05"N
192.02
1 7.00 One Year
(2016-17)
8.00
2 Roing-Kornu CD Block
MoWR AIBP C/O Misaya area MIP at Bhismaknagar
Head work /Channel
96000'01"E 28002'43"N
356.92
1 7.00 One Year
(2016-17)
8.00
3 Roing-Kornu CD Block
MoWR AIBP C/O JAS MIP at Iduli village
Head work /Channel
95049'25"E 27059'41"N
155.75
1 7.00 One Year
(2016-17)
8.00
4 Roing-Kornu CD Block
MoWR AIBP C/O Koronu MIP at Koronu village.
Head work /Channel
95056'04E 28003'24"N
305.41
1 7.00 One Year
(2016-17)
8.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
82
5 Roing-Kornu CD Block
MoWR AIBP C/O Jawa MIP at Abango village.
Head work /Channel
95053'27"E 28004'30"N
267.00
1 7.00 One Year
(2016-17)
9.00
6 Roing-Kornu CD Block
MoWR AIBP C/O Abili MIP at Iduli village
Head work /Channel
9505153"E 27059'10"N
156.06
1 7.00 One Year
(2016-17)
8.00
7 Roing-Kornu CD Block
MoWR AIBP C/O Keshapani MIP at Iduli village
Head work /Channel
95049'53E 27059'43"N
159.41
1 6.00 One Year
(2016-17)
8.00
8 Roing-Kornu CD Block
MoWR AIBP C/O Khingili Biddi MIP
Head work /Channel
95049'14"E 28001'18"N
184.10
1 6.00 One Year
(2016-17)
8.00
9 Roing-Kornu CD Block
MoWR AIBP C/O kolia MIP at Iduli village
Head work /Channel
95049'25"E 27059'41"N
156.00
1 8.00 One Year
(2016-17)
9.00
Sub Total
9 62.00 74.00
Section :-Bolung
I. Cluster of MIP under Bolung Section under Roing Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Roing-Koronu CD Block
MoWR AIBP C/O Kabang MIP at Parbuk village
Head work /Channel
95048'42"E 27059'01"N
151.18
1 5.00 One Year
(2016-17)
9.00
2 Roing-Koronu CD Block
MoWR AIBP C/O Holok MIP at Jia village.
Head work /Channel
95047'05"E 28003'32"N
180.75
1 5.00 One Year
(2016-17)
9.00
3 Roing-Koronu CD Block
MoWR AIBP C/O MIC for lower Kengkut area in
Head work /Channel
95047'45"E 270059'07"N
156.06
1 6.00 One Year
(2016-17)
9.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
83
Parbuk village
4 Roing-Koronu CD Block
MoWR AIBP C/O Jimmy MIP at Jia village
Head work /Channel
95047'12"E 28002'07"N
180.75
1 6.00 One Year
(2016-17)
9.00
5 Roing-Koronu CD Block
MoWR AIBP C/O MIP from Geying Patang in Jia village.
Head work /Channel
95043'25"E 28000'54"N
164.29
1 5.00 One Year
(2016-17)
9.00
6 Roing-Koronu CD Block
MoWR AIBP C/O Geying Patang in Parbuk village.
Head work /Channel
95043'49"E 27059'59"N
161.54
1 8.00 One Year
(2016-17)
15.00
7 Roing-Koronu CD Block
MoWR AIBP C/O MIP from Kopyang to Api agril field
Head work /Channel
95043'05"E 28042'02"N
153.01
1 5.00 One Year
(2016-17)
9.00
Sub Total
7 40.00 69.00
Roing-Koronu Total
23 176.00 228.00
I. Cluster of MIP under Dambuk Section under Dambuk Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Dambuk-Paglam CD Block
MoWR AIBP C/o Biltung MIP at Dambuk.
Head work /Channel
95º 35'02.70" E 28º14'56.47" N
1210 ft MSL
1 5.00 One Year
(2016-17)
9.50
2 Dambuk-Paglam CD Block
MoWR AIBP C/o CC Linning at Model Arik.
Head work /Channel
95º 37'42.27" E 28º15'43.64" N
1190 ft MSL
1 5.00 One Year
(2016-17)
9.50
3 Dambuk-Paglam CD Block
MoWR AIBP C/o Siying Karik MIP at Dambuk.
Head work /Channel
95º 38'32.48" E 28º15'52.56" N
1143 ft MSL
1 5.00 One Year
(2016-17)
9.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
84
4 Dambuk-Paglam CD Block
MoWR AIBP C/o Gayak MIP at Dambuk.
Head work /Channel
95º 35'05.12" E 28º15'01.28" N
1217 ft MSL
1 3.00 One Year
(2016-17)
6.00
5 Dambuk-Paglam CD Block
MoWR AIBP C/o Pipe Irrigation at Hiltop Garden.
Head work /Channel
95º 34'20.99" E 28º15'29.18" N
1534 ft MSL
1 5.00 One Year
(2016-17)
10.00
6 Dambuk-Paglam CD Block
MoWR AIBP C/o Pane MIP at Bomjir.
Head work /Channel
95º 39'44.37" E 28º09'33.30" N
708 ft MSL
1 5.00 One Year
(2016-17)
10.00
7 Dambuk-Paglam CD Block
MoWR AIBP C/o Bom MIP at Dambuk.
Head work /Channel
95º 35'01.18" E 28º15'01.11" N
1223 ft MSL
1 5.00 One Year
(2016-17)
9.50
8 Dambuk-Paglam CD Block
MoWR AIBP C/o Akako Nallah MIP at Sirang Phase-II.
Head work /Channel
95º 37'16.34" E 28º16'33.78" N
1589 ft MSL
1 2.00 One Year
(2016-17)
4.00
9 Dambuk-Paglam CD Block
MoWR AIBP C/o Pasing MIP at Bomjir Phase-II.
Head work /Channel
95º 39'42.73" E 28º10'01.90" N
721 ft MSL
1 5.00 One Year
(2016-17)
4.00
10 Dambuk-Paglam CD Block
MoWR AIBP C/o Ningo MIP at Dambuk.
Head work /Channel
95º 35'06.53" E 28º14'35.72" N
1164 ft MSL
1 5.00 One Year
(2016-17)
10.00
II . Cluster of MIP under Bizari Section under Dambuk Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Dambuk-Paglam CD Block
MoWR AIBP C/o MIC from Moyong to Zilung WRC Field.
Head work /Channel
95º 36'39.21" E 28º02'11.33" N
544 ft MSL
1 5.00 One Year
(2016-17)
10.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
85
2 Dambuk-Paglam CD Block
MoWR AIBP C/o Bolen MIP at Bizari.
Head work /Channel
95º 35'42.61" E 28º04'45.17" N
609 ft MSL
1 3.00 One Year
(2016-17)
6.00
3 Dambuk-Paglam CD Block
MoWR AIBP C/o Mekong MIP at Bizari.
Head work /Channel
95º 34'49.86" E 28º02'18.91" N
551 ft MSL
1 5.00 One Year
(2016-17)
4.50
4 Dambuk-Paglam CD Block
MoWR AIBP C/o MIP near Ekmile at Bizari.
Head work /Channel
95º 36'15.15" E 28º02'19.65" N
532 ft MSL
1 5.00 One Year
(2016-17)
9.50
5 Dambuk-Paglam CD Block
MoWR AIBP C/o Hatiy Nallah MIP at Bizari.
Head work /Channel
95º 36'21.80" E 28º02'13.95" N
547 ft MSL
1 5.00 One Year
(2016-17)
10.00
6 Dambuk-Paglam CD Block
MoWR AIBP C/o MIP from Banko Nallah at Bizari.
Head work /Channel
95º 34'43.89" E 28º02'04.21" N
546 ft MSL
1 5.00 One Year
(2016-17)
5.00
7 Dambuk-Paglam CD Block
MoWR AIBP C/o Lompo MIP at Bizari.
Head work /Channel
95º 35'34.28" E 28º02'24.93" N
546 ft MSL
1 2.00 One Year
(2016-17)
4.00
8 Dambuk-Paglam CD Block
MoWR AIBP C/o MIP at Subrang Agril Field from Tama Nallah at Bizari.
Head work /Channel
95º 36'31.60" E 28º02'35.90" N
540 ft MSL
1 5.00 One Year
(2016-17)
4.50
9 Dambuk-Paglam CD Block
MoWR AIBP C/o Gogen Mip at Bizari.
Head work /Channel
95º 35'29.22" E 28º04'03.33" N
592 ft MSL
1 5.00 One Year
(2016-17)
4.50
Dambuk-Paglam Total 19 85.00 140.00
I.Cluster of MIP Schemes under Hunli Section . S/Order no :- SWRD/ --- /AOP/RNG /2013-14. dt . 14/03/14
District Irrigation Plan (PMKSY) Lower Dibang Valley
86
1 Hunli - Desali CD Block
MoWR AIBP C/o MIP at Chulugu village
Head work /Channel
95º 56'18.66'' E 28º20'29.96'' N
1281 mtr MSL
1 6.00 One Year
(2016-17)
6.00
2 Hunli - Desali CD Block
MoWR AIBP C/o MIP at Hunli village
Head work /Channel
95º 57'45.99'' E 28º19'24.82'' N
1177 mtr MSL
1 4.00 One Year
(2016-17)
7.00
3 Hunli - Desali CD Block
MoWR AIBP C/o MIP at Aloni village
Head work /Channel
95º 56'57.09'' E 28º21'58.49'' N
817 mtr MSL
1 4.00 One Year
(2016-17)
5.00
Total 3 14.00
18.00
I. Cluster of MIP under Desali Section under Anini Sub-division S/Order no SWRD/02/AOP/RNG/2013-14dt.14/03/14
1 Hunli-Desali CD Block
MoWR AIBP C/o MIP at Jamupani Village.
Head work /Channel
95º 59'55.66" E 28º18'34.87" N
724 mtr MSL
1 3.00 One Year
(2016-17)
6.00
2 Hunli-Desali CD Block
MoWR AIBP C/O MIP at Desali village.
Head work /Channel
96º 02'00.60" E 28º17'25.83" N
1029mtr MSL
1 3.00 One Year
(2016-17)
7.00
3 Hunli-Desali CD Block
MoWR AIBP C/O MIP at Chuluni Model Village.
Head work /Channel
96º 03'03.44" E 28º17'03.13" N
1062 mtr MSL
1 3.00 One Year
(2016-17)
6.00
4 Hunli-Desali CD Block
MoWR AIBP C/O MIP at Charli village.
Head work /Channel
96º01'46.83" E 28º17'31.40" N
1083 mtr MSL
1 3.00 One Year
(2016-17)
5.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
87
5 Hunli-Desali CD Block
MoWR AIBP C/O MIP at Taloni village.
Head work /Channel
96º 04'39.37" E 28º16'55.71" N
1210 mtr MSL
1 3.00 One Year
(2016-17)
6.00
Sub-Total
5 15.00
30.00
Hunli-Desali Total
8 29.00
48.00
Grand Total of AIBP
50 290.00
416.00
Surface Minor Irrigation
A. New Proposals for Minor Irrigation Projects(Under HQ-I )
1 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Dongkal agricultural field at Meka village
Head work /Channel
950 48'72.14 E 28005'42.20 N
220.8
1 55.00 Five Year
136.95
2 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP from Samak Nallah to Pering area (Tea/Rubber plantation)
Head work /Channel
950 50'03.58 E 28005'25.99 N
257.556
1 37.00 Five Year
92.13
3 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Mayum MIP for Boli area at Meka
Head work /Channel
950 50'15.18 E 28007'25.02 N
301.45
1 30.00 Five Year
74.70
4 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Dongkal MIP at Moteng arik WRC field at Meka
Head work /Channel
95049'44.11 E 28005'89.03 N
261.54
1 40.00 Five Year
99.60
District Irrigation Plan (PMKSY) Lower Dibang Valley
88
5 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Jilek arik cultivation from Libit korong in Meka
Head work /Channel
95050'76.21 E 28006'35.01 N
316.2
1 25.00 Five Year
62.25
6 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o Balek Rikyu MIP for Balek village
Head work /Channel
95050'88.92 E 28006'25.03 N
290.00
1 28.00 Five Year
69.72
7 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP from river Meka to Balek cultivation field
Head work /Channel
95050'85.40 E 28006'03.15 N
285.00
1 17.00 Five Year
42.33
8 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o of Simar(Adi) MIP for Balek cultivation field(Balngo area) at Balek village
Head work /Channel
95051'75.70 E 28005'66.60 N
307.00
1 15.00 Five Year
37.35
9 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP from Libit Korong to Mobom area at Balek
Head work /Channel
95050'83.21 E 28006'36.12 N
312.00
1 20.00 Five Year
49.80
10 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP from Sita korong to Lingging Kando cultivation field at Rayang
Head work /Channel
95051'03.07 E 28007'02.30 N
329.00
1 15.00 Five Year
37.35
District Irrigation Plan (PMKSY) Lower Dibang Valley
89
11 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Kok arik cultivation field from Cheta Nallah
Head work /Channel
95050'48.10 E 28007'30.20 N
324.00
1 35.00 Five Year
87.15
12 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Odipa agril.field at Meka
Head work /Channel
950 49'36.30 E 28004'55.51 N
217.95
1 8.00 Five Year
19.92
13 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP from Samak at 6 Km Meka on Lego field
Head work /Channel
950 49'60.22 E 28004'36.03 N
218.45
1 10.00 Five Year
24.90
14 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Vid arik at Dongkal area at Meka
Head work /Channel
950 49'09.12 E 28004'72.05 N
219.15
1 7.00 Five Year
17.43
15 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Dongkal area at Meka(Samak Korong )
Head work /Channel
950 48'75.72 E 28004'91.64 N
215.55
1 6.00 Five Year
14.94
16 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Ara camp area
Head work /Channel
950 49'33.32 E 28004'30.54 N
213.5
1 10.00 Five Year
24.90
17 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP for Liklek Libit area at Meka
Head work /Channel
950 49'09.12 E 28004'72.05 N
296.36
1 10.00 Five Year
24.90
18 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP to Balek agril.field area
Head work /Channel
95050'66.60 E 28006'11.14 N
278.00
1 8.00 Five Year
19.92
19 Roing-Kornu CD Block
MoWR Har khet
C/o MIP to Lokni area at Balek
Head work /Channel
95050'60.60 E 28006'08.30 N
281.00
1 6.00 Five Year
14.94
District Irrigation Plan (PMKSY) Lower Dibang Valley
90
ko pani
20 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP to Simar agril field
Head work /Channel
95051'66.63 E 28005'52.72 N
301.00
1 10.00 Five Year
24.90
21 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Gangkek paddy field at Rayang
Head work /Channel
95050'15.10 E 28006'30.50 N
327.00
1 30.00 Five Year
74.70
22 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Kok arik cultivation field
Head work /Channel
95050'65.20 E 28007'12.10 N
322.00
1 15.00 Five Year
37.35
23 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Innong area at Rayang
Head work /Channel
95050'70.20 E 28007'60.30 N
328.00
1 7.00 Five Year
17.43
24 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o Renovation of Meka Korong MIP at Balek village.
Head work /Channel
95050'73.20 E 28007'58.30 N
289.00
1 10.00 Five Year
24.90
25 Roing-Kornu CD Block
MoWR Har khet ko pani
C/o MIP for Kangkin area at Rayang
Head work /Channel
95050'65.15 E 28006'80.40 N
326.00
1 15.00 Five Year
37.35
26 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Aba MIP at Simari I, Simari II and Balek
Head work /Channel
95°50'25,7"E 28°04'59,0"N
0.00 1 600.00 Five Year
1494.00
Total
26 1069.00
2661.81
District Irrigation Plan (PMKSY) Lower Dibang Valley
91
A. New Proposals for Minor Irrigation Projects(Under HQ-II )
1 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIC at Chimiri village.
Head work /Channel
95047'27,1"E 28011'07,2"N
0.00 1 20.00 Five Year
49.00
2 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Cheko
Head work /Channel
95°45'55,2"E 28°10'40,4"N
0.00 1 150.00 Five Year
367.50
3 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Digri agril field.
Head work /Channel
95°45'49,1"E 28°12'29,9"N
0.00 1 10.00 Five Year
24.50
4 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at New Chidu.
Head work /Channel
95°45'32,2"E 28°12'09,1"N
0.00 1 60.00 Five Year
147.00
5 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Chichi Nallah at Chidu village.
Head work /Channel
95°46'05,4"E 28°12'34,3"N
0.00 1 15.00 Five Year
36.75
6 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIC at Ale Ledo village.
Head work /Channel
95°45'52,5"E 28°10'42,0"N
0.00 1 10.00 Five Year
24.50
7 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIC from7 kilo Nallah for Hindume agril field at Kebali
Head work /Channel
95°48'04,3"E 28°10'43,1"N
0.00 1 7.50 Five Year
18.38
8 Roing-Kornu CD Block
MoWR Har khet ko pani
MIC at Dolombero agril field.
Head work /Channel
95°45'04,5"E 28°12'26,9"N
0.00 1 10.00 Five Year
24.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
92
9 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Demuko Nallah MIP at Chidu.
Head work /Channel
95°46'12,7"E 28°12'29,3"N
0.00 1 12.50 Five Year
30.63
10 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Bemuke Nallh MIP at Chidu.
Head work /Channel
95°46'11,8"E 28°12'27,9"N
0.00 1 15.00 Five Year
36.75
11 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIC for Buka Nallah area in Cheta-I village.
Head work /Channel
95°51'14,9"E 28°08'16,7"N
0.00 1 10.00 Five Year
24.50
12 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Cheko Athu MIC at Chidu.
Head work /Channel
95°47'53,3"E 28°11'44,5"N
0.00 1 10.00 Five Year
24.50
13 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Komul agril field at New Chidu village
Head work /Channel
95°45'22,2"E 28°11'38,1"N
0.00 1 15.00 Five Year
36.75
14 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Left bank of Jamu Nallah for Jummu Agril.field at Chidhu village
Head work /Channel
95°45'32,5"E 28°11'39,21"N
0.00 1 12.00 Five Year
29.40
15 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Right bank of Jamu Nallah for Jummu Agril.field at Chidhu village
Head work /Channel
95°45'07,11"E 28°11'24,6"N
0.00 1 15.00 Five Year
36.75
District Irrigation Plan (PMKSY) Lower Dibang Valley
93
16 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP for Agril field located at Old Abali - Iduli road near Iduli village
Head work /Channel
95°49'35,17"E 27°59'598,7"N
0.00 1 10.00 Five Year
24.50
17 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIC at Malek agril field from Deopani
Head work /Channel
95046'55.70.E 28008'30.41N
0.00 1 10.00 Five Year
24.50
Total 17 392.00 960.40
A. New Proposals for Minor Irrigation Projects(Under Roing-I )
1 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Rongu MIP at Rungu cultivation field.
Head work /Channel
95°52'22,7"E 27°59'03,8"N
179.22
1 100.00 Five Year
245.00
2 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Cheya MIP at Rukmo village.
Head work /Channel
95°52'20,4"E 27°59'49,9"N
179.53
1 700.00 Five Year
1,715.
00
3 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Eje MIP at Iduli.
Head work /Channel
95°52'12,1"E 27°59'38,5"N
178.31
1 80.00 Five Year
196.00
4 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Kesa Nallah at Iduli area.
Head work /Channel
95°52'18,4"E 27°59'38,7"N
170.38
1 20.00 Five Year
49.00
5 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Hambo MIP at Iduli.
Head work /Channel
95°48'35,5"E 27°59'28,6"N
168.86
1 15.00 Five Year
36.75
District Irrigation Plan (PMKSY) Lower Dibang Valley
94
6 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Jingo river at Emuli.
Head work /Channel
95°52'21,2"E 27°59'31,6"N
174.65
1 500.00 Five Year
1,225.
00
7 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Khingili Nallah to Khingili agril field.
Head work /Channel
95°51'46,3"E 28°01'13,8"N
173.13
1 200.00 Five Year
490.00
8 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Koliya Nallah to Lapoli agril field.
Head work /Channel
95°52'51,9"E 28°01'13,8"N
171.30
1 200.00 Five Year
490.00
9 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Lakha MIP at Old Abali.
Head work /Channel
95°50'19,2"E 27°58'09,8"N
174.04
1 60.00 Five Year
147.00
10 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Jawa river MIP for Abango agricultural field.
Head work /Channel
95°53'22,2"E 28°05'28,1"N
299.92
1 100.00 Five Year
245.00
11 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Suppi Nallah to Delo cultivation area.
Head work /Channel
95°55'02,8"E 28°04'58,5"N
304.80
1 200.00 Five Year
490.00
12 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Aruchigu at Koronu village
Head work /Channel
95°55'53,9"E 28°03'58,5"N
276.15
1 40.00 Five Year
98.00
13 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Marinda MIP at Bishmaknagar.
Head work /Channel
95°00'00,5"E 28°02'41,5"N
291.69
1 60.00 Five Year
147.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
95
14 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Koronu Nallah MIP at Koronu village.
Head work /Channel
95°56'10,3"E 28°03'23,4"N
287.12
1 200.00 Five Year
490.00
15 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Inju river to Injuno village.
Head work /Channel
95°55'11,7"E 28°04'16,3"N
274.93
1 150.00 Five Year
367.50
16 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Ambra Chili MIP at Bhiskmanagar
Head work /Channel
95°57'31.7"E 28°03'32.3"N
306.32
1 150.00 Five Year
367.50
17 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Keso Nallah at Denlo.
Head work /Channel
95°53'49.7"E 28°03'44.3"N
291.08
1 50.00 Five Year
122.50
18 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Rukmo river in Rukmo village.
Head work /Channel
95°53'11,9"E 27°58'47,0"N
162.46
1 50.00 Five Year
122.50
19 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Iduli village.
Head work /Channel
95°51'55,5"E 27°59'59,5"N
160.02
1 40.00 Five Year
98.00
20 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Endro Nallah MIP at Khingli.
Head work /Channel
95°51'21,5"E 28°00'59,4"N
171.91
1 15.00 Five Year
36.75
21 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP for Mepo agril field at Aru-Chigu.
Head work /Channel
95°50'37,8"E 28°01'25,3"N
169.77
1 30.00 Five Year
73.50
22 Roing-Kornu CD Block
MoWR Har khet
C/O Tokape MIP at Iduli.
Head work /Channel
95°48'32,0"E 27°59'32,1"N
155.14
1 15.00 Five Year
36.75
District Irrigation Plan (PMKSY) Lower Dibang Valley
96
ko pani
23 Roing-Kornu CD Block
MoWR Har khet ko pani
MIP at Southern part of Rukmo village.
Head work /Channel
95°52'28,4"E 27°58'38,2"N
152.40
1 35.00 Five Year
85.75
24 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Khingili II near Kundil.
Head work /Channel
95°51'09,4"E 28°01'18,3"N
171.30
1 20.00 Five Year
49.00
25 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Khindily Nallah MIP at Khingli in Abali village.
Head work /Channel
95°51'07,3"E 28°01'21,5"N
165.51
1 20.00 Five Year
49.00
26 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Agurupa MIP at Khinjili.
Head work /Channel
95°51'07,3"E 28°01'21,5"N
168.86
1 20.00 Five Year
49.00
27 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Imu Nallah MIP at Imuli village.
Head work /Channel
95°52'10,2"E 27°59'32,4"N
164.29
1 17.50 Five Year
42.88
28 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Aba MIP at Old Abali village.
Head work /Channel
95°50'09,4"E 28°02'26,9"N
183.18
1 25.00 Five Year
61.25
29 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Kemrah Nallah MIP at Old Abali village.
Head work /Channel
95°50'16,8"E 28°02'28,0"N
184.10
1 15.00 Five Year
36.75
30 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Kesha Nallah MIP.
Head work /Channel
95°48'30,6"E 27°59'40,8"N
206.65
1 25.00 Five Year
61.25
District Irrigation Plan (PMKSY) Lower Dibang Valley
97
31 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP for Horupahar.
Head work /Channel
95°52'37,7"E 28°04'03,0"N
195.38
1 20.00 Five Year
49.00
32 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Futabill.
Head work /Channel
95°52'18,8"E 27°59'32,5"N
191.72
1 25.00 Five Year
61.25
33 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Khundu agra MIP at Iduli.
