Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)GIR SOMNATH, GUJARAT
GIR SOMNATH
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
District Irrigation Plan (2016-2020)GIR SOMNATH, GUJARAT
GIR SOMNATH
1 | P a g e
CONTENTS
EXECUTIVE SUMMARY ...................................................................................................................... 3
INTRODUCTION ................................................................................................................................... 6
Background ............................................................................................................................................. 6
Vision ..................................................................................................................................................... 11
Objective ................................................................................................................................................ 11
Strategy/approach................................................................................................................................ 12
Programme Components .................................................................................................................... 12
Rationale/ Justification ....................................................................................................................... 14
Methodology ......................................................................................................................................... 15
Chapter 1. General Information of the District ................................................................. 17
1.1 District Profile ................................................................................................................................. 17
1.2 Demography .................................................................................................................................... 19
1.3 Biomass and Livestock .................................................................................................................. 21
1.4 Climate and Rainfall ...................................................................................................................... 23
1.5 Soil Profile ...................................................................................................................................... 23
1.6 Land Use Pattern ............................................................................................................................ 24
Chapter 2. District Water Profile ............................................................................................ 26
2.1 Area Wise, Crop Wise Irrigation Status ...................................................................................... 26
2.2 Production and Productivity of Major Crops ............................................................................. 28
2.3 Irrigation Based Classification ..................................................................................................... 36
Chapter 3. Water Availability ................................................................................................... 38
3.1 Status of Water Availability .......................................................................................................... 38
3.2 Status of Ground Water Availability ........................................................................................... 39
3.3 Status of Command Area ............................................................................................................. 43
3.4 Existing types of Irrigation ................................................................................................................ 43
Chapter 4. Water Requirement /Demand ........................................................................... 44
4.1 Domestic Water Demand .............................................................................................................. 45
4.2 Crop Water Requirement ............................................................................................................. 46
4.3 Livestock ......................................................................................................................................... 46
4.4 Industrial Water Requirement. ................................................................................................... 47
2 | P a g e
4.5 Water Demand for Power Generation ........................................................................................ 48
4.6 Total Water Demand of the district for various sectors ........................................................... 48
4.7 Water Budget .................................................................................................................................. 49
Chapter 5. Strategic Action Plan for Irrigation in District under PMKSY ............. 51
5.1 Strategic Plan for irrigation in PMKSY ....................................................................................... 51
5.2 Component wise Strategic Action Plan ....................................................................................... 55
5.3 Year wise Strategic Action Plan ................................................................................................... 55
5.4 Monitoring and Evaluation .......................................................................................................... 56
5.5 Suggestions ..................................................................................................................................... 57
Annexure ................................................................................................................................................ 60
Annexure-1- Department wise Summary of Strategic Action Plan ............................................... 60
Annexure-2 Strategic Action Plan of Water Resource Department .............................................. 62
Annexure-3 – Strategic Action Plan of GWRDC .............................................................................. 65
Annexure-4 – Strategic Action Plan of GLDC .................................................................................. 66
Annexure-5 – Strategic Action Plan of GGRC .................................................................................. 67
Annexure-6 Strategic Action Plan of GSWMA ................................................................................. 69
List of tables:
Table 1: District Profile ....................................................................................................................................................... 18 Table 2: Population of Girsomnath as per Census 2011 ..................................................................................................... 19 Table 3: Sex ratio by Sub-district, 2011 .............................................................................................................................. 20 Table 4: Demographic profile of Girsomnath .................................................................................................................... 20 Table 5: Biomass and livestock in Girsomnath district ...................................................................................................... 21 Table 6: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census ........................................... 22 Table 7: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census ........................................... 22 Table 8: Agro ecology of Girsomnath ................................................................................................................................. 23 Table 9: Block wise Soil Classification ............................................................................................................................... 23 Table 10: Blockwise land use pattern ................................................................................................................................. 24 Table 11: Block wise Area under Various Crops ................................................................................................................. 26 Table 12: Area with horticulture crops ............................................................................................................................... 28 Table 13: Block wise Area under Various Crops ................................................................................................................ 28 Table 14: Block wise Irrigation based Classification.......................................................................................................... 36 Table 15: Status of water availability in Girsomnath ......................................................................................................... 38 Table 16: Ground Water Status of Girsomnath ................................................................................................................. 42 Table 17: Status of Command ............................................................................................................................................. 43 Table 18: Block wise Area under various irrigation infrastructure ................................................................................... 43 Table 19: Domestic Water Demand (MCM) ....................................................................................................................... 45 Table 20: Crop wise Water Requirement ........................................................................................................................... 46 Table 21: Livestock Water Demand .................................................................................................................................... 47 Table 22: Water Demand for Industries ............................................................................................................................ 48 Table 23: Total Water Demand of the district for Various sectors ................................................................................... 48 Table 24: Water Budget ...................................................................................................................................................... 50 Table 25: Department wise Planned Coverage of Area under PMKSY .............................................................................. 51 Table 26: Component wise Financial Outlay for PMKSY .................................................................................................. 55 Table 27: Total amount to be spent by various agencies under PMKSY for four years ................................................... 55
3 | P a g e
EXECUTIVE SUMMARY
Water is of vital importance for human & animal life, for maintaining ecological balance
and for developmental efforts. With the ever-increasing demand for water due to
population growth, urbanization and industrialization, making water available to
multiple uses, planning and management of water resources and utilization of water
economically, optimally and equitably assumes greater significance. Government of
India formulated PMKSY with the vision of extending the coverage of irrigation (Har
Khet Ko Pani) and improving water use efficiency (More Crop Per Drop) in a focused
manner with end to end solution on water resource creation, distribution, management,
field application and extension activities. Under PMKSY, an integrated planning and
management of water resources, through estimation of water budget for each of the
district and sub districts and preparation of strategic action plan to address the water
gap through District Irrigation Plan (DIP) is envisaged. The present report presents the
District Irrigation Plan under PMSY in Girsomnath District.
Further, Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) incentivizes states to
enhance expenditures on irrigation and water resources management by making the
access to PMKSY funds to states on certain conditions. This means the states will have
access only if the expenditure in water resource development for agriculture sector in
the year under consideration is not less than the baseline expenditure, which is defined
as the average of the expenditure in irrigation sector irrespective of the department in
the state plan in three years prior to the year under consideration.
PMKSY will be implemented in area development mode only by adopting a
„decentralized State level planning and projective execution‟ structure that will allow
States to draw up their own irrigation development plans based on DIPs and SIPs with a
horizon of 5-7 years. A three-tier structure at national, state and district level will
oversee implementation and coordination of the program. The District Level
Implementation Committee will form the third tier of the PMKSY. The DLIC will be
chair by the Deputy Commissioner, Girsomnath and is comprised of the Departments of
Agriculture, Horticulture, District Rural Development Agency (DRDA), Irrigation and
Public Health Department, Forest Department, Lead bank of the District and any other
line Departments in the District. The DLIC will oversee the implementation and inter-
departmental coordination at district level.
District Water Profile: Girsomnath district is a predominantly rural district where
households were dependent on agriculture and allied activities for their livelihood.
Watering of crops is the main purpose of irrigation infrastructure created in the district.
Out of gross cropped area of 2,27,800 ha (exclusive of horticulture crops) in the district,
only kharif cereals have a share of 1,28,000 ha (or 56.19%).Groundnutis themajor crops
cultivated in kharif. In rabi season, 78.39 per cent area, i.e. 63,500 ha was covered
under wheat. Groundnutwas the major crops cultivated in summer season with area
4 | P a g e
share of 45.81 per cent. A total of 56,205 ha area out of 2,27,800 ha is rainfed in the
district. A single Bajra occupies most of the rainfed area..
The district reports to have a total area of 98017.80 ha under horticulture crops during
2014-15.
Area under Irrigation: The Gross Irrigated Area of Girsomnath district is
1,36,031hectare. Among the blocks, Kodinar blockis 100 percent irrigated. Vanthali
block has largest unirrigated area of 19,280 ha, followed by Veraval (18421 ha) and Una
(18,390 ha.)
Availability of Water Sources: Both surface and groundwater facilities are available
in the Girsomnath district. Major source of Surface water in the district is canal.The
availability of surface water is across all the six blocks of the district. The total
availability of Surface water in the district is 210.89 MCM. Girgadhada block has the
largest surface water availability of 46.15 MCM, followed by Talala (41.79) and Kodinar
(41.70).
As per Central Ground Water Board notification, the status ground water in all six
blocks of the district is safe
Existing Type of Irrigation: The district has 5,048 ha area under developed canal
command. It is having total 3 ponds, which are limited to Talala and Kodinar block.
Open wells and tubewells (36,651) irrigate 86,322 ha in the district.
Demand for Water Sources: The present water demand of the district has assessed
to be 1385.03 MCM annually. Out of the total water demand 1308.47 mcm (94.47%) is
the requirement from crop production. Nearly 53.24 mcm (or 3.84%) is required for
domestic drinking water requirement and another 11.53 mcm (or 0.83%) is required for
livestock water requirement purpose. Water demand for power generation and
industrial sector is negligible.
Planned Coverage of Area under PMKSY:
Out of the total area planned to cover under PMKSY, Water Resource Department is to
bring an additional area of 77,207.40 ha under irrigation by various activities such as
lining work, canal gates, watercourse, deepening of ponds and construction of water
harvesting structures. Gujarat Water Resource Development Corporation Ltd. Gujarat
Water Resource Development Corporation Ltd. (GWRDC) will bring 100 ha new area
under irrigation through new tube wells with drip irrigation system across six blocks of
the district. As per the plan Gujarat Land Development Corporation (GLDC), is to
irrigate a total area of 2134 ha in the district.
Gujarat Green Revolution Company Ltd. (GGRC) is implementing all the micro
irrigation schemes of the state,is expected to cover a total area of 28,807.80 ha under
5 | P a g e
drip and sprinkler irrigation. Gujarat State Watershed Management Agency (GSWMA)
will cover a total area of 4,766.50 ha under various component of watershed.
Component wise Financial Outlay:
Figures in Rupees Lakh
Agency 2016-17 2017-18 2018-19 2019-20 Total
GGRC 3545.57 2659.18 2659.18 2659.18 11523.12
PMKSY Watershed 2463.45 385.87 0.00 0.00 2849.32
GWRDC 50.00 50.00 50.00 50.00 200.00
ATMA 17.64 28.20 33.96 42.12 121.92
WRD 957.00 11726.50 14217.00 43589.50 70490.00
GLDC 397.20 397.20 397.20 397.20 1588.80
Total 7430.86 15246.95 17357.34 46738.00 86773.16
Department wise Financial Outlay:
Figures in Rupees Lakh
Component 2016-17 2017-18 2018-19 2019-20 Total
Per drop more crop 3545.57 2659.18 2659.18 2659.18 11523.12
PMKSY Watershed 2463.45 385.87 2849.32
Har Khet Ko Pani 1404.20 12173.70 14664.20 14036.70 42278.80
Training and Capacity Building
17.64 28.20 33.96 42.12 121.92
AIBP 0.00 0.00 0.00 30000.00 30000.00
Total 7430.86 15246.95 17357.34 46738.00 86773.16
Expected Output and Outcome: At present, a total of 1,12,669.70 ha of area under
crops is unirrigated in the district. Out of which, under PMKSY is proposed to cover an
additional area of 83,861.90 ha under irrigation during the upcoming four years. This
will save not only significant amount of water but also significantly larger area can be
irrigated with limited quantity of water.
6 | P a g e
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in various
plans took concrete shape through the years and initiatives like specific guidelines on
methodologies and processes for preparation of district plans. Framework for
preparation of perspective plan, medium term and annual term by the planning
commission in 1969 and the 73rd and 74th constitutional amendments conferring
constitutional status to Panchayats at district and sub district level; local self-
government in urban areas; constitution of district planning committee to consolidate
the plans prepared at Panchayats and municipalities and prepare a draft development
plan for the whole district.
The decentralized planning process was further strengthened through emphasis by
planning commission on preparation of district level plans and making it an integral
part of the process of preparation of the states 11th five year plan. The Planning
commission issued guidelines in August 2006 for preparation of the district plans. The
guidelines define the District Planning as „the process of preparing an integrated plan
for the local government sector in a district taking into account the resources (natural,
human and financial) available and covering the sectoral activities and schemes
assigned to the district level and below and those implemented through local
governments in a state. The document that embodies this statement of resources and
their allocation for various purposes is known as the District Plan”.
Government of India through a resolution in National Development Council on 29th May
2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the
slow growth of agriculture and allied sectors by incentivizing states to draw up plans for
their agriculture sectors more comprehensively. The NDC resolution states "GoI
introduced a new Additional Central Assistance Scheme to incentivize states to draw up
plans for their agriculture sector more comprehensively, taking agro-climatic
conditions, natural resource issues and technology into account, and integrating
livestock, poultry and fisheries, etc. This involved a new scheme for Additional Central
Assistance (ACA) to State Plans, administered by the Union Ministry of Agriculture over
and above its existing Centrally Sponsored Schemes, to supplement the State-specific
strategies including special schemes for beneficiaries of land reforms. The newly created
National Rain fed Area Authority on requestwas to assist States in planning for rain fed
areas".
The NDC in its resolution advised the states to prepare a comprehensive district
agriculture plans (C-DAP) that will fully utilize available resources and include allied
agriculture sectors. Further, GOI issued a manual on preparation of comprehensive
7 | P a g e
district agriculture plans to help the states prepare C-DAP. As per these guidelines, the
objective of district planning is „to design an integrated and participatory action plan for
the development of local area in general and agriculture and allied sectors in particular‟.
The objectives of Comprehensive District Agriculture Plan (C-DAP) were:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through
participatory process involving various organizations and stakeholders.
To enable optimum utilization of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like
credit, technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food
security and cropping system that will improve farmers‟ income.
The guidelines required the state/district authorities to: (i) ensure that the agricultural
plans prepared for the district and then integrated into the agricultural plans of the
State based on the agro-climatic conditions, availability of technology, trained
manpower and natural resources; (ii) local needs / crops / feed and fodder / animal
husbandry / dairying / fisheries / priorities are reflected in the plan; (iii) productivity
gaps for important crops and livestock and fisheries are reduced; and (iv) the returns to
the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was
the Government of India guidelines issued in 2015 in the form of a template for the
preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of
the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the
preparation of DIP and SIP mandatory for the states to receive funds from the program.
The present report is a product of these long drawn efforts of Government of India to
strengthen the decentralized planning process in the country focusing on the vital
resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance
and promotion of developmental activities. Considering its vital importance and ever
increasing demand for water, in the face of population growth, urbanization &
industrialization and considerations of climatic change, making water, an increasingly a
scarce resource, available to multiple uses, planning and management of this vital
resources, utilization of water economically, optimally and equitably assumes greater
importance.
8 | P a g e
According to the 12th Five year Plan the water budget estimates of India by Ministry of
Water Resources suggests an availability of 1123 billion cubic meters (BCM) against a
current estimated demand of 710 BCM. The Standing Committee of the Ministry of
Water Resources estimates that this water demand will rise to 1093 BCM by 2025.
Though the existing water availability in the immediate future seems to be adequate,
with the near constant supply of water resources in the face of increasing demand on
account of population growth, urbanization and industrialization will strain the water
supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced
to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic
meters. The projected per capita availability of water is 1341 cubic meters in 2025 and
1140 cubic meters in 2050 suggesting shortage of water in the medium term1. Further,
the all India water balance estimates does not reflect the variations in water balance
across time and space- certain areas having a positive water balance and the others
facing acute shortage. The problem is further accentuated by water quality related
issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were
allocated for irrigation purposes and the rest meeting the domestic and industrial
demands. In a recent study2on the demand for water from agriculture, domestic and
industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34
BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM
in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance
water available while agriculture demand for water will be (605 BCM in 2000, 675 BCM
in 2025 and 637 BCM in 2050). This change is partly because of the changing sectoral
contributions of India‟s GDP and also partly because of dynamics of irrigation
development in the country where the initial expansion in area under irrigation is
propelled by the availability of abundant water resources and availability of good quality
land. This is no longer the case in many of the states where the availability of land and
water are serious constraints for further expansion of irrigation. Further, as per the
erstwhile planning commission up to March 2012 out of 141 million hectares of net sown
area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC)
and 88 (or 62%) million hectares is Irrigation Potential Utilized (IPU) leaving almost
20% of irrigated potential unutilized. This leaves 40 percent of the net sown area in the
country dependent on rainfall which makes farming a high risk and less productive.
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New
Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Girsomnath, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management
Institute, Colombo.
9 | P a g e
The competing demands for water resources and the emerging issues and concerns were
to be addressed through certain basic principles and commonality in approaches in
dealing with planning, development and management of water resources3 under an
Integrated Water Resource Management framework. The main objectives of water
resource management as delineated in National Water Policy 2012 are:
a) Planning, development and management of water resources need to be governed
by common integrated perspective considering local, regional, State and national
context, having an environmentally sound basis, keeping in view the human,
social and economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to the
objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making and
regulation of water resources.
d) Water needs to be managed as a common pool community resource held, by the
state, under public trust doctrine to achieve food security, support livelihood, and
ensure equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum
ecological needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive
needs, followed by high priority allocation for other basic domestic needs
(including needs of animals), achieving food security, supporting sustenance
agriculture and minimum eco-system needs. Available water, after meeting the
above needs, should be allocated in a manner to promote its conservation and
efficient use.
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,
river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the
basic hydrological unit is the river basin, which should be considered as the basic
hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future needs
will depend more on demand management, and hence, this needs to be given
priority, especially through (a) evolving an agricultural system which economizes
on water use and maximizes value from water, and (b) bringing in maximum
efficiency in use of water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an
integrated manner, consistent with broader environmental management
approaches inter-alia including the use of economic incentives and penalties to
reduce pollution and wastage.
3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.
10 | P a g e
j) The impact of climate change on water resources availability must be factored
into water management related decisions. Water using activities need to be
regulated keeping in mind the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas.
Priorities of Government of India were reflected in the Hon‟ble President‟s address to
the joint Session of the Parliament of 16th Lok Sabha where he indicated that “Each
drop of water is precious. Government is committed to giving high
priority to water security. It will complete the long pending irrigation
projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously
considering all options including linking of rivers, where feasible; for
ensuring optimal use of our water resources to prevent the recurrence of
floods and drought. By harnessing rain water through ‘Jal Sanchay’ and
‘Jal Sinchan’, we will nurture water conservation and ground water
recharge. Micro irrigation will be popularised to ensure ‘Per drop-More
crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of
five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going
schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation,
Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing
schemes AIBP, CADWM, MI, SWMA,Watershed& Convergence with MGNREGA were
brought together under the umbrella program of PMKSY. Further the scheme seeks
convergence with scheme likeMahatma Gandhi National Rural Employment Guarantee
Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National
Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural
Infrastructure Development Fund (RIDF), Members of Parliament Local Area
Development Scheme (MPLAD), Members of Legislative Assembly Local Area
Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest
Department (WPSFD) etc. The PMKSY will be implemented in an area development
mode only by adopting a decentralized state level planning and projectised execution
structure that will allow the state to draw up their own irrigation development plans
based on DIPs and SIPs with a horizon of 5-7 years. The program will be implemented
as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture department
acting as the State Nodal Agency. However, the implementing departments for the four
components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and
PMKSY (watershed development) will be decided by the respective program
ministry/department.
11 | P a g e
The funds under this program would be provided to the states as per the pattern of
assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance
and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme
was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The
financial assistance provided to the state governments from this centrally sponsored
scheme is subject to fulfillment of certain conditions. Firstly, a state will become eligible
to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and
State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in water
resource development for agriculture sector in the year under consideration is not less
than the baseline expenditure, which is defined as the average of the expenditure in
irrigation sector irrespective of the department in the state plan in three years prior to
the year under consideration. Secondly, States will be given additional weightage for
levying charges on water and electricity for irrigation purposes, so as to ensure
sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be
decided based on
Share of percentage of unirrigated area in the state vis-à-vis national average
including prominence of areas classified under Desert Development Programme
(DDP) and Drought Prone Area Development Programme (DPAP)
Increase in percentage share of expenditure on water resource development for
agriculture sector in State Plan expenditure in the previous year over three years
prior to it and,
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to
ensure access to some means of protective irrigation to all agricultural farms in the
country, to produce „per drop more crop‟, thus bringing much desired rural prosperity.
Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of
district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area
under assured irrigation (Har Khet Ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use of
water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability
both in duration and extent,
12 | P a g e
e) Enhance the adoption of precision-irrigation and other water saving technologies
(More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation
practices
g) Ensure the integrated development of rainfed areas using the watershed
approach towards soil and water conservation, regeneration of ground water,
arresting runoff, providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and
crop alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include:
a) Creation of new water sources; repair, restoration and renovation of defunct
water sources; construction of water harvesting structures, secondary & micro
storage, groundwater development, enhancing potentials of traditional water
bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo
(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and
M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both
assured and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to access
recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the
farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and
other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer
producers‟ organisations/ NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on more
crop per drop of water through mass media campaign, exhibitions, field days, and
extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
13 | P a g e
1. Accelerated Irrigation Benefit Programme (AIBP)
To focus on faster completion of ongoing Major and Medium Irrigation including
National Projects.
2. PMKSY (Har Khet ko Pani)
This component focuses on-
a) Creation of new water sources through Minor Irrigation (both surface and ground
water)
b) Repair, restoration and renovation of water bodies; strengthening carrying
capacity of traditional water sources, construction rain water harvesting
structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution network
from source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is
created to store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies to
take advantage of the available source which is not tapped to its fullest capacity
(deriving benefits from low hanging fruits). At least 10% of the command area to
be covered under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby
water scarce areas, lift irrigation from water bodies/rivers at lower elevation to
supplement requirements beyond IWMP and MGNREGS irrespective of
irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc.
at feasible locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan, approval
of annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices
like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond permissible
limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,
distribution system etc.
d) Construction of micro irrigation structures to supplement source creation
activities including tube wells and dug wells (in areas where ground water is
available and not under semi critical/ critical/ over exploited category of
development) which are not supported under AIBP, PMKSY (Har Khet Ko Pani),
PMKSY (Watershed) and MGNREGS as per block/district irrigation plan.
14 | P a g e
e) Secondary storage structures at tail end of canal system to store water when
available in abundance (rainy season) or from perennial sources like streams for
use during dry periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage
pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and
agronomic measures including cropping alignment to maximise use of available
water including rainfall and minimise irrigation requirement (Jal Sarankchan);
h) Capacity building, training and awareness campaign including low cost
publications, use of pico projectors and low cost films for encouraging potential
use water source through technological, agronomic and management practices
including community irrigation.
i) The extension workers will be empowered to disseminate relevant technologies
under PMKSY only after requisite training is provided to them especially in the
area of promotion of scientific moisture conservation and agronomic measures,
improved/ innovative distribution system like pipe and box outlet system, etc.
Appropriate Domain Experts will act as Master Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A to
be made use in the field of water use efficiency, precision irrigation technologies,
on farm water management, crop alignment etc. and also to do intensive
monitoring of the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water
harvesting, in-situ moisture conservation and other allied activities on watershed
basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed blocks including renovation of traditional water
bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management
including irrigation related priorities was identified for Girsomnath district by the
peoples‟ representatives of district with support from administration and technical
experts. For instance the reports of Strategic Research and Extension Plan (SREP)
prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)
prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans
(PLP) of NABARD and the Integrated District Development Plan etc. identified number
of irrigation related issues for Girsomnath district including (i) promoting water use
15 | P a g e
efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse
cultivation to minimize risk factors and enhance quality and productivity; (iv)
Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v)
promotion of soil conservation of arable & non-arable land through engineering
measures; (vi) creation of new water harvesting structures, check dams, ponds, tanks,
etc (vii) increase the forest cover in the district and (viii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited
Girsomnath district to collect data and have interaction with all the stakeholders.
Methodology adopted to prepare DIP is outlined in brief as under:
a) Collection of primary and secondary data from field from various sources
including published documents and websites.
b) Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused
group discussions etc.
c) Meetings with various State Government departments and related institutions
were held
d) Meeting through VC was also held with State Level authorities.
e) GIS maps of the area‟s/clusters were studied to understand the land
morphology, topography of the district.
f) Focused group discussions and interaction with of agriculture officers,
horticulture officers, soil conservation officers, extension officers, rural
development department, animal husbandry department, irrigation officers
both at blocks and district level for identifying the key issues and focus areas of
the region.
g) Discussion with NABARD officer of Girsomnath district was also held during
the visit.
h) Team members also participated in the State Level workshop and held active
discussions with GoI officers, State Level officers and scientists of various
institutions
i) In the district at Panchayat level schemes were identified as per the need and
potential and resolutions were passed by the Panchayat to include the schemes
in PMKSY. The Panchayat resolutions were then consolidated and put up in the
Block Development Committee and a block plan was put up in the Zila
Parishad along with the programme of other line departments participating in
implementation of PMKSY. Besides IWMP prepared by District Water
Development agency was also proposed and approved by the Zila Parishad
Girsomnath in its meeting.
16 | P a g e
On the basis of detailed discussion and analysis of data, the team arrived at the
projections various components of PMKSY and Department wise plan for four years
from 2016-17 to 2019-20 as detailed in the plan.
17 | P a g e
CHAPTER 1. GENERAL INFORMATION OF THE DISTRICT
1.1 District Profile
Girsomnath district was carved from Junagad district as one of the new seven districts
in August 2013. Head quarter of the district is at Veraval. Gir somnath district is located
in Saurastra region of Gujarat and surrounded by the Arabian Sea to its south. The
district is divided in to six talukas, Veraval, Una, Kodinar, Sutrapada, Talala and newly
formed Gir gadhada, Gir somnath is very famous for Somnath Temple, first jyotirlinga
of lord shiva among the tweleve Jyotirlinga of India and Gir Sanctuary, only abode to
Asiatic lion.
Major industries such as, Ambuja cement, Gujarat heavy chemicals, Aditya birla nuvo
ltd(Indian Rayon), Gujarat siddhi cement have their presence in this district, Total
population of the district was about 12.5 lacs in 2011 census. Major crops of gir somnath
district are groundnut, wheat, cotton and sugar cane.
Veraval is a Municipality and the headquarters of Gir Somnath district. Fisheries have
always been the main industries in the town and are dominated by the Kharwas
(fisherfolk). Fishing is done mostly on traditional boats and trawlers. Veraval also has a
large boat making industry. Veraval is home to a large number of fish processing
factories in G.I.D.C, which export prime quality seafood to USA, Japan, SE Asian, Gulf
and EU Countries. The seafood-industry, which has started through government
initiative, now is in its prime and many importers are attracted towards Veraval from
around the globe. Regional research centers of CIFT and CMFRI situated at Veraval,
which are helping development of fisheries sector in Gujarat. Veraval also is home to
Aditya Birla Nuvo Ltd (Formerly: India-Rayon Industries Ltd) which is one of India‟s
largest rayon manufacturing companies.
Una is the biggest talukain Gir Somnath district in number of villages. Main tourist
attractions are Pauranik Talav (Ancient Lake), Rawal Dam, Ahmedpur Mandvi Beach,
Sana Cave an ancient places, Tulsishyam famous for temple of lord Krishna, Banej
Temple of Mahadev in middle of Gor forest. Una is one of the "the biggest Limestone
supplier" in Gujarat State.
Kodinar : Main tourist attractions are Mul Dwarka, Kaj and Kanjotar a small seashore
villages near Kodinar in which mul dwarka is a historic place of the original Dwarka of
Mahabharata. Kodinar is home to Gujarat Ambuja Cement Ltd. One of the largest
cement manufacturing company.
Talala Gir is Famous for its "KESAR MANGO", Siddi‟s folk dance "Dhamal and Gir
18 | P a g e
national park and Sanctuary". Siddi people who are originally from the south Africa are
found in Jambur village, also known as Mini Africa of India.
Sutrapada is a coastal taluka of Gir somnath district. This place is known for GHCL
plant, largest "Soda ash" producing company in the world. Gujarat Siddhi cement
manufacturing plant is also located in the taluka.
Gir Gadhada is the newly formed taluka of the district. It is curved out from Una taluka
in August 2013. Famous Tulsi shyam, temple of Lord Krishna is situated in this taluka.
The District Comprises 06 Talukas.
SR. NO NAME OF TALUKA
1 Talala 2 Veraval 3 Una 4 Kodinar 5 Sutrapada 6 Gir Gadhada
Table 1: District Profile
Name of the District
District Code Latitude Longitude
Girsomnath 20.9060 N 70.3844 E
.
19 | P a g e
Map 1: Location and administrative boundaries of Girsomnath
1.2 Demography
As per the 2011 census, the population of the district was 1217477 out of which number
of males and females were 620026 and 597451, respectively (Table 2.2). The male
literacy rate of the district is 54 per cent and female literacy rate is 46% currently as per
Collectorate website.
Table 2: Population of Girsomnath as per Census 2011 Block Name Population
M F Total
Talala 69833 65898 135731
Patan Verawal 164466 158026 322492
Sutrapada 72091 69877 141968 Kodinar 115684 113125 228809
Una 197952 190525 388477
Total 620026 597451 1217477
It must be noted that as GirGadhada was formed in 2013,Census data of 2011 pertaining
to it is not available separately.
As we can see from the above pie chart, Una holds the largest proportion (32%) of
population of Girsomnath District.
135731, 11%
322492, 26%
141968, 12%228809, 19%
388477, 32%
Taluka wise population and their percentage in total population of
Girsomnath
Talala Patan Verawal Sutrapada Kodinar Una
20 | P a g e
The sex ratios of various talukas of Girsomnath district is shown in the following table:
Table 3: Sex ratio by Sub-district, 2011 Sr.No. Name of Sub-district Sex ratio
Total Rural Urban
1 03834-Talala 944 950 911
2 03835-Patan-Veraval 961 955 965
3 03836-Sutrapada 969 972 959
4 03837-Kodinar 978 981 965
5 03838-Una 962 966 943
Source: Census 2011
The number of Schedule Caste and Schedule Tribes population and their proportion to
the total population is shown in the following table. It can be seen from the table that
Kodinar leads in Schedule Castes population with 35,346 persons comprising 15.45% of
the total population of the district. In case of Schedule Tribes, Talala leads with 7,672
persons comprising of 5.65% of the total population of the district.
Table 4: Demographic profile of Girsomnath
Table 2.4: Number and percentage of scheduled castes and scheduled tribes population in Sub-districts, 2011
Sr.No. Name of Sub-District
Total/ Rural/ Urban
Total population
Total scheduled
castes population
Total scheduled
tribes population
Percentage of
scheduled castes
population to total
population
Percentage of scheduled
tribes population
to total population
1 2 3 4 5 6 7 8 1 03834-Talala Total 135731 10451 7672 7.7 5.65
Rural 114671 9238 5560 8.06 4.85
Urban 21060 1213 2112 5.76 10.03
2 03835-Patan-Veraval Total 322492 26790 5798 8.31 1.8
Rural 136695 17357 2802 12.7 2.05
Urban 185797 9433 2996 5.08 1.61
3 03836-Sutrapada Total 141968 14588 1042 10.28 0.73
Rural 115836 13221 819 11.41 0.71
Urban 26132 1367 223 5.23 0.85
4 03837-Kodinar Total 228809 35346 1142 15.45 0.5
Rural 187317 30825 956 16.46 0.51
Urban 41492 4521 186 10.9 0.45
21 | P a g e
5 03838-Una Total 388477 26647 2107 6.86 0.54
Rural 329949 23438 1805 7.1 0.55
Urban 58528 3209 302 5.48 0.52
Source: Census 2011
1.3 Biomass and Livestock
Livestock Population
The livestock population in various taluka for Girsomnath district is provided in the
following table.The data is as per Livestock Census, 2012.The total livestock population
of the district is 607,673.
Table 5: Biomass and livestock in Girsomnath district
Sr. No. Name of Block/Taluka Total
1 VERAVAL 136731
2 SUTRAPADA 94556
3 TALALA 55099
4 KODINAR 143722
5 UNA 95468
6 GIR GADHADA 82097
Total 607673
Source: Livestock Census, GoG
136731
94556
55099143722
95468
82097
Livestock population of Girsomanthy distrcit taluka wise
VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA
22 | P a g e
As we can see from the above chart, Kodinar leads in the livestock population with
143,722 animals comprising 23.65% of the total livestock of the district.
Small Animals
The small animals‟ livestock population data is providedin Table 1.3 (a). Verawal has the
largest number of poultry(44,669) followed by Kodinar(6,887).Kodinar leads in the total
number of goats(14,761) while Una leads in the total number of sheep (8,612).
Table 6: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census Sr. No.
Name of Block/Taluka
Small Animals
Poultry (No.)
Ducks (No.)
Pigs (No.)
Goats (No.)
Sheeps (No.)