Head work /Channel
95°48'32,8"E 27°59'40,9"N
186.54
1 20.00 Five Year
49.00
34 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Abu Siru MIP at Iduli village.
Head work /Channel
95°48'31,9"E 27°59'43,1"N
185.93
1 15.00 Five Year
36.75
35 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Dema MIP at Iduli.
Head work /Channel
95°48'53,8"E 27°59'45,4"N
182.88
1 10.00 Five Year
24.50
36 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Andoli near Khingili.
Head work /Channel
95°48'33.52"E 28° 1'6.54"
N
170.69
1 10.00 Five Year
24.50
37 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Lower Jawa river MIP for Abango agricultural field.
Head work /Channel
95°53'22,2"E 28°05'28,1"N
206.96
1 10.00 Five Year
24.50
38 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Cheya MIP at Denlo.
Head work /Channel
95°55'16,2"E 28°03'13,7"N
299.92
1 20.00 Five Year
49.00
39 Roing-Kornu CD Block
MoWR Har khet
Renovation of MIP at
Head work /Channel
95°55'00,2"E 28°04'06,8"N
302.36
1 7.50 Five Year
18.38
District Irrigation Plan (PMKSY) Lower Dibang Valley
98
ko pani
Injono village.
40 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Denlo village.
Head work /Channel
95°55'21,6"E 28°03'13,7"N
295.05
1 23.00 Five Year
56.35
41 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Chilikhi MIP at Bishmaknagar.
Head work /Channel
95°59'51,4"E 28°02'27,8"N
302.67
1 17.50 Five Year
42.88
42 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Aba agril field from Mirinda Nallah at Bishmaknagar
Head work /Channel
95°59'14,2"E 28°02'44,1"N
306.32
1 30.00 Five Year
73.50
43 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Chip -Chipe MIP at Rukmo village.
Head work /Channel
95°51'55.94"E 27°58'33.91"N
167.64
1 25.00 Five Year
61.25
44 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Trame MIP at Abango village.
Head work /Channel
95°52'59,5"E 28°04'36,6"N
266.70
1 24.00 Five Year
58.80
45 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Merinda Nallah MIP for Misaya agril field.
Head work /Channel
95°59'50,9"E 28°02'56,0"E
267.00
1 30.00 Five Year
73.50
46 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Kesa Nallah MIC at Iduli agril field.
Head work /Channel
95°49'32.67"E 27°58'36.35"N
155.75
1 15.00 Five Year
36.75
47 Roing-Kornu CD Block
MoWR Har khet
C/O Kundil MIC at
Head work /Channel
95°47'40.41"E 28° 0'37.07
"N
159.11
1 12.00 Five Year
29.40
District Irrigation Plan (PMKSY) Lower Dibang Valley
99
ko pani
Khinjili agril field.
48 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Bishmaknagar (Meto Village) for Iteni area
Head work /Channel
28° 1'8.58"N 95°59'28.78"E
10.00
1 23.00 Five Year
56.35
49 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Panna Aguh (Nallah) at Iduli for kesha area.
Head work /Channel
27°58'24.86"N 95°50'34.29"E
15.00
1 22.00 Five Year
53.90
50 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Cheya Nallah at Emuli village for lokhauw area.
Head work /Channel
27°59'29.15"N 95°52'51.57"E
179.83
1 10.00 Five Year
24.50
51 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Lift Irrigation at Khinijli village
Head work /Channel
28° 1'4.26"N 95°47'46.32"E
159.41
1 10.00 Five Year
24.50
52 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP from Inju nallah to Agr. Land of Emuli.
Head work /Channel
27°59'44.24"N 95°51'54.23"E
174.35
1 20.00 Five Year
49.00
53 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Abango village
Head work /Channel
28° 4'42.64"N 95°53'42.76"E
362.41
1 25.00 Five Year
61.25
54 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Injonu village
Head work /Channel
28° 4'20.29"N 95°54'12.30"E
316.38
1 25.00 Five Year
61.25
District Irrigation Plan (PMKSY) Lower Dibang Valley
100
55 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Ammu chili nallah to Khinijli village
Head work /Channel
28° 0'55.38"N 95°48'8.60"E
177.39
1 80.00 Five Year
196.00
56 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O MIP at Aba nallah to Hawai chapori area at New Abali
Head work /Channel
28° 2'21.70"N 95°49'5.42"E
190.20
1 25.00 Five Year
61.25
57 Roing-Kornu CD Block
MoWR Har khet ko pani
C/O Ithi MIP at Bishmaknagar
Head work /Channel
95°00'00,5"E 28°02'41,5"N
290.00
1 200.00 Five year
490.00
Total
57 3906.50
9570.925
Section :-Bolung
1 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Getek area MIP at Jia village.
Head work /Channel
95°47'46.38"E 28° 3'16.50"N
188.67
1 180.00 Five Year
441.00
2 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Kutkong MIP from kundil river at Jia village.
Head work /Channel
95°46'57.67"E 28° 2'28.75"N
172.21
1 105.00 Five Year
257.25
3 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Kundil river for Kundung Banggo.
Head work /Channel
95°47'11.22"E 28° 1'56.61"N
167.64
1 78.00 Five Year
191.10
4 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Kundil river to Kengkut area in Bolung.
Head work /Channel
95°47'57.05"E 27°59'27.93"N
155.14
1 330.00 Five Year
808.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
101
5 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Lift Irrigation from Kundil river at Kabang.
Pump house/Pum
p set/ Channel
95°48'45.62"E 27°58'36.68"N
147.83
1 75.00 Five Year
183.75
6 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Buksing from kengkut river.
Head work /Channel
95°46'24.49"E 28° 2'47.96"N
173.74
1 179.00 Five Year
438.55
7 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Dolbo MIP from kungkut river in Jia village.
Head work /Channel
95°46'43.01"E 28° 2'43.53"N
172.82
1 18.00 Five Year
44.10
8 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Kengkut river in Bulung village.
Head work /Channel
95°47'18.70"E 28° 1'34.47"N
161.24
1 15.00 Five Year
36.75
9 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIC at Kengkut Nallah
Head work /Channel
95°47'9.85"E 27°59'40.65"N
154.53
1 210.00 Five Year
514.50
10 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Akkang Nallah
Head work /Channel
95°46'49.69"E 27°59'3.17"N
153.31
1 243.00 Five Year
595.35
11 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Kangkan MIP at Kangkong village
Head work /Channel
95°47'59.55"E 27°58'39.95"N
149.66
1 62.00 Five Year
151.90
12 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Moying MIP at Bolung Village.
Head work /Channel
95°43'41.26"E 28° 2'6.36"N
167.34
1 105.00 Five Year
257.25
District Irrigation Plan (PMKSY) Lower Dibang Valley
102
13 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Nom MIP at moying area in Bolung village.
Head work /Channel
95°43'50.68"E 28° 1'19.56"N
162.46
1 79.90 Five Year
195.76
14 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Kaadi nallah at Bolung village
Head work /Channel
95°43'18.48"E 28° 1'7.11"N
161.54
1 72.00 Five Year
176.40
15 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Moying river at Jangpathar area.
Head work /Channel
95°43'21.40"E 28° 1'27.67"N
161.85
1 51.00 Five Year
124.95
16 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Moying Korong in Parbuk Village
Head work /Channel
95°43'35.90"E 27°59'46.33"N
156.67
1 213.00 Five Year
521.85
17 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP for Geying Patang at Bolung village.
Head work /Channel
95°43'9.22"E 28° 1'31.32"N
164.90
1 25.00 Five Year
61.25
18 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/o MIP at Doleswar nallah in Kangkong village.
Head work /Channel
95°42'39.99"E 27°59'18.77"N
153.62
1 82.00 Five Year
200.90
19 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Gene WRC field from Horujia river
Head work /Channel
95°45'15.51"E 28° 1'5.59"N
163.37
1 113.00 Five Year
276.85
20 Roing-Koronu CD Block
MoWR Har khet
C/O Horujia MIP at Bolik village.
Head work /Channel
95°45'27.93"E 28° 0'16.36"N
160.93
1 20.00 Five Year
49.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
103
ko pani
21 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Kopyang-Horujia MIP at Parbuk village.
Head work /Channel
95°45'12.34"E 28° 0'10.68"N
158.80
1 102.00 Five Year
249.90
22 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Horujia korong at Parbuk Village.
Head work /Channel
95°44'44.24"E 27°59'26.02"N
156.67
1 14.00 Five Year
34.30
23 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP for lower Horujia cultivation area at Parbuk village.
Head work /Channel
95°44'59.68"E 27°58'43.17"N
159.41
1 182.00 Five Year
445.90
24 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Baksek river at langkam area.
Head work /Channel
95°44'42.36"E 28° 1'22.67"N
162.15
1 52.00 Five Year
127.40
25 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Baksek river to Parbuk field area.
Head work /Channel
95°44'41.14"E 28° 0'20.01"N
159.41
1 155.00 Five Year
379.75
26 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP from Baksek river at Middle Baksek
Head work /Channel
95°44'12.72"E 27°59'16.13"N
154.84
1 120.00 Five Year
294.00
27 Roing-Koronu CD Block
MoWR Har khet
C/O MIP from Baksek
Head work /Channel
95°43'34.63"E 27°58'33.15"N
153.31
1 180.00 Five Year
441.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
104
ko pani
river at low baksek area.
28 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Baksek MIP at Bolung.
Head work /Channel
95°45'2.55"E 28° 0'57.84"N
161.54
1 28.00 Five Year
68.60
29 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Asi- uyu kopang area in Jia village
Head work /Channel
95°45'49.09"E 28° 2'53.12"N
174.04
1 8.00 Five Year
19.60
30 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Lift Irrigation from Jia river at Lirung area in Bolung.
Pump house/Pum
p set/ Channel
95°46'6.22"E 28° 0'54.36"N
166.12
1 50.00 Five Year
122.50
31 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/o MIP from Jia river .
Head work /Channel
95°46'0.91"E 27°58'56.50"N
159.72
1 350.00 Five Year
857.50
32 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Remsing WRC field.
Head work /Channel
95°43'10.97"E 28° 4'20.47"N
174.04
1 47.00 Five Year
115.15
33 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Idili nallah
Head work /Channel
95°43'5.00"E 28° 4'7.77"N
171.60
1 13.00 Five Year
31.85
34 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Taaju nallah
Head work /Channel
95°43'34.38"E 28° 4'19.88"N
176.17
1 51.20 Five Year
125.44
35 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Hollock Bari MIP at Jia village.
Head work /Channel
95°48'20.67"E 28° 4'33.14"N
212.75
1 100.00 Five Year
245.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
105
36 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Jia village in Cheta Korong.
Head work /Channel
95°47'42.24"E 28° 3'44.16"N
192.63
1 120.00 Five Year
294.00
37 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP for Mongkang area in Jia Village
Head work /Channel
95°43'16.86"E 28° 4'42.29"N
179.83
1 44.50 Five Year
109.03
38 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Yidum MIP at Moying WRC field at Bolung village.
Head work /Channel
95°44'26.02"E 28° 2'25.20"N
169.16
1 102.00 Five Year
249.90
39 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O James MIP at Tatsing korong in jia village.
Head work /Channel
95°47'45.37"E 28° 1'41.81"N
165.51
1 12.00 Five Year
29.40
40 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Pertin area at Kabang Village.
Head work /Channel
95°48'22.48"E 27°58'31.92"N
149.66
1 20.00 Five Year
49.00
41 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O MIP at Peki nallah at Kundil.
Head work /Channel
95°48'54.82"E 27°58'11.55"N
147.52
1 88.00 Five Year
215.60
42 Roing-Koronu CD Block
MoWR Har khet ko
pani
C/O Kundung MIP at Taksing village
Head work /Channel
95°47'57.13"E 28° 2'17.74"N
175.26
1 7.00 Five Year
17.15
Total
42 4101.60
10048.92
Roing-Koronu Total
142 9469.10
23242.06
District Irrigation Plan (PMKSY) Lower Dibang Valley
106
A. New Proposals for Minor Irrigation Projects
1 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Right Bank of Dapey River at Bizari.
Head work /Channel
95º 35'08.59" E 28º00'45.72" N
509 ft MSL
1 110.00 Five Year
275.00
2 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Oman MIP at Bizari.
Head work /Channel
95º 37'10.50" E 28º01'15.80" N
280 ft MSL
1 5.00 Five Year
11.00
3 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/o MIP at Left Bank of Dapey River at Bizari.
Head work /Channel
95º 35'19.99" E 28º00'50.56" N
505 ft MSL
1 130.00 Five Year
325.00
4 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/o MIP at Tinkilo WRC area at Chiliprah nallah at Bizari.
Head work /Channel
95º 36'15.45" E 28º02'35.91" N
547 ft MSL
1 60.00 Five Year
150.00
5 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O pipe irrigation at Yakhung WRC field at Ansing Kobing area at Bomzir village .
Head work /Channel
95º 38'40.14" E 28º09'48.55" N
784 ft MSL
1 34.00 Five Year
85.00
6 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Lek MIP at Akako area under dambuk sub Division .
Head work /Channel
95º 37'51.99" E 28º16'36.61" N
1332 ft MSL
1 25.00 Five Year
62.50
7 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at 5Km from Dambuk at Model Arik
Head work /Channel
95º 37'33.74" E 28º13'23.35" N
993 ft MSL
1 35.00 Five Year
87.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
107
at Dambuk village .
8 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Reb MIP at Reebok WRC field at at Dambuk village .
Head work /Channel
95º 35'49.08" E 28º14'06.07" N
1113 ft MSL
1 50.00 Five Year
125.00
9 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Rajen MIP at Bise camp area at Bizari village .
Head work /Channel
95º 36'38.57" E 28º00'52.48" N
496 ft MSL
1 40.00 Five Year
100.00
10 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Enung MIP at Bizari village .
Head work /Channel
95º 36'22.99" E 28º03'08.04" N
560 ft MSL
1 15.00 Five Year
37.50
11 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Lung MIP at Tamak Korong at Bizari village .
Head work /Channel
95º 36'22.52" E 28º02'28.64" N
549 ft MSL
1 28.00 Five Year
70.00
12 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Baling MIP at Dambuk .
Head work /Channel
95º 37'48.84" E 28º15'04.66" N
1250 ft MSL
1 30.00 Five Year
75.00
13 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Kuger MIP at Bomjir village .
Head work /Channel
95º 39'45.70" E 28º07'35.20" N
702 ft MSL
1 20.00 Five Year
50.00
14 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Malek MIP at Dambuk at
Head work /Channel
95º 37'42.73" E 28º07'01.90" N
724 ft MSL
1 15.00 Five Year
37.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
108
Patching village .
15 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Sippy MIP at Dambuk.
Head work /Channel
95º 37'28.73" E 28º07'01.90" N
724 ft MSL
1 15.00 Five Year
37.50
16 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Ojing MIP at Bizari village .
Head work /Channel
95º 35'22.52" E 28º02'28.64" N
549 ft MSL
1 20.00 Five Year
50.00
17 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Ato MIP at Dambuk.
Head work /Channel
95º 35'17.10" E 28º14'37.37" N
1173 ft MSL
1 25.00 Five Year
62.50
18 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Nong MIP at Singking area at Bizari village .
Head work /Channel
95º 35'44.86" E 28º02'15.95" N
535 ft MSL
1 30.00 Five Year
75.00
19 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at 3 km WRC paddy field at Bizari
Head work /Channel
95º 36'35.72" E 28º03'20.23" N
555 ft MSL
1 70.00 Five Year
175.00
20 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Anpum Nallah at Bizari
Head work /Channel
95º 34'16.33" E 27º59'59.04" N
484 ft MSL
1 35.00 Five Year
87.50
21 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Anpum Arik at Bizari
Head work /Channel
95º 34'28.77" E 27º59'42.46" N
479 ft MSL
1 38.00 Five Year
95.00
22 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Siye Arik at Bizari
Head work /Channel
95º 36'48.37" E 28º01'56.66" N
523 ft MSL
1 33.00 Five Year
82.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
109
23 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Lokling Kaling at Bizari
Head work /Channel
95º 33'36.94" E 27º59'53.82" N
490 ft MSL
1 8.00 Five Year
20.00
24 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Bortak agril field at Bizari
Head work /Channel
95º 35'59.45" E 28º03'07.44" N
556 ft MSL
1 16.00 Five Year
40.00
25 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Jongga Gobo under Radang at Dambuk
Head work /Channel
95º 35'19.10" E 28º14'39.37" N
1176 ft MSL
1 15.00 Five Year
37.50
26 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Kayum Arik from Tipo Korong at Bizari
Head work /Channel
95º 36'14.78" E 28º02'43.37" N
540 ft MSL
1 14.00 Five Year
35.00
27 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Kolom Agril Field at Bizari
Head work /Channel
95º 35'17.82" E 28º02'10.21" N
541 ft MSL
1 12.00 Five Year
30.00
28 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Panya Siru at Roton agril field at Dunabari in Bizari
Head work /Channel
95º 34'20.78" E 27º59'27.94" N
468 ft MSL
1 12.00 Five Year
30.00
29 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Anpum Sibek at Lulom agril field at last dipu area at Bizari
Head work /Channel
95º 34'20.72" E 27º59'22.72" N
470 ft MSL
1 18.00 Five Year
45.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
110
30 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Ngargo Siru at Obinam agril field at Lidor area at Bizari
Head work /Channel
95º 34'11.91" E 27º59'14.46" N
469 ft MSL
1 12.00 Five Year
30.00
31 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Panbo Siru -II at Robin Agril field at Panbo area Bizari
Head work /Channel
95º 34'05.11" E 27º59'06" N
472 ft MSL
1 12.00 Five Year
30.00
32 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Maksum River at Seri agril field at Dunabari area at Bizari
Head work /Channel
95º 34'04.44" E 27º58'58.96" N
472 ft MSL
1 10.00 Five Year
25.00
33 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Tamak Nallah at Bizari
Head work /Channel
95º 36'11.17" E 28º03'12.33" N
568 ft MSL
1 12.00 Five Year
30.00
34 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Dunabari at Anpum in Bizari
Head work /Channel
95º 34'38.19" E 28º02'16.28" N
540 ft MSL
1 25.00 Five Year
62.50
35 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Pando River basin at Bizari
Head work /Channel
95º 36'00.00" E 28º02'16.53" N
546 ft MSL
1 20.00 Five Year
50.00
36 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Banko Nallah at Bizari
Head work /Channel
95º 35'37.82" E 28º02'22.15" N
570 ft MSL
1 60.00 Five Year
150.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
111
37 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP at Siiralli Nallah at Akoko
Head work /Channel
95º 37'25.07" E 28º16'43.92" N
1524 ft MSL
1 66.00 Five Year
165.00
38 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Irrigation at Orange Garden at Mongging at Dambuk
Head work /Channel
95º 34'20.17" E 28º15'20.88" N
1280 ft MSL
1 15.00 Five Year
37.50
Total
38 1190.00
2973.50
B. New Proposals Minor Irrigation Projects under Dambuk - Paglam Block
1 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Bizari-I village Agril land from Sinking River / Nallah .
Head work /Channel
95º 37'08.88" E 28º02'17.90" N
532 ft MSL
1 292.00 Five Year
730.00
2 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Bizari-II village Agril land from Anpum River / Nallah .
Head work /Channel
95º 36'56.26" E 28º02'32.81" N
538 ft MSL
1 298.00 Five Year
745.00
3 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP Tipo village Agril land from Tipo Krong / River / Nallah .
Head work /Channel
95º 37'05.42" E 28º02'12.70" N
533 ft MSL
1 244.00 Five Year
610.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
112
4 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Keara -Ah ( Chimu ) village Agril land from Chimu River / Nallah .
Head work /Channel
95º 36'44.04" E 28º02'14.58" N
549 ft MSL
1 175.00 Five Year
437.50
5 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Bizari-III village Agril land from Anpum River / Nallah .
Head work /Channel
95º 36'56.38" E 28º02'53.48" N
543 ft MSL
1 244.00 Five Year
610.00
6 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Gamyoling village Agril land from Peli River / Nallah .
Head work /Channel
95º 37'27.54" E 28º06'21.74" N
667 ft MSL
1 236.00 Five Year
590.00
7 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Gandhi ( Lasum ) village Agril land from Sinking River / Nallah .
Head work /Channel
95º 36'58.10" E 28º03'04.92" N
555 ft MSL
1 198.00 Five Year
495.00
8 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Agam village Agril land from Sinking & Sarku River / Nallah .
Head work /Channel
95º 36'54.26" E 28º03'16.90" N
562 ft MSL
1 151.00 Five Year
377.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
113
9 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Anpum-I village Agril land from Sarku & Anpum River / Nallah .
Head work /Channel
95º 35'07.51" E 27º58'41.82" N
473 ft MSL
1 380.00 Five Year
950.00
10 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Anpum - II village Agril land from Sarku & Anpum River / Nallah .
Head work /Channel
95º 35'00.58" E 27º58'30.77" N
472 ft MSL
1 300.00 Five Year
750.00
11 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Anpum - III village Agril land from Sarku & Anpum River / Nallah .
Head work /Channel
95º 34'54.39" E 27º58'27.30" N
467 ft MSL
1 216.00 Five Year
540.00
12 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Loklung village Agril land from Sarku & Anpum River / Nallah .
Head work /Channel
95º 34'20.58" E 27º57'37.26" N
460 ft MSL
1 263.00 Five Year
657.50
13 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Kaling -I Agril land from Tamak River / Nallah .
Head work /Channel
95º 33'53.25" E 27º55'17.64" N
435 ft MSL
1 72.00 Five Year
180.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
114
14 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Kaling -II Agril land from Tamak River / Nallah .
Head work /Channel
95º 32'38.09" E 27º54'25.62" N
420 ft MSL
1 76.00 Five Year
190.00
15 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Keba Agril land from Paglam River / Nallah .
Head work /Channel
95º 32'01.55" E 27º53'39.32" N
427 ft MSL
1 103.00 Five Year
257.50
16 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Tinali HQ Agril land from Tamak River / Nallah .
Head work /Channel
95º 31'34.68" E 27º53'28.06" N
439 ft MSL
1 73.00 Five Year
182.50
17 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Banggo Agril land from Paglam River / Nallah .
Head work /Channel
95º 31'05.43" E 27º52'02.56" N
422 ft MSL
1 323.00 Five Year
807.50
18 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Mobuk Agril land from Paglam River / Nallah .
Head work /Channel
95º 31'12.71" E 27º52'05.44" N
423 ft MSL
1 154.00 Five Year
385.00
19 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Paglam village Agril land from Paglam-I River / Nallah .
Head work /Channel
95º 30'42.81" E 27º50'22.24" N
423 ft MSL
1 312.00 Five Year
780.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
115
20 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Paglam -II village Agril land from Paglam River / Nallah .
Head work /Channel
95º 30'32.35" E 27º50'19.88" N
421 ft MSL
1 366.00 Five Year
915.00
21 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Paglam -III village Agril land from Paglam River / Nallah .
Head work /Channel
95º 30'39.19" E 27º50'26.85" N
419 ft MSL
1 242.00 Five Year
605.00
22 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Yapgo village Agril land from Anu Krong River / Nallah .
Head work /Channel
95º 35'58.94" E 28º15'03.12" N
1283 ft MSL
1 150.00 Five Year
375.00
23 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Tapat village Agril land from Ebrom & Anu River / Nallah .
Head work /Channel
95º 36'06.65" E 28º15'42.14" N
1485 ft MSL
1 50.00 Five Year
125.00
24 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Kapang Hydel village Agril land from Anu Krong River / Nallah .
Head work /Channel
95º 34'56.05" E 28º15'32.01" N
1494 ft MSL
1 60.00 Five Year
150.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
116
25 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Katon village Agril land from Peli River / Nallah .
Head work /Channel
95º 36'00.49" E 28º15'46.89" N
1598 ft MSL
1 15.00 Five Year
37.50
26 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP Patsam village Agril land from Ebrom River / Nallah .
Head work /Channel
95º 36'01.39" E 28º15'35.38" N
1434 ft MSL
1 10.00 Five Year
25.00
27 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Patbuk village Agril land from Ebrom River / Nallah .
Head work /Channel
95º 35'55.83" E 28º15'41.95" N
1512 ft MSL
1 10.00 Five Year
25.00
28 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Remi village Agril land from Peli & Ebrom River / Nallah .
Head work /Channel
95º 36'52.68" E 28º16'17.67" N
1497 ft MSL
1 300.00 Five Year
750.00
29 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Rasing village Agril land from Ebrom River / Nallah .
Head work /Channel
95º 36'04.10" E 28º15'32.01" N
1409 ft MSL
1 35.00 Five Year
87.50
30 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Sikkol village Agril land from Ebrom
Head work /Channel
95º 36'41.86" E 28º16'16.23" N
1558 ft MSL
1 60.00 Five Year
150.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
117
River / Nallah .
31 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Dambuk HQ Agril land from Sine River / Nallah .
Head work /Channel
95º 37'00.90" E 28º16'08.77" N
1411 ft MSL
1 200.00 Five Year
500.00
32 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Sirang village Agril land from Akako River / Nallah .
Head work /Channel
95º 37'09.76" E 28º16'14.52" N
1430 ft MSL
1 250.00 Five Year
625.00
33 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Akako village Agril land from Akako River / Nallah .
Head work /Channel
95º 37'13.24" E 28º16'24.39" N
1535 ft MSL
1 100.00 Five Year
250.00
34 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Poblung - I village Agril land from Peli River / Nallah .
Head work /Channel
95º 37'24.63" E 28º16'04.53" N
1321 ft MSL
1 250.00 Five Year
625.00
35 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Poblung-II village Agril land from Ebrom River / Nallah .
Head work /Channel
95º 37'23.18" E 28º16'04.11" N
1322 ft MSL
1 200.00 Five Year
500.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
118
36 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Tetong village Agril land from Patching River / Nallah .
Head work /Channel
95º 38'46.31" E 28º16'01.48" N
1150 ft MSL
1 150.00 Five Year
375.00
37 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Poblung-III village Agril land from Ebrom & Anu River / Nallah .
Head work /Channel
95º 37'09.28" E 28º16'03.66" N
1346 ft MSL
1 100.00 Five Year
250.00
38 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for New Poblung village Agril land from Ebrom & Anu River / Nallah .
Head work /Channel
95º 37'28.82" E 28º15'52.82" N
1253 ft MSL
1 100.00 Five Year
250.00
39 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Tusing Gite village Agril land from Ebrom, Makong , Anu & Sirki River / Nallah .
Head work /Channel
95º 36'37.47" E 28º15'57.95" N
1468 ft MSL
1 80.00 Five Year
200.00
40 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Bomjir village Agril land from Sissiri
Head work /Channel
95º 39'45.98" E 28º09'37.62" N
709 ft MSL
1 400.00 Five Year
1000.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
119
River / Nallah .
41 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Yagrung village Agril land from Sine & Sissiri River / Nallah .
Head work /Channel
95º 38'38.65" E 28º09'47.69" N
785 ft MSL
1 300.00 Five Year
750.00
42 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O MIP for Ehili Brwa village Agril land from Paching River / Nallah .
Head work /Channel
95º 37'16.88" E 28º16'23.41" N
1501 ft MSL
1 70.00 Five Year
175.00
Total
42 7608.00
19020.00
Dambuk-Paglam Total
80 8798.00
21993.50
A. New Proposals for Minor Irrigation Projects
1 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Cheleka village Agril land from Choppo River / Nallah .
Head work /Channel
95º 57'25.88'' E 28º19'18.82'' N
1277 mtr MSL
1 5.00 Five Year
12.50
Medium
District Irrigation Plan (PMKSY) Lower Dibang Valley
120
2 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Androni village Agril land from Choppo River / Nallah .
Head work /Channel
95º 57'19.15'' E 28º18'42.34'' N
1378 mtr MSL
1 9.00 Five Year
22.50
Low
3 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Boongo village Agril land from Chuhu River / Nallah .
Head work /Channel
95º 54'45.89'' E 28º16'48.12'' N
2274 mtr MSL
1 7.00 Five Year
17.50
Medium
4 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Chepahu village Agril land from Chuhu River / Nallah .
Head work /Channel
95º 54'31.45'' E 28º13'57.42'' N
2433 mtr MSL
1 94.00 Five Year
235.00
Low
5 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Hunli HQ village Agril land from Chuhu River / Nallah .
Head work /Channel
95º 57'45.99'' E 28º19'24.82'' N
1177 mtr MSL
1 70.00 Five Year
175.00
High
6 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Apanli village Agril land from Loo River / Nallah .
Head work /Channel
95º 56'35.91'' E 28º20'12.45'' N
1414 mtr MSL
1 38.00 Five Year
95.00
Medium
7 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Chulugu village Agril land from Chulugu
Head work /Channel
95º 56'18.66'' E 28º20'29.96'' N
1281 mtr MSL
1 32.00 Five Year
80.00
Medium
District Irrigation Plan (PMKSY) Lower Dibang Valley
121
River / Nallah .
8 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Abrango village Agril land from Loo River / Nallah .
Head work /Channel
95º 56'12.06'' E 28º20'23.09'' N
1431 mtr MSL
1 8.00 Five Year
20.00
High
9 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Atingo village Agril land from Atingo River / Nallah .
Head work /Channel
95º 56'7.97'' E 28º20'44.47'' N
1407 mtr MSL
1 9.00 Five Year
22.50
Medium
10 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Elope village Agril land from Loo River / Nallah .
Head work /Channel
95º 56'8.76'' E 28º20'40.21'' N
1408 mtr MSL
1 15.00 Five Year
37.50
Low
11 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Rango village Agril land from Ithi River / Nallah .
Head work /Channel
95º 56'9.86'' E 28º20'47.19'' N
1370 mtr MSL
1 12.00 Five Year
30.00
Low
12 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for New Elope village Agril land from Loo River / Nallah .
Head work /Channel
95º 56'12.20'' E 28º20'36.06'' N
1362 mtr MSL
1 38.00 Five Year
95.00
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
122
13 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Akungo village Agril land from Ithi River / Nallah .
Head work /Channel
95º 56'5.29'' E 28º21'27.46'' N
1057 mtr MSL
1 8.00 Five Year
20.00
Low
14 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Threni village Agril land from Ayyu River / Nallah .
Head work /Channel
95º 56'53.52'' E 28º21'57.66'' N
804 mtr MSL
1 71.00 Five Year
177.50
Low
15 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Aloni village Agril land from Chilu River / Nallah .
Head work /Channel
95º 56'57.09'' E 28º21'58.49'' N
817 mtr MSL
1 44.00 Five Year
110.00
Medium
16 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Eyanli village Agril land from Ithi River / Nallah .
Head work /Channel
95º 57'0.63'' E 28º21'54.64'' N
842 mtr MSL
1 65.00 Five Year
162.50
High
17 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Indini village Agril land from Hi River / Nallah .
Head work /Channel
95º 57'6.66'' E 28º21'51.13'' N
898 mtr MSL
1 9.00 Five Year
22.50
Low
18 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Esoli village Agril land from Hi River / Nallah .
Head work /Channel
95º 56'56.18'' E 28º21'59.47'' N
829 mtr MSL
1 11.00 Five Year
27.50
Medium
District Irrigation Plan (PMKSY) Lower Dibang Valley
123
19 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Ithungo village Agril land from Aku River / Nallah .
Head work /Channel
95º 56'31.91'' E 28º21'41.79'' N
627 mtr MSL
1 56.00 Five Year
140.00
High
20 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for New Aloni village Agril land from Aku River / Nallah .
Head work /Channel
95º 56'35.05'' E 28º21'37.10'' N
621 mtr MSL
1 9.00 Five Year
22.50
High
21 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Wini village Agril land from Aku River / Nallah .
Head work /Channel
95º 56'51.38'' E 28º21'56.68'' N
792 mtr MSL
1 54.00 Five Year
135.00
Medium
22 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Brinli village Agril land from Bri River / Nallah .
Head work /Channel
95º 55'97.02'' E 28º21'58.18'' N
941 mtr MSL
1 48.00 Five Year
120.00
High
23 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Yuma village Agril land from Atoron River / Nallah .
Head work /Channel
95º 55'40.49'' E 28º21'58.26'' N
920 mtr MSL
1 9.00 Five Year
22.50
Low
24 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Punli village Agril land from Chilu River / Nallah .
Head work /Channel
95º 53'33.71'' E 28º24'46.30'' N
483 mtr MSL
1 8.00 Five Year
20.00
Medium
District Irrigation Plan (PMKSY) Lower Dibang Valley
124
25 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Ebranli village Agril land from Ikki River / Nallah .
Head work /Channel
95º 53'39.12'' E 28º24'49.88'' N
543 mtr MSL
1 5.00 Five Year
12.50
High
26 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Adapowa village Agril land from Akki River / Nallah .
Head work /Channel
95º 54'9.77'' E 28º24'44.61'' N
729 mtr MSL
1 9.00 Five Year
22.50
Low
27 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Aranli village Agril land from Allu River / Nallah .
Head work /Channel
95º 53'22.54'' E 28º25'4.49'' N
495 mtr MSL
1 10.00 Five Year
25.00
Medium
28 Hunli - Desali CD Block
MoWR Har khet ko pani
C/O MIP for Kebaboli village Agril land from Allu River / Nallah .
Head work /Channel
95º 53'31.40'' E 28º24'52.64'' N
540 mtr MSL
1 632.00 Five Year
1580.00
Low
29 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chenga nallah to Gango A/F at Dopowa Village.
Head work /Channel
96º 05'39.53" E 28º16'09.87" N
1287 mtr MSL
1 225 One Year
(2016-17)
562.50
High
30 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Shomari nallah to Shomari A/F at Dopowa Village.
Head work /Channel
96º 06'20.12" E 28º15'58.36" N
1536 mtr MSL
1 130 One Year
(2016-17)
325.00
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
125
31 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Afroja nallah to Donli A/F at Donli Village.
Head work /Channel
96º 04'22.26" E 28º17'01.01" N
1294 mtr MSL
1 25 One Year
(2016-17)
62.50
High
32 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chebra nallah to Donli A/F at Donli Village.
Head work /Channel
96º 04'46.06" E 28º17'01.60" N
1247 mtr MSL
1 10.00 Five Years (2016-
20)
25.00
Medium
33 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chini nallah toEndagu A/F at Donli Village.
Head work /Channel
96º 04'08.64" E 28º17'05.37" N
1268 mtr MSL
1 22.00 Five Years (2016-
20)
55.00
High
34 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chili nallah to Amongo A/F at Taloni Village.
Head work /Channel
96º 04'38.52" E 28º16'49.77" N
1185 mtr MSL
1 24.00 Five Years (2016-
20)
60.00
High
35 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Maso nallah to Taloni A/F at Taloni Village.
Head work /Channel
96º 04'27.20" E 28º16'35.52" N
1223 mtr MSL
1 45.00 Five Years (2016-
20)
112.50
High
36 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Cheya nallah to Churu-Cheya-Atango A/F
Head work /Channel
96º 04'47.84" E 28º16'24.38" N
1119 mtr MSL
1 208.00 Five Years (2016-
20)
520.00
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
126
at Taloni Village.
37 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chulu nallah to Solungo A/F at Chuluni Village.
Head work /Channel
96º 03'06.23" E 28º17'37.42" N
1032 mtr MSL
1 4.00 Five Years (2016-
20)
10.00
Medium
38 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Ruyu nallah to Ruyungo A/F at Chuluni Village.
Head work /Channel
96º 03'00.99" E 28º17'31.60" N
1055 mtr MSL
1 1.00 Five Years (2016-
20)
2.50
Low
39 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chulu nallah to Chuluni A/F at Chuluni Village.
Head work /Channel
96º 03'03.59" E 28º17'30.15" N
1062 mtr MSL
1 1.00 Five Years (2016-
20)
2.50
Low
40 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chulu nallah to Bapa Miso A/F at Chuluni Village.
Head work /Channel
96º 03'02.60" E 28º17'21.98" N
1136 mtr MSL
1 4.00 Five Years (2016-
20)
10.00
Medium
41 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chulu nallah to Ruyu A/F at Chuluni Village.
Head work /Channel
96º 02'55.32" E 28º17'21.63" N
1135 mtr MSL
1 24.00 Five Years (2016-
20)
60.00
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
127
42 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chini nallah to Chini A/F at Chuluni Village.
Head work /Channel
96º 03'23.97" E 28º17'19.10" N
1187 mtr MSL
1 12.00 Five Years (2016-
20)
30.00
High
43 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Cheya nallah to Chuyungo A/F at Chuluni Village.
Head work /Channel
96º 03'15.34" E 28º17'34.03" N
1067 mtr MSL
1 19.00 Five Years (2016-
20)
47.50
High
44 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Jamupani to Kanjipa A/F at Jamupani Village.
Head work /Channel
96º59'55.17" E 28º18'34.75" N
1361 mtr MSL
1 2.00 Five Years (2016-
20)
5.00
High
45 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Ekhu nallah to Ekhuli A/F at Jamupani Village.
Head work /Channel
96º00'16.56" E 28º18'32.20" N
675 mtr MSL
1 10.00 Five Years (2016-
20)
25.00
High
46 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chikalu nallah to Chimbini A/F at Paingo Village.
Head work /Channel
96º 00'30.29" E 28º18'18.57" N
718 mtr MSL
1 10.00 Five Years (2016-
20)
25.00
High
47 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Pei nallah to Anubungo A/F at
Head work /Channel
96º 00'46.66" E 28º18'11.08" N
759 mtr MSL
1 3.00 Five Years (2016-
20)
7.50
Medium
District Irrigation Plan (PMKSY) Lower Dibang Valley
128
Paingo Village.
48 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chibathi nallah to Chibathi A/F at Mariso Village.
Head work /Channel
96º 01'13.12" E 28º18'36.84" N
1052 mtr MSL
1 1.00 Five Years (2016-
20)
2.50
Low
49 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Ekhu nallah to Aprani A/F at Choroni Village.
Head work /Channel
96º 02'03.48" E 28º18'12.81" N
714 mtr MSL
1 6.00 Five Years (2016-
20)
15.00
Medium
50 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Alu nallah toAluso A/F at Marango Village.
Head work /Channel
96º 02'49.27" E 28º18'13.95" N
806 mtr MSL
1 6.00 Five Years (2016-
20)
15.00
Medium
51 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Aka nallah to Akanda-Chanli A/F at Akanda Village.
Head work /Channel
96º 01'49.62" E 28º17'26.75" N
1059 mtr MSL
1 28.00 Five Years (2016-
20)
70.00
High
52 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Dusu nallah to Duchunli Agril field at Duchunli Village .
Head work /Channel
96º 01'59.01" E 28º17'34.38" N
1044 mtr MSL
1 5.00 Five Years (2016-
20)
12.50
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
129
53 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Desa nallah to Desali Agril field at Desali Village .
Head work /Channel
96º 02'13.75" E 28º17'28.31" N
1016 mtr MSL
1 25.00 Five Years (2016-
20)
62.50
High
54 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Ruyu nallah to Ruyu Ayuchi agril field at Desali villlage.
Head work /Channel
96º 02'44.06" E 28º17'33.88" N
1009 mtr MSL
1 7.00 Five Years (2016-
20)
17.50
High
55 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Desa nallah to Desa agril field at Desali villlage.
Head work /Channel
96º 02'37.51" E 28º17'35.30" N
1013 mtr MSL
1 3.00 Five Years (2016-
20)
7.50
Medium
56 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Chipi nallah to Chipi Agril field at Chimaro Village .
Head work /Channel
96º 02'10.93" E 28º17'38.13" N
1060 mtr MSL
1 7.00 Five Years (2016-
20)
17.50
High
57 Hunli-Desali CD Block
MoWR Har khet ko pani
C/O MIP from Disi nallah to Necha Agril field at Necha Village .
Head work /Channel
96º 05'28.00" E 28º17'35.89" N
1130 mtr MSL
1 2.00 Five Years (2016-
20)
5.00
Low
District Irrigation Plan (PMKSY) Lower Dibang Valley
130
Hunli-Desali Total
57 2254.00
5635.00
Grand Total Surface Irrigation
279 20521.10
50870.56
Repair, Renovation & Restoration of Water Bodies
1 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Dongkal area Near Ara Camp at Meka Village.
Reservoir /Check dam
/Nallah Bund
95049'09.20 E 28004'09.16 N
221.00
1 12.00 Five Year
30.00
2 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Kuri Arik at Meka Village.
Reservoir /Check dam
/Nallah Bund
95050'60.10 E 28004'44.10 N
232.00
1 7.00 Five Year
17.50
3 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Perying Dongkal at Meka.
Reservoir /Check dam
/Nallah Bund
28° 6'42.75"N 95°51'3.97"E
356.62
1 10.00 Five Year
25.00
4 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Aru Chigu area at Koronu village
Reservoir /Check dam
/Nallah Bund
28°3'31.60"N 95°55'43.48"E
274.32
1 12.00 Five Year
30.00
5 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Bellai agril.field at Endoli Village.
Nallah/ bund/Check dam / farm
pond
28°1'39.96"N 95°49'17.35"E
177.00
1 8.00 Five Year
20.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
131
6 Roing-Kornu CD Block
MoWR Har khet ko pani
RRR for Koronu Village.
Reservoir /Check dam
/Nallah Bund
28°1'39.96"N 95°49'17.35"E
177.00
1 65.00 Five Year
162.50
7 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Jia agril field.
Reservoir /Check dam
/Nallah Bund
95°44'36.32"E 28° 3'15.20"N
173.74
1 102.00 Five Year
255.00
8 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Zemi area at Jia Village.
Reservoir /Check dam
/Nallah Bund
95°46'3.89"E 28° 4'36.78"N
188.67
1 167.00 Five Year
417.50
9 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Tamul Bari
Reservoir /Check dam
/Nallah Bund
95°44'30.68"E 28° 3'56.55"N
177.39
1 182.00 Five Year
455.00
10 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Daking area.
Reservoir /Check dam
/Nallah Bund
95°45'14.27"E 28° 3'56.22"N
177.09
1 154.00 Five Year
385.00
11 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Ithili village
Reservoir /Check dam
/Nallah Bund
95°44'20.52"E 28° 2'45.64"N
169.77
1 33.53 Five Year
83.83
12 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Kampo Nath
Reservoir /Check dam
/Nallah Bund
95°43'55.43"E 28° 3'15.66"N
172.82
1 239.00 Five Year
597.50
13 Roing-Koronu CD Block
MoWR Har khet ko pani
RRR for Kani Nath
Reservoir /Check dam
/Nallah Bund
95°43'43.40"E 28° 3'44.88"N
175.56
1 92.50 Five Year
231.25
Total
13 1084.03
2710.08
District Irrigation Plan (PMKSY) Lower Dibang Valley
132
Repair, Renovation & Restoration of Water Bodies
1 Dambuk-Paglam CD Block
MoWR Har khet ko pani
RRR at Ehi Nallah at Gandhi village ( Bizari –III )
Reservoir /Check dam
/Nallah Bund
95º 35'17.60" E 28º3'29.19" N
594 ft MSL
1 90.00 Five Year
204.00
High
2 Dambuk-Paglam CD Block
MoWR Har khet ko pani
RRR at 3 KM Natural Nallah at Gandhi village ( Bizari –III )
Reservoir /Check dam
/Nallah Bund
95º 36'12.54" E 28º02'53.56" N
560 ft MSL
1 60.00 Five Year
150.00
High
3 Dambuk-Paglam CD Block
MoWR Har khet ko pani
RRR at Sine Nallah at Poblung -III village .
Reservoir /Check dam
/Nallah Bund
95º 37'30.14" E 28º10'50.94" N
864 ft MSL
1 55.00 Five Year
131.60
High
Total 3 205.00 0.00 485.60
Grand Total of RRR
16 1289.03
3195.68
COMMAND AREA DEVELOPMENT
District Irrigation Plan (PMKSY) Lower Dibang Valley
133
1 Roing Division MoWR AIBP CAD under Roing
Division
- - - - 1 - 2 Years (2016-
18)
365.00 This scheme was sub
mitted
and approved
by MoWR, RD&GR
Govt. of
India unde
r AIBP
A. New Proposals for CAD under WRS Roing
1 Roing-Koronu CD Block
MoWR Har khet ko
pani
CAD for Bolung WR Section
Field channel,Fiel
d drain
95°43'27.03"E 28°1'25.20"N
167 1 290 Five Year
145.00
2 Roing-Koronu CD Block
MoWR Har khet ko
pani
CAD for Koronu WR Section
Field channel,Fiel
d drain
95°51'46.30"E 28°01'13.8"N
174.04
1 270 Five Year
135.00
3 Roing-Koronu CD Block
MoWR Har khet ko
pani
CAD for Roing WR Section
Field channel,Fiel
d drain
95°50'60.60"E 28°06'08.30"N
278 1 180.00 Five Year
90.00
Total 3 740.00 370.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
134
1 Dambuk-Paglam CD Block
MoWR Har khet ko pani
C/O Cluster of CADWM project under Dambuk Sub-Division , Lower Dibang Valley District.
OFD works & Field
Drains etc .
95º 39'42.73" E to 95º 30'32.35" E
28º16'25.00" N to 27º45'00" N
420 to 2200 ft MSL
1 500.00 CCA of complet
ed Schem
es
Five Year
223.00
CAD Total
5 958.00
CCA of 740.00 Ha. under CAD is already created potential but which is not in use. So, this CCA may not be included in total Command area and CCA of 500.00 Ha. under CAD is already created potential but which is not in use. So, this CCA may not be included in total Command area.
Grand Total of WRD Dept.
350 22100.13
55440.
23
District Irrigation Plan (PMKSY) Lower Dibang Valley
135
Annexure-V
Strategic Action Plan of Water Resources Department (TW & GW) under PMKSY
Sr. No. Block Name
Concerned Ministry/
Department
Component
Village Name
Activity Number/Capacity
Command Area
/Irrigation. (ha)
Period Of Implimentation.
Estimated Cost in (Lakhs).