1 VERAVAL 44669 0 0 10769 1255
2 SUTRAPADA 4093 0 0 9253 2660
3 TALALA 0 0 0 4367 590
4 KODINAR 6887 0 0 14761 3546
5 UNA 5000 0 0 7460 8612
6 GIR GADHADA
0 0 0 4955 2351
Total 60649 00 0 51565 19014
Source: Livestock Census,2012
Large Animals
The large animals and other milch animals population data is provided in Table.
The total large livestock population of the district is 310,674. Talala has the largest
number of indigenous cows(39,138) while Una leads in the number of
buffaloes(42,442).
Table 7: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census Sr. No.
Name of Block/Taluk
a
Large Animals
Indigenous Cow (Nos.)
Hybrid Cow (No.)
In Descriptive Buffalo
(No.)
Hybrid Buffalo (No.)
Any other MilchorMeatAnimal(Nos.)
Draft Animal (Buffalo/yak/bulls/any other (Nos.)
1 VERAVAL 19679 0 16592 0 0 82
2 SUTRAPADA 28391 0 31033 0 0 257
3 TALALA 39138 0 30538 0 0 112
4 KODINAR 16710 0 23707 0 0 160
5 UNA 30147 0 42442 0 0 291
6 GIR 15497 0 15838 0 0 60
23 | P a g e
GADHADA
Total 149562 160150 962
Source: Livestock Census,2012
1.4 Climate and Rainfall
The district is in agro-climatic zone VI (South Saurashtra) and VII (North Saurashtra).
The climate of the district varies from hot to moderately hot throughout the year except
in winter. The climate is humid in coastal belt, (The temperature varies between 10
Centigrade being minimum in January and 42 Centigrade being maximum in May).
It receives rains from southwest monsoon from June to September. The average rainfall
of last three years is 559 MM
The following table depicts normal annual rainfall and temperature data.
Table 8: Agro ecology of Girsomnath
Name of District
Agro Ecological Zone Type
Normal Annual Rainfall(mm)
Average Monthly Rainfall
(mm)
Average Weekly Temperature (°C)
Period
Summer (April-May)
Winter (Oct-Mar)
Rainy (June-Sept)
Min. Max.
Mean
Min.
Max.
Mean
Min. Max. Mean
Girsomnath
South Saurastra Agro Climatic Zone
745.1 67.73 24.05
29.97
27.22
16.2
29.4
23.16
24.82
30.85
27.95
Source: C-DAP JAU Junagadh(Aug 2012),_Jilla ni Ankadakiya Ruprekha 2012-13, District panchayat,
Junagadh, Weather station Ambuja Cement Limited Ambujanagar
1.5 Soil Profile
The soils in the district are formed from sedimentary rocks and partly from volcanic
rocks. They are generally calcareous, rich in potassium content but comparatively
deficient in nitrogen and humus. The main types of soils occurring in the district are
Black soil, Medium black soil, Alluvial soil and in low-lying and coastal area, calcareous
and brackish soils. The black soil is foundin every part of the district. Though the soil of
this tract is fertile, water logging conditions prevent effective utilization of the land.
The soil profile of the district is summarized below in the following table 1.5:
Table 9: Block wise Soil Classification
Sr. No.
Name of Taluka Soil Type
Major Soil Classes Area ('000ha)
1 Kodinar Medium to Shallow Black 37.56
Mixed Red and Black 5.36
24 | P a g e
Coastal Alluvial 10.73
2 Sutrapada Medium to Shallow Black 15.31
Coastal Alluvial 6.09
3 Talala Shallow to Medium Black 30.22
4 Veraval Shallow to Medium Black 15.49
Coastal Alluvial 9.6
5 Una, Girgadhda Medium to Shallow Black 110.93
Mixed Red and Black 15.84
Coastal Alluvial 31.69
Source: C-DAP-Junagad,2012.
1.6 Land Use Pattern
The land use pattern is described in the following table. The total geographical area of
the district is 375,452 out of which 182,584 is under agriculture(48.63%).The cropping
intensity is 4 talukas is phenomenal and low cropping intensity in Talala can be owed to
large forest areas in the Taluka.
Table 10: Blockwise land use patternArea in Ha
Sr. No.
Name of the Block
Total Geographical
Area
Area under Agriculture
Area under Forest
Non-agri use
Gross Cropped Area(1)
Net Sown Area (2)
Area Sown more
than one (1-2)
Cropping Intensity
(%)
25 | P a g e
1 Kodinar 53681 59069 40131 18938 147.19 2739 3985
2 Talala 95156 33839 30216 3623 111.99 10023 11398
3 Sutrapada 32671 29467 21400 8067 137.7 0 5617
4 Una 157847 87173 65745 64038 132.59 5246 15176
5 Veraval 36097 46282 25092 21190 184.45 1770 6050
Total 375452 255830 182584 115856 142.78 19778 42226
Source: C-DAPJunagad-2012.
Note: The data related to irrigation in point 2.3 is provided by the Agriculture department and those
above is provided by C-DAP, so the figures might differ.
26 | P a g e
CHAPTER 2. DISTRICT WATER PROFILE
Agriculture and horticulture plays an important role in rural economy of Girsomnath.
Major cropsgrown in the district are Groundnut, Wheat, Gram, Cotton, and sugarcane,
Bajri and Jowar, Pulses. Groundnut is the most important crop of the district. Second
most important crop in the district is wheat.
2.1 Area Wise, Crop Wise Irrigation Status
The taluka wise details regarding irrigation availability and potential is provided in the
following tables. It can be observed from the table that to make farmer competent to go
for multiple-cropping and to ensure that they can grow crops in summer and rabi
seasons too to expand their income, it is essential that irrigation potential of the district
has to be upgraded significantly.
Table 11: Block wise Area under Various Crops(Area in hectare)
YEAR:2015-16
Source:Dist Agri Dept
Area-Wise ,Crop-wise Irrigation status Block: Veraval
Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 450 450 1850
0 1850
105 0 105 1955 450 2405
B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0
C)Pulses 0 1100 1100 100 0 100 2400 0 2400 2500 1100 3600
D)Oil seeds 8800
10450
19250
0 0 0 40 0 40 8840 10450
19290
E)Fiber 200 0 200 0 0 0 0 0 0 200 0 200
F).Any other crops
4250 0 4250 9250
0 9250
1075 0 1075 14575
0 14575
Block: Sutrapada
Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 225 225 6410
0 6410
70 0 70 6480 225 6705
B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0
C)Pulses 0 135 135 20 0 20 2225 0 2225 2245 135 2380
D)Oil seeds 3700 14800
18500
0 0 0 40 0 40 3740 14800
18540
E)Fiber 1500 0 1500 0 0 0 0 0 0 1500 0 1500
F).Any other crops
3340 0 3340 3710
0 3710
310 0 310 7360 0 7360
Block: Talala
27 | P a g e
Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 65 65 1080
0 1080
280 0 280 1360 65 1425
B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0
C)Pulses 0 810 810 75 0 75 3300 0 3300 3375 810 4185
D)Oil seeds 830 7544 8374 0 0 0 775 0 775 1605 7544 9149
E)Fiber 682 0 682 0 0 0 0 0 0 682 0 682
F).Any other crops
5865 0 5865 10435
0 10435
2575 0 2575 18875
0 18875
Block:Kodinar
Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 1600 1600 8500
0 8500
220 0 220 8720 1600 10320
B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0
C)Pulses 0 400 400 20 0 20 4850 0 4850 4870 400 5270
D)Oil seeds 8000
10227
18227
0 0 0 65 0 65 8065 10227
18292
E)Fiber 5000 0 5000 0 0 0 0 0 0 5000 0 5000
F).Any other crops
7700 0 7700 6250
0 6250
785 0 785 14735
0 14735
Block:Una
Crop type Kharif (Area in ha.)
Rabi(Area in ha.)
Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 800 800 3200
0 3200
50 0 50 3250
800 4050
B)Coarse cereals
0 0 0 0 0 0 0 0 0 0 0 0
C)Pulses 0 0 0 155 0 155 100 0 100 255 0 255
D)Oil seeds 1800
16650
18450
0 0 0 170 0 170 1970 16650
18620
E)Fiber 16800
0 16800
0 0 0 0 0 0 16800
0 16800
F).Any other crops
7450
0 7450
5765
0 5765
400 0 400 13615
0 13615
Block: Gir Gadhada
Crop type Kharif (Area in ha.)
Rabi(Area in ha.)
Summer crop(Area in ha.)
Tot (Area in ha.)
Irr RF Tot Irr RF
Tot Irr RF Tot Irr RF Tot
A)Cereals 0 650 650 2240
0 2240
50 0 50 2290
700 2990
B)Coarse 0 0 0 0 0 0 0 0 0 0 0 0
28 | P a g e
cereals
C)Pulses 0 45 45 180 0 180 130 0 130 310 175 485
D)Oil seeds 3700
7700
11400
0 0 0 280 0 280 3980
7980
11960
E)Fiber 7050
0 7050
0 0 0 0 0 0 7050
0 7050
Block wise area under Horticulture in Ha
Table 12: Area with horticulture cropsArea in Ha
Sr No Taluka Name
Flower Area
Vegetable Area
Fruit area
Total area
1 Veraval 1000 2535 1448 4983
2 Sutrapada 460 1335 370 2165
3 Una 430 4845 5458 10733
4 Talala 807 1560 7514 9881
5 Kodinar 890 2605 1644 5139
Total 3587 12880 16434 32901
Source: Horticulture Dept, GoG
As we can see from the above table, Girosmnath has 31,901 Ha of land under
horticulture, which is fully irrigated. The highest area under Horticulture is in the Una
Taluka of the district (10,733 Ha).
2.2 Production and Productivity of Major Crops
Agricultural productivity measures the ratio of agricultural outputsto Agricultural inputs
and it is indispensable to raise the level of productivity so that the farmer can earn more
from his limited land, which is invariable factor. The productivity and production of
various crops in each district is provided in the table below:
Table 13: Block wise Area under Various Crops(Area in hectare) Block :Talala
Season
Rainfed Irrigated Total
Crops
Area (ha)
Production
(qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation
(rs/ha)
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation (rs/h
a)
Area(ha)
Production
(qtn/yr)
Productivity
or yield
(kg/ha)
Cost of
cultivation
(rs/ha)
Kharif
Paddy
0 0 0 Na 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 Na 0 0 0 Na
29 | P a g e
Bajri 0 0 0 Na 50 719 1437 Na 50 719 1437 Na
Maize
0 0 0 Na 0 0 Na 0 0 0 Na
Ragi 0 0 0 Na 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 60 259 431 Na 60 259 431 Na
Math
0 0 0 Na 0 0 Na 0 0 0 Na
Udid 0 0 0 Na 310
1764 569 Na 310 1764 569 Na
Tur 0 0 0 Na 0 0 0 Na 0 0 0 Na
Groundnut
0 0 0 Na 19200
302976
1578 Na 19200
302976
1578 Na
Castor
0 0 0 Na 200
4054
2027 Na 200 4054 2027 Na
Sesamum
0 0 0 Na 20 71 357 Na 20 71 357 Na
Cotton
0 0 0 Na 95 599 630 Na 95 599 630 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Guar seed
0 0 0 Na 0 0 0 Na 0 0 0 Na
Soyabean
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rabi
Wheat
0 0 0 Na 0 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Gram
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rapeseed & mustard
0 0 0 Na 0 0 0 Na 0 0 0 Na
Sugarcane
0 0 0 Na 1850
136919
7401 Na 1850 136919
7401 Na
Isabgul
0 0 0 Na 0 0 0 Na 0 0 0 Na
Fennel
0 0 0 Na 0 0 0 Na 0 0 0 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Summe
Groundnut
0 0 0 Na 500
9140 1828 Na 500 9140 1828 Na
30 | P a g e
r Bajra
0 0 0 Na 200
5390 2695 Na 200 5390 2695 Na
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 300
1530 510 Na 300 1530 510 Na
Udid 0 0 0 Na 200
1288 644 Na 200 1288 644 Na
Sesamum
0 0 0 Na 1500
7785 519 Na 1500 7785 519 Na
Total
0 0 0 0 24485
472492
20626
0 24485
472492
20626 0
Block :Veraval
Season
Rainfed Irrigated Total
Crops
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation
(rs/ha)
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation (rs/h
a)
Area(ha)
Production
(qtn/yr)
Productivity
or yield
(kg/ha)
Cost of
cultivation
(rs/ha)
Kharif
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Bajri 0 0 0 Na 3000
43110
1437 Na 3000 43110 1437 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 340
1465 431 Na 340 1465 431 Na
Math
0 0 0 Na 0 0 0 Na 0 0 0 Na
Udid 0 0 0 Na 470
2674 569 Na 470 2674 569 Na
Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na
Groundnut
11000
173580
1578 Na 4800
75744
1578 Na 15800
249324
1578 Na
Castor
0 0 0 Na 700
14189
2027 Na 700 14189 2027 Na
Sesamum
140 499.8
357 Na 0 0 0 Na 140 500 357 Na
Cotton
0 0 0 Na 7850
49455
630 Na 7850 49455 630 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
31 | P a g e
Guar seed
0 0 0 Na 55 367 667 Na 55 367 667 Na
Soyabean
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rabi
Wheat
0 0 0 Na 15100
606265
4015 Na 15100 606265
4015 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Gram
0 0 0 Na 30 566 1886 Na 30 566 1886 Na
Rapeseed & mustard
0 0 0 Na 50 500 1000 Na 50 500 1000 Na
Sugarcane
0 0 0 Na 5100
377451
7401 Na 5100 377451
7401 Na
Isabgul
0 0 0 Na 0 0 0 Na 0 0 0 Na
Fennel
0 0 0 Na 0 0 0 Na 0 0 0 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Summer
Groundnut
0 0 0 Na 2610
47711
1828 Na 2610 47711 1828 Na
Bajra
0 0 0 Na 1950
52553
2695 Na 1950 52553 2695 Na
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 55 281 510 Na 55 281 510 Na
Udid 0 0 0 Na 0 0 0 Na 0 0 0 Na
Sesamum
0 0 0 Na 0 0 519 Na 0 0 0 Na
Total
11140
174080
1935 0 42155
1272795
28227
0 53295 1446875
28065 0
Block :Sutrapada
Season
Rainfed Irrigated Total
Crops
Area (ha)
Productio
n (qtn
Productivity or yield
Cost of
cultivati
Area (ha)
Productio
n (qtn
Productivity or yield
Cost of
cultivation
Area(ha)
Production
(qtn/yr)
Productivity
or yield
Cost of
cultivati
32 | P a g e
/yr) (kg/ha)
on (rs/ha)
/yr) (kg/ha)
(rs/ha)
(kg/ha)
on (rs/ha)
Kharif
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Bajri 305 4382.85
1437 Na 0 0 0 Na 305 4383 1437 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
315 1357.65
431 Na 0 0 0 Na 315 1358 431 Na
Math
0 0 0 Na 0 0 0 Na 0 0 0 Na
Udid 495 2816.55
569 Na 0 0 0 Na 495 2817 569 Na
Tur 0 0 0 Na 0 0 0 Na 0 0 0 Na
Groundnut
20435
322464.3
1578 Na 0 0 0 Na 20435
322464
1578 Na
Castor
0 0 Na 0 0 0 Na 0 0 0 Na
Sesamum
0 0 357 Na 0 0 0 Na 0 0 0 Na
Cotton
1235 2457.65
199 Na 0 0 0 Na 1235 2458 199 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Guar seed
0 0 0 Na 80 534 667 Na 80 534 667 Na
Soyabean
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rabi
Wheat
0 0 0 Na 18200
730730
4015 Na 18200
730730
4015 Na
Jowar
0 0 0 Na 5 85 1701 Na 5 85 1701 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Gram
0 0 0 Na 50 943 1886 Na 50 943 1886 Na
Rapeseed & mustard
0 0 0 Na 60 600 1000 Na 60 600 1000 Na
Sugarcane
0 0 0 Na 0 0 0 Na 0 0 0 Na
33 | P a g e
Isabgul
0 0 0 Na 0 0 0 Na 0 0 0 Na
Fennel
0 0 0 Na 0 0 0 Na 0 0 0 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Summer
Groundnut
0 0 0 Na 280
5118 1828 Na 280 5118 1828 Na
Bajra
0 0 0 Na 550
14823
2695 Na 550 14823 2695 Na
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 145
740 510 Na 145 740 510 Na
Udid 0 0 0 Na 275
1771 644 Na 275 1771 644 Na
Sesamum
0 0 0 Na 1000
5190 519 Na 1000 5190 519 Na
Total
22785
333479
4571 0 20645
760533
15465
0 43430
1094012
19679 0
Block :Kodinar Season
Rainfed Irrigated Total
Crops
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation
(rs/ha)
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation (rs/h
a)
Area(ha)
Production
(qtn/yr)
Productivity
or yield
(kg/ha)
Cost of
cultivation
(rs/ha)
Kharif
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Bajri 0 0 0 Na 3000
43110
1437 Na 3000 43110 1437 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 340
1465 431 Na 340 1465 431 Na
Math
0 0 0 Na 0 0 0 Na 0 0 0 Na
Udid 0 0 0 Na 470
2674 569 Na 470 2674 569 Na
Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na
34 | P a g e
Groundnut
11000
173580
1578 Na 4800
75744
1578 Na 15800
249324
1578 Na
Castor
0 0 0 Na 700
0 0 Na 700 0 0 Na
Sesamum
140 499.8
357 Na 0 0 0 Na 140 500 357 Na
Cotton
0 0 0 Na 7850
49455
630 Na 7850 49455 630 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Guar seed
0 0 0 Na 55 367 667 Na 55 367 667 Na
Soyabean
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rabi
Wheat
0 0 0 Na 15100
606265
4015 Na 15100 606265
4015 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Gram
0 0 0 Na 30 566 1886 Na 30 566 1886 Na
Rapeseed & mustard
0 0 0 Na 50 500 1000 Na 50 500 1000 Na
Sugarcane
0 0 0 Na 5100
377451
7401 Na 5100 377451
7401 Na
Isabgul
0 0 0 Na 0 0 0 Na 0 0 0 Na
Fennel
0 0 0 Na 0 0 0 Na 0 0 0 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Summer
Groundnut
0 0 0 Na 2610
47711
1828 Na 2610 47711 1828 Na
Bajra
0 0 0 Na 1950
52553
2695 Na 1950 52553 2695 Na
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 55 281 510 Na 55 281 510 Na
Udid 0 0 0 Na 0 0 0 Na 0 0 0 Na
Sesa 0 0 0 Na 0 0 519 Na 0 0 0 Na
35 | P a g e
mum
Total
11140
174080
1935 0 42155
1258606
26200
0 53295 1432686
26038 0
Block :Una Season
Rainfed Irrigated Total
Crops
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation
(rs/ha)
Area (ha)
Productio
n (qtn/yr)
Productivity or yield (kg/h
a)
Cost of
cultivation (rs/h
a)
Area(ha)
Production
(qtn/yr)
Productivity
or yield
(kg/ha)
Cost of
cultivation
(rs/ha)
Kharif
Paddy
0 0 0 Na 0 0 0 Na 0 0 0 Na
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Bajri 0 0 0 Na 3000
43110
1437 Na 3000 43110 1437 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na
Mung
0 0 431 Na 340
1465 431 Na 340 1465 431 Na
Math
0 0 0 Na 0 0 0 Na 0 0 0 Na
Udid 0 0 569 Na 470
2674 569 Na 470 2674 569 Na
Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na
Groundnut
11000
173580
1578 Na 4800
75744
1578 Na 15800
249324
1578 Na
Castor
0 0 Na 700
14189
2027 Na 700 14189 2027 Na
Sesamum
140 499.8
357 Na 0 0 0 Na 140 500 357 Na
Cotton
0 0 0 Na 7850
49455
630 Na 7850 49455 630 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Guar seed
0 0 0 Na 55 367 667 Na 55 367 667 Na
Soyabean
0 0 0 Na 0 0 0 Na 0 0 0 Na
Rabi
Wheat
0 0 0 Na 1510
606265
4015 Na 15100 606265
4015 Na
36 | P a g e
0
Jowar
0 0 0 Na 0 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 0 Na 0 0 0 Na
Gram
0 0 0 Na 30 566 1886 Na 30 566 1886 Na
Rapeseed & mustard
0 0 0 Na 50 500 1000 Na 50 500 1000 Na
Sugarcane
0 0 0 Na 5100
377451
7401 Na 5100 377451
7401 Na
Isabgul
0 0 0 Na 0 0 0 Na 0 0 0 Na
Fennel
0 0 0 Na 0 0 0 Na 0 0 0 Na
Tobacco
0 0 0 Na 0 0 0 Na 0 0 0 Na
Summer
Groundnut
0 0 0 Na 2610
47711
1828 Na 2610 47711 1828 Na
Bajra
0 0 0 Na 1950
52553
2695 Na 1950 52553 2695 Na
Paddy
0 0 0 Na 0 0 Na 0 0 0 Na
Maize
0 0 0 Na 0 0 Na 0 0 0 Na
Mung
0 0 0 Na 55 281 510 Na 55 281 510 Na
Udid 0 0 0 Na 0 0 Na 0 0 0 Na
Sesamum
0 0 0 Na 0 0 519 Na 0 0 0 Na
Total
11140
174080
2935 0 42155
1272795
28227
0 53295 1446875
28065 0
2.3 Irrigation Based Classification
The gross irrigated area of the district is 2,36,139.34 Ha while total unirrigated area is
77887.80 Ha, which means many irrigation facilities needs to be developed in the
district.The following table gives a glimpse of irrigation based classification in the
district.