Longitude Latitude Panchayat Priority
1 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Khinjili Deep Tube Well (8 ha)
2 16 5 24.00 28.02361 95.85501
High
2 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Arungo Deep Tube Well (8 ha)
3 24 5 36.00 28.06139 95.98035
High
3 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Harupahar Deep Tube Well (8 ha)
3 24 5 36.00 28.06704 95.87736
High
4 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Emuli Deep Tube Well (8 ha)
5 40 5 60.00 28.64117 95.87692
High
5 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Rukmo Deep Tube Well (8 ha)
5 40 5 60.00 27.97942 95.87537
High
6 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Iduli Deep Tube Well (8 ha)
5 40 5 60.00 27.98970 95.80847
High
7 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Anumboli Deep Tube Well (8 ha)
10 80 5 120.00 27.14900 93.61750
High
8 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Koronu Deep Tube Well (8 ha)
5 40 5 60.00 28.06683 95.921928
High
9 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Denlo Deep Tube Well (8 ha)
3 24 5 36.00 27.14230 93.61473
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
136
10 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Abango Deep Tube Well (8 ha)
3 24 5 36.00 27.14780 93.614387
High
11 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Injunu Deep Tube Well (8 ha)
3 24 5 36.00 28.07921 95.898498
High
12 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Machiano Deep Tube Well (8 ha)
5 40 5 60.00 27.77900 95.89762
High
13 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kundil Deep Tube Well (8 ha)
5 40 5 60.00 27.7333 97.79961
High
14 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Baksek Deep Tube Well (8 ha)
5 40 5 60.00 27.1400 93.16143
High
15 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kengkut Deep Tube Well (8 ha)
3 24 5 36.00 33.9700 93.21261
High
16 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Jia Deep Tube Well (8 ha)
5 40 5 60.00 27.1400 93.61567
High
17 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Majang arik Deep Tube Well (8 ha)
2 16 5 24.00 27.9810 95.74765
High
18 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Teksing arik Deep Tube Well (8 ha)
2 16 5 24.00 27.9812 95.74364
High
19 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Getek arik Deep Tube Well (8 ha)
2 16 5 24.00 27.9813 95.74678
High
20 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Tambul bari Deep Tube Well (8 ha)
2 16 5 24.00 27.1400 93.61234
High
21 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kutsing Deep Tube Well (8 ha)
2 16 5 24.00 27.1413 93.61458
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
137
22 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
9km(NH-52) Deep Tube Well (8 ha)
1 8 5 12.00 27.1421 93.61897
High
23 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
8km(NH-52) Deep Tube Well (8 ha)
1 8 5 12.00 27.1423 93.61347
High
24 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Sukhan Pukhuri
Deep Tube Well (8 ha)
2 16 5 24.00 27.1424 93.61589
High
25 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Moying Deep Tube Well (8 ha)
7 56 5 84.00 28.6026 94.988213
High
26 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Horujia Deep Tube Well (8 ha)
2 16 5 24.00 28.6026 94.988213
High
27 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Ithili(Jia)/Idili Deep Tube Well (8 ha)
4 32 5 48.00 28.0488 95.745697
High
28 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kabang Deep Tube Well (8 ha)
2 16 5 24.00 27.1400 93.61567
High
29 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Holokbari Deep Tube Well (8 ha)
7 56 5 84.00 27.1401 93.61234
High
30 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Malek Deep Tube Well (8 ha)
5 40 5 60.00 27.1403 93.23563
High
31 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Mali Deep Tube Well (8 ha)
2 16 5 24.00 28.1402 94.23563
High
32 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
7km(NH-52) Deep Tube Well (8 ha)
2 16 5 24.00 29.1408 95.23563
High
33 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Atimeh Deep Tube Well (8 ha)
2 16 5 24.00 30.1456 96.23563
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
138
34 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Parbuk Deep Tube Well (8 ha)
10 80 5 150.00 27.1466 93.61785
High
35 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Nath Deep Tube Well (8 ha)
12 96 5 144.00 27.1445 93.61123
High
36 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kalek Deep Tube Well (8 ha)
2 16 5 24.00 27.1456 93.61689
High
37 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Jengpathar Deep Tube Well (8 ha)
1 8 5 12.00 27.9874 95.74851
High
38 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Bolik Deep Tube Well (8 ha)
2 16 5 24.00 27.9899 95.74823
High
39 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Dholeswar Deep Tube Well (8 ha)
2 16 5 24.00 27.9847 95.74458
High
40 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Zemi Deep Tube Well (8 ha)
2 16 5 24.00 28.9847 95.324245
High
41 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kumreng arik Deep Tube Well (8 ha)
1 8 5 12.00 27.9751 95.76519
High
42 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kumdang arik Deep Tube Well (8 ha)
1 8 5 12.00 27.9485 95.76655
High
43 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Katan Bedang Deep Tube Well (8 ha)
1 8 5 12.00 32.6383 97.74065
High
44 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kangkong Deep Tube Well (8 ha)
10 80 5 120.00 33.2656 97.79962
High
45 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Mobang(I/II) Deep Tube Well (8 ha)
10 80 5 120.00 27.8996 92.64072
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
139
46 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Daran Shallow Tube Well(4 ha)
2 8 5 14.00 32.6243 96.10331
High
47 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Paglam Shallow Tube Well(4 ha)
1 7 5 7.00 27.93998 95.57191
High
48 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Parbuk Shallow Tube Well(4 ha)
4 16 5 28.00 27.1466 93.61785
High
49 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Mobang(I/II) Shallow Tube Well(4 ha)
15 60 5 105.00 27.8996 92.64072
High
50 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kangkong Dug Masonary Well (1 ha) (Nos)
5 5 5 10.00 33.2656 97.79962
High
51 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Kundil Dug Masonary Well (1 ha) (Nos)
5 5 5 10.00 27.7333 97.79961
High
52 Roing-Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Paglam Dug Masonary Well (1 ha) (Nos)
30 60 5 60.00 27.93998 95.57191
High
53 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Lirung (jia) Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 High
54 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Aumboli Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14900 93.61750
High
55 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Abango Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14780 93.61439
High
56 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Monkong Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14000 93.61567
High
57 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Malek Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14030 93.23563
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
140
58 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Rukmo (Athime)
Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.97942 95.87537
High
59 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Harupahar Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 28.06704 95.87736
High
60 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
8.km Roing Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14230 93.61347
High
61 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Macheno (Balijan)
Energisation of Deep Tube Well (8 ha)
1 8 2 7.50 27.14900 93.61750
High
62 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Old Abalin(Ara camp)
Renovation of Deep Tube Well (Nos)
1 8 2 5.00 28.64117 95.87692
High
63 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Jemmy Notco Renovation of Deep Tube Well (Nos)
1 8 2 5.00 27.14230 93.61347
High
64 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Abali (Model) Renovation of Shallow Tube Well(4 ha)
1 4 2 3.00 28.64117 95.87692
High
65 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Abali (II) Renovation of Shallow Tube Well(4 ha)
1 4 2 3.00 28.64117 95.87692
High
Total of Roing- Koronu
246 1625 2399.5
66 Roing Koronu
MoWR (TW & GW)
Har Khet
ko Pani
Khinjili Renovation of Shallow Tube Well(4 ha)
1 4 2 3.00 28.02361 95.85501
High
67 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Bolung(Tapar)
Deep Tube Well (8 ha)
5 40 5 60.00 21.8737 94.65762
High
District Irrigation Plan (PMKSY) Lower Dibang Valley
141
68 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Bango Shallow Tube Well(4 ha)
5 20 5 35.00 27.1400 93.61345
High
69 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Anpum Shallow Tube Well(4 ha)
5 20 5 35.00 28.0014 95.58633
High
70 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Bijari(I/II) Shallow Tube Well(4 ha)
8 32 5 56.00 28.0204 95.60641
High
71 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Bango Dug Masonary Well (1 ha) (Nos)
20 20 5 40.00 27.1400 93.61345
High
72 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Bijari(I/II) Dug Masonary Well (1 ha) (Nos)
20 20 5 40.00 28.0204 95.60641
High
73 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Anpum Dug Masonary Well (1 ha) (Nos)
10 10 5 20.00 28.0014 95.58633
High
74 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Patsing Dug Masonary Well (1 ha) (Nos)
10 10 5 20.00 27.1410 93.61378
High
75 Dambuk-Paglam
MoWR (TW & GW)
Har Khet
ko Pani
Sirang Dug Masonary Well (1 ha) (Nos)
5 5 5 10.00 27.1443 93.61291
High
Total of Dambuk-Paglam
89 181 319
Total 335 1806 0 2718.5
District Irrigation Plan (PMKSY) Lower Dibang Valley
142
Annexure-VI
Strategic Action Plan of Rural Works Department (Soil Conservation) under PMKSY
Sr. No.
Name of block
Concerned Ministry
/ Deptt.
Component Activities Total Number /Capacity
(cum)
Command Area
/ Irrigatio
n Potentia
l (Ha)
Period of Implematat
ion
Estimated Cost (Rs. In Lakhs)
Lat
itu
de
Lo
ng
itu
de
Alt
itu
de
(m
)
Water Harvesting Structures
1 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
IWMP-6 IWMP at Khinjili Village (Abali-1000) proposed by State Rural Development Department
1 1000 5 150
2 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Abango Village
6 8 5Year 30
28.0
9333
95.9
0015
310
to 4
50
3 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Abango Village
5 5 5Year 5
4 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Abango Village
6 3 5Year 3
5 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Abango Village
5 2.5 5Year 2.5
6 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Abango Village
6 3 5Year 6
7 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Abango Village
8 2 5Year 5
8 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Abango Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
143
9 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Abango Village
6 3 5Year 6
10 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Abali Village
4 6 5Year 20
28.0
4742
95.8
1955
240
t0 2
00
11 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Abali Village
5 5 5Year 5
12 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Abali Village
6 3 5Year 3
13 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Abali Village
5 2.5 5Year 2.5
14 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Abali Village
6 3 5Year 6
15 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Abali Village
8 2 5Year 5
16 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Abali Village
10 4 5Year 4
17 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Abali Village
6 3 5Year 6
18 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chidu Village
6 8 5Year 30
28.2
0113
95.7
8400
450
t0 5
50
19 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chidu Village
5 5 5Year 5
20 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Chidu Village
6 3 5Year 3
21 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Chidu Village
5 2.5 5Year 2.5
22 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Chidu Village
6 3 5Year 6
23 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chidu
8 2 5Year 5
24 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chidu Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
144
25 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Chidu Village
6 3 5Year 6
26 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Arungo Village
4 6 5Year 20
28.0
4541
95.8
6568
250
t0 3
50
27 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Arungo Village
5 5 5Year 5
28 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Arungo Village
6 3 5Year 3
29 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Arungo Village
5 2.5 5Year 2.5
30 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Arungo Village
6 3 5Year 6
31 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Arungo Village
6 1.5 5Year 3
32 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Arungo Village
10 4 5Year 4
33 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Arungo Village
6 3 5Year 6
34 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Balek Village
6 8 5Year 30
28.0
9765
3
95.8
4923
5
250
t0 3
50
35 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Balek Village
5 5 5Year 5
36 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Balek Village
6 3 5Year 3
37 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Balek Village
5 2.5 5Year 2.5
38 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Balek Village
6 3 5Year 6
39 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Balek Village
6 1.5 5Year 3
40 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Balek Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
145
41 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Balek Village
6 3 5Year 6
42 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bhismak nagar
6 8 5Year 30
28.0
6094
2
95.9
5396
1
350
t0 4
00
43 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bhismak nagar
5 5 5Year 5
44 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bhismak nagar
6 3 5Year 3
45 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bhismak nagar
5 2.5 5Year 2.5
46 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bhismak nagar
6 3 5Year 6
47 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bhismak nagar
6 1.5 5Year 3
48 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bhismak nagar
10 4 5Year 4
49 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bhismak nagar
6 3 5Year 6
50 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bolung Village
6 8 5Year 30
28.0
3114
95.7
6301
230
t0 2
40
51 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bolung Village
5 5 5Year 5
52 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bolung Village
6 3 5Year 3
53 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bolung Village
5 2.5 5Year 2.5
54 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bolung Village
6 3 5Year 6
55 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bolung Village
6 1.5 5Year 3
56 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bolung Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
146
57 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bolung Village
6 3 5Year 6
58 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bolik Village
6 8 5Year 30
28.0
2322
95.7
6105
230
to 2
40
59 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bolik Village
5 5 5Year 5
60 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bolik Village
6 3 5Year 3
61 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bolik Village
5 2.5 5Year 2.5
62 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bolik Village
6 3 5Year 6
63 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bolik Village
8 2 5Year 5
64 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bolik Village
10 4 5Year 4
65 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bolik Village
6 3 5Year 6
66 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chimri Village
6 8 5Year 30
28.1
8723
95.8
0044
330
to 3
50
67 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chimri Village
5 5 5Year 5
68 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Chimri Village
6 3 5Year 3
69 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Chimri Village
5 2.5 5Year 2.5
70 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Chimri Village
6 3 5Year 6
71 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chimri Village
8 2 5Year 5
72 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chimri Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
147
73 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Chimri Village
6 3 5Year 6
74 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Denlo Village
4 6 5Year 20
28.0
5783
95.9
0319
250
to 2
80
75 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Denlo Village
5 5 5Year 5
76 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Denlo Village
6 3 5Year 3
77 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Denlo Village
5 2.5 5Year 2.5
78 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Denlo Village
6 3 5Year 6
79 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Denlo Village
8 2 5Year 5
80 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Denlo Village
10 4 5Year 4
81 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Denlo Village
6 3 5Year 6
82 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Emuli Village
6 8 5Year 30
27.9
8960
95.8
1962
200
to 2
30
83 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Emuli Village
5 5 5Year 5
84 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Emuli Village
6 3 5Year 3
85 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Emuli Village
5 2.5 5Year 2.5
86 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Emuli Village
6 3 5Year 6
87 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Emuli Village
8 2 5Year 5
88 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Emuli Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
148
89 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Emuli Village
6 3 5Year 6
90 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Horupahar Vill
4 6 5Year 20
28.0
5470
95.8
5635
201
to 2
30
91 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Horupahar Vill
5 5 5Year 5
92 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Horupahar Vill
6 3 5Year 3
93 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Horupahar Vill
5 2.5 5Year 2.5
94 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Horupahar Vill
6 3 5Year 6
95 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Horupahar Vill
6 1.5 5Year 3
96 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Horupahar Vill
10 4 5Year 4
97 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Horupahar Vill
6 3 5Year 6
98 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Holokbari Vill
4 6 5Year 20
28.0
8218
95.8
1014
200
to 2
40
99 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Holokbari Vill
5 5 5Year 5
100 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Holokbari Vill
6 3 5Year 3
101 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Holokbari Vill
5 2.5 5Year 2.5
102 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Holokbari Vill
6 3 5Year 6
103 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Holokbari Vill
6 1.5 5Year 3
104 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Holokbari Vill
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
149
105 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Holokbari Vill
6 3 5Year 6
106 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Hydel Model
6 8 5Year 30
28.0
8817
95.8
4954
200
to 2
20
107 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Hydel Model
5 5 5Year 5
108 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Hydel Model
6 3 5Year 3
109 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Hydel Model
5 2.5 5Year 2.5
110 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Hydel Model
6 3 5Year 6
111 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Hydel Model
6 1.5 5Year 3
112 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Hydel Model
10 4 5Year 4
113 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Hydel Model
6 3 5Year 6
114 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Idili Village
4 6 5Year 20
28.0
6849
95.7
4722
230
to 2
60
115 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Idili Village
5 5 5Year 5
116 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Idili Village
6 3 5Year 3
117 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Idili Village
5 2.5 5Year 2.5
118 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Idili Village
6 3 5Year 6
119 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Idili Village
6 1.5 5Year 3
120 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Idili Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
150
121 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Idili Village
6 3 5Year 6
122 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Injuno Village
8 10 5Year 50
28.0
6669
95.9
1885
250
to 3
00
123 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Injuno Village
5 5 5Year 5
124 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Injuno Village
6 3 5Year 3
125 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Injuno Village
5 2.5 5Year 2.5
126 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Injuno Village
6 3 5Year 6
127 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Injuno Village
8 2 5Year 5
128 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Injuno Village
10 4 5Year 4
129 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Injuno Village
6 3 5Year 6
130 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Iduli Village
8 12 5Year 50
27.9
8933
95.8
1093
220
to 2
40
131 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Iduli Village
5 5 5Year 5
132 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Iduli Village
6 3 5Year 3
133 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Iduli Village
5 2.5 5Year 2.5
134 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Iduli Village
6 3 5Year 6
135 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Iduli Village
8 2 5Year 5
136 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Iduli Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
151
137 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Iduli Village
6 3 5Year 6
138 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Ithili Village
4 6 5Year 20
28.0
4881
95.7
5853
350
to 4
00
139 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Ithili Village
5 5 5Year 5
140 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Ithili Village
6 3 5Year 3
141 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Ithili Village
5 2.5 5Year 2.5
142 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Ithili Village
6 3 5Year 6
143 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Ithili Village
6 1.5 5Year 3
144 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Ithili Village
10 4 5Year 4
145 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Ithili Village
6 3 5Year 6
146 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Ithini Village
4 6 5Year 20
28.0
5378
95.9
5396
231
to 2
40
147 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Ithini Village
5 5 5Year 5
148 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Ithini Village
6 3 5Year 3
149 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Ithini Village
5 2.5 5Year 2.5
150 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Ithini Village
6 3 5Year 6
151 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Ithini Village
6 1.5 5Year 3
152 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Ithini Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
152
153 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Ithini Village
6 3 5Year 6
154 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kabang Village
8 12 5Year 50
27.9
8900
95.7
9870
220
to 2
40
155 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kabang Village
5 5 5Year 5
156 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kabang Village
6 3 5Year 3
157 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kabang Village
5 2.5 5Year 2.5
158 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kabang Village
6 3 5Year 6
159 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kabang Village
6 1.5 5Year 3
160 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kabang Village
10 4 5Year 4
161 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kabang Village
6 3 5Year 6
162 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Jia Village
4 6 5Year 20
28.0
5298
95.7
6480
220
to 2
40
163 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Jia Village
5 5 5Year 5
164 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Jia Village
6 3 5Year 3
165 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Jia Village
5 2.5 5Year 2.5
166 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Jia Village
6 3 5Year 6
167 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Jia Village
6 1.5 5Year 3
168 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Jia Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
153
169 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Jia Village
6 3 5Year 6
170 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kangkong Vill
4 6 5Year 20
27.9
7764
95.7
6044
190
to 2
00
171 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kangkong Vill
5 5 5Year 5
172 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kangkong Vill
6 3 5Year 3
173 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kangkong Vill
5 2.5 5Year 2.5
174 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kangkong Vill
6 3 5Year 6
175 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kangkong Vill
6 1.5 5Year 3
176 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kangkong Vill
10 4 5Year 4
177 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kangkong Vill
6 3 5Year 6
178 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kebali Village
6 8 5Year 30
28.1
7750
95.8
2011
350
to 4
00
179 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kebali Village
5 5 5Year 5
180 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kebali Village
6 3 5Year 3
181 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kebali Village
5 2.5 5Year 2.5
182 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kebali Village
6 3 5Year 6
183 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kebali Village
6 1.5 5Year 3
184 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kebali Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
154
185 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kebali Village
6 3 5Year 6
186 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Khinjili Village
4 6 5Year 20
28.0
0380
95.7
9875
220
to 2
40
187 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Khinjili Village
5 5 5Year 5
188 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Khinjili Village
6 3 5Year 3
189 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Khinjili Village
5 2.5 5Year 2.5
190 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Khinjili Village
6 3 5Year 6
191 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Khinjili Village
6 1.5 5Year 3
192 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Khinjili Village
10 4 5Year 4
193 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Khinjili Village
6 3 5Year 6
194 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Koronu Village
8 8 5Year 40
28.0
6678
95.9
2362
300
to 3
40
195 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Koronu Village
5 5 5Year 5
196 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Koronu Village
6 3 5Year 3
197 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Koronu Village
5 2.5 5Year 2.5
198 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Koronu Village
6 3 5Year 6
199 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Koronu Village
6 1.5 5Year 3
200 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Koronu Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
155
201 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Koronu Village
6 3 5Year 6
202 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kundil Village
4 6 5Year 20
27.9
7742
95.8
2160
180
to 2
00
203 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kundil Village
5 5 5Year 5
204 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kundil Village
6 3 5Year 3
205 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kundil Village
5 2.5 5Year 2.5
206 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kundil Village
6 3 5Year 6
207 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kundil Village
6 1.5 5Year 3
208 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kundil Village
10 4 5Year 4
209 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kundil Village
6 3 5Year 6
210 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Malek Village
6 6 5Year 30
28.1
1886
95.7
5869
280
to 3
00
211 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Malek Village
5 5 5Year 5
212 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Malek Village
6 3 5Year 3
213 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Malek Village
5 2.5 5Year 2.5
214 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Malek Village
6 3 5Year 6
215 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Malek Village
6 1.5 5Year 3
216 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Malek Village
10 4 5Year 4
District Irrigation Plan (PMKSY) Lower Dibang Valley
156
217 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Malek Village
6 3 5Year 6
218 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kunduli Village
4 6 5Year 20
28.0
6612
95.8
0616
240
to 2
80
219 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kunduli Village
5 5 5Year 5
220 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kunduli Village
6 3 5Year 3
221 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kunduli Village
5 2.5 5Year 2.5
222 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kunduli Village
6 3 5Year 6
223 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kunduli Village
6 1.5 5Year 3
224 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kunduli Village
10 4 5Year 4
225 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kunduli Village
6 3 5Year 6
226 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at New Chidu Village
10 12 5Year 50
28.2
0113
95.7
8400
320
to 3
80
227 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at New Chidu Village
5 5 5Year 5
228 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at New Chidu Village
6 3 5Year 3
229 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at New Chidu Village
5 2.5 5Year 2.5
230 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at New Chidu Village
6 3 5Year 6
231 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at New Chidu
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
157
232 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at New Chidu Village
10 4 5Year 4
233 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at New Chidu Village
6 3 5Year 6
234 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Meka Village
4 6 5Year 20
28.1
1128
95.8
2209
250
to 3
00
235 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Meka Village
5 5 5Year 5
236 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Meka Village
6 3 5Year 3
237 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Meka Village
5 2.5 5Year 2.5
238 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Meka Village
6 3 5Year 6
239 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Meka Village
6 1.5 5Year 3
240 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Meka Village
10 4 5Year 4
241 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Meka Village
6 3 5Year 6
242 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Old Abali Village
6 8 5Year 30
28.0
4441
95.8
4071
230
to 2
80
243 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Old Abali Village
5 5 5Year 5
244 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Old Abali Village
6 3 5Year 3
245 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Old Abali Village
5 2.5 5Year 2.5
246 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Old Abali Village
6 3 5Year 6
247 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Old Abali Village
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
158
248 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Old Abali Village
10 4 5Year 4
249 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Old Abali Village
6 3 5Year 6
250 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Parbuk Village
4 6 5Year 20
28.0
0471
95.7
6058
220
to 2
50
251 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Parbuk Village
5 5 5Year 5
252 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Parbuk Village
6 3 5Year 3
253 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Parbuk Village
5 2.5 5Year 2.5
254 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Parbuk Village
6 3 5Year 6
255 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Parbuk Village
6 1.5 5Year 3
256 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Parbuk Village
10 4 5Year 4
257 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Parbuk Village
6 3 5Year 6
258 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Rambasti Village
8 12 5Year 50
28.0
0082
95.7
5103
200
to 2
30
259 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Rambasti Village
5 5 5Year 5
260 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Rambasti Village
6 3 5Year 3
261 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Rambasti Village
5 2.5 5Year 2.5
262 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Rambasti Village
6 3 5Year 6
263 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Rambasti Village
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
159
264 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Rambasti Village
10 4 5Year 4
265 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Rambasti Village
6 3 5Year 6
266 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Rukmo Village
6 8 5Year 30
27.9
8558
95.8
2743
200
to 2
30
267 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Rukmo Village
5 5 5Year 5
268 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Rukmo Village
6 3 5Year 3
269 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Rukmo Village
5 2.5 5Year 2.5
270 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Rukmo Village
6 3 5Year 6
271 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Rukmo Village
8 2 5Year 5
272 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Rukmo Village
10 4 5Year 4
273 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Rukmo Village
6 3 5Year 6
274 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Simari-I Village
6 8 5Year 30
28.1
0709
95.8
9331
250
to 3
00
275 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Simari-I Village
5 5 5Year 5
276 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Simari-I Village
6 3 5Year 3
277 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Simari-I Village
5 2.5 5Year 2.5
278 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Simari-I Village
6 3 5Year 6
279 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Simari-I Village
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
160
280 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Simari-I Village
10 4 5Year 4
281 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Simari-I Village
6 3 5Year 6
282 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Tamolbari Village
4 6 5Year 20
28.0
9198
95.7
5281
230
to 2
80
283 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Tamolbari Village
5 5 5Year 5
284 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Tamolbari Village
6 3 5Year 3
285 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Tamolbari Village
5 2.5 5Year 2.5
286 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Tamolbari Village
6 3 5Year 6
287 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Tamolbari Village
6 1.5 5Year 3
288 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Tamolbari Village
10 4 5Year 4
289 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Tamolbari Village
6 3 5Year 6
290 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Inju Nallah
6 8 5Year 30
28.0
6669
3
95.9
1885
1
280
to 3
50 291 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Inju Nallah
5 5 5Year 5
292 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Inju Nallah
6 1.5 5Year 3
293 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Inju Nallah
10 4 5Year 4
294 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Seeta Nallah
6 8 5Year 30
28.1
2724
5
95.8
4371
6
280
to 3
50
295 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Seeta Nallah
5 5 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
161
296 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Seeta Nallah
6 1.5 5Year 3
297 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Seeta Nallah
10 4 5Year 4
298 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kandu Nallah
6 8 5Year 30
28.1
5734
5
95.8
7321
6
300
to 3
50 299 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kandu Nallah
5 5 5Year 5
300 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kandu Nallah
6 1.5 5Year 3
301 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kandu Nallah
10 4 5Year 4
302 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Cheta Nallah
6 8 5Year 30
28.1
3002
8
95.8
5385
3
320
to 3
50 303 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Cheta Nallah
5 5 5Year 5
304 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Cheta Nallah
6 1.5 5Year 3
305 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Cheta Nallah
10 4 5Year 4
306 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Ahompohuri area
6 8 5Year 30
28.0
2014
95.8
4189
220
to 2
50
307 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Ahompohuri area
5 5 5Year 5
308 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Ahompohuri area
6 3 5Year 3
309 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Ahompohuri area
5 2.5 5Year 2.5
310 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Ahompohuri area
6 3 5Year 6
311 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Ahompohuri area
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
162
312 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Ahompohuri area
10 4 5Year 4
313 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Ahompohuri area
6 3 5Year 6
314 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Deopani area
8 12 5Year 50
28.1
4245
95.8
5173
340
to 4
00
315 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Deopani area
5 5 5Year 5
316 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Deopani area
6 3 5Year 3
317 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Deopani area
5 2.5 5Year 2.5
318 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Deopani area
6 3 5Year 6
319 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Deopani area
6 1.5 5Year 3
320 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Deopani area
10 4 5Year 4
321 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Deopani area
6 3 5Year 6
322 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Lopoli area
4 6 5Year 20
27.9
5558
95.4
2743
220
to 2
40
323 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Lopoli area
5 5 5Year 5
324 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Lopoli area
6 3 5Year 3
325 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Lopoli area
5 2.5 5Year 2.5
326 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Lopoli area
6 3 5Year 6
327 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Lopoli area
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
163
328 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Lopoli area
10 4 5Year 4
329 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Lopoli area
6 3 5Year 6
330 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Shantinagar
4 6 5Year 20
27.9
8746
95.8
1918
220
to 2
40
331 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Shantinagar
5 5 5Year 5
332 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Shantinagar
6 3 5Year 3
333 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Shantinagar
5 2.5 5Year 2.5
334 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Shantinagar
6 3 5Year 6
335 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Shantinagar
6 1.5 5Year 3
336 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Shantinagar
10 4 5Year 4
337 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Shantinagar
6 3 5Year 6
338 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Abili Village
6 8 5Year 30
27.9
8966
95.8
2316
220
to 2
40
339 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Abili Village
5 5 5Year 5
340 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Abili Village
6 3 5Year 3
341 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Abili Village
5 2.5 5Year 2.5
342 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Abili Village
6 3 5Year 6
343 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Abili Village
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
164
344 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Abili Village
10 4 5Year 4
345 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Abili Village
6 3 5Year 6
346 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Old Elopa
6 8 5Year 30
28.2
8033
95.7
9709
360
to 4
20
347 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Old Elopa
5 5 5Year 5
348 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Old Elopa
6 3 5Year 3
349 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Old Elopa
5 2.5 5Year 2.5
350 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Old Elopa
6 3 5Year 6
351 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Old Elopa
6 1.5 5Year 3
352 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Old Elopa
10 4 5Year 4
353 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Old Elopa
6 3 5Year 6
354 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Old Elopa
4 6 5Year 20
355 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Old Elopa
5 5 5Year 5
356 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Old Elopa
6 1.5 5Year 3
357 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Old Elopa
10 4 5Year 4
358 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chihu Nallah
6 8 5Year 30
28.2
0114
95.7
8535
4
340
to 4
00
359 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chihu Nallah
5 5 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
165
360 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chihu Nallah
6 1.5 5Year 3
361 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chihu Nallah
10 4 5Year 4
362 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Cheya Nallah
4 6 5Year 20
27.9
8683
028
95.8
2192
843
220
to 2
40 363 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Cheya Nallah
5 5 5Year 5
364 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Cheya Nallah
6 1.5 5Year 3
365 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Cheya Nallah
10 4 5Year 4
366 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kesha Nallah
6 8 5Year 30
27.9
8808
083
95.8
1642
935
220
to 2
40 367 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kesha Nallah
5 5 5Year 5
368 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kesha Nallah
6 1.5 5Year 3
369 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kesha Nallah
10 4 5Year 4
370 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Jingu Nallah
6 8 5Year 30
27.9
8745
556
95.8
1917
889
220
to 2
40 371 Roing-
Koronu DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Jingu Nallah
5 5 5Year 5
372 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Jingu Nallah
6 1.5 5Year 3
373 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Jingu Nallah
10 4 5Year 4
374 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Aba Nallah
6 8 5Year 30
28.0
9535
4
95.9
5214
5
300
to 3
40
375 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Aba Nallah
5 5 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
166
376 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Aba Nallah
6 1.5 5Year 3
377 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Aba Nallah
10 4 5Year 4
378 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Meka Village ( Donkel area near Ara camp)
Nallah/Bund/Check
Dam/Farm pond
12 5Year 30
0 0 221
379 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Meka Village for Donkel Kuri Arik
Nallah/Bund/Check
Dam/Farm pond
7 5Year 17.5
28.0
7891
7
95.8
5003
232
380 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Meka Village for Donkel (Meka)
Nallah/Bund/Check
Dam/Farm pond
10 5Year 25
28.1
1187
5
95.8
5110
3
356.
62
381 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Endoli Village for Bellai Agril field
Nallah/Bund/Check
Dam/Farm pond
7 5Year 20
28.0
2776
7
95.8
2148
6
177
382 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 2Km
Nallah/Bund/Check
Dam/Farm pond
5 5Year 25
28.0
422
95.9
2758
6
255.
73
383 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 2.5Km
Nallah/Bund/Check
Dam/Farm pond
6 5Year 30
28.0
4205
8
95.9
3725
8
271.
58
District Irrigation Plan (PMKSY) Lower Dibang Valley
167
384 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 5Km
Nallah/Bund/Check
Dam/Farm pond
4 5Year 20
28.0
2127
5
95.9
2029
4
228.
6
385 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 5.8Km
Nallah/Bund/Check
Dam/Farm pond
6 5Year 30
28.0
3368
6
95.9
0022
2
229.
82
386 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 9Km
Nallah/Bund/Check
Dam/Farm pond
5 5Year 25
28.0
363
95.8
7436
7
227.
69
387 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
Water Conservation/Harvesting Structures at Koronu Village for 9.7Km
Nallah/Bund/Check
Dam/Farm pond
13 5Year 32.5
28.0
2731
7
95.8
8115
225.
86
388 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Jia Field
Nallah/Bund/Check Dam/Cut
off wall
102 5Year 255
28.0
5422
2
95.7
4342
2
173.
74
389 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Zemi Area
Nallah/Bund/Check Dam/Cut
off wall
167 5Year 417.5
28.0
7688
3
95.7
6774
7
188.
67
390 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Tamol Bari
Nallah/Bund/Check Dam/Cut
off wall
182 5Year 455
28.0
6570
8
95.7
4185
6
177.
39
District Irrigation Plan (PMKSY) Lower Dibang Valley
168
391 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Daking Area
Nallah/Bund/Check Dam/Cut
off wall
154 5Year 385
28.0
6561
7
95.7
5396
4
177.
09
392 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Ithili Village
Nallah/Bund/Check Dam/Cut
off wall
33.53 5Year 84
28.0
4601
1
95.7
3903
3
169.
77
393 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Kampo Nath
Nallah/Bund/Check Dam/Cut
off wall
239 5Year 597
28.0
5435
95.7
3206
4
172.
82
394 Roing-Koronu
DoLR- RWD
PMKSY (Watershed Management)
C/O Water Conservation Project at Kani Nath
Nallah/Bund/Check Dam/Cut
off wall
92.5 5Year 231.5
28.0
6246
7
95.7
2872
2
175.
56
395
396 Soil and Water Conservation
397 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Old Abali
5 5 5Year 3
28.0
4441
95.8
4071
230
to 2
80
398 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Old Abali
2 1 5Year 1
399 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Old Abali
6 12 5Year 9
400 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Chidu
5 5 5Year 3
28.2
0113
95.7
8400
450
t0 5
50
401 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Chidu
2 1 5Year 1
402 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Chidu
6 12 5Year 9
403 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Abango
5 5 5Year 3
28.0
9333
95.9
0015
310
to 4
50
404 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Abango
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
169
405 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Abango
6 12 5Year 9
406 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Injunu
5 5 5Year 3
28.0
6669
95.9
1885
250
to 3
00
407 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Injunu
2 1 5Year 1
408 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Injunu
6 12 5Year 9
409 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Koronu
5 5 5Year 3
28.0
6678
95.9
2362
300
to 3
40
410 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Koronu
2 1 5Year 1
411 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Koronu
6 12 5Year 9
412 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Ithini
5 5 5Year 3
28.0
5378
95.9
5396
350
t0 4
00
413 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Ithini
2 1 5Year 1
414 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Ithini 6 12 5Year 9
415 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Abili
5 5 5Year 3
27.9
8966
95.8
2316
220
to 2
40
416 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Abili
2 1 5Year 1
417 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Abili 6 12 5Year 9
418 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Arungo
5 5 5Year 3
28.0
4541
1
95.8
6568
250
t0 3
50
419 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Arungo
2 1 5Year 1
420 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Arungo
6 12 5Year 9
421 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Balini
5 5 5Year 3
28.0
6372
97
2
95.9
3981
250
t0 3
50
422 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Balini
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
170
423 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Balini
6 12 5Year 9
424 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bhismaknagar
5 5 5Year 3
28.0
6094
95.9
5396
350
t0 4
00
425 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bhismaknagar
2 1 5Year 1
426 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bhismaknagar
6 12 5Year 9
427 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Chidu
5 5 5Year 3
28.2
0112
861
95.7
8399
972
450
t0 5
00
428 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Chidu
2 1 5Year 1
429 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Chidu
6 12 5Year 9
430 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Denlo Village
5 5 5Year 3
28.0
5783
4722
95.9
0318
5833
3
250
t0 3
50
431 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Denlo Village
2 1 5Year 1
432 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Denlo Village
6 12 5Year 9
433 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at New Chidu
5 5 5Year 3
28.2
2032
89
95.7
5709
47
320
to 3
80
434 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at New Chidu
2 1 5Year 1
435 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at New Chidu
6 12 5Year 9
436 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Balek
5 5 5Year 3
28.0
9765
95.8
4924
250
t0 3
50
437 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Balek
2 1 5Year 1
438 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Balek
6 12 5Year 9
439 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Emuli
5 5 5Year 3
27.9
8959
86
1
95.8
1962
05
6
230
t0 2
50
440 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Emuli
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
171
441 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Emuli
6 12 5Year 9
442 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Simari - I
5 5 5Year 3
28.1
0709
39
95.8
9331
250
t0 3
50
443 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Simari - I
2 1 5Year 1
444 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Simari - I
6 12 5Year 9
445 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Holokbari
5 5 5Year 3
28.0
8218
08
95.8
1013
78
230
to 2
40
446 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Holokbari
2 1 5Year 1
447 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Holokbari
6 12 5Year 9
448 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Ithili
5 5 5Year 3
28.0
4881
95.7
5853
350
to 4
00
449 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Ithili
2 1 5Year 1
450 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Ithili 6 12 5Year 9
451 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Horupahar
5 5 5Year 3
28.0
5470
1389
95.8
5635
17
250
to 3
00
452 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Horupahar
2 1 5Year 1
453 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Horupahar
6 12 5Year 9
454 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bolik
5 5 5Year 3
28.0
2322
95.7
6105
230
to 2
40
455 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bolik
2 1 5Year 1
456 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bolik 6 12 5Year 9
457 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Jia I
5 5 5Year 3
28.0
5298
95.7
6480
220
to 2
40
458 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Jia I
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
172
459 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Jia I 6 12 5Year 9
460 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Jia II
5 5 5Year 3
28.0
5251
95.7
6410
220
to 2
40
461 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Jia II
2 1 5Year 1
462 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Jia II 6 12 5Year 9
463 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Malek
5 5 5Year 3
28.1
1886
95.7
5869
280
to 3
00
464 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Malek
2 1 5Year 1
465 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Malek
6 12 5Year 9
466 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Kunduli
5 5 5Year 3
28.0
6612
1
95.8
0616
417
220
to 2
50
467 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Kunduli
2 1 5Year 1
468 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Kunduli
6 12 5Year 9
469 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Parbuk
5 5 5Year 3
28.0
0471
95.7
6058
220
to 2
50
470 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Parbuk
2 1 5Year 1
471 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Parbuk
6 12 5Year 9
472 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Kebali
5 5 5Year 3
28.1
7749
97
95.8
2011
306
380
to 4
00
473 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Kebali
2 1 5Year 1
474 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Kebali
6 12 5Year 9
475 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Rambosti
5 5 5Year 3
28.0
0082
05
55
95.7
5102
69
44
200
to 2
20
476 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Rambosti
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
173
477 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Rambosti
6 12 5Year 9
478 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Idili
5 5 5Year 3
28.0
6849
95.7
4722
230
to 2
60
479 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Idili
2 1 5Year 1
480 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Idili 6 12 5Year 9
481 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Khinjili
5 5 5Year 3
28.0
0379
806
95.7
9874
94
210
to 2
40
482 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Khinjili
2 1 5Year 1
483 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Khinjili
6 12 5Year 9
484 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Kundil
5 5 5Year 3
27.9
7742
0833
95.8
2160
1944
200
t0 2
40
485 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment atKundil
2 1 5Year 1
486 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Kundil
6 12 5Year 9
487 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bolung I
5 5 5Year 3
28.0
3114
95.7
6301
230
t0 2
40
488 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bolung I
2 1 5Year 1
489 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bolung I
6 12 5Year 9
490 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bolung II
5 5 5Year 3
28.0
3155
95.7
6100
230
t0 2
40
491 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bolung II
2 1 5Year 1
492 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bolung II
6 12 5Year 9
493 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Malek
5 5 5Year 3
28.1
1886
02
78
95.7
5868
75
0
220
t0 2
40
494 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Malek
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
174
495 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Malek
6 12 5Year 9
496 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Tamolbari
5 5 5Year 3
28.0
9197
806
95.7
5280
528
230
t0 2
50
497 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Tamolbari
2 1 5Year 1
498 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Tamolbari
6 12 5Year 9
499 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Rukmo
5 5 5Year 3
27.9
8558
95.8
2743
210
t0 2
40
500 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Rukmo
2 1 5Year 1
501 Roing-Koronu
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Rukmo
6 12 5Year 9
502 Roing-Koronu Total of Watershed Management
2824 4105.53 6156
503 Water Harvesting Structures
504 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Apanli Village
4 6 5Year 20
28.3
1684
95.9
5265
139
1400
to 1
500
505 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Apanli Village
4 4 5Year 4
506 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Apanli Village
3 1.5 5Year 2
507 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Apanli Village
4 2 5Year 2
508 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Apanli Village
3 2 5Year 3
509 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Apanli Village
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
175
510 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Apanli Village
10 4 5Year 4
511 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Apanli Village
6 3 5Year 6
512 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Adapowa Village
6 8 5Year 30
28.4
0356
9166
667
95.9
3261
9722
222
1400
to 1
500
513 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Adapowa Village
4 4 5Year 4
514 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Adapowa Village
3 1.5 5Year 2
515 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Adapowa Village
4 2 5Year 2
516 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Adapowa Village
3 2 5Year 3
517 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Adapowa Village
6 1.5 5Year 3
518 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Adapowa Village
10 4 5Year 4
519 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Adapowa Village
6 3 5Year 6
520 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Abrango Village
6 8 5Year 30
28.3
4399
9722
222
95.9
1958
8888
889
1250
to 1
500
521 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Abrango Village
4 4 5Year 4
522 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Abrango Village
3 1.5 5Year 2
523 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Abrango Village
4 2 5Year 2
524 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Abrango Village
3 2 5Year 3
525 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Abrango Village
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
176
526 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Abrango Village
10 4 5Year 4
527 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Abrango Village
6 3 5Year 6
528 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Brinli Village
4 6 5Year 20
28.3
2039
1111
111
95.9
7904
7500
000
1100
to 1
200
529 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Brinli Village
4 4 5Year 4
530 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Brinli Village
3 1.5 5Year 2
531 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Brinli Village
4 2 5Year 2
532 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Brinli Village
3 2 5Year 3
533 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Brinli Village
6 1.5 5Year 3
534 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Brinli Village
10 4 5Year 4
535 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Brinli Village
6 3 5Year 6
536 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Aranli Village
4 6 5Year 20
28.3
1892
7500
000
96.0
8417
7500
000
1300
to 1
500
537 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Aranli Village
4 4 5Year 4
538 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Aranli Village
3 1.5 5Year 2
539 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Aranli Village
4 2 5Year 2
540 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Aranli Village
3 2 5Year 3
541 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Aranli Village
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
177
542 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Aranli Village
10 4 5Year 4
543 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Aranli Village
6 3 5Year 6
544 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Elope Village
6 8 5Year 30
28.3
8121
9166
667
95.9
2456
6944
445
1250
to 1
400
545 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Elope Village
4 4 5Year 4
546 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Elope Village
3 1.5 5Year 2
547 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Elope Village
4 2 5Year 2
548 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Elope Village
3 2 5Year 3
549 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Elope Village
8 2 5Year 5
550 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Elope Village
10 4 5Year 4
551 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Elope Village
6 3 5Year 6
552 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Punli Village
4 6 5Year 20
28.3
5549
1388
889
95.9
6107
5833
333
1250
to 1
500
553 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Punli Village
4 4 5Year 4
554 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Punli Village
3 1.5 5Year 2
555 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Punli Village
4 2 5Year 2
556 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Punli Village
3 2 5Year 3
557 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Punli Village
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
178
558 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Punli Village
10 4 5Year 4
559 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Punli Village
6 3 5Year 6
560 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Koni Village
6 8 5Year 30
28.3
0473
0277
778
95.9
6991
0833
333
1200
to 1
300
561 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Koni Village
4 4 5Year 4
562 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Koni Village
3 1.5 5Year 2
563 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Koni Village
4 2 5Year 2
564 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Koni Village
3 2 5Year 3
565 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Koni Village
6 1.5 5Year 3
566 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Koni Village
10 4 5Year 4
567 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Koni Village
6 3 5Year 6
568 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chatani Village
4 6 5Year 20
28.2
9823
0277
778
96.0
0136
7500
000
1150
to 1
300
569 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chatani Village
4 4 5Year 4
570 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Chatani Village
3 1.5 5Year 2
571 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Chatani Village
4 2 5Year 2
572 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Chatani Village
3 2 5Year 3
573 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chatani Village
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
179
574 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chatani Village
10 4 5Year 4
575 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Chatani Village
6 3 5Year 6
576 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Choroni Village
4 6 5Year 20
28.3
1474
5555
556
96.0
4098
2222
222
1200
to 1
500
577 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Choroni Village
4 4 5Year 4
578 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Choroni Village
3 1.5 5Year 2
579 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Choroni Village
4 2 5Year 2
580 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Choroni Village
3 2 5Year 3
581 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Choroni Village
6 1.5 5Year 3
582 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Choroni Village
10 4 5Year 4
583 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Choroni Village
6 3 5Year 6
584 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chuingo Village
6 8 5Year 30
28.2
9638
1111
111
96.0
6014
7500
000
1300
to 1
500
585 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chuingo Village
4 4 5Year 4
586 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Chuingo Village
3 1.5 5Year 2
587 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Chuingo Village
4 2 5Year 2
588 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Chuingo Village
3 2 5Year 3
589 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chuingo Village
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
180
590 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chuingo Village
10 4 5Year 4
591 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Chuingo Village
6 3 5Year 6
592 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at New Elope
6 8 5Year 30
28.3
2902
4166
667
95.9
3700
9722
222
1250
to 1
500
593 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at New Elope
4 4 5Year 4
594 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at New Elope
3 1.5 5Year 2
595 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at New Elope
4 2 5Year 2
596 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at New Elope
3 2 5Year 3
597 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at New Elope
6 1.5 5Year 3
598 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at New Elope
10 4 5Year 4
599 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at New Elope
6 3 5Year 6
600 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Hunli
8 8 5Year 25
28.3
1535
0833
333
95.9
6697
7222
222
1200
to 1
300
601 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Hunli
4 4 5Year 4
602 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Hunli 3 1.5 5Year 2
603 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Hunli
4 2 5Year 2
604 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Hunli 3 2 5Year 3
605 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Hunli
8 2 5Year 8
District Irrigation Plan (PMKSY) Lower Dibang Valley
181
606 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Hunli
10 4 5Year 4
607 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Hunli
6 3 5Year 6
608 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at New Aloni Vill
4 4 5Year 16
28.3
6409
8888
889
95.9
6106
8611
111
1100
to 1
200
609 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at New Aloni Vill
4 4 5Year 4
610 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at New Aloni Vill
3 1.5 5Year 2
611 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at New Aloni Vill
4 2 5Year 2
612 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at New Aloni Vill
3 2 5Year 3
613 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at New Aloni Vill
8 2 5Year 5
614 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at New Aloni Vill
10 4 5Year 4
615 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at New Aloni Vill
6 3 5Year 6
616 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Chanli Vill
6 8 5Year 30
28.2
7909
5277
778
96.0
4356
1944
444
1250
to 1
500
617 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Chanli Vill
4 4 5Year 4
618 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Chanli Vill
3 1.5 5Year 2
619 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Chanli Vill
4 2 5Year 2
620 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Chanli Vill
3 2 5Year 3
621 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Chanli Vill
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
182
622 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Chanli Vill
10 4 5Year 4
623 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Chanli Vill
6 3 5Year 6
624 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Sulongo Vill
6 8 5Year 30
28.2
9321
0000
000
96.0
5315
0000
000
14
00 to
150
0
625 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Sulongo Vill
4 4 5Year 4
626 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Sulongo Vill
3 1.5 5Year 2
627 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Sulongo Vill
4 2 5Year 2
628 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Sulongo Vill
3 2 5Year 3
629 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Sulongo Vill
8 2 5Year 5
630 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Sulongo Vill
10 4 5Year 4
631 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Sulongo Vill
6 3 5Year 6
632 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Ruingo Vill
4 4 5Year 16
28.2
8213
0000
000
96
.053
3091
6666
7
14
00 to
150
0
633 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Ruingo Vill
4 4 5Year 4
634 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Ruingo Vill
3 1.5 5Year 2
635 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Ruingo Vill
4 2 5Year 2
636 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Ruingo Vill
3 2 5Year 3
637 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Ruingo Vill
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
183
638 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Ruingo Vill
10 4 5Year 4
639 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Ruingo Vill
6 3 5Year 6
640 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Desali HQ
6 8 5Year 30
28.2
9934
7777
778
96.0
3658
1666
667
1450
to 1
580
641 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Desali HQ
4 4 5Year 4
642 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Desali HQ
3 1.5 5Year 2
643 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Desali HQ
4 2 5Year 2
644 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Desali HQ
3 2 5Year 3
645 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Desali HQ
6 1.5 5Year 3
646 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Desali HQ
10 4 5Year 4
647 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Desali HQ
6 3 5Year 6
648 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Donli Vill
4 4 5Year 16
28.2
8493
9722
222
96.0
7703
1388
889
1350
to 1
500
649 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Donli Vill
4 4 5Year 4
650 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Donli Vill
3 1.5 5Year 2
651 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Donli Vill
4 2 5Year 2
652 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Donli Vill
3 2 5Year 3
653 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Donli Vill
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
184
654 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Donli Vill
10 4 5Year 4
655 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Donli Vill
6 3 5Year 6
656 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Taloni Vill
6 8 5Year 30
28.2
8029
8611
111
96.0
7523
5277
778
1300
to 1
450
657 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Taloni Vill
4 4 5Year 4
658 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Taloni Vill
3 1.5 5Year 2
659 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Taloni Vill
4 2 5Year 2
660 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Taloni Vill
3 2 5Year 3
661 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Taloni Vill
8 2 5Year 5
662 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Taloni Vill
10 4 5Year 4
663 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Taloni Vill
6 3 5Year 6
664 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Jambupani
4 4 5Year 16
28.3
1928
6666
667
96.0
0271
3055
556
1250
to 1
300
665 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Jambupani
4 4 5Year 4
666 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Jambupani
3 1.5 5Year 2
667 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Jambupani
4 2 5Year 2
668 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Jambupani
3 2 5Year 3
669 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Jambupani
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
185
670 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Jambupani
10 4 5Year 4
671 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Jambupani
6 3 5Year 6
672 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Mitaka vill
4 4 5Year 16
28.3
1615
9722
222
96.0
7709
1111
111
1600
to 1
700
673 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Mitaka vill
4 4 5Year 4
674 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Mitaka vill
3 1.5 5Year 2
675 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Mitaka vill
4 2 5Year 2
676 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Mitaka vill
3 2 5Year 3
677 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Mitaka vill
6 1.5 5Year 3
678 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Mitaka vill
10 4 5Year 4
679 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Mitaka vill
6 3 5Year 6
680 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Dopowa Vill
4 4 5Year 16
28.2
7629
2777
778
96.1
1424
7777
778
1700
to 1
800
681 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Dopowa Vill
4 4 5Year 4
682 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Dopowa Vill
3 1.5 5Year 2
683 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Dopowa Vill
4 2 5Year 2
684 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Dopowa Vill
3 2 5Year 3
685 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Dopowa Vill
6 1.5 5Year 3
District Irrigation Plan (PMKSY) Lower Dibang Valley
186
686 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Dopowa Vill
10 4 5Year 4
687 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Dopowa Vill
6 3 5Year 6
688 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Mariso Vill
6 8 5Year 30
28.3
1145
8888
889
96.0
2373
5277
778
1350
to 1
500
689 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Mariso Vill
4 4 5Year 4
690 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Mariso Vill
3 1.5 5Year 2
691 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Mariso Vill
4 2 5Year 2
692 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Mariso Vill
3 2 5Year 3
693 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Mariso Vill
8 2 5Year 5
694 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Mariso Vill
10 4 5Year 4
695 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Mariso Vill
6 3 5Year 6
696 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Duchuli Vill
6 8 5Year 30
28.2
8833
2777
778
96.0
3477
9444
444
1400
to 1
500
697 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Duchuli Vill
4 4 5Year 4
698 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Duchuli Vill
3 1.5 5Year 2
699 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Duchuli Vill
4 2 5Year 2
700 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Duchuli Vill
3 2 5Year 3
701 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Duchuli Vill
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
187
702 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Duchuli Vill
10 4 5Year 4
703 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Duchuli Vill
6 3 5Year 6
704 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Ekhoni Vill
6 8 5Year 30
28.3
0710
1666
667
96.0
1216
2500
000
1250
to 1
300
705 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Ekhoni Vill
4 4 5Year 4
706 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Ekhoni Vill
3 1.5 5Year 2
707 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Ekhoni Vill
4 2 5Year 2
708 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Ekhoni Vill
3 2 5Year 3
709 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Ekhoni Vill
8 2 5Year 5
710 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Ekhoni Vill
10 4 5Year 4
711 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Ekhoni Vill
6 3 5Year 6
712 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Hukani Vill
6 8 5Year 30
28.3
1433
5833
333
96.0
1080
6666
667
1350
to 1
400
713 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Hukani Vill
4 4 5Year 4
714 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Hukani Vill
3 1.5 5Year 2
715 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Hukani Vill
4 2 5Year 2
716 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Hukani Vill
3 2 5Year 3
717 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Hukani Vill
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
188
718 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Hukani Vill
10 4 5Year 4
719 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Hukani Vill
6 3 5Year 6
720 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Esoli Vill
6 8 5Year 30
28.3
4305
9444
444
95.9
9162
8611
111
1500
to 1
600
721 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Esoli Vill
4 4 5Year 4
722 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Esoli Vill
3 1.5 5Year 2
723 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Esoli Vill
4 2 5Year 2
724 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Esoli Vill
3 2 5Year 3
725 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Esoli Vill
8 2 5Year 5
726 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Esoli Vill
10 4 5Year 4
727 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Esoli Vill
6 3 5Year 6
728 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Eyanli Vill
6 8 5Year 30
28.3
3903
2777
778
95.9
8000
7222
222
1350
to 1
500
729 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Eyanli Vill
4 4 5Year 4
730 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Eyanli Vill
3 1.5 5Year 2
731 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Eyanli Vill
4 2 5Year 2
732 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Eyanli Vill
3 2 5Year 3
733 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Eyanli Vill
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