Source: Department Of Agriculture, Agriculture Statistic of state, AgriState
Table 14: Block wise Irrigation based Classification Areain Ha
Sr. No.
Blocks Irrigated Area Unirrigated area Total
37 | P a g e
1 Veraval 51123.00 11284.80 62407.80
2 Sutrapada 23036.00 22822.00 45858.00
3 Una 55305.50 11685.80 66991.30
4 Talala 15019.00 751.40 15770.40
5 Kodinar 47570.90 11304.40 58875.30
Note: The data pertaining to Gir Gadhada forms part of Una block
38 | P a g e
CHAPTER 3. WATER AVAILABILITY
The district has a semi-arid climate. Extreme temperatures, erratic rainfall and high
evaporation are the characteristic features of this type of climate. The average rainfall
recorded in Girsomnath district is 900mm (1950-80).
3.1 Status of Water Availability
A number of rivers drain the district Girsomnath. The principle among them is Ozat.
Other important rivers include Madhuvanti, Noli, Meghal, Hiran, Saraswati, Singarva,
Ingavadi, Rupen and Machhundri. The Ozar river originates near village Merwada of the
Bhesan taluka. After flowing through the district for a distance of 157 km, it debauches
into the Arabian Sea. The important tributaries of the Ozat River are Uben, Bhandukia,
Jhanjheshri, Fulsar and Lol. These rivers originate in the central plateau region of
Saurashtra and meanders in a radial pattern through the plains to meet the Arabian Sea.
The narrowness of the river mouths and sand bars at their mouth impedes the
floodwater, causing inundation particularly in Ghed and in coastal depressions. When
the accumulated water in the Ghed area breaks the sand bars, tidal water enters and
accumulates in the lower parts of Gheds and at places in coastal depressions.
Table 15: Status of water availability in Girsomnath(In MCM)
Sr.No.
Source Kharif Rabi Summer Total
1 Surface Irrigation
(i) Canal (Major & Medium Irrigation)
Talala 0 0.00 39.04 39.04
Veraval 0 0.00 22.13 22.13
Kodinar 0 34.68 0 34.68
Una 0 33.45 0 33.45
Gir Gadhada 0 32.84 0 32.84
TOTAL 0 100.97 61.17 162.14
(ii) Minor Irrigation tanks 0 0 0 0.00
(iii) Lift Irrigation/Diversion 0 0 0 0.00
(iv) Various Water Bodies including Rain Water Harvesting
Una 1.33 0.00 0 1.33
Kodinar 7.02 0.00 0 7.02
Talala 2.75 0.00 0 2.75
Veraval 15.72 0.00 0 15.72
Sutrapada 8.62 0.00 0 8.62
Gir Gadhada 13.31 0.00 0 13.31
TOTAL 48.75 0.00 0 48.75
(v) Treated Effluent Received from 0 0 0 0
39 | P a g e
STP
(vi) Untreated Effluent 0 0 0 0
(vii)
Perennial sources of water 0 0 0 0
2 Ground Water
(i) Open Well 0 0 0 0
(ii) Deep Tube Well 0 0 0 0
(iii) Medium Tube Well 0 0 0 0
(iv) Shallw Tube Well 0 0 0 0
Total…. 48.75 100.97 61.17 210.89
Name of Block Total Sufarce Water- MCM
VERAVAL 37.85
SUTRAPADA 8.62
TALALA 41.79
KODINAR 41.70
UNA 34.78
GIR GADHADA 46.15
3.2 Status of Ground Water Availability
3.2.1 Hydrogeology
Hydro-geologically, the district area can be broadly classifiedunder hard rocks
comprising of “Deccan Traps” and soft rocks comprising of “Tertiary and Alluvium”.
Nearly 80% of the area is underlain by the Deccan Traps, 19% by the Tertiariesand the
rest by Alluvium. Hydrogeological conditions in various litho-units are described below.
The taluka wise ground water status is provided in the following table:
Deccan Trap (Hard Rock):
These are essentially basaltic flows having a general horizontal to near horizontal
disposition over large area. The basaltic flows do not have any primary porosity in the
lower massive portion, but the top vesicular portion has some primary porosity because
of the vesicles formed due to the escaping gases. Both the massive and vesicular portions
have no primary permeability, as the vesicles are seldom interconnected. The secondary
porosity and permeability developed due to fracturing and jointing provides passage for
infiltration, storage and movement of ground water. The weathered zone extends to
about 20mbgl in the surface flows. Weathered flow contacts extend to greater depths.
The permeability of these zones are further intensified by fracturing and jointing. These
inter flow zones and fractured and jointed zones have given rise to stratified aquifer
systems, which is responsible for occurrence of water even at greater depths.
40 | P a g e
Weathering of basalts, which extend down to 20m and the fractured basalts beneath the
weathered mantle have given rise to water table aquifers down to 40m bgl. The depth of
water level in the basaltic area ranges from 3.30 m bgl to 25.40 m bgl during the pre-
monsoon period while during the post monsoon period the water levels ranges from
0.06 to 17.50 m bgl. The yields of the wells tapping the weathered basaltsare in the
range of 20-100 m3/day, while the yield in wells in which the inter flow zones have been
tapped range from 100-400 m3/day. The bore wells drilled in the district have yields
ranging from 100-500 m3/day.
Supratrappean and Gaj Beds Ground water in these series occur both under confined and water table conditions. The
upper granular bed of the series consist of limestone and grits form a good aquifer for
shallow ground water. Dugwells and dug cum bore wells within the depth range of 20-
25 m blg are constructed. The depth of the water level in the Gaj aquifer ranges from 5
to 15 m bgl during pre-monsoon. The yield of the wells ranges from 4 to 312m3/day and
an average yield of 66m3/day.
Miliolitic Limestone Ground water occurs under phreatic conditions. These milliolite limestone acts as a
good reservoir for shallow ground water. The depth of the water level in milliolitic
limestones is generally about 5 m bgl. Open dug wells are about 10m deep. The yield of
these wells range from 100-200 m3/day.
Alluvium Ground water occurs under unconfined conditions. The thickness of the alluvium is not
more than 20m. Because of its clayey nature, percolation of rain water is very poor
resulting in poor yields. The depth of water level ranges from 2 to 10 m bgl during the
pre-monsoon period. The yield of these wells hardly ecceeds 100 m3/day.
Water Levels Pre-monsoon period (May 2012) The map depicting the depth to water level (Figure 5.2) has been prepared based on water level data for May 2012 collected from NHS observation wells of CGWB. The depth to water levels in Junagadh district ranged from less than 2 mbgl to more
than 20 m bgl. However the water levels in Junagadh are relatively shallow and range
from 5 m bgl to 20 m bgl over most of Junagadh district. Isolated pockets of shallow
water levels were observed in the eastern extreme of Una talukas, northern parts of
Talala taluka and the western extreme of Mangrol taluka. Isolated pockets of deeper
water levels were observed in Mangarol and Malia talukas.
41 | P a g e
Note: In the map the blocks which form a part of Girsomnath district post separation from
Junagadh district in August, 2013 are Una, Kodinar, Sutrapada, Veraval and Talala.
Post-monsoon period (November 2012) The depth to water level ranges from 10 to 20 m bgl over most of the Junagadh district during the post monsoon period. Isolated patches of water levels of 5-10 m bgl are observed in the eastern extreme of Una taluka, near the northern extreme of Kodinar taluka, northern and central part of Talala taluka.
42 | P a g e
Note: In the map the blocks which form a part of Girsomnath district post separation from
Junagadh district in August, 2013 are Una, Kodinar, Sutrapada, Veraval and Talala.
Table 16: Ground Water Status of GirsomnathIn MCM
Sr No
Taluka/ Block
Status of block as per central ground water board notification
Ground water (MCM)
OE Critical Semi-Critical
Safe Saline Draft Recharge Gap
1 Kodinar Safe 79.596 11.88 39.16
2 Sutrapada Safe 24.26 36.13 11.88
3 Talala Safe 72.82 11.12 38.38
4 Una Safe 87.22 14.65 59.32
5 Veraval Safe 44.41 66.55 22.14
43 | P a g e
3.3 Status of Command Area
The total area of canal command is 40,853 Ha out which 32,367 hais developed while
8,486 ha is undeveloped. The following table illustrates the status of command area in
the district.
Table 17: Status of CommandArea(in Ha)
Name of
the Taluka
Information of Canal Command Information on the other
Services Command
Total
Area
Developed
Area
Undeveloped
Area
Total
Area
Developed
Area
Undeveloped
Area
Verawal 8880 6665 2215 1420 1420 0
Sutrapada 0 0 0 1302 1302 0
Kodinar 6707 4133 2574 7486 7486 0
Una 12822 11697 1125 1603 1603 0
Gir Gadhada 7754 6654 1100 3236 3236 0
Talala 4690 3218 1472 1398 1398 0
TOTAL 40853 32367 8486 16445 16445 0
Source: SSNNL and WRD, Govt. of Gujarat
3.4 Existing types of Irrigation
The existing type of irrigation in the district includes primarily canal irrigation and
irrigation through ponds and well is negligible as can be observed from the following
table:
Table 18: Block wise Area under various irrigation infrastructure Area in ha.
Taluka
Canal (Area)
Pond Well/Tube Well
Check Dams/Others
Area Irr.
Nos. Area Nos. Area Nos.
Verawal 1120 0 0 5016 17599 5016 18719
Sutrapada 0 0 0 1724 10480 1724 10480
Kodinar 1050 1 150 9030 24016 9031 25216
Una 1850 0 0 15651 22778 15651 24628
Talala 1028 2 120 5230 11449 5232 12597
Total 5048 3 270 36651 86322 36654 91640
Source:SSNNL, WRD and Comprehensive Agriculture Plan, Govt. of Gujarat
44 | P a g e
Note: The data for the newly formed Gir Gadhada district form part of Una district.
CHAPTER 4. WATER REQUIREMENT /DEMAND
The earlier Chapters deal with the general profileand water profile along withwater
availabilityin Girsomnath district. The present chapter deals with the current (2015) and
45 | P a g e
projected (2020) demand of water for various sectors. The demand for water has been
assessedon the basis of data obtained from different departments.
4.1 Domestic Water Demand
Data of Census 2011 and 2001 has been considered to arrive at the growth rate of
population of the district. It is assumed that per capita daily water requirement of
people residing in urban areas of the district is 140 litersand for population in rural
areas, the daily per capita daily water requirement is 100liters.Using the same norms,
block-wise domestic water supply demand has been worked out and is given in table 4.1
below.
Table 19: Domestic Water Demand (MCM) Sl. No.
District Name of block
Annual water
demand in 2020
MCM
Present population-
2015
Projected Population in
2020
Annual water demand in 2015
MCM
1 Gir Somnath Talala 146589 161248 5.68 6.25
2 Gir Somnath Una 321755 353930 12.67 13.93
3 Gir Somnath Gir Gadhada
97800 107581 3.57 3.93
4 Gir Somnath Veraval 348291 383120 15.64 17.21
5 Gir Somnath Sutrapada 153325 168658 6.01 6.61
6 Gir Somnath Kodinar 247114 271825 9.67 10.64
Total 1314874 1446362 53.24 58.57
Source: Gujarat W.S.& S.Board, P.H.W.Division, Veraval
46 | P a g e
4.2 Crop Water Requirement
In Girsomnath, the water requirement for various agricultural and horticultural crops
have been summarized in the following table which gives us clear picture of total water
requirement. All major agricultural crops and horticultural components like flower,
fruits and vegetables have been considered while concluding this data.