189
734 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Eyanli Vill
10 4 5Year 4
735 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Eyanli Vill
6 3 5Year 6
736 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Marango Vill
6 8 5Year 30
28.3
0352
9166
667
96.0
4324
1111
111
1450
to 1
500
737 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Marango Vill
4 4 5Year 4
738 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Marango Vill
3 1.5 5Year 2
739 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Marango Vill
4 2 5Year 2
740 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Marango Vill
3 2 5Year 3
741 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Marango Vill
8 2 5Year 5
742 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Marango Vill
10 4 5Year 4
743 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Marango Vill
6 3 5Year 6
744 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Runli Vill
6 8 5Year 30
28.3
3014
5833
333
96.0
8931
4444
444
1400
to 1
500
745 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Runli Vill
4 4 5Year 4
746 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Runli Vill
3 1.5 5Year 2
747 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Runli Vill
4 2 5Year 2
748 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Runli Vill
3 2 5Year 3
749 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Runli Vill
8 2 5Year 5
District Irrigation Plan (PMKSY) Lower Dibang Valley
190
750 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Runli Vill
10 4 5Year 4
751 Hunli- Desali
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Runli Vill
6 3 5Year 6
752 Soil and Water Conservation
753 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Adapowa
5 5 5Year 3
28.4
0356
9
95.9
3262
1400
to 1
500
754 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Adapowa
2 1 5Year 1
755 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Adapowa
6 12 5Year 9
756 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Aranli
5 5 5Year 3
28.3
1892
750
96.0
8417
750
1300
to 1
500
757 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Aranli
2 1 5Year 1
758 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Aranli
6 12 5Year 9
759 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Eyanli
5 5 5Year 3
28.3
3903
278
95.9
8000
722
1350
to 1
500
760 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Eyanli
2 1 5Year 1
761 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Eyanli
6 12 5Year 9
762 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Apanli
5 5 5Year 3
28.3
1683
583
95.9
5265
139
1400
to 1
500
763 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Apanli
2 1 5Year 1
764 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Apanli
6 12 5Year 9
765 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Abrango
5 5 5Year 3
28.3
4399
972
95.9
1958
9
1250
to 1
500
766 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Abrango
2 1 5Year 1
767 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Abrango
6 12 5Year 9
District Irrigation Plan (PMKSY) Lower Dibang Valley
191
768 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Brinli
5 5 5Year 3
28.3
2039
1
95.9
7904
750
1100
to 1
200
769 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Brinli
2 1 5Year 1
770 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Brinli 6 12 5Year 9
771 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Choroni
5 5 5Year 3
28.3
1474
56
96.0
4098
2
1200
to 1
500
772 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Choroni
2 1 5Year 1
773 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Choroni
6 12 5Year 9
774 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Elope
5 5 5Year 3
28.3
8121
917
95.9
2456
695
1250
to 1
500
775 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Elope
2 1 5Year 1
776 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Elope
6 12 5Year 9
777 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Chanli
5 5 5Year 3
28.2
7909
5278
96.0
4356
1944
1250
to 1
500
778 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Chanli
2 1 5Year 1
779 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Chanli
6 12 5Year 9
780 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Sulongo
5 5 5Year 3
28.2
9321
0
96.0
5315
0
1400
to 1
500
781 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Sulongo
2 1 5Year 1
782 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Sulongo
6 12 5Year 9
783 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Ruingo
5 5 5Year 3
28.2
8213
0
96.0
5330
917
1400
to 1
500
784 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Ruingo
2 1 5Year 1
785 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Ruingo
6 12 5Year 9
District Irrigation Plan (PMKSY) Lower Dibang Valley
192
786 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Donli
5 5 5Year 3
28.2
8493
972
96.0
7703
139
1350
to 1
500
787 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Donli
2 1 5Year 1
788 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Donli 6 12 5Year 9
789 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Duchuli
5 5 5Year 3
28.2
8833
278
96.0
3477
94
1400
to 1
500
790 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Duchuli
2 1 5Year 1
791 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Duchuli
6 12 5Year 9
792 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Taloni
5 5 5Year 3
28.2
8029
861
96.0
7523
5278
1300
to 1
450
793 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Taloni
2 1 5Year 1
794 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Taloni
6 12 5Year 9
795 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Dopowa
5 5 5Year 3
28.2
7629
278
96.1
1424
78
1700
to 1
800
796 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Dopowa
2 1 5Year 1
797 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Dopowa
6 12 5Year 9
798 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Chuingo
5 5 5Year 3
28.2
9638
1
96.0
6014
750
1300
to 1
500
799 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Chuingo
2 1 5Year 1
800 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Chuingo
6 12 5Year 9
801 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Hunli
10 10 5Year 6
28.3
1535
083
95.9
6697
72
1200
to 1
300
802 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Hunli
4 2 5Year 2
803 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Hunli 12 24 5Year 18
District Irrigation Plan (PMKSY) Lower Dibang Valley
193
804 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at New Elope
5 5 5Year 3
28.3
2902
4167
95.9
3700
97
1250
to 1
500
805 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at New Elope
2 1 5Year 1
806 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at New Elope
6 12 5Year 9
807 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at New Aloni
5 5 5Year 3
28.3
6409
89
95.9
6106
861
1100
to 1
200
808 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at New Aloni
2 1 5Year 1
809 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at New Aloni
6 12 5Year 9
810 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Esoli
5 5 5Year 3
28.3
4305
944
95.9
9162
861
1500
to 1
600
811 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Esoli
2 1 5Year 1
812 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Esoli 6 12 5Year 9
813 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Marango
5 5 5Year 3
28.3
0352
917
96.0
4324
1
1450
to 1
500
814 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Marango
2 1 5Year 1
815 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Marango
6 12 5Year 9
816 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Mitaka
5 5 5Year 3
28.3
1615
972
96.0
7709
1
1600
to 1
700
817 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Mitaka
2 1 5Year 1
818 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Mitaka
6 12 5Year 9
819 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Jambupani
5 5 5Year 3
28.3
1928
67
96.0
0271
3056
1250
to 1
300
820 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Jambupani
2 1 5Year 1
821 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Jambupani
6 12 5Year 9
District Irrigation Plan (PMKSY) Lower Dibang Valley
194
822 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at New Chetani
5 5 5Year 3
28.2
9823
0278
96.0
0136
750
1150
to 1
300
823 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at New Chetani
2 1 5Year 1
824 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at New Chetani
6 12 5Year 9
825 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Desali
5 5 5Year 3
28.2
9934
78
96.0
3658
167
1450
to 1
580
826 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Desali
2 1 5Year 1
827 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Desali
6 12 5Year 9
828 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Mariso
5 5 5Year 3
28.3
1145
89
96.0
2373
5278
1350
to 1
500
829 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Mariso
2 1 5Year 1
830 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Mariso
6 12 5Year 9
831 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Punli
5 5 5Year 3
28.3
5549
1389
95.9
6107
583
1250
to 1
500
832 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Punli
2 1 5Year 1
833 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Punli 6 12 5Year 9
834 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Hukani
5 5 5Year 3
28.3
1433
583
96.0
1080
67
1350
to 1
400
835 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Hukani
2 1 5Year 1
836 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Hukani
6 12 5Year 9
837 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Arini
5 5 5Year 3
28.3
4942
3056
96.1
1908
361
1400
to 1
500
838 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Arini
2 1 5Year 1
839 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Arini 6 12 5Year 9
District Irrigation Plan (PMKSY) Lower Dibang Valley
195
840 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Ekhoni
5 5 5Year 3
28.3
0710
167
96.0
1216
25
1250
to 1
300
841 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Ekhoni
2 1 5Year 1
842 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Ekhoni
6 12 5Year 9
843 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Koni
5 5 5Year 3
28.3
0473
0278
95.9
6991
083
1200
to 1
300
844 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Koni
2 1 5Year 1
845 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Koni 6 12 5Year 9
846 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Runli
5 5 5Year 3
28.3
3014
583
96.0
8931
44
1400
to 1
500
847 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Runli
2 1 5Year 1
848 Hunli- Desali
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Runli 6 12 5Year 9
849 Hunli-Desali Total of Watershed Management
1693 1301 1993
850 Water Harvesting Structures
851 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Anpum(I) Vill
6 8 5Year 30
28.0
2579
7777
778
95.6
1369
8888
889
205
to 2
20 852 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Anpum(I) Vill
4 4 5Year 4
853 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Anpum(I) Vill
3 1.5 5Year 2
854 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Anpum(I) Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
196
855 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Anpum(I) Vill
3 2 5Year 3
856 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Anpum(I) Vill
8 2 5Year 5
857 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Anpum(I) Vill
10 4 5Year 4
858 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Anpum(I) Vill
6 3 5Year 6
859 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Anpum(II) Vill
6 8 5Year 30
28.0
2483
33
95.6
1311
210
to 2
20
860 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Anpum(II) Vill
4 4 5Year 4
861 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Anpum(II) Vill
3 1.5 5Year 2
862 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Anpum(II) Vill
4 2 5Year 2
863 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Anpum(II) Vill
3 2 5Year 3
864 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Anpum(II) Vill
8 2 5Year 5
865 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Anpum(II) Vill
10 4 5Year 4
866 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Anpum(II) Vill
6 3 5Year 6
867 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Banggo Vill
6 8 5Year 30
27.9
0803
7500
000
95.5
3655
2500
000
160
to 1
80 868 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Banggo Vill
4 4 5Year 4
869 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Banggo Vill
3 1.5 5Year 2
870 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Banggo Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
197
871 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Banggo Vill
3 2 5Year 3
872 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Banggo Vill
6 1.5 5Year 3
873 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Banggo Vill
10 4 5Year 4
874 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Banggo Vill
6 3 5Year 6
875 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bizari A Vill
6 8 5Year 30
28.0
8575
6111
111
95.6
3006
4722
222
220
to 2
30
876 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bizari A Vill
4 4 5Year 4
877 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bizari A Vill
3 1.5 5Year 2
878 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bizari A Vill
4 2 5Year 2
879 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bizari A Vill
3 2 5Year 3
880 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bizari A Vill
6 1.5 5Year 3
881 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bizari A Vill
10 4 5Year 4
882 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bizari A Vill
6 3 5Year 6
883 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bizari B Vill
6 8 5Year 30
28.0
8885
0833
333
95.6
2938
7777
778
220
to 2
30 884 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bizari B Vill
4 4 5Year 4
885 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bizari B Vill
3 1.5 5Year 2
886 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bizari B Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
198
887 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bizari B Vill
3 2 5Year 3
888 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bizari B Vill
6 1.5 5Year 3
889 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bizari B Vill
10 4 5Year 4
890 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bizari B Vill
6 3 5Year 6
891 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Bomjir Vill
6 8 5Year 30
28.1
5593
3055
556
95.6
6249
4444
444
280
to 3
00
892 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Bomjir Vill
4 4 5Year 4
893 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Bomjir Vill
3 1.5 5Year 2
894 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Bomjir Vill
4 2 5Year 2
895 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Bomjir Vill
3 2 5Year 3
896 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Bomjir Vill
6 1.5 5Year 3
897 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Bomjir Vill
10 4 5Year 4
898 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Bomjir Vill
6 3 5Year 6
899 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Dambuk Vill
4 4 5Year 16
28.2
5201
2500
000
95.6
1632
1944
445
325
to 3
50 900 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Dambuk Vill
4 4 5Year 4
901 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Dambuk Vill
3 1.5 5Year 2
902 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Dambuk Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
199
903 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Dambuk Vill
3 2 5Year 3
904 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Dambuk Vill
6 1.5 5Year 3
905 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Dambuk Vill
10 4 5Year 4
906 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Dambuk Vill
6 3 5Year 6
907 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Kapang Vill
6 8 5Year 30
28.2
3946
7222
222
95.5
7121
6111
111
325
to 3
50
908 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Kapang Vill
4 4 5Year 4
909 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Kapang Vill
3 1.5 5Year 2
910 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Kapang Vill
4 2 5Year 2
911 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Kapang Vill
3 2 5Year 3
912 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Kapang Vill
6 1.5 5Year 3
913 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Kapang Vill
10 4 5Year 4
914 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Kapang Vill
6 3 5Year 6
915 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Dambuk HQ
6 8 5Year 30
28.2
5203
33
95.6
1111
325
to 3
50 916 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Dambuk HQ
4 4 5Year 4
917 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Dambuk HQ
3 1.5 5Year 2
918 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Dambuk HQ
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
200
919 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Dambuk HQ
3 2 5Year 3
920 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Dambuk HQ
6 1.5 5Year 3
921 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Dambuk HQ
10 4 5Year 4
922 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Dambuk HQ
6 3 5Year 6
923 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at New Poblung
8 10 5Year 50
28.2
3827
95.6
2594
300
to 3
20
924 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at New Poblung
4 4 5Year 4
925 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at New Poblung
3 1.5 5Year 2
926 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at New Poblung
4 2 5Year 2
927 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at New Poblung
3 2 5Year 3
928 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at New Poblung
6 1.5 5Year 3
929 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at New Poblung
10 4 5Year 4
930 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at New Poblung
6 3 5Year 6
931 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Sirang Vill
6 8 5Year 30
28.2
5828
95.6
1664
350
to 3
70 932 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Sirang Vill
4 4 5Year 4
933 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Sirang Vill
3 1.5 5Year 2
934 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Sirang Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
201
935 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Sirang Vill
3 2 5Year 3
936 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Sirang Vill
6 1.5 5Year 3
937 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Sirang Vill
10 4 5Year 4
938 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Sirang Vill
6 3 5Year 6
939 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Tapat Vill
6 8 5Year 30
28.2
3060
95.5
9619
320
to 3
40
940 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Tapat Vill
4 4 5Year 4
941 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Tapat Vill
3 1.5 5Year 2
942 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Tapat Vill
4 2 5Year 2
943 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Tapat Vill
3 2 5Year 3
944 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Tapat Vill
6 1.5 5Year 3
945 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Tapat Vill
10 4 5Year 4
946 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Tapat Vill
6 3 5Year 6
947 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Remi Vill
6 8 5Year 30
28.2
4009
95.6
0235
330
to 3
50 948 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Remi Vill
4 4 5Year 4
949 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Remi Vill
3 1.5 5Year 2
950 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Remi Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
202
951 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Remi Vill
3 2 5Year 3
952 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Remi Vill
6 1.5 5Year 3
953 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Remi Vill
10 4 5Year 4
954 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Remi Vill
6 3 5Year 6
955 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Yagpo Vill
6 8 5Year 30
28.2
2754
95.5
8834
315
to 3
40
956 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Yagpo Vill
4 4 5Year 4
957 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Yagpo Vill
3 1.5 5Year 2
958 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Yagpo Vill
4 2 5Year 2
959 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Yagpo Vill
3 2 5Year 3
960 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Yagpo Vill
6 1.5 5Year 3
961 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Yagpo Vill
10 4 5Year 4
962 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Yagpo Vill
6 3 5Year 6
963 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Loklung Vill
8 10 5Year 50
28.0
1475
95.6
0854
200
to 2
30 964 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Loklung Vill
4 4 5Year 4
965 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Loklung Vill
3 1.5 5Year 2
966 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Loklung Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
203
967 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Loklung Vill
3 2 5Year 3
968 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Loklung Vill
6 1.5 5Year 3
969 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Loklung Vill
10 4 5Year 4
970 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Loklung Vill
6 3 5Year 6
971 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Paglam Vill
10 14 5Year 50
27.8
9908
3888
889
95.5
2373
3888
889
150
to 1
70
972 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Paglam Vill
4 4 5Year 4
973 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Paglam Vill
3 1.5 5Year 2
974 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Paglam Vill
4 2 5Year 2
975 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Paglam Vill
3 2 5Year 3
976 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Paglam Vill
6 1.5 5Year 3
977 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Paglam Vill
10 4 5Year 4
978 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Paglam Vill
6 3 5Year 6
979 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Paglam-II Vill
6 8 5Year 30
27.8
9908
95.5
2373
150
to 1
70 980 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Paglam-II Vill
4 4 5Year 4
981 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Paglam-II Vill
3 1.5 5Year 2
982 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Paglam-II Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
204
983 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Paglam-II Vill
3 2 5Year 3
984 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Paglam-II Vill
6 1.5 5Year 3
985 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Paglam-II Vill
10 4 5Year 4
986 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Paglam-II Vill
6 3 5Year 6
987 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Banggo Vill
6 8 5Year 30
27.9
0804
95.5
3655
160
to 1
80
988 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Banggo Vill
4 4 5Year 4
989 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Banggo Vill
3 1.5 5Year 2
990 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Banggo Vill
4 2 5Year 2
991 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Banggo Vill
3 2 5Year 3
992 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Banggo Vill
6 1.5 5Year 3
993 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Banggo Vill
10 4 5Year 4
994 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Banggo Vill
6 3 5Year 6
995 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Keba Vill
8 12 5Year 50
27.9
4841
95.5
7947
185
to 2
00 996 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Keba Vill
4 4 5Year 4
997 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Keba Vill
3 1.5 5Year 2
998 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Keba Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
205
999 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond atKeba Vill
3 2 5Year 3
1000 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Keba Vill
6 1.5 5Year 3
1001 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Keba Vill
10 4 5Year 4
1002 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Keba Vill
6 3 5Year 6
1003 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Loklung Vill
8 12 5Year 50
28.0
1475
95.6
0854
200
to 2
20
1004 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Loklung Vill
4 4 5Year 4
1005 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Loklung Vill
3 1.5 5Year 2
1006 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Loklung Vill
4 2 5Year 2
1007 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Loklung Vill
3 2 5Year 3
1008 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Loklung Vill
6 1.5 5Year 3
1009 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Loklung Vill
10 4 5Year 4
1010 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Loklung Vill
6 3 5Year 6
1011 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Poblung -I Vill
8 12 5Year 50
28.2
4122
95.6
1701
310
to 3
30 1012 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Poblung -I Vill
4 4 5Year 4
1013 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Poblung -I Vill
3 1.5 5Year 2
1014 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Poblung -I Vill
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
206
1015 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Poblung -I Vill
3 2 5Year 3
1016 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Poblung -I Vill
6 1.5 5Year 3
1017 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Poblung -I Vill
10 4 5Year 4
1018 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Poblung -I Vill
7 4 5Year 9
1019 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Poblung -II Vill
8 12 5Year 50
28.2
4508
95.6
2040
320
to 3
50
1020 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Poblung -II Vill
4 4 5Year 4
1021 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Poblung -II Vill
3 1.5 5Year 2
1022 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Poblung -II Vill
4 2 5Year 2
1023 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Poblung -II Vill
3 2 5Year 3
1024 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Poblung -II Vill
6 1.5 5Year 3
1025 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Poblung -II Vill
10 4 5Year 4
1026 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Poblung -II Vill
6 4 5Year 10
1027 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Gabion Structure at Tinali
8 12 5Year 50
27.9
1947
95.5
4447
170
to 2
00 1028 Dambuk-
Paglam DoLR- RWD
PMKSY (Watershed Management)
Earthen check dam at Tinali
4 4 5Year 4
1029 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Nallah bund at Tinali 3 1.5 5Year 2
1030 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Land Development at Tinali
4 2 5Year 2
District Irrigation Plan (PMKSY) Lower Dibang Valley
207
1031 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Farm pond at Tinali 3 2 5Year 3
1032 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Boulder check dam at Tinali
6 1.5 5Year 3
1033 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Brush wood check at Tinali
10 4 5Year 4
1034 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed Management)
Contour trenching at Tinali
6 3 5Year 6
1035 Soil and Water Conservation
1036 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Anpum(I)
5 5 5Year 3
28.0
2579
778
95.6
1369
889
205
to 2
20
1037 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Anpum(I)
2 1 5Year 1
1038 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Anpum(I)
6 12 5Year 9
1039 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Anpum(II)
5 5 5Year 3
28.0
2483
33
95.6
1311
11
210
to 2
20
1040 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Anpum(II)
2 1 5Year 1
1041 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Anpum(II)
6 12 5Year 9
1042 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Banggo
5 5 5Year 3
27.9
0803
75
95.5
3655
25
160
to 1
80
1043 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Banggo
2 1 5Year 1
1044 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Banggo
6 12 5Year 9
1045 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bizari A
5 5 5Year 3
28.0
8575
611
95.6
3006
472
220
to 2
30
1046 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bizari A
2 1 5Year 1
1047 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bizari A
6 12 5Year 9
District Irrigation Plan (PMKSY) Lower Dibang Valley
208
1048 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bizari B
5 5 5Year 3
28.0
8885
083
95.6
2938
778
220
to 2
30
1049 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bizari B
2 1 5Year 1
1050 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bizari B
6 12 5Year 9
1051 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Bomjir
5 5 5Year 3
28.1
5593
306
95.6
6249
444
280
to 3
00
1052 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Bomjir
2 1 5Year 1
1053 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Bomjir
6 12 5Year 9
1054 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Kapang
5 5 5Year 3
28.2
3946
722
95.5
7121
611
325
to 3
50
1055 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Kapang
2 1 5Year 1
1056 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Kapang
6 12 5Year 9
1057 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Dambuk
5 5 5Year 3
28.2
5201
25
95.6
1632
194
325
to 3
50
1058 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Dambuk
2 1 5Year 1
1059 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Dambuk
6 12 5Year 9
1060 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at New Poblung
5 5 5Year 3
28.2
3827
333
95.6
2593
556
300
to 3
20
1061 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at New Poblung
2 1 5Year 1
1062 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at New Poblung
6 12 5Year 9
1063 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Poblung I
5 5 5Year 3
28.2
41
2225
95.6
17
0133
3
310
to
330
District Irrigation Plan (PMKSY) Lower Dibang Valley
209
1064 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Poblung I
2 1 5Year 1
1065 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Poblung I
6 12 5Year 9
1066 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Poblung II
5 5 5Year 3
28.2
4507
556
95.6
2039
722
320
to 3
50
1067 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Poblung II
2 1 5Year 1
1068 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Poblung II
6 12 5Year 9
1069 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Sirang
5 5 5Year 3
28.2
5827
917
95.6
1663
972
350
to 3
70
1070 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Sirang
2 1 5Year 1
1071 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Sirang
6 12 5Year 9
1072 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Tapat
5 5 5Year 3
28.2
3060
083
95.5
9618
611
320
to 3
40
1073 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Tapat
2 1 5Year 1
1074 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Tapat
6 12 5Year 9
1075 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Remi
5 5 5Year 3
28.2
4009
028
95.6
0235
056
330
to 3
50
1076 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Remi
2 1 5Year 1
1077 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Remi
6 12 5Year 9
1078 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Yagpo
5 5 5Year 3
28.2
2753
639
95.5
8834
306
315
to 3
40
1079 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Yagpo
2 1 5Year 1
District Irrigation Plan (PMKSY) Lower Dibang Valley
210
1080 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Yagpo
6 12 5Year 9
1081 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Tinali
5 5 5Year 3
27.9
1947
083
95.5
4446
667
170
to 2
00
1082 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Tinali
2 1 5Year 1
1083 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Tinali
6 12 5Year 9
1084 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Loklung
5 5 5Year 3
28.0
1474
944
95.6
0853
556
200
to 2
30
1085 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Loklung
2 1 5Year 1
1086 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Loklung
6 12 5Year 9
1087 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Paglam
5 5 5Year 3
27.8
9908
389
95.5
2373
389
150
to 1
70
1088 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Paglam
2 1 5Year 1
1089 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Paglam
6 12 5Year 9
1090 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Vegetative Barriers at Keba
5 5 5Year 3
27.9
4840
889
95.5
7946
611
185
to 2
00
1091 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Land Devlopment at Keba
2 1 5Year 1
1092 Dambuk- Paglam
DoLR- RWD
PMKSY (Watershed ) Field Bunds at Keba
6 12 5Year 9
Dambuk-Paglam Total of Watershed Management
2959 2318 1646
RWD Proposal Total 7476 7724.53 0 9795
District Irrigation Plan (PMKSY) Lower Dibang Valley
211
Annexure-VII
Strategic Action Plan of DRDA under PMKSY
Sr. No.
Name of the Blocks
Concerned Ministry/Depar
tment
Name of Village
Component Activity Proposal Total no. Of structu
res
Command
Area/ Irrigati
on Potenti
al
Period of implementation 5 yrs/7
yrs
Estimated
cost (rs.in lakhs)
ACTIVITY 1. ( Water Harvesting &
Conservation Structures )
1 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
v) Gabion Structures 7 17.50 one year 61.25
2 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
3 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
4 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
xv)Check Dam 3 7.50 one year 37.50
5 Roing-Kornu CD Block
( RENOVATION :Water Harvesting & Conservation Structures )
6 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
7 Roing-Kornu CD Block
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
212
8 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
i)vegetative barriers 3 3.00 3.00
9 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
10 Roing-Kornu CD Block
ACTIVITY 3. PASTURE DEVELOPMENT
11 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
12 Roing-Kornu CD Block
DoLR-MoRD Ithili-Idili PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
13
14 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 26.25
15 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
16 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 6.00
17 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
xv)Check Dam 4 10.00 one year 50.00
18 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
19 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
20 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
21 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
i)vegetative barriers 3 3.00 3.00
22 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
23 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
24 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
213
25 Roing-Kornu CD Block
DoLR-MoRD Bolung-III PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
26 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 52.50
27 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
vi) Percolation tank
28 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
29 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 4.50
30 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
xv)Check Dam 4 10.00 one year 50.00
31 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
32 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
33 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
i)vegetative barriers 3 3.00 3.00
34 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
35 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
36 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
37 Roing-Kornu CD Block
DoLR-MoRD Bolung-II PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
38 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
39 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
vi) Percolation tank
40 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 4.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
214
41 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 6.00
42 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
(RENOVATION :Water Harvesting & Conservation Structures )
43 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
44 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
45 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
i)vegetative barriers 3 3.00 3.00
46 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
47 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
48 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
49 Roing-Kornu CD Block
DoLR-MoRD Bolung-I PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
50 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
51 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 35.00
52 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
53 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
54 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
55 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
56 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
215
57 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
i)vegetative barriers 1 1.00 one year 1.00
58 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
59 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
60 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
61 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
62 Roing-Kornu CD Block
DoLR-MoRD Shantipur-kalek
PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
63 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
64 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 26.25
65 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
66 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
67 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
68 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
69 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
70 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
i)vegetative barriers 1 1.00 one year 1.00
71 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
v)land development 2 2.00 one year 2.00
72 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
216
73 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
74 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 3.00
75 Roing-Kornu CD Block
DoLR-MoRD kangkong PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
76 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
77 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 52.50
78 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
79 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
80 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
81 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
82 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
83 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
i)vegetative barriers 2 2.00 one year 2.00
84 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
v)land development 2 2.00 one year 2.00
85 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
vi)field bunds 2 2.00 one year 2.00
86 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
87 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 3.00
88 Roing-Kornu CD Block
DoLR-MoRD Mobang-II PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
217
89 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
90 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
v) Gabion Structures 8 20.00 one year 70.00
91 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
92 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 3.00
93 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
94 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
95 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
96 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
i)vegetative barriers 2 2.00 one year 2.00
97 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
v)land development 2 2.00 one year 2.00
98 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
99 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
100 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 3.00
101 Roing-Kornu CD Block
DoLR-MoRD Mobang-I PMKSY (Watershed)
b)community land 3 3.00 one year 4.50
102 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
103 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year Rs 87.50
104 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year Rs 1.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
218
105 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year Rs 1.50
106 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
107 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year Rs 3.75
108 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
109 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
i)vegetative barriers 2 2.00 one year Rs 2.00
110 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
v)land development 2 2.00 one year Rs 2.00
111 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
vi)field bunds 1 1.00 one year Rs 1.00
112 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
113 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
a)private agricultural land 3 3.00 one year Rs 4.50
114 Roing-Kornu CD Block
DoLR-MoRD Parbuk-Bolik
PMKSY (Watershed)
b)community land 3 3.00 one year Rs 4.50
115 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
116 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
iv) Boulder Checks 4 6.00 one year 15.00
117 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
v) Gabion Structures 18 45.00 one year 157.50
118 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
vii) Earthen Checks 20 20.00 one year 20.00
119 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
xv)Check Dam 6 15.00 one year 75.00
120 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
District Irrigation Plan (PMKSY) Lower Dibang Valley
219
121 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
122 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
123 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
124 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
v)land development 10 10.00 one year 10.00
125 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
vi)field bunds 3 3.00 one year 3.00
126 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
127 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
a)private agricultural land 6 6.00 one year 9.00
128 Roing-Kornu CD Block
DoLR-MoRD Khinjili PMKSY (Watershed)
b)community land 6 6.00 one year 9.00
129 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
130 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
iv) Boulder Checks 3 4.50 one year 11.25
131 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
132 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
133 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
xv)Check Dam 2 5.00 one year 25.00
134 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
135 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
136 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
220
137 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
i)vegetative barriers 3 3.00 one year 3.00
138 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
139 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
140 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
141 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
142 Roing-Kornu CD Block
DoLR-MoRD Rukmo PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
143 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
144 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
iv) Boulder Checks 2 3.00 one year 7.50
145 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
v) Gabion Structures 9 22.50 one year 78.75
146 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
vii) Earthen Checks 3 3.00 one year 3.00
147 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
148 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
149 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
150 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
i)vegetative barriers 3 3.00 one year 3.00
151 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
152 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
221
153 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
154 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
155 Roing-Kornu CD Block
DoLR-MoRD Emuli-Kabang
PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
156 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
ACTIVITY 1.(Water Harvesting & Conservation Structures )
157 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
iv) Boulder Checks 3 4.50 one year 11.25
158 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
v) Gabion Structures 15 37.50 one year 131.25
159 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
vii) Earthen Checks 8 8.00 one year 8.00
160 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
161 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
v) Gabion Structures 2 3.00 one year 7.50
162 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
163 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
i)vegetative barriers 3 3.00 one year 3.00
164 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
165 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
166 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
167 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 6.00
168 Roing-Kornu CD Block
DoLR-MoRD Iduli PMKSY (Watershed)
b)community land 4 4.00 one year 6.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
222
169 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
170 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
iv) Boulder Checks 4 6.00 one year 15.00
171 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
v) Gabion Structures 15 37.50 one year 131.25
172 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
vii) Earthen Checks 10 10.00 one year 10.00
173 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
xv)Check Dam 5 12.50 one year 62.50
174 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
175 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
176 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
177 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
178 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
v)land development 6 6.00 one year 6.00
179 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
vi)field bunds 1 1.00 one year 1.00
180 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
181 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 4.50
182 Roing-Kornu CD Block
DoLR-MoRD Abali-I & II PMKSY (Watershed)
b)community land 3 3.00 one year 4.50
183 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
184 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
iv) Boulder Checks 4 6.00 one year 15.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
223
185 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
186 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
187 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
188 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
189 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
190 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
i)vegetative barriers 4 4.00 4.00
191 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
v)land development 2 2.00 2.00
192 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
193 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
194 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
a)private agricultural land 5 5.00 one year 7.50
195 Roing-Kornu CD Block
DoLR-MoRD Old Abali PMKSY (Watershed)
b)community land 5 5.00 one year 7.50
196 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
197 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
iv) Boulder Checks 1 1.50 one year 3.75
198 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
v) Gabion Structures 8 20.00 one year 70.00
199 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.50
200 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
xv)Check Dam 2 5.00 one year 25.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
224
201 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
202 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
203 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
204 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
205 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
iv)bench terracing 1 1.00 one year 1.00
206 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
207 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
208 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 4.50
209 Roing-Kornu CD Block
DoLR-MoRD Bhismaknagar
PMKSY (Watershed)
b)community land 3 3.00 one year 4.50
210 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
211 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
iv) Boulder Checks 1 1.50 one year 3.75
212 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
v) Gabion Structures 5 12.50 one year 43.75
213 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
vii) Earthen Checks 3 3.00 one year 4.50
214 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
xv)Check Dam 2 5.00 one year 25.00
215 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
216 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
District Irrigation Plan (PMKSY) Lower Dibang Valley
225
217 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
218 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
219 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
220 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
221 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 4.50
222 Roing-Kornu CD Block
DoLR-MoRD Injuno PMKSY (Watershed)
b)community land 3 3.00 one year 4.50
223 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
224 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
iv) Boulder Checks 2 3.00 one year 7.50
225 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 35.00
226 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 3.00
227 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
xv)Check Dam 1 2.50 one year 12.50
228 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
229 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
v) Gabion Structures 2 3.00 one year 7.50
230 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
231 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
232 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
iv)bench terracing 2 2.00 one year 2.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
226
233 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
234 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
235 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 3.00
236 Roing-Kornu CD Block
DoLR-MoRD Denlo PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
237 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
238 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
iv) Boulder Checks 3 4.50 one year 11.25
239 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 52.50
240 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
xv)Check Dam 2 5.00 one year 25.00
241 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
242 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
v) Gabion Structures 2 3.00 one year 7.50
243 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
244 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
i)vegetative barriers 4 4.00 one year 4.00
245 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
iv)bench terracing 2 2.00 one year 2.00
246 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
247 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
248 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
227
249 Roing-Kornu CD Block
DoLR-MoRD Abango PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
250 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
251 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
iv) Boulder Checks 4 6.00 one year 15.00
252 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
v) Gabion Structures 7 17.50 one year 61.25
253 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
xv)Check Dam 2 5.00 one year 25.00
254 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
255 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
256 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
257 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
i)vegetative barriers 3 3.00 one year 3.00
258 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
iv)bench terracing 2 2.00 one year 2.00
259 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
v)land development 1 1.00 one year 1.00
260 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
261 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
262 Roing-Kornu CD Block
DoLR-MoRD Koronu PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
263 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
264 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
v) Gabion Structures 2 5.00 1 Year 17.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
228
265 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
vi) Percolation tank 1 2.50 1 Year 8.75
266 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
vii) Earthen Checks 2 2.00 1 Year 2.00
267 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
viii) Nallah bund 2 2.00 1 Year 3.00
268 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
269 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
v) Gabion Structures 1 1.50 1 Year 3.75
270 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
271 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
i)vegetative barriers 4 4.00 1 Year 4.00
272 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
v)land development 1 1.00 1 Year 1.00
273 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
vi)field bunds 1 1.00 1 Year 1.00
274 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT 1 Year
275 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
a)private agricultural land 1 1.00 1 Year 1.50
276 Roing-Kornu CD Block
DoLR-MoRD Jia-III PMKSY (Watershed)
b)community land 2 2.00 1 Year 3.00
277 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
278 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
v) Gabion Structures 2 5.00 one year 17.50
279 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
vi) Percolation tank 3 7.50 one year 26.25
280 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
229
281 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 3.00
282 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
283 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
284 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
285 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
i)vegetative barriers 3 3.00 3.00
286 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
v)land development 1 1.00 1.00
287 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
288 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
289 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
290 Roing-Kornu CD Block
DoLR-MoRD Jia-II PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
291 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
292 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 26.25
293 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
vi) Percolation tank 2 5.00 one year 17.50
294 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
295 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
296 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
District Irrigation Plan (PMKSY) Lower Dibang Valley
230
297 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
iv) Boulder Checks 1 1.00 one year 2.50
298 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
299 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
300 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
i)vegetative barriers 4 4.00 4.00
301 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
v)land development 1 1.00 1.00
302 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
303 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
304 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
305 Roing-Kornu CD Block
DoLR-MoRD Jia-I PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
306 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
307 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
v) Gabion Structures 5 12.50 one year 43.75
308 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
vi) Percolation tank 2 5.00 one year 17.50
309 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
310 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 1.50
311 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
312 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
iv) Boulder Checks 1 1.00 one year 2.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
231
313 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
314 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
315 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
i)vegetative barriers 4 4.00 4.00
316 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
v)land development 1 1.00 1.00
317 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
318 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
319 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
320 Roing-Kornu CD Block
DoLR-MoRD Meka-II PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
321 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
322 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 52.50
323 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
vi) Percolation tank 1 2.50 one year 8.75
324 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
325 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 3.00
326 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
327 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
iv) Boulder Checks 1 1.00 one year 2.50
328 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
v) Gabion Structures 1 1.50 one year 3.75
District Irrigation Plan (PMKSY) Lower Dibang Valley
232
329 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
330 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
i)vegetative barriers 4 4.00 4.00
331 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
v)land development 2 2.00 2.00
332 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
333 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
334 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
335 Roing-Kornu CD Block
DoLR-MoRD Meka-I PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
336 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
337 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
iv) Boulder Checks 1 1.50 1 Year 3.00
338 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
v) Gabion Structures 6 15.00 1 Year 52.50
339 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
vii) Earthen Checks 1 1.00 1 Year 1.00
340 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
viii) Nallah bund 2 2.00 1 Year 3.00
341 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
x) Land development 1 1.00 1 Year 1.50
342 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
xv)Check Dam 2 4.00 1 Year 20.00
343 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
344 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
iv) Boulder Checks 1 1.00 1 Year 2.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
233
345 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
v) Gabion Structures 2 3.00 1 Year 7.50
346 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
347 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
i)vegetative barriers 4 4.00 1 Year 4.00
348 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
iv)bench terracing 2 2.00 1 Year 2.00
349 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
vi)field bunds 1 1.00 1 Year 1.00
350 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
351 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
a)private agricultural land 1 1.00 1 Year 1.50
352 Roing-Kornu CD Block
DoLR-MoRD Simari-I & II
PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
353 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
354 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
vi) Percolation tank 4 4.00 1 Year 8.00
355 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
vii) Earthen Checks 2 2.00 1 Year 2.00
356 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
viii) Nallah bund 2 2.00 1 Year 3.00
357 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
x) Land development 1 1.00 1 Year 1.50
358 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
359 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
v) Gabion Structures 1 2.50 1 Year 6.25
360 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
234
361 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
vi)field bunds 2 2.00 2.00
362 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
363 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
a)private agricultural land 6 6.00 1 Year 9.00
364 Roing-Kornu CD Block
DoLR-MoRD Mayu-II PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
365 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
366 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
vi) Percolation tank 3 3.00 one year 6.00
367 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2.00
368 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 4.50
369 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
x) Land development 3 3.00 one year 4.50
370 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
371 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 6.25
372 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
373 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
vi)field bunds 2 2.00 2.00
374 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
375 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 6.00
376 Roing-Kornu CD Block
DoLR-MoRD Mayu-I PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
235
377 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
378 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
iv) Boulder Checks 2 3.00 1 Year 6.00
379 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
v) Gabion Structures 3 7.50 1 Year 26.25
380 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
vii) Earthen Checks 2 2.00 1 Year 2.00
381 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
382 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
v) Gabion Structures 2 2.50 1 Year 6.25
383 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
1 Year
384 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
vi)field bunds 1 1.00 1 Year 1.00
385 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
386 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
a)private agricultural land 3 3.00 1 Year 4.50
387 Roing-Kornu CD Block
DoLR-MoRD Balek PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
388 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
389 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
iv) Boulder Checks 4 6.00 one year 12.00
390 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 35.00
391 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
vii) Earthen Checks 1 1.00 one year 1.00
392 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 3.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
236
393 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
x) Land development 1 1.00 one year 1.50
394 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
xv)Check Dam 2 4.00 one year 20.00
395 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
396 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 6.25
397 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
398 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
iv)bench terracing 2 2.00 2.00
399 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
vi)field bunds 1 1.00 1.00
400 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
401 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 1.50
402 Roing-Kornu CD Block
DoLR-MoRD Kebali PMKSY (Watershed)
b)community land 1 1.00 one year 1.50
403 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
404 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
iv) Boulder Checks 4 6.00 1 Year 12.00
405 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
v) Gabion Structures 4 10.00 1 Year 35.00
406 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
vii) Earthen Checks 2 2.00 1 Year 2.00
407 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
viii) Nallah bund 3 3.00 1 Year 4.50
408 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
x) Land development 3 3.00 1 Year 4.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
237
409 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
xv)Check Dam 3 6.00 1 Year 30.00
410 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
411 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
v) Gabion Structures 1 2.50 1 Year 6.25
412 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
1 Year
413 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
iv)bench terracing 2 2.00 1 Year 2.00
414 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
vi)field bunds 2 2.00 1 Year 2.00
415 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT 1 Year
416 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
a)private agricultural land 1 1.00 1 Year 1.50
417 Roing-Kornu CD Block
DoLR-MoRD Chidu PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
418 Roing-Koronu Total 764 1175 3137
419 Dambuk-Paglam
DoLR-MoRD Bizari-A ACTIVITY 1. ( Water Harvesting & Conservation Structures )
420 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 2016-17
52.50
421 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
vii) Earthen Checks 6 6.00 one year 2016-17
6.00
422 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 2016-17
5.00
423 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
ix) Under ground dyke
424 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
x) Land development 6 6.00 one year 2016-17
9.00
425 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
xi) Farm ponds 3 3.00 one year 2016-18
4.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
238
426 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
xv)Check Dam 2 6.00 one year 2016-17
20.00
427 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
428 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
v) Gabion Structures 3 2.50 one year 2016-17
7.50
429 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
430 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
vi)field bunds 4 4.00 2.00
431 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
432 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 6.00
433 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
b)community land 4 4.00 one year 6.00
434 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
v) Gabion Structures 7 17.50 one year Rs 61.25
435 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
vii) Earthen Checks 10 10.00 one year Rs 10.00
436 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
viii) Nallah bund 10 10.00 one year Rs 10.00
437 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
x) Land development 6 6.00 one year Rs 9.00
438 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
xi) Farm ponds 7 7.00 one year Rs 7.00
439 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
xv)Check Dam 3 9.00 one year Rs 30.00
440 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
441 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year Rs 5.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
239
442 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
443 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
vi)field bunds 5 5.00 one year Rs 2.50
444 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
445 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
a)private agricultural land 5 5.00 one year Rs 4.00
446 Dambuk-Paglam
DoLR-MoRD Bizari-A PMKSY (Watershed)
b)community land 2 2.00 one year Rs 3.00
447 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
ACTIVITY 1.(Water Harvesting & Conservation Structures )
448 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
v) Gabion Structures 8 20.00 one year 70.00
449 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
vii) Earthen Checks 12 12.00 one year 10.00
450 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
viii) Nallah bund 10 10.00 one year 10.00
451 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
x) Land development 6 6.00 one year 9.00
452 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
xi) Farm ponds 4 4.00 one year 6.00
453 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
xv)Check Dam 4 12.00 one year 40.00
454 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
455 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
456 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2.50
457 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
240
458 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
vi)field bunds 6 6.00 3.00
459 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
460 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
a)private agricultural land 5 5.00 one year 7.50
461 Dambuk-Paglam
DoLR-MoRD Bizari-B PMKSY (Watershed)
b)community land 2 2.00 one year 3.00
462 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
463 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
464 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
vii) Earthen Checks 10 10.00 one year 10.00
465 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
viii) Nallah bund 9 9.00 one year 9.00
466 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
x) Land development 8 8.00 one year 12.00
467 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
xi) Farm ponds 2 2.00 one year 3.00
468 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
xv)Check Dam 3 9.00 one year 30.00
469 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
470 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2.50
471 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
472 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
vi)field bunds 8 8.00 3.00
473 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
District Irrigation Plan (PMKSY) Lower Dibang Valley
241
474 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 6.00
475 Dambuk-Paglam
DoLR-MoRD Bizari-C PMKSY (Watershed)
b)community land 4 4.00 one year 2.00