Table 20: Crop wise Water Requirement Sr. No. Blocks Area Sown
(Ha) Irrigated Area (Ha)
Water Requirement
Existing potential
Total Water requirement
in MCM
1 Veraval 62407.80 51123.00 386.22 283.45 102.77
2 Sutrapada 45858.00 23036.00 216.20 107.32 108.88
3 Una 66991.30 55305.50 423.88 335.71 88.17
4 Talala 15770.40 15019.00 148.92 135.48 13.44
5 Kodinar 58875.30 47570.90 339.60 232.40 107.20
4.3 Livestock Water Demand
The water requirement for 100 poultry is assumed as 459 litres a day while for sheep
and goats it is assumed as 5 litres of water per day.Similarly,for milch animals, 65 litres
a day and for draft animals, 60 litres a day of water requirement has been considered
while arriving at the following data concerning livestock of the district.
Talala Una Gir Gadhada Veraval Sutrapada Kodinar
Water demand in 2015 5.68 12.67 3.57 15.64 6.01 9.67
Water Demand in 2020 6.25 13.93 3.93 17.21 6.61 10.64
5.68
12.67
3.57
15.64
6.01
9.67
6.25
13.93
3.93
17.21
6.61
10.64
0
2
4
6
8
10
12
14
16
18
20
AXIS TITLE
Domestic Water Demand in MCM
Water demand in 2015 Water Demand in 2020
47 | P a g e
Table 21: Livestock Water Demand
Block
Total number of live stock
Present water
demand (MCM)
Water demand in
2020 (MCM)
Existing Water
potential (MCM)
Water potential to be created
(MCM)
Veraval 136731 2.00 2.39 2.00 0.40
SUTRAPADA 94556 1.89 2.27 1.89 0.38
TALALA 55099 1.20 1.44 1.20 0.24
KODINAR 143722 2.86 3.43 2.86 0.57
UNA 95468 1.80 2.16 1.80 0.36
GIR GADHADA
82097 1.79 2.15 1.79 0.36
Total 607673 11.5326 13.83915 11.53263 2.30653
4.4 Industrial Water Requirement.
Major industries such as Ambuja cement, Gujarat heavy chemicals, Aditya Birla Nuvo
ltd (Indian Rayon), Gujarat siddhi cement have their presence in this district.Veraval is
home to a large number of fish processing factories in G.I.D.C, which export prime
quality seafood to USA, Japan, SE Asian, Gulf and EU Countries. The seafood-industry,
which was started through government initiative, now is in its prime and many
importers are attracted towards Veraval from around the globe. Regional research
centers of CIFT and CMFRI are situated at Veraval, which are helping development of
fisheries sector in Gujarat. Veraval also is home to Aditya Birla Nuvo Ltd (Formerly
India-Rayon Industries Ltd) which is one of India‟s largest rayon manufacturing
companies.
2 1.89
1.2
2.86
1.8 1.79
2.39 2.27
1.44
3.43
2.16 2.15
0.4 0.380.24
0.570.36 0.36
0
0.5
1
1.5
2
2.5
3
3.5
4
VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA
Livestock Water Demand
Existing Water potential (MCM) Water demand in 2020 (MCM)
Water potential to be created (MCM)
48 | P a g e
The industrial water demand as per data given by irrigation department is presented in
the following table:
Table 22: Water Demand for IndustriesFig. in Lakhs Block Name of the
industry Water
demand (MCM)
Water demand in
2020 (MCM)
Existing Water potential (MCM)
Water potential to be created
(MCM)
Veraval
IRC 8.1 8.1 8.1 0
GHCL 3.68 3.68 3.68 0
Total…. 11.78 11.78 11.78 0
4.5 Water Demand for Power Generation
The district is not having any thermal or nuclear power plant where water may be
consumed. Therefore, demand of water for power generation has been taken as nil.
4.6 Total Water Demand of the district for various sectors
This section presents the total water demand of the district and has been calculated by
summing up all major sectors consuming water. The current water demand in 2015 and
the projected water demand has been depicted in the following table
Table 23: Total Water Demand of the district for Various sectorsFig. in Lakhs Block Components
Total
, MCM
for 2020
Domestic
water demand in 2015
Domestic
Water
Demand in 2020
Crop water req
in 2015
Crop water req
in 2020
Livestock
water demand in 2015
Livestock
water demand in 2020
Industrial
water demand in 2015
Industrial
water demand in 2020
Powergeneration water
demand 2015 and
2020
Total
MCM for
2015
VERAVAL 15.64 17.21 318.32
318.32
2.00 2.39 11.78 12.958
0 347.74
350.88
SUTRAPADA
6.01 6.61 124.87
124.87
1.89 2.27 0 0 0 132.77
133.75
TALALA 5.68 6.25 189.23
189.23
1.20 1.44 0 0 0 196.11
196.92
KODINAR
9.67 10.64
271.48
271.48
2.86 3.43 0 0 0 284.01
285.55
UNA 12.67
13.93
404.57
404.57
1.80 2.16 0 0 0 419.04
420.67
GIR GADHADA
3.57 3.93 1.79 2.15 0 0 0 5.36 6.07
Total 53.24
58.57
1308.47
1308.47
11.54
13.84 11.78 12.958
0 1385.03
1393.84
49 | P a g e
During 2015, total water requirement of the district has been assessed at 1385.03 MCM in which crop water requirement comprises 94% of total water requirement. During 2020, total water requirement of the district has been assessed at 1393.84 MCM.
The following chart depicts the share of each sector in the water requirement for the year 2015 for Gir Somnath district.
Fig.Water Requirement for Various Sectors (2015)
The percentage share of various sector remain same in 2020.
4.7 Water Budget
While assessing the water being used from Surface sources and through Ground Water
extraction, following assumption has been considered.
Since the total water available (consumed) by different sector had to be
bifurcated based on their source of origin (Surface/ Ground), proportion of
number of ground water and surface water sources have been taken as the basis
for bifurcation of total volume of water.
4%
94%
1%
1%
0%
Water demand in MCM for 2015
Domestic
Crop
Livestock
Industrial
Power
50 | P a g e
Table 24: Water BudgetFig. in Lakhs
Name of Existing water availability (MCM)
Total Water Demand (MCM) Water Gap (MCM)
Blocks Surface water
Ground water
(MCM) Present Projected (2020)
Present Projected (2020)
VERAVAL 37.85 66.55 104.40 425.88 429.02 321.48 324.62
SUTRAPADA 8.62 36.13 44.75 204.02 205.00 159.27 160.25
TALALA 41.79 110.53 152.32 441.04 441.85 288.73 289.53
KODINAR 41.70 117.3 159.00 227.72 229.26 68.72 70.26
UNA 34.78 146.55 181.33 364.37 366.00 183.04 184.67
GIR GADHADA 46.15 46.15 5.36 6.07 -40.79 -40.08
Total 210.89 477.06 687.95 1668.39 1677.20 980.45 989.25
The total water gap for the district has been estimated at 989.25 MCM during 2020. The
gap is maximum in Veraval with 324.62 MCM followed by Talala (289.53 MCM).
-100.00
0.00
100.00
200.00
300.00
400.00
500.00
VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA
Water Budget for Gir Somnath District
Present Water Demand 2015 Projected Water Demand (2020)
Present Water Demand 2015 Projected Water Gap (2020)
51 | P a g e
CHAPTER 5. STRATEGIC ACTION PLAN FOR IRRIGATION IN DISTRICT UNDER PMKSY
5.1 Strategic Plan for irrigation in PMKSY
A strategic plan for four years has been prepared starting from 2016-17 to 2019-20.The data from water agencies, government
departments and organizationshave been collated and provided in the following table taluka wise:
Table 25: Department wise Planned Coverage of Area under PMKSYFig. in Lakhs Sr. No
Name of the Blocks/Sub
Districts
Concerned Ministry/
Department
Component
Activity Area (Ha)
Estimated cost
(in Lacs.)
2016-17
Area (Ha)
Estimated cost
(in Lacs.)
2017-18
Area (Ha)
Estimated cost (in
Lacs.) 2018-19
Area (Ha)
Estimated cost (in
Lacs.) 2019-20
Area (Ha)
Total Cost
1 Talala GGRC Per drop more crop
Non DPAP Drip &
Sprinkler
1867.89 747.16 1400.92 560.37 1400.92 560.37 1400.92 560.37 6070.65 2428.26
Watershed Dept.
PMKSY Watershed
Check dam,
percolation tanks,
farm ponds etc.
4014.5 1456.69 40.50 280.24 0 0 0 0 4055.00 1736.93
GWRDC Har Khet ko Pani
Recharge Structure
5 10.00 5 10.00 5 10.00 5 10.00 20.00 40.00
ATMA Training and capacity building
2.94 0 4.70 5.66 7.02 0.00 20.32
State
Irrigatipn Dept
AIBP 10071.00 5000 10071.00 5000.00
Har Khet ko Pani
34.00 29.00 252.00 512.00 140.00 229.00 55.00 126.00 481.00 896.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko Pani
Farm pond 31.68 24.64 31.68 24.64 31.68 24.64 31.68 24.64 126.72 98.56
Sim pond 21 25.00 21.00 25.00 21 25.00 21 25.00 84.00 100.00
Village pond
57.6 14.00 57.60 14.00 57.6 14.00 57.6 14.00 230.40 56.00
WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84
Total 6079.67 2318.39 1856.70 1439.91 1704.20 877.63 11690.20 5775.99 21330.77 10411.91
2 Verawal GGRC Per drop more crop
Non DPAP Drip &
Sprinkler
1677.42 670.97 1258.06 503.23 1258.06 503.23 1258.06 503.23 5451.61 2180.64
52 | P a g e
ATMA Training and capacity building
2.94 4.7 5.66 7.02 0.00 20.32
State Irrigatipn
Dept
AIBP 10066.00 5000 10066.00 5000.00
Har Khet ko Pani
104 172.00 2001.00 5106 943 6577 400 3714 3448.00 15569.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko Pani
Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64
Sim pond 12.6 15.00 12.60 15 12.6 15 12.6 15 50.40 60.00
Village pond
57.6 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00
WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84
Total 1925.54 904.53 3403.18 5672.05 2345.18 7144.01 11868.18 9282.37 19542.09
23002.44
3 Sutrapada GGRC Per drop more crop
Non DPAP Drip &
Sprinkler
963.50 385.40 722.63 289.05 722.63 289.05 722.63 289.05 3131.38 1252.55
GWRDC Har Khet ko Pani
Recharge Structure
5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00
ATMA Training and capacity building
2.94 4.7 5.66 7.02 0.00 20.32
State Irrigatipn
Dept
AIBP 8056.00 4000 8056.00 4000.00
Har Khet ko Pani
21 24 101 106 28 27 1154 914 1304.00 1071.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko Pani
Farm pond 23.04 17.92 23.04 17.92 23.04 17.92 23.04 17.92 92.16 71.68
Sim pond 21 25.00 21.00 25 21 25 21 25 84.00 100.00
Village pond
57.6 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00
WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84
Total 1139.14 488.22 978.27 475.63 905.27 397.59 10087.27 5285.95 13109.34 6647.39
4 Una GGRC Per drop more crop
Non DPAP Drip &
Sprinkler
1969.67 787.87 1477.26 590.90 1477.26 590.90 1477.26 590.90 6401.44 2560.58
53 | P a g e
Watershed Dept.
PMKSY Component,
PMKSY Component
(Renovated), Convergence
with MGNREGA
Check dam,
percolation tanks,
farm ponds etc.
557.5 1006.76 154.00 105.63 711.50 1112.39
GWRDC Har Khet ko Pani
Recharge Structure
5 10.00 5 10.00 5 10.00 5 10.00 20.00 40.00
ATMA Training and capacity building
2.94 4.7 5.66 7.02 0.00 20.32
State Irrigatipn
Dept
AIBP 20142.00 10000 20142.00 10000.00 Har Khet ko
Pani 249.00 260.00 2711.00 2971.00 3027.00 3624.00 3376.00 4972.00 9363.00 11827.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko Pani
Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64
Sim pond 12.60 15.00 12.60 15 12.6 15 12.6 15 50.40 60.00
Village pond
57.60 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00
WHS 48.00 8.96 48.00 8.96 48.00 8.96 48.00 8.96 192.00 35.84
Total 2925.29 2125.69 4491.38 3740.35 4653.38 4288.68 25144.38 15638.04 37214.42 25792.77
5 Kodinar GGRC Per drop more crop
Non DPAP Drip &
Sprinkler
2134.94 853.98 1601.21 640.48 1601.21 640.48 1601.21 640.48 6938.56 2775.42
GWRDC Har Khet ko Pani
Recharge Structure
5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00
ATMA Training and capacity building
2.94 4.7 5.66 7.02 0.00 20.32
State Irrigatipn
Dept.
Har Khet ko Pani
1720 382 2602 1532.5 1814 1870.00 2163.00 2143.5 8299.00 11928.00
AIBP Medium Irrigation
1208.00 6000 1208.00 6000.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko Pani
Farm pond 30.24 23.52 30.24 23.52 30.24 23.52 30.24 23.52 120.96 94.08
Sim pond 16.8 20.00 16.80 20 16.8 20 16.8 20 67.20 80.00
Village pond
86.4 21.00 86.40 21 86.4 21 86.4 21 345.60 84.00
WHS 36 6.72 36.00 6.72 36 6.72 36 6.72 144.00 26.88
Total 4029.38 1320.16 4377.65 2258.92 2597.38 2597.38 5146.65 14872.24 17143.92 15048.70
6 Gir Gadhada
GGRC Per drop more crop
Non DPAP Drip
250.51 100.20 187.88 75.15 187.88 75.15 187.88 75.15 814.16 325.66
54 | P a g e
&Sprinkler
GWRDC Har Khet ko Pani
Recharge Structure
5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00
ATMA Training and capacity building
2.94 4.7 5.66 7.02 0.00 20.32
State
Irrigatipn Dept
AIBP 0.00 0.00
Har Khet ko Pani
43 90 788 1499 1024 1890.00 944.00 1720 2799.00 5199.00
Gujarat State Land
Development Corp (GLDC)
Har Khet ko
Pani
Farm pond 28.8 22.40 28.80 22.4 28.8 22.4 28.8 22.4 115.20 89.60
Sim pond 16.8 20.00 16.80 20 16.8 20 16.8 20 67.20 80.00
Village pond
86.4 21.00 86.40 21 86.4 21 86.4 21 345.60 84.00
WHS 42 7.84 42.00 7.84 42 7.84 42 7.84 168.00 31.36
Total
472.51 274.38 1154.88 1660.09 1390.88 2052.05 1310.88 1883.41 4329.16 5869.94
Note: The other component in both the districts for the year 2016-17 and 2017-18 is divided equally among the 2 blocks i.e. Una and Talala, as it was practically
not possible to allocate the exact amount of funds allocated for the 2 blocks.
PMKSY-Watershed Component (erstwhile named as Integrated Watershed Management Programme) is one of the flagship program of Govt. of India. The main objectives of this is to restore the ecological balance by harnessing, conserving and developing degraded natural resources such as soil, vegetative cover and water. Gujarat is one of the largest States in context of land area treatment under PMKSY-Watershed project. The important activities carried out under this projects are Soil moisture conservation, Water harvesting, Vegetative cover and Plantation, Agricultural production and Productivity improvement, Dairy development, Agro processing, Livelihood and Income Generating Activities etc. In Gujarat PMKSY-Watershed component is implemented through a State Level Nodal Agency constituted as Gujarat State Watershed Management Agency (GSWMA), an autonomous society supported under the Rural Development Department (RDD) of Government of Gujarat. GSWMA has vision of “Enhancing the quality of rural population through Sustainable, Equitable and Participatory Natural resources Management” and also has Mission of “Creating sustainable rural livelihoods through scientific and Integrated Watershed Development Approach”.
55 | P a g e
5.2 Component wise Strategic Action Plan
Out of a total planned outlay of 86,773.16lakh rupees, Har Khet ko Pani component has the largest
share of 49 per cent, followed by AIBP (35%) and Per Drop More Crop (13%). PMKSY Watershed
component has a MINIMUM share in the total outlay. AIBP components are to be executed mainly
by Narmada, Water Resources, Water Supply and Kalpsar Department (WRD). Har Khet ko Pani
component will be implemented by WRD, SSNNL and GWRDC. Per drop, more crop component
will be executed by GGRC. Watershed component will be taken care of by the Rural Development
Department through GSWMA and extension & training component will be executed by ATMA.
However, all the stakeholders need to have coordination among themselves to have the maximum
irrigation efficiency and to avoid duplicity. Fig. 5.2 is the graphical representation of various
components of PMKSY.
Table 26: Component wise Financial Outlay for PMKSYFig. in Lakhs
Component 2016-17 2017-18 2018-19 2019-20 Total
Per drop more crop 3545.57 2659.18 2659.18 2659.18 11523.12
PMKSY Watershed 2421.74 367.17 00 00 2788.90
MGNREGA 43.71 18.70 00 00 62.41
Har Khet Ko Pani 1404.20 12173.70 14664.20 14036.70 42278.80
Training and Capacity Building 17.64 28.20 33.96 42.12 121.92
AIBP 0.00 0.00 0.00 30000.00 30000.00
Total 7430.86 15246.95 17357.34 46738.00 86773.16
5.3 Department wise &Year wise Strategic Action Plan Year wise financial outlay for the four years can be observed in Fig.5.2. In the first year of
implementation, i.e. in financial year 2016-17, a budget of Rs. 7430.86 lakh is required. In the
subsequent three years, Rs.15,246.95 lakh, Rs.17357.34 lakh and Rs.46738.00 lakh budget is
estimated for various departments. Year wise financial outlay is illustrated in the following table.
Table 27: Total amount to be spent by various agencies under PMKSY for four yearsFig. in Lakhs
Agency 2016-17 2017-18 2018-19 2019-20 Total
GGRC 3545.57 2659.18 2659.18 2659.18 11523.12
GSWMA (PMKSY Watershed +
2465.45 385.87 0.00 0.00 2849.32
13%
3%
49%0%
35%
Components of PMKSY
Per drop more crop
PMKSY Watershed
Har Khet Ko Pani
Training and Capacity Building
AIBP
56 | P a g e
MGNREGA)
GWRDC 50.00 50.00 50.00 50.00 200.00
ATMA 17.64 28.20 33.96 42.12 121.92
WRD 957.00 11726.50 14217.00 43589.50 70490.00
GLDC 397.20 397.20 397.20 397.20 1588.80
Total 7430.86 15246.95 17357.34 46738.00 86773.16
Table 28: Total area to be covered under PMKSY
Agency Estimated Area
to be Covered
under PMKSY
(ha.)
Proposed
Additional area
brought under
irrigation
GGRC 28807.8 NA
PMKSY Watershed 4766.5 4766.5
GWRDC 100 100
WRD 75237 7667
GLDC 3758.4 3758.4
Total 112669.7 16291.9
As can be seen from the above table 27 and table 28, an area of 112699.7 Ha will be covered and
total funds of Rs.86,773will be required to spend for four years under PMSKY.
5.4 Monitoring and Evaluation
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be monitored by
the District Level Irrigation Committee. Further, the activities, outputs and outcomes will
be reported in web based MIS of PMKSY for review at state and national level. Some of the
key indicators that will be used to monitor and evaluate the progress of PMKSY include:
Annual irrigation water supply per unit irrigated area measured as the ratio of total
volume of irrigation water supplied at intake divided by total area irrigated in all
seasons
Potential created and utilized measured as the ratio of total potential utilised
(measured crop area) to irrigation potential created
Output (agricultural production) per unit irrigated area measured as the ratio of
total value of agriculture production divided by the total irrigated area.
Output (agricultural production) per unit irrigation water supply measured as the
ratio of total value of agriculture production divided by the total volume of irrigated
water supplied.
Total Operations & Maintenance (O&M) cost per unit irrigated area measured as
the total Management, Operation and Maintenance (MOM) costs for the system
divided by total area irrigated (potential utilised).
Total Operations & Maintenance (O&M) cost per unit volume of water supplied
measured as total Management, Operation and Maintenance (MOM) costs for the
system divided Total volume of water supplied (all uses)
57 | P a g e
Equity performance measured as actual area irrigated in head, middle and tail
divided by Command area in head, middle and tail.
GSWMA has its own structural arrangements (GSWMA, District Watershed
Development Unit, PIA, and Watershed Committee) from state to village level for
implementation of program and has system of internal monitoring of project activities
through different means. GSWMA has its own web based monitoring system as Soil
Water Resource Management System (SWaRSys). The said system is online and helps
not only for the monitoring/documentation of all the main project activities but also
facilitates to collect and collate monthly and quarterly data from District level
offices.For preparation of DIP, the watershed component information is collected from
various levels and incorporated in this document for the years 2016-20.
5.5 Expected outcome and income
At present, a total of 112669.70 ha of area under crops is unirrigated in the district. Out of
which, under PMKSY it is proposed to cover an additional area of 83861.90 ha under
irrigation during the upcoming four years. This will save not only significant amount of
water but also a significantly larger area can be irrigated with limited quantity of water.
Similarly under Per Drop More Crop component, Gujarat Green Revolution Company Ltd
(GGRC) will cover 28,807.80 ha.This will save a significant amount of water as
comparison traditional method of irrigation. Hence, significantly larger area can be
irrigated with limited quantity of water.
The PMKSY interventions are likely to generate an additional income of Rs. 21,133.20 lakh
to the farmers of the district. This is based on the assumption of at least 60% of potential
utilised and Rs. 42,000 per ha incremental income from rainfed to irrigated farming.
This is also likely to create 132lakh man-days of non-recurring employment. The total
man-days after calculation come 13195079. All this generates total number of individuals
who will be employed for 4 years under the project: 13641.
5.6 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of Panchayat Samities and then finalize
the village plan and prepare DPR.
There should not be any duplicity of project.
The Department should supplement each other so that the maximum irrigation
efficiency is achieved.
Agriculture and Horticulture Department should take micro irrigation projects in the
command of minor irrigation projects, which are either completed or likely to be
completed in near future.
All the irrigation projects should have a component of water conveyance so that the
each drop of water is judiciously utilized.
Where ever feasible, Solarpump sets should be installed.
58 | P a g e
All the structures planned should be geo tagged and marked on map, so that social
monitoring of the projects can be conducted. This will also avoid the duplicity.
Priority should be given to projects to minimize the gap in potential created and
potential utilized.
Execution of the scheme should be expeditiously completed.
There should be smooth fund flow for timely completion of the project and to avoid
cost escalation.
Strategic Action plan for Irrigation in District under PMKSY
Concerned Ministry/
Department Component Activity
Total Number/Capacity
(cum )
Command Area/
additional area
lrrigation Potential
(Ha)
Period of
Implementation^/ 7
yrs)
Estimated cost (in
lakh Rs.)
MoWR AIBP Minor Irrigation WRD 5 92805 4 Years 30000
MoWR
Har khet ko pani
Surface Minor Irrigation
MoWR Line Filed Channels WRD 5 16788 4 Years 286
Check Dams WRD 104 20674 4 Years 21108
MoWR Other Works WRD 255 22611 4 Years 19096
Recharge Tubewell GWRDC 20 100 4 Years 200
MoWR Farm pond GLDC 460 662.4 4 Years 515
MoWR Sim pond GLDC 96 403.2 4 Years 480
MoWR Village pond GLDC 56 1612.8 4 Years 392
MoWR WHS GLDC 180 1080 4 Years 202
MoWR Per drop more crop
(Micro Irrigation)
Micro Irrigation
MoWR Non -DPAP Drip 10803 17284.68 4 Years 10371
MoWR Non -DPAP Sprinkler 7202 11523.12 4 Years 1152
DoLR-MoRD
PMKSY Watershed
Existing/Old Water Harvesting Structure
Maintance (Renovation & Repair)
219 1123 4 Years 257
DoLR-MoRD Ground Water Recharging Structures
11 35 4 Years 5
DoLR-MoRD Admin 0 0 4 Years 105
DoLR-MoRD AGRICULTURE ACTIVITIES 3564 40 4 Years 656
DoLR-MoRD AGRO PROCESSING ACTIVITIES
60 1 4 Years 103
DoLR-MoRD Animal Husbandry 960 6 4 Years 108
DoLR-MoRD Capacity Building, Monitoring & Evaluation
0 0 4 Years 55
DoLR-MoRD Consolidation 0 0 4 Years 59
DoLR-MoRD Dugwell Recharge structure 9 0 4 Years 2
DoLR-MoRD EPA 3003 0 4 Years 9
DoLR-MoRD Establishing linkages 4 0 4 Years 9
DoLR-MoRD Holiya in farm/Field 85 0 4 Years 41
DoLR-MoRD Land Development 30884.8 16190 4 Years 330
DoLR-MoRD Local traditional handicraft 2 0 4 Years 2
59 | P a g e
DoLR-MoRD Minor Activities 76 2 4 Years 108
DoLR-MoRD Pond Recharge structure 97 0 4 Years 40
DoLR-MoRD Soil & Moisture Conservation 34584 4335 4 Years 283
DoLR-MoRD Water Harvesting Structure 1016 1168.5 4 Years 615
DoLR-MoRD Convergence with
MGNREGA Multiple activities
4 Years 62
Irrigation Scheme of State
Agriculture
Capacity Building by
ATMA Training Programmes
1494 trainings
18012 trainees
4 Years 122
60 | P a g e
ANNEXURE
Annexure-1- Department wise Summary of Strategic Action Plan
1. Strategic Action Plan of Water Resource Department (WRD) Fig. in Lakhs
Component
Activity
2016-17 2017-18 2018-19
2019-20
TOTAL
Fund (lacs.)
Fund (lacs.)
Fund (lacs.)
Fund (lacs.)
Additional irrigation
Area (hac.)
AIBP Kalpsar Yojna 0 0 0 30000 49543
Hark het ko pani
Lined Field Channels 24 132.5 63 36.5 478
Drought Proofing through check
0 0 0 0 0
Dams/Water Harvesting Structures
466 4072 4601 7095 19434
Other Works (Desilting, Deepning,Repairing,RRR)
377 6023 7663 4738 5782
Total 867 10228 12327 41870 75237
2. Strategic Action Plan for Gujarat Water Resource Development Corporation (GWRDC)Fig. in Lakhs
GWRDC
Components Work Blocks 2016-17 2017-18 2018-19 2019-20 Total Command Area
HKP Recharge Structure
Kodinar 10 10 10 10 40 20
Patan Veraval
10 10 10 10 40 20
Sutrapada 10 10 10 10 40 20
Talala 10 10 10 10 40 20
Una 10 10 10 10 40 20
Total 50 50 50 50 200 100
3. Strategic Action Plan for Gujarat State Land Development Corporation Limited (GLDC) Fig. in Lakhs
Total Activity Estimated cost (in
Lacs.) 2016-17
Estimated cost (in
Lacs.) 2017-18
Estimated cost (in Lacs.)
2018-19
Estimated cost (in Lacs.)
2019-20
Total Area (Ha)
Total estimated
cost (in Lacs.)
Gujarat State Land
Development Corp (GLDC)
Farm pond
128.8 128.8 128.8 128.8 662.4 515.2
Sim pond
120 120 120 120 403.2 480
Village pond
98 98 98 98 1612.8 392
WHS 50.4 50.4 50.4 50.4 1080 201.6
61 | P a g e
4. Strategic Action Plan for Gujarat Green Revolution Company Limited (GGRC) Fig. in Lakhs
GGRC
Components Work 2016-17 2017-18 2018-19 2019-20 Total Command Area
Per Drop More Crop
Drip 3191.02 2393.26 2393.26 2393.26 10370.8 17284.67
Sprinkler 354.56 265.92 265.92 265.92 1152.32 11523.11
Total 3545.58 2659.18 2659.18 2659.18 11523.12 28807.78
5. Strategic Action Plan for Gujarat State Watershed Management Agency (GSWMA)Fig. in Lakhs
GSWMA
Components 2016-17 2017-18 2018-19 2019-20 Total Command Area
PMKSY Watershed 2421.7 367.17 0 0 2788.91 4766.5
MGNREGA 41.71 0 0 0 41.71 0
Total 2463 367.17 0 0 2830.62 4766.5
6. Strategic Action Plan for Agriculture Technology Management Agency (ATMA) Fig. in Lakhs
Components Work 2016-17 2017-18 2018-19 2019-20 Total
Capacity Building
Training related to irrigation
17.62 28.19 33.98 42.14 121.92
62 | P a g e
Annexure-2 Strategic Action Plan of Water Resource Department
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/
Department
Component
Activity Total Total Comm
and Area/
lrrigation
Potential
(Ha)
Existing
irrigation
Area (hac.)
2016-17 2017-18 2018-19 2019-20 TOTAL
Number/Capacity(cum )
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP Kalpsar Yojna 1 13450 0 0 0 0 0 0 0 8056 4000
8056 4000
7.1
MoWR Hark het ko pani
Lined Field Channels
0 0 0 0
10 MoWR Drought Proofing through check
6 1561 0 0
MoWR Dams/Water
Harvesting
Structures
0 19 21 70 81 0 0 1137 900 1226 1002
11 MoWR Secondary
Storage Structures
(Tank)
0 0 0 0
MoWR 0 0
17
.5 MoWR Other Works
(Desilting,
Deepning,Repairing,RRR)
26 298 220 2 3 31 25 28 27 17 14 78 69
TOTAL 21 24 101 106 28 27 9210 4914 9360 5071
Name of the Block: KODINAR
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/
Department
Component
Activity Total Total Comma
nd Area/
lrrigation
Potential (Ha)
Existing
irrigation
Area (hac.)
2016-17 2017-18 2018-19 2019-20 TOTAL
Number/Capacity(cum )
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP Kalpsar Yojna 1 2435 0 0 0 0 0 0 0 1208 6000
1208 6000
7. MoWR Hark het Lined Field 1 6800 6500 14 4 96 27.5 63 18 127 36.50 300 86
63 | P a g e
1 ko pani Channels 0
10 MoWR Drought Proofing through check
21 6259 0 0
MoWR Dams/Water
Harvesting
Structures
0 1659 300 2434 1375 1137 1555 989 1685 6219 4915
11 MoWR Secondary
Storage Structures
(Tank)
0 0 0 0
MoWR 0 0
17
.5 MoWR Other Works
(Desilting,
Deepning,Repairi
ng,RRR)
34 1970 190 47 78 72 130 614 297 1047 422 1780 927
TOTAL 1720 382 2602 1533 1814 1870 3371 8144 9507 1192
8
Name of the Block: UNA
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/
Department
Component
Activity Total Total Comma
nd Area/
lrrigation
Potential (Ha)
Existing
irrigation
Area (hac.)
2016-17 2017-18 2018-19 2019-20 TOTAL
Number/Capacity(cum )
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP Kalpsar Yojna 1 41921 0 0 0 0 0 0 0 20142 10000
20142 10000
7.1
MoWR Hark het ko pani
Lined Field Channels
1 193 150 3 5 40 0 0 0 0 0 43 5
10 MoWR Drought Proofing
through check
30 8341 0 0
MoWR Dams/Water
Harvesting Structures
0 127 132 2074 2275 2362 2771 2942 4400 7505 9578
11 MoWR Secondary
Storage Structures (Tank)
0 0 0 0
MoWR 0 0
17
.5 MoWR Other Works
(Desilting,
Deepning,Repairing,RRR)
57 12081 10266 119 123 597 696 665 853 434 572 1815 2244
TOTAL 249 260 2711 2971 3027 3624 23518 1497
2
29505 2182
7
Name of the Block: GIR GADHADA
Sr Name of Concern Compon Activity Total Total Existin 2016-17 2017-18 2018-19 2019-20 TOTAL
64 | P a g e
. No
the Blocks/
Sub Districts
ed Ministry
/ Departm
ent
ent Number/Capacity(cum )
Command
Area/ lrrigati
on Potential (Ha)
g irrigati
on Area (hac.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP -
7.1
MoWR Hark het ko pani
Lined Field Channels
1 170 150 0 0 13 20 7 10 0 0 20 30
10 MoWR Drought Proofing
through check
20 2709 0 0
MoWR Dams/Water
Harvesting Structures
0 35 67 733 1361 989 1796 922 1650 2679 4874
11 MoWR Secondary
Storage Structures (Tank)
0 0 0 0
MoWR 0 0
17
.5 MoWR Other Works
(Desilting, Deepning,Repairi
ng,RRR)
23 640 540 8 23 42 118 28 84 22 70 100 295
TOTAL 43 90 788 1499 1024 1890 944 1720 2799 5199
Name of the Block: VERAVAL
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/
Department
Component
Activity Total Total Comma
nd Area/
lrrigation
Potential (Ha)
Existing
irrigation
Area (hac.)
2016-17 2017-18 2018-19 2019-20 TOTAL
Number/Capacity(cum )
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP Kalpsar Yojna 1 15743 0 0 0 0 0 0 0 10066 5000
10066 5000
7.1
MoWR Hark het ko pani
Lined Field Channels
1 9600 9510 6 10 57 95 27 45 0 0 90 150
10 MoWR Drought Proofing
through check
21 1738 0 0
MoWR Dams/Water
Harvesting Structures
0 7 10 731 291 700 245 300 100 1738 646
11 MoWR Secondary
Storage Structures (Tank)
0 0 0 0
MoWR 0 0
65 | P a g e
17
.5 MoWR Other Works
(Desilting,
Deepning,Repairing,RRR)
48 2050 430 91 152 1213 4720 216 6287 100 3614 1620 14773
Total 104 172 2001 5106 943 6577 10466 8714 13514 2056
9
Name of the Block: TALALA
Sr.