476 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
477 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
478 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
vii) Earthen Checks 15 15.00 one year 15.00
479 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 3.00
480 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
x) Land development 8 8.00 one year 12.00
481 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
xi) Farm ponds 6 6.00 one year 9.00
482 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
xv)Check Dam 4 12.00 one year 40.00
483 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
484 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2.50
485 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
486 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
vi)field bunds 3 3.00 1.50
487 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
488 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 6.00
489 Dambuk-Paglam
DoLR-MoRD Anupum-A
PMKSY (Watershed)
b)community land 4 4.00 one year 6.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
242
490 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
491 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
v) Gabion Structures 10 25.00 one year 87.50
492 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
vii) Earthen Checks 13 13.00 one year 10.00
493 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2.00
494 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
x) Land development 15 15.00 one year 22.50
495 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
xi) Farm ponds 1 1.00 one year 1.50
496 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
xv)Check Dam 6 18.00 one year 60.00
497 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
498 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2.50
499 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
500 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
vi)field bunds 3 3.00 1.50
501 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
502 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 4.50
503 Dambuk-Paglam
DoLR-MoRD Anupum-B
PMKSY (Watershed)
b)community land 3 3.00 one year 4.50
504 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
505 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
v) Gabion Structures 4 10.00 One Year 35.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
243
506 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
vii) Earthen Checks 2 2.00 One Year 3.00
507 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
viii) Nallah bund 2 2.00 One Year 2.00
508 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
x) Land development 2 2.00 One Year 4.00
509 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
xv)Check Dam 1 3.00 One Year 10.00
510 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
511 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
v) Gabion Structures 1 2.50 One Year 2.50
512 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
513 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
vi)field bunds 2 2.00 1.00
514 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
515 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
516 Dambuk-Paglam
DoLR-MoRD Yapgo PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
2.00
517 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
518 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
v) Gabion Structures 7 17.50 one year 2016-17
61.25
519 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
vii) Earthen Checks 8 8.00 one year 2016-17
8.00
520 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 2016-17
2.00
521 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
x) Land development 5 5.00 one year 2016-17
7.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
244
522 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
523 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year 2016-17
6.00
524 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
525 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
vi)field bunds 3 3.00 1.50
526 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
527 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
528 Dambuk-Paglam
DoLR-MoRD Tapat PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
529 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
530 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 2016-17
26.00
531 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2016-17
2.00
532 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
viii) Nallah bund 1 1.00 one year 2016-17
1.00
533 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
x) Land development 1 1.00 one year 2016-17
1.50
534 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
10.00
535 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
536 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year 2016-17
5.00
537 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
District Irrigation Plan (PMKSY) Lower Dibang Valley
245
538 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
vi)field bunds 1 1.00 0.50
539 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
540 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
541 Dambuk-Paglam
DoLR-MoRD Kapang PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
2.00
542 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
543 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
v) Gabion Structures 6 15.00 one year 2016-17
52.50
544 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
vii) Earthen Checks 10 10.00 one year 2016-17
10.00
545 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2016-17
2.00
546 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
x) Land development 2 2.00 one year 2016-17
3.00
547 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
10.00
548 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
549 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year 2016-17
5.00
550 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
551 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
vi)field bunds 2 2.00 1.00
552 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
553 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
246
554 Dambuk-Paglam
DoLR-MoRD Remi PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
555 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
556 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
v) Gabion Structures 7 17.50 one year 2016-17
61.25
557 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
vii) Earthen Checks 10 10.00 one year 2016-17
12.00
558 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2016-17
2.00
559 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
x) Land development 2 2.00 one year 2016-17
4.00
560 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
xv)Check Dam 4 12.00 one year 2016-17
40.00
561 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
562 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
v) Gabion Structures 3 2.50 one year 2016-17
7.50
563 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
564 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
vi)field bunds 5 5.00 2.50
565 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
566 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
2.00
567 Dambuk-Paglam
DoLR-MoRD Poblung-A PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
568 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
569 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
v) Gabion Structures 5 12.50 one year 2016-17
33.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
247
570 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
vii) Earthen Checks 12 12.00 one year 2016-17
15.00
571 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 2016-17
3.00
572 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
x) Land development 2 2.00 one year 2016-17
3.00
573 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
xv)Check Dam 2 6.00 one year 2016-17
20.00
574 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
575 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
v) Gabion Structures 4 2.50 one year 2016-17
10.00
576 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
577 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
vi)field bunds 2 2.00 1.00
578 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
579 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
580 Dambuk-Paglam
DoLR-MoRD Poblung-B PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
581 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
582 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 2016-17
20.00
583 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
vii) Earthen Checks 15 15.00 one year 2016-17
20.00
584 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 2016-17
4.00
585 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
x) Land development 3 3.00 one year 2016-17
4.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
248
586 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
10.00
587 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
588 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
v) Gabion Structures 5 2.50 one year 2016-17
12.50
589 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
590 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
vi)field bunds 4 4.00 2.00
591 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
592 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
593 Dambuk-Paglam
DoLR-MoRD Poblung-C PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
594 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
595 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
v) Gabion Structures 8 20.00 one year 2016-17
70.00
596 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 2016-17
4.00
597 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2016-17
3.00
598 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
x) Land development 2 2.00 one year 2016-17
3.00
599 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
10.00
600 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
601 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
v) Gabion Structures 3 2.50 one year 2016-17
7.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
249
602 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
603 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
vi)field bunds 4 4.00 2.00
604 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
605 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 2016-17
6.00
606 Dambuk-Paglam
DoLR-MoRD Sirang PMKSY (Watershed)
b)community land 4 4.00 one year 2016-17
6.00
607 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
ACTIVITY 1.(Water Harvesting & Conservation Structures )
608 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
v) Gabion Structures 2 5.00 12.00
609 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
vii) Earthen Checks 1 1.00 2.00
610 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
viii) Nallah bund 2 2.00 3.00
611 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
612 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
v) Gabion Structures 1 2.50 3.00
613 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
614 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
vi)field bunds 2 2.00 2.00
615 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
616 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
617 Dambuk-Paglam
DoLR-MoRD Paglam-B PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
2.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
250
618 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
619 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
v) Gabion Structures 2 5.00 15.00
620 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
vii) Earthen Checks 2 2.00 2.00
621 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
viii) Nallah bund 3 3.00 5.00
622 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
623 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
v) Gabion Structures 1 2.50 2.50
624 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
vi)field bunds 2 2.00 1.00
625 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
626 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
a)private agricultural land 1 1.00 2.00
627 Dambuk-Paglam
DoLR-MoRD Paglam-A PMKSY (Watershed)
b)community land 1 1.00 1.50
628 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
629 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
v) Gabion Structures 4 10.00 1 Year 25.00
630 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
vii) Earthen Checks 12 12.00 1 Year 12.00
631 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
viii) Nallah bund 8 8.00 1 Year 8.00
632 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
x) Land development 1 1.00 1 Year 1.50
633 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
1 Year
District Irrigation Plan (PMKSY) Lower Dibang Valley
251
634 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
vi)field bunds 9 9.00 1 Year 4.50
635 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT 1 Year
636 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
a)private agricultural land 2 2.00 1 Year 3.00
637 Dambuk-Paglam
DoLR-MoRD Anpum-c PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
638 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
639 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
vii) Earthen Checks 10 10.00 1 Year 10.00
640 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
viii) Nallah bund 8 8.00 1 Year 8.00
641 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
x) Land development 2 2.00 1 Year 3.00
642 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
643 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
644 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
vi)field bunds 2 2.00 1 Year 1.00
645 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT 1 Year
646 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
a)private agricultural land 1 1.00 1 Year 1.50
647 Dambuk-Paglam
DoLR-MoRD Keba-Tinali
PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
648 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
649 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
v) Gabion Structures 2 5.00 1 Year 13.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
252
650 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
vii) Earthen Checks 10 10.00 1 Year 10.00
651 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
viii) Nallah bund 8 8.00 1 Year 8.00
652 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
x) Land development 1 1.00 1 Year 1.50
653 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
1 Year
654 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
vi)field bunds 8 8.00 1 Year 4.00
655 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT 1 Year
656 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
a)private agricultural land 4 4.00 1 Year 6.00
657 Dambuk-Paglam
DoLR-MoRD Banggo PMKSY (Watershed)
b)community land 1 1.00 1 Year 1.50
658 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
659 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
v) Gabion Structures 1 2.50 6.50
660 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
vii) Earthen Checks 10 10.00 10.00
661 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
viii) Nallah bund 6 6.00 6.00
662 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
x) Land development 1 1.00 1.50
663 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
664 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
vi)field bunds 7 7.00 3.50
665 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
District Irrigation Plan (PMKSY) Lower Dibang Valley
253
666 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
a)private agricultural land 2 2.00 3.00
667 Dambuk-Paglam
DoLR-MoRD Loklung PMKSY (Watershed)
b)community land 1 1.00 1.50
668 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
669 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
v) Gabion Structures 1 2.50 6.50
670 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
vii) Earthen Checks 11 11.00 11.00
671 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
viii) Nallah bund 7 7.00 7.00
672 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
x) Land development 2 2.00 3.00
673 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
674 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
vi)field bunds 8 8.00 4.00
675 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
676 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
a)private agricultural land 2 2.00 3.00
677 Dambuk-Paglam
DoLR-MoRD Kaling-II PMKSY (Watershed)
b)community land 1 1.00 1.50
678 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
679 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
v) Gabion Structures 1 2.50 6.50
680 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
vii) Earthen Checks 12 12.00 12.00
681 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
viii) Nallah bund 8 8.00 8.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
254
682 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
x) Land development 1 1.00 1.50
683 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
684 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
vi)field bunds 9 9.00 4.50
685 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
686 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
a)private agricultural land 2 2.00 3.00
687 Dambuk-Paglam
DoLR-MoRD Kaling-I PMKSY (Watershed)
b)community land 1 1.00 1.50
688 Dambuk-Paglam Total 764 1000.5 0 1943.75
689 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
690 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
v) Gabion Structures 4 12.00 one year 2016-17
25.00
691 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
vii) Earthen Checks 2 2.50 one year 2016-17
2.50
692 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
viii) Nallah bund 5 4.00 one year 2016-17
2.50
693 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
x) Land development 5 3.50 one year 2016-17
7.00
694 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
695 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
v) Gabion Structures 1 2.00 one year 2016-17
2.50
696 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
697 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
iv)bench terracing 4 3.00 one year 2016-17
7.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
255
698 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
699 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 2016-17
3.00
700 Hunli-Desali DoLR-MoRD Mitaka PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
701 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
702 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 2016-17
19.50
703 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
vii) Earthen Checks 1 1.50 one year 2016-17
1.50
704 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
viii) Nallah bund 5 5.00 one year 2016-17
5.00
705 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
x) Land development 4 4.00 one year 2016-17
6.00
706 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
RENOVATION :Water Harvesting & Conservation Structures )
707 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
2.50
708 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
709 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
iv)bench terracing 4 4.00 one year 2016-17
7.00
710 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
711 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
2.00
712 Hunli-Desali DoLR-MoRD Dopowa PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
713 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
District Irrigation Plan (PMKSY) Lower Dibang Valley
256
714 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
v) Gabion Structures 2 5.00 one year 2016-17
13.00
715 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2016-17
1.50
716 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 2016-17
5.00
717 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
x) Land development 5 5.00 one year 2016-17
7.00
718 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
719 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
3.00
720 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
721 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
iv)bench terracing 3 3.00 one year 2016-17
4.00
722 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
723 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
1.50
724 Hunli-Desali DoLR-MoRD Chulungo PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
2.00
725 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
ACTIVITY 1( Water Harvesting & Conservation Structures )
726 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
v) Gabion Structures 2 5.00 one year 2016-17
13.00
727 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 2016-17
5.00
728 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 2016-17
3.00
729 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
x) Land development 4 4.00 one year 2016-17
8.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
257
730 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
731 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
2.50
732 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
733 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
iv)bench terracing 4 4.00 one year 2016-17
7.00
734 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
735 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
a)private agricultural land 1 1.00 one year 2016-17
2.00
736 Hunli-Desali DoLR-MoRD Chorni PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
737 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
738 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 2016-17
25.00
739 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
vii) Earthen Checks 8 8.00 one year 2016-17
10.00
740 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
viii) Nallah bund 8 8.00 one year 2016-17
8.00
741 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
x) Land development 8 8.00 one year 2016-17
12.00
742 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
743 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
2.50
744 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
745 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
iv)bench terracing 6 6.00 one year 2016-17
8.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
258
746 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
747 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 2016-17
3.00
748 Hunli-Desali DoLR-MoRD Desali PMKSY (Watershed)
b)community land 2 2.00 one year 2016-17
5.00
749 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
ACTIVITY 1. (Water Harvesting & Conservation Structures )
750 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 2016-17
20.00
751 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 2016-17
5.00
752 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
viii) Nallah bund 5 5.00 one year 2016-17
5.00
753 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
x) Land development 5 5.00 one year 2016-17
8.00
754 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
755 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
3.00
756 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
757 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
iv)bench terracing 3 3.00 one year 2016-17
4.50
758 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
759 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 2016-17
5.00
760 Hunli-Desali DoLR-MoRD Donli Taloni
PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
761 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
District Irrigation Plan (PMKSY) Lower Dibang Valley
259
762 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
v) Gabion Structures 4 10.00 one year 2016-17
25.00
763 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
vii) Earthen Checks 3 3.00 one year 2016-17
3.00
764 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 2016-17
5.00
765 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
x) Land development 5 5.00 one year 2016-17
7.50
766 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
767 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year 2016-17
5.00
768 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
769 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
iv)bench terracing 6 6.00 one year 2016-17
10.00
770 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
771 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 2016-17
4.50
772 Hunli-Desali DoLR-MoRD Chuluni Model Village
PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
District Irrigation Plan (PMKSY) Lower Dibang Valley
260
773 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
774 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
v) Gabion Structures 5 12.50 one year 2016-17
30.00
775 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
vii) Earthen Checks 2 2.00 one year 2016-17
3.00
776 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 2016-17
2.00
777 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
ix) Under ground dyke
778 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
x) Land development 6 6.00 one year 2016-17
6.00
779 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
780 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
v) Gabion Structures 3 2.50 one year 2016-17
7.50
781 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
782 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
iv)bench terracing 4 4.00 one year 2016-17
5.00
783 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
784 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 2016-17
5.00
785 Hunli-Desali DoLR-MoRD Jamu Pani PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
786 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
787 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
v) Gabion Structures 8 20.00 one year 2016-17
50.00
788 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
vii) Earthen Checks 3 3.00 one year 2016-17
3.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
261
789 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
viii) Nallah bund 4 4.00 one year 2016-17
4.00
790 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
x) Land development 5 5.00 one year 2016-17
8.00
791 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
792 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
3.00
793 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
794 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
iv)bench terracing 2 2.00 one year 2016-17
4.00
795 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
796 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
a)private agricultural land 2 2.00 one year 2016-17
3.00
797 Hunli-Desali DoLR-MoRD Hunli PMKSY (Watershed)
b)community land 1 1.00 one year 2016-17
1.50
798 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
799 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
v) Gabion Structures 3 7.50 one year 2016-17
20.00
800 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 2016-17
4.00
801 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
viii) Nallah bund 3 3.00 one year 2016-17
5.00
802 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
ix) Under ground dyke
803 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
x) Land development 8 8.00 one year 2016-17
12.00
804 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
District Irrigation Plan (PMKSY) Lower Dibang Valley
262
805 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
v) Gabion Structures 2 2.50 one year 2016-17
6.00
806 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
807 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
iv)bench terracing 6 6.00 one year 2016-17
10.00
808 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
809 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 2016-17
6.00
810 Hunli-Desali DoLR-MoRD Aloni Eyanli
PMKSY (Watershed)
b)community land 2 2.00 one year 2016-17
3.00
811 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
ACTIVITY 1. ( Water Harvesting & Conservation Structures )
812 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
v) Gabion Structures 5 12.50 one year 2016-17
43.75
813 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
vii) Earthen Checks 7 7.00 one year 2016-17
7.00
814 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2016-17
3.00
815 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
x) Land development 8 8.00 one year 2016-17
12.00
816 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
xi) Farm ponds 3 3.00 2.00
817 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
10.00
818 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
819 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
v) Gabion Structures 3 2.50 one year 2016-17
7.50
820 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
xi) Farm ponds 2 2.00 one year 2016-17
2.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
263
821 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
822 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
iv)bench terracing 5 5.00 one year 2016-17
7.50
823 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
824 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
a)private agricultural land 4 4.00 one year 2016-17
6.00
825 Hunli-Desali DoLR-MoRD New Elope PMKSY (Watershed)
b)community land 3 3.00 one year 2016-17
5.00
826 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
ACTIVITY 1.( Water Harvesting & Conservation Structures )
827 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
v) Gabion Structures 2 5.00 one year 2016-17
15.00
828 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
vii) Earthen Checks 4 4.00 one year 2016-17
4.00
829 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
viii) Nallah bund 2 2.00 one year 2016-17
2.00
830 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
x) Land development 4 4.00 one year 2016-17
6.00
831 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
xv)Check Dam 1 3.00 one year 2016-17
15.00
832 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
( RENOVATION :Water Harvesting & Conservation Structures )
833 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
v) Gabion Structures 1 2.50 one year 2016-17
2.50
834 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
xi) Farm ponds 1 1.00 one year 2016-17
1.50
835 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
ACTIVITY 2.SOIL & MOISTURE CONSERVATION WORKS
836 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
iv)bench terracing 4 4.00 one year 2016-17
6.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
264
837 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
ACTIVITY 3. PASTURE DEVELOPMENT
838 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
a)private agricultural land 3 3.00 one year 2016-17
4.50
839 Hunli-Desali DoLR-MoRD Brinli PMKSY (Watershed)
b)community land 2 2.00 one year 2016-17
5.00
840 Hunli Desali Total 329 411.5 0 731.75
841 Total Strategic Action Plan of DRDA 1857 2587 0 5812.5
District Irrigation Plan (PMKSY) Lower Dibang Valley
265
Annexure-VIII
Summary of Block-wise and Department-wise Target under PMKSY
Department of Agriculture
Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Total Number/Capacity(cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation
Estimated cost
(Rs. in Lakhs )
Block Total
Roing-Koronu MOA &FW- DAC&FW Micro Irrigation 1696 1696 5 860.197 9634.697
MOA &FW- DAC&FW Supplementary water management activities
16680 9058 5 8774.5
Dambuk-Paglam MOA &FW- DAC&FW Micro Irrigation 1280 1280 5 574.058 6001.058
MOA &FW- DAC&FW Supplementary water management activities
9730 9900 5 5427
Hunli-Desali MOA &FW- DAC&FW Micro Irrigation 698 698 5 389.764 1679.764
MOA &FW- DAC&FW Supplementary water management activities
1660 1690 5 1290
Agriculture Total 31744 24322 17315.52
District Irrigation Plan (PMKSY) Lower Dibang Valley
266
Department of Horticulture
Name of the Blocks/Sub Districts
Concerned Ministry/Department
Component Activity Priority Command Area/Irrigation Potential(Ha)
Period of Implementation ( 5/
7 yrs)
Estimated cost(in Lakhs )
Block Total
Roing Koronu MDA & FW-DAC & FW
Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation
High 1812 5 3972.74
5148.51 Roing Koronu MDA & FW-DAC &
FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler
High 340 5 1175.77
Dambuk-Paglam MDA & FW-DAC & FW
Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation
High 863 5 1876.66
2239.77 Dambuk-Paglam MDA & FW-DAC &
FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler
High 105 5 363.11
Hunli-Desali MDA & FW-DAC & FW
Per drop more crop
(Micro Irrigation)
DPAP Drip Irrigation
High 40 5 80.14
1152.17 Hunli-Desali MDA & FW-DAC &
FW Per drop more crop
(Micro Irrigation)
DPAP Mini Sprinkler
High 310 1072.03
Total 3470 8540.45
District Irrigation Plan (PMKSY) Lower Dibang Valley
267
ATMA
Name of the Blocks/Sub Districts
Concerned Ministry/Department
Component Activity Total Number/Capacity(cum)
Period of Implementation (
5/ 7 yrs)
Estimated cost(in Lakhs )
Roing-Koronu MOA &FW- DAC&FW Per drop more crop
ATMA Training and Extension Services
2000 5 300.00
Dambuk-Paglam MOA &FW- DAC&FW Per drop more crop
ATMA Training and Extension Services
1500 5 225.00
Hunli-Desali MOA &FW- DAC&FW Per drop more crop
ATMA Training and Extension Services
1000 5 150.00
Total 4500 675.00
District Irrigation Plan (PMKSY) Lower Dibang Valley
268
Block-wise Strategic Action Plan of WRD Dept under PMKSY
Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Total Number/Capacity(cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation
Estimated cost
(Rs. in Lakhs )
Block Total
Roing-Koronu
MoWR/WRD AIBP 23 176.00 1 228.00 26915.14
MoWR/WRD Har Khet Ko Pani (Newly Created) 142 9469.10 5 23242.06
Har Khet Ko Pani (Renovation, RRR and CAD) 17 1084.03 5 3445.08
Dambuk-Paglam
MoWR/WRD AIBP 19 85.00 1 140.00 22842.10
MoWR/WRD Har Khet Ko Pani (Newly Created) 80 8798.00 5 21993.50
Har Khet Ko Pani (Renovation, RRR and CAD) 4 205.00 5 708.60
Hunli-Desali MoWR/WRD AIBP 8 29.00 1 48.00
5683.00
MoWR/WRD Har Khet Ko Pani (Newly Created) 57 2254.00 5 5635.00
Total WRD 350 22100.13 55440.24
District Irrigation Plan (PMKSY) Lower Dibang Valley
269
Block-wise Action Plan for WRD (TW & GW)
Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Total Number/Capacity(cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation
Estimated cost
(Rs. in Lakhs )
Roing-Koronu MOWR/ CGWB Har Khet ko
Pani. 246
1625 2 2399.50
Dambuk-Paglam
MOWR/ CGWB Har Khet ko Pani. 89 181 5 319.00
Hunli-Desali MOWR/ CGWB Har Khet ko
Pani. 0 0 0 0
Total CGWB 335 1806 2718.50
Block-wise Action Plan for DRDA under PMKSY
Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Total Number/Capacity(cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation
Estimated cost (Rs. in Lakhs )
Roing-Koronu DoLR-MoRD PMKSY Watershed Management
764 1175 1 Year 3137
Dambuk-Paglam DoLR-MoRD PMKSY Watershed Management
764 1000.5 1 Year 1943.75
Hunli-Desali DoLR-MoRD PMKSY Watershed Management
329 411.5 1 Year 731.75
Total 1857 2587 0 5812.5
District Irrigation Plan (PMKSY) Lower Dibang Valley
270
Block-wise Action Plan for RWD (Water Conservation)
Name of the Blocks/Sub
Districts
Concerned Ministry/Department
Component Total Number/Capacity(cum)
Command Area/Irrigation Potential(Ha)
Period of Implementation
Estimated cost
(Rs. in Lakhs )
Roing-Koronu MoLR/ MoRD Watershed
Management 2824
4105.05 5 6156.00
Dambuk-Paglam MoLR/ MoRD Watershed
Management 2959 2318 5 1646.00
Hunli-Desali MoLR/ MoRD Watershed
Management 1693 1301 5 1993.00
Total CGWB 7476 7724.05 15 9795
District Irrigation Plan (PMKSY) Lower Dibang Valley
271
Annexure-IX
Summary of District Irrigation Plan of Lower Dibang Valley
Name of the Block
Physical and Financial Target under PMKSY for 05 Years (2016-2021)
WRD WRD (TW & GW) Agriculture Horticulture RWD (Soil Conservation) DRDA ATMA
Physical Target Financial
Target
Physical Target Financial
Target
Physical Target Financial Target
Physical
Target
Financial Target
Physical Target Financial
Target
Physical Target Financial
Target
Physical
Target
Financial
Target
Unit/ Number
Command Area
Unit/ Numb
er
Command Area
Unit/ Numbe
r
Command Area
Command Area
Unit/ Numb
er
Command Area
Unit/ Numb
er
Command Area
Unit/ Numbe
r
Roing Koronu
182 10729.13 26915.1 246 1625 2399.5 18376 10754 9634.7 2152 5148.51 2823 3105.05
6156.00 764 0 3137 2000 300.00
Dambuk-Paglam
103 9088.00 22842.10
89 181 319.00 11010 11180 6001.06 968 2239.77 2959 2318
1646.00 764 0 1943.75 1500 225.00
Hunli-Desali
65 2283.00 5683.00 0 0 0 2358 2388 1679.76 350 1152.17 1693 1301
1993.00 329 0 731.75 1000 150.00
Total 350 22100.13 55440.2 335 1806 2718.5 31744 24322 17315.5 3470 8540.45 7475 6724.05 9795.00 1857 0 5812.5 4500 675.00
Summary of District Irrigation Plan
Name of the Block Physical Target Financial Target
Unit/ Number Command Area/ Irrigation Potential to be Created
Roing Koronu 24391 28365.2 53690.85
Dambuk-Paglam 16425 23735 35216.68
Hunli-Desali 5445 6322 11389.68
Total 46261 58422.2 100297.2
District Irrigation Plan (PMKSY) Lower Dibang Valley
272
Annexure-X
Important Maps of Lower Dibang Valley District
District Irrigation Plan (PMKSY) Lower Dibang Valley
273
District Irrigation Plan (PMKSY) Lower Dibang Valley
274
District Irrigation Plan (PMKSY) Lower Dibang Valley
275