No
Name of the
Blocks/Sub
Districts
Concerned
Ministry/
Department
Component
Activity Total Total Comma
nd Area/
lrrigation
Potential (Ha)
Existing
irrigation
Area (hac.)
2016-17 2017-18 2018-19 2019-20 TOTAL
Number/Capacity(cum )
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
Additional
irrigation
Area (hac.)
Fund
(lacs.)
7 GIR SOMNA
TH
MoWR AIBP Kalpsar Yojna 1 19256 0 0 0 0 0 0 0 10071 5000
10071 5000
7.1
MoWR Hark het ko pani
Lined Field Channels
1 25 0 8 5 17 10 0 0 0 0 25 15
10 MoWR Drought Proofing
through check
6 66 0 0
MoWR Dams/Water Harvesting
Structures
0 2 3 37 50 21 30 7 10 67 93
11 MoWR Secondary
Storage Structures (Tank)
0 0 0 0
MoWR 0 0
17
.5 MoWR Other Works
(Desilting, Deepning,Repairi
ng,RRR)
67 5572 5183 24 21 198 452 119 199 48 116 389 788
TOTAL 75 24919 5183 34 29 252 512 140 229 10126 5126 10552 5896
Annexure-3 – Strategic Action Plan of GWRDCFig. in Lakhs
Gir Somnath
Taluka Concerned Ministry/ Department
Component Activity Period of Implementation 5 / 7 yrs)
Total Number/Capacity(cum
)
Total Command Area/ lrrigation Potential
(Ha)
Estimated cost (in Rs.)(LacS)
Kodinar MoWR Har Khet ko Pani
Recharge Structure
5 Years 5 25 50
Patan MoWR Har Khet ko Recharge 5 Years 5 25 50
66 | P a g e
Veraval Pani Structure
Sutrapada
MoWR Har Khet ko Pani
Recharge Structure
5 Years 5 25 50
Talala MoWR Har Khet ko Pani
Recharge Structure
5 Years 5 25 50
Una MoWR Har Khet ko Pani
Recharge Structure
5 Years 5 25 50
Annexure-4 – Strategic Action Plan of GLDC Fig. in Lakhs
Blocks Component Area (Ha)
Estimated cost (in Lacs.)
2016-17
Area (Ha)
Estimated cost (in Lacs.)
2017-18
Area (Ha)
Estimated cost (in Lacs.)
2018-19
Area (Ha)
Estimated cost (in Lacs.)
2019-20
Total Area (Ha)
Total estimated
cost (in Lacs.)
Talala Farm pond 31.68 24.64 31.68 24.64 31.68 24.64 31.68 24.64 126.72 98.56
Sim pond 21 25 21 25 21 25 21 25 84 100
Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56
WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84
Total 72.6 158.28 72.6 158.28 72.6 158.28 72.6 633.1 290.4
Veraval Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64
Sim pond 12.6 15 12.6 15 12.6 15 12.6 15 50.4 60
Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56
WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84 Total 58.12 144.12 58.12 144.12 58.12 144.12 58.12 576.5 232.48
Sutrapada Farm pond 23.04 17.92 23.04 17.92 23.04 17.92 23.04 17.92 92.16 71.68
Sim pond 21 25 21 25 21 25 21 25 84 100 Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56
WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84
Total 65.88 149.64 65.88 149.64 65.88 149.64 65.88 598.6 263.52
67 | P a g e
Una Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64
Sim pond 12.6 15 12.6 15 12.6 15 12.6 15 50.4 60
Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56
WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84
Total 58.12 144.12 58.12 144.12 58.12 144.12 58.12 576.5 232.48
Kodinar Farm pond 30.24 23.52 30.24 23.52 30.24 23.52 30.24 23.52 120.96 94.08
Sim pond 16.8 20 16.8 20 16.8 20 16.8 20 67.2 80 Village pond 86.4 21 86.4 21 86.4 21 86.4 21 345.6 84
WHS 36 6.72 36 6.72 36 6.72 36 6.72 144 26.88
Total 71.24 169.44 71.24 169.44 71.24 169.44 71.24 677.8 284.96
Gir Gadhada
Farm pond 28.8 22.4 28.8 22.4 28.8 22.4 28.8 22.4 115.2 89.6
Sim pond 16.8 20 16.8 20 16.8 20 16.8 20 67.2 80 Village pond 86.4 21 86.4 21 86.4 21 86.4 21 345.6 84
WHS 42 7.84 42 7.84 42 7.84 42 7.84 168 31.36 Total 71.24 174 71.24 174 71.24 174 71.24 696 284.96
Annexure-5 – Strategic Action Plan of GGRCFig. in Lakhs
Target for 2019-20 Total Drip Irrigation System Sprinkle Irrigation System
Sr. No. District Block No of Farmers
Area (Ha)
Estimated Total Cost
Estimated Assistance
No of Farm
ers
Area (Ha)
Estimated
Total Cost
Estimared
Assistance
No of Farme
rs
Area (Ha)
Estimated Total Cost
Estimared
Assistance
1 GIR SOMNATH GIR GADHADA
117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52
68 | P a g e
Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05
Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91
Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04
Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09
Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32
TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77
4786.53
2393.26
1662 2659.18
531.84
265.92
Target for 2018-19 18-19
2 GIR SOMNATH GIR GADHADA
117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52
Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05
Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91
Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04
Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09
Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32
TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77
4786.53
2393.26
1662 2659.18
531.84
265.92
Target for 2017-18 17-18
3 GIR SOMNATH GIR GADHADA
117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52
Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05
Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91
Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04
69 | P a g e
Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09
Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32
TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77
4786.53
2393.26
1662 2659.18
531.84
265.92
Target for 2016-17 16-17
4 GIR SOMNATH GIR GADHADA
157 250.51 200.41 100.20 94 150.31 180.37 90.18 63 100.20 20.04 10.02
Kodinar 1334 2134.94 1707.95 853.98 801 1280.96
1537.16 768.58 534 853.98 170.80 85.40
Sutrapada 602 963.50 770.80 385.40 361 578.10 693.72 346.86 241 385.40 77.08 38.54
Talala 1167 1867.89 1494.31 747.16 700 1120.74
1344.88 672.44 467 747.16 149.43 74.72
Una 1231 1969.67 1575.74 787.87 739 1181.80
1418.17 709.08 492 787.87 157.57 78.79
Veraval 1048 1677.42 1341.93 670.97 629 1006.45
1207.74 603.87 419 670.97 134.19 67.10
TOTAL 5540 8863.94 7091.15 3545.57 3324 5318.36
6382.03
3191.02
2216 3545.57
709.11
354.56
Annexure-6 Strategic Action Plan of GSWMA Fig. in Lakhs
GSWMA PMKSY watershed MGNREGA
Cost Area Cost Area
UNA 1051.98 711.5 41.71 0
TALALA 1736.93 4055 0 0
70 | P a g e
Sr.No Activity Unit Physical Target for FY (2016-17)
Unit Cost (In
Lakhs) IWMP
Storage Volumes
(Cubic Meter)
Command Area/
Irrigation Potential
(Ha.)
Person days/Manday
s Planned
Convergence
Unit
Amount (In
Lakhs)
Name of Schemes
S.No EPA
1 Animal camp No. 0 0.00 0 0 0 0 0.00 0
2 Animal water trough (Havada)
No. 0 0.28 0 0 0 0 0.00 0
3 Causeway on connecting roads
No. 0 0.02 0 0 0 0 0.00 0
4 Check / Protection wall No. 0 0.08 0 0 0 0 0.00 0
5 Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
6 Drainage line correction (To prevent flooding of Gamtal)
rmt 0 0.00 0 0 0 0 0.00 0
7 Drinking water facility No. 1 2.09 0 0 0 0 0.00 0
8 Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
9 Grassland/Gauchar Development
Ha. 0 0.00 0 0 0 0 0.00 0
10 Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
11 Panchayat Well Repair & Pump Room
No. 0 0.00 0 0 0 0 0.00 0
12 Rain water harvesting system No. 1 0.59 0 0 0 0 0.00 0
13 Recharge / Repair of open wells
No. 1 0.09 0 0 0 0 0.00 0
71 | P a g e
14 Repair / development of artificial water bodies
No. 0 0.00 0 0 0 0 0.00 0
15 Revival of natural water bodies with recharge activities
No. 0 0.00 0 0 0 0 0.00 0
16 Sanitation facilities/Sewerage line
rmt 0 0.00 0 0 0 0 0.00 0
17 Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
18 Wind energy development No. 0 0.00 0 0 0 0 0.00 0
19 OTHERS (Otta at Tree) No. 0 0.00 0 0 0 0 0.00 0
20 OTHERS (Community Washing Stand and ghat)
No. 0 0.00 0 0 0 0 0.00 0
21 OTHERS (Plantation with Tree Guard)
No. 0 0.00 0 0 0 0 0.00 0
22 OTHERS (Cemetery Fencing & Wood Store Room)
No. 0 0.00 0 0 0 0 0.00 0
23 OTHERS (Nala Plug) No. 0 0.02 0 0 0 0 0.00 0
24 OTHERS (Open well cover) No. 0 0.01 0 0 0 0 0.00 0
25 OTHERS (Snan ghat) No. 0 0.00 0 0 0 0 0.00 0
26 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0
27 OTHERS (Drainage line farm )
RMT 3000 5.60 0 0 0 0 0.00 0
28 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0
S.No Land Development
1 Farm Bunding rmt. 10950
13.09 0 0 0 0 0.00 0
2 Afforestation Ha. 15.3 14.38 0 0 0 0 0.00 0
3 Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0
4 Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0
5 Horticulture Ha. 0 0.00 0 0 0 0 0.00 0
6 Land leveling Ha. 22 5.28 0 0 0 39 19.50 Forest
72 | P a g e
7 Pasture development Ha. 50.5 51.50 0 0 0 0 0.00 0
8 OTHERS (Plantation With wire fencing)
Ha. 18300
58.51 0 0 0 0 0.00 0
9 OTHERS (Sprikleer & drip) rmt. 828 97.71 0 0 0 680 69.89 GGRC
10
11
12
S.No Soil & Moisture Conservation
1 Check wall No. 20 17.42 0 0 1664 0 0.00 0
2 Earthen bund No. 8 9.80 320 7 936 0 0.00 0
3 Protection Wall No. 339 74.66 0 0 7130 35 9.80 MGNREGA
4 Waste weir No. 18 8.25 0 0 788 0 0.00 0
5 Bench Terracing cumec
1 1.00 0 0 96 0 0.00 0
6 Bori bandh No. 0 0.00 0 0 0 0 0.00 0
7 Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0
8 Countour Bunding rmt. 10 1.00 0 0 96 0 0.00 0
9 Countour Trenches rmt. 4000 4.60 0 0 439 0 0.00 0
10 Earthern Dam No. 0 0.44 0 0 42 0 0.00 0
11 Field Outlet No. 33 3.30 0 0 315 0 0.00 0
12 Gabion structure No. 20 3.00 0 0 287 0 0.00 0
13 Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
14 Gully plug No. 4 0.95 189.136 14 90 0 0.00 0
15 Loose boulder Checks No. 585 34.28 0 0 0 0 0.00 0
16 Nala Plug No. 57 34.09 0 0 3256 0 0.00 0
17 Stone bunding rmt. 2007 15.45 0 0 1476 0 0.00 0
18 Straggred Contour trenching(Terrace Talavadi)
0 0.00 0 0 0 0 0.00 0
19 OTHERS (Drainage line) rmt. 1426 10.92 0 0 812 0 0.00 0
73 | P a g e
20 OTHERS (Dry Rubble wall with pointing)
rmt. 917 11.00 0 0 0 0 0.00 0
21 OTHERS (well parapet) No. 4 1.12 0 0 80 0 0.00 0
OTHERS (Drainage line farm )
rmt 25100
42.16 0 0 688 0 0.00 0
22 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0
S.No Water Harvesting Structure
1 Cause way cum Chek dam No. 29 142.54 42761.136 130.5 13613 1 2.00 Mla
2 Check dam No. 83 337.01 101102.973
456.5 32186 0 0.00 0
3 Village/Community Pond No. 39 45.48 13644 214.5 4344 1 1.80 MGNREGA
4 Farm Pond No. 63 38.44 11533.188 181.5 3672 4 2.46 Self,mla
5 Percolation Tank No. 5 6.97 2091 22.5 666 0 0.00 MGNREGA
6 Pond Inlet No. 1 3.30 990 4.5 0 0 0.00 GLDC
7 Pond Outlet No. 0 0.00 0 0 0 0 0.00 0
8 OTHERS (Connection Diversion Drainege Line)
rmt 507 4.80 1440 0 458 250 2.00 MGNREGA
9 OTHERS (Paka Plag) rmt 33 28.60 8580 148.5 2731 0 0.00 MGNREGA
S.No Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
1 Deepening/Desiltation Of Pond
19 44.96 13487.73 104.5 4294 9 23.01 MGNREGA
2 Deepening Of Percolation Tank
No. 0 0.00 0 0 0 0 0.00 MGNREGA
3 De-siltation of Checkdam No. 92 51.21 15364.35 506 4891 8 7.10 MGNREGA
74 | P a g e
4 Repairing of Checkdam No. 85 123.05 36915.642 467.5 11752 0 0.00 MGNREGA
5 OTHERS (De-Siltation & Repair Of Village Pond)
No. 4 2.50 750 22 239 0 0.00 MGNREGA
6 OTHERS (De-Siltation & Repair Of Village Well)
No. 2 5.10 1530 11 487 0 0.00 0
S.No Ground Water Recharging Structures
1 Dugwell Recharge structure No. 11 4.60 0 0 439 0 0.00 0
2 Farm Recharge Filter No. 9 2.07 0 0 198 0 0.00 0
3 Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0
4 Pond Recharge structure No. 85 40.72 0 0 3889 0 0.00 0
5 OTHERS (Wall Protection Of Well)
No. 97 39.76 0 0 573 0 0.00 0
6 OTHERS (Recharge filter with Bore Well)
No. 174 90.26 0 0 0 0 0.00 0
7 OTHERS (Recharge filter with village Dug Wall)
No. 1 3.95 0 0 0 0 0.00 0
S.No LH & ME & Production System
1 AGRICULTURE ACTIVITIES
0 0.00 0 0 0 0 0.00
Agro Center No. 12 28.90 0 0 0 44 1.80 0
Agricultural Implements No. 8 18.08 0 0 0 113 0.00 Agri Dept
Agro- Forestry No. 0 0.00 0 0 0 0 0.00 0
Crop Demonstration Plot No. 13 3.17 0 0 0 2 0.22 Agri Dept
Fishery Development No. 0 0.00 0 0 0 0 0.00 0
Floriculture Development No. 0 0.00 0 0 0 0 0.00 0
Fodder Bank Development No. 5 12.46 0 0 0 34 0.40 SELF
Green House No. 21 5.06 0 0 0 0 0.00 Misan
75 | P a g e
Mangalam
Horticulture Plantation No. 0 0.00 0 0 0 0 0.00 0
Kitchen Garden No. 3 0.51 0 0 0 2 0.00 0
Nursery raising No. 0 0.00 0 0 0 0 0.00 0
OTHERS(Crop Proctetion tower)
No. 199 34.28 0 0 0 17 0.62 0
INPUT SUPPORT No. 0 0.00 0 0 0 0 0.00 0
Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation
No. 1029 154.12 0 0 0 1020
253.47 GGRC
Sprinkler Demo. No. 531 71.81 0 0 0 463 59.62 GGRC
Vegetable Nursery Raising with drip irrigation
No. 2 0.48 0 0 0 2 0.72 SELF
Vermi compost No. 42 10.54 0.4 0 0 2 0.00 0
2 AGRO PROCESSING ACTIVITIES
Dal Making Unit No. 0 0.00 0 0 0 0 0.00 0
Flour & Dal/Rice Processing unit
No. 7 12.59 0 0 0 1 1.00 SELF
Garam Masala No. 3 5.00 0 0 0 0 0.00 0
Grading and packaging of agricultural produces,
No. 29 47.78 0 0 0 0 0.00 0
Jam-jelly making No. 0 0.00 0 0 0 0 0.00 0
Microenterprises based on Minor Forest Produce (MFP)
No. 0 0.00 0 0 0 0 0.00 0
Oil extraction mill No. 1 2.00 0 0 0 0 0.00 0
OTHERS No. 16 32.74 0 0 0 0 0.00 0
Package Food Products No. 3 1.50 0 0 0 0 0.00 0
Pulp making No. 0 0.00 0 0 0 0 0.00 0
Rice mill No. 0 0.00 0 0 0 0 0.00 0
Value added products from No. 0 0.00 0 0 0 0 0.00 0
76 | P a g e
milk
3 Animal Husbandry
Cattle Feed and Nutrition Store
No. 16 48.04 0 0 0 1 0.50 Group Conti.
Animal Health camps No. 64 28.75 0 0 0 17 2.06 Group Conti.
Animal Travis (Pinjaru) No. 0 0.00 0 0 0 0 0.00 Taluka Vaternory
Center Apiculture (Bee keeping) No. 0 0.00 0 0 0 0 0.00 0
Artificial insemination No. 0 0.00 0 0 0 0 0.00 0
Back-yard poultry No. 0 0.00 0 0 0 0 0.00 0
Dairy cooperative promotion, No. 4 10.30 0 0 0 0 0.00 0
OTHERS(Honey Bee Farm) No. 827 8.96 0 0 0 0 0.00 0
Pasture development No. 0 0.00 0 0 0 0 0.00 0
Poultry Farming to individuals
No. 1 2.00 0 0 0 0 0.00 0
Sericulture No. 0 0.00 0 0 0 0 0.00 0
Small ruminants No. 0 0.00 0 0 0 0 0.00 0
Veterinary Aid for livestock No. 0 0.00 0 0 0 0 0.00 0
Cattle Shed No. 30 7.20 0 0 0 0 0.00 0
4 Establishing linkages
Credit linkages No. 1 4.77 0 0 0 0 0.00 0
Linkages with Future Markets,
No. 3 4.46 0 0 0 0 0.00 0
Market linkages, No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
Raw material supply channel, No. 0 0.00 0 0 0 0 0.00 0
5 Local traditional handicraft
Bamboo based products, No. 0 0.00 0 0 0 0 0.00 0
Kutchi Bandhini, No. 0 0.00 0 0 0 0 0.00 0
77 | P a g e
OTHERS No. 2 2.25 0 0 0 0 0.00 0
Pottery No. 0 0.00 0 0 0 0 0.00 0
6 Minor Activities
Embroidery Unit No. 1 2.47 0 0 0 0 0.00 0
Handicraft Unit No. 6 6.02 0 0 0 0 0.00 0
OTHERS(Grain Bank) No. 36 55.31 0 0 0 3 1.44 P.C.
Provision Store No. 14 15.99 0 0 0 0 0.00 0
stiching machine No. 4 5.10 0 0 0 0 0.00 0
Up Gradation of centering materials
No. 11 21.37 0 0 0 0 0.40 P.C.
Vegetable shop No. 1 0.26 0 0 0 0 0.00 0
7 Non-conventional Energy Sources
Bio gas plant, No. 0 0.00 0 0 0 0 0.00 0
Bio-fuel plantation, No. 0 0.00 0 0 0 0 0.00 0
energy conservation measures,
No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
Solar energy promotion, No. 0 0.00 0 0 0 0 0.00 0
Wind energy production, No. 0 0.00 0 0 0 0 0.00 0
8
Capacity Building, Monitoring & Evaluation
0 55.00 0 0 0 0 0.00 0
9 Admin 0 105.06 0 0 0 0 0.00 0
10 Consolidation 0 59.39 0 0 0 0 0.00 0
TOTAL 2421.74
2290.50
Sr.No Activity Unit Physical Target for FY (2017-18)
78 | P a g e
Unit Cost (In
Lakhs)
IWMP
Storage Volumes (Cubic Meter)
Command Area/
Irrigation Potential
(Ha.)
Person days/Manday
s Planned
Convergence
Unit
Amount (In
Lakhs)
Name of Schemes
S.No EPA
1 Animal camp No. 0 0.00 0 0 0 0 0.00 0
2 Animal water trough (Havada)
No. 0 0.00 0 0 0 0 0.00 0
3 Causeway on connecting roads
No. 0 0.00 0 0 0 0 0.00 0
4 Check / Protection wall No. 0 0.00 0 0 0 0 0.00 0
5 Demonstration for Agricultural / Animal Husbandry Productivity Enhancement
No. 0 0.00 0 0 0 0 0.00 0
6 Drainage line correction (To prevent flooding of Gamtal)
rmt 0 0.00 0 0 0 0 0.00 0
7 Drinking water facility No. 0 0.00 0 0 0 0 0.00 0
8 Fencing for protection from wild animals
rmt. 0 0.00 0 0 0 0 0.00 0
9 Grassland/Gauchar Development
Ha. 0 0.00 0 0 0 0 0.00 0
10 Improvised and energy efficient smashan gruh (Cemetery )
No. 0 0.00 0 0 0 0 0.00 0
11 Panchayat Well Repair & Pump Room
No. 0 0.00 0 0 0 0 0.00 0
12 Rain water harvesting system No. 0 0.00 0 0 0 0 0.00 0
13 Recharge / Repair of open wells
No. 0 0.00 0 0 0 0 0.00 0
14 Repair / development of artificial water bodies
No. 0 0.00 0 0 0 0 0.00 0
79 | P a g e
15 Revival of natural water bodies with recharge activities
No. 0 0.00 0 0 0 0 0.00 0
16 Sanitation facilities/Sewerage line
rmt 0 0.00 0 0 0 0 0.00 0
17 Use solar power for productive activities
No. 0 0.00 0 0 0 0 0.00 0
18 Wind energy development No. 0 0.00 0 0 0 0 0.00 0
19 OTHERS (Otta at Tree) No. 0 0.00 0 0 0 0 0.00 0
20 OTHERS (Community Washing Stand and ghat)
No. 0 0.00 0 0 0 0 0.00 0
21 OTHERS (Plantation with Tree Guard)
No. 0 0.00 0 0 0 0 0.00 0
22 OTHERS (Cemetery Fencing & Wood Store Room)
No. 0 0.00 0 0 0 0 0.00 0
23 OTHERS (Nala Plug) No. 0 0.00 0 0 0 0 0.00 0
24 OTHERS (Open well cover) No. 0 0.00 0 0 0 0 0.00 0
25 OTHERS (Snan ghat) No. 0 0.00 0 0 0 0 0.00 0
26 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0
27 OTHERS (Drainage line farm )
RMT 0 0.00 0 0 0 0 0.00 0
28 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0
S.No Land Development
1 Farm Bunding rmt. 16130
17.31 0 0 0 0 0.00 0
2 Afforestation Ha. 4 4.20 0 0 0 0 0.00 0
3 Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0
4 Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0
5 Horticulture Ha. 0 0.00 0 0 0 0 0.00 0
6 Land leveling Ha. 37 18.00 0 0 0 0 0.00 Forest
7 Pasture development Ha. 12 15.73 0 0 0 0 0.00 0
8 OTHERS (Plantation With Ha. 0 0.00 0 0 0 0 0.00 0
80 | P a g e
wire fencing)
9 OTHERS (Sprikleer & drip) rmt. 7 1.60 0 0 0 0 0.00 GGRC
10
11
12
S.No Soil & Moisture Conservation
1 Check wall No. 1 1.00 0 0 96 0 0.00 0
2 Earthen bund No. 1 2.14 0 0 204 0 0.00 0
3 Protection Wall No. 0 0.00 0 0 0 0 0.00 MGNREGA
4 Waste weir No. 0 0.00 0 0 0 0 0.00 0
5 Bench Terracing cumec
2 1.97 0 0 188 0 0.00 0
6 Bori bandh No. 0 0.00 0 0 0 0 0.00 0
7 Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0
8 Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0
9 Countour Trenches rmt. 400 6.00 0 0 573 0 0.00 0
10 Earthern Dam No. 0 0.00 902 14 0 0 0.00 0
11 Field Outlet No. 104 14.51 0 0 1386 0 0.00 0
12 Gabion structure No. 0 0.00 0 0 0 0 0.00 0
13 Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0
14 Gully plug No. 10 6.08 1356.092 59.5 581 0 0.00 0
15 Loose boulder Checks No. 127 13.30 0 0 67 0 0.00 0
16 Nala Plug No. 19 12.82 0 0 1224 0 0.00 0
17 Stone bunding rmt. 0 0.00 0 0 0 0 0.00 0
18 Straggred Contour trenching(Terrace Talavadi)
900 2.24 0 0 214 0 0.00 0
19 OTHERS (Drainage line) rmt. 2750 8.23 0 0 0 0 0.00 0
20 OTHERS (Dry Rubble wall with pointing)
rmt. 0 0.00 0 0 0 0 0.00 0
81 | P a g e
21 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0
OTHERS (Drainage line farm )
rmt 0 0.00 0 0 0 0 0.00 0
22 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0
S.No Water Harvesting Structure
1 Cause way cum Chek dam No. 0 0.00 0 0 0 0 3.50 Mla
2 Check dam No. 0 0.00 0 0 0 1 4.00 0
3 Village/Community Pond No. 1 4.66 1398.69 5.5 445 4 8.00 MGNREGA
4 Farm Pond No. 9 2.10 630 49.5 201 2 1.50 Self,mla
5 Percolation Tank No. 0 0.00 0 0 0 0 0.00 MGNREGA
6 Pond Inlet No. 0 0.00 0 0 0 0 0.00 GLDC
7 Pond Outlet No. 0 0.00 0 0 0 0 0.00 0
8 OTHERS (Connection Diversion Drainege Line)
rmt 0 0.00 0 0 0 0 0.00 MGNREGA
9 OTHERS (Paka Plag) rmt 0 0.00 0 0 0 0 0.00 MGNREGA
10
11
S.No Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)
1 Deepening/Desiltation Of Pond
0 0.00 0 0 0 7 10.70 MGNREGA
2 Deepening Of Percolation Tank
No. 0 0.00 0 0 0 0 0.00 MGNREGA
3 De-siltation of Checkdam No. 0 0.00 0 0 0 0 0.00 MGNREGA
4 Repairing of Checkdam No. 12 14.78 4434 66 1412 0 0.00 MGNREGA
82 | P a g e
5 OTHERS (De-Siltation & Repair Of Village Pond)
No. 0 0.00 0 0 0 0 0.00 MGNREGA
6 OTHERS (De-Siltation & Repair Of Village Well)
No. 0 0.00 0 0 0 0 0.00 0
S.No Ground Water Recharging Structures
1 Dugwell Recharge structure No. 35 9.20 0 0 879 0 0.00 0
2 Farm Recharge Filter No. 0 0.00 0 0 0 0 0.00 0
3 Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0
4 Pond Recharge structure No. 0 0.00 0 0 0 0 0.00 0
5 OTHERS (Wall Protection Of Well)
No. 0 0.00 0 0 0 0 0.00 0
6 OTHERS (Recharge filter with Bore Well)
No. 0 0.00 0 0 0 0 0.00 0
7 OTHERS (Recharge filter with village Dug Wall)
No. 0 0.00 0 0 0 0 0.00 0
8
9
S.No LH & ME & Production System
1 AGRICULTURE ACTIVITIES
0 0.00 0 0 0 0 0.00
Agro Center No. 0 0.00 0 0 0 0 0.00 0
Agricultural Implements No. 0 0.00 0 0 0 0 0.00 Agri Dept
Agro- Forestry No. 0 0.00 0 0 0 0 0.00 0
Crop Demonstration Plot No. 0 0.00 0 0 0 0 0.00 Agri Dept
Fishery Development No. 0 0.00 0 0 0 0 0.00 0
Floriculture Development No. 0 0.00 0 0 0 0 0.00 0
Fodder Bank Development No. 0 0.00 0 0 0 0 0.00 SELF
Green House No. 0 0.00 0 0 0 0 0.00 Misan Mangalam
83 | P a g e
Horticulture Plantation No. 0 0.00 0 0 0 0 0.00 0
Kitchen Garden No. 0 0.00 0 0 0 0 0.00 0
Nursery raising No. 0 0.00 0 0 0 0 0.00 0
OTHERS(Crop Proctetion tower)
No. 40 8.40 0 0 0 10 1.10 0
INPUT SUPPORT No. 0 0.00 0 0 0 0 0.00 0
Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation
No. 0 0.00 0 0 0 0 0.00 GGRC
Sprinkler Demo. No. 0 0.00 0 0 0 0 0.00 GGRC
Vegetable Nursery Raising with drip irrigation
No. 0 0.00 0 0 0 0 0.00 SELF
Vermi compost No. 0 0.00 0 0 0 0 0.00 0
2 AGRO PROCESSING ACTIVITIES
0 0 0 0 0.00 0
Dal Making Unit No. 0 0.00 0 0 0 0 0.00 0
Flour & Dal/Rice Processing unit
No. 0 0.00 0 0 0 0 0.00 SELF
Garam Masala No. 0 0.00 0 0 0 0 0.00 0
Grading and packaging of agricultural produces,
No. 1 1.40 0 0 0 0 0.00 0
Jam-jelly making No. 0 0.00 0 0 0 0 0.00 0
Microenterprises based on Minor Forest Produce (MFP)
No. 0 0.00 0 0 0 0 0.00 0
Oil extraction mill No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
Package Food Products No. 0 0.00 0 0 0 0 0.00 0
Pulp making No. 0 0.00 0 0 0 0 0.00 0
Rice mill No. 0 0.00 0 0 0 0 0.00 0
Value added products from milk
No. 0 0.00 0 0 0 0 0.00 0
84 | P a g e
3 Animal Husbandry 0 0 0 0 0.00 0
Cattle Feed and Nutrition Store
No. 1 2.00 0 0 0 0 0.00 Group Conti.
Animal Health camps No. 5 2.24 0 0 0 0 0.00 Group Conti.
Animal Travis (Pinjaru) No. 0 0.00 0 0 0 0 0.00 Taluka Vaternory
Center Apiculture (Bee keeping) No. 0 0.00 0 0 0 0 0.00 0
Artificial insemination No. 0 0.00 0 0 0 0 0.00 0
Back-yard poultry No. 0 0.00 0 0 0 0 0.00 0
Dairy cooperative promotion, No. 0 0.00 0 0 0 0 0.00 0
OTHERS(Honey Bee Farm) No. 0 0.00 0 0 0 0 0.00 0
Pasture development No. 0 0.00 0 0 0 0 0.00 0
Poultry Farming to individuals
No. 0 0.00 0 0 0 0 0.00 0
Sericulture No. 0 0.00 0 0 0 0 0.00 0
Small ruminants No. 0 0.00 0 0 0 0 0.00 0
Veterinary Aid for livestock No. 0 0.00 0 0 0 0 0.00 0
Cattle Shed No. 0 0.00 0 0 0 0 0.00 0
4 Establishing linkages 0 0 0 0 0.00 0
Credit linkages No. 0 0.00 0 0 0 0 0.00 0
Linkages with Future Markets,
No. 0 0.00 0 0 0 0 0.00 0
Market linkages, No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
Raw material supply channel, No. 0 0.00 0 0 0 0 0.00 0
5 Local traditional handicraft
0 0 0 0 0.00 0
Bamboo based products, No. 0 0.00 0 0 0 0 0.00 0
Kutchi Bandhini, No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
85 | P a g e
Pottery No. 0 0.00 0 0 0 0 0.00 0
6 Minor Activities 0 0 0 0 0.00 0
Embroidery Unit No. 0 0.00 0 0 0 0 0.00 0
Handicraft Unit No. 0 0.00 0 0 0 0 0.00 0
OTHERS(Grain Bank) No. 2 2.46 0 0 0 0 0.00 P.C.
Provision Store No. 0 0.00 0 0 0 0 0.00 0
stiching machine No. 0 0.00 0 0 0 0 0.00 0
Up Gradation of centering materials
No. 0 0.00 0 0 0 0 0.00 P.C.
Vegetable shop No. 0 0.00 0 0 0 0 0.00 0
7 Non-conventional Energy Sources
0 0 0 0 0.00 0
Bio gas plant, No. 0 0.00 0 0 0 0 0.00 0
Bio-fuel plantation, No. 0 0.00 0 0 0 0 0.00 0
energy conservation measures,
No. 0 0.00 0 0 0 0 0.00 0
OTHERS No. 0 0.00 0 0 0 0 0.00 0
Solar energy promotion, No. 0 0.00 0 0 0 0 0.00 0
Wind energy production, No. 0 0.00 0 0 0 0 0.00 0
8
Capacity Building, Monitoring & Evaluation
0 40.00 0 0 0 0 0.00 0
9 Admin 0 55.64 0 0 0 0 0.00 0
10 Consolidation 0 99.15 0 0 0 0 0.00 0
TOTAL 367.17 194.50
MANGO
GROUNDNUT